Loading...
HomeMy WebLinkAbout2 Development Permit 293 Soil Analytical Svcs INCDEVELOPMENT PERMIT PERMIT NO.# 293R FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA RE: CHAPTER 13 OF THE COLLEGE ST A TION CITY CODE SITE LEGAL DESCRIPTION: Lot 1, Blo ck 1 , D euel Addition SITE ADDRESS: 415 Graham Road OWNER: Vicki Deuel 415 Graham Road College Station, Texas 77840 DRAINAGE BASIN: North Fork of Lick Cr eek, Chann el No. III TYPE OF DEVELOPMENT: This pemiit is valid for the construction of a fire hydrant, the gravel emergency access turnaround and all other site constru ction associated with the Soil Analytical Building Ex.pans ion. Contractor shall prevent silt and debris from leaving the site in accordance with th e City of Coll ege Station Drainage Poli cy and D esign Criteria. Owner and/or contractor shall be responsible for any damage to existin g city streets or infrastructure due to heavy machinery and/or equipment. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities. I hereby grant this permit for dev elopment of an area outside the special flood hazard area. All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer in the development permit application for the above named project and all of the codes and ordinances of the City of College Station that apply. Administrator/Representative Date Owner Date Contractor Date DEVELOPMENT PERMIT PERMIT NO. # 293 FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA RE: CHAPTER 13 OF THE COLLEGE ST A TION CITY CODE SITE LEGAL DESCRIPTION: Lot 88.13 of University Indu strial Center SITE ADDRESS: 415 Graham Road OWNER: Soil Analytical Services, In c. 415 Graham Road College Station, Texas .77845 DRAINAGE BASIN: North Fork of Lick Creek, Channel No. III TYPE OF DEVELOPMENT: This permit is valid for the construction of a fire hydrant and site construction related to the fire lane. Contractor shall prevent silt and debris from leaving the site in accordance with the City of College Station Drainage Policy and Design Criteria. Owner and/or contractor shall be responsible for any damage to existing city streets or infrastructure due to heavy machinery and/or equipment. An erosion control plan is not required but erosion control will be handled on-site to the satisfaction of the City Inspector and/or Engineer. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities. I hereby grant this permit for development of an area outside the special flood hazard area. All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer in the development permit application for the above named project and all of the codes and ordinances of the City of College Station that apply. Date D D Drainage Developrnent Permit Issuance Checklist $I 00.00 Fee Paid Application Complete/Signed Erosion Control Plan (submitted & approved.) -~ hl hatJ v//cd Qn r,fc, 5~ If Site > 5 Acre s Is N .0 .1 Submitted ~ Drainage Report/L etter (submitted & approved) -W~i vt::c;/ ~ $300 Fee Paid -For Subdivision Insp ect ion (if applicable) -JV~ I t/~J:> _. . ~L~ "The above checklist must be co mpl e te prior to issui ng a full drainage permit on a project. To iss ue a parti a l permit for clearing and grading only , a ll it ems minu s the drainage re port mu st be com pl e te . Plea se initial in ea c h box if you ch eck off an y of t hes e i te rn s " Figure XII Development Permit City of College St T;;-/°'Bt.,o::;k: I DJwGAw rn ct1 S~L~~D~~ption :~~~~'~/-~~--u~~A~~~l_t~l~C~A~'L~-~~~e~~~V~l ~C~e~-=s~---EE u e:z-t <' Address : 4-1 £ 6 12AH-AM R,1:::J Site Owner: Telephone: __________ _ Architect/ _ Engineer: c!:---5/VI 6A I Contractor: ..S 0-.:J ()bC> b-J4 Address : 2 ZD c5 E 8 y /JA5.S Su ITE 4b<Jo Telephone No : _________ _ Jlo/>1t-':S Address • / bo 7 ?vi t:t2/IL-D /JJ! WV 1 Telephone No : (o 9 ~362::2_ 3 ( ..µ, // Date Applicat ion Filed : _:r;~-'°~j_\._/ __ b ___ 96 Approved : __________ _ I I ''"" 0 Application Fee 0 Signed Certifications 0 Drainage and erosion control plan, with supporting Drainage Report two (2) copies each . 0 Site and Construction Plans, with supporting Drainage Report two (2) copies each. 0 Other: ----------------------------- usions co tai e in the above plans and supporting documents comply with the current requirement the City of College Station, Texas City Code, Chapter 13 and its associated Drainage Policy and De · n Standards. As a condition of approval of this permit apph · n, I agre proposed in this application according to these docu the College Station City Code. Property Qwner(s) Figure XII Continued CERTIFICATIONS: (for proposed alterations within designated flood hazard areas .) A. I, certify that any nonresidential structure on or proposed to be on th. site as part of this application is designated to prevent damage to the structure or its contents as a r ult of flooding from the 100 year storm. Engineer Date B. I, certify that the finished floor elevation of the lowest floor, including any baseme t, of any residential structure, proposed as part of this application is at or above the base flood ele ation established in the latest Federal Insurance Administration Flood Hazard Study and maps, s amended. Engineer C. I, -----------~ this permit shall not diminish the flo ertify that e alterations or development covered by ca city of the waterway adjoining or crossing elopment are consistent with requirements of this permitted site and that such alter tions r the City of College Station Cit · ode, hapt 1 concerning encroachments offloodways and of floodway fringes . Engineer I, do certify that the propos alterations do not raise the level of the 100 year flood above elevation established in the latest Fe al Insurance Administration Flood Hazard Study . Engineer Date Conditions or comments as part of approval : ____________ _..,~------ In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities. I hereby grant this permit for development. All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer for the above named project. All of the applicable codes and ordinances of the City of College Station shall apply . TO THE ORDER OF ACCOUNT NO . __________________ _ Pa id by_ Check ~ L ( Cash SWOBODA CUSTOM HOMES 1607 EMERALD PKWY. 693-3223 COLLEGE STATION , TX 77845 THANK YOU VICTORIA BANK & TRUST 3000 BRJARCREST ·BRYA N. T EXAS 77802 MEMBER: VICTO RIA BA NKSHARES. I NC./FDIC 835 3811 88 -257 /1131 835 ~y1) An~lyh~( fJDP -ii 2-1~ 1e/z1/?s Pu, fz, fhe 11/ sm-vll -Sure-Pl' ~f>ct"5'6'" ~ fh 1 '5 F f-C rl-7; > /i..P d Y7<; YJ'ij ~ s !vd7 W"-<S t'cj 1/7 'rr..I t?( fhc o{/l/Y)c-r. 8~tf tA>rY1;n v-.., ,,, ~~ #z,s IY)~a~ lo f'h.e t?AJnu-/arr/,~hl-. CITY OF COLLEGE STATION March 16, 1995 TO: Planning (Sabine) Li!ngineering (Brett) Building (David) Electric (Don) FROM : Shirley _N PLANNING DIVISION POST OFFICE BOX 9960 1101 TEXAS AVENUE COLLEGE STATION , TEXAS 77842 ·9960 (409) 764-3570 SUBJECT: C~)keptual Plan -Soil Analytical Services , Inc. Expansions In February we met with the president, Vicki R. Deuel, of this company, and visited about her ideas about expanding her business on Graham Road . Sabine explained that a non-conforming use can be expanded up to 25% with ZBA action, without having to bring the entire site into compliance. She also mentioned the possibility of upgrading up to 60% of the monetary value of the structure without losing the non-conforming status . Brett explained that he needs an interpretation as to whether the proposal represents a "substantial change" so he can decide if what is added must meet ordinance requirements , or if the entire site must be brought up to current standards . Brett explained at the predevelopment meeting that the building could be built on the existing slab without a drainage development permit. If they added to a building , he would need a drainage development permit , but the accompanying documentation could be in the form of a letter. He also explained that if full compliance is required , involving parking lot , curbing, etc., a full drainage development permit and drainage report would be required. Vicki was told that Impact Fees would be required at the time of issuance of a building permit ; also that we would need a copy of the filed document regarding the dedication of R.O .W . for Graham Road to the County. Staff also explained the requirements of a fire hydrant , with Vicki explaining that Fire had told them they could put it across the street. They have letters to that effect. Now we must determine for her if what she is proposing falls within the area for which the ZBA could grant a Special Exception, and if so, what she will need to submit for site review. Please advise . Also, point out any other requirements she would have to meet if, indeed, the ZBA grants the S .E. and she decides to build this. Thanks .