Loading...
HomeMy WebLinkAbout34 Development Permit 324 Shenandoah Ph III.. • McCLURE ENGINEERING, INC.---~---- ~~\~\0: January 2, 1996 Mrs. Veronica Morgan, P.E. Assistant City Engineer CITY OF COLLEGE STATION P .O. Box 9960 College Station , Texas 77842 RE: DRAINAGE REPORT ADDENDUM FOR SHENANDOAH , PHASE THREE Dear Veronica: This letter is intended to document our response to your concerns about the ability of the existing storm drain system in Dove Trail to accommodate the SHENANDOAH , PHASE THREE development. You correctly noted that our submittal includes detailed information and calculations about the ultimate conditions, but failed to specifically address the interim period of time between the construction of Shenandoah , Phase Three and Shenandoah, Phase Four. The following is an analysis of the existing drainage area upstream of the Dove Trail/Barron Road intersection. Projections and estimates for the drainage area and storm drain system were documented in the SPRINGBROOK-OAKGROVE Subdivision drainage report dated June 28 , 1994. A. EXISTING CONDITIONS AT OUTFALL 1. A 30" RCP storm drain @ 1.49% grade was built along Dove Trail. (The pipe was extended across Barron Road at 4 .82 % grade ; however , for the purposes of this analysis , the lesser slope was used to determine the system's capacity at Barron Road.) 2 . The calculated pipe capacity is 46.5 cfs (flowing full). B. RUNOFF COMPUTATIONS FOR CONTRIBUTING DRAINAGE AREA USING RATIONAL FORMULA 1. Time of Concentration: Hydraulic Length = 1125' 325 L.F. Wooded & Trash Fallow Flow@ 1.5% grade , V = 0.6 fps 800 L.F. Grassed Waterway Flow@ 1.9% grade , V = 2.1 fps Tc = 325 + 800 = 15.4 min. 0 .6(60) 2.1(60) 1722 Broadmoor, Suite 210 • Bryan , Texas 77802 • (409) 776-6700 • FAX (409) 776-6699 .,, . ' SHENANDOAH , PHASE THREE DRAINAGE 1/2/96 2 . Runoff Coefficient: Total Drainage Area = 15 .4 Acres with 0.9 Acres Medium Residential & 14.5 Acres Fallow & Wooded c(composite) = 0.9(0.6) + 14.5(0.4) = 0 .41 15.4 3. Rainfall Intensity: I10 = 80 = 7.10 in./hr. (tc + 8.5)" 763 4 . Peak Dischar~e: Q10 = 0.41(7.10)(15.4) = 44.8 cfs <46.5 cfs allowed C . CONCLUSION: PAGE2 Since the projected peak discharge for the drainage area is less than the capacity of the existing storm drainage system at Barron Road/Dove Trail, the design is in compliance with the City Drainage Ordinance. For storms greater than the 10-year storm event, the overflow will be contained in the Dove Trail right-of-way and will enter the South Fork of Lick Creek through the drainage corridor provided at the Cardinal Street/Dove Trail intersection (see Springbrook -Oakgrove Plat). Should you have any questions or need additional information , please do not hesitate to call . . e,,/ . Very~truly yours, J(} I/~ ~chael R. McClure, P.E., R.P.L.S. MRM/mlm a :\shen3drg.adn Hugh G. Glenn, Fronds Mahoney And Ernest D. I Leno Rivers 58. 79 Acres vo1um~of8tl;,it~r 119 ~ 35 ~ 9 34 ~ ~ 8 33 c ~ Q'l 7 J2 6 JI 5 () 4 3 2 5 Richland Court South 6 7 8 9 " 14 13 12 15 9 10 11 2 . -g ;g • ::> ~o 30" RCP-. 10 16 Spring. rook ~ Ookfl r----...:V.:.:::bl.~. '~t~og~ 'JJ 17 32 33 9 BLOCK FOUR 33 32 Richland Court North ~ JS 11 ~ ~ ~ ~ Interim Drainage Area Map Shenandoah Phase Ill &-IV 4 JI .}£ 2~ 9 J 2 19 10 Jasmine Cou. ,. • McCLURE ENGINEERING, INC. ______ _ September 13, 1995 Mrs . Veronica Morgan , P.E. Assistant City Engineer CITY OF COLLEGE STATION P.O . Box 9960 College Station , Texas 77842 Re: Drainage Report Addendum for Shenandoah Phase Ill Dear Veron ica : The Shenandoah Phase Two Final Drainage Analysis dated March 15 , 1995 (amended May 11 , 1995) states in the introduction , "The study includes the drainage analysis for the storm water detention requirements of both Phases Two and Three of the Shenandoah development". Minor changes in the design of Phase Three require that the Phase Two Analysis be updated to account for these changes . The attached Exhibit "A" (Master Drainage Map) and Exhibit "B" (Drainage Computations) may be inserted into the Phase Two Analysis as an Addendum . Note that calculations for all Areas of Phases Two through Five are included . The information shown for Phase Four and Five is preliminary . No final Analysis of the detention area included in Phase Four is offered . Because the Phase Four detention area is not built or required with this Phase , we have not completed our design . With the submission of Phase Four, we will submit a complete drainage report covering all Phases . Should you have any questions concerning this revision to the Drainage Report, please advise . Very_ t~uly J'Jls , Jr)~~ Michael R. McClure, P.E., RP.LS . MRM/mlm attachments 1722 Broadmoor, Suite 210 • Bryan , Texas 77802 • (409) 776-6700 • FAX (409) 776-6699 DATE: TO: ATTN: 12/21 /95 McCLURE ENGINEERING, INC. 1722 Broadmoor, Suite 210 Bryan, Texas 77802 (409) 776-6700 FAX 776-6699 TRANSMITTAL LETTER Mrs. Veronica Morgan, P.E. Assistant City Engineer CITY OF COLLEGE STATION ATTACHED PLEASE FIND: Six (6) additional sets of revised construction plans for SHENANIX>AH, PHASE THREE. Three (3) additional sets for the City (total of 4) and three (3) sets to be stamped with "approval" and returned to our office for the Contractor's use. THESE ARE TRANSMITTED TO YOU FOR THE FOLLOWING REASON: For Approval Your Use Revisions Made xx As Requested For Review and Comment Returned after Loan to Us RECEIVED BY: DATE: SIGNED BY: /Y/.f!lf'~ MICHAEL R. McCLURE, P.E., R.P.L.S. DATE: TO: ATTN: 12/8/95 McCLURE ENGINEERING, INC. 1722 Broadmoor, Suite 210 Bryan, Texas 77802 (409) 776-6700 FAX 776-6699 TRANSMITTAL LETTER Mrs. Veronica Morgan, P.E. Assistant City Engineer COLLEGE STATION, 'IEXAS ATTACHED PLEASE FIND: 1. Redlined construction plans for SHENANOOAH, PHASE THREE 2. One set of revised construction plans to be checked for compliance with redlined sets 3. Two (2) copies of Construction Cost Estimate THESE ARE TRANSMITTED TO YOU FOR THE FOLLOWING REASON: For Approval Your Use Revisions Made As Requested For Review and Comment Returned after Loan to Us .~r \~ RECEIVED BY: DATE: SIGNED BY: MICHAEL R. McCLURE, P.E., R.P.L.S. to Fn~ cDW ENGINEER'S CONSTRUCTION COST ESTIMATE -tt ?z4) SHENANDOAH,PHASETHREE DECEMBER 7, 1995 (REVISED) ITEM DESCRIPTION UNIT QUANTITY UNIT AMOUNT NO. COST STREET CONSTRUCTION 1 Erosion & Sedimentation Control LS. $2,000.00 $2,000.00 2 Clearing & Grubbing LS. 1 2,500.00 2,500.00 3 Excavation C.Y. 10,981 2.50 27,452.50 4 Cellulose Fiber Mulch Seeding S.Y. 2,225 0.50 1,112.50 5 6" Lime Stab. Subgrade (53 Lime) S.Y. 8,111 2.40 19,466.40 6 Extra Lime Ton 55 80.00 4,400.00 7 6" Flexible Base Crushed Stone S.Y. 6,433 5.35 34,416.55 8 11h" Hot Mix Asphaltic Concrete (Type DJ S.Y. 6,433 3.75 24, 123.75 9 Reinforced Concrete Curb & Gutter LF. 2,674 7.00 18,718.00 10 Reinf. Concrete Sidewalk S.F. 7,055 2.15 15,168.25 11 Reinf. Concrete Aprons S.F. 1,934 3.75 7,252.50 12 Driveway Approaches S.F. 13,664 3 .15 43,041.60 STREET CONSTRUCTION SUBTOTAL $156,610.45 DRAINAGE CONSTRUCTION 13 15" RCP (C76, Cl. Ill) LF. 58 22.00 $1,276.00 14 18" RCP (C76, Cl. Ill) LF. 130 27.00 3,510.00 15 24" RCP (C76, Cl. Ill) LF. 58 32.00 1,856.00 16 27' RCP (C76, Cl. 111) LF . 130 35.00 4,550.00 17 Concrete Junction Box Ea. 1 1,200.00 1,200.00 18 5' Recessed Cone. Inlet Ea. 2 1,750.00 3,500.00 19 1 O' Recessed Cone. Inlet Ea. 2 2,050.00 4,100.00 20 Connect to Existing Storm Drain LS. 1 250.00 250.00 21 Dry Riprap Channel Lining S.Y. 35 60.00 2,100.00 22 Trench Safety (Storm Drain) LF. 188 1.50 282.00 DRAINAGE CONSTRUCTION SUBTOTAL $22,624.00 SEWER LINE CONSTRUCTION 23 6" PVC (SDR-26, D3034)(6' to 8' depth) LF . 323 15.00 4,845.00 24 6" PVC (SDR-26 , D3034)(8' to 10' depth) LF. 1,684 16.50 27,786.00 25 6" PVC (SDR -26, D3034)(10' to 12' depth) LF. 121 18.50 2,238.50 26 Standard Sewer Manhole {< 8' depth) Ea. 4 1,200.00 4,800.00 27 Standard Sewer Manhole (8' to 1 O' depth) Ea. 5 1,350.00 6.750.00 28 Remove Plug & Connect to Existing 6" Line LS . 200.00 200.00 Page 1 ENGINEER'S CONSTRUCTION COST ESTIMATE SHENANDOAH,PHASETHREE DECEMBER 7, 1995 (REVISED) ITEM DESCRIPTION UNIT QUANTITY UNIT AMOUNT NO. COST 29 Trench Safety (Sewer System) L.F. 2.128 1.50 3,192.00 30 4" Service Line (Type 1)(17.4' Avg.) Ea . 20 650.00 13,000.00 31 4" Service Line (Type 11)(56.2' Avg.) Ea. 5 810.00 4,050.00 SEWER LINE CONSTRUCTION SUBTOTAL $66.861.50 WATER LINE CONSTRUCTION 32 6" PVC (C900, Cl. 200) L.F. 1.521 14.50 $22,054.50 33 8" PVC (C900, Cl. 200) L.F. 665 17.50 11,637.50 34 Rre Hydrant Assembly (Type I) Ea. 2 1,600.00 3,200.00 35 Connect to Existing 6" A.C. Line LS. 300.00 300.00 36 Connect to Existing 8" A.C. Line LS . 1 350.00 350.00 37 6" M.J. Gate Valve Ea. 4 350.00 1,400.00 38 8" M.J. Gate Valve Ea. 2 500.00 1,000.00 39 'Z' Blow-off Assembly with 6" C9p Ea. 400.00 400.00 40 2" Blow-off Assembly with 8" Cap Ea. 410.00 410.00 41 8" X 6" M. J. Cross Ea. 240.00 240.00 42 6" X 6" M.J. Hydrant Tee Ea. 230.00 230.00 43 8" X 6" M.J. Hydrant Tee Ea. 240.00 240.00 44 6" X 45° M.J. Bend Ea. 4 175.00 700.00 45 6" X 13" Anchor Coupling Ea. 3 180.00 540.00 46 8" X 13" Anchor Coupling Ea. 2 210.00 420.00 47 11h" Copper Service (49' Avg. Length) Ea . 12 715.00 8.580.00 48 1" Copper Service (44' Avg. Length) Ea. 1 530.00 530.00 49 Trench Safety (Water Line) L.F. 2,046 1.50 3.069.00 WATER LINE CONSTRUCTION SUBTOTAL $55,301.00 TOTAL ESTIMATED COST OF CONSTRUCTION $301.396.95 Page2 DEVELOPMENT PERMIT PERMIT NO . 324 Shenandoah Phase 3 FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE SITE LEGAL DESCRIPTION: Shenandoah Subdivision, Phase 3 SITE ADDRESS: n/a OWNER: Edward Froehling 3887 High Lonesome College Station, Texas 77845 DRAINAGE BASIN: South Fork of Lick Creek, Basin IV TYPE OF DEVELOPMENT: This permit is valid for site construction according to approved plans . Contractor shall prevent silt and debris from leaving the site in accordance with the City of College Station Drainage Policy and Design Criteria. Owner and/or contractor shall be responsible for any damage to existing city streets or infrastructure due to heavy machinery and/or equipment. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities . I hereby grant this permit for development of an area outside the special flood hazard area . All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer in the development permit application for the above named project and all of the codes and ordinances of the City of College Station that apply . <;)~~ Administrator/Representative Date 1 Date Contractor Date Figure XII Application Form Development Permit Inside/Outside Established Flood Hazard Areas City of CoUege Station, Texas (re: Ordinance No. 1728) Site Legal Description: _ __:S=:HENANOO.=:::.::=..:~Aff=,~P..:;HAS~;:;:;E_THREE::.:=-==:__------------------ Site Address: end of Hunter Creek Drive in SHENANOOAH, PHASE ONE Owner: EDWARD FROEHLING Address: 3387 High Lonesome, c.s. 77845 ~--~-----------~---~~-~ Telephone No.: __!..7.L76~8,!_f,2~6.J.L6 _____ _ ~ Michael R. McClure, P.E., R.P.L.S. Address: 1722 Broadrnoor, Bryan. 77802 Engineer: --'M""'"cCL"-==URE==........,EN ... G .... I=N--EER __ IN_G~, _IN_C_,. ________ Telephone No.: .....1.7~7~6=.i.6"'"'701.1..10~------- Contractor: CENTRAL TEXAS SITEWORKS, INC. Address: P.O. Box 2338, Bryan, 77806 Telephone No.: ..... aL.:14..1.1.6~-J...J1 8o.l.JO.L.3,,__ _____ _ Date Application Filed:---------------Approved:------------ Application is hereby made for the following specific waterway alterations: subdivis ion develognent on land that drains to the South Fork of Lick Creek Attach ed as part of this application: 63 Application Fee IBI Signe d Certificate O Site and Construct ion Plans, with supporting document<1tion : iwo (2) copies of each O Oth<:;r: ~~-~~---~~~--~~-~~ ACKNOWLEDGEMENTS: I, EDWARD FROEHLING as owner, hereby acknowledge or a ffirm that: The above Drainage Plan and supporHng documents complies wiht the require ments of Ordinance No. 1728, :~11~ Own e r · ) I I Date Date o ~ue Page 1of2 I #!*"/ / / .. Figure XII Continued CERTIFICATIONS: A I, certify that any nonresidential structure on or proposed to be on this site as part of this application meets flood-proofing requirements as set out in Section of Ordinance No. 1728 Architect/Engineer Date B. I, certify that the finished floor level of the lowest floor, including any basement, of any residential structure as part of this application is or proposed to be at or above the base flood elevation as established in the latest Federal Insurance Administration flood hazard study and maps, as amended. Architect/Engineer Date Architect/Engineer Date· REVIEWED FOR APPROVAL: -----=-----------Floodplain Administrator Date APPROVAL: Special conditions or comments as part of approval: __________ _ ACCOUNT NO . ________________ _ 377968 O-r1 ,:__j . ,. q ,)'- THANK YOU~ Barry R. McBee , Chairman . R. B. "Ralph" Marquez, Commissioner John M. Baker, Commissioner Dan Pearson, Executive Director TEXAS NATURAL RESOURCE CONSERVATION COMMISSION Protecting Texas by Reducing and Preventing Pollution Michael R. McClure, P.E., RPLS McClure Engineering , Inc. 1722 Broadmoor, Suite 210 Bryan, Texas 77802 Re: City of College Station Shenandoah, Phase Three TNRCC Permit No.: Unknown WPR Log No.: 016/032 County: Brazos Dear Mr. McClure: January 16, 1996 We have received the design submittal included with your cover letter dated 1/02/1996. The rules which regulate the design, installation and testing of domestic wastewater projects are found in 30 TAC, Chapter 317, of the TNRCC's rules titled, Design Criteria for Sewerage Systems. All plans and specifications submitted for TNRCC approval must comply with these rules. Beginning on September 1, 1994, severe budget reductions required the TNRCC to eliminate most reviews of domestic wastewater project plans and specifications. At most, only a cursory review of the proposed project was performed. A technical review to determine conformity with 30 TAC Chapter 317 has not been performed. The proposed project is approved with the following comments and conditions: 1. An engineering report must be prepared and sealed by a Professional Engineer registered in the State of Texas. This engineering report must include all constants, graphs, equations, and calculations, which are needed to both justify the design and show full compliance with Section 317 .1 ( c) of the TNRCC 's rules requiring a final engineering report. Copies of this report shall be made available to the TNRCC, upon request. 2. The final version ~i.the project plans and specifications shall include any and all information necessary to show full compliance with the applicable requirements detailed in Chapter 317 of the TNRCC's rules. Copies of the final version of the project plans and specifications shall be made available to the TNRCC, upon request. P.O. Box 13087 Austin , Texas 78711-3 087 • 512/239 -1000 printed on recycl tJ pil pu u1init M>y-b.u.ed ink Michael R. McClure , P .E ., RPLS Page 2 3 . Any test results necessary to show compliance with the testing requirements of Chapter 317 shall be made available to the TNRCC , upon request. 4 . The TNRCC still maintains its review authority and may utilize this authority at any time in the future . If plans are to undergo review , the TNRCC will notify you upon our receipt of the project . Also , please be aware of Section 317 . l(a)(2)(A) of the rules which states, "Approval given by the commission is not intended to relieve the sewerage system owner or the design engineer of any liabilities or responsibilities with respect to the design , construction , or operation of the project ." 5 . Within 60 days of the completion of construction, an appointed engineer must notify both the Permitting Section of the TNRCC 's Wate r shed Management Division and the app ro priate Region Office of the date of completion . The engineer must also provide written certification that all construction, materials and equipment, and test results were substantially in accordance with the approved plans and specifications, the rules of the TNRCC and any change orders filed with the TNRCC. All notifications, certifications and change orders must include the signed and dated seal of a Professional Engineer registered in the State of Te xas . 6. All plans and specifications shall conform with any other waste discharge requirements and water quality standards established by the TNRCC, as the requirements pertain to a regulated discharge. If you have any questions or if we can be of any further service , please call me at (512) 239-4554. Sincrely, Louis C. Herrin, III , P.E. Plan Review Team Wastewater Permits Section cc : City of College Station TNRCC, Region 9 -Office DATE: TO: ATTN: 1 /3/96 McCLURE ENGINEERING, INC. 1722 Broadmoor, Suite 210 Bryan, Texas 77802 (409) 776-6700 FAX 776-6699 TRANSMI'rl'AL LETTER Mrs. Veronica Morgan, P.E. Assistant City Engineer CITY OF COLLEGE STATION ATTACHED PLEASE FIND: Copy of Engineering Sewerage Report on SHENANDOAH, PHASE THREE that was sent to TNRCC (attachments listed but not enclosed in your copy). THESE ARE TRANSMITTED TO YOU FOR THE FOLLOWING REASON: For Approval xx Your Use Revisions Made As Requested For Review and Comment , Returned after Loan to Us RECEIVED BY: DATE: SIGNED BY: MICHAEL R. McCLURE, P.E., R.P.L.S. .• McCLURE ENGINEERING, INC.------- January 2, 1996 TEXAS NATIONAL RESOURCE CONSERVATION COMMISSION P.O. Box 13087 Austin, TX 78711-3087 Attn: Mr. Thomas W. Weber, Manager WASTEWATER PERMITS SECTION AGRICULTURE & WATERSHED MANAGEMENT DIVISION RE: SHENANDOAH,PHASETHREE COLLEGE STATION, BRAZOS COUNTY, TEXAS Dear Mr. Weber: As per TNRCC Regulations, attached for your review and approval, please find the following items for the above referenced submittal for SHENANDOAH, PHASE THREE subdivision construction in College Station, Texas: 1. ENGINEERING SEWERAGE REPORT 2. Specifications for Sanitary Sewer Construction 3. Plan Sheets 1, 5, 6, 7, S2 and S4 of the Construction Plans We request that you review this application at your earliest convenience and provide the required approval so that this project can be constructed upon completion of the City's approval process. We appreciate your assistance in this matter. Veryt~ly~~ 11~~ Michael R. McClure, P.E., R.P.L.S. MRM/mln'l xc: Mrs. Veronica Morgan, P.E. Assistant City Engineer CITY OF COLLEGE STATION 1722 Broadmoor , Suite 210 • Bryan , Texas 77802 • (409) 776-6700 • FAX (409) 776 -6699 TNRCC TEXAS NATURAL RESOURCE CONSERVATION COMMISSION GRAVITY LINE SUB MITT AL APPLICATION FOR PLANS AND SPECIFICATION REVIEW SHENANDOAH, PHASE THREE COLLEGE STATION, BRAZOS COUNTY, TEXAS DECEMBER, 1995 PREPARED BY: McCLURE ENGINEERING, 1:Nc. 1722 Broadmoor, Suite 21 '0 Bryan , Texas 77802 (409) 776-6700 TABLE OF CONTENTS SHENANDOAH, PHASE THREE I. ENGINEERING SEWERAGE REPORT II. DESIGN OF BURIED PVC PIPE (TRENCH CONDITION) III. TECHNICAL SPECIFICATIONS NO . S102 -LEAKAGE TESTS NO. S104 -POL YVINYLCHLORIDE PIPE AND FITTINGS NO. S201 -MANHOLES NO. WS306 -EXCAVATION IV. PLAN SHEETS PLAN SHEETS 1, 5, 6, 7, S2 AND S4 ENGINEERING SEWERAGE REPORT INTRODUCTION . The SHENANDOAH, PHASE THREE project is a proposed new phase of the existing Shenandoah subdivision in southern College Station, Brazos County, Texas. The proposed 6" sewer lines extend from existing the SHENANDOAH, PHASE TWO to service the proposed residences in Phase Three. GENERAL The sewer will be owned and maintained by the City of College Station and will be constructed with private funds. The line is designed by McClure Engineering, Inc. of Bryan, Texas. The Engineer for the project is Michael R. McClure; P.E. (409) 776-6700. The proposed sewer line is to be located within the rights-of-way of proposed streets and public utility easements of the City of College Station. No part of the project is in the Edwards Aquifer Recharge Zone. Sewerage flows from the line will flow to the existing waste water treatment plant (Texas Natural Resources Conservation Commission (TNRCC) Permit # 10024006) ·operated by the City of College Station. This plant is currently not under an enforcement order. The project consists of 2068 L.F. of 6" sewer line (minimum slope 0.600%) and does not require; any boring or other threnchless technology. Per sheet one (1) of the construction drawings, the plans are superior to the technical specifications. The design of the system ensures that full flow velocities will be greater than two feet per second and less than ten feet per second. Per the genefal notes on sheet one of the construction drawings, the City of College Station will provide inspection of the project and will certify that the construction was performed substantially in accordance with the approved plans and specifications. This project has been reviewed by the City of College Station. CAPACITY Capacity design for this line is based on service connections. The subdivision includes forty-one (41) residential lots , with stub-outs provided for a total of nineteen (19) more residential lots. Using the total of sixty (60) lots at 300 gallons per day (g .p.d.) with 103 infiltration and a peaking factor of four (4), the peak flow in this line is 79 ,200 g.p.d. (0.123 cubic feet per second (cfs)). A 6" PVC pipe with a Manning's "n " valve of 0.013 and minimum slope of 0 .603 has a capacity of .40 cfs. Hence, the system has adequate capacity. MATERIALS The plans specify PVC pipe (ASTM D3034 , SDR 26). Per the specifications (S.104/1- S104/5), these pipes are required to use joints per ASTM D3034-89. Manholes will be cast in place or precast concrete per construction plan sheet S2 and Specification S.201/1-8 Item S.201. These materials have been chosen to eliminate corrosive attack. Precast Manhole Bases requiring resilient connects are not specified for this project. The City of College Station has recently been allowing these bases provided they meet all City requirements including the resilient connector per ASTM C-923. The minimum manhole size is 48 " (inside diameter). All manhole lids are minimum 24" in diameter. No drop manholes are required because no drops greater than 24" are designed. 2 ' ' The soffit of the pipe is matched or a minimum of .1' of drop is provided to reduce turbulence. Per TNRCC requirements, a channel is provided through the base of the manhole of a depth that is at least one half the diameter of the pipe. The base outside of the flow channel is sloped at 12: 1 toward the channel. No manholes on this job are within a 100-year floodplain (per the Federal Emergency Management Agency Flood Insurance Rate Map# 48041C0205C for Brazos county, Texas and Incorporated Areas). All manhole access will be by ladder. Low pressure air tests or Exfiltration tests will be required on all sewer line per the specifications page S.102/1 Item S.102.2. Manholes may be tested using a Hydrostatic test per the specifications page S.20116 Item S.201.7.1. EMBEDMENT DESIGN The design of the embedment for the flexible pipe is included as Table 1 of this report. Note that the existing soil parameters are estimated by an experienced soils engineer familiar to the area and proposed embedment soil parameters are per ASTM C2321. Maximum and minimum trench widths are shown on sheet S 1 of the construction drawings. The design allows for a minimum of eight inches (8") and a maximum of twelve inches (12") on either side of the pipe. This requirement minimizes the trench width while allowing for proper compaction of the material around the pipe. Trenches should be vertical for a minimum of 12" above the pipe per the specification WS.306.B.1.b. The bedding material per sheet S 1 of the constructions precludes the use of large stones or lumps in the backfill. No unusual soil or geologic or hydrologic conditions are known to exist for this project. Sediment and erosion control are shown on sheets 1 and 12. 3 ' . OTHER ITEMS No horizonal or vertical curves are required for this work. Manholes are provided at all ends of lines, and changes of grade or alignment. The maximum spacing of any manholes is 500' for all sizes of lines. The design of the system incorporates a minimum of 9' clearance between water lines and sewer lines. Where this is not obtainable, a 20' joint of sewer pipe is centered on the waterline to preclude cross connections. An 18" air gap is provided between the elevation of all potable water outlets and the maximum water surface elevation of any sewer appurtenances. The site does not contain any water wells, springs, surface water sources of potable water, or potable water storage facilities. The storm drain system and sanitary sewer system are designed to prevent storm water from entering the sewer system. The storm drain system for this project is designed for the 10 year storm. SUMMARY The project is designed entirely within the TNRCC guidelines given in chapter 317 of the Texas Water Code under the authority of sections 26.023 and 5.103. 4 > TABLE 1 DESIGN OF BURIED PVC PIPE (Trench Condition) Common Data Deflection Analysis . . ·-... Nominal Diameter 6 inches w= 120 Wt. of Soil (lbs/cf) Be= 0.52 Outside D of Pipe (ft.) k= 0.33 Rankine's Ratio Bd= 2.52 Trench Width (ft.) u= 0.5 Coef. of friction H= 27 .89 Height of Cover (ft.) P= 0 Single Wheel Load (lbs) ~d= ( 1-eA (-2 kuH/Bd)) /2ku: 2.95 no units SOR 26 Dim. Ratio W c (in ital) =CdwBdBc= 467 lbs/If E'b= 150 Bedding Mat. Modulus Wc(Prisim)=H w Be 1751 12.16 lbs/sf ps i E'n= 150 Soil Mat. Modulus R= 0.262 Rad ius in ft. K= 0.1 Bedding Constant HA2+RA2= 778 .16 ftA2 E= 4.00E +05 Elastic Mod. of Pipe Cl= (live load coefficent) 0.0003 0.001 hw 0 Depth of Water (inches) lf=.766-.133H= 0 no units Wl=CI P (1 +lf)/12= 0 lbs/inA2 f=Pipe/Trench Width Coefficent =b/da-1/(1.154 + .444(b/da-1 )= 1.34 no un its zeta= 1.44/(f+ [( 1.44-f)*(Eb/En) 1 no units Pipe Deflection K (Lp+LI) 100/(.149 Ps+.061 zeta E'b 5.00 3 t= 0.02 0.24 ft inches Ps= .559 E (t/r)A3 101.78 psi Stiffness Check 11.12 >.15 . . . .. ·-· ... Buckling Analysis Rw= 1 B'= 0.605 I= 0.001 inA3 ftA3 qa= 29.69 ps i qa= 12 .16 psi Wall Crushing T= 38 .1 5 lbs Pc= 158 .04 psi Page 1