Loading...
HomeMy WebLinkAbout32 Development Permit 325 HEB Detention Pond RetrofitI ._ __ _ _, .. February 26 , 1996 Redstone Apartments One Pacific Plaza 7755 Center Ave , Suite 300 Huntington Beach, CA 9264 7 RE: H.E.B. Detention Pond Retrofit Dear Owner: As many of you are aware, the City of College Station has been working with H.E.B. to correct their detention pond drainage problem . Plans have been submitted and approved for this construction . The contractor was issued a permit for construction, today. Over the next few weeks you will see construction at the outlet from the pond . The City of College Station will have an inspector working closely with the contractor as he constructs these improvements . We appreciate your patience in this matter. If you have any questions or concerns, please do not hesitate to call. I can be reached at (409) 764-3570 . Sincerely, v~~m~ Veronica JB Morgan, P .E . Assistant City Engineer cc : File VJBM/dsc February 26 , 1996 Em.manual Venetoulias 1513 Pine Ridge Dr. College Station, Texas 77840 RE: H.E.B. Detention Pond Retrofit Dear Mr. Venetoulias : As many of you are aware, the City of College Station has been working with H .E .B. to correct their detention pond drainage problem . Plans have been submitted and approved for this construction . The contractor was issued a permit for construction, today. Over the next few weeks you will see construction at the outlet from the pond . The City of College Station will have an inspector working closely with the contractor as he constructs these improvements . We appreciate your patience in this matter. If you have any questions or concerns, please do not hesitate to call . I can be reached at (409) 764-3570. Sincerely, v~~m~ Veronica JB Morgan, P .E . Assistant City Engineer cc : File VJBM/dsc February 26 , 1996 Neal Briers 3005 Bolero College Station, Texas 77845 RE: H.E.B. Detention Pond Retrofit Dear Mr. Briers : As many of you are aware, the City of College Station has been working with H .E .B. to correct their detention pond drainage problem . Plans have been submitted and approved for this construction . The contractor was issued a permit for construction, today . Over the next few weeks you will see construction at the outlet from the pond . The City of College Station will have an inspector working closely with the contractor as he constructs these improvements . We appreciate your patience in this matter. If you have any questions or concerns, please do not hesitate to call . I can be reached at (409) 764-3570 . Sincerely, v~~m~ Veronica JB Morgan, P .E . Assistant City Engineer cc : File VJBM/dsc February 26 , 1996 Eugene Savage 8714 Bent Tree College Station, Texa 77845 RE: H.E.B. Detention Pond Retrofit Dear Mr. Savage : As many of you are aware, the City of College Station has been working with H .E .B. to correct their detention pond drainage problem. Plans have been submitted and approved for this construction. The contractor was issued a permit for construction, today. Over the next few weeks you will see construction at the outlet from the pond. The City of College Station will have an inspector working closely with the contractor as he constructs these improvements . We appreciate your patience in this matter. If you have any questions or concerns, please do not hesitate to call. I can be reached at (409) 764-3570 . Sincerely, v~~m~ Veronica JB Morgan, P .E . Assistant City Engineer cc : File VJBM/dsc February 26, 1996 John Moore Jr. 3 511 Midwest Bryan, Texas 77802 RE: H.E.B. Detention Pond Retrofit Dear Mr. Moore: As many of you are aware, the City of College Station has been working with H .E .B. to correct their detention pond drainage problem . Plans have been submitted and approved for this construction . The contractor was issued a permit for construction, today. Ov er the next few weeks you will see construction at the outlet from the pond . The City of College Station will have an inspector working closely with the contractor as he constructs these improvements . We appreciate your patience in this matter. If you have any questions or concerns, please do not hesitate to call. I can be reached at (409) 764-3570 . Sincerely, v~~m~ Veronica JB Morgan, P .E. Assistant City Engineer cc: File VJBM/dsc February 26 , 1996 Marina Pequegnat 8425 Paseo Del Ocaso La Jolla, CA 92037 RE: H.E.B. Detention Pond Retrofit Dear Ms. Pequegnat : As many of you are aware, the City of College Station has been working with H.E.B. to correct their detention pond drainage problem . Plans have been submitted and approved for this construction . The contractor was issued a permit for construction, today. Over the next few weeks you will see construction at the outlet from the pond . The City of College Station will have an inspector working closely with the contractor as he constructs these improvements . We appreciate your patience in this matter . If you have any questions or concerns, please do not hesitate to call . I can be reached at (409) 764-3570. Sincerely, v~~m~ Veronica JB Morgan, P .E . Assistant City Engineer cc : File VJBM/dsc February 26 , 1996 Theresa Butler 3720 Centenary Dr. Dallas, Texas 75225 RE: H.E.B. Detention Pond Retrofit Dear Ms . Butler: As many of you are aware, the City of College Station has been working with H .E .B . to correct their detention pond drainage problem . Plans have been submitted and approved for this construction. The contractor was issued a permit for construction, today. Over the next few weeks you will see construction at the outlet from the pond. The City of College Station will have an inspector working closely with the contractor as he constructs these improvements . We appreciate your patience in this matter. If you have any questions or concerns, please do not hesitate to call . I can be reached at (409) 764-3570 . Sincerely, v~~(]J~ Veronica JB Morgan, P .E . Assistant City Engineer cc : File VJBM/dsc February 26 , 1996 Jerry Schenk 4512 Littleton Ct. Bryan, Texas 77802 RE: H.E.B. Detention Pond Retrofit Dear Mr. Schenk : As many of you are aware, the City of College Station has been working with H.E.B. to correct their detention pond drainage problem. Plans have been submitted and approved for this construction. The contractor was issued a permit for construction, today. Over the next few weeks you will see construction at the outlet from the pond . The City of College Station will have an inspector working closely with the contractor as he constructs these improvements . We appreciate your patience in this matter. If you hav e any questions or concerns, please do not hesitate to call . I can be reached at (409) 764-3570 . Sincerely, v~~m ~ Veronica ID Morgan, P .E . Assistant City Engineer cc: F ile VIBMJdsc February 26 , 1996 Donald Mize 2604 Cavitt Bryan, Texas 77801 RE: H.E.B. Detention Pond Retrofit Dear Mr. Mize : As many of you are aware, the City of College Station has been working with H .E.B. to correct their detention pond drainage problem . Plans have been submitted and approved for this construction. The contractor was issued a permit for construction, today. Over the next few weeks you will see construction at the outlet from the pond . The City of College Station will have an inspector working closely with the contractor as he constructs these improvements . We appreciate your patience in this matter. If you have any questions or concerns, please do not hesitate to call . I can be reached at (409) 764-3570. Sincerely, v~~m~ Veronica JB Morgan, P .E. Assistant City Engineer cc : File VJBM/dsc February 26 , 1996 Resident 1301-A Bartholow College Station, Texas 77840 RE: H.E.B. Detention Pond Retrofit Dear Resident : As many of you are aware, the City of College Station has been working with H .E.B . to correct their detention pond drainage problem . Plans have been submitted and approved for this construction. The contractor was issued a permit for construction, today . Over the next few weeks you will see construction at the outlet from the pond. The City of College Station will have an inspector working closely with the contractor as he constructs these improvements . We appreciate your patience in this matter. If you have any questions or concerns, please do not hesitate to call . I can be reached at (409) 764-3570. Sincerely, V~Jm~ Veronica JB Morgan, P .E. Assistant City Engineer cc : File VJBM/dsc February 26 , 1996 Resident 1301-B Bartholow College Station, Texas 77840 RE: H.E.B. Detention Pond Retrofit Dear Resident : As many of you are aware, the City of College Station has been working with H .E .B . to correct their detention pond drainage problem . Plans have been submitted and approved for this construction . The contractor was issued a permit for construction, today . Over the next few weeks you will see construction at the outlet from the pond . The City of College Station will have an inspector working closely with the contractor as he constructs these improvements . We appreciate your patience in this matter. If you have any questions or concerns, please do not hesitate to call . I can be reached at (409) 764-3570 . Sincerely, V~J(]J~ Veronica JB Morgan, P .E. Assistant City Engineer cc : File VJBM/dsc February 26, 1996 Resident 1515-APineRidge College Station, Texas 77840 RE: H.E.B. Detention Pond Retrofit Dear Resident : As many of you are aware, the City of College Station has been working with H .E .B. to correct their detention pond drainage problem. Plans have been submitted and approved for this construction . The contractor was issued a permit for construction, today. Over the next few weeks you will see construction at the outlet from the pond . The City of College Station will have an inspector working closely with the contractor as he constructs these improvements . We appreciate your patience in this matter. If you have any questions or concerns, please do not hesitate to call . I can be reached at (409) 764-3570. Sincerely, V~Jm~ Veronica JB Morgan, P.E. Assistant City Engineer cc : File VJBM/dsc February 26 , 1996 Resident 1515-B Pine Ridge College Station, Texas 77840 RE: H.E.B. Detention Pond Retrofit Dear Resident : As many of you are aware, the City of College Station has been working with H.E.B . to correct their detention pond drainage problem . Plans have been submitted and approved for this construction . The contractor was issued a permit for construction, today . Over the next few weeks you will see construction at the outlet from the pond . The City of College Station will have an inspector working closely with the contractor as he constructs these improvements . We appreciate your patience in this matter. If you have any questions or concerns, please do not hesitate to call. I can be reached at (409) 764-3570 . Sincerely, v~~m~ Veronica JB Morgan, P .E . Ass istant City Engineer cc : File VJBM/dsc February 26 , 1996 Resident 1517-A Pine Ridge College Station, Texas 77840 RE: H.E.B. Detention Pond Retrofit Dear Resident: As many of you are aware, the City of College Station has been working with H .E.B . to correct their detention pond drainage problem. Plans have been submitted and approved for this construction. The contractor was issued a permit for construction, today . Over the next few weeks you will see construction at the outlet from the pond . The City of College Station will have an inspector working closely with the contractor as he constructs these improvements . We appreciate your patience in this matter. If you have any questions or concerns, please do not hesitate to call . I can be reached at (409) 764-3570 . Sincerely, V~Jm~ Veronica JB Morgan, P .E . Assistant City Engineer cc : File VJBM/dsc February 26 , 1996 Resident 1517-B Pine Ridge College Station, Texas 77840 RE: H.E.B. Detention Pond Retrofit Dear Resident : As many of you are aware, the City of College Station has been working with H .E .B . to correct their detention pond drainage problem. Plans have been submitted and approved for this construction . The contractor was issued a permit for construction, today. Over the next few weeks you will see construction at the outlet from the pond. The City of College Station will have an inspector working closely w ith the contractor as he constructs these improvements . We appreciate your patience in this matter. If you have any questions or concerns, please do not hesitate to call . I can be reached at (409) 764-3570. Sincerely, V~Jm~ Veronica JB Morgan, P .E . Assistant City Engineer cc : File VJBM/dsc February 26 , 1996 Resident 1519-A Pine Ridge College Station, Texas 77840 RE: H.E.B. Detention Pond Retrofit Dear Resident : As many of you are aware, the City of College Station has been working with H .E .B. to correct their detention pond drainage problem . Plans have been submitted and approved for this construction. The contractor was issued a permit for construction, today. Over the next few weeks you will see construction at the outlet from the pond . The City of College Station will have an inspector working closely with the contractor as he constructs these improvements . We appreciate your patience in this matter. If you have any questions or concerns, please do not hesitate to call . I can be reached at (409) 764-3570 . Sincerely, v~~m~ Veronica JB Morgan, P .E . Assistant City Engineer cc : File VJBM/dsc February 26, 1996 Resident 1519-B Pine Ridge College Station, Texas 77840 RE: H.E.B. Detention Pond Retrofit Dear Resident: As many of you are aware, the City of College Station has been working with H .E .B. to correct their detention pond drainage problem. Plans have been submitted and approved for this construction. The contractor was issued a permit for construction, today. Over the next few weeks you will see construction at the outlet from the pond. The City of College Station will have an inspector working closely with the contractor as he constructs these improvements . We appreciate your patience in this matter. If you have any questions or concerns, please do not hesitate to call . I can be reached at ( 409) 764-3570. Sincerely, v~~m~ Veronica JB Morgan, P.E. Assistant City Engineer cc : File VJBM/dsc February 26 , 1996 Resident 1521-A Pine Ridge College Station, Texas 77840 RE: H.E.B. Detention Pond Retrofit Dear Resident: As many of you are aware, the City of College Station has been working with H.E.B. to correct their detention pond drainage problem . Plans have been submitted and approved for this construction. The contractor was issued a permit for construction, today. Over the next few weeks you will see construction at the outlet from the pond . The City of College Station will have an inspector working closely with the contractor as he constructs these improvements . We appreciate your patience in this matter. If you have any questions or concerns, please do not hesitate to call . I can be reached at (409) 764-3570 . Sincerely, v~~m~ Veronica JB Morgan, P .E. Assistant City Engineer cc : File VJBM/dsc February 26 , 1996 Resident 1521-B Pine Ridge College Station, Texas 77840 RE: H.E.B. Detention Pond Retrofit Dear Resident : As many of you are aware, the City of College Station has been working with H .E .B. to correct their detention pond drainage problem . Plans have been submitted and approved for this construction. The contractor was issued a permit for construction, today. Over the next few weeks you will see construction at the outlet from the pond. The City of College Station will have an inspector working closely with the contractor as he constructs these improvements . We appreciate your patience in this matter. If you have any questions or concerns, please do not hesitate to call. I can be reached at (409) 764-3570 . Sincerely, v~~m~ Veronica JB Morgan, P .E . Assistant City Engineer cc: File VJBM!dsc February 26 , 1996 Resident 1511-A Pine Ridge College Station, Texas 77840 RE: H.E.B. Detention Pond Retrofit Dear Resident : As many of you are aware , the City of College Station has been working with H .E .B. to correct their detention pond drainage problem. Plans have been submitted and approved for this construction. The contractor was issued a permit for construction, today . Over the next few weeks you will see construction at the outlet from the pond. The City of College Station will have an inspector working closely with the contractor as he constructs these improvements . We appreciate your patience in this matter . If you have any questions or concerns, please do not hesitate to call. I can be reached at (409) 764-3570 . Sincerely, V~JrB~ Veronica JB Morgan, P .E. Assistant City Engineer cc: File VJBM/dsc February 26 , 1996 Resident 1511-B Pine Ridge College Station, Texas 77840 RE: H.E.B. Detention Pond Retrofit Dear Resident : As many of you are aware, the City of College Station has been working with H.E.B. to correct their detention pond drainage problem . Plans have been submitted and approved for this construction . The contractor was issued a permit for construction, today . Over the next few weeks you will see construction at the outlet from the pond . The City of College Station will have an inspector working closely with the contractor as he constructs these improvements. We appreciate your patience in this matter. If you have any questions or concerns, please do not hesitate to call . I can be reached at (409) 764-3570 . Sincerely, v~~m~ Veronica JB Morgan, P .E . Assistant City Engineer cc : File VJBM/dsc February 26 , 1996 Resident 1509-A Pine Ridge College Station, Texas 77840 RE: H.E.B. Detention Pond Retrofit Dear Resident: As many of you are aware , the City of College Station has been working with H .E.B. to correct their detention pond drainage problem . Plans have been submitted and approved for this construction. The contractor was issued a permit for construction, today . Over the next few weeks you will see construction at the outlet from the pond . The City of College Station will have an inspector working closely with the contractor as he constructs these improvements . We appreciate your patience in this matter. If you have any questions or concerns, please do not hesitate to call . I can be reached at (409) 764-3570 . Sincerely, V~Jm~ Veronica JB Morgan, P .E . Assistant City Engineer cc : File VJBM/dsc February 26, 1996 Resident 1509-B Pine Ridge College Station, Texas 77840 RE: H.E.B. Detention Pond Retrofit Dear Resident : As many of you are aware, the City of College Station has been working with H.E.B. to correct their detention pond drainage problem. Plans have been submitted and approved for this construction . The contractor was issued a permit for construction, today . Over the next few weeks you will see construction at the outlet from the pond . The City of College Station will have an inspector working closely with the contractor as he constructs these improvements . We appreciate your patience in this matter. If you have any questions or concerns, please do not hesitate to call . I can be reached at (409) 764-3570 . Sincerely, VOJlM!iu» Jm ~ Veronica JB Morgan, P .E. Assistant City Engineer cc : File VJBM/dsc February 26 , 1996 Resident 1507-A Pine Ridge College Station, Texas 77840 RE: H.E.B. Detention Pond Retrofit Dear Resident : As many of you are aware, the City of College Station has been working with H.E.B . to correct their detention pond drainage problem . Plans have been submitted and approved for this construction . The contractor was issued a permit for construction, today . Over the next few weeks you will see construction at the outlet from the pond . The City of College Station will have an inspector working closely with the contractor as he constructs these improvements . We appreciate your patience in this matter. If you have any questions or concerns, please do not hesitate to call . I can be reached at (409) 764-3570 . Sincerely, v~~m~ Veronica JB Morgan, P .E . Assistant City Engineer cc : File VJBM/dsc February 26, 1996 Resident 1507-B Pine Ridge College Station, Texas 77840 RE: H.E.B. Detention Pond Retrofit Dear Resident : As many of you are aware, the City of College Station has been working with H .E .B. to correct their detention pond drainage problem . Plans have been submitted and approved for this construction. The contractor was issued a permit for construction, today. Over the next few weeks you will see construction at the outlet from the pond . The City of College Station will have an inspector working closely with the contractor as he constructs these improvements . We appreciate your patience in this matter. If you have any questions or concerns, please do not hesitate to call. I can be reached at (409) 764-3570 . Sincerely, v~~m~ Veronica JB Morgan, P .E . Assistant City Engineer cc : File VJBM/dsc February 26 , 1996 Resident 1505-A Pine Ridge College Station, Texas 77840 RE: H.E.B. Detention Pond Retrofit Dear Resident : As many of you are aware, the City of College Station has been working with H.E.B. to correct their detention pond drainage problem . Plans have been submitted and approved for this construction . The contractor was issued a permit for construction, today. Over the next few weeks you will see construction at the outlet from the pond . The City of College Station will have an inspector working closely with the contractor as he constructs these improvements . We appreciate your patience in this matter. If you have any questions or concerns, please do not hesitate to call . I can be reached at (409) 764-3570 . Sincerely, v~~m~ Veronica JB Morgan, P .E . Assistant City Engineer cc : File VJBM/dsc February 26 , 1996 Resident 1505-B Pine Ridge College Station, Texas 77840 RE: H.E.B. Detention Pond Retrofit Dear Resident : As many of you are aware, the City of College Station has been working with H .E .B. to correct their detention pond drainage problem . Plans have been submitted and approved for this construction. The contractor was issued a permit for construction, today. Over the next few weeks you will see construction at the outlet from the pond . The City of College Station will have an inspector working closely with the contractor as he constructs these improvements . We appreciate your patience in this matter. If you have any questions or concerns, please do not hesitate to call . I can be reached at (409) 764-3570 . Sincerely, v~~m~ Veronica JB Morgan, P .E . Assistant City Engineer cc : File VJBM/dsc February 26 , 1996 Resident 15 03-A Pine Ridge College Station, Texas 77840 RE: H.E.B. Detention Pond Retrofit Dear Resident : As many of you are aware, the City of College Station has been working with H .E.B. to correct their detention pond drainage problem . Plans have been submitted and approved for this construction . The contractor was issued a permit for construction, today. Over the next few weeks you will see construction at the outlet from the pond . The City of College Station will have an inspector workin g closely with the contractor as he constructs these improvements . We appreciate your patience in this matter. If you have any quest ions or concerns , please do not hesitate to call . I can be reached at (409) 764-3570 . Sincerely, V~J(]J~ Veronica JB Morgan, P .E. Assistant City Engineer cc : File VJBM/dsc February 26 , 1996 Resident 1503-B Pine Ridge College Station, Texas 77840 RE: H.E.B. Detention Pond Retrofit Dear Resident : As many of you are aware, the City of College Station has been working with H.E.B . to correct their detention pond drainage problem . Plans have been submitted and approved for this construction . The contractor was issued a permit for construction, today. Over the next few weeks you will see construction at the outlet from the pond . The City of College Station will have an inspector working closely with the contractor as he constructs these improvements . We appreciate your patience in this matter. If you have any questions or concerns, please do not hesitate to call . I can be reached at (409) 764-3570 . Sincerely, v~~m~ Veronica JB Morgan, P .E . Assistant City Engineer cc : File VJBM/dsc February 26 , 1996 Resident 1501-A Pine Ridge College Station, Texas 77840 RE: H.E.B. Detention Pond Retrofit Dear Resident : As many of you are aware, the City of College Station has been working with H.E.B . to correct their detention pond drainag e problem . Plans have been submitted and approved for this construction. The contractor was issued a permit for construction, today . Over the next few weeks you will see construction at the outlet from the pond . The City of College Station will have an inspector working closely with the contractor as he constructs these improvements . We appreciate your patience in this matter. If you have any questions or concerns, please do not hesitate to call . I can be reached at (409) 764 -3570 . Sincerely, v~~m~ Veronica JB Morgan, P .E . Assistant City Engineer cc : File VJBM/dsc February 26 , 1996 Resident 1501-B Pine Ridge College Station, Texas 77840 RE: H.E.B. Detention Pond Retrofit Dear Resident: As many of you are aware, the City of College Station has been working with H .E .B. to correct their detention pond drainage problem . Plans have been submitted and approved for this construction. The contractor was issued a permit for construction, today. Over the next few weeks you will see construction at the outlet from the pond . The City of College Station will have an inspector working closely with the contractor as he constructs these improvements . We appreciate your patience in this matter. If you have any questions or concerns, please do not hesitate to call . I can be reached at (409) 764-3570 . Sincerely, V~JrE~ Veronica JB Morgan, P .E. Assistant City Engineer cc : File VJBM/dsc .. February 26, 1996 Ronny Hermann P .O . Box430 Caldwell, Texas 77836 RE: H.E.B. Detention Pond Retrofit Dear Mr. Herrmann : As many of you are aware, the City of College Station has been working with H .E .B . to correct their detention pond drainage problem . Plans have been submitted and approved for this construction. The contractor was issued a permit for construction, today. Over the next few weeks you will see construction at the outlet from the pond. The City of College Station will have an inspector working closely with the contractor as he constructs these improvements . We appreciate your patience in this matter. If you have any questions or concerns, please do not hesitate to call . I can be reached at (409) 764-3570 . Sincerely, v~~OJ~ Veronica JB Morgan, P .E. Assistant City Engineer cc : File VJBM/dsc CITY OF COLLEGE STATION Post Office Box 9960 1101 Texas Avenue M .L. Hammons 1700 Kyle South, Suite 240 College Station, Texas 77840 College Station, Texas 77842-9960 (409) 764-3500 November 8, 1995 RE: HEB DETENTION POND RETROFIT DESIGN Dear Roy:· We have reviewed your plans for the above referenced project and have the following comments: 1. The aluminum splash panel is unacceptable. This form of protection is not permanent and in our opinion will not withstand the water forces imposed upon it. 2 . Dimension the height of the addition on top of the existing concrete wall. 3. Show what method you intend to use to get the water from the Redstone Apartments parking lot into the creek. 4 . Show what method you intend to use to get the water from under the ~edstone Apartment pool deck into the creek. 5. Does the detail provided on sheet #4 have rebar throughout or only in the bottom 2-3 sacks of Quickcrete? 6 . The existing outlet ponds water 2-3 feet deep from the v-notched weir to the end of the easement area shown on sheet # 1. This area must be graded to drain . It currently does not. 7 . The existing site observations of the area illustrate that the velocities of water exiting the pond (from the concrete wall with the v-notch to the end of the easement area) are well in excess of the velocities allowable in the drainage ordinance for a vegetative bottom or one with loose rip-rap (as was originally designed). Please correct this problem . in your retrofit design solution. If you have any questions regarding the review, please do not hesitate to call . I can be reached at (409) 764-3570 between 8 a .m. and 5 p.m. We appreciate your quick response and corrective actions to this problem. cc: Kent uiza, P .E., City Engineer Jim Callaway, Asst. Director of Economic and Development Services Elrey Ash, Director of Economic and Development Services Tom Brymer, Asst. City Manager Cathy Locke, City Attorney Ralph Mehringer, Vice President, HEB Home of Texas A&M Univers ity ' STORMWATER DISCHARGE HOLLEMAN DRIVE & TEXAS AVENUE COLLEGE STATION, TEXAS FOR: H.E . B. GROCERY COMPANY BY: M.L. HAMMONS, P.E. 1700 KYLE SOUTH, SUITE 240 COLLEGE STATION, TX 77840 DATE: OCTOBER 31, 1995 • • . -;:·.: ""'..~. ~ .. ·. -... . '; '·. . -1 ~--· ~ ~ .:Jil ;~ . (/) ~ ;~ ~. uyiln-Y EASEMENT (2) ~! ~ , I -'- EX I STl NG 8" SAN. SWR .. ~'M 'I <i. ' I-='· pp -..--- en E e><\~ri tJ.c;. ~' ~A:r ~r?t>« "'"~Kea Out eti-M PROFILE -s,1..re,o Aa~ To ~~ Ct..~ANW . --PROPER1Y LINE .---t--OUTLIT ORAFlCE SEE DETAIL T/W 299.0 :m---J-__JDETENTION POND EASEMENT UNE T/W 300.0 ...... ~ °\ CofL--\; \(g't -\~o \0o NC J I I I \"t--t t ~~ ± --------------------Ou :.,;;;(J_e:: f~t-:A~ • ,, ~~~~-r----. fgf .G>~-Co~-,+B 66C110'Y,; -Sr\16~ ~ ~ ~ "'S-lC:C. Tf ~ -~~ i1:-~ ~E TAI t--1€:12 \.L..LL -.X::-.l-€. v Ali OIJ I ~IJ?2''( CoLL€6t "'S¥--[t 0\-l l C\\iqfq --~«~~~re ~1'p RAP~~~ (~Oji f?Apett--~AuS) / 6"Mov~ f"As r CoNv H.6. ...... ,-.~~-~.L--~~~ rs~TAl-1\\~fl --?~cr1 ON (AT u)~'$Heo Ou ( r-\~~A) , ~r 1 L.~ -Co~~e. CS ':floN q {~q Jqc; \ r J~;3fi~ ~s-) $~<;>~ 1.\~9il~ ---------------- ' • ' M. L. HAMMONS, P.E. 1700 KYLE SOUTH, SUITE 240 COLLEGE STATION, TEXAS 77840 ( 409) 696-1444 Veronica Morgan Office of City Engineer College Station , Tex as Dear Mrs . Morgan: Ref: HEB Detention Pond The following items, relating to stormwater flow at subject location were reviewed with you, at your office , last week : 1. Proposed aluminum splash panels . 2. Splash wall height dimensions . 3 . Redstone Apartment parking lot drainage method . 4 . Redstone Apartment pool deck drainage method . 5. Rip-rap reinforcing details . 6. Standing water within drainage channel. 7 . Water discharge flow channel velocities . After meeting with you, the items were again discussed with Mr. Les McGehee of H.E .B. The following are therefore submitted pertaining to the same issues: 1. The splash wall at the end of the discharge ramp will be constructed of concrete , as detailed by sheets #2 and #5 , alternate 2, of the drawings submitted to you . 2. The proposed splash wall height extension dimension is defined by sheets #2 and #5 of the attached drawings. 3. T he stormwater discharge from the Redstone property has always been via the Redstone pool area , beneath the pool deck . No change in drainage is proposed . While work proposed hereby is being done, however, positive drainage from the deck area will be provided at the end of the rip-rap retainer. The established drainage routing will be observed for poss ible routing damage , etc., created by wash-out eros ion . 4 . (See item #3) 5. Reinforcing of the Quickrete rip-rap wall is to be according to manufacturers recommendation and will generally be as shown by drawing sheets #3 and #4. (Manufacturers recommendation sheet is attached hereto). 6 . Silt will be removed from the flow channel, from the discharge weirs to the end of the L.U .L.A.C . easement. After silt removal the existing stone rip-rap liner will be restored to function as originally planned . Routine maintenance will then be performed on an intermittent basis to prevent excessive future silting. 7 . During the "clean-up" provided by item 6 , above , the stone rip-rap channel bottom profile will be checked and adjusted to provide a discharge flow velocity of 6 feet per second at the discharge end of the L.U .L.A.C. easement. Not sharp drops will be created at the discharge end due to work being performed . Sincerely , MLH/av .-.. ''-·· 10 :5E: Rip Rap QUIKRETE® Rip Rap controls erosion along the waterfront . Nat1Jral rno isture adds to its strength. I • • t J QUIKRETE ® Has Erosion Control "In the Bag" QUIKRETE® Rip Rap bags save you money In time. labor and machinery . The old way. of having men filling burlap bags by hand and never getting two bags the same size and weight, is now a thing of the past. No longer do you have to pay the high hourly rates for a ready-mix truck . No expensive ma - chinery is necessary to place OUIKRETE® bags . OUI KAE r E® Alp Rap bags are uniform In size and weig ht, and ca n be deli vered to the site where man- powe r is utilized in placing the oags . What Is Rip Rap? Use or OUIKRE TE ® Rip Rap on rhe Wh ite Rock C re ek Tributary, Da llas, Tex as. QU IKRETE® Rip Rap is packaged in biodegradable paper bags to save time and labor on heavy.duty projects . They are ideal for constructing headwalls for culverts and other erosion control projects, as well as to r building dams , beach bulkheads. an d waterway walls. They are al so espe- cially useful i n out -of ·the · way locations and eliminate the need for cost l y con· struction mach inery . A par - ticular adva ntage ln their use Is the ab i lity 10 sat In a wi de range of conditions . from water i mmer sion to na tural moisture atone . The 6m b a n kmen t lncfvUBS t ha built-in planters. (Aon Knight, contrec l orj rn :S'3 003 ,. \ ,___ .. Projects Using Rip Ra p -------. ··~--.-----·-------·--~~-·-· . ---··----~---- <0 198 6 . 1989 The OU I KRETE ® Companies, Atlanta, Georg ia 3034 5 «rid Assoc..11 :;d L ;: ••:>'9d Ma nufa c turers . QU IKR ETE~ & QU IK WALL ® are 1h e re g istered tr adema rks of T he OUIKRErE® Co rn pa )i (jS , US Pat ON . l Reg Nos . 391 ,990 ; 767 , 386 ; 1,042 ,903 & 1, 124 ,922 . Pri nted June , i 989 Ite m tt6939 ·3 i .~~-----~·~~---------~~~----~-! ,. 11 : 0l3 Dams and Bulkheads A st L :·.i{, long -lasting dam or bulkhead Is a rela- tiv~ly q u i·;; nn ci Glmple job w it h rip rap . The 60-lb . bag I& SUQge i;!ed be cai.Ge cf It~ aMy handling . Whon OS• ti ma iir.9 rip rap n •.::fds. figure five bags for 7 lin ea r te st a nd thr ee t>a gs for each vertic al foo t. Approximately 170 1 12 Cu -F· .!QS Are Needed for a 100 Sq .·Fl . Are a Construction 1 . Out l ine l11e area to be e xcavate d , exte di ng the excavation at least 1' be yond the edge of the planned wall. Remove all grass , roots , and oth er organ ic matter. Dig to a dep th of s·· and bri ng the base of this trench to a uniform gra de . 2 . Lay the first ti er of bags fo r t he da m or bulkhead wal l by butting the bags toge th er end to end . Stac K succeeding tiers in an in terlo cking fash io n or bond pattern. Thoroughly sprinkle and ta mp each layer of bags . Perfo ra tin g t he bags wi li speed saturation and initial set. 3 . To increase the wall's strengtll , 3/8" steel rebar stap le s can be driven into the bags . Alt ernate the staple direction from bag to bag and tie r to tier. S tee l St a pfGs Ma de fro m 318" Diamet er Rebar ~+---Sto c k . Placed In Fash!on Shown for Grsat~st St reng th . '-. : ~ I .fl -·>' Alter nale D i rect ions of Staple s f•om 8 ..-19 l·-B ag and T ;er to T ier HEB PL8t'1t-J I ~JG At'1D DES I 13t 1 4 . As an alternative, drive st raight re e;,,, , ods down through the bags as shown . Th is method is needed if tha bags are stacked under water. 5 . Dependin g upon the he ight of the dam wall and th e ca p aclt}' of the reservoir, It may be daslrable to leave c hannels for water runoff between bags In the in p t ier. lnstG ad of staples , rainfo rcing bars can be driv en vert ically through Iha bags as tr <:!y are sta c-i·~. TI 1ls mathod ,,;:: b~ necessary ii thG b ag~ ar.:; stackGd under wate r. I For Best Results j I The wol1< s.hould be compl ete d w ith as little inter-I ! rt.~1 ti on as possible to as sur e int egral construction . I Mat erials should be ~,· .·1e t for 4 days to assist c urin g, although na tura! moistu re alone ls enough to set. Walls higher than 1 O' should be temporarily i sw ay -braced wtth 2 x 4s to facilit ate Initial set. I ln:e rlocking Da rn and Wing Wa lls Slope Walls/Ero sion Control Control ling ,..,osion with r ip rap Is alm ost as ea sy as playi ng w it h c 1::!dren ·s bui ld ing b:oc ks. Becau se it will se t from natural moistu re alone and com es in ea sy·to-handle b ag s. eros io n wa lis can be bu ilt fro rr, ri p rap even In lo ca tion s inaccessib le for o \11 er cc r· st ruction methods . I • C1EV 02/31 l1: 131 Construction 1. Place f irst tier of bags onto a secure base end -to - t and . ·....__, '··--- i I I 1 2 . Set back succeeding rows in a stairstep fashion to full height of slope . Set bags i n a running bond pattern with the ends butted together and comers interlocked. A n chor the bags to the slope with 3/8" rebar. Perforate and tamp bag s as thoroughl y as poss ible . Set bags in a runn ing patte rn w ith the ends butted togethe r and comers interlocked. 3 . As each t ier Is la ld , ~iac kfill wit h tarnped·in d irt to a s· sure a solid ban k . For Best Results Urive steel reinforcing rods through each bag to an ci ''-'f them to the slope. Us ·a 3/8" fiab ar to anchor bags L___,_ .... ___ , __________ ~------ HEB PLRHt-i I t lC'.i mm DE·::; l 1:3ti A v oid doing the jo b wt1en the temperature is at or near freezing . Complete the job with as littl e inte r ruption as poss ible to assure in tegra l construction . If wa ter is a v ailable, keep t11e material wet for 4 days to assist cur ing . QUIKRETE ® R ip Rap i s approved by the foll owing age ncies for most soil erosion appli c at ions : U .S . Arm y Corps of Engineers Florida Departmen t of Natural Resources Flori da Dep a11nient of Transport ation Sout11 Florida Water Management District Bag s a re available in 60 -or 80 ·1b . dry weigllt. 6 0 -lb . bags are approxima te ly 4" x 12" x 18 " an d conta in approx imately 1/2 cu. tt. of material. 80·1 b. bags are approximately 4 1/4" x 13" x 2 1" and contain approx imatel y 2/3 cu ft. of materia l 80 ·1 b. scrim bags are approx imately 5" x 12" xi 5". (No t all sizes ava il abl e from a ll sh ipping locations.) OUIKRETE ~J Rip Rap is a sta ndard 5 -1 DO I . approved mix, as specif ied in section 530 o f lhe Departme nt or Tr ansportation Stand ard Spec p:c 2- tions and Arm y Corp of Eng in ee rs tor road and b ridge const(uction A higt1 strength 3 -1 mix can be p repared on s pecial requ est . -~~CITY OF COLLEGE STATION ~ ~ ENGINE::ERING DIVISION Post O ffice Box 9960 1101 Te xas Avenue C ollege Station, Texas 77842-0960 (409) 764-3570 INTERNAL MEMORANDUM TO: Kent Laza, City Engineer FROM : Veronica Morgan, Assistant City Engineer DATE : December 13, 1995 RE: HEB Detention Pond "Retrofit" l had a long discussion with Roy Hammons on December 11, 1995. He brought in his revisions to the plans based on my redline comments several weeks ago . I reviewed these revisions and commented during our 2 1/2 hour meeting . My original comments consisted of 7 items . They were as follows : 1. Proposed aluminum splash panels not permitted 2 . Splash wall height dimensions 3. Redstone Apartment parking lot drainage method 4 . Redstone Apartment pool deck drainage method 5. Rip-rap reinforcing 6 . Standing water within drainage channel 7 . Water discharge flow channel velocities Several of these comments have not been addressed to my satisfaction . They are : 1.) Roy is still proposing the aluminum splash panel. He has provided on his drawing a "concrete extension" to the height of the wall but he feels that this is the city's alternative and not really the one HEB wants to do . I explained my position regarding aesthetics, durability , maintain ability and that HEB won't be looking at it, the adjacent residents will and said that my answer to the aluminum is still NO . 2.) Answered . 3 & 4 .) Still not addressed in my opinion . Although Roy thinks I am trying to get HEB to solve Redstone's drainage problem, which Roy says existed prior to the construction of HEB , I disagreed . explained that I am trying to get HEB to look beyond their property line to areas that were damaged as a result of the "breach" and can no longer function the way they originally did prior to the breach of the wall. Roy said HEB doesn't want to do anything beyond their property lines as (the following is my words) it would then imply liability . I told Roy he would have to go back to HEB and tell them they need to look beyond their property lines because I believe (and I was there in knee deep water watching) there is damage under the pool deck caused by the HEB detention pond design. o:'Group'deve _ srv\v\heb-roy .doc 5.) I as ked him to provide me a copy of the mfg . recommended reinforcement schedule so that I can provide it to my inspector. He said he would forward that information . 6 .) He did not answer the standing water issue except to say that if the silt is cleaned out, the water wouldn't stand . To that I asked is that what HEB was go ing to do and he said he couldn't commit HEB to this . I said I needed that commitment. Roy said he would get that in writing from them. 7.) I asked what the velocities were in the channel. He responded with calculations knowing that the velocity in the creek to Anderson would be 7+ fps . Our dra i nage ord inance calls for this velocity to be contained in a channel that is lined in some fashion . To this comment, Roy said he would try to "slow" the water down so that when it leaves HEB's prop erty it would be no more than 6 fps . Our drainage ordinance states this is the max velocit y for a "sodd ed" chann el. Again my impression is that Roy has been directed to do everything on HEB's property and not extend any improvements off th at property because it would imply liability . (again -my words, not Roy 's) Roy we nt back to talk to HEB. I am disappointed to say the l east in this project. I feel that the repairs are being "short-sighted" and "cheap" and I am afra id that the results will be poor at best. cc: J im Callaway Elrey Ash T om Brymer Cathy Locke VM/d sc o :'(jrou pV::l eve_srv\vlheb-roy.doc DEVELOPMENT PERMIT PERMIT NO . 325 HEB : DETENTION POND RETROFIT FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE i SITE LEGAL DESCRIPTION: Lot 1 of the Kapchinski Hill Subdivision SITE ADDRESS: 2000 Texas Avenue South OWNER: HE. Butt Grocery Company 646 South Main Avenue ,· San Antonio , Texas 78204 DRAINAGE BASIN: Wolfpen Creek, Channel III TYPE OF DEVELOPMENT: This permit is valid for the construction of a quickcrete wall and additional repairs as outlined in the approved letter from Roy Hammons, P .E. These repairs are being made to the existing detention facility that serves the HEB complex . This permit also includes clearing of the existing pond and drainage easement area . Contractor shall prevent silt and debris from leaving the site in accordance with the City of College Station Drainage Policy and Design Criteria. Owner and/or contractor shall be responsible for any damage to existing city streets or infrastructure due to heavy machinery and/or equipment. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities . I hereby grant this permit for development of an area outside the special flood hazard area. All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer in the development permit application for the above named project and all of the codes and ordinances of the City of College Station that apply . ~~ Administrator/Representative Date Owner ~ ~~ Contractor ~ Date 2-/-u:,/q b Date 1 b) l fz ®rM!f13JJ ~ ~~~-> . 5 ~'<I d )rtb.fj "lJ~ ~NO~ ~/lO~ ACCOUNT NO . ___________ _ 380100 '19<2{~ THANK YOU (J~ls1.Ll ~ .., I FOR : STORMWATER DISCHARGE HOLLEMAN DRIVE & TEXAS AVENUE COLLEGE STATION, TEXAS H .E . B. GROCERY COMPANY BY : M.L. HAMMONS, P .E. 1700 KYLE SOUTH , SUITE 240 COLLEGE STATION , TX 77840 DATE : OCTOBER 31, 1995 , -T--· ~ ~ ·.i ~ ·; (/) ~ 0 0 EASEMENT (2) ~i ~ UYJ LITY + ·~ + EXISTING !8,, SAN. SWR. v "d· v .._ pp ~ -- ..... ~t (/) E ~-PROPER1Y LINE .----+---OUTLET ORAFICE SEE DETAIL ~f---J-T/W 300.0 T/W 299.0 :m---i.__1DCTENTION POND EASEMENT UNE T/W 300.0 ACC.ES'S P..AMP Z-, g 1 ~tr>- j . -;:.. ' (\ z.. ,. -. ~ V1 t \-\-' ~ ~ f\)~ I \!'\ ;;! j .o ~ ~ G ...t ,,_ """ ~"1 ~ cr1 ~ t ~ ~ ~ \-0 \...\> ~ ~2 \I\ )! V> ~ ~ z ~ \I\ v. '> -.J ~~ ~ <d \j) '-.) <:::!. \\ ~ ir: ~ 1'_ ~ -z ~ t) 4:~ \J\ \.4... :_J_r•• ••• :~. \~&_ ~~,s ~ Q.. ~ \ ~ -~~ ~~ --4 •J \<"..( -\:C \(\ .JU\ u: "X'~. -~~ ~~ ~ -:r. ti) CJ ~Nit--\~ ~~~ <!-·~ tc& :;~ \.\} cnlD 7 \U~"1 4!J ~~ \\) ~ C!-~-l '--' --C) : \[' -\\~ ~ • ¥) cy'-> cl:.: ... f ~7A-l/ U)-f\.-l.A._,, L ~rw-~~ t Wkvv 8 [' <t 1 t ( v~Q \ ~-s) :R~e~n. ~o?S c~~ c?..t ~~r 1) f. DEVELOPMENT PERMIT PERMIT NO . 325 HEB : DETENTION POND RETROFIT FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA RE : CHAPTER 13 OF THE COLLEGE STATION CITY CODE SITE LEGAL DESCRIPTION: Lot 1 of the Kapchinski Hill Subdivision SITE ADDRESS: 2000 Texas Avenue South OWNER: H.E. Butt Grocery Company 646 South Main Avenue San Antonio, Texas 78204 DRAINAGE BASIN: W olfpen Creek, Channel III TYPE OF DEVELOPMENT: This permit is valid for the construction of a quickcrete wall and additional repairs as outlined in the approved letter from-Roy Hammons, P .E.-'Fhese repairs are being made to·-- the existing detention facility that serves the HEB complex . This permit also includes clearing of the existing pond and drainage easement area. Contractor shall prevent silt and debris from leaving the site in accordance with the City of College Station Drainage Policy and Design Criteria. Owner and/or contractor shall be responsible for any damage to existing city streets or infrastructure due to heavy machinery and/or equipment. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities . I hereby grant this permit for development of an area outside the special flood hazard area. All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer in the development permit application for the above named project and all of the codes and ordinances of the City of College Station that apply. ~~ Administrator/Representative Date Owner ~ cO~~· I Date 2-/7-Jo(q b I Date Contractor ,, '/ \, M. L. HAMMONS, P.E. 1700 KYLE SOUTH, SUITE 240 COLLEGE STATION, TEXAS 77840 (409) 696-1444 Veronica Morgan Office of City Engineer College Station, Texas Dear Mrs . Morgan: 1. Proposed aluminum splash panels . 2 . Splash wall height dimeofilpns . 3. Redstone Apartment parking lot draina 4 . Redstone Apartment pool deck drainage 5. Rip-rap reinforcing details. 6 . Standing water within drainage channel. 7. Water discharge flow channel velocities . Ref: HEB Detention Pond After meeting with you, the items were again discussed with Mr. Les McGehee of H.E .B . The following are therefore submitted pertaining to the same issues : 1. The splash wall at the end of the discharge ramp will be constructed of concrete, as detailed by sheets #2 and #5, alternate 2, of the drawings submitted to you . 2. The proposed splash wall height extension dimension is defined by sheets #2 and #5 of the attached drawings. 3. The stormwater discharge from the Redstone property has always been via the Redstone pool area , beneath the pool deck. No change in drainage is proposed . While work proposed hereby is being done , however, positive drainage from the deck area will be provided at the end of the rip-rap retainer. The established drainage routing will be observed for possible routing damage , etc., created by wash-out erosion . 4 . (See item #3) 5 . Reinforcing of the Quickrete rip-rap wall is to be according to manufacturers recommendation and will generally be as shown by drawing sheets #3 and #4. (Manufacturers recommendation sheet is attached hereto). 6. Silt will be removed from the flow channel, from the discharge weirs to the end of the L.U .L.A .C . easement. After silt removal the existing stone rip-rap liner will be restored to function as originally planned . Routine maintenance will then be performed on an intermittent basis to prevent excessive future silting . 7 . During the "clean-up" provided by item 6 , above, the stone rip-rap channel bottom profile will be checked and adjusted to provide a discharge flow velocity of 6 feet per second at the discharg e end of the L.U.L.A .C . easemen t. Not sharp drops will be created at the discharge end due to work being performed . Sincerely , , 7 } -~ ~~ M. L mmons M LH /a v ./ FOR : STORMWATER DISCHARGE HOLLEMAN DRIVE & TEXAS AVENUE COLLEGE STATION, TEXAS H.E . B . GROCERY COMPANY BY : M .L. HAMMONS, P.E. 1700 KYLE SOUTH, SUITE 240 COLLEGE STATION, TX 77840 DATE: OCTOBER 31 , 1995 -r ~~ .~~ J ~~ 0 U1ilLITY EASEMENT (2) ~:it ~ /. I +~ + ,EXISTING 8" SAN. SWR. ~ 'M · v pp -.--- E <C !-"· {f} ACC.E5'::> P..AMP ! PROP. 2 -42" R .C.P. F /L 294.5 (SET FLAT) / . O (SET 1 SECTION EACH L ~o\L.M_ · 1N~6e-fLA-W YlGw [ ~\?-\ ~CoL-u;c.c Sr"Afl'o"; j ql1:1 JC\S -- ....0 c...--, :< ? ~ (ti J\ g A (\I 1 z <l'-ro _g ~ ~ f :i ' ~ ,~l ~ t\l v.) l rn < ~ ~. 0 z: ;z; ' i' Ji ~~ I 1-1~ -J + I ~ " \ tt~~\1 J no O~H-;~(n lv) ~o 1~~3~ {~N~liv'l'Sl<zt ..,.,'?f"I -?NOJ l s~ ~t10M,,f3-/ (>"7'1~ '!J~d"1d ~Q~) .. ~~~ d-v~ d .1~ -al~li~,.~ -\ -- ( rl07A-v uJ-A-L,-L,. L ~ fu Cf~ t W kvv H [' 1 1 t ( v'A--rf1 ~-s) R~e~n. Rof'S (s~.Sl-t~@ f 1) ·..._ .. ··- 10:58 Rip Rap QUIKRETE® Rip Rap controls erosion along the waterfront . Natural moisture adds to its strength. HEB PLA Nl--1 1 NG AHO DE::. l ·'1 :< Y QUIKRETE® H "In the Bag" . ' I QUIKRETE® Rip Rap bags save you money In time, labor and machinery . The old way. ot having men filling burlap bags by hand and never gelling two bags the same size and weight. is now a thing of the past. No longer do you have to pay the high -=-='hourly rates for a ready -mix truck . No expensive ma- chinery is necessary to place QUIKRETE® bags. OUIKRE rE® Alp Rap bags are uniform In size and weight, and can be del iv ered to the site where man- power is utilized in placing the oags . What Is Rip Rap? Us e or OUIKRE TE:t· Rip Aa p on rhe Wh ite Rock Creek Tr ibu tary, Dallas, Texas . QUIKRETE® Rip Rap is packaged in biodegradable paper bags to save time and labor on heavy -duty proj ects . They are ideal for constructing headwalls for culverts and other erosion control projects, as well as for building dams, beach bulkheads. an d waterway walls . They are also espe - cially useful in out -of-the · way locallons and eliminate the need for costly con- struction machinery . A par- ticular advantage i n the ir use Is the ability to sat In a wide ran g e of conditi ons, fr om water im mer sion to natural moisture alone . The ftm/Jankme n r ln cl.;ues th& bf.Jllt·in plante rs. (Ron Knight. contrecto :) ' \ Projects l .-. 1 1: 00 Dams and Bulkheads A st ,_:.~~. long -lasting dam or bulkhead Is a rela - tivtily q wi·>' vnd simple job with rip rap . Tho 60-lb . bag I& &UQQe sl0Cl beca1.i;e of Its eMy handling. Whon os· t i ma \ir.9 rip rap n ·~·e ds . figure five bags for 7 linear lest and thre e bag s lor each verilcal foot. Construction 2 . Lay the first tier of bags for t h t: dam or bulkhead wall by butting the bags together end to end . Stack succeeding tiers in an interlock !ng fash io n or bond pattern. Thoroughly sprinkle and ta mp each layer of bags. Perforating the bags wili speed saturation and initial set . 3 . To increase the watt's strengtll, 3/8" steel rebar staples can be driven into the bags . Alternate th e staple direction from bag to bag and tier to tier . l· ' ... 't, '• Steu! Slapll'.IS Mada !rem 318" Diameter Rebar """"1---Stoc k.. Placed In Fash!on Shown for Greatest Strength . '- . : ~ ' .1' -·;· Alternate Olrocfons o ! S t aple , f•om B~·lJ : .. Bag and T ;or lo Ti er HEB PU:1t'-ll'-l I ~~G AN D DE"::; I Gt ~ 4 . As an alternat ive, drive straight re v,,, . Dds down through the bags as shown . This method is needed if tha bags are stacked under water. 5 . Depending upon the height of tt1e dam wan and the capaclt}' of the reservoir, It may be dastrabte to leave ch annels for water runoff between bags In the inp tier. I The wor1< should be comrleted with as little inter-I n.;~iti on as possible to as s~re integral construction. I Materials should be ~ · ,.,et for 4 days to assist II cu rin g, although natural moisture alone is enough to 1 set. Walls higher than 1 O' should be temporarily i sway -braced wtth 2 x 4s to facilitate Initial set. j Slope Walls/Erosion Control Controll ing ,.,osio n with rip rap Is almost as ea sy as playi ng with v 'd ren ·s bui ld i ng b:ocks. Becau se it wiil 5e t from natura l m oi s!u re a:one and com es i'.· easy-to-handle bag s . eros io n wa ns can be bu ;lt tr cn - rip rap even In lo ca tion s inacc e:;.sible for ot11 i:-r c: • struction m ethods . ' ·.___, ·--.. ! l1 :01 Construction 1. Place first tier of bags onto a secure base end -to - e nd. 2. Set back succeeding rows in a stairstep fashion to full height of slope . Set bags In a running bond pattern with the ends butted together and comers ln!erlocked . Anchor the bags to the slope with 3/8" rebar. Perforate and tamp bags as thoroughly as possible. Set bags in a running pattern ,.. with the ends butted toge! corners Interlocked . 3. As each tier Is lak.1 , ~iackfill with tamp sure a solid bank For Best Results Drive steel reinforcing rods through each bag to anclicr them to the slope . U s-a 31 8 " Reb ar to an chor b;:igs -~-L_._. -···---·. HEB PLAt--lt'-1 ! t--ll3 A~m DE S I GN Avoid doing the jo b wt1en t t1e temperature is at or near freezing . Complete ttl e job with as li!!l e int e rruption as possible to assure integral constt'\.J cti o n. If water is available, keep tt1 e material wet for 4 days to assist cu ring . Bags are ava ilable in 60 -or 80·1b . dry weigt1t. 60-lb. bags are approx i mately 4·· x 12" x 18 " and contain approximately 112 cu . 11 . of maierial. 80-lb. bags are approx imately 4 1/4'' x 13" x 21" and contain approximately 213 cu ft. of material 80-lb. scrim bags are approximately 5" x 12 " x 15". (Not all size s available fro m all st 1ipping locat ion s .) OUIKRETE ~J Rip Rap is a standard 5 -1 D .O ,.- approved mix, as specif ied in s ec tion 530 o f tne Department of Transportat io n Sta ndard Sp ecr !·C J · lions and Army C orp of Eng in e ers tor road and bridge constru ct ion A higt1 s trength 3 -1 mix c a n b8 p repared on sp ectal r ~que s t . October 13, 1995 ' ·RECEIVED OCT ·2 3 19S5 City of College Station 1101 Texas Avenue College Station, Texas 77842 Attention: Mr. Kent Laza, City Engineer Re: Stormwater Detention Pond Dear Mr. Laza: Thank you for your October 2 letter regarding the stormwater detention pond utilized by Target, Outback Steakhouse, Olive Garden, the Enclave Apartments, and HEB (the "Owners"), and for the lead role which the City of College Statior • ·-· ' -·'----~~--TTrm -L---------- concerns and intends to fulfill its responsibiliti HEB is in an arrangement of shared use and r1 Owners, and cannot unilaterally speak for all 1 propose the following work and pledge to us€: other Owners, whom we know to be conscien 1. Regarding your item "a. the end v enough" .............. PROPOSAL: \Ve propo! of the outlet structure in accordance with plar of the plans . 2. Regarding your item "b . a berm o is in need of repair" .............. PROPOSAL: with concrete rip-rap . Work would be in ace• City acceptance of the plans . /0 3 . Regarding your item "c. the downstream ditch is in need of cleaning and w, 1th er ~t he long 1g wall ~ptance ed and erm s, upon modificatio n" ............... PROPOSAL : We propose to clean and clear the downstream ditch from the detention pond to the end of the LULAC easement, a distance of approximately 65', by removing debris and vegetation which would divert or impede flow, and by shaping the bed of the ditch to achieve a run-off slope from the detention pond to the lower end of the LULAC easement, at which lower end the cleaned-out ditch would match existing grade. 4 . Regarding your item "d . the inflow pipe from the Enclave Apartments causes water to jump over the pond wall, directly into the outfall structure" .................. PROPOSAL : It is our understanding from Mr. Hammons that the detention pond will adequately handle inflow from the Enclave, without overflow of the pond wall, when the pond's detention capacity is maintained at H.E. BUTT GROCERY COMPAN Y P.O . BOX 839955 SAN ANTONIO , TEXAS 78283 -3 955 646 SOUT H MAIN AVENUE 78204 (2 10) 246-8932 FAX (210 ) 246-853 0 December 18 , 1995 Mr. Ralph Mehringer Vice President H.E. Butt Grocery Company P .O . Box 839955 CITY OF COi .I .EGE STATION Pos t Office Box 9960 1101 Texas Avenue C o llege S t ation , Texas 7784 2 -9960 (409) 764-3500 . San Antonio, Texas 78283-3955 Dear Mr. Mehringer: I sent you a letter dated October 23 , 1995 in which a deadline was set for HEB to prepare and submit plans that addressed drainage problems at the dete ntion pond adjacent to the Enclave Apartments. The date of that deadline was November 3 . Plans were submitted by Roy Hammons prior to that date and were quickly returned with comments by my staff. The comments pointed out various shortcomings of the plans and made specific statements about materi als that were not allowabl e. Mr. Hammons was asked to resubmit these plans with revisions to address the concerns of my staff. Following a long period of inactivity, a second set of plans were resubmi tted by Mr. Hammons on December 11. The second set of plans failed to address most of the comme nts from the first submittal and are unacceptable to the City of College Station . I am beginning to believe that there is not the commitment of behalf of HEB and Roy Hammons to address the flooding problems in the area of the detention pond as we were led to believe in earlier meetings. Therefore, I must set another deadline for submittal of acceptable plans for work on the detention pond and its outfall. That deadline is January 5, 1996 . Ifwe have not received an acceptable set of plans that address the comments made on the first submittal, we will assume HEB is not making a good faith effort in this matter and turn it over to our legal department for subsequent action. City Engineer cc : Roy Hammons Tom Brymer Cathy Locke Elrey Ash Veronica Morgan Home o f Texas A&M University 10:43 210-246-8530 ~ 409 764 34 96 City of College Station 1101 Texas Avenue College Station, Texas 77842 October 13, 1995 Attention : Mr. Kent Laza, City Engineer Re : Stormwater Detention Pond Dear Mr. Laza: Thank you for your October 2 letter regarding the stormwater detention pond utilized by Target , Outback Steakhouse, Olive Garden, the Enclave Apartments, and HEB (the "Owners''), and for the lead role which the City of College Station has taken in the matter . HEB shares your concerns and intends to fulfill its responsibilities regarding the detention pond . As you know, HEB is in an arrangement of shared use and responsibility for the detention pond with the other Owners, and cannot unilaterally speak for all the Owners, but in response to your letter we propose the following work and pledge to use our best efforts to obtain the participation of the other Owners, whom we know to be conscientious in matters of this nature. 1. Regarding your item "a. the end wall of the outlet structure is too low and not long enough" .............. PROPOSAL: We propose to add to the height of the concrete retaining wall of the outlet structure in accordance with plans prepared by Roy Hanunons, upon City acceptance of the plans. 2. Regarding your item "b . a berm outside of the outlet structure has been breached and is in need of repair'' .............. PROPOSAL : We propose to reinforce and fill gaps in the berm with concrete rip-rap . Work would be in accordance with plans prepared by Mr. Hammons, upon City acceptance of the plans . 3. Regarding your item "c . the downstream ditch is in need of cleaning and modification" ............... PROPOSAL: We propose to clean and clear the downstream ditch from the detention pond to the end of the LULAC easement, a distance of approximately 65', by removing debris and vegetation which would divert or impede flow, and by shaping the bed of the ditch to achieve a run-off slope from the detention pond to the lower end of the LULAC easement, at which lower end the cleaned-out ditch would match existing grade . 4 . Regarding your item ''d . the inflow pipe from the Enclave Apartments causes water to jump over the pond wall, directly into the outfall structure" .................. PROPOSAL: It is our understanding from Mr. Hammons that the detention pond will adequately handle inflow from the Enclave, without overflow of the pond wall, when the pond's detention capacity is maintained at H.E. BUTT GROCERY COMPANY 646 SOUTH MAIN AVENUE 78204 P.O . BOX 839Q55 (210) 246-8932 SAN ANTONIO . TEXAS 78283 -3955 FAX (21 0) 246-8530 10:43 2 1 0-245-8530 ~ 409 ?b4 j4~b NU. 4c:'.ld its designed level. To maintain the pond at its designed level of capacity, we propose for the Owners to establish an effective maintenance program of grass/weed control and silt removal at regu lar clean-up intervals (and as needed between periodic clean-ups), for both the detention pond and the LULAC easement area below the pond . We would volunteer the maintenance program for regular inspections by the City, with the request that the City notify a designated Owners' representative to attend inspections in order to streamline communications . Upon the City's acceptance of the above work proposals , and City approval of Mr. Hammons' design plans for proposals #1 and #2 above, HEB will promptly contract for and proceed with the proposed work, in good faith that the other Owners will reimburse HEB for their respective shares of the cost. We estimate that we would be able to complete all work within 3 weeks after City approval of plans . Regarding your suggestion that the drainage ditch below the LULAC easement needs to be improved, and that the Owners utilizing the detention pond need to undertake such improvements , we agree only that the downstream ditch needs to be improved; but we disagree that the Owners should have responsibility for such improvements . When the propo·sed work on the detention pond and the LULAC easement is complete, stormwater from the parcels of the Owners will be properly handled and discharged from the pond, then onto and across the LULAC easement. Stormwater drainage below the LULAC easement will include not only water which has come from the properties of the Ovvners but also the drainage from other properties besides those of the Owners. It is our position that below the LULAC easement, the drainage ditch is a part of the City's overall municipal drainage, commonly serving abutting properties, and within th e responsibility of the City to control the gathering surface drainage . HEB respectfully declines to perform any work on the drainage ditch below the LULAC easement, and we look to the City of College Station to perfonn work as necessary to meet the City 's responsibility on areas downstream from the detention pond and the LULAC easement. We want our discussions to be clear and directed toward a constructive resolution of the problem . Please let us know if there is any portion of your letter to which we have failed to respond clearly , and we will look forward to hearing back from you regard ing our proposal . Yours very truly, cc : see following page 10:44 210-246-8530 ~ 409 764 3496 cc : Dayton Hudson Corporation 33 South Sixth Street P.O . Box 1392 Minneapolis, Minnesota 5 5402-13 92 Attention : Mr. Jim Thensch General Mills Restaurants, Inc . 5900 Lake Ellenor Drive 1751 Directors Row Orlando, Florida 32809 Mr . John Godfrey Godfrey Construction P .O . Box 4269 Bryan, Texas 77805 Mr. Tom Kenney Outback Steakhouse 675 Rablewood Drive Houston, Texas 77079 Mr. Bill Thornton, Jr . Bruchez, Goss, Thornton , Meronoff, Michel & Hawthorne 3131 Briarcrest Bryan, Texas 77802 Mr . Roy Hammons Mr . Charles Blackbum, HEB Mr . Les McGehee, HEB Mr. Jim Sloan, HEB N0.420 GJ 04 (409) 696-1444 Veronica Morgan Office of City Engineer College Station, Texas M. L. HAMMONS, P.E. 1700 KYLE SOUTH, SUITE 240 COLLEGE STATION, TEXAS 77840 December 8, 1995 Ref: HEB Detention Pond Dear Mrs . Morgan : Various items have been reviewed relating to stormwater flow at subject location . Your latest letter addresses these issues: 1· 1. Proposed aluminum splash panels not permitted \ i.l~ IArv-u.tJ-e_.) 2 . Splash wall height dimensions tJ ~ 3. Redstone Apartment parking lot drainage method ( I 4 . Redstone Apartment pool deck drainage method ) / 5. Rip-rap reinforcing -d ~~tr · 6 . Standing water within drainage channel 7 . Water discharge flow channel velocities ·~~ l f?PS We submit the following information and comments pertaining to the same issues : 1. While no material is considered truly "permanent", aluminum does not rust and according to manufacturers of aluminum products, aluminum in fact has a very long life span . If allowed, placement and attachment can , and will, be done with structural integrity far in excess of water pressure potent ial at the top of the wall. Aluminum panel and concrete topping wall details are provided by sheet #5 of the attached drawings . a) We know that the flooding that has been experienced at this location indicates wate,r flow above the existing wall height. Grass/debris collection at the chain link fence on the wall shows a high water line approximately 8" to 1 O" above the wall. The potential force of a 1 O" liquid head is not great. I also point out that the levels we have experienced does not accurately reflect an adequately maintained flow channel. Attachment #1 (Flow calculation print-out from Haestad Methods Software) calculates the flow depth along a properly maintained 1 O' wide concrete discharge channel leading to the subject wall at a depth of 1.06' during the 100 year event (producing 90 CFS discharge volume). We, however, recognize a change of direction and channel condition at the wall that results in a calculated flow depth of 1.57' (Attachment #2) which would result in an effective flow depth of 1.57' at the wall. The 1.57' flow depth impacting the concrete wall will create some degree of splash . We anticipate the splash to result in minimal, or no , water flow over the existing 3' concrete wall even without the height increase. . The ditch condition at the time of previous flooding, however, is more closely simulated by the calculations of Attachment #3. It indicates an imposed flow depth of 2 .65' at the 3' concrete wall due to the rip-rap section of the ditch being approximately 50% blocked . Flow depth at 2 .65' in a 3' containment wall will definitely result in over-spill at a point of direction change . The constant flow created by such conditions in this case has resulted in a continuous flow over the wall and the eventual failure of the natural ground barrier between the rip-rap flow channel and the adjacent Redstone land tract. Remediation of the flow constriction condition will, in my opinion, substantially reduce, if not completely eliminate , the "wall spill" that has been experienced . 2 . The proposed splash wall height extension dimension is clarified by sheets #2 and #5 of the attached drawings . 3. The method of discharge for transfer of Redstone property stormwater run-off to the original flow line has never been modified . Attachment #4 is a representation of the original topo that shows a natural flow line along the Redstone land adjacent and parallel to the Enclave/Lulac south properly line . The rip-rap flow ditch that was constructed for detention pond discharge flow is wholly within the Enclave/Lulac tracts and was excavated from natural ground that was the north bank of the orig i nal flow . A portion of the natural barrier was left in place, as is attested to by the growth of mature trees on the Redstone tract north property line . It may , in fact, be the breach in this barrier that has caused the flooding that has been experienced . 4 . (Same as item #3) 5 . Reinforcing of the Quickrete rip-rap wall is to be according to manufacturers recommendation and will generally be as shown by drawing sheets #3 and #4 . 6 . Standing water in the discharge channels of the existing easement has been measured at approximately 1' and is so standing due to silting that has not been removed from the flow channel. Since the channels have not been cleaned since the stormwater collection area has been fully developed , it seems reasonable that most of the silting was deposited before a nd during construction activ it ies . After clean ing and restoration to original configurat ion , there may be very little additional silt ing . If so , the channel should require a minimum of ma intenance after the in it ial clean-out . 7. Water disch~rge velocities in the flow channels do not calculate as excessive for lined channels. ; The concrete section calculates at 8+ feet per second and the rip- rap section calculates at 7+ feet per second . If we can be of assistance in solving the flooding problem we are happy to do so . We believe, however, that the problem stems from restricted flow throughout the drainage channels . The drawings presented herewith are to solve specific physical problems. Where more than one solution method is shown we propose that either is a suitable solution. Selection of the method to be used is a City of College Station -H.E.B . issue . I Sincerely, M . L. Hammons MLH/av Rectangular Channel Analysis & Design Open Channel -Uniform flow Worksheet Name: ANDERSON STREET Comment: CONCRETE 10' FLATBOTTOM, VERTICAL WALLS Solve For Depth Given Input Data: Bottom Width .... . Manning's n ..... . Channel Slope ... . Discharge ....... . Computed Results: Depth ........... . Velocity ........ . Flow Area ....... . Flow Top Width .. . Wetted Perimeter . Critical Depth .. . Critical Slope .. . Froude Number ... . 10.00 ft 0.013 0.0066 ft/ft 90.00 cfs 1.06 ft 8.49 fps 10.60 sf 10.00 ft 12.12 ft 1.36 ft 0 .0031 ft /ft 1.45 (flow i s S u percritical } Op en Ch annel F low Mod u l e , Ve rs i o n 3 .12 (c) 1 99 0 Haes tad Methods, Inc . * 37 Br ookside Rd * Wate rbu ry , Ct 06 7 08 Trapezoidal Channel Analysis & Design Open Channel -Uniform flow Worksheet Name: ANDERSON STREET Comment: RIPRAP DITCH Solve For Depth Given Input Data: Bottom Width ..... Left Side Slope .. Right Side Slope. Manning's n ..... . Channel Slope ... . Discharge ....... . Computed Results: Depth ........... . Veloc i ty ........ . Flow Area ....... . Flow Top Width .. . Wetted Perimeter. Critical Depth .. . Critical Slope .. . Froude Number ... . 7.00 ft 0 . S 0 : 1 (H : V) 0.50:1 (H:V) 0.020 0.0080 ft /ft 90.00 cfs 1.57 ft 7.3 5 fps 12.24 sf 8 .57 ft 10.51 ft 1.66 ft 0.00 68 ft /ft 1.08 (flow is Super c ritical ) Op en C annel Flow Modu l e, Versi on 3.12 (c) 1990 Haestad Me thods , Inc. * 3 7 Broo kside Rd *Waterbury, Ct 06 7 08 Trapezoidal Channel Analysis & Design Open Channel -Uniform flow Worksheet Name: ANDERSON STREET Comment: RIPRAP DITCH Solve For Depth Given Input Data: Bottom Width ..... Left Side Slope .. Right Side Slope. Manning's n ..... . Channel Slope ... . Discharge ....... . Computed Results: Depth ........... . Velocity ........ . Flow Area ....... . Flow Top Width .. . Wetted Perimeter. Critical Depth .. . Critical Slope .. . Froude Number ... . 3.00 ft 0.50:1 (H:V ) 0.50:1 (H:V ) 0.020 0.0080 ft /ft 90.00 cfs 2.65 ft 7.85 fps 11 .46 sf 5.6 5 ft 8.93 ft 2.61 ft 0.0085 ft/ft 0 .9 7 (fl o w i s Subcr i tic al ) Open Channel Flow Modu l e, Ver si on 3.1 2 (c ) 1 9 90 Haestad Methods, I nc. * 37 Broo kside Rd * Wa te r bu r y , Ct 0 6 7 0 8 ?" :1 ..q-j N i (() 0 ..q-(() + + n n r-i 296 r-i <{ ~ J ~ ~ I- (/) J (/) 1 O' UJILITY EASEMENT (2) b~ I EXISTING 8" pp -.- E SAN. SWR. -- v ~DETENTION POND T/W 299.0 ;i.... LINE G R A S S B 0 T T 0 M \ EASEMENT LINE (NORTH FACE) 4" SLAB T/W 29 9 .8 T/W 300 .0 0 (() N + '<t I r --------- U.E. LINE TjJH 29'6."5 - - ---- if~3.5 . -(:=: - --296 T /W 296.o ___ _. PROFILE 70.0' .-JL----PROPERTY LINE ~--+--OUTLET ORAFICE SEE DETAIL T/W 299.0 m-----l-DETENTION POND b 0 "' EASEMENT LINE T/W 300 .0 ACCESS P.,AMP -- PROP. 2-42" R.C.P. ---- 1 • ,..., ,..., A c: ( C"' LT C-l "T\ -- 295 -- 295 ~ -~ -~ ?- 6' Ur-J\ ~ \ ~ f\ ~ m ~ \I\ cl' -T-~ ~ ·~ ·~ J (/)S: 0 UlilLITf EASEMENT (2) ·~] ~ /' l +it + ,, .q-CH . .q-EX I STl NG 8 SAN. SWR. . 0 pp ~ -- @ ....... E T/W 300.0 <{ -· i-= (/) ~i\~rlt\c. <RI ~A:?~fj'l)IK . "'~~~(.) Out e{L.M PROFILE -S\t..TcO A.a~ To ~E C1..e-ANW . ~-PROPER1Y LINE .----+---OUTLET ORAFICE SEE DETAIL ~1----11-T/W 300.0 T/W 299.0 :111---f-_IDETENTION POND EASEMENT UNE T/W 300 .0 t' \)'I -:-~ i ,_ 0 c L -A n L:-(\I ~ ~ r ' ~ ~ ~ ~ I -t-~ {\. 9 ':J f\\ -~ ~ rt\ -+ R-~ ! en ii i ~ I I ~ t h Iv, -I ~ \-\-~ I . I \\\ ~ ~1\- I ~L_~---tilK=i-:ft-:fi:j1tt-r--ll -.f>-~ ' .-\. --·--------..L----'1' _<Qu ·,~~~re ~r'p RAP e~~ ( eo~ PApe n.. ~Au~) I s "M?WG Plsr Co N v H..s.,_._ __....,...,......'-'_-----£'-------- f)E-TAl ,-{\)€J l ?e;cr·1 O N (AT u)~-$1-i e o ow i A-~~A) \1 \ I YP-N (•L \ -C o ~c;.e, 'Sf'Tl~;J ~ {&q )q e; ( r101A-v uJ-A-~ L~*rw-<::t~ t w A·vv 8 r : <t I t ( v krf 1 ~-s) I q .i ~1 1 \(\I ~ , I i \ ~~-\ .. ~~~ O { ,, \ i \; I ) _, _ _9 __ \ ) . --· -··--·-----~~ December 29 , 1995 Les McGehee 12435 Millway Drive Houston, Texas 77070 Dear Mr. McGehee: CITY OF COLLEGE STATION Post Office Box 9960 1101 Texas Ave nue College Station , Texas 77842-9960 (409 ) 764-3500 I received, from Roy Hammons on December 27 , 1995, a letter outlining the plans and procedures which HEB would like to have approved for the repair work to the detention pond . Mr. Hammon's letter and the items outlined therein appear to meet the City of College Station ordinances and our concerns in the damaged areas . As I stated to Mr. Hammons, item #3 and #7, as written are not well defined . Please be aware that the City inspector assigned to this job will be assuring that these items are completed to the City's satisfaction. I understand why you desired to have them so loosely worded, but by doing so we are all in a position of delving into . an "unknown", without the problem and solutions being well-defined before we begin . I certainly am not opposed to working things out in the field, however, I've found that people are sometimes surprised when they realize what is expected, once the problem is defined . My understanding from Mr. Hammons is that, this is exactly why you desire to work these items out in the field . You would prefer to get a contractor in the field , see what they uncover as problems, have them possibly take grade shots and then find an acceptable solution, rather than performing hours of survey work now, defining the problem and working out a solution. I have prepared a development permit for this work. Once you have selected a contractor for the job please have them stop by our office to sign and date the permit and pay the appropriate fees . The fee for' this permit will be $100 .00, payable to the City of College Station. When the contractor stops in I will have attached to the permit, the inspector's card for his/her information . It is imperative that prior to commencing work that he/she notify the inspector that they will be beginning work . Home of Texas Af..M University We certainly look forward to this work being completed. As you are aware, there are several property owners in the immediate vicinity who will be thankful to see work is progressing . I hope that this project will be one that HEB and the citizens of College Station can be proud of If I can be of any further assistance or you have any questions, please do not hesitate to call. I can be reached at (409) 764-3570. Sincerely, a~~~ ~eronica J.B. Morgan, P.E. Asst. City Engineer cc : Kent Laza Elrey Ash Jim Callaway Cathy Locke Tom Brymer Roy Hammons Ralph Mehringer RECEIVED DE C 2 7 1995 -~~CITY OF COLLEGE STATION ~ OFFICE OF THE CITY MANAGER \' .\t Post Office Box 9960 1101 Texas Avenue \A~ Co1leg e Station, Texas 77842-0960 /~\ 1 \~v MEMORANDUM (409) 764-3510 . \~ffe I TO: FROM: DATE: SUBJECT: George K . Noe, City Manager Tom Brymer, Assistant City Manager/Community Services~ December 27 , 1995 Update Regarding HEB Shopping Center and Pine Ridge Duplex Flooding I wanted to give you a brief status report on the flooding situation caused by the storm water detention basin that serves the HEB/Target/Enclave development. This detention basin is upstream from duplexes on Pine Ridge that have experienced flooding staff believes is the result of this detention basin's inadequate design and performance . Following Council's direction to pursue appropriate remedy (and if necessary, legal action), the civil engineer who designed this detention basin submitted a design for modifications to it. After staff reviewed his submittals , we found them to be totally deficient in addressing the problem and so advised him . After a lengthy delay, he made some modifications to these plans and resubmitted them. However, in staffs view , these most recent proposed modifications are still entirely inadequate in terms of remedying the problem . For that reason , we recently sent letters via certified mail to this engineer as well as representatives for HEB giving them a deadline of January 5, 1996 to submit acceptable plans to us for remedying the basin and its outfall or we plan to turn this over to the City Attorney's office for further legal action. Please let me know if you have any questions about this. cc : E.Ash J .Callaway K.Laza V .Morgan M .Smith R.Nemec C.Locke CITY OF COLLEGE STATION M.L. Hammons 1700 Kyle South, Suite 240 College Station, Texas 77840 Post Office Box 9960 1101 Texas Avenue College Station, Texas 77842-9960 (409) 764-3500 November 8, 1995 RE: HEB DETENTION POND RETROFIT DESIGN \ Dear Roy: We have reviewed your plans for the above referenced project and have the following comments: 1. The aluminum splash panel is unacceptable . This form of protection is not permanent and in our opinion will not withstand the water forces imposed upon it. 2. Dimension the height of the addition on top of the existing concrete wall. 3. Show what method you intend to use to get the water from the Redstone Apartments parking lot into the creek. 4 . Show what method you intend to use to get the water fi:om under the Redstone Apartment pool deck into the creek. 5. Does the detail provided on sheet #4 have rebar throughout or only in the bottom 2-3 sacks of Quickcrete? 6. The existing outlet ponds water 2-3 feet deep from the v-notched weir to the end of the easement area shown on sheet # 1. This area must be graded to drain . It currently does not. 7. The existing site observations of the area illustrate that the velocities of water exiting the pond (from the concrete wall with the v-notch to the end of the easement area) are well in excess of the velocities allowable in the drainage ordinance for a vegetative bottom or one with loose rip-rap (as was originally designed). Please correct this problem in your retrofit design solution. If you have any questions regarding the review, please do not hesitate to call. I can be reached at (409) 764-3570 between 8 a.m. and 5 p.m. We appreciate your quick response and corrective actions to this problem . cc: Kent Laza, P .E ., City Engineer Jim Callaway, Asst. Director of Economic and Development Services Elrey Ash, Director of Economic and Development Services Tom Brymer, Asst. City Manager Cathy Locke, City Attorney Ralph Mehringer, Vice President, HEB Home of Texas A&M University October 13 , 199 5 r ·RECEIVED OC T ·2 3 19S5 City of College Station 1101 Texas Avenue College Station , Texas 7784 2 Attention: Mr. Kent Laza, City Engineer Re: Stormwater Detention Pond Dear Mr\ Laza: Thank you for your October 2 letter regarding the stormwater detention pond utilized by Target , Outback Steakhouse, Olive Garden, the Enclave Apartments, and HEB (the "Owners"), and for the lead role which the City of College Statior ' · .... · TTrr. -'----------- concerns and intends to fulfill its responsibiliti HEB is in an arrangement of shared use and re Owners, and cannot unilaterally speak for all t propose the following work and pledge to usE other Owners, whom we know to be conscien l . Regarding your item "a . the end v enough" .............. PROPOSAL: We propm of the outlet structure in accordance with plar of the plans . 2. Regarding your item "b . a berm o is in need ofrepair" .............. PROPOSAL: with concrete rip-rap . Work would be in ace• City acceptance of the plans . /0 3 . Regarding your item "c . the downstream ditch is in need of cleaning and w, 1th er ~the long 1g wall !ptance ed and erm s, upon modification" ............... PROPOSAL: We propose to clean and clear the downstream ditch from the detention pond to the end of the LULAC easement , a distance of approximately 65', by removing debris and vegetation which would divert or impede flow , and by shaping the bed of the ditch to achieve a run-off slope from the detention pond to the lower end of the LULAC easement, at which lower end the cleaned-out ditch would match existing grade . 4 . Regarding your item "d . the inflow pipe from the Enclave Apartments causes water to jump over the pond wall, directly into the outfall structure" .................. PROPOSAL: It is our understanding from Mr. Hammons that the detention pond will adequately handle inflow from the Enclave , without overflow of the pond wall , when the pond's detention capacity is maintained at H.E. sun GROCERY COM PANY P 0. BOX 839955 SAN ANTONIO . TEXAS 78283-3955 646 SOU TH MAIN AVENUE 78204 (210) 246-8932 FAX (210) 246 -8530 cc : Dayton Hudson Corporation 33 South Sixth Street P .O . Box 1392 Minneapolis , Minnesota 5 5402-13 92 Attention: Mr. Jim Thensch General Mills Restaurants, Inc . 5900 Lake Ellenor Drive 1751 Directors Row Orlando, Florida 32809 Mr . John Godfrey Godfrey Construction P .O . Box 4269 Bryan, Texas 77805 Mr. Tom Kenney Outback Steakhouse 675 Rablewood Drive Houston, Texas 77079 Mr. Bill Thornton, Jr . Bruchez, Goss, Thornton, Meronoff, Michel & Hawthorne 3131 Briarcrest Bryan, Texas 77802 Mr. Roy Hammons Mr. Charles Blackbum, HEB Mr. Les McGehee, HEB Mr. Jim Sloan, HEB ,~~·.\• ~. ~.~. ~. ~ .~. ~.~. ~. ~-\· '.~ .; ~: ~ ·: ~: ~: ~ ·: ~: ~ ·: ~~ ~: ~-~ ~: ~: ~: ~ :~: ~ ·: ~. ·/·/·l·l·l ·l·l ·.···l·l ·l·l ·/·l ·l ·l·l ·l·l ·/·l· .,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,.,. '/·l·l ·l·.'-!-.'·l ·.'·l·l·l·l·l·l·.'•l ·l •/·l·l ·l·l·I \·\·\·\·\·\·\·\·\·\·\·\·\·\·\·\·\·\•\•\•\•\•\•\•\• · ! /·/·/·.'·I ·/· '·/·!·l·l·.'·l·l ·l ·.l ·l·l·l·l·l ·/·I·! , ',. '_:.·~; ~ .~ ·~ .~ ~ .~ ·~; ·~; ~ -~ ~ ;·~ .~ ~; ~ ;·~ ;·~; ~ .~ ~ i ·~;·:; ~; ·~; ·:; ·: .~ ~ -~ ·~; ·~; ·~; ~~ \.',.\. · .. ·, \ ·, •\. \·\. \·\·\. \·\ •\•\ •\. \•\. •\ ·\ ·\. \·\ ·\· \•\• ! I !-.'-."·' .'·!·.'·l ·.'·l •/•l •/•/•/•/•/•/·/·/·/•l ·I ·.'·/•/•/•/ . •\ \•'•·\·\·\·\·\·\·\·\·\·\·\·\·\·\·\·\· .. ·\·\·\·\·\·\··,., .. , .... DEVELOP~1ENT SERV I CES 1101 TEXAS AVE COLLEGE STATION . TEXAS 77840 Facsimile Cover Sheet To: Company : Phone: Fax: From: Company: Phone: Fax: Date: Pages including this cover page: 2 Comments : ____ Oa ___ ~__,__.x.=..;_____;--=--------------- (409) 764 -3570 (409) 764 -3 496 FA X I' --- ....... ·- ~·6.( CITY O~ C<?LL~9E STATION ~ Engmeermg D1v1s1on Printed by Veronica Morgan From: Kent Laza To: Veronica Morgan Subject: Enclave Apt. Det. Pond ===NOTE===============3/07/95=10:58am== Have we contacted the appropriate party about having the detention pond cleaned? If not, we better do it soon or the people on Pine Ridge will be trying to hang me. We also need to hire a surveyor to begin developing an easement along the ditch that runs between the apartments and the nursing home. This may be something we can hand off to Sam and let her start dealing with. Let's talk when you have a chance. Page: 1 9/15/95 5:3lpm Printed by Veronica Morgan From: Veronica Horgan To: Kathryn Anthony, Kent Laza, Steve Homeyer Subject: fwd: clean i ng of enclave pond ===NOTE===============9/14/95==8:59am== john holloway and i met back in april on the site to discuss cleaning of this pond and the outfall structure. at that time he promised to do it in august because they just cant get in the pond to clean at any other time because it is too wet. i agreed with him and asked him to assure it was cleaned once it got as dry as it was going to get. last week i called him back and left a message that it wasnt cleaned yet and i was wondering what the status was. he and i talked this morning. he is going to get it done probably next week. he is waiting on a call back from kelly burt with a date . he will call back and leave a message with a date as to when i need to get an inspector to the site to work with kelly burt. a copy of this note is going to jerry jones, as i want him to i nspect. when i have an exact date i will let you all know. Fwd=by:=Kent=Laza=====9/14/95==9:11am== Fwd to: Veronica Horgan DoclJllent this in a letter to him. If he doesn't meet that date, we'll go into code enforcement and put more pressure on him. Page: 1 9/15/95 9:03arn ~-~~CITY OF COLLEGE STATION SI ~ ENGil'EERING DIVISION Post Office Box 9960 1101 Texas Avenue College Station, Texas 77842-0960 (409) 764-3570 MEMORANDUM To : Tom Brymer, Interim City Mana]er/ / L From: Kent Laza , City Engineer ~ Subject: Flooding Problems on Pine Ri gc Street Date: January 27, 1995 In response to a letter addressed to you from Mr. Neal Briers as well as several telephone calls from other property owners on Pine Ridge Street , my staff met with Mark Smith and members of his staff to develop alternatives to address a flooding problem that exists on Pine Ridge Street. Pine Ridge is a street which runs between Brentwood and Anderson approximately 1000 feet west of Texas Avenue. It is a curb and gutter street with a short underground drainage system . Most of the properties along the street are duplexes . These duplexes are the buildings which were most effected by the flooding in the October and December rain.fall events . We have been notified that at least six duplexes received water in the building. Behind the duplexes to the north are two apartment complexes, both of which have detention ponds that empty into a privately owned, unimproved drainage channel that also rnns behind the duplexes on the north side of Pine Ridge . The exact cause of the flooding is difficult to determine at this site. It is likely a combination of several contributing factors . First, and probably most notably, is the magnitude of the rainfall events themselves'. In both events, unusually heavy rains fell causing many areas of the city to experience flooding problems that are normally unaffected . Secondly, several of the affected buildings are constrncted very low in relation to the top-of-curb on the street. These duplexes have "sunken" living room floors that are a few inches below the remainder of the building slab thus exasperating the problem . Third , the detention ponds owned by the apartment complexes have been poorly maintained and are likely not being utilized to their design potential. Fourth, the drainage channel is in need of maintenance to remove trees and other flow impediments. Fifth, the pipes carrying water across Anderson may not be adequate for the amount of water coming down the channel. Sixth, in an attempt to keep water off their individual properties, each property owner has placed varying amounts of dirt in their back yards and have eliminated any type of natural or designed drainage path for water to leave the site. Consequently, it builds up until it begins to flow into the buildings . Pinc Ridge memo January 27. ltl95 P. 2 r meeting with Public Services we developed five alternatives for addressing this flooding problem. They are a follows : >-., 1. Require the apartment complexes to clean out and maintain the detention ponds so they perform the ~ function for which they were intended. This can be done through our code enforcement authorities. 2. 3 . 4 . 5 . 6 . * Acquire drainage easements for the channel from the adjoining property owners and clean out the channel. Estimated cost: $5,000, assuming property owners are willing to donate it to the City. Improve the drainage channel in the appropriate manner (concrete lining, gabions, etc.) to increase its carrying capacity. Estimated cost: $300,000 *. Install at least one additional pipe across Anderson to prevent the existing crossing from acting as a restriction to the drainage channel. Estimat ed cost: $15 ,000 *. Install an underground drainage system along Pine Ridge to capture water now flowing down the street to prevent it from rising to a level where it begins flowing into the duplexes . Estimated cost: $75,000 *. Install a stonn drainage system along Barthel ow to c:ipture water leaving that street before it enters the area being affected , and in doing so, provide another outfall for the apartment complex owners to use when solving their internal drainage prohlems . Estimated cost $100 ,000 * Funds for these projects have not been id entified . Current drainage funds have been allocated toward for other proj ects throughmit the City . It is our feeling that despite the measures we arc proposing, flooding may still occur in this area when rainfall events of the magnitude we have recently experienced happen again. It is virtually impossible to design a system that will carry the volume of water necessary to prevent flooding during these extreme events, especially in areas that are prone to flooding , as this one is . It is difficult to explain to flooded property owners that there is little the City can do to guarantee their problems will not occur again . All they know is that within a period of about two months, the buildings on their property flooded twice and they want something done to alleviate the problem . The measures we are proposing will at least convey that we are attempting to address the flooding issue in their neighborhood . Rccomme o ·ects. 1 e ore, only the first two items shown above are reasonable to undertake. My staff can begin work on those immedia departmental budget. Assuming the proposed bond election passes, some or all of the remaining items shown above can begin as soon as bonds are sold . I believe this project would be an ideal candidate for construction since multiple properties are being adversely affected by flooding . Since this is a relatively simple engineering project, it is one I would consider doing in-house with my staff. , / rJ o-:J_ cc: Elrey Ash Jim Calloway Mark Smith Kathryn Anthony Veronica Morgan Brett McCulley V/J r nn l ""'I . I . ~ 2 {.. v j ~ i'l''f.~ r f)o. I ' ) JI/ e P P 1 f fe q ~o v f k er. l;V e. L -} ~ Ta f -fP J-e: ~ s ~t e e ~0 'e !~ LJ hen (/./-<' May 7, 1996 Owner Redstone Apartments One Pacific Plaza 7755 Center Ave, Suite 300 Huntington Beach , CA 9264 7 Re: Pine Ridge Drainage Improvements Status Dear Owner: We wanted to let you know what is going on with this project. RECEIVED n1-1, u 8 1996 As you may know, improvements have been made to the detention structure that serves the HEBffarget commercial development as well as the Enclave Apartments. The City of College Station is pursuing improvements to the drainage channel from this detention structure to Anderson Street, as well as improvements to the culvert under Anderson Street. We have the engineering design underway. Once this design is finished , we will know the drainage easement size and improvements needed for this channel. This, in turn , affects easement dedication. We are working on this project with the understanding that all the property owners along this channel will give this easement to the City so that construction can begin this summer. With your cooperation, if we can get all necessary easements given to us in a timely fashion , we plan to bid this project out in July. It should take about 3 months to complete the construction . In the meantime, please let me know if you have any questions regarding this project. Unless I hear otherwise from you , I will assume that you are amenable to giving a dedicated drainage easement on your property to the City for this project . Your cooperation is greatly appreciated. Sincerely yours , ~ Thomas E. Brymer Assistant City Manager cc: Skip Noe, City Manager Jim Callaway, Acting Director of Development Services Kent Laza, City Engineer Veronica Morgan, Asst. City Engineer Brett McCully, Project Engineer Mark Smith, D irector of Public Works Kathryn Anthony, Asst. Director of Public Works o :pineltr.doc ( August29, 1996 HEB Pantry Foods P.O. Box 839999 646 South Main A venue CITY OF COi .I .EGE STATION Post Office Box 9960 1101 Texas Avenue College Station, Texas 77842-9960 (409) 764-35 00 CERTIFIED RETURN RECEIPT San Antonio, Texas 78283-3999 Attn : Robert D. Lo effle r Dear Mr. Leoffler: Re: H.E.B. Drainage Detention facility I am writing this letter to provide you with formal notice of three drainage probl ems present at the HEB drainage detention facility. 1. the retrofit wall is acting as a barrier which increases flood hazards to adjacent property. 2 . the drainage facility is inadequately maintained because the vegetation has not been cut back which can impair capacity for conveyance of the stormwater flow in your facility 3 . peak stormwater flows are exceeding those that existed before development If you will recall there are several duplexes just downstream of the HEB store in College Station . In [)ecember 1995, HEB designed and constructed a wall extension to its detention pond in an attempt to fix improper drainage that resulted in the flood ing of duplexes on the adjacent property in October and December of 1994'. During the review of the HEB detention pond retrofit, we asked your design engineer to : • "Show what method you intend to use to get the water from the Redstone Apartments parking lot into the creek" • to ushow what method you intend to use to get the water from under the Redstone Apartment poo l deck into the cre ek. Your design_~ngineer represented to the City of College Station th~t. uThe stormwater discharge from the Redstone property has always been via the Redstone pool area, beneath the pool deck. No change in drainage is proposed. While work proposed hereby ' is being done, however, positive drainage from the deck area will be provided at the end of the rip-rap retainer: On August 11, 1996, the largest rainfall occurred since the retr<;>fit to your detention facility has been constructed. The City had personnel in the field observing flooding Home o f Texas A&M University ' areas. The duplexes were once again flooded . While observing the stonnwa location, it appeared that water from the Redstone Apartments parking lot, tha entered the creek prior to the addition of the sackrete wall, is now partially blo entering the creek by that wall. Instead, the water takes the path of least resist and flows into the rear of the duplex lots . While it appears to us that some of thi water was able to leave the downstream side of the pool deck, a large amount di\ and instead entered the rear of the duplex lots . This recen t flooding indicates that the problem noted by the City during design re vr was not adequately addressed by your engineer's design. Roy Hammons, your de~ engineer, was infonned of our findings regarding this most recent flooding on the morning of August 12th. The purpose of the City of College Station drainage ordinance is "To restrict or prohio development which is dangerous to health, safety, or property during flooding conditions , or causes unacceptable increases in water surface elevation or velocities:" and "To prevent the construction of barriers which will divert stonnwater flows and subject other lands to increased flood hazard". See, Chapter 12, Sections 1.8 .7 and 1.8.10. As it exists, it is my opinion that your development fails to meet both of these conditions . In addition, the facility is out of compliance pursuant to Section 50 (1), (6) and (12). (Please see attachment) Non-compliance with Section 50(1) The City is currently working on downstream drainage to improve maintenance in this drainage channel. In the course of working on the downstream project our design engineer assessed the flows coming from your facility and concluded, albeit using a different methodology, that your facility is not detaining sufficient flows. Even using the same methodology, the review of the ~lculations show the pond is only detaining through the 25 year stonn event instead of the 100 year event. Non-compliance with Section 50(6) As stated above, it does appear from field observation that you indeed have constructed a barrier which is increasing flood hazards to other lands. Non-compliance with Section 50(12) The maintenance of the pond must be addressed . The pond should have maintenance scheduled on a regular basis (at a minimum -twice a year). In it's present state, it is a ·· ~ nuisance, health proble01 and has decreased stonnwater capacity: In the past, HEB and Enclave complained that it is difficult to maintain and that it can only be done in August b.ecause of the so(t bottom. If you cannot maintain the facility in its current configuration, perhaps you should e)(plore construction of a bottom that is maintainable. Your corrections to the above cited problems may affect the City's downstream project. Consequently, we are requesting that you correct the above-listed problems immediately and that this correction be submitted, approved and constructed on or before October 1, 1996. If you have any questions or if we can be of assistance, please do not hesitate to call. can be reached at (409) 764-3570 or by email at vmorgan@ci.college-station .tx.us. Thank you in advance for your prompt response. Cc: Tom Brymer, Asst. City Manager Mark Smith, Director of Public Works Roxanne Nemcik, Acting City Attorney Jim Callaway, Acting Director of Development Services Kent Laza, P.E., City Engineer Brett McCully, Asst. to the City Engineer Roy Hammons file HEB.doc D. METHODS OF REDUCING FLOOD DAMAGE E. In .-.rder :..ut the purposes of thll chapter shall be accomplished tn accordance with Section 1, the following methods, measures, requirement.a, and practices mu be utilized by the Administrator in accordance with U1e Drainage Policy and Design Standards: (l) Limit pea.le stormwater flows after development to that which existed before devel- opment; (2) (3 ) (4) (5 ) (6) (7) (8) (9) (10) (ll) Llmil, control. or prevent ch.ang9'1 in the path of ltormwater flows across or away from a site or development; L.imit, control. or prevent alteration. to existing watercourses and drainage fac ilities either tnn:le or outside existing Areu of Special Fkxxl Hazard; Limit, control. or prevent the alteration of natural or developed Areas of Special F1ood Ha.zard, channels, or protective baniera which are necessary to accorruno- date flood waters; Llmi1, control. or prevent the UM of e.xistlng or propoeed drainage eaaementa su c h that the euement remam. UMtul for ila intended puipoee; L.imit, control. or prevent the con.struction of barriers which may increase flood haz . ards to other lands or facilities; Establish or cause to be established adequate drainage easements and/or lights of way to control develop~nt and limn potential Oood damage and protect e.xit:ting or propOeed drainage facilities; LimJl. control. or prev:ent dumping of refuse, 611, garbage, QTUa clippings, brush, wP~· concz:ete, !Or othei . mi.teriala in existing drainage facilities. including swales, street.a, inlets, dJlcheS. ;_'atorm 88W8rs, culveria, etc.; · Limit, control. or prevent fllling, grading, cleartng, dredging, P.vtng, berrning, or :R-fE.!!.~~1'~~~~\tf~~n.io!r,~c.~8.1:-'8 stormwater flows, chang~ drain.age pathways. iric:reue eromon · and :--Mdiiriel\tabon, or increue Oood haUrd or damage from flooding; Limit, control. or prevellt development which is dangerous to health, safety, or proJ)eny by causing tncreues in water surface elevations, velocities, or aowra tes wruch .mt poor to au-Ch d~pment ; .. , t · ' :~-.... Limll, control. or p revent .development which is wlnerable to flood damage o r ~, .... , I , ' -·· • • .,· ··-·•-7".!(.a)f~t~> ... :I• . , ':' ' • • ' ·, • • ·~ ;_._ r~Wre 'Lthat · said d~p~nt ~c:Sh&ll be adequately protect~ ag~ said_ flcxxi ~ ... ;+::: -:~···-....--n~·-.-. -t"..i.;;:',.'""'"··"-"'~r~. · · ·. ' ·. diiriage at the tune o f constrUcUOn ; ·~ .. -:-.{ . ;.; ~ ~-?-. 13 -13 R...,. 10/l/90 Resident l30J-B Bartholow Coll ege St t . a ion, Texas 77840 Resident 1301-A Bartholow College Station, Texas 77840 i 11 II!!! II! 11fl!11!1l 11111 II I !I!! I L_ ____ .. . • ~SENDER: "ti •Complete items 1 and/or 2 for additional services. "ii •Complete items 3, 4a, and 4b . Ill •Print your name and address on the reverse of this form so that we can return this I also wish to receive the following services (for an extra fee): Qi 1. )[] Addressee's Address -~ !!! card to you . ... ~ •Attach this form to the front of the mailpiece, or on the back if space does not -permit. •Write'Retum Receipt Requested' on the mailpiece below the article number. •The Return Receipt will show to whom the article was delivered and the date 2. 0 Restricted Delivery ~ delivered . Consult postmaster for fee . -3-.-A~rn-·c_l_e_A_d_d-re_s_s_e_d_to-:~~~~~~~~~~~~4-a-.-A-rn-·c-le~N~u-m_b_e_r~~~~~~~~~·~ a: HEB Pantry Foods P 526 750 849 c ID Box 839999 1-4,.,_b-. s-=-e-rv"""'i,...ce...,T=y-p_e _________ ~ 646 South Main Avenue 0 Registered 0 Certified ~ San Antonio, Texas 78283-39999 0 Express Mail 0 Insured -~ Attn: Mr. Robert D. Loeffler Kl Return Receipt for Merchandise O COD : 5 . Received By: (Print Name) 7. Date of Delivery 8 . Addressee's Address (Only if requested and fee is paid) .e :J 0 >- .)//. c as .r:. I- r UNITED STATES POSTAL SERVICE First-Class Mail Postage & Fees Paid USPS Permit No. G-10 • Print your name, address , and ZIP Code in this box • 62VM City of College Station Developnent Services ro Box 9960 College Station, Texas 77842 RECEIVED SE p 0 3 .1996 11111II1111111,,, ,, I J, 1I1I11I1 II Iii I ii I ii! fl! 11IIii111111111!111111rll!111II11 I p 526 750 84 9 US Postal Service' Receipt for Certified Mail No Insurance Coverage Provided. Do not use for International Mail See reverse ~ Pantry Foods re m 6 South Main Avenu e ~·~iil·Af 1 !' ~xas 78283-39 99 Postage $ Certified Fee Special Delivery Fee Restricted Del ivery Fee ~1--~~~~~~---1~~~~~~----l ~ Return Receipt Showing to Whom & Date Delivered -~ Return Receipt Showing to Whom , < Date, & Addressee's Address 0 ~ TOTAL Postage & Fees $ M Postmark or Date E ~ en a.. Stick postage stamps to article to cover First-Class postage, certified mall fee, and charges for any selected optional services (See front). 1. If you want this receipt postmarked , stick the gummed stub to the right of the return address leaving the receipt attached , and present the artide at a post office service window or hand it to your rural carrier (no extra charge). 2. If you do not want this receipt postmarked , stick the gummed stub to the right of the return address of the artide , date , detach, and retain the receipt , and mail the article . 3. If you want a return receipt, write the certified mail number and your name and address on a return receipt card , Form 3811, and attach tt to the front of the artide by means of the gummed ends if space permtts. Otherwise , affix to back of artide . Endorse front of artide.,.. RETURN RECEIPT REQUESTED adjacent to the number. 4. If you want delivery restricted to the addressee , or to an authorized agent of the addressee, endorse RESTRICTED DELIVERY on the front of the artide . 5. Enter fees for the services requested in the appropriate spaces on the front of this receipt. If return receipt is requested, check the applicable blocks in item 1 of Form 3811 . 6. Save this receipt and present tt if you make an inquiry. i 0 0 co C") E 0 u. en a..