Loading...
HomeMy WebLinkAbout12 Development Permit 302 H&M Wholesale Inc,' Figure XII Development Permit City of College Station, Texas Site Legal Description : L er I) i L O C~ l 7} ~ 0 U{kl 'KJQO Q V{rl-L~ ) 'Seer t ---'B Site Owner: t-\-f ~~ WA-oL-b;A L~ Address: _________ _ Telephone: ------------ Architect/ I ~~M'-'-+-.. _L ~· !'-----'-~ A-"---'-M--"-'-l M-+--,0-'"-'-N .,..__7 _ Date Application Filed: 2/Ldc? {" I Address : ------------~ Telephone No : __________ _ lication is hereby made for the following development specific waterway alterations : ~ ; ' \) 0 Application Fee 0 Signed Certifications 0 Drainage and erosion control plan, with supporting Drainage Report two (2) copies each. 0 Site and Construction Plans, with supporting Drainage Report two (2) copies each . 0 Other: -----------------------------~ ACKNOWLEDGMENTS : ormat n and conclusions contained in the above plans and supporting documents comply with the current requirements of the City of College Station, Texas City Code, Chapter 13 and its associated Drainage Policy and Design Standards. As a condition of approval of this permit application, I agree to construct the improvements proposed in this application according to these documents and the requirements of Chapter 13 of the ollege Station City Code. Contractor Figure XII Development Permit City of College Station, Texas Site Legal Description : LO-C I J i LOc.t:'.'-l(J ~00(\JWQQQ VMt--~ J 'Sec(. + ---B Site Owner : t\-f ~\. vl-AoUSALb Address : _________ _ Architect/ I ~-M'-'-+--. ~_L _. l~-t A---'--'-M__..__,_l M-.0--'--4-N -r---7 _ Date Application Filed : 2/L~/q {" I Telephone: ___________ _ Address : ~------------Te 1 e phone No : __________ _ lication is hereby made for the following development specific waterway alterations: . ' ~ v 0 Application Fee 0 Signed Certifications 0 Drainage and erosion control plan , with supporting Drainage Report two (2) copies each . 0 Site and Construction Plans, with supporting Drainage Report two (2) copies each . 0 Other: ~----------------------------- ACKNOWLEDGMENTS: n and conclusions contained in the above plans and supporting documents comply with the current requirements of the City of College Station, Texas City Code, Chapter 13 and its associated Drainage Policy and Design Standards. As a condition of approval of this permit application, I agree to construct the improvements proposed in this application according to these documents and the requirements of Chapter 13 of the College Station City Co d e. ~w~o; ~ _C_o_n-tr-ac_t_o_r ___________ _ , ' . I STORMWATER DRAINAGE ANALYSIS FOR : RETAIL FACILITY DEACON STREET @TEXAS AVENUE COLLEGE STATION, TEXAS H & M WHOLESALE, INC. 1214 SOUTH COLLEGE AVENUE BRYAN, TEXAS BY : M. L. HAMMONS, P.E. 1700 KYLE SOUTH COLLEGE STATION, TEXAS STORMWATER DRAINAGE ANALYSIS RETAIL FACILITY 3300 TEXAS AVENUE COLLEGE STATION, TEXAS I, M. L. Hammons, P.E., as Engineer for site grading and drainage of this development site , by seal and signature, certify that this analysis and the resultant facilities design, to the best of my knowledge and intent, are in compliance with the City of College Station or stormwater management. Date /, ?>(7--'f t 'l r-· - -,,· :-- ANALYSIS I I I SITE DESCRIPTION The proposed development site for this project is the southwest corner of the Texas Avenue/Deacon Street intersection (See Appendix #I, "vicinity map"). The tract is Lot 1, Block 17, of the Southwood Valley Subdivision, Section 4-B. The street address is 3300 Texas Avenue . The site is bounded to the north by Deacon Road, to the South by Lot 2 of the same subdivision, to the east by the west access road of Texas Avenue and to the west by a subdivision alley. The tract is currently vacant and is vegetated with grass only . There are no trees or shrubs . The proposed development usage is for a convenience store with gasoline sales . EXISTING SITE DRAINAGE The site is not located in, or eminently near, the 100 year flood plain as identified by FIRM map #48041C0205C, of 712192 (See Appendix #2, "Flood Plain Map"). According to Figure II - 1 of the Stormwater Management Plan for the City of College Station as presented by the "Drainage Policy and Design Standards", this site is located in the Bee Creek Tributary "A" drainage area (See Appendix #3, "Drainage Area Map"). Current surface drainage is sheet drainage and is generally in a northerly direction with discharge onto Deacon Street, and Texas Avenue (See Appendix #4, "Site Plan" with existing Topo), then via street curb and gutter to the drainage ditches at Texas Avenue and/or Longmire Drive. There are no streams originating on or passing through the tract. PROPOSED SITE DRAINAGE In order to comply with City of College Station stormwater management criteria, the post development stormwater runoff rate will be attenuated to a rate no greater than the pre- development runoff rate . Control will be accomplished by on-site detention ponding, including a controlled flow discharge structure. Ponding will be in two areas, the lower being located along the east end of the site and th~,~r between the two driveways along Deacon Street. Site discharge will be via I~" ~CP pipe from the discharge structure, under Texas Avenue access road, into e ·sti open ditch drainage . 1 4-IS'/\. ~ l ~ ~ ~ \4-.' iS~~\M.~ t>~ ,u DRAINAGE DESIGN CRITERIA The 25 year storm event is used as the design storm, with discharge rate design adjustment to control the 1 O year and the 100 year event. The "Rational Method" of calculation is used. With the "Rational Method" calculation, the following values have been established for the C, I and A formula components : Direct discharge C = .47 Detention discharge C = .82 (See Appendix #5) 110 = 8.63 125 = 9.86 1100= 11.64 (See Appendix #6) TOTAL DRAINAGE AREA = 37,000 SF = .849 acres Direct discharge area = 9,000 SF = .206 acres Detention discharge area = 28,000 SF = .643 acres Drainage diagram is shown by Appendix # 8 . STORMWATER RUNOFF CALCULATIONS (See Appendix #7) Based on the C, I, and A factors established herein , stormwater runoff is calculated thus: PRE DEVELOPMENT RUNOFF 0 =CIA 0100 =0.35 x 11 .64 x .849 = 3.46 025 =0 .35 x 9.86 x .849 = 2 .93 010 =0 .35 x 8 .63 x .849 = 2 .56 POST DEVELOPMENT RUNOFF Direct Discharge 0100 =0.472 x 11 .64 x .207 = 1.14 025 =0.472 x 9 .86 x .207 = 0 .96 010 =0.472 x 8 .63 x .207 = 0 .84 Detention Collection 2 0100 =0.82 x 11.64 x .643 = 6.14 025 =0.82 x 9 .86 x .643 = 5.20 010 =0 .82 x 8.63 x .643 = 4.55 STORMWATER DISCHARGE RATE CONTROL As indicated by the diagram of Appendix #8, part of the post development drainage will be discharged from the tract directly to the adjacent street or right of way . The direct drainage is quantified by the calculations as shown on page 2 herein . By deducting the direct discharge runoff flow rate from the pre-development runoff flow rate, the allowable detention pond discharge flow rate is established as follows : Q100 = 3.46 cfs (pre-dev) - 1.14 cfs (direct discharge) = 2 .32 cfs 0 25 = 2 .93 cfs (pre-dev) -0.96 cfs (direct discharge) = 1.97 cfs 0 10 = 2.56 cfs (pre-dev) -0.84 cfs (direct discharge) = 1.72 cfs Pond volume and discharge flow rate determinations are based on these all~wables . The attenuated stormwater discharge , from this site , is via a discharge outlet structure (See Appendix #10, "Flow-Control Discharge Structure Sketch) in the lower of two interconnected detention ponds. There is no flow constriction between the upper and lower pond, thereby rendering the pond storage and flow characteristics as one . With the discharge structure openings as shown by the Appendix# 10 drawing , discharge -liquid elevation relationships are thus: STORM ATTENUATED LIQUID EVENT DISCHARGE ELEVATION 100 YR . 2.24 cfs (Appendix #12) 100.0 25 YR. 1.98 cfs (Appendix #12) 99.9 10 YR . 1.70 cfs (Appendix #12) 99 .8 Discharge rates have been determined using the "Haested Methods" software program to establish flow from the 6" round opening, combined with manual flow calculations for the rectangulars · weir at the top of the structure . The rectangular weir calculation is shown by Appendix #12 and the Haested data is shown by Appendix #11 . STORMWATER DETENTION The Stormwater detention system, as previously identified herein, is a two pond system connected by a 12" storm drain pipe . The lower pond, located near Texas Avenue , will contain about 53% of the maximum storm detained run-off while the upper pond and the transfer pipe contain the remainder. Detention requirements are calculated according to 3 the "simplified hydrograph" method as presented by the City "Drainage Policy and Design Standards" manual, page 75 . (See Appendix #9, "Detention Volume Requirements"). The calculated storage volume is 4150 cubic feet. The elevation low point of the detention system is 97 .3, at the discharge orifice . The overflow level, (which exceeds the 100 year event requirements), is at elevation 100.2 . Pond storage volumes provided and pond storage volumes required at various levels are :· (See Appendix #13) ELEVATION 97 .3 98.0 99.0 99.8 99.9 100 .0 100.2 POND VOLUME 0 145 ft3 1,070 ft3 2,550 ft3 2.900 ft3 3,400 ft 3 4,150 ft 3 POND REQUIRED 2,550 ft3 2.900 ft 3 3,400 ft3 Detention storage volumes are calculated as shown by Appendix #12 . PHYSICAL CHARACTERISTICS With stormwater detention as described herein and as indicated on site grading and site landscaping plans, the detention ponds are an integral part of the landscaping areas . In order to achieve the required liquid storage volumes, vertical walls are used along portions of the pond perimeters . The walls are to be hand finished concrete . The greatest differential elevation between the wall top and the adjacent pond floor is 4.0 feet at the Texas Avenue frontage . The wall top elevation along Texas Avenue is slightly (0 .3 to O. 7 feet) higher than the top of the street curb, thus allowing city landscape requirements to prevail. The pond wall characteristics along Deacon Street are essentially the same except the maximum wall height is approximately 2 feet. CONCLUSIONS Peak run -off due to development will be attenuated adequately to provide no increased runoff rate through the 100 year rainfall event. No run-off is routed to other channels or tributaries . No negative downstream impact is anticipated . 4 APPENDICES I I APPENDIX #1 APPENDIX #2 APPENDIX #3 APPENDIX #4 APPENDIX #5 APPENDIX #6 APPENDIX #7 APPENDIX #8 APPENDIX #9 APPENDIX #10 APPENDIX #11 APPENDIX #12 APPENDIX #13 VICINITY MAP FLOOD PLAIN MAP DRAINAGE AREA MAP SITE PLAN w/topo "C" -FACTOR DETERMINATION 1-D-F CURVE SITE DRAINAGE AREA DETERMINATION SITE DRAINAGE DIAGRAM DETENTION VOLUME REQUIREMENTS FLOW CONTROL DISCHARGE STRUCTURE 6" ROUND OPENING OUTFLOW RATES RECTANGULAR WEIR OUTFLOW RATES CHART -VOLUME/ELEVATION/STORM EVENT 5 \ \ ,.., I N \ '=>-L \ \ \ \ \ > ~ 3!1S :_.:·>-. '~}-~;?, \ \ -" w 2 2~ !,/) ~I 0 1 """)j I I ! A 51TE Brazos Co unt y Uni nco rp o r a t ed A reas 48 11 95 -, I"°'\ A. Ir-,, 0 7 B City of College Sta, 480083 APPENDIX#2 co )> ""'CJ ""'CJ m z 0 x ~ c.u 1 B STATlONl ' ' I 01 -q -</ ~ C:/ ~ ~I o -j fTI (/)I I \ ' \ ~ ----- ~ ~ (<\ ~®· ~ .,.. .w. 0 :i:.. ::o" -j ' s '~ ' PARKWAY \ \ l \ G Figure XII Development Permit City of College Station, Texas Site Legal Description : LO-C I) i LOC-~ l(} ~O!J{IJ\IJQ()'Q v~) <Sec..-r t ~ Site Owner: ttf ~~ vl.8-o k€-SAL~ Architect/ I ~-M~. ~-L-· l'--L-t A-"----'-M-"-'-l M-+-.O~N -;L--7 _ Contractor: ------------- Date Application Filed: gjdq {" I Telephone : ___________ _ Address : ------------~ Telephone No : __________ _ Approved: ___________ _ lication is hereby made for the following development specific waterway alterations : ~ ; ' . \) 0 Application Fee 0 Signed Certifications 0 Drainage and erosion control plan, with supporting Drainage Report two (2) copies each . 0 Site and Construction Plans, with supporting Drainage Report two (2) copies each . 0 Other: -----------------------------~ ACKNOWLEDGMENTS : format1 n and conclusions contained in the above plans and supporting documents comply with the current requirements of the City of College Station, Texas City Code, Chapter 13 and its associated Drainage Policy and Design Standards. As a condition of approval of this permit application, I agree to construct the improvements proposed in this application according to these documents and the requirements of Chapter 13 of the ollege Station City Code . Contractor Figure XII Development Permit City of College Station, Texas Site Legal Description : LO-C I) i LOG(-l(} ~OD {IJ\IJQQQ v{rLL~) <Seer + -"'B Site Owner: l-\-f ~l. vlAol&SALb: Contractor : ------------- Date Application Filed : gjdq {" I Telephone: ___________ _ Address : ------------~ Telephone No : __________ _ Approved : ___________ _ lication is hereby made for the following_develor.ment specific waterway alterations : . v 0 Applicati o n Fee 0 Signed Certifications 0 Drainage and erosion control plan, with supporting Drainage Report two (2) copies each. 0 Site and Construction Plans , with supporting Drainage Report two (2) copies each . 0 Other: ------------------------------ ACKNOWLEDGMENTS : n and conclusions contained in the above plans and supporting documents comply with the current requirements of the City of College Station, Texas City Code, Chapter 13 and its associated Drainage Policy and Design Standards . As a condition of approval of this permit application, I agree to construct the improvements proposed in this application according to these documents and the requirements of Chapter 13 of the College Station City Co d e . ~w~4; ~ -C-o-nt-r-ac_t_or ___________ _ , .. I STORMWATER DRAINAGE ANALYSIS FOR : RETAIL FACILITY DEACON STREET@ TEXAS AVENUE COLLEGE STATION, TEXAS H & M WHOLESALE, INC. 1214 SOUTH COLLEGE AVENUE BRYAN, TEXAS BY : M. L. HAMMONS, P.E. 1700 KYLE SOUTH COLLEGE STATION, TEXAS : ; STORMWATER DRAINAGE ANALYSIS RETAIL FACILITY 3300 TEXAS AVENUE COLLEGE STATION, TEXAS I, M. L. Hammons, P.E., as Engineer for site grad ing and drainage of this development site, by seal and signature, certify that this analysis and the resultant facilities design, to the best of my knowledge and intent, are in compliance with the City of College Station or stormwater management. Date /, '(;-(7-'f ( q_ :;---- 5: ·-· . ~ .. __ _ ANALYSIS I I SITE DESCRIPTION The proposed development site for this project is the southwest corner of the Texas Avenue/Deacon Street intersection (See Appendix #I , "vicinity map"). The tract is Lot 1, Block 17, of the Southwood Valley Subdivision, Section 4-B. The street address is 3300 Texas Avenue . The site is bounded to the north by Deacon Road, to the South by Lot 2 of the same subdivision , to the east by the west access road of Texas Avenue and to the west by a subdivision alley . The tract is currently vacant and is vegetated with grass only . There are no trees or shrubs . The proposed development usage is for a convenience store with gasoline sales . EXISTING SITE DRAINAGE The site is not located in, or eminently near, the 100 year flood plain as identified by FIRM map #48041 C0205C, of 7/2/92 (See Appendix #2 , "Flood Plain Map"). According to Figure II - 1 of the Stormwater Management Plan for the City of College Station as presented by the "Drainage Policy and Design Standards", this site is located in the Bee Creek Tributary "A" drainage area (See Appendix #3, "Drainage Area Map "). Current surface drainage is sheet drainage and is generally in a northerly direction with discharge onto Deacon Street , and Texas Avenue (See Appendix #4, "Site Plan" with existing Topo), then via street curb and gutter to the drainage ditches at Texas Avenue and/or Longmire Drive . There are no streams originating on or passing through the tract. PROPOSED SITE DRAINAGE In order to comply with City of College Station stormwater management criteria , the post development stormwater runoff rate will be attenuated to a rate no greater than the pre- development runoff rate. Control will be accomplished by on-site detention ponding , including a controlled flow discharge structure . Ponding will be in two areas , the lower being located along the east end of the site and th~i/-er between the two driveways along Deacon Street. Site discharge will be via 15" C P pipe from the discharge structure, under Texas Avenue access road, into e ·sti open ditch drainage . I ()V\. rlJtLU.s ~ ~ ~ ,, l.y 'tS 'ib ~ ~ fo QM. \'O 1 DRAINAGE DESIGN CRITERIA The 25 year storm event is used as the design storm, with discharge rate design adjustment to control the 1 O year and the 100 year event. The "Rational Method" of calculation is used. With the "Rational Method" calculation, the following values have been established for the C, I and A formula components: Direct discharge C = .47 Detention discharge C = .82 (See Appendix #5) 110 = 8.63 125 = 9.86 1100= 11.64 (See Appendix #6) TOTAL DRAINAGE AREA = 37,000 SF = .849 acres Direct discharge area = 9,000 SF = .206 acres Detention discharge area = 28,000 SF = .643 acres Drainage diagram is shown by Appendix # 8. STORMWATER RUNOFF CALCULATIONS (See Appendix #7) Based on the C, I, and A factors established herein , stormwater runoff is calculated thus : PRE DEVELOPMENT RUNOFF 0 =CIA 0100 =0 .35 x 11 .64 x .849 = 3.46 025 =0.35 x 9 .86 x .849 = 2.93 010 =0.35 x 8 .63 x .849 = 2.56 POST DEVELOPMENT RUNOFF Direct Discharge 0100 =0.472 x 11.64 x .207 = 1.14 025 =0.472 x 9 .86 x .207 = 0.96 Q10 =0.472 x 8.63 x .207 = 0 .84 Detention Collection 2 0100 =0.82 x 11 .64 x .643 = 6.14 025 =0.82 x 9 .86 x .643 = 5.20 010 =0 .82 x 8.63 x .643 = 4 .55 STORMWATER DISCHARGE RATE CONTROL As indicated by the diagram of Appendix #8, part of the post development drainage will be discharged from the tract directly to the adjacent street or right of way . The direct drainage is quantified by the calculations as shown on page 2 herein . By deducting the direct discharge runoff flow rate from the pre-development runoff flow rate, the allowable detention pond discharge flow rate is established as follows : Q100 = 3.46 cfs (pre-dev) -1.14 cfs (direct discharge)= 2 .32 cfs Q25 = 2 .93 cfs (pre-dev) -0.96 cfs (direct discharge) = 1.97 cfs Q10 = 2.56 cfs (pre-dev) -0.84 cfs (direct discharge) = 1.72 cfs Pond volume and discharge flow rate determinations are based on these all~wables . The attenuated stormwater discharge , from this site, is via a discharge outlet structure (See Appendix #10, "Flow-Control Discharge Structure Sketch) in the lower of two interconnected detention ponds . There is no flow constriction between the upper and lower pond, thereby rendering the pond storage and flow characteristics as one . With the discharge structure openings as shown by the Appendix# 1 O drawing , discharge -liquid elevation relationships are thus : STORM ATTENUATED LIQUID EVENT DISCHARGE ELEVATION 100 YR . 2 .24 cfs (Appendix #12) 100 .0 25 YR . 1.98 cfs (Appendix #12) 99.9 10 YR. 1.70 cfs (Appendix #12) 99 .8 Discharge rates have been determined using the "Haested Methods" software program to establish flow from the 6" round opening , combined with manual flow calculations for the rectangulars · weir at the top of the structure. The rectangular weir calculation is shown by Appendix #12 and the Haested data is shown by Appendix #11 . STORMWATER DETENTION The Stormwater detention system , as previously identified herein, is a two pond system connected by a 12" storm drain pipe . The lower pond, located near Texas Avenue , will contain about 53% of the maximum storm detained run-off while the upper pond and the transfer pipe contain the remainder . Detention requirements are calculated according to 3 the "simplified hydrograph" method as presented by the City "Drainage Policy and Design Standards" manual, page 75 . (See Appendix #9, "Detention Volume Requirements"). The calculated storage volume is 4150 cubic feet. The elevation low point of the detention system is 97 .3, at the discharge orifice . The overflow level, (which exceeds the 100 year event requirements), is at elevation 100.2 . Pond storage volumes provided and pond storage volumes required at various levels are:· (See Appendix #13) ELEVATION 97 .3 98.0 99.0 99 .8 99 .9 100.0 100.2 POND VOLUME 0 145 ft3 1,070 ft3 2,550 ft3 2.900 ft 3 3,400 ft3 4 ,150 ft3 POND REQUIRED 2,550 ft3 2.900 ft3 3,400 ft 3 Detention storage volumes are calculated as shown by Appendix #12 . PHYSICAL CHARACTERISTICS With stormwater detention as described herein and as indicated on site grading and site landscaping plans, the detention ponds are an integral part of the landscaping areas. In order to achieve the required liquid storage volumes, vertical walls are used along portions of the pond perimeters . The walls are to be hand finished concrete. The greatest differential elevation between the wall top and the adjacent pond floor is 4.0 feet at the Texas Avenue frontage . The wall top elevation along Texas Avenue is slightly (0 .3 to 0.7 feet) higher than the top of the street curb, thus allowing city landscape requirements to prevail. The pond wall characteristics along Deacon Street are essentially the same except the maximum wall height is approximately 2 feet. CONCLUSIONS Peak run-off due to development will be attenuated adequately to provide no increased runoff rate through the 100 year rainfall event. No run-off is routed to other channels or tributaries . No negative downstream impact is anticipated . 4 APPENDICES I I I APPENDIX #1 APPENDIX #2 APPENDIX #3 APPENDIX #4 APPENDIX #5 APPENDIX #6 APPENDIX #7 APPENDIX #8 APPENDIX #9 APPENDIX #10 APPENDIX #11 APPENDIX #12 APPENDIX #13 VICINITY MAP FLOOD PLAIN MAP DRAINAGE AREA MAP SITE PLAN w/topo "C" -FACTOR DETERMINATION 1-D-F CURVE SITE DRAINAGE AREA DETERMINATION SITE DRAINAGE DIAGRAM DETENTION VOLUME REQUIREMENTS FLOW CONTROL DISCHARGE STRUCTURE 6" ROUND OPENING OUTFLOW RATES RECTANGULAR WEIR OUTFLOW RATES CHART -VOLUME/ELEVATION/STORM EVENT 5 If SITE < \ / \ \ \ \ .. ,,. t --, ~ \ N TS \ \ 6 I APPENDIX #1 I ...J UJ 2 2~ (,/) 2 1 oi """')j I ! ! A 51TE Brazos Co unt y Unincor p orated Areas 48 11 95 7 B C) City of College Sta1 480083 APPENDIX#2 co )> "1J "1J m z 0 >< ~ c.v STATloN f ' ' I 0 1 -q -<I '=I ~, ....; Ul / I ----\ ----- -} ff) ------- \ \ \ G C-FACTOR DETERMINATION PRE DEVELOPMENT Total Drainage Area Considered . . . . . . 37,000 sf* "C" . . . . . . . . . . . . . . . . 0 .35 POST DEVELOPMENT Direct Discharge : South side West end Sidewalk & Driveways Deacon St. PL Texas Avenue PL Tota l Direct Discharge Detention Discharge : Impervious areas bldgs paving sidewalks, etc. Landscape areas Total Detention Discharge TOTAL P/D DISCHARGE * See Append ix #7 630 sf 5 , 440 sf 2 ,000 sf 670 sf 260 sf 9,000 sf 23 ,960 sf 4,040 sf 28,000 sf 37,000 sf 10 0 .35 0.35 0 .90 0 .35 0 .35 0.472 0 .90 0.35 0.82 0 .735 APPENDIX #5 ~ ~ )> -u -u m z 0 x ~ O> II ::lJ Q :J -Q :J -(9 :J Cll -'< --· -? ....... =r' ~ 14t~ ' : Ill I I I I i I; Ii ! : : .• ·~ .. . ·. . .. . . i I j 11 ·l~H--, I I I -. I I -I . . . . . . . . I I F\-: r--, I i I 1 1 1 : 1 · --I · · · I I -I I I i tt ~ ~ -·_ ~ _ ----. -+ = _ : --_ ··: --_ ~ -: .. r. _: = _ ~ -_ _ 8 ' -t-+-+-+-+-+----1'--f-t-¥'--+---t--t-+-+-+-+-+----1'--f---.+--+-t--t--t-+-+-+-i-l-+-+-+--+--+--+-+--+--l--}-.C.-~-· ---l . -=--~ . ---: ~ -... . ~ ·. --~ ~----... --I --. -6f--7---+-\-l~-f"rf--+'~-t--f"-.;c-R=+-t-+----1-+-+--+-+--+--+--+-+-+-+-+----1-+-+-+-+--+--+--+-+-+-1-4-+-+-+-+--+--J=~+..-4. .• 1-i -: --. --_· :_---_·_-. -. - . ---. -·-· -~-·_ -~:· -~--~ . -·------41-i-t--t--t-r--t---t--t-~~-f'~:t-~~::-t-'f""'~t="t~~~::=t-t--Vt-1-+-+-~+-1-+-t--t-t-1-t-+-t-+-~~-+-i • ,V -·-· --1 -..... . . I -~ I I·--• 2~-t-~~t-~~--+-t-t-t--t-t=f=f=[J~-t-J~i--t-=ff=~~r]?J~~~~~~t:E3E3=l=t=±=t=t=t-~±=I=i I , I ! I ! 1-l i I -· -_ ---~ -···. -· ---I I \' ! I I . .. . . --. . - ---0 I : i ·-I . .. -. . ·--. - ---. 5 'i: 11 1• :1 20 '. 35 50 65 80 95 110 12,~ Time of Concentration . t.. (min.) 4 H-O o \AJ~ri Tiu.c r~ ~s-o '~loo '-:::::: ~~o . V-f .. : ..::::; \ ·o-e. wA i....:(_ , • . .. • ? so ' x. 41 1 -- 1/R.\W \VA\? (@-~c.co~ --W TA ~ - ?S: o ao ~~ ) Discharge is as follows and as shown by plan in Appendix #8. Direct discharge to adjacent property along south edge of property 630 sf Direct discharge to Deacon St. at west end 5,440 sf Direct discharge to Deacon St. from sidewalk and driveways 2 ,000 sf Direct discharge to Deacon St. along north PL between sidewalk and detention wall and/or berm 670 sf Direct discharge to Texas Avenue along east PL between detention wall and PL 260 sf Discharge via detention system 28 ,000 sf TOTAL DISCHARGE AREA 37,000 sf 12 APPENDIX#? 0 Q~lS/\J (to~ VoL-uM£ IZ:oi£wi12£1'tjB\JU CM I.I LA -(LotJ /-{ E: [ 11 o 0 -fa;i\-1~ W L-lrll-4'( J711..0 <>-il-11-f-D, P . @_, Q,.. -01s~A!l4e-ft._<-<>u.1er'J -'f.<fG.LfuJ-/.1f(/ot70ia.) ::-Z.>Z---~~lJ V~r>cv-Oe-r&1-'(toN. Col.,,_e:-c.rtcN. ::::-1.,.rtcF51(f-1,,) 1c 1,0 A f {i:{'4 0 (\Tg fa,orn. &,.I tf ~ 2., 3 ~ I ~It l ~00 x.. . 5 x. G, I I 'f ::::-'::> S-2-G:. ·-i :? 1 'tvo '/\. , ~ X Z. '3 & ~ --z,o 25'~ ·~-~01~ VDw.JfYti!:---~'f78"'Cf. 4eio iio a -sec.... ~Q-i~ -(),SatA-~A1.-wu.?eO-i.ct1-o/1 ~ ':! }.q 7 ~~ (P-'3) ?~°'~ ~I6lT;0 ,.i CoL-LZqiOt~ ;;. s-, zoc._p-;(f-2) ,,. A--rr~ u ""re fiiovtA. -D.z,o --"' l .C'.1 7 lc10 : ~-i-( .:7~e ~ 4'1~ !1.q· -l 7 7-; l,o 1 i?o~ll;fltM JQt--U M-e" VI 0 7 f ( :>€C:.... @-[{.D -01ScttMU.c;;-~<.{)e0 z.;(p ~v.'if: 1.1z,cr-s-u --.) ?~rt-~ aret(Tot~ ~fcN -.:: '1-. :;;~ c.vs(f-z) .f\{(~;JA(<2 filOvV\ Cf-.SS-~ \.1~ (2111Y1f:' CA,~ \S-0 0 +o~s­ -\ S-'{ '6' ----Z,~f1 -f(1 14 APPENDIX #9 T ~ecr~oN. ~TA-"l G ti L-A1L l.l) ei 1£.; (Li "e Ft.0w hrLMLJ {.') .v'·; '-\ ::.~,),_ l r 15 APPENDIX #10 I Outlet Structure File: DEC POND-2 Version: 5 .15 Date Execu te d: .STR S/N: 1295130055 Time Executed: ********************* DEC OUTFALL STRUCTURE I.( .. ~ th OtO &~ ~ ~ c *****t****t********** ***** CO MPOSITE OUT FLOW SU MMARY **** Elevation (ft) Q (c fs} Contributing Structures --------------------------------------------- 97 .3 0 0 .0 1 97.4 0 0 .0 1 97.5 0 0 .1 1 97.60 0 .2 1 97.7 0 0.3 1 97.8 0 0.4 1 97.9 0 0 .5 1 98.00 0 .6 1 98.1 0 0.7 1 98.20 0.7 1 98.30 0.8 1 98 .4 0 0.9 1 98.5 0 0 .9 1 98 .60 1 .0 l 98.7 0 1 .0 1 98.8 0 1.1 1 98.9 0 1.1 1 99.00 1. 2 1 99.1 0 1.2 1 99.20 1.2 1 99.30 1 .3 1 99.40 1.3 l 9 9 .50 1 .3 1 ?~ 9 9 .60 1 .4 1 99.7 0 1.4 1 99.8 0 1.4 1 99.9 0 1.5 1 0 10 0.00 1.5 1 ; .s- 100 .10 1. 5 ~ 1 ,, ~ (,. 16 APPENDIX #11 Ane-"1 0 11 TerJ \), 5~1+A rL4-6 CA Le-DLA r1 'o (\J ( Ft.-ocu F ll.o""t W &I 1L) -s L"o ll.-A-u 0 t:-wv . I @o ,o & I( f 0 ,·5c.-1-+A (L,&G =: ) , S c P .S ( A17 PG N )7 1'x P:-11) Wf?t Cl. CJ) l ~l+A-t L0 t ::: 0 , 1 l( e,p) . '3 ,, L-'('I ~ S- -t-; n . z z 1 ,,. ,..,.~ t..-:: I{) , I/ r i ~ , r: I 0 {flL--V 1 'SC.1-I A:~ :-, L . \-/ l(:: !l ~(H ~,i S ZS YrL ::: 1. (1'i C\-'J ~ f o {lf\:(?'E 2L--~,,-v . -: qq ,q b"¢ ri 'scH {\flC,? ~ 1,~C(<;. (!\f (l N01·Xfi-10 LQ e:ia V19:t+A-1!6 c:: >O:~s ~· r s- '\or1t c., V1sc MArko E: = \.CJ \'.'., ~ 0 ,- 3 10 ~(l, -: ) I 7 0 C f-? _, ~'ro(l~IS lZ L.0 0. ·:: 9l{. f to '1<ji \)1 Sc H (\ (L&? :: l. i C fS CAf pe:l'IVt)<'. 41 \ 0 Lth~·\\L y\5G ~All0 t-:.. (). 5 8 Cf-~ \0i Toftk Q,s~;,~~f> )~:~:~~ 17 APPENDIX #12 .:O~-- :S.· r . ------------: -! . ---·: -! ____ ... ------·-· -·-· . . . ' . --·· ···-----·---------· ----:----.. -·-·-;-------7"°-----:------·----- i --------·---~-- -··-·-· _ __; __ :.; __ ~--- . . i .. , •. : _L_ ______ _:.. -'--+--- ! . .. • _i _ : ____ !._:~_c; __ ~ ' '--1 .... -L___:__-+-----·-'~-----'--·'f--+---,,..._,.--. ....!-. -~---~------..:_ __ ----~- ........... ..0 __ . -:---· ~------+-_ _:_ __ :--·~ -·-•--- "! ·-:-_, ·------·-----------' i- i I I ______ .;....... ----------l---,j-1--------:----~---;·-·-·--:---:--"t------ ----,----=~~-~ , __ ,_•~-tr---~---.~.1~:~~-.~-.L~.-·-···: __ =_1,~_~_-: __ -_ :__ (I_~_t _~:=·--:~ __ J_ ____ : ~--_ ·;...4J _ . . ' ~ I -~-~= ~ _ ___ .._ ----·-·· _ __:___~ _____ _i_ ____ - ·---~:;--: - ·-~~i---- : ··-:~~------ -,~---:-- i •I ,--·· i -·-· --'·-i---: .. __ L ....... -----:-----------------'._ __ -~~; --------- ----------------. . . ' ---, ---.. -1 . ! j -'--'-'-.. ..._! _-..:.~'t----+., ,_·_ •-.,.--· . . : I .. ' . ----r-----·r-. ·-. ' I . ~---·--,--_-;----~- ... : __ ~--·-: i .. __ : __ : __ ;_:_.' __ + .. L-+ L ------ ' f----t·- 1 -----· ------~ -~--'-j~~ _ _j _____ ~--~---------- i . i i • [d ••~~ ~-~· -i··---_t:. ------- ' I I . . . . l,--·-4.---:._.t-I -----~----t--; __ ,_ i : ~. :~-l•+-_.;_._---, -~~I --~~- .. ·+ i -. --_;---. ----n :· i I ·-: -~-. N l. --i ___ :_ 18 APPENDIX #13 .. STORMWATER DRAINAGE ANALYSIS FOR : RETAIL FACILITY DEACON STREET@ TEXAS AVENUE COLLEGE STATION, TEXAS H & M WHOLESALE, INC. • . 1214 SOUTH COLLEGE AVENUE BRYAN, TEXAS BY : M. L. HAMMONS, P.E. 1700 KYLE SOUTH COLLEGE STATION, TEXAS . STORMWATER DRAINAGE ANALYSIS RETAIL FACILITY 3300 TEXAS AVENUE COLLEGE STATION, TEXAS I, M. L. Hammons, P.E ., as Engineer for site grading and drainage of this development site , by seal and signature, certify that this analysis and the resultant facilities design, to the best of my knowledge and intent, are in compliance with the City of College Station Ordinance # 1728 for stormwater management. Date <6'/2f/1~ •' ,, ~ -~~- :-- ...::_ .. - -~:~ -__,, --:..:,, ....::. ,,.... _., ....,.... -,.. '"' ANALYSIS I I I SITE DESCRIPTION The proposed development site for this project is the southwest corner of the Texas Avenue/Deacon Street intersection (See Appendix #1 , "vicinity map"). The tract is Lot 1, Block 17, of the Southwood Valley Subdivision , Section 4-B . The street address is 3300 Texas Avenue. The site is bounded to the north by Deacon Road, to the South by Lot 2 of the same subdiv ision , to the east by the west access road of Texas Avenue and to the west by a subdivision alley. The tract is currently vacant and is vegetated with grass only . There are no trees or shrubs . The proposed development usage is for a convenience store with gasoline sales . EXISTING SITE DRAINAGE The site is not located in, or eminently near, the 100 year flood plain as identified by FIRM map #48041C0205C , of 712192 (See Appendix #2, "Flood Plain Map"). According to Figure II - 1 of the Stormwater Management Plan for the City of College Station as presented by the "Drainage Policy and Design Standards", this site is located in the Bee Creek Tributary "A" drainage area (See Appendix #3 , "Drainage Area Map"). Current surface drainage is sheet drainage and is generally in a northerly direction with discharge onto Deacon Street , and Texas Avenue (See Appendix #4, "Site Plan" with existing Topo), then via street curb and gutter to the drainage ditches at Texas Avenue and/or Longmire Drive . There are no streams originating on or passing through the tract. PROPOSED SITE DRAINAGE In order to comply with City of College Station stormwater management criteria, the post development stormwater runoff rate will be attenuated to a rate no greater than the pre- development runoff rate. Control will be accomplished by on -site detention ponding , including a controlled flow discharge structure . Ponding will be in two areas , the lower being located along the east end of the site and the f3 ~er between the two driveways along Deacon Street. Site discharge will be via 5" J~CP pipe from the discharge structure, under Texas Avenue access road , into ex1 . mg open ditch drainage . 1 DRAINAGE DESIGN CRITERIA The 25 year storm event is used as the design storm, with discharge rate design adjustment to control the 1 O year and the 100 year event. The "Rational Method" of calculation is used . With the "Rational Method" calculation, the following values have been established for the C, I and A formula components : Direct discharge C = .47 Detention discharge C = .82 (See Appendix #5) 110 = 8.63 125 = 9.86 1100= 11.64 (See Appendix #6) TOTAL DRAINAGE AREA = 37,000 SF = .849 acres Direct discharge area = 9,000 SF = .206 acres Detention discharge area = 28,000 SF = .643 acres Drainage diagram is shown by Appendix # 8 . STORMWATER RUNOFF CALCULATIONS (See Appendix #7) Based on the C , I, and A factors established herein , stormwater runoff is calculated thus: PRE DEVELOPMENT RUNOFF Q =CIA 0100 =0 .35 x 11.64 x .849 = 3.46 025 =0 .35 x 9.86 x .849 = 2.93 010 =0 .35 x 8 .63 x .849 = 2 .56 POST DEVELOPMENT RUNOFF Direct Discharge 0100 =0.472 x 11.64 x .207 = 1.14 025 =0.472 x 9.86 x .207 = 0 .96 010 =0.472 x 8 .63 x .207 = 0 .84 Detention Collection 2 ~iJt~Jvt) 0100 =0 .82 x 11 .64 x .643 = 6.14 1 (J~~G\ ")~;,,,.>-~~I·~ ."1 025 =0.82 x 9.86 x .643 = 5 .20 ~ ~ ~ ¥~, ~ o,, =0.82 x 8.63 x .643 = 4 .55 ~il :I ...t'-1: ~~ ~ ~ STORMWATER DISCHARGE RATE CONTROL ~ ~; toJ/').I~ ~ ~· . As indicated by the diagram of Appendix #8, part of the post development drainage will l, 'Pf be discharged from the tract directly to the adjacent street or right of way . The direct ~ drainage is quantified by the calculations as shown on page 2 herein . By deducting the detention pond discharge flow rate is established as follows : ~ Q100 = 3.46 cfs (pre-dev) -1.14 cfs (direct discharge) = 2.32 cfs 0 25 = 2.93 cfs (pre-dev) -0.96 cfs (direct discharge) = 1.97 cfs Q10 = 2 .56 cfs (pre-dev) -0.84 cfs (direct discharge) = 1.72 cfs Pond volume. and discharge flow .rate determinatiol'ls are based pn these all~wables . The attenuated stormwater discharge , from this site , is via a discharge outlet structure (See Append Lr-#10, "Flow-Control Discharge Structure Sketch) in the lower of two interconnected detention ponds. There is no flow constriction between the upper and lower pond , thereby rendering the pond storage and flow characteristics as one. With the discharge structure openings as shown by the Appendix# 1 O drawing , discharge -liquid eleva ti on relationships are thus : STORM ATTENUATED LIQUID EVENT DISCHARGE ELEVATION 100 YR. 2 .24 cfs (Appendix #12) 100.0 25 YR. 1.98 cfs (Appendix #12) 99.9 10 YR. 1.70 cfs (Appendix #12) 99 .8 Discharge rates have been determined us ing the "Haested Methods" software program to establish flow from the 6" round opening , combined with manual flow calculations for the rectangulars · weir at the top of the structure . The rectangular weir calculation is shown by Appendix #12 and the Haested data is shown by Appendix #11 . STORMWATER DETENTION The Stormwater detention system , as previously identified herein, is a two pond system connected by a 12" storm drain pipe . The lower pond, located near Texas Avenue, will conta in about 53% of the maximum storm detained run-off while the upper pond and the transf er pipe contain the remainder. Detention requirements are calculated according to 3 the "simplified hydrograph" method as presented by the City "Drainage Policy and Design Standards" manual , page 75 . (See Appendix #9, "Detention Volume Requirements"). The calculated storage volume is 4150 cubic feet. The elevation low point of the detention system is 97 .3, at the discharge orifice . The overflow level, (which exceeds the 100 year event requirements), is at elevation 100.2. Pond storage volumes provided and pond storage volumes required at various levels are:· (See Appendix #13) ELEVATION 97 .3 98.0 99 .0 99.8 99.9 100 .0 100.2 POND VOLUME 0 145 ft 3 1,070 ft 3 2,550 ft3 2.900 ft 3 3,400 ft 3 4 ,150 ft 3 POND REQUIRED 2 ,550 ft 3 2.900 ft 3 3 ,400 ft 3 Detention storage volumes are calculated as shown by Appendix #12 . PHYSICAL CHARACTERISTICS With stormwater detention as described herein and as indicated on site grading and site landscaping plans, the detention ponds are an integral part of the landscaping areas . In order to achieve the required liquid storage volumes , vertical walls are used along portions of the pond perimeters . The walls are to be hand finished concrete . The greatest differential elevation between the wall top and the adjacent pond floor is 4.0 feet at the Texas Avenue frontage . The wall top elevation along Texas Avenue is slightly (0 .3 to 0 . 7 feet) higher than the top of the street curb, thus allowing city landscape requ irements to prevai l. The pond wall characteristics along Deacon Street are essentially the same except the maximum wall height is approximately 2 feet. CONCLUSIONS Peak run -off due to development will be attenuated adequately to provide no increased runoff rate through the 100 year rainfall event. No run-off is routed to other channels or tributaries . No negative downstream impact is anticipated . 4 APPENDICES I I APPENDIX #1 APPENDIX #2 APPENDIX #3 APPENDIX #4 APPENDIX #5 APPENDIX #6 APPENDIX #7 APPENDIX #8 APPENDIX #9 APPENDIX #10 APPENDIX #11 APPENDIX #12 APPENDIX #13 VICINITY MAP FLOOD PLAIN MAP DRAINAGE AREA MAP SITE PLAN w/topo "C" -FACTOR DETERMINATION 1-D-F CURVE SITE DRAINAGE AREA DETERMINATION SITE DRAINAGE DIAGRAM DETENTION VOLUME REQUIREMENTS FLOW CONTROL DISCHARGE STRUCTURE 6 11 ROUND OPENING OUTFLOW RATES RECTANGULAR WEIR OUTFLOW RATES CHART -VOLUME/ELEVATION/STORM EVENT 5 I>-\ \ \ \ ~ § SITE < \ / \ \ \ \ .. If ~ --.; ... "" I ·--, s L. T"'s\ N ,. \ \ I \\ ~ _/ 6 I APPENDIX #1 I I A 51TE Brazos Co unty Unin co rp orat e d Areas 481195 7 B C) City of College Sta1 480083 APPENDIX #2 CP )> "1J "1J m z 0 x ~ w B STATiO"'NI ' ' I 01 -i j -</ ~ C:/ ~ !1 0 -i fT1 (/)I I ~ ----\ ~ ('\ n@ .. ~ ' \ ~ 0 > :; ....... ?: ' '~ 0 c -1 :r .... .w. PARKWAY ------ CJ) ---- \ \ l \ G C) :tl 0 < l'TJ C-FACTOR DETERMINATION PRE DEVELOPMENT Total Drainage Area Considered . . . . . . 37 ,000 sf* "C " . . . . . . . . . . . . . . . . 0 .35 POST DEVELOPMENT Direct Discharge : South side West end Sidewalk & Driveways Deacon St. PL Texas Avenue PL Total Direct Discharge Detention Discharge : Impervious areas bldgs paving sidewalks, etc. Landscape areas Total Detention Discharge TOTAL P/D DISCHARGE * See Appendix #7 630 sf 5, 440 sf 2,000 sf 670 sf 260 sf 9,000 sf 23,960 sf 4 ,040 sf 28,000 sf 37,000 sf 10 0.35 0 .35 0 .90 0 .35 0 .35 0.472 0 .90 0.35 0 .82 0 .735 APPENDIX#5 ~ ~ )> ""U ""U rn z 0 x ~ O'> II ::tJ Q ::9 -Q -::J -C9 ::9 Cilt -'< --· -? ..... ::r ~ I __ 1 -----'---'----' ' I I I : -----· -----I II I 1 · -14t-! I: I· I ... ' , , .. .. I ·: . ! i~ ~ I I I I l I . I . • --. j t_j_·· +-+-+-11 12M-o-I 4-·1-H· I~ If I limffi I!~, i-·oo· i·m-·--·--·---j~-· ~~~--r-! _ -_ _ _ . _ T IC .1 C B ~ ' ( U T 0 R VI E ) Jl11 I,, .•. -.. ·· --~ ~ --~ -JJb_1-1r.r11rc: -~ t _ --_ _ ~ ~ J~ _ i-_ -_ -: -----r --_ --. -_ 8 ' -+--t--+-+-t-t-+-+-t--;t"--t::-:-t-+-t-t-+-+--+--+---r-.-+-t-1--+--+-+--+-+-~-t-f--+--+-!--+-+--+--+-++-i;...+--+----· ----·-----t--.·-· 1 I ·-----· · --------------~ --· ---· --6~ -+-'~-t~-r-G-~~+-f"d~-+-+--+--+--+-+-t-t-+-+--+--r--+-+-+-t-t--+-+--+-+--+-+-t-t-+-+-+--+--+--+-.J=.-c..:.;.+~ l --·-------------· ----· -·-. -· ---.. ------·--··----···-· ··------------4t--r--t-+-t--+--+-+-t--t"'-<t-+-f"-.:t:--t-+:"~t-i--.-f"""'+!~-Yz~~~t-t-+-t-;,Lf--t---+-+-t--=-1-+-+-+--+---+-+-+-1c-+-+--!'!!~Y---l-I v -1 -. ----' ---·;· -. I ... 2rt-:-~11-t1--+-i-t-t--f-l-=t=±~~t-~~~-t-f=t=rt=t::P.lf1~::f~~~t:E3:I=±=tJ=±=t=tJc1=±j I , I ' I 1-1 I ---_ ~---~ -_ --. I ~-~--~-0 ·ll1l1 !I I -----: ---5 ',; 11 I' :i 20 . -35 50 65 80 95 110 Time of Concentration • •~ (min.) I f 1-.AN D O \~ ~fl--Tll!.C. :-~ ~SD x:_ l 00 -::::::: \ ~~o. \A/-: ~\O ~ WAL-\L ,, .. ., • ?so ''>( '1-' -- f,;R .lW\VA\? (@-~~~ --W TA-4 - Discharge is as follows and as shown by plan in Appendix #8. Direct discharge to adjacent property along south edge of property 630 sf Direct discharge to Deacon St. at west end 5,440 sf Direct discharge to Deacon St. from sidewalk and driveways 2,000 sf Direct discharge to Deacon St. along north PL between sidewalk and detention wall and/or berm 670 sf Direct discharge to Texas Avenue along east PL between detention wall and PL 260 sf Discharge via detention system 28,000 sf TOTAL DISCHARGE AREA 37,000 sf 12 APPENDIX#? 0 Q~'f£./\J (tow VoLuM£ \Z;c£_~i1Z-t1"'/Ei'1Q CM IJ LI\ f tot\l r.{ E: ( 1-j 0 0 -fa;11:1•w 1../.-IZ-~'(J7 /l..O G.a.-a-p-D. p . Cl Q ' A .(p-~) ~ 1"0 -O,s~A-tl4~ ft1.--c..ow er-; -~. <fG..{fu) -l.1 f (((){r O;a,) :::-i . > z.__c r-s VtS-PtlL-De-r<S--1-'(toN. Coi...LiE-C..(tcN.. ::=-t,.t'fcF-5 J(f-"Z.) 1c 1 1 o 4 r Ti:{" u A-\g PMrn. LR .1 ~ ~ 2-, 3 z,, _fu i t l g""oo x.. .5 X l., 1 'f :::. '-::> ~Z,(p :z,, 7 J 'lvo X. , ~ X Z. '3 & -== --z,o g--? ·~ ~~1~ Jow.Jme---"3f~g>'Cf . 4oo iioo ":)e C- @-Q,~ -01.ScitAftkG<-~<.VeO z..~t,, ~v.'if-: i.1z..as-U -~) ?~rt-I:'-\1-r::i.qf 01-1 ~fDI\\ "'-4 . :;;-;-c,vs (f-z) ~:((~JJA r <2 ftlOvV\ er.SS-~ \ ,1 i, f06\ s- -\ S-l{ cgr ----~~+1 f () \SOO 14 APPENDIX #9 ·I T ~Tf-t1,1Gti L-A1L L-t)ei jl.,; ( u "e:-Fi...0w hrLMJJ CJ .v'·~-\ ::~,L-1 r 15 APPENDIX #10 I Outlet Structure File: DEC POND-2 Versi on: 5.15 Date Executed; .STR S/N: 1295130055 Time Executed: ********************* DEC OUTFALL STRUCTURE ***** COMPOSITE OUTFLO W SUMMARY **** Elevation (ft) Q (c fs ) Contributing Structures --------------------------------------------- 97.30 0.0 1 97.4 0 0.0 1 97 .5 0 0.1 1 97 .60 0.2 1 97.7 0 0.3 1 97 .80 0.4 1 97.9 0 0.5 1 98.00 0 .6 1 98.1 0 0.7 1 98.2 0 0.7 1 98.3 0 0.8 1 98 .40 0.9 1 98 .50 0.9 l 98 .60 1.0 1 98.7 0 1.0 l 98.80 1.1 1 98 .90 1.1 1 99 .00 1. 2 1 99.1 0 1 .2 1 99.2 0 1.2 1 99 .30 1.3 1 99.40 1.3 1 99.5 0 1.3 1 ?~ 99.60 1 .4 l 99.7 0 1.4 1 99.8 0 1 .4 1 9 9.90 1 .5 1 CJ 10 0.00 1.5 1 ; .s- 100.1 0 1. 5 ~ 1 ,, ~ <";.. 16 APPENDIX #11 A-rre"1 DA TerJ '71s~1-1 -A ~8 CA LC DcATJ,o<\J ( F1.-ou.J F 12-oi¥l w &I 1L) } oo Y!L ::: 2, 2 f CFS ~ L"D (Lf\-6 6-IS-u?V . I @ 0 ,Q t.o l< f 01 .5G H-AfL~0-:: ) Is c r ,5' ( A17vGt-J )/i'X ri-11) WE?( rL (Y t '5Ci+A-IUt :: {), 1 lf ~f) . '3 ~ L-y I~ 5' ~ -,"\ 0 . .... ·,,,. t:7 z 2 I r. "'.-<:. i .::. '<.) I ii -( J I -:::: I <? I O{v-t"l--tS<:J-l-f\:1~ :.. , ~-l-/ ..... y ~ v¥£H ~,Lfs z s y(L ::: 1 . q ~ c r-s ~ ro{LA(-.~;~ f;L,G"?\J . -: qq .9 {.y ''¢> 17,scH t\~? -:'-L ~ c rs. 0f (;"'o ,-x tt-10 LQt:1'a~1:L1-fA:fl6 C ->Q,SZ CF-) ~ --'~~I,? '\oTAL--0-1sc1'1Ar'l.w E> : \ .CJ3 ~ o:3 ~ 10 ~(l,, -: ) I 70 C ?-? ~. ~\o(LA:&b JZL.\;-v.-:: Cfl{.f Co 11 </i \)1 ScH 0-ll&2 ~ } . i Cf S Utf p(:t-IV~)<'. 4f \ i) l\.h::·\\L \:,\5Cl-\A(l.&t-=-D. S8 C.f-.S ~ ---l.-::: o.~ To(t\L-v~sC.t-h1J L l-f -.::: \,(0 c f> '~o,z;- 17 I APPENDIX #12 I 1 : 1 ~ • !' l ~-r~H~-, . · __ -=r=F~Y===~:~ ------------ ~~~----I ~-:--j~--:--!·:-;-·--;-----=t:t.j ·--__ ,. ----··. --~:-~ _____ _ __ ,o : __ '~t . -----·-:··. ,--·:--- . . ' . ---·--··-· .. ·-· .. 1 ____ _ .. ! ""j .. , .... ,. ... . ___ : ___ J ____ : __ L ___ ..:._. __ ~ __ :__:___ --·------·----------· ----·------------. ~ n ~-:K ~T ; _L __ :_j__ __ i.__~---------. ____________ :_____ --,---,--;-- ·-··i···--.: ____ _:_ __ :.__.2_ ----:---· · ·· ·1 -~· <; I rf,__ ____ -___ :,i_-:-_:-_,.;_-_ -+--__,-,...-_-~_.,..-: --_--·,--_...,-::-t-:_rr:-_ •\-• ._~_--=-_~-:i-_ --··-·--,--~ t•~-_rg-~~= f ~J ~-f-~±f T~?=l :--. i~J= I · I ----····-------__,_ ______ ----······---. . : __ ····-__ _; __ ; _____ _ :·· :··-;··--:· . ! . I -1---.... --__ _:_ . ~-+--- ! : -· -· ! __ _L _:j_ ~- . I • I ·-'----'----'I''-'~-'--,.\'.....--__ ..!_ __ _:__L __ i ____ ~-----~-----:_-----~-----+--. _ __: ___ ;·-.......___ ----· ---. i ' . ' ·r· ---: -·-·-·-----' 1 -------1~--r-t---~----r-----~-:---"t----- -~j ~---~ ---;. __ : ___ :_ ---------~--- 1 . . ·---·-·--·----r-------·--1---:- .L -----· ------------' --- . : l.J\ : t . 1 ==t~: __ j__~_-~~---· ; . -: ___ ~-~~~~--~---;---· ·--~-;- --~~Q:): ~i <:b j li' ·,: .. , i . ~! ! ' -~----_; ___ .._ _____ . ----~---__..._ ---:- "1~-~J-~~l~:--~: ______ -··----~J-_:: __ :~~---; ·---- ----~~--. . --·-~-~-~---~--------:------1-----; ___ :+..:__ _ _:. _____ ----+---. i --··-,----··· ·-· ---·-----·----I . . , i '.__ -__ t___: ___ _!__: __ !._ _____ ; ____ : __ _ I . ·-~ ·-1---: ,---,-----.----------; i• ."'--f --: -+ . ! l-~·-'--'---'-'-'--"---+-------j ! l I i I " !' ----~-~ •. : .. 1 .. 1 .i : I -i '" : : i __ ..:L_T ______ : ··-·-+-____ ,_:~:. ____ :_ _ _.:___ __ , __ •. 1 ... ·----__:.__;___,__ ____ _ I r----t----··-· - L ______ J ____ -1 -•• ---i l__:_j_:i__J ____ l _ __l__ ___ ;____ . • l ·o -a ·~ --Cb i : i •. 1 -. • , . : ____ :~-~[=~--~----_: ___ ·=c- t --:---·1 --~----i ·~,--\---·--~-~------~--+ -~+- ! : 1 ' l .. i . .-· '.!-;-·----1 ··-;---:----~ __ j : .t,L- :1 ~-, __ ~: _T_ ~11 --~. =f~-i :.:_ r: · -~ _j -f--f-'---t-c--C -~~ -+ : --_ :--~4 - ___ i ___ L____ . i · . '. l ; : ~ !-_-.:1 =-~r=:=·-: __ --~---'~--~:___ ! -r-,-----n , -~;--~-, -r·---:--:~r~:-i--·-:----:--~3-- :r-----1-----;_i -----1,.-----.·. -·-.---'.-,·--.------'--·-r .~~, ~ ~:~., -~-'~-·-~_' ... :-.-· --11._-_-_~-_-_; ____ L,.:·,~.-7 ·_--_~: -·,-. , ~ -J. • .. ~ ~,. -·. ·-~:--·-r)s~- . -----r · -: · -: --. --· ·r i ~ i l .:L I .I i . L ___ _; __ , __ . _ .. : -LL~-L~-~__: __ o __ ~~-L ! _, • • t4~_J J . 1 ~~ : ~ _ 1 _ ___1 _k _'. 1 ~~r : -i . , ~~~L-!:.~~: . ! I : l i·: ,,. ·: 1· -:: : i i I f. ---=-: . ,' . · .. -re::=_._':_ 1'._L: _...:.:_-~ -: -.-----:-_::: ·----1-'-'--t--;---r . ~r-:----·t,. " \;.) · ' . -~i~r ~1-~-+--~---~;:··1 ~-'--L__l __ ~--~04~~1-~~. .. j - 18 APPENDIX #13 ' August 29 , 1995 CITY OF COLLEGE STATION Post Offic e Box 9960 1 10 1 Texas Avenue College Station, Texas 77842-9960 (409) 764-3500 Texas Department of Transportation 1300 N. Texas Ave . Bryan, TX 77803-2760 Attn : Jay Pag e RE: H&M Wholesale located at the southwest corner of the Deacon/Bus. 6 frontage road Dear Jay : It is my understanding that Roy Hammons has been in contact with you regard ing the above referenced project. I've attached the drawings as well as the permit application . The City has made redline comments which the applicant has not addressed because of coordination th at may be needed between the three of us . We would appreciate it if you would review this at your earliest convenience and if necessary contact me or th e appl icant for additional information . Because this area is one that we may maintain throu g h our maintenance agre ement, we would like to enforce our 18" minimum pipe size . It is difficult for us to clean anything small er . If you'll note, I have not signed the permit and will withhold signature while we work tog ether to get Mr. Hammons a complete set of comments/concerns . attachments cc : Shirley Volk, Development Coordinator Steve Homeyer, Graduate Engineer Samantha Smith, E ng ineering Asst. Roy Hammons file H o me o f Texas A&M University Notice of Proposed Installation Utility Line on Non-Controlled Access Highway Form 1023 (Rev . 9 ·93) (Pre vious version(s) are obsolete.) To the Texas Transportation Commission clo District Engineer Texas Department of Transportation -------------, Texas Date August 14 1 995 Formal notice is hereby given that __ H~-&~M~l_fu_o--=l_e_s_a_l_e ______________________ _ Company proposes to place a s tom drain culvert line within the right-of-way of Hwy 6 (Texas Ave) Texas as follows: (give location, length, general design, etc .) in College Station. Brazos County, I n t e rsect i on -Texas Avenue @ Deacon Stre e t , Colleg e Station Pla c ement -Across West Access Lanes (to drain SW quadrant to ditch) Leng th -50 +/-fro~ property line to d i scharge Const r uction -Road bore, 15" pipe The line will be constructed and maintained on the highway right-o f-way as s hown on the a t tached drawing and in accordance with the rules, regulations and policies of the Texas Departme nt of Transportation (TxDOT), and all governing laws , including but not limited to the "Federal Clean Water Act," the "Federal Endangered Species Act," a n d the "Federal Historic Preservation Act ." Upon request by TxDOT, proof of compliance with all governing laws , rules, a n d regulations will be submitted to TxDOT before commencement of construction. Our firm will use Best Management Practices to minimize erosion and sed im entation resulting from t he propo sed installation, and we will revegetate the project area as indicated under "Revegetation Special Provisions ." Our firm will insure that traffic control measures complying with applicable portions of the Texas Manual of Uniform Traffi c Control Devices will be installed and maintained for the duration of this installation. The location and description of the proposed line and appurtenances is more fully shown by __ O_n~e-~<-1~) __ complete sets of drawings attached to this notice . Construction of this line will begin on or after the 1st day of ___ S~· e~p~t_em_b_e_r ___ ,19 9 5 By signing below, I certify that I am authorized to represent the Firm listed below, and that the Firm agrees to the cond itions/pro vi sions included in this permit. F irm H & M Wholesale Si gnature --~#-/+,l~/.,M<fl{'1-'"'----'~IL'-'Cl.l.ll'~v~vv::__-~'-l. 1L:Ar--'':£=. _______ _ By (Print) _1_M ,~-tfJ-f-i-J:a--r-mm-+----+-.-. _. ~--./--- T it le ------=E=-~n=~>-=i:..::nc::_e=e-=r-,.;.·-------------- Address ___ 1_7_0_0 __ K.:_y_l _e_S_o_u_t"-h _ __::_S...:..u .c::.::i -=t -=e'---2_4_0 ___ _ Phone No. ~n ... -....ci-1 W " .. -· Coll eg e Station, Texas 696 :-1 444 Printed by Samantha Smith From: veronica Horgan To: Kathryn Anthony Subject: maintenance responsibility? ===NOTE===============8/28/95==9:26am== CC: Kent Laza, Samantha Smith, Steve Homeyer do we have the maintenance responsibility for storm drains constructed under the bus. 6 frontage roads? in particular i am talking about those near deacon and in front of walmart???? h&H wholesale is going to be building at the corner of deacon and bus.6 frontage (across from where the new wings&more is going up). they have to put a new storm drain under the frontage road to drain their detention pond into the roadside ditch between the frontage road and mainlanes. our drainage ordinance calls for an 18" minirm.rn pipe size and they want to put in a 15 11 • they tell us that the state will allow the 15" Ci'm checking on that now). i'm standing firm on the 18 11 min. because from what i understand it is our maintenance responsibility and we have a hard time cleaning anything less than an 18 11 pipe.please let me know what you think. Page: 1 8/29/95 3:18pm STORMWATER DRAINAGE ANALYSIS FOR : BY : RETAIL FACILITY DEACON STREET@TEXAS AVENUE COLLEGE STATION, TEXAS M. L. HAMMONS, P.E. 1700 KYLE SOUTH COLLEGE STATION, TEXAS ~~-~=~~~~~~~·~~~~~~===~=J • STORMWATER DRAINAGE ANALYSIS RETAIL FACILITY 3300 TEXAS AVENUE COLLEGE STATION, TEXAS I, M. L. Hammons, P.E., as Engineer for site grading and drainage of this development site, by seal and signature , certify that this analysis and the resultant facilities design, to the best of my knowledge and intent, are in compliance with the City of College Station Ordinance #1728 for stormwater management. ANALYSIS I I I The proposed development site for this project is the s uthwest corner of the Texas Avenue/Deacon Street intersection (See Appendix #I , "vi 1. ·ty map"). The tract is Lot 1, Block 17 , of the Southwood Valley Subdivision, Section 4 3 The street address is 3300 Texas Avenue . The site is bounded to the north by Deacon Road , to the South by Lot 2 of the same subdivision, to the east by the west access road of Texas Avenue and to the west by a subdivision alley . The tract is currently vacant and is vegetated with grass only . There are no trees or shrubs . The proposed development usage is for a convenience store with gasoline sales . EXISTING SITE DRAINAGE The site is not located in , or eminently near, the 100 year flood plain as identified by FIRM map #48041C0205C , of 712192 (See Appendix #2, "Flood Plain Map"). According to Figure II - 1 of the Stormwater Management Plan for the City of College Station as presented by the "Drainage Policy and Design Standards", this site is located in the Bee Creek Tributary "A" drainage area (See Appendix #3 , "Drainage Area Map "). Current surface drainage is sheet drainage and is generally in a northerly direction with discharge onto Deacon Street , and Texas Avenue (See Appendix #4, "Site Plan" with existing Topo), then via street curb and gutter to the drainage ditches at Texas Avenue and/or Longmire Drive . There are no streams originating on or passing through the tract. PROPOSED SITE DRAINAGE In order to comply with City of College Station stormwater management criteria, the post development stormwater runoff rate will be attenuated to a rate no greater than the pre- development runoff rate . Control will be accomplished by on-site detention ponding , including a controlled flow discharge structure . Pond · wi be in two areas , the lower being located along the east ·end of the site and th upper etween the two driveways along Deacon Street. Site discharge will be vi a 15" R P pipe from the discharge structure, under Texas Avenue access road , in existin open ditch drain g ~ 1 . ' I ,. I \ • ,. DRAINAGE DESIGN CRITERIA The 25 year storm event is used as the des1 n storm, with dischar rate design adjustment to control the 1 O year and the 100 ye event. The " ·anal Method" of "~~ calculation is used . \~~ With the "Rational Method" calculation, the following values have been established for the ~D C, I and A formula components : Direct discharge C = .47 ./ Detention discharge C =. 82 (See Appendix #5) 110 = 8.63 125 = 9.86 1100= 11.64 (See Appendix #6) TOTAL DRAINAGE AREA = 37,000 SF = .849 acres Direct discharge area = 9,000 SF = .206 acres Detention discharge area = 28,000 SF = .643 acres Drainage diagram is shown by Appendix # 8 . STORMWATER RUNOFF CALCULATIONS (See Appendix #7) Based on the C , I, and A factors established herein , stormwater runoff is calculated thus : PRE DEVELOPMENT RUNOFF 0 =CIA 0100 =0.35 x 11 .64 x .849 = 3.46 025 =0 .35 x 9 .86 x .849 = 2.93 010 =0 .35 x 8 .63 x .849 = 2.56 POST DEVELOPMENT RUNOFF Direct Discharge ~ 0100 =0.472 x 11 .64 x .207 = 1.14 0 25 =0.472 x 9 .86 x .207 = 0 .96 010 =0.472 x 8.63 x .207 = 0.84 Detention Collection 0100 =0 .82 x 11 .64 x .643 = 6.14 025 =0 .82 x 9 .86 x .643 = 5 .20 010 =0 .82 x 8.63 x .643 = 4 .55 z STORMWATER DISCHARGE RATE CONTROL As indicated by the diagram of Appendix #8, part of the; post development drainage will be discharged from the tract directly to the adjacent street or right of wa . The direct drainage is quantified by the calculations as shown ab ve By deduc ion the direct discharge runoff flow rate from the pre-development runoff flow rate, ttie allowable detention pond discharge flow rate is established as follows : 0 100 = 3.46 cfs (pre-dev) -1.14 cfs (direct discharge)= 2 .32 cfs 0 25 = 2.93 cfs (pre-dev) -0.96 cfs (direct discharge) = 1.97 cfs 0 10 = 2 .56 cfs (pre-dev) -0.84 cfs (direct discharge) = 1.72 cfs Pond volume and discharge flow rate determinations are based , these allowables . The attenuated stormwater discharge, from this site , is vi a discharge outlet structure (See Appendix #10, "Flow-Control Discharge Struct Sketch) in the lower of two interconnected detention ponds. There is no ·flow n i tion between the upper and lower pond, thereby rendering the pond ystem na t ri~ics as one. With the discharge structure openings as shown by the pp, !m d· drawing , discharge -liquid elevation relationships are thus : STORM EVENT Discharge rates ave been determined using the "Haested Methods" softwa e progr from the 6" round opening, combined with manual flo ca culations for and the Haested data is shown by Appendix #11 . STORMWATER DETENTION The Stormwater detention system, as previously identified herein, is a two pond system connected by a 12" storm drain pipe . The lower pond, located near Texas Avenue, will contain about 53% of the maximum stefm detained run-off while the upper pond and the transfer pipe contain the remainder. Detention requ irements are calculated according to the "simplified hydrograph" method as presented by the City "Drainage Policy and Design Standards" manual , page 75 . (See Appendix #9, "Detention Volume Requirements"). The calculated storage volume is 4150 cubic feet. The elevation low point of the detention system is 97 .3, at the discharge orifice . The overflow level, (which exceeds the 100 year event requirements), is at elevation 100 .2 . Pond storag olu es provided and pond storage volumes required at various levels are : t') ELEVATION POND VOLUME POND REQUIRED 97.3 98 .0 99 .0 99.8 99 .9 100 .0 100.2 0 145 ft 3 1,070 ft 3 2 ,550 ·ft 3 2 .900 ft 3 3,400 ft 3 4,150 ft3 2 ,550 ·ft 3 2 .900 ft 3 3 400 ft3 I Detention storage volumes are calculated as shown by Appendix #12 . PHYSICAL CHARACTERISTICS With stormwater detention as described herein and as indicated on site gradin d site landscaping plans , the detention ponds are an integral part of the landscaping ar as. In order to achieve the required liquid storage volumes, vertical walls are used long portions of the pond perimeters . The walls are to be and finished concrete . he greatest differential elevation between the wall to and the adjacent pond floor is 3.~5 1 feet at the Texas Avenue frontage . -Pta ntm pt anrred fo r t:>oth sides of the wall , ..M-J.J....--,,,...::s~e ciA~rU1e visual imp.a ct ~frnm he site) of the grade separation . The wall top elevation along Texas Avenue is slightly (0 .3 to 0.7 feet) higher than the top of the street curb , thus allowing city landscape requirements to prevail. The pond wall characteristics along Deacon Street are essentially the same except the maximum wall height is approximately 2 feet. CONCLUSIONS """ Peak run-off due to development will be attenuated adequate t o provide no aee+Hooa! .. runoff C ough the 100 year rainfall event. No run-off is routed to other channels or t ributaries . No negative downstream impact is anticipated . I I I S3~1CN3dd'1 APPENDIX #1 APPENDIX #2 APPENDIX #3 APPENDIX #4 APPENDIX #5 APPENDIX #6 APPENDIX #7 APPENDIX #8 APPENDIX #9 APPEND IX #10 ' \ ) \ I\ \ \ ,_, ) VICINITY MAP FLOOD PLAIN MAP DRAINAGE AREA MAP SITE PLAN w/topo "C" -FACTOR DETERMINATION 1-D-F CURVE SITE DRAINAGE AREA DETERMINATION SITE DRAINAGE DIAGRAM DETENTION VOLUME EQUIREMENTS FLOW CONTROL DI CHARGE STRUCTURE ~ \lf ~l Ou ) ~ l ( v IJ \ J / ( c -L..;.. • ·. o;(i~!'.-}' ~ .. <.~--:.. § I( SITE < \ / \ \ \ \ ... ,. 1 --, ~ \ N TS \ \ APPENDIX #1 A 51TE Br azos Co unt y Unin co rp orat ed Areas 48 11 95 7 B C) City of College Sta1 480083 APPENDIX#2 )> "1J "1J m z 0 >< ::ti: c.v srATlo"NI ' ' I 0 1 -q -<I '=I ~, ....; (/)I I ----\ ------- \ \ 0 \ C-FACTOR DETERMINATION PRE DEVELOPMENT Total Drainage Area Considered . . . . . . 37,000 sf* "C" . . . . . . . . . . . . . . . . 0.35 POST DEVELOPMENT Direct Discharge: South side West end Sidewalk & Driveways Deacon St. PL Texas Avenue PL Total Direct Discharge Detention Discharge : Impervious areas bid gs paving sidewalks, etc. Landscape areas Total Detention Discharge TOTAL P/D DISCHARGE * See Appendix #7 \0 630 sf 5, 440 sf 2,000 sf 670 sf 260 sf 9,000 sf 23,960 sf 4 ,040 sf 28,000 sf 37 ,000 sf 0 .35 0 .35 0.90 0 .35 0.35 0.472 0 .90 0.35 0.82 0.735 APPENDIX #5 -_.... )> -u -u m z 0 -x ~ O> :::0 Q :::J -Q -:::J -~ :::J Cll -'< ---:::J ....... ::T' ~ 14 . . . . .. :· · .. ·~· --. :t . l ~.· -. -. :. -. -: -: ~ ~ ~-t _: . .~ .. -. . . -· -. -·--t ---· ----------. . -··-. ---·-·· . ~ ·-81--1'--'l.--+_.___,.._-+-~ ~'--t-t-+-+-+--+--+-+-'~+--:-t-il--l-+-+-+-t--+--t-+-+-+-+-il-+-t-+-1--+-+-+-+-~~l---1--+-+-+:J-1;~~ i -~---~ ----~ -~ -~ - . ---·· --. -I ----6~·+-'\-~-f'.....-f---+'~-t--i""<o~:-1:--t--t-l!-t-t-+-+-+--+--+--t-+-t--t-1'--t-t-+-+-+--+-+-+--t--t---jl-+-t-+-+--4--F:....;..:..;~ --··--··---·-----·-· ----·-·-··----······--------·-· -·---·------. . ·•· -· ··-----. . -- -------t--11---t--+--l.&-4 ~1-+-+-+--4---+-+-+-~!--f---1'"""'d:-+-+~d---+-....:po.~~~f::::;j~..,;::J--+-+-H£f--+-+-4-~1-+-+-+-+-+-+--+-+-4-+-~~-+~ ' .. v -1 ·--1 ·-····· --I . ·, ---2r+:. ~,tttl+1+1t1tti1-tl_~_t __ t __ t .... tttitiTI=HFt:Pfttt_t_i __ iJ:E3J_i±i±±±±±±l I I ----. ---r -·· ... --· -··1 ---\' ! I I . . -----------' ---0 I : l I .. -------. ----. ,___, _ _,___ ... 5 ',i II I' :1 20'.· 35 50 65 80 95 110 IZ~ Time of Concentration • t... (min.} G.A r-HJ O \~~ri TiZ-A c:--; ~s-o ' ~loo ~ \ ~~o. vy# : ~\-Oe'.. WAL-'(_ , . . ., • ?so'>( '1' -- ~·lW \VA\? (@-~~~ -- 175-rA..,._._~ - Discharge is as follows and as shown by plan in Appendix #8. Direct discharge to adjacent property along south edge of property 630 sf Direct discharge to Deacon St. at west end 5,440 sf Direct discharge to Deacon St. from sidewalk and driveways 2,000 sf Direct discharge to Deacon St. along north PL between sidewalk and detention wall and/or berm 670 sf Direct discharge to Texas Avenue along east PL between detention wall and PL 260 sf Discharge via detention system 28,000 sf TOTAL DISCHARGE AREA 37,000 sf APPENDIX #7 U_ssN [tow VoL-uM£ IZ£c£wi1z£1't/8'1Q r\" CMULA-(LON ME:ri-joO -{iii1tNWLA-1t. ~'<J111..0~~ D. p. ~ Q,.. -01s~Ml'-~/r.-<-<>w er7 -1.'f!,.{f'leJ-/ .1f(/ol(Oiii) ~ 'l..> UP5 J Y&fJrv-Oe(§--1-'rtoN. Co1-Le-c.r1ot-1. ::::. l.,.f cF-5 Ar [fAIJ IJ fir rg frwrn. & . I tf-~ 2-,' z_, \' 't '1 l ?oo x.. .5 X. (.p, 1 'f ::-~ ~Z,(p 1 r v o x.. . ~ x. z. ' & -: --z, o ~~ ~~I~ Vol...WM& --'3'("3 &>'Cf . ~Q"t~ -(),~atA-~ AL,wwet? -Z..C\3 -D/1 G, ~ }.q 7 ~? ?~°'~ ~re»T j 0(-i CocLZC(iON 4-fft?:1~ u I\ re ftLoAA -s:. zo ----> l .ct 7 ""--.......-~ ( '7kv>te-~ -117-; iZ.cQil;(U!N) JQ1.,;u r'V\-C ---z_,q 0 7 f(7 0 ~ G; @_ Q,~ -01ScttAfW;;· ~weO Z.{(.,, ~ O.'if : l.i & Cf>1 1~11t-~ a~ 0 01~ ~f DN "' 4-. s-.,;-c.¥5 ~{(~J.lA f ~ FitoY1;\ Lf-.SS-~ \.1~ +o~s- - \ S--lf, ~ --~~+1 ~CJ '4 APPENDIX #9 I T ~ecr~oN. ~Ttt-1,IG 8 L-i\1L wei IL,; ( Ll .-,e Ft-0w hrtMLJ {.) -v'·{ '-\~~·l-1 r APPENDIX #10 I ------ ,/ f?.oy; if-ems 3 '4 r c::::tr?e/ & arG m i SC?,-ny ~h? !,/_., ~. (()vr-Arta '.; s/5 . IX. Detention Facilities I /J A. B. General ~ " I The purpose of a detention facility. is to store excess volumes of stormwater runoff and discharge it at a predetermined controlled rate. Typically, this is done to limit post development discharge rates to those that existed in existing conditions for a range of design storms. The following sequence of design storms shall be used until the maximum design storm is reached: 5 year, 10 year, 25 year, 50 year, 100 year. Detention faci 1 ities may be site or development specific, their purpose being to protect immediate downstream properties and drainage systems. An example of this would be a detention facility in a large parking area to avoid overwhelming adjacent streets and storm sewers of the secondary drainage system. Typical methods utilize parking lots, landscaped areas, and rooftops formed into depressions that drain dry between rainfall events. Detention facilities also may be regional, receiving stormwater from many developments and sites. Here the limiting capacity is that of the drainage system that traverses an existing developed area. This type of facility requires a large land area to develop the required storage and thus is usually designed for multiple uses compatible with its stormwater purpose. Typically, these are combined with greenbelt and recreation areas centered around a permanent storage area designed to hold water between rainfall events. Design Parameters 1. Design Storm All detention facilities located in drainage system that are site .or deve 1 opment use a maximum design storm based upon the secondary specific shall the specific detention requirements. These requirements are based upon the requirements of the other sect i ans of these standards 70 2. and the effect the deve 1 opment wil 1 have on the receiving facilities of the secondary drainage system relative to performance standards and pathway requirements. In addition, a design storm having a return period of 100 years shall be evaluated to check emergency overflow requirements of the detention facility and the effect of resulting flows on downstream drainage systems. All detention facilities located in the primary drainage system (regional) shall use a maximum design storm having an average return period of 100 years or greater . Delineation of Drainage Area The land area contributing detention facility shall be runoff to the proposed determined for the pre- development existing condition and the post-development expected condition. 3. Pre-development and Post-development Hydrographs A pre-development hydrograph shall be determined representing the drainage area and land cover conditions that exist prior to the proposed development. A post-development hydrograph shall be determined representing the drainage area and land cover conditions that exist after ultimate development occurs within the land area that contributes runoff to the detention facility. Hydrographs sha 11 be determined using the appropriate methods from Section III of the guide. 4. Determination of Storage Volume Storage vo 1 ume sha 11 be determined such that the peak discharges of the ultimate development hydrographs for the design storms from the detention facility shall be limited to values less than the target discharges. The target d~scharges shall be equal to or less than the peak discharges of the pre-development hydrographs for the design storms. 71 The required storage volume may be taken as the difference in area between the pre-and post-development hydrographs as shown in Figure IX-1. The outlet structure shall be sized such that the design storage volume will occur at a depth that corresponds to the target discharge. This method shall be limited to detention facilities whose hydrographs may be determined by the rational method. All other detention facilities shall have the storage volume determined from Storage-Routing Analysis procedures. 5. Storage-Routing Analysis The basis of this method is the continuity equation stated thus: Iavg -Oavg = dS/dt, where Iavg = the average inflow over time period t Oavg = the average outflow over time period t dS = the change in storage dt = the designated time period Substituting subscripts of 1 and 2 for beginning and end of time period respectively, yields the final equation. and re-arranging terms 2s 1 (I 1 + I 2 ) + ( --- dt 2s 2 - o1 ) = <---+ o2 ) dt The use of this procedure is based upon severa 1 assumptions: The inflow hydrograph is known. The starting conditions of storage volume and outflow are known at the beginning of the routing. The discharge rate at the outlet structure(s) is only a function of the head available. The relationship between depth and storage are known. The time period "dt" shall be taken as less than or equal to 1/St (time of concentration). c 72 J Outlet Structures a. The design of outlet structures shall consider the conditions for all design storms. The outlet structure /sha 11 limit the peak discharge to less than the peak discharge that existed under predevelopment conditions for all design storms. b. All outlet structures shall be designed to allow the facility to be drained dry by gravity. This does not / include those facilities designed to have a permanent storage component. c. An emergency overflow outlet shall be provided with a capacity to carry the peak discharge from a 100 year storm for ultimate basin development conditions. This discharge must be directed and limited to prevent /damage to adjacent properties and hazards to life. In addition, this discharge shall be evaluated for its effect on the downstream receiving drainage systems, and shall not exceed its capacity to control and contain the ultimate condition discharge. d. J Analysis methods Inlets, Section and design of outlet works shall use the and guidelines in Sections V -Storm Drain Section VI -Enclosed Storm Drainage Systems, VII -Open Channel Flow, and Section VIII - Culverts. C. Physical Characteristics and Limitations 1. Side and Bottom Slopes a. Side slopes shall not exceed 4:1 for vegetative cover and 2:1 for non-vegetative cover. b. Bottom slopes must be 20: 1 or steeper .directed to the low flow outlet for facilities designed to drain "dry" between rainfall events. c. A low-flow invert shall be provided for all facilities which have a vegetative cover on the bottom. Design shall be consistent with Section VII -Open Channel Flow. 73