HomeMy WebLinkAbout20 Development Permit 312 Fojtik Swoboda No 1 Oil WellDEVELOPMENT PERMIT
PERMIT NO . 312
Fojtik-Swoboda Unit Well #1
FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA
RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE
SITE LEGAL DESCRIPTION:
Situated in the Morgan Rector Survey, A-46
Land owned by Mary Fojtik, NW of land owned by Allen Swoboda
SITE ADDRESS:
NIA
OWNER:
BEXCO Operating, Inc.
DRAINAGE BASIN:
Carters Creek
TYPE OF DEVELOPMENT:
This permit is valid for site construction as per approved plans for the drilling and production pad
associated with the Fojtik -Swoboda No . 1 oil well.
The Contractor shall take all necessary precautions to prevent silt and debris from leaving the immediate
construction site in accordance with the approved erosion control plan as well as the City of College
Station Drainage Policy and Design Criteria. Owner & Contractor shall assure that all disturbed areas
are sodden and establishment of vegetation occurs prior to removal of any silt fencing of hay bales used
for temporary erosion control. Owner & Contractor shall also insure that any disturbed vegetation be
returned to its original condition, placement and state. Owner & Contractor shall be responsible for any
damage to adjacent properties, city streets or infrastructure due to heavy machinery and/or equipment as
well as erosion, siltation or sedimentation resulting from the permitted work.
This permit expires six months from the date of issuance.
In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures
shall be taken to insure that debris from construction, erosion , and sedimentation shall not be deposited in
city streets , or existing drainage facilities .
I hereby grant this permit for development of an area outside the special flood hazard area. All
development shall be in accordance with the plans and specifications submitted to and approved by the City
Engineer in the development permit application for the above named project and all of the codes and
ordinances of City of College Station that appl y.
1-1 ] -C,{,
Date
Date
Date
Ol /03 /96 12:18 '5'409 764 3496
ESMOND ENGINEERING,. INC.
Environment & Infrastructure
DEVELOPMENT SVCS
CRVSlAL PARK PLAZA
2700 EAST BYPASS • SUITE 4600
COUEGE STATION, TEXAS 77845
Ot+lf:I: (41JCJ)7h4-7ft4U • (800)444-7640
FAX (4U9)b9~H1729
INVOICE
Date: Invoice Number: Project Number:
3 1996
January 3, 1996 95288 1396
Client Name & Address: Mr'_ Steve Homeyer
City of College Station
P _Q _ Oox 9960
College Station TX 77842
Project Description: Update July ·1992 Environmental Assessment for
Swoboda No. 1-H oil and gas well, College Station,
Texas. Copy and mail · July 1992 Environmental
Assessment report.
DlJPLICATE O~" INVOI~E NO. 95288 DA.TED NOVEMBEH 28, 1995
Services:
For Services per Agreement of November 30, 1995 $ 1,381-00
CrP.dit for Over Contract Amounl
Copy & mail July 1992 Report (1396. 1)
Respectfully~ ~mond, President
ESMOND ENGINEERING, INC.
:l3/1396A-01 .llW
<JBl.00>
27.46
Total Due This Invoice $ 1,027.46
Please include invoic;e number on check.
~003