February 26 , 1996
Redstone Apartments
One Pacific Plaza
7755 Center Ave , Suite 300
Huntington Beach, CA 9264 7
RE: H.E.B. Detention Pond Retrofit
Dear Owner:
As many of you are aware, the City of College Station has been working with H.E.B. to
correct their detention pond drainage problem . Plans have been submitted and approved
for this construction . The contractor was issued a permit for construction, today.
Over the next few weeks you will see construction at the outlet from the pond . The City
of College Station will have an inspector working closely with the contractor as he
constructs these improvements .
We appreciate your patience in this matter. If you have any questions or concerns, please
do not hesitate to call. I can be reached at (409) 764-3570 .
Sincerely,
v~~m~
Veronica JB Morgan, P .E .
Assistant City Engineer
cc : File
VJBM/dsc
February 26 , 1996
Em.manual Venetoulias
1513 Pine Ridge Dr.
College Station, Texas 77840
RE: H.E.B. Detention Pond Retrofit
Dear Mr. Venetoulias :
As many of you are aware, the City of College Station has been working with H .E .B. to
correct their detention pond drainage problem . Plans have been submitted and approved
for this construction . The contractor was issued a permit for construction, today.
Over the next few weeks you will see construction at the outlet from the pond . The City
of College Station will have an inspector working closely with the contractor as he
constructs these improvements .
We appreciate your patience in this matter. If you have any questions or concerns, please
do not hesitate to call . I can be reached at (409) 764-3570.
Sincerely,
v~~m~
Veronica JB Morgan, P .E .
Assistant City Engineer
cc : File
VJBM/dsc
February 26 , 1996
Neal Briers
3005 Bolero
College Station, Texas 77845
RE: H.E.B. Detention Pond Retrofit
Dear Mr. Briers :
As many of you are aware, the City of College Station has been working with H .E .B. to
correct their detention pond drainage problem . Plans have been submitted and approved
for this construction . The contractor was issued a permit for construction, today .
Over the next few weeks you will see construction at the outlet from the pond . The City
of College Station will have an inspector working closely with the contractor as he
constructs these improvements .
We appreciate your patience in this matter. If you have any questions or concerns, please
do not hesitate to call . I can be reached at (409) 764-3570 .
Sincerely,
v~~m~
Veronica JB Morgan, P .E .
Assistant City Engineer
cc : File
VJBM/dsc
February 26 , 1996
Eugene Savage
8714 Bent Tree
College Station, Texa 77845
RE: H.E.B. Detention Pond Retrofit
Dear Mr. Savage :
As many of you are aware, the City of College Station has been working with H .E .B. to
correct their detention pond drainage problem. Plans have been submitted and approved
for this construction. The contractor was issued a permit for construction, today.
Over the next few weeks you will see construction at the outlet from the pond. The City
of College Station will have an inspector working closely with the contractor as he
constructs these improvements .
We appreciate your patience in this matter. If you have any questions or concerns, please
do not hesitate to call. I can be reached at (409) 764-3570 .
Sincerely,
v~~m~
Veronica JB Morgan, P .E .
Assistant City Engineer
cc : File
VJBM/dsc
February 26, 1996
John Moore Jr.
3 511 Midwest
Bryan, Texas 77802
RE: H.E.B. Detention Pond Retrofit
Dear Mr. Moore:
As many of you are aware, the City of College Station has been working with H .E .B. to
correct their detention pond drainage problem . Plans have been submitted and approved
for this construction . The contractor was issued a permit for construction, today.
Ov er the next few weeks you will see construction at the outlet from the pond . The City
of College Station will have an inspector working closely with the contractor as he
constructs these improvements .
We appreciate your patience in this matter. If you have any questions or concerns, please
do not hesitate to call. I can be reached at (409) 764-3570 .
Sincerely,
v~~m~
Veronica JB Morgan, P .E.
Assistant City Engineer
cc: File
VJBM/dsc
February 26 , 1996
Marina Pequegnat
8425 Paseo Del Ocaso
La Jolla, CA 92037
RE: H.E.B. Detention Pond Retrofit
Dear Ms. Pequegnat :
As many of you are aware, the City of College Station has been working with H.E.B. to
correct their detention pond drainage problem . Plans have been submitted and approved
for this construction . The contractor was issued a permit for construction, today.
Over the next few weeks you will see construction at the outlet from the pond . The City
of College Station will have an inspector working closely with the contractor as he
constructs these improvements .
We appreciate your patience in this matter . If you have any questions or concerns, please
do not hesitate to call . I can be reached at (409) 764-3570.
Sincerely,
v~~m~
Veronica JB Morgan, P .E .
Assistant City Engineer
cc : File
VJBM/dsc
February 26 , 1996
Theresa Butler
3720 Centenary Dr.
Dallas, Texas 75225
RE: H.E.B. Detention Pond Retrofit
Dear Ms . Butler:
As many of you are aware, the City of College Station has been working with H .E .B . to
correct their detention pond drainage problem . Plans have been submitted and approved
for this construction. The contractor was issued a permit for construction, today.
Over the next few weeks you will see construction at the outlet from the pond. The City
of College Station will have an inspector working closely with the contractor as he
constructs these improvements .
We appreciate your patience in this matter. If you have any questions or concerns, please
do not hesitate to call . I can be reached at (409) 764-3570 .
Sincerely,
v~~(]J~
Veronica JB Morgan, P .E .
Assistant City Engineer
cc : File
VJBM/dsc
February 26 , 1996
Jerry Schenk
4512 Littleton Ct.
Bryan, Texas 77802
RE: H.E.B. Detention Pond Retrofit
Dear Mr. Schenk :
As many of you are aware, the City of College Station has been working with H.E.B. to
correct their detention pond drainage problem. Plans have been submitted and approved
for this construction. The contractor was issued a permit for construction, today.
Over the next few weeks you will see construction at the outlet from the pond . The City
of College Station will have an inspector working closely with the contractor as he
constructs these improvements .
We appreciate your patience in this matter. If you hav e any questions or concerns, please
do not hesitate to call . I can be reached at (409) 764-3570 .
Sincerely,
v~~m ~
Veronica ID Morgan, P .E .
Assistant City Engineer
cc: F ile
VIBMJdsc
February 26 , 1996
Donald Mize
2604 Cavitt
Bryan, Texas 77801
RE: H.E.B. Detention Pond Retrofit
Dear Mr. Mize :
As many of you are aware, the City of College Station has been working with H .E.B. to
correct their detention pond drainage problem . Plans have been submitted and approved
for this construction. The contractor was issued a permit for construction, today.
Over the next few weeks you will see construction at the outlet from the pond . The City
of College Station will have an inspector working closely with the contractor as he
constructs these improvements .
We appreciate your patience in this matter. If you have any questions or concerns, please
do not hesitate to call . I can be reached at (409) 764-3570.
Sincerely,
v~~m~
Veronica JB Morgan, P .E.
Assistant City Engineer
cc : File
VJBM/dsc
February 26 , 1996
Resident
1301-A Bartholow
College Station, Texas 77840
RE: H.E.B. Detention Pond Retrofit
Dear Resident :
As many of you are aware, the City of College Station has been working with H .E.B . to
correct their detention pond drainage problem . Plans have been submitted and approved
for this construction. The contractor was issued a permit for construction, today .
Over the next few weeks you will see construction at the outlet from the pond. The City
of College Station will have an inspector working closely with the contractor as he
constructs these improvements .
We appreciate your patience in this matter. If you have any questions or concerns, please
do not hesitate to call . I can be reached at (409) 764-3570.
Sincerely,
V~Jm~
Veronica JB Morgan, P .E.
Assistant City Engineer
cc : File
VJBM/dsc
February 26 , 1996
Resident
1301-B Bartholow
College Station, Texas 77840
RE: H.E.B. Detention Pond Retrofit
Dear Resident :
As many of you are aware, the City of College Station has been working with H .E .B . to
correct their detention pond drainage problem . Plans have been submitted and approved
for this construction . The contractor was issued a permit for construction, today .
Over the next few weeks you will see construction at the outlet from the pond . The City
of College Station will have an inspector working closely with the contractor as he
constructs these improvements .
We appreciate your patience in this matter. If you have any questions or concerns, please
do not hesitate to call . I can be reached at (409) 764-3570 .
Sincerely,
V~J(]J~
Veronica JB Morgan, P .E.
Assistant City Engineer
cc : File
VJBM/dsc
February 26, 1996
Resident
1515-APineRidge
College Station, Texas 77840
RE: H.E.B. Detention Pond Retrofit
Dear Resident :
As many of you are aware, the City of College Station has been working with H .E .B. to
correct their detention pond drainage problem. Plans have been submitted and approved
for this construction . The contractor was issued a permit for construction, today.
Over the next few weeks you will see construction at the outlet from the pond . The City
of College Station will have an inspector working closely with the contractor as he
constructs these improvements .
We appreciate your patience in this matter. If you have any questions or concerns, please
do not hesitate to call . I can be reached at (409) 764-3570.
Sincerely,
V~Jm~
Veronica JB Morgan, P.E.
Assistant City Engineer
cc : File
VJBM/dsc
February 26 , 1996
Resident
1515-B Pine Ridge
College Station, Texas 77840
RE: H.E.B. Detention Pond Retrofit
Dear Resident :
As many of you are aware, the City of College Station has been working with H.E.B . to
correct their detention pond drainage problem . Plans have been submitted and approved
for this construction . The contractor was issued a permit for construction, today .
Over the next few weeks you will see construction at the outlet from the pond . The City
of College Station will have an inspector working closely with the contractor as he
constructs these improvements .
We appreciate your patience in this matter. If you have any questions or concerns, please
do not hesitate to call. I can be reached at (409) 764-3570 .
Sincerely,
v~~m~
Veronica JB Morgan, P .E .
Ass istant City Engineer
cc : File
VJBM/dsc
February 26 , 1996
Resident
1517-A Pine Ridge
College Station, Texas 77840
RE: H.E.B. Detention Pond Retrofit
Dear Resident:
As many of you are aware, the City of College Station has been working with H .E.B . to
correct their detention pond drainage problem. Plans have been submitted and approved
for this construction. The contractor was issued a permit for construction, today .
Over the next few weeks you will see construction at the outlet from the pond . The City
of College Station will have an inspector working closely with the contractor as he
constructs these improvements .
We appreciate your patience in this matter. If you have any questions or concerns, please
do not hesitate to call . I can be reached at (409) 764-3570 .
Sincerely,
V~Jm~
Veronica JB Morgan, P .E .
Assistant City Engineer
cc : File
VJBM/dsc
February 26 , 1996
Resident
1517-B Pine Ridge
College Station, Texas 77840
RE: H.E.B. Detention Pond Retrofit
Dear Resident :
As many of you are aware, the City of College Station has been working with H .E .B . to
correct their detention pond drainage problem. Plans have been submitted and approved
for this construction . The contractor was issued a permit for construction, today.
Over the next few weeks you will see construction at the outlet from the pond. The City
of College Station will have an inspector working closely w ith the contractor as he
constructs these improvements .
We appreciate your patience in this matter. If you have any questions or concerns, please
do not hesitate to call . I can be reached at (409) 764-3570.
Sincerely,
V~Jm~
Veronica JB Morgan, P .E .
Assistant City Engineer
cc : File
VJBM/dsc
February 26 , 1996
Resident
1519-A Pine Ridge
College Station, Texas 77840
RE: H.E.B. Detention Pond Retrofit
Dear Resident :
As many of you are aware, the City of College Station has been working with H .E .B. to
correct their detention pond drainage problem . Plans have been submitted and approved
for this construction. The contractor was issued a permit for construction, today.
Over the next few weeks you will see construction at the outlet from the pond . The City
of College Station will have an inspector working closely with the contractor as he
constructs these improvements .
We appreciate your patience in this matter. If you have any questions or concerns, please
do not hesitate to call . I can be reached at (409) 764-3570 .
Sincerely,
v~~m~
Veronica JB Morgan, P .E .
Assistant City Engineer
cc : File
VJBM/dsc
February 26, 1996
Resident
1519-B Pine Ridge
College Station, Texas 77840
RE: H.E.B. Detention Pond Retrofit
Dear Resident:
As many of you are aware, the City of College Station has been working with H .E .B. to
correct their detention pond drainage problem. Plans have been submitted and approved
for this construction. The contractor was issued a permit for construction, today.
Over the next few weeks you will see construction at the outlet from the pond. The City
of College Station will have an inspector working closely with the contractor as he
constructs these improvements .
We appreciate your patience in this matter. If you have any questions or concerns, please
do not hesitate to call . I can be reached at ( 409) 764-3570.
Sincerely,
v~~m~
Veronica JB Morgan, P.E.
Assistant City Engineer
cc : File
VJBM/dsc
February 26 , 1996
Resident
1521-A Pine Ridge
College Station, Texas 77840
RE: H.E.B. Detention Pond Retrofit
Dear Resident:
As many of you are aware, the City of College Station has been working with H.E.B. to
correct their detention pond drainage problem . Plans have been submitted and approved
for this construction. The contractor was issued a permit for construction, today.
Over the next few weeks you will see construction at the outlet from the pond . The City
of College Station will have an inspector working closely with the contractor as he
constructs these improvements .
We appreciate your patience in this matter. If you have any questions or concerns, please
do not hesitate to call . I can be reached at (409) 764-3570 .
Sincerely,
v~~m~
Veronica JB Morgan, P .E.
Assistant City Engineer
cc : File
VJBM/dsc
February 26 , 1996
Resident
1521-B Pine Ridge
College Station, Texas 77840
RE: H.E.B. Detention Pond Retrofit
Dear Resident :
As many of you are aware, the City of College Station has been working with H .E .B. to
correct their detention pond drainage problem . Plans have been submitted and approved
for this construction. The contractor was issued a permit for construction, today.
Over the next few weeks you will see construction at the outlet from the pond. The City
of College Station will have an inspector working closely with the contractor as he
constructs these improvements .
We appreciate your patience in this matter. If you have any questions or concerns, please
do not hesitate to call. I can be reached at (409) 764-3570 .
Sincerely,
v~~m~
Veronica JB Morgan, P .E .
Assistant City Engineer
cc: File
VJBM!dsc
February 26 , 1996
Resident
1511-A Pine Ridge
College Station, Texas 77840
RE: H.E.B. Detention Pond Retrofit
Dear Resident :
As many of you are aware , the City of College Station has been working with H .E .B. to
correct their detention pond drainage problem. Plans have been submitted and approved
for this construction. The contractor was issued a permit for construction, today .
Over the next few weeks you will see construction at the outlet from the pond. The City
of College Station will have an inspector working closely with the contractor as he
constructs these improvements .
We appreciate your patience in this matter . If you have any questions or concerns, please
do not hesitate to call. I can be reached at (409) 764-3570 .
Sincerely,
V~JrB~
Veronica JB Morgan, P .E.
Assistant City Engineer
cc: File
VJBM/dsc
February 26 , 1996
Resident
1511-B Pine Ridge
College Station, Texas 77840
RE: H.E.B. Detention Pond Retrofit
Dear Resident :
As many of you are aware, the City of College Station has been working with H.E.B. to
correct their detention pond drainage problem . Plans have been submitted and approved
for this construction . The contractor was issued a permit for construction, today .
Over the next few weeks you will see construction at the outlet from the pond . The City
of College Station will have an inspector working closely with the contractor as he
constructs these improvements.
We appreciate your patience in this matter. If you have any questions or concerns, please
do not hesitate to call . I can be reached at (409) 764-3570 .
Sincerely,
v~~m~
Veronica JB Morgan, P .E .
Assistant City Engineer
cc : File
VJBM/dsc
February 26 , 1996
Resident
1509-A Pine Ridge
College Station, Texas 77840
RE: H.E.B. Detention Pond Retrofit
Dear Resident:
As many of you are aware , the City of College Station has been working with H .E.B. to
correct their detention pond drainage problem . Plans have been submitted and approved
for this construction. The contractor was issued a permit for construction, today .
Over the next few weeks you will see construction at the outlet from the pond . The City
of College Station will have an inspector working closely with the contractor as he
constructs these improvements .
We appreciate your patience in this matter. If you have any questions or concerns, please
do not hesitate to call . I can be reached at (409) 764-3570 .
Sincerely,
V~Jm~
Veronica JB Morgan, P .E .
Assistant City Engineer
cc : File
VJBM/dsc
February 26, 1996
Resident
1509-B Pine Ridge
College Station, Texas 77840
RE: H.E.B. Detention Pond Retrofit
Dear Resident :
As many of you are aware, the City of College Station has been working with H.E.B. to
correct their detention pond drainage problem. Plans have been submitted and approved
for this construction . The contractor was issued a permit for construction, today .
Over the next few weeks you will see construction at the outlet from the pond . The City
of College Station will have an inspector working closely with the contractor as he
constructs these improvements .
We appreciate your patience in this matter. If you have any questions or concerns, please
do not hesitate to call . I can be reached at (409) 764-3570 .
Sincerely,
VOJlM!iu» Jm ~
Veronica JB Morgan, P .E.
Assistant City Engineer
cc : File
VJBM/dsc
February 26 , 1996
Resident
1507-A Pine Ridge
College Station, Texas 77840
RE: H.E.B. Detention Pond Retrofit
Dear Resident :
As many of you are aware, the City of College Station has been working with H.E.B . to
correct their detention pond drainage problem . Plans have been submitted and approved
for this construction . The contractor was issued a permit for construction, today .
Over the next few weeks you will see construction at the outlet from the pond . The City
of College Station will have an inspector working closely with the contractor as he
constructs these improvements .
We appreciate your patience in this matter. If you have any questions or concerns, please
do not hesitate to call . I can be reached at (409) 764-3570 .
Sincerely,
v~~m~
Veronica JB Morgan, P .E .
Assistant City Engineer
cc : File
VJBM/dsc
February 26, 1996
Resident
1507-B Pine Ridge
College Station, Texas 77840
RE: H.E.B. Detention Pond Retrofit
Dear Resident :
As many of you are aware, the City of College Station has been working with H .E .B. to
correct their detention pond drainage problem . Plans have been submitted and approved
for this construction. The contractor was issued a permit for construction, today.
Over the next few weeks you will see construction at the outlet from the pond . The City
of College Station will have an inspector working closely with the contractor as he
constructs these improvements .
We appreciate your patience in this matter. If you have any questions or concerns, please
do not hesitate to call. I can be reached at (409) 764-3570 .
Sincerely,
v~~m~
Veronica JB Morgan, P .E .
Assistant City Engineer
cc : File
VJBM/dsc
February 26 , 1996
Resident
1505-A Pine Ridge
College Station, Texas 77840
RE: H.E.B. Detention Pond Retrofit
Dear Resident :
As many of you are aware, the City of College Station has been working with H.E.B. to
correct their detention pond drainage problem . Plans have been submitted and approved
for this construction . The contractor was issued a permit for construction, today.
Over the next few weeks you will see construction at the outlet from the pond . The City
of College Station will have an inspector working closely with the contractor as he
constructs these improvements .
We appreciate your patience in this matter. If you have any questions or concerns, please
do not hesitate to call . I can be reached at (409) 764-3570 .
Sincerely,
v~~m~
Veronica JB Morgan, P .E .
Assistant City Engineer
cc : File
VJBM/dsc
February 26 , 1996
Resident
1505-B Pine Ridge
College Station, Texas 77840
RE: H.E.B. Detention Pond Retrofit
Dear Resident :
As many of you are aware, the City of College Station has been working with H .E .B. to
correct their detention pond drainage problem . Plans have been submitted and approved
for this construction. The contractor was issued a permit for construction, today.
Over the next few weeks you will see construction at the outlet from the pond . The City
of College Station will have an inspector working closely with the contractor as he
constructs these improvements .
We appreciate your patience in this matter. If you have any questions or concerns, please
do not hesitate to call . I can be reached at (409) 764-3570 .
Sincerely,
v~~m~
Veronica JB Morgan, P .E .
Assistant City Engineer
cc : File
VJBM/dsc
February 26 , 1996
Resident
15 03-A Pine Ridge
College Station, Texas 77840
RE: H.E.B. Detention Pond Retrofit
Dear Resident :
As many of you are aware, the City of College Station has been working with H .E.B. to
correct their detention pond drainage problem . Plans have been submitted and approved
for this construction . The contractor was issued a permit for construction, today.
Over the next few weeks you will see construction at the outlet from the pond . The City
of College Station will have an inspector workin g closely with the contractor as he
constructs these improvements .
We appreciate your patience in this matter. If you have any quest ions or concerns , please
do not hesitate to call . I can be reached at (409) 764-3570 .
Sincerely,
V~J(]J~
Veronica JB Morgan, P .E.
Assistant City Engineer
cc : File
VJBM/dsc
February 26 , 1996
Resident
1503-B Pine Ridge
College Station, Texas 77840
RE: H.E.B. Detention Pond Retrofit
Dear Resident :
As many of you are aware, the City of College Station has been working with H.E.B . to
correct their detention pond drainage problem . Plans have been submitted and approved
for this construction . The contractor was issued a permit for construction, today.
Over the next few weeks you will see construction at the outlet from the pond . The City
of College Station will have an inspector working closely with the contractor as he
constructs these improvements .
We appreciate your patience in this matter. If you have any questions or concerns, please
do not hesitate to call . I can be reached at (409) 764-3570 .
Sincerely,
v~~m~
Veronica JB Morgan, P .E .
Assistant City Engineer
cc : File
VJBM/dsc
February 26 , 1996
Resident
1501-A Pine Ridge
College Station, Texas 77840
RE: H.E.B. Detention Pond Retrofit
Dear Resident :
As many of you are aware, the City of College Station has been working with H.E.B . to
correct their detention pond drainag e problem . Plans have been submitted and approved
for this construction. The contractor was issued a permit for construction, today .
Over the next few weeks you will see construction at the outlet from the pond . The City
of College Station will have an inspector working closely with the contractor as he
constructs these improvements .
We appreciate your patience in this matter. If you have any questions or concerns, please
do not hesitate to call . I can be reached at (409) 764 -3570 .
Sincerely,
v~~m~
Veronica JB Morgan, P .E .
Assistant City Engineer
cc : File
VJBM/dsc
February 26 , 1996
Resident
1501-B Pine Ridge
College Station, Texas 77840
RE: H.E.B. Detention Pond Retrofit
Dear Resident:
As many of you are aware, the City of College Station has been working with H .E .B. to
correct their detention pond drainage problem . Plans have been submitted and approved
for this construction. The contractor was issued a permit for construction, today.
Over the next few weeks you will see construction at the outlet from the pond . The City
of College Station will have an inspector working closely with the contractor as he
constructs these improvements .
We appreciate your patience in this matter. If you have any questions or concerns, please
do not hesitate to call . I can be reached at (409) 764-3570 .
Sincerely,
V~JrE~
Veronica JB Morgan, P .E.
Assistant City Engineer
cc : File
VJBM/dsc
..
February 26, 1996
Ronny Hermann
P .O . Box430
Caldwell, Texas 77836
RE: H.E.B. Detention Pond Retrofit
Dear Mr. Herrmann :
As many of you are aware, the City of College Station has been working with H .E .B . to
correct their detention pond drainage problem . Plans have been submitted and approved
for this construction. The contractor was issued a permit for construction, today.
Over the next few weeks you will see construction at the outlet from the pond. The City
of College Station will have an inspector working closely with the contractor as he
constructs these improvements .
We appreciate your patience in this matter. If you have any questions or concerns, please
do not hesitate to call . I can be reached at (409) 764-3570 .
Sincerely,
v~~OJ~
Veronica JB Morgan, P .E.
Assistant City Engineer
cc : File
VJBM/dsc
CITY OF COLLEGE STATION
Post Office Box 9960 1101 Texas Avenue
M .L. Hammons
1700 Kyle South, Suite 240
College Station, Texas 77840
College Station, Texas 77842-9960
(409) 764-3500
November 8, 1995
RE: HEB DETENTION POND RETROFIT DESIGN
Dear Roy:·
We have reviewed your plans for the above referenced project and have the following comments:
1. The aluminum splash panel is unacceptable. This form of protection is not permanent and in our opinion will not
withstand the water forces imposed upon it.
2 . Dimension the height of the addition on top of the existing concrete wall.
3. Show what method you intend to use to get the water from the Redstone Apartments parking lot into the creek.
4 . Show what method you intend to use to get the water from under the ~edstone Apartment pool deck into the creek.
5. Does the detail provided on sheet #4 have rebar throughout or only in the bottom 2-3 sacks of Quickcrete?
6 . The existing outlet ponds water 2-3 feet deep from the v-notched weir to the end of the easement area shown on sheet
# 1. This area must be graded to drain . It currently does not.
7 . The existing site observations of the area illustrate that the velocities of water exiting the pond (from the concrete
wall with the v-notch to the end of the easement area) are well in excess of the velocities allowable in the drainage
ordinance for a vegetative bottom or one with loose rip-rap (as was originally designed). Please correct this problem
. in your retrofit design solution.
If you have any questions regarding the review, please do not hesitate to call . I can be reached at (409) 764-3570 between
8 a .m. and 5 p.m. We appreciate your quick response and corrective actions to this problem.
cc: Kent uiza, P .E., City Engineer
Jim Callaway, Asst. Director of Economic and Development Services
Elrey Ash, Director of Economic and Development Services
Tom Brymer, Asst. City Manager
Cathy Locke, City Attorney
Ralph Mehringer, Vice President, HEB
Home of Texas A&M Univers ity
'
STORMWATER DISCHARGE
HOLLEMAN DRIVE & TEXAS AVENUE
COLLEGE STATION, TEXAS
FOR:
H.E . B. GROCERY COMPANY
BY:
M.L. HAMMONS, P.E.
1700 KYLE SOUTH, SUITE 240
COLLEGE STATION, TX 77840
DATE: OCTOBER 31, 1995
•
•
. -;:·.: ""'..~. ~ .. ·. -... . '; '·. .
-1 ~--· ~ ~ .:Jil ;~
. (/) ~ ;~ ~.
uyiln-Y EASEMENT (2) ~! ~ , I -'-
EX I STl NG 8" SAN. SWR .. ~'M 'I
<i. '
I-='·
pp -..---
en
E
e><\~ri tJ.c;. ~' ~A:r ~r?t>«
"'"~Kea Out
eti-M
PROFILE
-s,1..re,o Aa~ To
~~ Ct..~ANW .
--PROPER1Y LINE
.---t--OUTLIT ORAFlCE
SEE DETAIL
T/W 299.0
:m---J-__JDETENTION POND
EASEMENT UNE
T/W 300.0
......
~ °\ CofL--\; \(g't
-\~o \0o NC J
I
I I
\"t--t t ~~ ±
--------------------Ou :.,;;;(J_e:: f~t-:A~
•
,,
~~~~-r----. fgf .G>~-Co~-,+B
66C110'Y,; -Sr\16~ ~ ~ ~ "'S-lC:C. Tf ~ -~~ i1:-~ ~E TAI t--1€:12 \.L..LL -.X::-.l-€. v Ali OIJ
I ~IJ?2''( CoLL€6t "'S¥--[t 0\-l l
C\\iqfq
--~«~~~re ~1'p RAP~~~
(~Oji f?Apett--~AuS)
/ 6"Mov~ f"As r CoNv H.6. ......
,-.~~-~.L--~~~
rs~TAl-1\\~fl --?~cr1 ON
(AT u)~'$Heo Ou ( r-\~~A)
, ~r 1 L.~ -Co~~e. CS ':floN
q {~q Jqc;
\ r J~;3fi~ ~s-)
$~<;>~ 1.\~9il~
----------------
'
•
'
M. L. HAMMONS, P.E.
1700 KYLE SOUTH, SUITE 240
COLLEGE STATION, TEXAS 77840
( 409) 696-1444
Veronica Morgan
Office of City Engineer
College Station , Tex as
Dear Mrs . Morgan:
Ref: HEB Detention Pond
The following items, relating to stormwater flow at subject location were reviewed with you,
at your office , last week :
1. Proposed aluminum splash panels .
2. Splash wall height dimensions .
3 . Redstone Apartment parking lot drainage method .
4 . Redstone Apartment pool deck drainage method .
5. Rip-rap reinforcing details .
6. Standing water within drainage channel.
7 . Water discharge flow channel velocities .
After meeting with you, the items were again discussed with Mr. Les McGehee of H.E .B.
The following are therefore submitted pertaining to the same issues:
1. The splash wall at the end of the discharge ramp will be constructed of concrete ,
as detailed by sheets #2 and #5 , alternate 2, of the drawings submitted to you .
2. The proposed splash wall height extension dimension is defined by sheets #2
and #5 of the attached drawings.
3. T he stormwater discharge from the Redstone property has always been via
the Redstone pool area , beneath the pool deck . No change in drainage is
proposed . While work proposed hereby is being done, however, positive drainage
from the deck area will be provided at the end of the rip-rap retainer. The
established drainage routing will be observed for poss ible routing damage , etc.,
created by wash-out eros ion .
4 . (See item #3)
5. Reinforcing of the Quickrete rip-rap wall is to be according to manufacturers
recommendation and will generally be as shown by drawing sheets #3 and #4.
(Manufacturers recommendation sheet is attached hereto).
6 . Silt will be removed from the flow channel, from the discharge weirs to the end
of the L.U .L.A.C . easement. After silt removal the existing stone rip-rap liner will be
restored to function as originally planned . Routine maintenance will then be
performed on an intermittent basis to prevent excessive future silting.
7 . During the "clean-up" provided by item 6 , above , the stone rip-rap channel
bottom profile will be checked and adjusted to provide a discharge flow velocity of
6 feet per second at the discharge end of the L.U .L.A.C. easement. Not sharp
drops will be created at the discharge end due to work being performed .
Sincerely ,
MLH/av
.-..
''-··
10 :5E:
Rip Rap
QUIKRETE® Rip Rap controls erosion along the
waterfront . Nat1Jral rno isture adds to its strength.
I •
• t
J
QUIKRETE ® Has Erosion Control
"In the Bag"
QUIKRETE® Rip Rap bags save you money In
time. labor and machinery . The old way. of having
men filling burlap bags by hand and never getting
two bags the same size and weight, is now a thing of
the past. No longer do you have to pay the high
hourly rates for a ready-mix truck . No expensive ma -
chinery is necessary to place OUIKRETE® bags .
OUI KAE r E® Alp Rap bags are uniform In size and
weig ht, and ca n be deli vered to the site where man-
powe r is utilized in placing the oags .
What Is
Rip Rap?
Use or OUIKRE TE ® Rip Rap on rhe Wh ite Rock C re ek Tributary, Da llas, Tex as.
QU IKRETE® Rip Rap is
packaged in biodegradable
paper bags to save time
and labor on heavy.duty
projects . They are ideal for
constructing headwalls for
culverts and other erosion
control projects, as well as
to r building dams , beach
bulkheads. an d waterway
walls. They are al so espe-
cially useful i n out -of ·the ·
way locations and eliminate
the need for cost l y con·
struction mach inery . A par -
ticular adva ntage ln their
use Is the ab i lity 10 sat In a
wi de range of conditions .
from water i mmer sion to
na tural moisture atone . The 6m b a n kmen t lncfvUBS t ha built-in planters. (Aon Knight, contrec l orj
rn :S'3 003 ,.
\ ,___ .. Projects Using Rip Ra p
-------. ··~--.-----·-------·--~~-·-· . ---··----~----
<0 198 6 . 1989 The OU I KRETE ® Companies, Atlanta, Georg ia 3034 5 «rid Assoc..11 :;d L ;: ••:>'9d Ma nufa c turers .
QU IKR ETE~ & QU IK WALL ® are 1h e re g istered tr adema rks of T he OUIKRErE® Co rn pa )i (jS , US Pat ON . l
Reg Nos . 391 ,990 ; 767 , 386 ; 1,042 ,903 & 1, 124 ,922 . Pri nted June , i 989 Ite m tt6939 ·3 i
.~~-----~·~~---------~~~----~-!
,. 11 : 0l3
Dams and Bulkheads
A st L :·.i{, long -lasting dam or bulkhead Is a rela-
tiv~ly q u i·;; nn ci Glmple job w it h rip rap . The 60-lb . bag
I& SUQge i;!ed be cai.Ge cf It~ aMy handling . Whon OS•
ti ma iir.9 rip rap n •.::fds. figure five bags for 7 lin ea r
te st a nd thr ee t>a gs for each vertic al foo t.
Approximately 170 1 12 Cu -F· .!QS
Are Needed for a 100 Sq .·Fl . Are a
Construction
1 . Out l ine l11e area to be e xcavate d , exte di ng the
excavation at least 1' be yond the edge of the
planned wall. Remove all grass , roots , and oth er
organ ic matter. Dig to a dep th of s·· and bri ng the
base of this trench to a uniform gra de .
2 . Lay the first ti er of bags fo r t he da m or bulkhead
wal l by butting the bags toge th er end to end .
Stac K succeeding tiers in an in terlo cking fash io n
or bond pattern. Thoroughly sprinkle and ta mp
each layer of bags . Perfo ra tin g t he bags wi li
speed saturation and initial set.
3 . To increase the wall's strengtll , 3/8" steel rebar
stap le s can be driven into the bags . Alt ernate the
staple direction from bag to bag and tie r to tier.
S tee l St a pfGs
Ma de fro m 318"
Diamet er Rebar
~+---Sto c k . Placed In
Fash!on Shown for
Grsat~st St reng th .
'-. : ~
I .fl
-·>'
Alter nale D i rect ions of Staple s
f•om 8 ..-19 l·-B ag and T ;er to T ier
HEB PL8t'1t-J I ~JG At'1D DES I 13t 1
4 . As an alternative, drive st raight re e;,,, , ods down
through the bags as shown . Th is method is
needed if tha bags are stacked under water.
5 . Dependin g upon the he ight of the dam wall and
th e ca p aclt}' of the reservoir, It may be daslrable to
leave c hannels for water runoff between bags In
the in p t ier.
lnstG ad of staples , rainfo rcing
bars can be driv en vert ically
through Iha bags as tr <:!y are
sta c-i·~. TI 1ls mathod ,,;:: b~
necessary ii thG b ag~ ar.:;
stackGd under wate r.
I For Best Results j
I The wol1< s.hould be compl ete d w ith as little inter-I
! rt.~1 ti on as possible to as sur e int egral construction . I
Mat erials should be ~,· .·1e t for 4 days to assist
c urin g, although na tura! moistu re alone ls enough to
set.
Walls higher than 1 O' should be temporarily i
sw ay -braced wtth 2 x 4s to facilit ate Initial set. I
ln:e rlocking Da rn and Wing Wa lls
Slope Walls/Ero sion Control
Control ling ,..,osion with r ip rap Is alm ost as ea sy
as playi ng w it h c 1::!dren ·s bui ld ing b:oc ks. Becau se it
will se t from natural moistu re alone and com es in
ea sy·to-handle b ag s. eros io n wa lis can be bu ilt fro rr,
ri p rap even In lo ca tion s inaccessib le for o \11 er cc r·
st ruction methods .
I
• C1EV 02/31 l1: 131
Construction
1. Place f irst tier of bags onto a secure base end -to -
t and . ·....__,
'··---
i
I
I
1
2 . Set back succeeding rows in a stairstep fashion to
full height of slope . Set bags i n a running bond
pattern with the ends butted together and
comers interlocked. A n chor the bags to the slope
with 3/8" rebar. Perforate and tamp bag s as
thoroughl y as poss ible .
Set bags in a runn ing patte rn
w ith the ends butted togethe r and
comers interlocked.
3 . As each t ier Is la ld , ~iac kfill wit h tarnped·in d irt to a s·
sure a solid ban k .
For Best Results
Urive steel reinforcing rods through each bag to
an ci ''-'f them to the slope.
Us ·a 3/8" fiab ar to anchor bags
L___,_ .... ___ , __________ ~------
HEB PLRHt-i I t lC'.i mm DE·::; l 1:3ti
A v oid doing the jo b wt1en the temperature is at
or near freezing .
Complete the job with as littl e inte r ruption as
poss ible to assure in tegra l construction .
If wa ter is a v ailable, keep t11e material wet for 4
days to assist cur ing .
QUIKRETE ® R ip Rap i s approved by the
foll owing age ncies for most soil erosion appli c at ions :
U .S . Arm y Corps of Engineers
Florida Departmen t of Natural Resources
Flori da Dep a11nient of Transport ation
Sout11 Florida Water Management District
Bag s a re available in 60 -or 80 ·1b . dry weigllt.
6 0 -lb . bags are approxima te ly 4" x 12" x 18 " an d
conta in approx imately 1/2 cu. tt. of material.
80·1 b. bags are approximately 4 1/4" x 13" x 2 1"
and contain approx imatel y 2/3 cu ft. of materia l
80 ·1 b. scrim bags are approx imately 5" x 12" xi 5".
(No t all sizes ava il abl e from a ll sh ipping locations.)
OUIKRETE ~J Rip Rap is a sta ndard 5 -1 DO I .
approved mix, as specif ied in section 530 o f lhe
Departme nt or Tr ansportation Stand ard Spec p:c 2-
tions and Arm y Corp of Eng in ee rs tor road and
b ridge const(uction A higt1 strength 3 -1 mix can be
p repared on s pecial requ est .
-~~CITY OF COLLEGE STATION
~ ~ ENGINE::ERING DIVISION
Post O ffice Box 9960 1101 Te xas Avenue
C ollege Station, Texas 77842-0960
(409) 764-3570
INTERNAL MEMORANDUM
TO: Kent Laza, City Engineer
FROM : Veronica Morgan, Assistant City Engineer
DATE : December 13, 1995
RE: HEB Detention Pond "Retrofit"
l had a long discussion with Roy Hammons on December 11, 1995. He brought in his revisions to the
plans based on my redline comments several weeks ago . I reviewed these revisions and commented
during our 2 1/2 hour meeting . My original comments consisted of 7 items . They were as follows :
1. Proposed aluminum splash panels not permitted
2 . Splash wall height dimensions
3. Redstone Apartment parking lot drainage method
4 . Redstone Apartment pool deck drainage method
5. Rip-rap reinforcing
6 . Standing water within drainage channel
7 . Water discharge flow channel velocities
Several of these comments have not been addressed to my satisfaction . They are :
1.) Roy is still proposing the aluminum splash panel. He has provided on his drawing a "concrete
extension" to the height of the wall but he feels that this is the city's alternative and not really the one
HEB wants to do . I explained my position regarding aesthetics, durability , maintain ability and that
HEB won't be looking at it, the adjacent residents will and said that my answer to the aluminum is still
NO .
2.) Answered .
3 & 4 .) Still not addressed in my opinion . Although Roy thinks I am trying to get HEB to solve
Redstone's drainage problem, which Roy says existed prior to the construction of HEB , I disagreed .
explained that I am trying to get HEB to look beyond their property line to areas that were damaged
as a result of the "breach" and can no longer function the way they originally did prior to the breach
of the wall. Roy said HEB doesn't want to do anything beyond their property lines as (the following is
my words) it would then imply liability . I told Roy he would have to go back to HEB and tell them
they need to look beyond their property lines because I believe (and I was there in knee deep water
watching) there is damage under the pool deck caused by the HEB detention pond design.
o:'Group'deve _ srv\v\heb-roy .doc
5.) I as ked him to provide me a copy of the mfg . recommended reinforcement schedule so that I can
provide it to my inspector. He said he would forward that information .
6 .) He did not answer the standing water issue except to say that if the silt is cleaned out, the water
wouldn't stand . To that I asked is that what HEB was go ing to do and he said he couldn't commit
HEB to this . I said I needed that commitment. Roy said he would get that in writing from them.
7.) I asked what the velocities were in the channel. He responded with calculations knowing that the
velocity in the creek to Anderson would be 7+ fps . Our dra i nage ord inance calls for this velocity to
be contained in a channel that is lined in some fashion . To this comment, Roy said he would try to
"slow" the water down so that when it leaves HEB's prop erty it would be no more than 6 fps . Our
drainage ordinance states this is the max velocit y for a "sodd ed" chann el. Again my impression is
that Roy has been directed to do everything on HEB's property and not extend any improvements off
th at property because it would imply liability . (again -my words, not Roy 's)
Roy we nt back to talk to HEB. I am disappointed to say the l east in this project. I feel that the repairs
are being "short-sighted" and "cheap" and I am afra id that the results will be poor at best.
cc: J im Callaway
Elrey Ash
T om Brymer
Cathy Locke
VM/d sc
o :'(jrou pV::l eve_srv\vlheb-roy.doc
DEVELOPMENT PERMIT
PERMIT NO . 325
HEB : DETENTION POND RETROFIT
FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA
RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE
i
SITE LEGAL DESCRIPTION:
Lot 1 of the Kapchinski Hill Subdivision
SITE ADDRESS:
2000 Texas Avenue South
OWNER:
HE. Butt Grocery Company
646 South Main Avenue
,· San Antonio , Texas 78204
DRAINAGE BASIN:
Wolfpen Creek, Channel III
TYPE OF DEVELOPMENT:
This permit is valid for the construction of a quickcrete wall and additional repairs as
outlined in the approved letter from Roy Hammons, P .E. These repairs are being made to
the existing detention facility that serves the HEB complex . This permit also includes
clearing of the existing pond and drainage easement area .
Contractor shall prevent silt and debris from leaving the site in accordance with the City of
College Station Drainage Policy and Design Criteria. Owner and/or contractor shall be
responsible for any damage to existing city streets or infrastructure due to heavy
machinery and/or equipment.
In accordance with Chapter 13 of the Code of Ordinances of the City of College
Station, measures shall be taken to insure that debris from construction, erosion, and
sedimentation shall not be deposited in city streets, or existing drainage facilities .
I hereby grant this permit for development of an area outside the special flood
hazard area. All development shall be in accordance with the plans and specifications
submitted to and approved by the City Engineer in the development permit application for
the above named project and all of the codes and ordinances of the City of College Station
that apply .
~~
Administrator/Representative Date
Owner ~ ~~
Contractor ~
Date
2-/-u:,/q b
Date
1 b) l fz ®rM!f13JJ ~
~~~->
. 5 ~'<I d )rtb.fj
"lJ~ ~NO~ ~/lO~
ACCOUNT NO . ___________ _ 380100
'19<2{~
THANK YOU (J~ls1.Ll ~ ..,
I
FOR :
STORMWATER DISCHARGE
HOLLEMAN DRIVE & TEXAS AVENUE
COLLEGE STATION, TEXAS
H .E . B. GROCERY COMPANY
BY :
M.L. HAMMONS, P .E.
1700 KYLE SOUTH , SUITE 240
COLLEGE STATION , TX 77840
DATE : OCTOBER 31, 1995
,
-T--· ~ ~ ·.i ~
·; (/) ~ 0 0
EASEMENT (2) ~i ~ UYJ LITY + ·~ +
EXISTING !8,, SAN. SWR. v "d· v
.._
pp
~ --
.....
~t
(/)
E
~-PROPER1Y LINE
.----+---OUTLET ORAFICE
SEE DETAIL
~f---J-T/W 300.0
T/W 299.0
:m---i.__1DCTENTION POND
EASEMENT UNE
T/W 300.0
ACC.ES'S P..AMP
Z-,
g 1
~tr>-
j .
-;:.. '
(\
z.. ,. -.
~
V1 t \-\-'
~
~
f\)~
I
\!'\
;;!
j .o ~ ~
G ...t ,,_
""" ~"1 ~ cr1 ~ t ~ ~ ~
\-0 \...\> ~ ~2 \I\ )! V> ~ ~ z ~ \I\ v. '> -.J
~~ ~ <d \j) '-.)
<:::!. \\ ~
ir: ~ 1'_ ~ -z ~ t) 4:~ \J\ \.4... :_J_r•• ••• :~. \~&_ ~~,s ~ Q.. ~ \ ~ -~~ ~~ --4 •J \<"..( -\:C \(\ .JU\ u: "X'~. -~~ ~~ ~ -:r. ti) CJ ~Nit--\~ ~~~ <!-·~ tc& :;~ \.\} cnlD 7
\U~"1
4!J ~~ \\) ~ C!-~-l
'--' --C) : \[' -\\~ ~ • ¥) cy'->
cl:.:
...
f ~7A-l/ U)-f\.-l.A._,, L ~rw-~~ t
Wkvv 8 [' <t 1 t ( v~Q \ ~-s)
:R~e~n. ~o?S
c~~ c?..t ~~r 1)
f.
DEVELOPMENT PERMIT
PERMIT NO . 325
HEB : DETENTION POND RETROFIT
FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA
RE : CHAPTER 13 OF THE COLLEGE STATION CITY CODE
SITE LEGAL DESCRIPTION:
Lot 1 of the Kapchinski Hill Subdivision
SITE ADDRESS:
2000 Texas Avenue South
OWNER:
H.E. Butt Grocery Company
646 South Main Avenue
San Antonio, Texas 78204
DRAINAGE BASIN:
W olfpen Creek, Channel III
TYPE OF DEVELOPMENT:
This permit is valid for the construction of a quickcrete wall and additional repairs as
outlined in the approved letter from-Roy Hammons, P .E.-'Fhese repairs are being made to·--
the existing detention facility that serves the HEB complex . This permit also includes
clearing of the existing pond and drainage easement area.
Contractor shall prevent silt and debris from leaving the site in accordance with the City of
College Station Drainage Policy and Design Criteria. Owner and/or contractor shall be
responsible for any damage to existing city streets or infrastructure due to heavy
machinery and/or equipment.
In accordance with Chapter 13 of the Code of Ordinances of the City of College
Station, measures shall be taken to insure that debris from construction, erosion, and
sedimentation shall not be deposited in city streets, or existing drainage facilities .
I hereby grant this permit for development of an area outside the special flood
hazard area. All development shall be in accordance with the plans and specifications
submitted to and approved by the City Engineer in the development permit application for
the above named project and all of the codes and ordinances of the City of College Station
that apply.
~~
Administrator/Representative Date
Owner ~ cO~~·
I
Date
2-/7-Jo(q b
I Date Contractor
,,
'/
\,
M. L. HAMMONS, P.E.
1700 KYLE SOUTH, SUITE 240
COLLEGE STATION, TEXAS 77840
(409) 696-1444
Veronica Morgan
Office of City Engineer
College Station, Texas
Dear Mrs . Morgan:
1. Proposed aluminum splash panels .
2 . Splash wall height dimeofilpns .
3. Redstone Apartment parking lot draina
4 . Redstone Apartment pool deck drainage
5. Rip-rap reinforcing details.
6 . Standing water within drainage channel.
7. Water discharge flow channel velocities .
Ref: HEB Detention Pond
After meeting with you, the items were again discussed with Mr. Les McGehee of H.E .B .
The following are therefore submitted pertaining to the same issues :
1. The splash wall at the end of the discharge ramp will be constructed of concrete,
as detailed by sheets #2 and #5, alternate 2, of the drawings submitted to you .
2. The proposed splash wall height extension dimension is defined by sheets #2
and #5 of the attached drawings.
3. The stormwater discharge from the Redstone property has always been via
the Redstone pool area , beneath the pool deck. No change in drainage is
proposed . While work proposed hereby is being done , however, positive drainage
from the deck area will be provided at the end of the rip-rap retainer. The
established drainage routing will be observed for possible routing damage , etc.,
created by wash-out erosion .
4 . (See item #3)
5 . Reinforcing of the Quickrete rip-rap wall is to be according to manufacturers
recommendation and will generally be as shown by drawing sheets #3 and #4.
(Manufacturers recommendation sheet is attached hereto).
6. Silt will be removed from the flow channel, from the discharge weirs to the end
of the L.U .L.A .C . easement. After silt removal the existing stone rip-rap liner will be
restored to function as originally planned . Routine maintenance will then be
performed on an intermittent basis to prevent excessive future silting .
7 . During the "clean-up" provided by item 6 , above, the stone rip-rap channel
bottom profile will be checked and adjusted to provide a discharge flow velocity of
6 feet per second at the discharg e end of the L.U.L.A .C . easemen t. Not sharp
drops will be created at the discharge end due to work being performed .
Sincerely ,
, 7 } -~ ~~
M. L mmons
M LH /a v
./
FOR :
STORMWATER DISCHARGE
HOLLEMAN DRIVE & TEXAS AVENUE
COLLEGE STATION, TEXAS
H.E . B . GROCERY COMPANY
BY :
M .L. HAMMONS, P.E.
1700 KYLE SOUTH, SUITE 240
COLLEGE STATION, TX 77840
DATE: OCTOBER 31 , 1995
-r ~~ .~~
J ~~ 0
U1ilLITY EASEMENT (2) ~:it ~ /. I +~ +
,EXISTING 8" SAN. SWR. ~ 'M · v
pp -.---
E
<C
!-"·
{f}
ACC.E5'::> P..AMP
! PROP. 2 -42" R .C.P.
F /L 294.5 (SET FLAT)
/ . O (SET 1 SECTION EACH L ~o\L.M_ · 1N~6e-fLA-W YlGw
[ ~\?-\ ~CoL-u;c.c Sr"Afl'o"; j
ql1:1 JC\S --
....0
c...--,
:<
? ~
(ti
J\
g
A (\I
1
z <l'-ro _g ~
~ f :i ' ~ ,~l
~
t\l v.)
l rn < ~ ~.
0 z:
;z;
' i' Ji
~~
I
1-1~ -J +
I
~ "
\ tt~~\1 J no O~H-;~(n lv)
~o 1~~3~ {~N~liv'l'Sl<zt
..,.,'?f"I -?NOJ l s~ ~t10M,,f3-/
(>"7'1~ '!J~d"1d ~Q~) ..
~~~ d-v~ d .1~ -al~li~,.~ -\ --
(
rl07A-v uJ-A-L,-L,. L ~ fu Cf~ t
W kvv H [' 1 1 t ( v'A--rf1 ~-s)
R~e~n. Rof'S
(s~.Sl-t~@ f 1)
·..._ ..
··-
10:58
Rip Rap
QUIKRETE® Rip Rap controls erosion along the
waterfront . Natural moisture adds to its strength.
HEB PLA Nl--1 1 NG AHO DE::. l ·'1 :< Y
QUIKRETE® H
"In the Bag"
. '
I
QUIKRETE® Rip Rap bags save you money In
time, labor and machinery . The old way. ot having
men filling burlap bags by hand and never gelling
two bags the same size and weight. is now a thing of
the past. No longer do you have to pay the high
-=-='hourly rates for a ready -mix truck . No expensive ma-
chinery is necessary to place QUIKRETE® bags.
OUIKRE rE® Alp Rap bags are uniform In size and
weight, and can be del iv ered to the site where man-
power is utilized in placing the oags .
What Is
Rip Rap?
Us e or OUIKRE TE:t· Rip Aa p on rhe Wh ite Rock Creek Tr ibu tary, Dallas, Texas .
QUIKRETE® Rip Rap is
packaged in biodegradable
paper bags to save time
and labor on heavy -duty
proj ects . They are ideal for
constructing headwalls for
culverts and other erosion
control projects, as well as
for building dams, beach
bulkheads. an d waterway
walls . They are also espe -
cially useful in out -of-the ·
way locallons and eliminate
the need for costly con-
struction machinery . A par-
ticular advantage i n the ir
use Is the ability to sat In a
wide ran g e of conditi ons,
fr om water im mer sion to
natural moisture alone . The ftm/Jankme n r ln cl.;ues th& bf.Jllt·in plante rs. (Ron Knight. contrecto :)
' \
Projects
l .-.
1 1: 00
Dams and Bulkheads
A st ,_:.~~. long -lasting dam or bulkhead Is a rela -
tivtily q wi·>' vnd simple job with rip rap . Tho 60-lb . bag
I& &UQQe sl0Cl beca1.i;e of Its eMy handling. Whon os·
t i ma \ir.9 rip rap n ·~·e ds . figure five bags for 7 linear
lest and thre e bag s lor each verilcal foot.
Construction
2 . Lay the first tier of bags for t h t: dam or bulkhead
wall by butting the bags together end to end .
Stack succeeding tiers in an interlock !ng fash io n
or bond pattern. Thoroughly sprinkle and ta mp
each layer of bags. Perforating the bags wili
speed saturation and initial set .
3 . To increase the watt's strengtll, 3/8" steel rebar
staples can be driven into the bags . Alternate th e
staple direction from bag to bag and tier to tier .
l· ' ...
't, '•
Steu! Slapll'.IS
Mada !rem 318"
Diameter Rebar
""""1---Stoc k.. Placed In
Fash!on Shown for
Greatest Strength .
'-
. : ~
' .1' -·;·
Alternate Olrocfons o ! S t aple ,
f•om B~·lJ : .. Bag and T ;or lo Ti er
HEB PU:1t'-ll'-l I ~~G AN D DE"::; I Gt ~
4 . As an alternat ive, drive straight re v,,, . Dds down
through the bags as shown . This method is
needed if tha bags are stacked under water.
5 . Depending upon the height of tt1e dam wan and
the capaclt}' of the reservoir, It may be dastrabte to
leave ch annels for water runoff between bags In
the inp tier.
I
The wor1< should be comrleted with as little inter-I
n.;~iti on as possible to as s~re integral construction. I
Materials should be ~ · ,.,et for 4 days to assist II
cu rin g, although natural moisture alone is enough to
1
set.
Walls higher than 1 O' should be temporarily i
sway -braced wtth 2 x 4s to facilitate Initial set. j
Slope Walls/Erosion Control
Controll ing ,.,osio n with rip rap Is almost as ea sy
as playi ng with v 'd ren ·s bui ld i ng b:ocks. Becau se it
wiil 5e t from natura l m oi s!u re a:one and com es i'.·
easy-to-handle bag s . eros io n wa ns can be bu ;lt tr cn -
rip rap even In lo ca tion s inacc e:;.sible for ot11 i:-r c: •
struction m ethods .
' ·.___,
·--..
!
l1 :01
Construction
1. Place first tier of bags onto a secure base end -to -
e nd.
2. Set back succeeding rows in a stairstep fashion to
full height of slope . Set bags In a running bond
pattern with the ends butted together and
comers ln!erlocked . Anchor the bags to the slope
with 3/8" rebar. Perforate and tamp bags as
thoroughly as possible.
Set bags in a running pattern ,..
with the ends butted toge!
corners Interlocked .
3. As each tier Is lak.1 , ~iackfill with tamp
sure a solid bank
For Best Results
Drive steel reinforcing rods through each bag to
anclicr them to the slope .
U s-a 31 8 " Reb ar to an chor b;:igs
-~-L_._. -···---·.
HEB PLAt--lt'-1 ! t--ll3 A~m DE S I GN
Avoid doing the jo b wt1en t t1e temperature is at
or near freezing .
Complete ttl e job with as li!!l e int e rruption as
possible to assure integral constt'\.J cti o n.
If water is available, keep tt1 e material wet for 4
days to assist cu ring .
Bags are ava ilable in 60 -or 80·1b . dry weigt1t.
60-lb. bags are approx i mately 4·· x 12" x 18 " and
contain approximately 112 cu . 11 . of maierial.
80-lb. bags are approx imately 4 1/4'' x 13" x 21"
and contain approximately 213 cu ft. of material
80-lb. scrim bags are approximately 5" x 12 " x 15".
(Not all size s available fro m all st 1ipping locat ion s .)
OUIKRETE ~J Rip Rap is a standard 5 -1 D .O ,.-
approved mix, as specif ied in s ec tion 530 o f tne
Department of Transportat io n Sta ndard Sp ecr !·C J ·
lions and Army C orp of Eng in e ers tor road and
bridge constru ct ion A higt1 s trength 3 -1 mix c a n b8
p repared on sp ectal r ~que s t .
October 13, 1995
' ·RECEIVED OCT ·2 3 19S5
City of College Station
1101 Texas Avenue
College Station, Texas 77842
Attention: Mr. Kent Laza, City Engineer
Re: Stormwater Detention Pond
Dear Mr. Laza:
Thank you for your October 2 letter regarding the stormwater detention pond utilized by Target,
Outback Steakhouse, Olive Garden, the Enclave Apartments, and HEB (the "Owners"), and for
the lead role which the City of College Statior • ·-· ' -·'----~~--TTrm -L----------
concerns and intends to fulfill its responsibiliti
HEB is in an arrangement of shared use and r1
Owners, and cannot unilaterally speak for all 1
propose the following work and pledge to us€:
other Owners, whom we know to be conscien
1. Regarding your item "a. the end v
enough" .............. PROPOSAL: \Ve propo!
of the outlet structure in accordance with plar
of the plans .
2. Regarding your item "b . a berm o
is in need of repair" .............. PROPOSAL:
with concrete rip-rap . Work would be in ace•
City acceptance of the plans .
/0
3 . Regarding your item "c. the downstream ditch is in need of cleaning and
w,
1th er
~t he
long
1g wall
~ptance
ed and
erm
s, upon
modificatio n" ............... PROPOSAL : We propose to clean and clear the downstream ditch from
the detention pond to the end of the LULAC easement, a distance of approximately 65', by
removing debris and vegetation which would divert or impede flow, and by shaping the bed of the
ditch to achieve a run-off slope from the detention pond to the lower end of the LULAC
easement, at which lower end the cleaned-out ditch would match existing grade.
4 . Regarding your item "d . the inflow pipe from the Enclave Apartments causes water to
jump over the pond wall, directly into the outfall structure" .................. PROPOSAL : It is our
understanding from Mr. Hammons that the detention pond will adequately handle inflow from the
Enclave, without overflow of the pond wall, when the pond's detention capacity is maintained at
H.E. BUTT GROCERY COMPAN Y P.O . BOX 839955 SAN ANTONIO , TEXAS 78283 -3 955
646 SOUT H MAIN AVENUE 78204 (2 10) 246-8932 FAX (210 ) 246-853 0
December 18 , 1995
Mr. Ralph Mehringer
Vice President
H.E. Butt Grocery Company
P .O . Box 839955
CITY OF COi .I .EGE STATION
Pos t Office Box 9960 1101 Texas Avenue
C o llege S t ation , Texas 7784 2 -9960
(409) 764-3500 .
San Antonio, Texas 78283-3955
Dear Mr. Mehringer:
I sent you a letter dated October 23 , 1995 in which a deadline was set for HEB to prepare and submit
plans that addressed drainage problems at the dete ntion pond adjacent to the Enclave Apartments. The
date of that deadline was November 3 . Plans were submitted by Roy Hammons prior to that date and were
quickly returned with comments by my staff. The comments pointed out various shortcomings of the
plans and made specific statements about materi als that were not allowabl e. Mr. Hammons was asked to
resubmit these plans with revisions to address the concerns of my staff.
Following a long period of inactivity, a second set of plans were resubmi tted by Mr. Hammons on
December 11. The second set of plans failed to address most of the comme nts from the first submittal and
are unacceptable to the City of College Station .
I am beginning to believe that there is not the commitment of behalf of HEB and Roy Hammons to
address the flooding problems in the area of the detention pond as we were led to believe in earlier
meetings. Therefore, I must set another deadline for submittal of acceptable plans for work on the
detention pond and its outfall. That deadline is January 5, 1996 . Ifwe have not received an acceptable set
of plans that address the comments made on the first submittal, we will assume HEB is not making a good
faith effort in this matter and turn it over to our legal department for subsequent action.
City Engineer
cc : Roy Hammons
Tom Brymer
Cathy Locke
Elrey Ash
Veronica Morgan
Home o f Texas A&M University
10:43 210-246-8530 ~ 409 764 34 96
City of College Station
1101 Texas Avenue
College Station, Texas 77842
October 13, 1995
Attention : Mr. Kent Laza, City Engineer
Re : Stormwater Detention Pond
Dear Mr. Laza:
Thank you for your October 2 letter regarding the stormwater detention pond utilized by Target ,
Outback Steakhouse, Olive Garden, the Enclave Apartments, and HEB (the "Owners''), and for
the lead role which the City of College Station has taken in the matter . HEB shares your
concerns and intends to fulfill its responsibilities regarding the detention pond . As you know,
HEB is in an arrangement of shared use and responsibility for the detention pond with the other
Owners, and cannot unilaterally speak for all the Owners, but in response to your letter we
propose the following work and pledge to use our best efforts to obtain the participation of the
other Owners, whom we know to be conscientious in matters of this nature.
1. Regarding your item "a. the end wall of the outlet structure is too low and not long
enough" .............. PROPOSAL: We propose to add to the height of the concrete retaining wall
of the outlet structure in accordance with plans prepared by Roy Hanunons, upon City acceptance
of the plans.
2. Regarding your item "b . a berm outside of the outlet structure has been breached and
is in need of repair'' .............. PROPOSAL : We propose to reinforce and fill gaps in the berm
with concrete rip-rap . Work would be in accordance with plans prepared by Mr. Hammons, upon
City acceptance of the plans .
3. Regarding your item "c . the downstream ditch is in need of cleaning and
modification" ............... PROPOSAL: We propose to clean and clear the downstream ditch from
the detention pond to the end of the LULAC easement, a distance of approximately 65', by
removing debris and vegetation which would divert or impede flow, and by shaping the bed of the
ditch to achieve a run-off slope from the detention pond to the lower end of the LULAC
easement, at which lower end the cleaned-out ditch would match existing grade .
4 . Regarding your item ''d . the inflow pipe from the Enclave Apartments causes water to
jump over the pond wall, directly into the outfall structure" .................. PROPOSAL: It is our
understanding from Mr. Hammons that the detention pond will adequately handle inflow from the
Enclave, without overflow of the pond wall, when the pond's detention capacity is maintained at
H.E. BUTT GROCERY COMPANY
646 SOUTH MAIN AVENUE 78204
P.O . BOX 839Q55
(210) 246-8932
SAN ANTONIO . TEXAS 78283 -3955
FAX (21 0) 246-8530
10:43 2 1 0-245-8530 ~ 409 ?b4 j4~b NU. 4c:'.ld
its designed level. To maintain the pond at its designed level of capacity, we propose for the
Owners to establish an effective maintenance program of grass/weed control and silt removal at
regu lar clean-up intervals (and as needed between periodic clean-ups), for both the detention
pond and the LULAC easement area below the pond . We would volunteer the maintenance
program for regular inspections by the City, with the request that the City notify a designated
Owners' representative to attend inspections in order to streamline communications .
Upon the City's acceptance of the above work proposals , and City approval of Mr. Hammons'
design plans for proposals #1 and #2 above, HEB will promptly contract for and proceed with the
proposed work, in good faith that the other Owners will reimburse HEB for their respective
shares of the cost. We estimate that we would be able to complete all work within 3 weeks after
City approval of plans .
Regarding your suggestion that the drainage ditch below the LULAC easement needs to be
improved, and that the Owners utilizing the detention pond need to undertake such
improvements , we agree only that the downstream ditch needs to be improved; but we disagree
that the Owners should have responsibility for such improvements . When the propo·sed work on
the detention pond and the LULAC easement is complete, stormwater from the parcels of the
Owners will be properly handled and discharged from the pond, then onto and across the LULAC
easement. Stormwater drainage below the LULAC easement will include not only water which
has come from the properties of the Ovvners but also the drainage from other properties besides
those of the Owners. It is our position that below the LULAC easement, the drainage ditch is a
part of the City's overall municipal drainage, commonly serving abutting properties, and within th e
responsibility of the City to control the gathering surface drainage . HEB respectfully declines to
perform any work on the drainage ditch below the LULAC easement, and we look to the City of
College Station to perfonn work as necessary to meet the City 's responsibility on areas
downstream from the detention pond and the LULAC easement.
We want our discussions to be clear and directed toward a constructive resolution of the problem .
Please let us know if there is any portion of your letter to which we have failed to respond clearly ,
and we will look forward to hearing back from you regard ing our proposal .
Yours very truly,
cc : see following page
10:44 210-246-8530 ~ 409 764 3496
cc : Dayton Hudson Corporation
33 South Sixth Street
P.O . Box 1392
Minneapolis, Minnesota 5 5402-13 92
Attention : Mr. Jim Thensch
General Mills Restaurants, Inc .
5900 Lake Ellenor Drive
1751 Directors Row
Orlando, Florida 32809
Mr . John Godfrey
Godfrey Construction
P .O . Box 4269
Bryan, Texas 77805
Mr. Tom Kenney
Outback Steakhouse
675 Rablewood Drive
Houston, Texas 77079
Mr. Bill Thornton, Jr .
Bruchez, Goss, Thornton , Meronoff, Michel & Hawthorne
3131 Briarcrest
Bryan, Texas 77802
Mr . Roy Hammons
Mr . Charles Blackbum, HEB
Mr . Les McGehee, HEB
Mr. Jim Sloan, HEB
N0.420 GJ 04
(409) 696-1444
Veronica Morgan
Office of City Engineer
College Station, Texas
M. L. HAMMONS, P.E.
1700 KYLE SOUTH, SUITE 240
COLLEGE STATION, TEXAS 77840
December 8, 1995
Ref: HEB Detention Pond
Dear Mrs . Morgan :
Various items have been reviewed relating to stormwater flow at subject location . Your
latest letter addresses these issues: 1·
1. Proposed aluminum splash panels not permitted \ i.l~ IArv-u.tJ-e_.)
2 . Splash wall height dimensions tJ ~
3. Redstone Apartment parking lot drainage method ( I
4 . Redstone Apartment pool deck drainage method )
/
5. Rip-rap reinforcing -d ~~tr · 6 . Standing water within drainage channel
7 . Water discharge flow channel velocities ·~~ l f?PS
We submit the following information and comments pertaining to the same issues :
1. While no material is considered truly "permanent", aluminum does not rust and
according to manufacturers of aluminum products, aluminum in fact has a very long
life span . If allowed, placement and attachment can , and will, be done with
structural integrity far in excess of water pressure potent ial at the top of the wall.
Aluminum panel and concrete topping wall details are provided by sheet #5 of the
attached drawings .
a) We know that the flooding that has been experienced at this location
indicates wate,r flow above the existing wall height. Grass/debris collection at
the chain link fence on the wall shows a high water line approximately 8" to 1 O"
above the wall. The potential force of a 1 O" liquid head is not great. I also point
out that the levels we have experienced does not accurately reflect an
adequately maintained flow channel. Attachment #1 (Flow calculation print-out
from Haestad Methods Software) calculates the flow depth along a properly
maintained 1 O' wide concrete discharge channel leading to the subject wall at
a depth of 1.06' during the 100 year event (producing 90 CFS discharge
volume). We, however, recognize a change of direction and channel condition
at the wall that results in a calculated flow depth of 1.57' (Attachment #2) which
would result in an effective flow depth of 1.57' at the wall. The 1.57' flow depth
impacting the concrete wall will create some degree of splash . We anticipate
the splash to result in minimal, or no , water flow over the existing 3' concrete
wall even without the height increase. . The ditch condition at the time of
previous flooding, however, is more closely simulated by the calculations of
Attachment #3. It indicates an imposed flow depth of 2 .65' at the 3' concrete
wall due to the rip-rap section of the ditch being approximately 50% blocked .
Flow depth at 2 .65' in a 3' containment wall will definitely result in over-spill at
a point of direction change . The constant flow created by such conditions in this
case has resulted in a continuous flow over the wall and the eventual failure of
the natural ground barrier between the rip-rap flow channel and the adjacent
Redstone land tract. Remediation of the flow constriction condition will, in my
opinion, substantially reduce, if not completely eliminate , the "wall spill" that has
been experienced .
2 . The proposed splash wall height extension dimension is clarified by sheets #2
and #5 of the attached drawings .
3. The method of discharge for transfer of Redstone property stormwater run-off to
the original flow line has never been modified . Attachment #4 is a representation
of the original topo that shows a natural flow line along the Redstone land adjacent
and parallel to the Enclave/Lulac south properly line . The rip-rap flow ditch that was
constructed for detention pond discharge flow is wholly within the Enclave/Lulac
tracts and was excavated from natural ground that was the north bank of the orig i nal
flow . A portion of the natural barrier was left in place, as is attested to by the
growth of mature trees on the Redstone tract north property line . It may , in fact, be
the breach in this barrier that has caused the flooding that has been experienced .
4 . (Same as item #3)
5 . Reinforcing of the Quickrete rip-rap wall is to be according to manufacturers
recommendation and will generally be as shown by drawing sheets #3 and #4 .
6 . Standing water in the discharge channels of the existing easement has been
measured at approximately 1' and is so standing due to silting that has not been
removed from the flow channel. Since the channels have not been cleaned since
the stormwater collection area has been fully developed , it seems reasonable that
most of the silting was deposited before a nd during construction activ it ies . After
clean ing and restoration to original configurat ion , there may be very little additional
silt ing . If so , the channel should require a minimum of ma intenance after the in it ial
clean-out .
7. Water disch~rge velocities in the flow channels do not calculate as excessive for
lined channels. ; The concrete section calculates at 8+ feet per second and the rip-
rap section calculates at 7+ feet per second .
If we can be of assistance in solving the flooding problem we are happy to do so . We
believe, however, that the problem stems from restricted flow throughout the drainage
channels .
The drawings presented herewith are to solve specific physical problems. Where more than
one solution method is shown we propose that either is a suitable solution. Selection of the
method to be used is a City of College Station -H.E.B . issue .
I
Sincerely,
M . L. Hammons
MLH/av
Rectangular Channel Analysis & Design
Open Channel -Uniform flow
Worksheet Name: ANDERSON STREET
Comment: CONCRETE 10' FLATBOTTOM, VERTICAL WALLS
Solve For Depth
Given Input Data:
Bottom Width .... .
Manning's n ..... .
Channel Slope ... .
Discharge ....... .
Computed Results:
Depth ........... .
Velocity ........ .
Flow Area ....... .
Flow Top Width .. .
Wetted Perimeter .
Critical Depth .. .
Critical Slope .. .
Froude Number ... .
10.00 ft
0.013
0.0066 ft/ft
90.00 cfs
1.06 ft
8.49 fps
10.60 sf
10.00 ft
12.12 ft
1.36 ft
0 .0031 ft /ft
1.45 (flow i s S u percritical }
Op en Ch annel F low Mod u l e , Ve rs i o n 3 .12 (c) 1 99 0
Haes tad Methods, Inc . * 37 Br ookside Rd * Wate rbu ry , Ct 06 7 08
Trapezoidal Channel Analysis & Design
Open Channel -Uniform flow
Worksheet Name: ANDERSON STREET
Comment: RIPRAP DITCH
Solve For Depth
Given Input Data:
Bottom Width .....
Left Side Slope ..
Right Side Slope.
Manning's n ..... .
Channel Slope ... .
Discharge ....... .
Computed Results:
Depth ........... .
Veloc i ty ........ .
Flow Area ....... .
Flow Top Width .. .
Wetted Perimeter.
Critical Depth .. .
Critical Slope .. .
Froude Number ... .
7.00 ft
0 . S 0 : 1 (H : V)
0.50:1 (H:V)
0.020
0.0080 ft /ft
90.00 cfs
1.57 ft
7.3 5 fps
12.24 sf
8 .57 ft
10.51 ft
1.66 ft
0.00 68 ft /ft
1.08 (flow is Super c ritical )
Op en C annel Flow Modu l e, Versi on 3.12 (c) 1990
Haestad Me thods , Inc. * 3 7 Broo kside Rd *Waterbury, Ct 06 7 08
Trapezoidal Channel Analysis & Design
Open Channel -Uniform flow
Worksheet Name: ANDERSON STREET
Comment: RIPRAP DITCH
Solve For Depth
Given Input Data:
Bottom Width .....
Left Side Slope ..
Right Side Slope.
Manning's n ..... .
Channel Slope ... .
Discharge ....... .
Computed Results:
Depth ........... .
Velocity ........ .
Flow Area ....... .
Flow Top Width .. .
Wetted Perimeter.
Critical Depth .. .
Critical Slope .. .
Froude Number ... .
3.00 ft
0.50:1 (H:V )
0.50:1 (H:V )
0.020
0.0080 ft /ft
90.00 cfs
2.65 ft
7.85 fps
11 .46 sf
5.6 5 ft
8.93 ft
2.61 ft
0.0085 ft/ft
0 .9 7 (fl o w i s Subcr i tic al )
Open Channel Flow Modu l e, Ver si on 3.1 2 (c ) 1 9 90
Haestad Methods, I nc. * 37 Broo kside Rd * Wa te r bu r y , Ct 0 6 7 0 8
?"
:1
..q-j N i (() 0 ..q-(()
+ + n n
r-i 296 r-i <{ ~ J ~ ~ I-
(/) J (/)
1 O' UJILITY EASEMENT (2)
b~ I EXISTING 8"
pp -.-
E
SAN. SWR. --
v ~DETENTION POND T/W 299.0
;i....
LINE
G R A S S B 0 T T 0 M
\
EASEMENT LINE
(NORTH FACE)
4" SLAB
T/W 29 9 .8
T/W 300 .0
0
(()
N + '<t
I
r ---------
U.E. LINE
TjJH 29'6."5 - -
----
if~3.5 .
-(:=: -
--296
T /W 296.o ___ _.
PROFILE
70.0'
.-JL----PROPERTY LINE
~--+--OUTLET ORAFICE
SEE DETAIL
T/W 299.0
m-----l-DETENTION POND
b
0
"'
EASEMENT LINE
T/W 300 .0
ACCESS P.,AMP
--
PROP. 2-42" R.C.P.
----
1 • ,..., ,..., A c: ( C"' LT C-l "T\
--
295
--
295
~ -~ -~
?-
6'
Ur-J\ ~
\ ~
f\
~ m
~ \I\ cl'
-T-~ ~ ·~ ·~
J (/)S: 0
UlilLITf EASEMENT (2) ·~] ~ /' l +it +
,, .q-CH . .q-EX I STl NG 8 SAN. SWR. . 0
pp
~ --
@
.......
E
T/W 300.0
<{ -·
i-=
(/)
~i\~rlt\c. <RI ~A:?~fj'l)IK
. "'~~~(.) Out
e{L.M
PROFILE
-S\t..TcO A.a~ To
~E C1..e-ANW .
~-PROPER1Y LINE
.----+---OUTLET ORAFICE
SEE DETAIL
~1----11-T/W 300.0
T/W 299.0
:111---f-_IDETENTION POND
EASEMENT UNE
T/W 300 .0
t'
\)'I
-:-~ i ,_
0 c
L -A n
L:-(\I
~ ~ r
'
~ ~ ~ ~ I
-t-~ {\. 9 ':J
f\\ -~
~ rt\ -+ R-~ ! en
ii i ~ I I ~ t h Iv, -I ~ \-\-~ I .
I \\\
~
~1\-
I
~L_~---tilK=i-:ft-:fi:j1tt-r--ll
-.f>-~
' .-\. --·--------..L----'1'
_<Qu ·,~~~re ~r'p RAP e~~ ( eo~ PApe n.. ~Au~) I s "M?WG Plsr Co N v H..s.,_._
__....,...,......'-'_-----£'--------
f)E-TAl ,-{\)€J l ?e;cr·1 O N
(AT u)~-$1-i e o ow i A-~~A)
\1
\
I YP-N (•L \ -C o ~c;.e, 'Sf'Tl~;J
~ {&q )q e;
(
r101A-v uJ-A-~ L~*rw-<::t~ t
w A·vv 8 r : <t I t ( v krf 1 ~-s)
I q .i
~1 1
\(\I ~ , I
i
\
~~-\ .. ~~~ O { ,,
\ i \;
I
) _,
_ _9
__ \ )
. --· -··--·-----~~
December 29 , 1995
Les McGehee
12435 Millway Drive
Houston, Texas 77070
Dear Mr. McGehee:
CITY OF COLLEGE STATION
Post Office Box 9960 1101 Texas Ave nue
College Station , Texas 77842-9960
(409 ) 764-3500
I received, from Roy Hammons on December 27 , 1995, a letter outlining the plans and
procedures which HEB would like to have approved for the repair work to the detention
pond . Mr. Hammon's letter and the items outlined therein appear to meet the City of
College Station ordinances and our concerns in the damaged areas . As I stated to Mr.
Hammons, item #3 and #7, as written are not well defined . Please be aware that the City
inspector assigned to this job will be assuring that these items are completed to the City's
satisfaction. I understand why you desired to have them so loosely worded, but by doing
so we are all in a position of delving into . an "unknown", without the problem and
solutions being well-defined before we begin . I certainly am not opposed to working
things out in the field, however, I've found that people are sometimes surprised when they
realize what is expected, once the problem is defined . My understanding from Mr.
Hammons is that, this is exactly why you desire to work these items out in the field . You
would prefer to get a contractor in the field , see what they uncover as problems, have
them possibly take grade shots and then find an acceptable solution, rather than
performing hours of survey work now, defining the problem and working out a solution.
I have prepared a development permit for this work. Once you have selected a contractor
for the job please have them stop by our office to sign and date the permit and pay the
appropriate fees . The fee for' this permit will be $100 .00, payable to the City of College
Station. When the contractor stops in I will have attached to the permit, the inspector's
card for his/her information . It is imperative that prior to commencing work that he/she
notify the inspector that they will be beginning work .
Home of Texas Af..M University
We certainly look forward to this work being completed. As you are aware, there are
several property owners in the immediate vicinity who will be thankful to see work is
progressing . I hope that this project will be one that HEB and the citizens of College
Station can be proud of If I can be of any further assistance or you have any questions,
please do not hesitate to call. I can be reached at (409) 764-3570.
Sincerely,
a~~~
~eronica J.B. Morgan, P.E.
Asst. City Engineer
cc : Kent Laza
Elrey Ash
Jim Callaway
Cathy Locke
Tom Brymer
Roy Hammons
Ralph Mehringer
RECEIVED DE C 2 7 1995
-~~CITY OF COLLEGE STATION ~ OFFICE OF THE CITY MANAGER \' .\t
Post Office Box 9960 1101 Texas Avenue \A~
Co1leg e Station, Texas 77842-0960 /~\
1
\~v
MEMORANDUM
(409) 764-3510 . \~ffe I
TO:
FROM:
DATE:
SUBJECT:
George K . Noe, City Manager
Tom Brymer, Assistant City Manager/Community Services~
December 27 , 1995
Update Regarding HEB Shopping Center and Pine Ridge Duplex
Flooding
I wanted to give you a brief status report on the flooding situation caused by the storm
water detention basin that serves the HEB/Target/Enclave development. This detention
basin is upstream from duplexes on Pine Ridge that have experienced flooding staff
believes is the result of this detention basin's inadequate design and performance .
Following Council's direction to pursue appropriate remedy (and if necessary, legal
action), the civil engineer who designed this detention basin submitted a design for
modifications to it. After staff reviewed his submittals , we found them to be totally
deficient in addressing the problem and so advised him . After a lengthy delay, he made
some modifications to these plans and resubmitted them. However, in staffs view ,
these most recent proposed modifications are still entirely inadequate in terms of
remedying the problem .
For that reason , we recently sent letters via certified mail to this engineer as well as
representatives for HEB giving them a deadline of January 5, 1996 to submit acceptable
plans to us for remedying the basin and its outfall or we plan to turn this over to the City
Attorney's office for further legal action.
Please let me know if you have any questions about this.
cc : E.Ash
J .Callaway
K.Laza
V .Morgan
M .Smith
R.Nemec
C.Locke
CITY OF COLLEGE STATION
M.L. Hammons
1700 Kyle South, Suite 240
College Station, Texas 77840
Post Office Box 9960 1101 Texas Avenue
College Station, Texas 77842-9960
(409) 764-3500
November 8, 1995
RE: HEB DETENTION POND RETROFIT DESIGN
\
Dear Roy:
We have reviewed your plans for the above referenced project and have the following comments:
1. The aluminum splash panel is unacceptable . This form of protection is not permanent and in our opinion will not
withstand the water forces imposed upon it.
2. Dimension the height of the addition on top of the existing concrete wall.
3. Show what method you intend to use to get the water from the Redstone Apartments parking lot into the creek.
4 . Show what method you intend to use to get the water fi:om under the Redstone Apartment pool deck into the creek.
5. Does the detail provided on sheet #4 have rebar throughout or only in the bottom 2-3 sacks of Quickcrete?
6. The existing outlet ponds water 2-3 feet deep from the v-notched weir to the end of the easement area shown on sheet
# 1. This area must be graded to drain . It currently does not.
7. The existing site observations of the area illustrate that the velocities of water exiting the pond (from the concrete
wall with the v-notch to the end of the easement area) are well in excess of the velocities allowable in the drainage
ordinance for a vegetative bottom or one with loose rip-rap (as was originally designed). Please correct this problem
in your retrofit design solution.
If you have any questions regarding the review, please do not hesitate to call. I can be reached at (409) 764-3570 between
8 a.m. and 5 p.m. We appreciate your quick response and corrective actions to this problem .
cc: Kent Laza, P .E ., City Engineer
Jim Callaway, Asst. Director of Economic and Development Services
Elrey Ash, Director of Economic and Development Services
Tom Brymer, Asst. City Manager
Cathy Locke, City Attorney
Ralph Mehringer, Vice President, HEB
Home of Texas A&M University
October 13 , 199 5
r ·RECEIVED OC T ·2 3 19S5
City of College Station
1101 Texas Avenue
College Station , Texas 7784 2
Attention: Mr. Kent Laza, City Engineer
Re: Stormwater Detention Pond
Dear Mr\ Laza:
Thank you for your October 2 letter regarding the stormwater detention pond utilized by Target ,
Outback Steakhouse, Olive Garden, the Enclave Apartments, and HEB (the "Owners"), and for
the lead role which the City of College Statior ' · .... · TTrr. -'-----------
concerns and intends to fulfill its responsibiliti
HEB is in an arrangement of shared use and re
Owners, and cannot unilaterally speak for all t
propose the following work and pledge to usE
other Owners, whom we know to be conscien
l . Regarding your item "a . the end v
enough" .............. PROPOSAL: We propm
of the outlet structure in accordance with plar
of the plans .
2. Regarding your item "b . a berm o
is in need ofrepair" .............. PROPOSAL:
with concrete rip-rap . Work would be in ace•
City acceptance of the plans .
/0
3 . Regarding your item "c . the downstream ditch is in need of cleaning and
w,
1th er
~the
long
1g wall
!ptance
ed and
erm
s, upon
modification" ............... PROPOSAL: We propose to clean and clear the downstream ditch from
the detention pond to the end of the LULAC easement , a distance of approximately 65', by
removing debris and vegetation which would divert or impede flow , and by shaping the bed of the
ditch to achieve a run-off slope from the detention pond to the lower end of the LULAC
easement, at which lower end the cleaned-out ditch would match existing grade .
4 . Regarding your item "d . the inflow pipe from the Enclave Apartments causes water to
jump over the pond wall, directly into the outfall structure" .................. PROPOSAL: It is our
understanding from Mr. Hammons that the detention pond will adequately handle inflow from the
Enclave , without overflow of the pond wall , when the pond's detention capacity is maintained at
H.E. sun GROCERY COM PANY P 0. BOX 839955 SAN ANTONIO . TEXAS 78283-3955
646 SOU TH MAIN AVENUE 78204 (210) 246-8932 FAX (210) 246 -8530
cc : Dayton Hudson Corporation
33 South Sixth Street
P .O . Box 1392
Minneapolis , Minnesota 5 5402-13 92
Attention: Mr. Jim Thensch
General Mills Restaurants, Inc .
5900 Lake Ellenor Drive
1751 Directors Row
Orlando, Florida 32809
Mr . John Godfrey
Godfrey Construction
P .O . Box 4269
Bryan, Texas 77805
Mr. Tom Kenney
Outback Steakhouse
675 Rablewood Drive
Houston, Texas 77079
Mr. Bill Thornton, Jr .
Bruchez, Goss, Thornton, Meronoff, Michel & Hawthorne
3131 Briarcrest
Bryan, Texas 77802
Mr. Roy Hammons
Mr. Charles Blackbum, HEB
Mr. Les McGehee, HEB
Mr. Jim Sloan, HEB
,~~·.\• ~. ~.~. ~. ~ .~. ~.~. ~. ~-\·
'.~ .; ~: ~ ·: ~: ~: ~ ·: ~: ~ ·: ~~ ~: ~-~ ~: ~: ~: ~ :~: ~ ·: ~.
·/·/·l·l·l ·l·l ·.···l·l ·l·l ·/·l ·l ·l·l ·l·l ·/·l· .,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.
'/·l·l ·l·.'-!-.'·l ·.'·l·l·l·l·l·l·.'•l ·l •/·l·l ·l·l·I
\·\·\·\·\·\·\·\·\·\·\·\·\·\·\·\·\·\•\•\•\•\•\•\•\•
· ! /·/·/·.'·I ·/· '·/·!·l·l·.'·l·l ·l ·.l ·l·l·l·l·l ·/·I·!
, ',. '_:.·~; ~ .~ ·~ .~ ~ .~ ·~; ·~; ~ -~ ~ ;·~ .~ ~; ~ ;·~ ;·~; ~ .~ ~ i ·~;·:; ~; ·~; ·:; ·: .~ ~ -~ ·~; ·~; ·~; ~~
\.',.\. · .. ·, \ ·, •\. \·\. \·\·\. \·\ •\•\ •\. \•\. •\ ·\ ·\. \·\ ·\· \•\•
! I !-.'-."·' .'·!·.'·l ·.'·l •/•l •/•/•/•/•/•/·/·/·/•l ·I ·.'·/•/•/•/ . •\ \•'•·\·\·\·\·\·\·\·\·\·\·\·\·\·\·\·\· .. ·\·\·\·\·\·\··,., .. , ....
DEVELOP~1ENT SERV I CES
1101 TEXAS AVE
COLLEGE STATION . TEXAS 77840
Facsimile Cover Sheet
To:
Company :
Phone:
Fax:
From:
Company:
Phone:
Fax:
Date:
Pages including this
cover page: 2
Comments : ____ Oa ___ ~__,__.x.=..;_____;--=---------------
(409) 764 -3570
(409) 764 -3 496 FA X
I'
---
....... ·-
~·6.( CITY O~ C<?LL~9E STATION ~ Engmeermg D1v1s1on
Printed by Veronica Morgan
From: Kent Laza
To: Veronica Morgan
Subject: Enclave Apt. Det. Pond
===NOTE===============3/07/95=10:58am==
Have we contacted the appropriate party
about having the detention pond
cleaned? If not, we better do it soon
or the people on Pine Ridge will be
trying to hang me.
We also need to hire a surveyor to
begin developing an easement along the
ditch that runs between the apartments
and the nursing home. This may be
something we can hand off to Sam and
let her start dealing with. Let's talk
when you have a chance.
Page: 1
9/15/95 5:3lpm
Printed by Veronica Morgan
From: Veronica Horgan
To:
Kathryn Anthony, Kent Laza, Steve
Homeyer
Subject: fwd: clean i ng of enclave pond
===NOTE===============9/14/95==8:59am==
john holloway and i met back in april
on the site to discuss cleaning of this
pond and the outfall structure. at that
time he promised to do it in august
because they just cant get in the pond
to clean at any other time because it
is too wet. i agreed with him and asked
him to assure it was cleaned once it
got as dry as it was going to get. last
week i called him back and left a
message that it wasnt cleaned yet and i
was wondering what the status was. he
and i talked this morning. he is going
to get it done probably next week. he
is waiting on a call back from kelly
burt with a date . he will call back and
leave a message with a date as to when
i need to get an inspector to the site
to work with kelly burt. a copy of this
note is going to jerry jones, as i want
him to i nspect. when i have an exact
date i will let you all know.
Fwd=by:=Kent=Laza=====9/14/95==9:11am==
Fwd to: Veronica Horgan
DoclJllent this in a letter to him. If
he doesn't meet that date, we'll go
into code enforcement and put more
pressure on him.
Page: 1
9/15/95 9:03arn
~-~~CITY OF COLLEGE STATION SI ~ ENGil'EERING DIVISION
Post Office Box 9960 1101 Texas Avenue
College Station, Texas 77842-0960
(409) 764-3570
MEMORANDUM
To : Tom Brymer, Interim City Mana]er/ / L
From: Kent Laza , City Engineer ~
Subject: Flooding Problems on Pine Ri gc Street
Date: January 27, 1995
In response to a letter addressed to you from Mr. Neal Briers as well as several telephone calls from other property
owners on Pine Ridge Street , my staff met with Mark Smith and members of his staff to develop alternatives to
address a flooding problem that exists on Pine Ridge Street. Pine Ridge is a street which runs between Brentwood
and Anderson approximately 1000 feet west of Texas Avenue. It is a curb and gutter street with a short
underground drainage system . Most of the properties along the street are duplexes . These duplexes are the
buildings which were most effected by the flooding in the October and December rain.fall events . We have been
notified that at least six duplexes received water in the building.
Behind the duplexes to the north are two apartment complexes, both of which have detention ponds that empty into
a privately owned, unimproved drainage channel that also rnns behind the duplexes on the north side of Pine
Ridge . The exact cause of the flooding is difficult to determine at this site. It is likely a combination of several
contributing factors . First, and probably most notably, is the magnitude of the rainfall events themselves'. In both
events, unusually heavy rains fell causing many areas of the city to experience flooding problems that are normally
unaffected . Secondly, several of the affected buildings are constrncted very low in relation to the top-of-curb on the
street. These duplexes have "sunken" living room floors that are a few inches below the remainder of the building
slab thus exasperating the problem . Third , the detention ponds owned by the apartment complexes have been
poorly maintained and are likely not being utilized to their design potential. Fourth, the drainage channel is in
need of maintenance to remove trees and other flow impediments. Fifth, the pipes carrying water across Anderson
may not be adequate for the amount of water coming down the channel. Sixth, in an attempt to keep water off
their individual properties, each property owner has placed varying amounts of dirt in their back yards and have
eliminated any type of natural or designed drainage path for water to leave the site. Consequently, it builds up
until it begins to flow into the buildings .
Pinc Ridge memo
January 27. ltl95
P. 2
r meeting with Public Services we developed five alternatives for addressing this flooding problem. They are
a follows :
>-., 1. Require the apartment complexes to clean out and maintain the detention ponds so they perform the
~ function for which they were intended. This can be done through our code enforcement authorities.
2.
3 .
4 .
5 .
6 .
*
Acquire drainage easements for the channel from the adjoining property owners and clean out the
channel. Estimated cost: $5,000, assuming property owners are willing to donate it to the City.
Improve the drainage channel in the appropriate manner (concrete lining, gabions, etc.) to increase its
carrying capacity. Estimated cost: $300,000 *.
Install at least one additional pipe across Anderson to prevent the existing crossing from acting as a
restriction to the drainage channel. Estimat ed cost: $15 ,000 *.
Install an underground drainage system along Pine Ridge to capture water now flowing down the street to
prevent it from rising to a level where it begins flowing into the duplexes . Estimated cost: $75,000 *.
Install a stonn drainage system along Barthel ow to c:ipture water leaving that street before it enters the
area being affected , and in doing so, provide another outfall for the apartment complex owners to use
when solving their internal drainage prohlems . Estimated cost $100 ,000 *
Funds for these projects have not been id entified . Current drainage funds have been allocated toward for
other proj ects throughmit the City .
It is our feeling that despite the measures we arc proposing, flooding may still occur in this area when rainfall
events of the magnitude we have recently experienced happen again. It is virtually impossible to design a system
that will carry the volume of water necessary to prevent flooding during these extreme events, especially in areas
that are prone to flooding , as this one is .
It is difficult to explain to flooded property owners that there is little the City can do to guarantee their problems
will not occur again . All they know is that within a period of about two months, the buildings on their property
flooded twice and they want something done to alleviate the problem . The measures we are proposing will at least
convey that we are attempting to address the flooding issue in their neighborhood .
Rccomme o ·ects.
1 e ore, only the first two items shown above are reasonable to undertake. My staff can begin work on those
immedia
departmental budget. Assuming the proposed bond election passes, some or all of the remaining items shown
above can begin as soon as bonds are sold . I believe this project would be an ideal candidate for construction since
multiple properties are being adversely affected by flooding . Since this is a relatively simple engineering project, it
is one I would consider doing in-house with my staff.
, / rJ o-:J_ cc: Elrey Ash
Jim Calloway
Mark Smith
Kathryn Anthony
Veronica Morgan
Brett McCulley
V/J r nn l ""'I . I . ~ 2
{.. v j ~ i'l''f.~ r f)o.
I ' ) JI/ e P P 1 f fe q ~o v f k er.
l;V e. L -} ~ Ta f -fP J-e: ~ s ~t e e ~0 'e !~
LJ hen (/./-<'
May 7, 1996
Owner
Redstone Apartments
One Pacific Plaza
7755 Center Ave, Suite 300
Huntington Beach , CA 9264 7
Re: Pine Ridge Drainage Improvements Status
Dear Owner:
We wanted to let you know what is going on with this project.
RECEIVED n1-1, u 8 1996
As you may know, improvements have been made to the detention structure that serves the HEBffarget
commercial development as well as the Enclave Apartments. The City of College Station is pursuing
improvements to the drainage channel from this detention structure to Anderson Street, as well as
improvements to the culvert under Anderson Street. We have the engineering design underway. Once
this design is finished , we will know the drainage easement size and improvements needed for this
channel. This, in turn , affects easement dedication. We are working on this project with the
understanding that all the property owners along this channel will give this easement to the City so that
construction can begin this summer. With your cooperation, if we can get all necessary easements given
to us in a timely fashion , we plan to bid this project out in July. It should take about 3 months to
complete the construction .
In the meantime, please let me know if you have any questions regarding this project. Unless I hear
otherwise from you , I will assume that you are amenable to giving a dedicated drainage easement on
your property to the City for this project . Your cooperation is greatly appreciated.
Sincerely yours ,
~
Thomas E. Brymer
Assistant City Manager
cc: Skip Noe, City Manager
Jim Callaway, Acting Director of Development Services
Kent Laza, City Engineer
Veronica Morgan, Asst. City Engineer
Brett McCully, Project Engineer
Mark Smith, D irector of Public Works
Kathryn Anthony, Asst. Director of Public Works
o :pineltr.doc
(
August29, 1996
HEB Pantry Foods
P.O. Box 839999
646 South Main A venue
CITY OF COi .I .EGE STATION
Post Office Box 9960 1101 Texas Avenue
College Station, Texas 77842-9960
(409) 764-35 00
CERTIFIED RETURN RECEIPT
San Antonio, Texas 78283-3999
Attn : Robert D. Lo effle r
Dear Mr. Leoffler:
Re: H.E.B. Drainage Detention facility
I am writing this letter to provide you with formal notice of three drainage probl ems
present at the HEB drainage detention facility.
1. the retrofit wall is acting as a barrier which increases flood hazards to adjacent
property.
2 . the drainage facility is inadequately maintained because the vegetation has not
been cut back which can impair capacity for conveyance of the stormwater flow
in your facility
3 . peak stormwater flows are exceeding those that existed before development
If you will recall there are several duplexes just downstream of the HEB store in College
Station . In [)ecember 1995, HEB designed and constructed a wall extension to its
detention pond in an attempt to fix improper drainage that resulted in the flood ing of
duplexes on the adjacent property in October and December of 1994'.
During the review of the HEB detention pond retrofit, we asked your design engineer to :
• "Show what method you intend to use to get the water from the Redstone
Apartments parking lot into the creek"
• to ushow what method you intend to use to get the water from under the Redstone
Apartment poo l deck into the cre ek.
Your design_~ngineer represented to the City of College Station th~t. uThe stormwater
discharge from the Redstone property has always been via the Redstone pool area,
beneath the pool deck. No change in drainage is proposed. While work proposed
hereby ' is being done, however, positive drainage from the deck area will be provided at
the end of the rip-rap retainer:
On August 11, 1996, the largest rainfall occurred since the retr<;>fit to your detention
facility has been constructed. The City had personnel in the field observing flooding
Home o f Texas A&M University
'
areas. The duplexes were once again flooded . While observing the stonnwa
location, it appeared that water from the Redstone Apartments parking lot, tha
entered the creek prior to the addition of the sackrete wall, is now partially blo
entering the creek by that wall. Instead, the water takes the path of least resist
and flows into the rear of the duplex lots . While it appears to us that some of thi
water was able to leave the downstream side of the pool deck, a large amount di\
and instead entered the rear of the duplex lots .
This recen t flooding indicates that the problem noted by the City during design re vr
was not adequately addressed by your engineer's design. Roy Hammons, your de~
engineer, was infonned of our findings regarding this most recent flooding on the
morning of August 12th.
The purpose of the City of College Station drainage ordinance is "To restrict or prohio
development which is dangerous to health, safety, or property during flooding
conditions , or causes unacceptable increases in water surface elevation or velocities:"
and "To prevent the construction of barriers which will divert stonnwater flows and
subject other lands to increased flood hazard". See, Chapter 12, Sections 1.8 .7 and
1.8.10. As it exists, it is my opinion that your development fails to meet both of these
conditions . In addition, the facility is out of compliance pursuant to Section 50 (1), (6)
and (12). (Please see attachment)
Non-compliance with Section 50(1)
The City is currently working on downstream drainage to improve maintenance in this
drainage channel. In the course of working on the downstream project our design
engineer assessed the flows coming from your facility and concluded, albeit using a
different methodology, that your facility is not detaining sufficient flows. Even using the
same methodology, the review of the ~lculations show the pond is only detaining
through the 25 year stonn event instead of the 100 year event.
Non-compliance with Section 50(6)
As stated above, it does appear from field observation that you indeed have
constructed a barrier which is increasing flood hazards to other lands.
Non-compliance with Section 50(12)
The maintenance of the pond must be addressed . The pond should have maintenance
scheduled on a regular basis (at a minimum -twice a year). In it's present state, it is a ·· ~
nuisance, health proble01 and has decreased stonnwater capacity: In the past, HEB
and Enclave complained that it is difficult to maintain and that it can only be done in
August b.ecause of the so(t bottom. If you cannot maintain the facility in its current
configuration, perhaps you should e)(plore construction of a bottom that is maintainable.
Your corrections to the above cited problems may affect the City's downstream project.
Consequently, we are requesting that you correct the above-listed problems
immediately and that this correction be submitted, approved and constructed on or
before October 1, 1996.
If you have any questions or if we can be of assistance, please do not hesitate to call.
can be reached at (409) 764-3570 or by email at vmorgan@ci.college-station .tx.us.
Thank you in advance for your prompt response.
Cc: Tom Brymer, Asst. City Manager
Mark Smith, Director of Public Works
Roxanne Nemcik, Acting City Attorney
Jim Callaway, Acting Director of Development Services
Kent Laza, P.E., City Engineer
Brett McCully, Asst. to the City Engineer
Roy Hammons
file HEB.doc
D. METHODS OF REDUCING FLOOD DAMAGE
E.
In .-.rder :..ut the purposes of thll chapter shall be accomplished tn accordance with
Section 1, the following methods, measures, requirement.a, and practices mu be utilized by
the Administrator in accordance with U1e Drainage Policy and Design Standards:
(l) Limit pea.le stormwater flows after development to that which existed before devel-
opment;
(2)
(3 )
(4)
(5 )
(6)
(7)
(8)
(9)
(10)
(ll)
Llmil, control. or prevent ch.ang9'1 in the path of ltormwater flows across or away
from a site or development;
L.imit, control. or prevent alteration. to existing watercourses and drainage fac ilities
either tnn:le or outside existing Areu of Special Fkxxl Hazard;
Limit, control. or prevent the alteration of natural or developed Areas of Special
F1ood Ha.zard, channels, or protective baniera which are necessary to accorruno-
date flood waters;
Llmi1, control. or prevent the UM of e.xistlng or propoeed drainage eaaementa su c h
that the euement remam. UMtul for ila intended puipoee;
L.imit, control. or prevent the con.struction of barriers which may increase flood haz .
ards to other lands or facilities;
Establish or cause to be established adequate drainage easements and/or lights of
way to control develop~nt and limn potential Oood damage and protect e.xit:ting or
propOeed drainage facilities;
LimJl. control. or prev:ent dumping of refuse, 611, garbage, QTUa clippings, brush,
wP~· concz:ete, !Or othei . mi.teriala in existing drainage facilities. including swales,
street.a, inlets, dJlcheS. ;_'atorm 88W8rs, culveria, etc.; ·
Limit, control. or prevent fllling, grading, cleartng, dredging, P.vtng, berrning, or
:R-fE.!!.~~1'~~~~\tf~~n.io!r,~c.~8.1:-'8 stormwater flows, chang~ drain.age pathways.
iric:reue eromon · and :--Mdiiriel\tabon, or increue Oood haUrd or damage from
flooding;
Limit, control. or prevellt development which is dangerous to health, safety, or
proJ)eny by causing tncreues in water surface elevations, velocities, or aowra tes
wruch .mt poor to au-Ch d~pment ;
.. , t · ' :~-....
Limll, control. or p revent .development which is wlnerable to flood damage o r
~, .... , I , ' -·· • • .,· ··-·•-7".!(.a)f~t~> ... :I• . , ':' ' • • ' ·, • • ·~ ;_._ r~Wre 'Lthat · said d~p~nt ~c:Sh&ll be adequately protect~ ag~ said_ flcxxi ~ ... ;+::: -:~···-....--n~·-.-. -t"..i.;;:',.'""'"··"-"'~r~. · · ·. ' ·. diiriage at the tune o f constrUcUOn ;
·~ .. -:-.{ . ;.; ~ ~-?-.
13 -13
R...,. 10/l/90
Resident
l30J-B Bartholow
Coll ege St t .
a ion, Texas 77840
Resident
1301-A Bartholow
College Station, Texas 77840
i 11 II!!! II! 11fl!11!1l 11111 II I !I!! I
L_ ____ .. . •
~SENDER:
"ti •Complete items 1 and/or 2 for additional services.
"ii •Complete items 3, 4a, and 4b .
Ill •Print your name and address on the reverse of this form so that we can return this
I also wish to receive the
following services (for an
extra fee): Qi
1. )[] Addressee's Address -~ !!! card to you .
...
~ •Attach this form to the front of the mailpiece, or on the back if space does not
-permit.
•Write'Retum Receipt Requested' on the mailpiece below the article number.
•The Return Receipt will show to whom the article was delivered and the date
2. 0 Restricted Delivery ~
delivered . Consult postmaster for fee . -3-.-A~rn-·c_l_e_A_d_d-re_s_s_e_d_to-:~~~~~~~~~~~~4-a-.-A-rn-·c-le~N~u-m_b_e_r~~~~~~~~~·~
a: HEB Pantry Foods P 526 750 849 c ID Box 839999 1-4,.,_b-. s-=-e-rv"""'i,...ce...,T=y-p_e _________ ~
646 South Main Avenue 0 Registered 0 Certified ~
San Antonio, Texas 78283-39999 0 Express Mail 0 Insured -~
Attn: Mr. Robert D. Loeffler Kl Return Receipt for Merchandise O COD :
5 . Received By: (Print Name)
7. Date of Delivery
8 . Addressee's Address (Only if requested
and fee is paid)
.e
:J
0 >-
.)//. c as .r:.
I-
r
UNITED STATES POSTAL SERVICE
First-Class Mail
Postage & Fees Paid
USPS
Permit No. G-10
• Print your name, address , and ZIP Code in this box •
62VM
City of College Station
Developnent Services
ro Box 9960
College Station, Texas 77842
RECEIVED SE p 0 3 .1996
11111II1111111,,, ,, I J, 1I1I11I1 II Iii I ii I ii! fl! 11IIii111111111!111111rll!111II11 I
p 526 750 84 9 US Postal Service' Receipt for Certified Mail No Insurance Coverage Provided. Do not use for International Mail See reverse ~ Pantry Foods re m 6 South Main Avenu e ~·~iil·Af 1 !' ~xas 78283-39 99 Postage $ Certified Fee Special Delivery Fee Restricted Del ivery Fee ~1--~~~~~~---1~~~~~~----l
~ Return Receipt Showing to
Whom & Date Delivered
-~ Return Receipt Showing to Whom ,
< Date, & Addressee's Address
0 ~ TOTAL Postage & Fees $
M Postmark or Date
E
~
en a..
Stick postage stamps to article to cover First-Class postage, certified mall fee, and charges for any selected optional services (See front). 1. If you want this receipt postmarked , stick the gummed stub to the right of the return address leaving the receipt attached , and present the artide at a post office service window or hand it to your rural carrier (no extra charge). 2. If you do not want this receipt postmarked , stick the gummed stub to the right of the return address of the artide , date , detach, and retain the receipt , and mail the article . 3. If you want a return receipt, write the certified mail number and your name and address on a return receipt card , Form 3811, and attach tt to the front of the artide by means of the gummed ends if space permtts. Otherwise , affix to back of artide . Endorse front of artide.,.. RETURN RECEIPT REQUESTED adjacent to the number. 4. If you want delivery restricted to the addressee , or to an authorized agent of the addressee, endorse RESTRICTED DELIVERY on the front of the artide . 5. Enter fees for the services requested in the appropriate spaces on the front of this receipt. If return receipt is requested, check the applicable blocks in item 1 of Form 3811 . 6. Save this receipt and present tt if you make an inquiry. i 0 0 co C") E 0 u. en a..