HomeMy WebLinkAbout29 Development Permit 314 Pleasant Grove Baptist ChurchDEVELOPMENT PERMIT
PERMIT NO . 314
PLEASANT GROVE BAPTIST CHURCH
FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA
RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE
SITE LEGAL DESCRIPTION:
Lots 7-11, 19-22 ofBlock 6 of the McCullough Subdivision
SITE ADDRESS:
1216 Detroit Street
OWNER:
Pleasant Grove Baptist Church
Contact: The Reverend Arnold
4501 Northwood
Bryan, TX 77803
DRAINAGE BASIN:
Within Basin 5 branching off from Bee Creek Tributary "B"
TYPE OF DEVELOPMENT:
This permit is valid for all site construction associated with the approved facilities
expansion.
Contractor shall prevent silt and debris from leaving the site in accordance with the City of
College Station Drainage Policy and Design Criteria . Owner and/or contractor shall be
responsible for any damage to existing city streets or infrastructure due to heavy
machinery and/or equipment.
In accordance with Chapter 13 of the Code of Ordinances of the City of College
Station, measures shall be taken to insure that debris from construction, erosion, and
sedimentation shall not be deposited in city streets, or existing drainage facilities .
I hereby grant this permit for development of an area outside the special flood
hazard area . All development shall be in accordance with the plans and specifications
submitted to and approved by the City Engineer in the development permit application for
the above named project and all of the codes and ordinances of the City of College Station
that apply .
Administrator/Representative Date '
Owner Date
Contractor Date
11
PLEASANT GROVE BAPTIST CHURCH
ACTIVITIES BUILDING ADDITION
COLLEGE STATION, TEXAS
11
ii FOR : 'I I,
ii PLEA.SANT GROVE BAPTIST CHURCH
II
II
11
I
BY :
M . L. HAMMO NS , P.E .
1700 KYLE SO UTH , SUITE 240
COLLEGE STA TI ON , TEXAS
·1
l=== --------=========
I
I
I
I
=======11
1y1&/~~.~~
PROJECT:
LOCATION :
PROJECT INFORMATION
Construct 3,265 sf Activity Building
Pleasant Grove Baptist Church .
1216 Detroit Street.College Station, Texas
DRAINAGE BASIN : Bee Creek -Tributary "B" (See Map -Attachment #1)
EXISTING DRAINAGE CONDITION: Current drainage at the site is surface flow to street
gutter. (Detroit, Nevada and Carolina Streets). The tract is 1.02
acres . The entire tract is covered by building and walkways, or lawn
grass. There are no erosion or stream conditions on or emanating
from the site nor are there erosion or stream conditions leading to the
site . Attachment #3 is the proposed site plan .
PROPOSED DRAINAGE : It is proposed that stormwater drainage from this site remain
as is . No detention is proposed since the flow created by this
improvement is so minor. The proposed building and walkway adds
3 ,725 sf of impervious area, and contributes 0 .59 CFS discharge flow
during the 100 year storm event. (See flow calculations ,
Attachment #2).
/
~ 0:: ~ a
I ~ ::..::
~ ~ ~ -z -
::;(
3:
::..:: / -n:: I <{
Q DARTM OUTH
I
~j I
I ~
] / I
c! -
IT]
/
<.__;--
\.
!ATTACHMENT #1 I
STORMWATER FLOW CALCULATIONS
IMPERVIOUS AREA INCREASE :
Building
Cone . Walks
Total =
=
3,265 SF
460 SF
3,725 SF
0 .086 AC
"RATIONAL" FLOW CALCULATIONS :
Q 100PRE = .35 x 12 .5 x .086 = 0 .38 cfs
Q 100POST = .90 x 12 .5 x .086 = 0 .97 cfs
Q 100 -Flow Increase = 0 .59 cfs
Q 5PRE = .35 x 7 .7 x .086 = 0.23 cfs
Q 5POST = .90 x 7.7 x .086 = 0.59 cfs
Q 5POST-Flow Increase = 0 .36 cfs
!ATTACHMENT #21
Date : September 22, 2000
To: Amanda Hudec, Accounting(\ .r+..
From: Bob Mosley, City Engineer '{I\'\
Subject: Completed Infrastructure from Private Development
By the attached letter of completion for the Bridle Gate Estates Phase One development,
we have accepted the following improvements to the City of College Station
infrastructure.
Streets:
27-foot wide pavement
(Bridle Trails Court)
38-foot wide pavement
(Bridle Gate Drive)
Sidewalks:
4-foot wide concrete
Storm Sewer:
18-inch diameter RCP
(C-76 Cl. III)
24-inch diameter RCP
(C-76 Cl. III)
30-inch diameter RCP
(C-76 Cl. III)
36-inch diameter RCP
(C-76 Cl.III)
5 to 6 foot diameter manholes
(standard)
Sanitary Sewer:
6-inch PVC sanitary sewer main
(SDR 26, DR 3034)
8-inch PVC sanitary sewer main
(SDR 26, DR 3034)
4-foot diameter manholes
(standard)
865 linear feet
960 linear feet
6,650 square yards
subtotal
4 7 4 linear feet
149 linear feet
655 linear feet
127 linear feet
4 each
subtotal
295 linear feet
920 linear feet
2 each
subtotal
$164,899.00
$89,152 .00
$41,343 .00
_.,
'
Water:
6-inch PVC main
(C-900, Cl. 150)
8-inch PVC main
(C-900, Cl. 150)
Fire Hydrant Assembly
(standard , Type I)
7 64 linear feet
915 linear feet
3 each
Subtotal
The total cost of the above infrastructure is $ 358,508 .00 .
c: Natalie Ruiz, Development Coordinator
Vernon Wright, Engineering Technician
Missy Green, Staff Assistant
$63,114 .00
LETTER OF COMPLETION
CITY ENGINEER
CITY OF COLLEGE STATION
COLLEGE STATION, TEXAS
Dear Sir:
DATE: __ 3=r/_-2_.,._/~o~o""'----/ I
RE: COMPLETION-OF ~,-~Jc bq.,,ft
&A~s= ~.s=e Ac.
The purpose of our letter i s to request that the following listed improvem ents be approved
and accepted as being constructe d unde r city inspection and completed acco rdin g to plans
and specifications as approved and required by the City of College Station, T exas. This
approval and accep tance by the City is requested in order that we may finalize any sub-
contracts and to a ffirm their warranty on the work . This approval and acceptance by the
City of the improvements liste d below do es h e reby void the letter of guarantee for the
listed improvements on the above refere nce project.
The one year warranty is herby affirmed a nd agreed to by --""-~-'-"'i~L.-4''-""'-L-',.J""'----and
by their sub-contractors as indicated by signatures below.
WORK COMPLETED
ukk/i~e
ACCEPTANCE & APPROVAL
DATE
ci,h/oo
I /
I I
4&/oo /
Contractor: llx62&
Address : /zoz W-<.,kmh.
~/~ ~J7&',r, lX 77?~.s-
Signature:
. .,,
BRIDLE GATE ESTATES PHASE ONE
11. 32 ACRE DEVELOPMENT. -26 SINGLE FAMILY RESIDENTIAL HOMES
8: 1.4 ACRE COMMERCIAL DEVELOPMENT
OCTOBER 4, 1999 . ....
ENGINEERS QUANTITY AND COST ESTIMATE OF CONSTRUCTION COST
>,
ITEM DESCRIPTION UNITS QTY. UNIT PRICE EXTENSION
I CLEARING EASEMENTS AC . 1.35 $2,000 .00 $2,700
2 ROADWAY EXCAVATION (IN PLACE) C.Y. 3000 $3 .00 $9,000
3 6" STABILIZED SUBGRADE (4%) S.Y . 7663 $3 .00 $22,989
4 EXTRA LIME (TYPE A) UP TO 6% TONS 31.0 $90 .00 $2,790
5 6" GRAVEL BASE BETWEEN C&G S.Y. 2780 $6.00 $16,680
6 7" GRAVEL BASE BETWEEN C&G S.Y. 3625 $7.00 $25,375
7 1.5" H.M.A.C S.Y . 6405 .$5.50 $35,228
8 CURB AND GUTTER L.F . 3468 $7.00 $24,276
9 CONCRETE VALLEY GUTTER L.S. 583 $4.00 $2,332
10 4' WIDE SIDEWALK S.F. 6644 $3.00 $19,932
II SIDEWALK RAMP EA . 4 $450.00 $1,800
12 RE-VEGATATION S.Y. 3595 $0.50 $1,798
13 18" RCP C-76 CUii L.F . 474 $38.00 $18,012
14 24" RCP C-76 CUii L.F . 148 $42.00 $6,216
15 30" RCP C-76 CLlll L .F . 652 $48.00 $31,296
16 36" RCP C-76 CLlll L.F . 127 $54.00 $6,858
17 5' RECESSED INLET EA . 3 $2,500.00 . $7,500
18 10' RECESSED INLET EA. I $3,000.00 $3,000
19 STORM SEWER MANHOLE EA. 4 $1,700 .00 $6,800
20 DRAINAGE STRUCTURE OS-I L.S. I $3,000.00 $3,000
21 DITCH EXCAVATION -SH-6 C.Y . 530 $3.00 $1,590
22 RE-VEGATATION -SH-6 S.Y. 1660 $0.50 $830
23 DRAINAGE STRUCTURE DS-2 L.S . I $3,000.00 $3,000
24 ROCK RIP RAP S.Y. 35 $30.00 $1,050
25 6" PVC WATERLINE L.F . 793 $18.00 $14,274
26 8" PVC WATERLINE L .F. 914 $20.00 $18,280
27 24"X8" TAPPING SLEEVE & VALVE L.S. I $5,500.00 $5,500
28 8"X6" CROSS EA . 2 $600.00 $1,200
29 8" VALVE EA . 2 $750.00 $1,500
30 8" TEE EA . I $500.00 $500
31 STD . Fl RE HYDRANT EA. 3 $1,750 .00 $5,250
32 6" VALVES EA . 4 $600.00 $2,400
33 BLOW OFF ASSEMBLY EA . 2 $375.00 $750
34 W~T CONNECTION L.S . I $500.00 $500
35 WATER SERVICES L.F . 648 $20.00 $12,960
• I
36 6" PVC SAN. SWR . L.F . 296 $22.50 $6,660
37 8" PVC SAN. SWR . L.F . 860 $22 .50 $19,350
38 STD . SAN . MH (6'DEPTH) EA . 4 $1,650 .00 $6,600
39 X-DEPTH MH V.F. 13.2 $90 .00 $1 ,188
40 SEWER SERVICE CONNECTIONS L.F . 503 $15 .00 $7 ,545
41 EROS I ON & SEDIM . CONTROL LS . I $2,000.00 $2 ,000
42 TRENCH SAFETY LS . I $2,000 .00
~, $2 ,000
43 END OF ROAD SIGNAGE EA. 8 $80.00 $640
44 PERFORMANCE AND PAYMENT BOND L.S . I $5,447 .22 $5 ,447
TOTAL PAVEMENT = $164,899
TOTAL DRAINAGE = $89,152
TOTAL WATER LINE = $63,114
TOTAL SAN. SWR . = $41,343
MISCELLANEOUS = $10,087
TOTAL ESTIMATED CONSTRUCTION COST = $368,595
LETTER OF COMPLETION q
CITY ENGINEER
CITY OF COLLEGE STATION
COLLEGE STATION, TEXAS
Dear Sir:
RE: COMPLETION OF ffe,.2/c ba.-ft
&A~s= ~s-e a?nc.
The purpose of our l etter is to requ est that the following li sted improve ments be approved
and accepted as being constructed under city insp ection and completed according to plans
and specifications as approved and r equired by the City of College Station, Texas . This
approval and acceptance by the City is requested in order that we may finalize any sub-
contracts and to affirm their warranty on the work. This approval and acceptance by the
City of the improvements listed b e low does h ere by void the letter of guarantee for the
listed improvements on the above refere nce project.
The one year warranty is herby affirm ed and agreed to by __ ...._?q:__._..,~C-4~.L:A..J"""----and
by their sub-contractors as indicated by signatures below .
WORK COMPLETED
u_kluhe
ACCEPTANCE & APPROVAL
DATE
~/..2/oo
I I
7 7
~loo /
Contractor: Lex c;..L?c-J
Address: /Zt!?Z br"-km /Jl.
4~ ~Y&d1 .1X z7?f£S-
Signature: