Supplementary
Drainage Report
Pebble Creek Phase 3
\)\'\Lt~ 3c.,
"
--:::::::=-
Prepared by
David R . Mayo, P . E .
for
Pebble Creek Development Company
4500 Pebble Creek Parkway
College Station, Texas 77845
July 30, 1995
.l
Veronica Morgan, P .E .
Asst. City Engineer
City of College Station
P .O . Box 9960
College Station, Texas 77842
Joe Orr, Inc.
Surveyors & E ng in eers
2167 Post Oak Circle
College Station, Texas 77845
(409) 690-3378
1 August 1994
Re : Pebble Creek 3C Street and Drainage Plans
Dear Veronica,
I am submitting the Drainage Report for Pebble Creek Phase 3C along with Construction
Plans for the Streets and Drainage. I do not believe an application for a Development
Permit for this project is necessary as it is a part of Pebble Creek phase 3 which has been
permitted .
Please review these documents and give your approval or comments at your earliest
convenience .
Thank you,
Joe Orr, Inc.
S urveyors & E ng in eers
2167 Post Oak Circle
College Station, Texas 77845
(409) 690-3378
Supplementary
Drainage Report
Pebble Creek Phase 3
Prepared by
David R. Mayo, P .E .
for
Pebble Creek Development Company
4500 Pebble Creek Parkway
College Station, Texas 77845
July 30, 1995
INTRODUCTION
This report is supplementary to the drainage report for Pebble Creek Phase 3 submitted in
July 1993. It covers the runoff onto the extension of Spearman Drive between St.
Andrews Drive in Pebble Creek Phase 3 and Putter Court in Pebble Creek Phase 5.
DRAINAGE AREAS
Drainage onto this street extension has been divided into four areas for calculation
purposes. These were previously addressed in reports submitted for Pebble Creek phases
3 and 5. A map showing these areas in included on the next page .
It was determined in the earlier calculations that drainage from the north onto this portion
of Spearman Drive could not totally carried in the north gutter and comply with the
requirements of the City of College Station Drainage Policy and Design Standards. We
plan to intercept this runoff at a point downstream of Putter Court where a future street
intersection will be constructed . This will divide the runoff area into four parts . Area Al
lies upstream of the proposed intercept point and is approximately 3. 0 acres of residential
lots south of Spearman Drive . Area A2 lies upstream of the proposed intercept point and
is approximately 1.6 acres of residential lots north of Spearman Drive . Area BI is
approximately 1.9 acres downstream of the intercept point and lies north of Spearman
Drive. It is composed of large residential lots. Area B2 is approximately 1.3 acres
downstream of the intercept point, lies south of Spearman Drive and is approximately
50% street and 50% grass .
DRAINAGE DESIGN CRITERIA
Regulations: The City of College Station Drainage Policy and Design Standards have
been used as the primary design criteria for this project. Material referenced in the Design
Standards such as the "Hydraulic Manual" of the TSDHPT have also been used .
Development Criteria Reference and Constraints: This project site has had no
previous drainage studies made other than the general area studies for the primary
drainage basin . There will be little impact on adjoining tracts since the majority of the
outflow will be into the existing natural drainage system .
Hydrological Criteria: There is one type of street in this project. Spearman Drive is a
collector street and will be designed to carry a 10 year storm with one 12' lane clear . All
streets will be designed so that the runoff from a I 00 year storm will be contained within
the right-of-way. The curb inlets and storm drains will be designed to carry no less than a
I 0 year storm.
All of the sub-areas for determination of inlet placement and pipe size are small . None are
over 5 acres . Therefore we will use the Rational Formula to determine the runoff from
these areas . The formula is expressed as
Q=ciA
where:
Q =discharge in acre-inches per hour which is equivalent to cubic feet per second (cfs)
c is a runoff coefficient having no units ,
i is the rainfall intensity in inches per hour, and
A = area in acres of land contributing to the runoff
Since the drainage areas are small , we have elected to use a nurumum time of
concentration instead of determining a flow path from the most hydraulically remote point
in each drainage area . A time of 15 minutes will be used which is generally considered the
minimum for residential lots
Rainfall intensities will be determined from the formula
which was developed to plot rainfall intensity versus duration for each recurrence interval
as a straight line on log-log paper.
where :
I = rainfall intensity in inches per hour,
tc = the time of concentration of the watershed in minutes ,
b = the y-intercept of the straight line ,
d = a constant used to adjust the relationship to plot as a straight line , and
e = the slope of the straight line .
Values for b, d, and e have been determined for most locations, and a table from the
Bridge Division Hydraul ic Manual of the TSDHPT which includes those for Brazos
County is included on the following page .
3
Table of Rainfall Intensities
The following is a tabulation of the rainfall intensity equation using constants for 10 , 25
and 100 year storm events for Brazos County.
Rainfall Intensities
Brazos County, Texas
Constants for use in the formula l=b/(Tc+d)"e from SDHPT Manual
Storm e b d
2 0 .806 65 8 .00
5 0 .785 76 8 .50
10 0 .763 80 8 .50
25 0.754 89 8.50
50 0 .745 98 8 .50
100 0 .730 96 8.00
Tc(min) Storm Intensity
Frequency in/hr
15 10 7 .19
15 25 8 .23
15 100 9.73
There is no detention proposed in this project, as previous studies have shown that the
Pebble Creek development will have a faster peak runoff than the runoff from the entire
Lick Creek watershed .
4
TABLE 5. RUNOFF COEFFICIENTS FOR RATIONAL FORMULA
Type of Drainage Area Runoff Coeff lclent
Business :
Downtown areas
Neighborhood areas
Resldentlal:
Slngle-faml ly areas
Multl-unlts, detached
Multl-unlts, attached
Suburban
Apartment dwell lng areas
I ndustr l al:
Ll ght areas
Heavy areas
Parks, cemeterles
Playgrounds
Ra! I road yard areas
Unimproved areas
Sand or sandy loam so l I, 0-3%
Sand or sandy loam sol I, 3-5%
Black or loesslal sol I, 0-3%
Black or loesslal sol I, 3-5%
Black or loesslal sol I, >5%
Deep sand area
Steep grassed slopes
Lawns:
Sandy sol I,
Sandy sol I,
Sandy sol I,
Heavy so l I,
Heavy sol I,
flat 2%
average 2-7%
steep, 7%
f I at 2%
average 2-7%
Heavy sol I, steep, 7%
Streets:
Asp ha I tl c
Concrete
Brick
Drives and walks
Roofs
from ASCE, 1960
BRIDGE DIVISION HYDRAULIC MANUAL
2 - 1 5
o. 70-0.95
0.50-0.70
0.30-0.50
0.40-0.60
0.60-0.75
0.25-0.40
0.50-0.70
o.50-0.80
0.60-0.90
O. 10-0.25
0.20-0.40
0,20-0.40
0,10-0.30
0.15-0.20
0.20-0,25
0, 18-0,25
0,25-0.3P
0,70-0.80
0.05-0, 15
0.10
0,05-0.10
0,10-0,15
0,15-0.20
0.13-0. 17
0, 18-0,22
0.25-0.35
0,70-0.95
0.80-0-95
0,70-0.85
0,75-0.85
0, 75-0,95
12-85
Hydraulic Criteria: The street capacities in this project will be determined by
considering each half of the street as a triangular channel with one vertical side . The
Manning Equation,
V= (1.486/n)R2/3sll2,
will be used to determine the velocities and capacities . The roughness coefficient "n" is
assumed to be 0 . 015 for part concrete and part asphalt surface . The inlet equations from
the City of College Station Design Standards
Q=3 .0 Ly312
will be used to determine the length of opening required for all inlets in a sump or on a
slope of 1 % or less with a 5" or greater depression at the entrance where
Q =total flow upstream of inlet , L= length of inlet throat (ft) and y= total depth of flow
at inlet, and
Q=O . 7L(l/y)((a+y)5/2_a512)
will be used to determine the length of opening required for inlets on grade with gutter
depression where
Q=total flow upstream of inlet , L= length (ft) of inlet throat required to capture Q, y=
depth of flow upstream of inlet and a= depression at inlet.
Capacities of reinforced concrete storm drain will also be calculated using Manning's
Equation and an "n" value of 0 .014 for concrete will be assumed .
6
Drainage Facility Design
General Concept: The initial phase of the drainage design for this project was to analyze
the drainage patterns from the topo and determine curb inlet placement from street
capacities and lot layout. Inlets were then sized and storm drain pipe sizes were
determined .
Specific Details: Each drainage area and storm drain will be outlined in this section .
Drainage Area "A"
Drainage area "A" lies northwest of this portion of Spearman Drive extending from the
centerline of Hook Court to the centerline of a proposed future street. It is approximately
4 .6 acres . Spearman Drive slopes southeast at 1.44%. The following tabulation shows
the carrying capacity of this 39 ' wide street at 1.44%.
Str eet Grade(%) ................................. .
Manning's Roughness Coefficient (n-value) ........ .
Street Width (feet) .............................. .
Street Crown (in .) ............................... .
Street Side Slope (horizontal/Vertical) .......... .
Program Results :
1.44
0 .01~0
39
7
32 .6
Depth Flow Rate Velocity Velocity Energy Flow Area Top Width
(ft .) (cfs) (fps) Head (ft) Head (ft) (sq ft)
0 .1 0 .3 1.58 0 .039 0.139 0 .2
0 .2 1.6 2 .51 0 .098 0 .298 0 .7
0 .3 4 .8 3 .29 0 .168 0.468 1.5
0.4 10.4 3 .98 0 .246 0 .646 2 .6
0 .5 18 .8 4 .62 0 .332 0 .832 4 .1
Drainage Area "Al"
This sub-area is approx imately 3.0 acres and stormwater accumulates on the southwest
side of Spearman Drive. The Q10 flow calculates to be 8.6 cfs and the Q100 flow is 11.7
cfs . We can see that this Q10 flow will have a spread of less than 13' on the southwest
side of Spearman Drive at this point.
7
(ft)
3 .3
6 .5
9.8
13 .0
16 .3
J~
Drainage area "A2" contributes Q 10=4.6 cfs and Q 100=6.2 cfs at this point. We can see
from the preceding street flow calculations that the gutter along the northeast side of
Spearman Drive will carry the flow from this area of 1.6 acres with more than one lane
clear.
The combined Q 100=17.9 cfs will not overflow the curbs. /
A curb inlet will be installed on the north side of Spearman Drive at this point to pick up
the flow from Area A2 . The inlet will be on a slope greater than I%. A stan~ double
inlet with a I 0' throat will be used. From the equation for an inlet on grade, we see that
this opening will take 15.6 cfs which is more than the Q100 flow at this point.
An 18" RCP will be installed to carry the stormwater under the street at this point and will
discharge into a temporary drainage ditch.
Using Manning's Equation an a roughness coefficient of 0 .014 for concrete pipe, we
determine that, at a grade of 0 .5%, the 18" RCP will carry the Q10 flow of 4 .6 cfs at a (
depth of 0 .90 feet and a velocity of 4 .18 fps . This is 59 .7% full which is within the design tf;
criteria for 18" culverts. Q 10o of 6 .2 cfs will flow at 4.42 fps and 1.11 feet deep .
The 18" RCP will end at the south right-of-way line and a temporary drainage ditch will
be installed south through the undeveloped area along the route of a future street. This
will be a grass lined "V" ditch at a slope of approximately 0 .5%. Flow from Drainage j o.v
Area Al will be allow to exit through a temporary curb break at this point and enter the /
ditch . Manning's equation shows that this ditch will carry the combined Q 10 flow 1.09 feet
deep at 2.76 fps and the combined Q100 flow 1.23 feet deep at 2 .97 fps . This should be
satisfactory .
Drainage area "Bl" is approximately 1.9 acres and drains onto Spearman Drive from the olJ...!k~
residential lots to the north. Q10 from this area is 5.5 cfs and Q 100 is 7.4 cfs . The Q 10 flow ~~\;'} A ,.o,
in the north gutter on Spearman Drive will be approximately 4" deep with a spread of I 0 ~\cf "'.,,
feet and the Q100 flow will be less than 5" deep with a spread of less than 13 feet. This is ~ro" \t, :1 ~
well within the design cri~ria and will be picked up in an inlet at the intersection of ~
Spearman and St. Andrews Drive . The existing storm sewer at this inlet has been P..'5-t'MP ... __.1
designed for this flow. ~ t'C.. ~ riqi>~
~~~
Drainage area "B2" is approximately 1.3 acres draining onto Spearman Drive from the ~. ~
south . It is approximately 50% pavement and 50% grass . This yields a weighted "c" of 4lLJo "
0 .5. Q10 from this area is therefore 4 .7 cfs and Q1oois 6 .3 cfs . The QIOO flow in the south
gutter of Spearman Drive would flow at a depth of about 4" with a spread of about IO'. ~
The combined Q100 flow from north and south along this portion of Spearman Drive ~
would leave a clear lane of approximately 18'. The inlet and storm sewer at the east end .-::::?"
of this area has been designed for this flow . ~l0 -<(:;Z \l'\\e,\-VJO..S ().Q.~ _fl
I ~ ~ Ch0 ~\0.\CJ\S
8
~t)r:f \'>) .\9~
·,\~ \,Ul>) ~~ "" • l\-.1 ~,s
U< \o ~
Qloos<' l.9· ~~<:,
I Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Diameter
Dischar~e
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Percent Full
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Maximum Discharge
Full Flow Capaci~
Full Flow Slope
Flow is subcritical.
Aug 1, 1995
11 :42:29
Spearman Drive Storm Sewer
Worksheet for Circular Channel
c:\fmw\pblcrk3c.fm2
Spearman Drive Storm Sewer
Circular Channel
Manning's Formula
Channel De~th
0.014
0.005000 ft/ft I
1.50 ft (
4.60 ffl/s
0.90 ft
1.10 ft2
2.65 ft
1.47 ft
0.82 ft
59.72 %
0.006518 ft/ft
4.18 ft/s
0.27 ft
1.17 ft
0.85
7.42 ffl/s
6.90 ffl/s
0.002224 ft/ft
Joe Orr, Inc .
Hae stad M ethods, Inc . 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v4.1 c
Page 1 of 1
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Diameter
Discharge
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Percent Full
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Maximum Discharge
Full Flow Capacity
Full Flow Slope
Flow is subcritical.
Aug 1 , 1995
11 :43:53
Spearman Drive Storm Sewer Q100
Worksheet for Circular Channel
c :\fmw\pblcrk3c.fm2
Spearman Drive Storm Sewer
Circular Channel
Manning's Formula
Channel Depth
0.014
0.005000 tuft
ft ( 1.50
6.20
1.11
1.40
3.11
1.31
0.96
74.10
fflts I
ft J
ft2
ft
ft
ft
%
0.007332 tuft
4.42 tus
0.30 ft
1.41 ft
0.75
7.42 ffl/s
6.90 ffl/s
0.004041 tuft
Joe Orr. Inc.
Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v4.1 c
Pa ge 1 of 1
I
Project Description
Project Fil e
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Discharge
Results
Depth
Flow Area
Wetted Peri meter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is subcritical.
Aug 1 , 1995
11 :47:53
Spearman Drive Channel Q1 O
Worksheet for Triangular Channel
c :\fmw\pblcrk3c.fm2
Pebble Creek 3C
Triangular Channel
Manning's Formula
Channel Depth
0.025
0.005000 tuft ( I
4.00 H :V I
4.00 H :V j
13 .20 ffl/s
1.09 ft J
4.79 ft2
9.02 ft
8.75 ft
0.92 ft
0.012263 tuft j
2.76 tus
0.12
1.21
0.66
ft
ft
Joe Orr, Inc.
Haestad Methods; Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v4.1 c
Page 1 of 1
Project Description
Project File
Worksheet
Flow Element
Method
Solve For
Input Data
Mannings Coefficient
Channel Slope
Left Side Slope
Right Side Slope
Dischar~e
Results
Depth
Flow Area
Wetted Perimeter
Top Width
Critical Depth
Critical Slope
Velocity
Velocity Head
Specific Energy
Froude Number
Flow is subcritical.
Aug 1, 1995
11 :48:42
Spearman Drive Channel 0100
Worksheet for Triangular Channel
c :\fmw\pblcrk3c .fm2
Pebble Creek 3C
Triangular Channel
Manning's Formula
Channel De~th
0.025 I ;
0.005000 ft/ft
4.00 H:V ~ 4.00 H:V / 17 .90 ft3/s
1.23 ft J
6.02 ft2
10.12 ft
9.81 ft
1.04 ft
0.011775 ft/ft I 2.97 ftls
0.14 ft
1.36 ft
0.67
Joe Orr, Inc.
Haestad Methods, Inc. 37 Brookside Road Waterbury, CT 06708 (203) 755-1666
FlowMaster v4.1 c
Page 1 of 1
I
Conclusions
The design of these drainage facilities is in compliance with the City of College Station
Drainage Policy and Design Standards . The design provides for adequate control of the
stormwater flow through this project from both the 10 year design storm and the 100 year
flood . The design is for ultimate development. Offsite routing is through existing
drainageways to Lick Creek. If no future downstream development is in the floodplain ,
there should be no stormwater problems .
I hereby certify that this report for the drainag e design of Pebble Creek phase 3C was
prepared by me in accordance with the provisions of the City of College Station Drainage
Policy and p e · tandards for the owners thereof.
,;/ ~~ rr-:_,·..,,·~ ""1 •11v j~··,-~" ; ... lj-G 9 ~
' • +• fl''t:v.~w
13
August28, 1995
Mr. David Mayo
Joe Orr, Inc.
Route 3, Box 413
CITY OF COLLEGE STATION
Post Office Box 9 960 1 101 Texas Avenue
C ollege S tation, Texas 7784 2-99 6 0
( 4 0 9) 764-3500
College Station, TX 77845
RE : Approval of Spearman Drive Extension
Dear Mr. Mayo,
Ale
The attached plans for the Spearman Drive extension associated w ith Pebble
Creek 3C are approved for construction with the following understandings.
If by next summer (May of 1996) the future phase of Pebble Creek south of
Spearman is not built or does not have approved construction plans , then
Pebble Creek Development Corporation must begin constructing the sidewalk
along the south side of Spearman Drive .
It is agreed that since the temporary channel is temporary in nature , its
construction documents were not required to meet the City's drainage ordinance
standards . The City, however, will not accept the responsibility for maintain ing
it. We understand that Pebble Creek Development Corporation will maintain silt
control, vegetation, and erosion control for the channel.
Veronica spoke with Brett concerning the earth channel in the College Station
Business Center. According to Brett, the City placed Curlex blankets in the
bottom and on the sides of that channel for erosion protection and stabilization.
You may wish to consider that technique as an option if you find that you are
having difficulty with stabilizat ion .
Sincerely,
Samantha Smith
Engineering Assistant
cc: Kathryn Anthony
Kent Laza
Shirley Volk
Home of Texas A&M University
Development Permit
City of College Station, Texas
Site Description : Spearman Drive adjoining south line of Lots 1-11Block10 Pebble Creek Phase 3 .
Site Owner: Pebble Creek Development Company Address : 4500 Pebble Creek Parkway
Telephone: 690-0990
Engineer: Joe Orr, Inc .
Contractor: Young Contractors, Inc.
Address: 2167 Post Oak Circle, C.S .
Telephone: 690-3378
Address: W . Hwy 21, Bryan, TX
Telephone : 779-1112
Date Application Filed __________ Approved: _________ _
Application is hereby made for the following development specific waterway alterations :
None
7 Application Fee
__ Drainage Plan with supporting documentation :
Other: -----------------
ACKNOWLEDGMENTS:
We, Pebble Creek Development Company and Young Contractors, Inc., developer and contractor,
agree as a condition of approval of this permit application, to construct the improvements proposed in
this application according to these documents and the requirements of Chapter 13 of the College
Station City Code.
pf!!:o iff7h
ACCOUNT NO . _________________ _ 377630
CITY OF COLLEGE STATION
'19ct) ~-+--I--\-~~~~~==---~
ACCOUNT NO . _________________ _