Loading...
HomeMy WebLinkAbout6 Drainage ComputationsDRAINAGE COMPUTATIONS For El Chico Restaurant To Be Located Lot 5 & Lot 6 Anderson Ridge Subdivision -Phase Four College Station, Brazos County, Texas Prep a red By : Garrett Engineer ing 4444 Carter Creek Parkway -Suite 108 Bryan , Texas 77802 Telephone : (409) 846-2688 *May, 1994 * DRAINAGE COMPUTATIONS For El Chico Restaurant To Be Localed Lots &Lot 6 And erson Rid ge Subdivi s ion -Phase Four College Station , Brazos County, Texas *May, 1994 * SUMMARY The proj ect cons is ts of tb e con s tru c tion of a 6440 square foo t restaurant and as sociated s ide walks, dri veways and parkin g areas s ite is occupied by a 9825 square foot building which will be demoli s hed . Exis tin g pave m ent will be utilized tl1r o ug ho ut mos t of th e prope rty , howe ve r, some will be remo ved (S ee attac hed s ite pl an at re ar of thi s presentation . At present th ere is no de te nti on facility con s tructed on-s ite . Storm water run-off s heet drain s acro ss th e prope rty in a northweste rly direction and exits th e property via curb leave-ou ts. Du e to the demolition of th e e xi sting buildin g located on th e s ubject s ite and th e con s truction of the proposed structure along with tl1 e pave ment modifi cation s th e pos tdevelopme nt p eak run-off rates will be less th an tlle p eak run-off rates currently present o n-s ite. It is with tl1i s reali zation tbat the owner intend s to allow run-o ff to exit tl1 e prope rty in it's current m ann er with o ut providin g on-site de tention. C omputation s s ub s ta nti a tin g th e abo ve m enti o ns results are presente d a s fo ll o w s: From tlle computa ti o ns on p age 1 b ased on tl1 e proj ec t area of 1.51 acres a s shown on tl1 e afore me ntion ed Site & Gradin g Pl a n, tl1 e prede ve lo pm ent run-o ff coeffi cient be in g as s um ed a t 0 .87 and a minimum tim e of concentrati o n o f 10 minutes tl1 e rela ti ve predevelo pm ent peak di scharge rates ("Q") we re de termin ed. The inte nsiti es shown on page 1 were take n fr o m "F igure UT -1 Intensity Duratiou Frequ ency Curve s For The City Of Coll e ge Station"as conta in ed in th e "Drainag e P olicy and D es ign Standard s for th e City of Coll e ge Station " as sumin g s am e miuimum tim e of co nc e ntr ati on of 10 miuutes . The R a tional M e thod wac.; utilized to compute tl1 e es tim a ted peak predevelo pm ent di scharge rates . The equ a tion tilat re prese nts tl1 e R a ti o nal Me tJ10d is as follow s: Q = CIA , wh e re; "Q" is tl1 e p eak di sch ar ge rate in cubic feet p er second . "C" is tb e run-off coeffici e n t, in tl1 e prede velo pm e nt co nditi on "C " is ass um ed to be 0 .8 7 , "I " is tl1 e s torm inte u s ity in in ch es pe r hour and "A" whi ch i tl1 e ar ea of til e s ite in acres . F rom tl1 e computa tion s on p age 2 b ased o n th e proj ect ar ea of 1.51 acres, th e pos td evelopme nt run-off coeffi cient b e in g ass um ed a t 0.83 a nd a minimum tim e of co nc enlrnti o n of 10 minutes til e relative prede velopm e nt peak di sc harge rates ("Q ") were detennined. T he iuten s iti es s hown o n page 1 were take n fr om "F igure IH-1 Inte ns ity Du ra 1i o n F requ e ncy C urv es For T he City Of Coll e ge Stali o n"a s coutaine d in tl1 e "Drainag e P oli c y and D es ign Standard s fo r th e C ity of C oll e ge Station" ass umin g sam e minimum tim e of conc entrati o n of 10 minutes. The R a ti o nal Me tJ10d was utili zed to compute tl1 e es tim a ted p eak po s t develo pm e nt di scharge rates . Th e e qu ati on that re presents th e Rational Me thod is as follow s : Q = CIA , wh e re; "Q" is th e peak di scharge rate in cubi c feet per seco nd. "C " is tl1 e run-off coeffici e nt, in tl1 e po st develo pm ent conditi o n "C" is ass um ed to be 0 .83, "I" is tll e sto rm inte ns ity in inch es p e r ho ur and "A" whi c h is tl1 e a rea o f tl1 e s ite in ac res. The compari so n betw een pe ak predevelo pm e nt di scharge rates a nd pos t develo pm ent di scharge rates is includ ed a s an a id to tl1 e des ig ne r to es tabli s h a pre limin ar y "ta rge t" a s to tl1 e volmn e n ecessary in tl1 e proposed de te nti o u fa c ility s ho uld a de te nti o n fac ility be deem ed necessar y . Thi s preliminary es timate is arri ved at by s imply de te rminin g tJ1 e vo lum e gen era ted from tJ1 e diffe ren ce of tl1 e predevelo pm e nt and po st develop ment hydrographs (see pages 5-7 for predevelopment and post dev elopment hydro gra ph s). Please note Urnt U1e post development hydrogra ph show n on Ules e same gra phs assumes no detention. Pa ge 3 and pa ge 4 are tabulation s of ilie predevelopment hydrograph and the po st dev elopment hydro gra ph based on U1e computations perform ed on page 1 and pa ge 2. The post development hydro gra ph ass um es no dete nti on to fac ilitate direct comparison in U1e pre and post development conditions. The hydrograph s are triangular in shape and are based on U1 e sta ndard SCS unit hydrograph wiili time to peak se t equal to the time of concentration and U1e total time base set at 2.67 tim es U1e time of concentration. Please note Urnt a 26.7 minute total storm eve nt duration was utilized excl usively U1rou ghout U1i s r eport due totally to U1 e small ph ys ical si ze of U1 e project. A s prev iou sly stated, th e anticipated po sttl eve lopment peak run-off rates will be l ess Urnt U1e pred evelopment peak di sc har ge rates U1 erefo r e, it is anticipated Uiat no detention facilities will be req uired . Determine Total Pre-Development Peak Storm Wate r Discharge Rates Tributary Ar ea ("A"): 1.51 Acres Pervious A rea : 0.28 Acres Impervio us Ar ea : 1.23 Acres Run-Off C oefficient ("Cwt"): 0.87 Time Of Conc entration ("T/c"): Woodland s : Low Elevation : High Elevation : Distance (Feet): S lope (% G rade): Velocity ("Vw"): Time : Pa stures: Low Ele vation: High El evation : Distance (F eet): Sl ope (%Grade): Velocit y ("V p "): Time: Pavem e nts: Low Elevation : High Elevation : Distance (Feet): Slope (% Grade): Velocit y ("Vpave"): T ime : Total Trav el Time: Hourly Inte nsity Rates ("I "): 2-Yea r: 5.20 5-Yea r: 7.69 10-Year: 8.63 25-Year: 9.86 50-Yea r: 11.15 100-Year: 12.60 Peak Discharge Rate ("O"): 2-Year: 6.85 5-Year : 10 .13 10-Year: 11 .38 25-Year: 12 .99 50-Year: 14.69 100-Year: 16 .60 c = 0.40 C= 0.98 0.00 0.00 0.00 0.00 0.00 Feet I Second 0.00 Minutes 0.00 0.00 0.00 0.00 0.00 Feet I Second 0.00 Minutes 0.00 0.0 0 0.00 0.00 0.00 Feet I Second 0.00 Minutes 10 .00 Minutes Inches I Hour Inches I Hour Inches I Hour Inches I Hour Inches I Hou r Inches I Hour Cubic Feet I Second Cubic Feet I Second Cubic Feet I Seco nd Cubic Feet I Seco nd Cubic Feet I Second Cubic Feet I Seco nd Determine Post -development Peak Storm Water Discharge (No Detention) T ributary Area ("A"): 1.51 Acres Pervious Ar ea: 0.4 0 Acres Im pervious A rea: 1.11 Acres Run-Off C oefficient ("Cwt"): 0.83 Time Of Con centration ("T/c"): 10 Minut es (Min) Hourly Inte nsity Rates ("I"): 2-Year: 5.20 5-Yea r: 7.70 10-Year: 8.60 25-Year: 9.9 0 50-Year: 11 .20 100-Year: 12 .60 c = 0.40 C= 0.98 Inches I Hour Inche s I Hour Inches I Hour Inches I Hour Inches I Hour Inches I Hour Peak Discharge Rate ("O"): 2-Year: 6.49 Cubic Fee t I Second 5-Year: 9.61 Cubic Feet I Second 10-Year: 10 .73 Cubi c Feet I Se co nd 25-Yea r: 12 .35 C ubic Feet I Sec ond 50-Year : 13 .98 Cubic Feet I Seco nd 100-Year: 15 .72 Cubic Feet I Second Comparison Of Predeve lopment And Post-development Peak Discharge Rates Prede velopme nt Post-Dev elopme nt In c rease 2-Year: 6.85 Ft3/sec 6.49 Ft3/sec -0.36 Ft3/sec 5-Year: 10 .13 Ft3/sec 9.61 Ft3 /sec -0.53 Ft3/sec 10-Year: 11 .38 Ft3/sec 10 .73 Ft3 /sec -0 .64 Ft3/sec 25-Year: 12 .99 Ft3/sec 12 .35 Ft3 /sec -0.64 Ft3/sec 50-Year: 14 .69 Ft3/sec 13.98 Ft3 /sec -0.71 Ft3/sec 100-Year: 16 .60 Ft3 /sec 15 . 72 Ft3 /sec -0.88 Ft3/sec Prelim i nary De termination Of Detention Pond Volume 2-Year: -0.36 Ft3/sec x (26 .7 Min . x 60 Sec. I 2 ) = -290 Cubic 5-Year: -0 .53 Ft3/sec x (26 .7 Min . x 60 Sec . I 2 ) = -422 Cubic 10-Year: -0 .64 Ft3/sec x (26 .7 Min . x 60 Sec. I 2 ) = -516 Cubic 25-Year: -0 .64 Ft3/sec x (26.7 Min . x 60 Sec. I 2 ) = -51 1 Cubic 50-Year: -0 .71 Ft3/sec x (26 .7 Min . x 60 Sec . I 2 ) = -569 Cubic 100-Year: -0 .88 Ft3/sec x (26 .7 Min . x 60 Sec . I 2 ) = -702 Cubic Feet Feet Feet Feet Feet Feet Post-Development Storm Intensity Rates (Inches Per Hour) Time 2-Year 5-Year 10-Year 25-Year 50-Year 100-Year (Minutes) Storm Storm Storm Storm Storm Storm 0 0.00 0.00 0.00 0.00 0.00 0.00 1 0.65 0.96 1.07 1.24 1.40 1.57 2 1.30 1.92 2.15 2.47 2.80 3.14 3 1.95 2.88 3.22 3.71 4.19 4.72 4 2.60 3.84 4.29 4.94 5.59 6.29 5 3.24 4.80 5.37 6.18 6.99 7.86 6 3.89 5.76 6.44 7.41 8.39 9.43 7 4.54 6.73 7.51 8.65 9.78 11.01 8 5.19 7.69 8.58 9.88 11.18 12.58 5.84 8.65 9.66 11.12 12.58 14.15 110 --·---·-------Peak=> 6.49 _Q.§L. 10.73 12.35 13.98 15.72 --------11 6.10 9.03 10.09 11.61 13.14 14.78 12 5.71 8.46 9.45 10.87 12.30 13.84 13 5.32 7.88 8.80 10.13 11.46 12.90 14 4.93 7.31 8.16 9.39 10.63 11.96 15 4.55 6.73 7.52 8.65 9.79 11.02 16 4.16 6.16 6.88 7.91 8.95 10.07 17 3.77 5.58 6.23 7.18 8.12 9.13 18 3.38 5.01 5.59 6.44 7.28 8.19 19 2.99 4.43 4.95 5.70 6.44 7.25 20 2.60 3.85 4.31 4.96 5.61 6.31 21 2.21 3.28 3.66 4.22 4.77 5.37 22 1.83 2.70 3.02 3.48 3.93 4.42 23 1.44 2.13 2.38 2.74 3.10 3.48 24 1.05 1.55 1.73 2.00 2.26 2.54 25 0.66 0.98 1.09 1.26 1.42 1.60 26 0.27 0.40 0.45 0.52 0.59 0.66 27 0.00 0.00 0.00 0.00 0.00 0.00 Inflow I Outflow Simulation 2-Year Storm Event Time Inflow 11+ 12 2s/t-0 2s/t+O Outflow Depth Elevation Velocity (Minutes) (Ft3/Sec) (Ft3/Sec) (Feet) (Ft/Sec) 0 0.00 0.00 0.00 0.00 0.00 0.00 293.51 0.00 1 0.33 0.33 0.31 0.33 0.01 0.04 293.55 0.62 2 0.65 0.98 1.23 1.29 0.03 0.10 293.61 0.98 3 0.98 1.63 2.74 2.87 0.06 0.17 293.68 1.28 4 1.31 2.29 4.80 5.02 0.11 0.25 293.76 1.55 5 1.63 2.94 7.39 7.74 0.17 0.34 293.85 1.79 6 1.96 3.59 10.49 10.98 0.24 0.42 293.93 2.00 7 2.29 4.25 14.09 14.74 0.32 0.51 294.02 2.20 8 2.61 4.90 18.15 18.99 0.42 0.60 294.11 2.39 9 2.94 5.55 22.67 23.71 0.52 0.69 294.20 2.57 10 3.27 6.20 27.62 28.88 0.63 0.79 294.30 2.74 11 6.10 9.37 35.39 36.99 0.80 0.93 294.44 2.97 12 5.71 11.81 45.09 47.20 1.05 1.11 294.62 3.26 13 5.32 11.03 53.54 56.13 1.29 1.28 294.79 3.49 14 4.93 10.26 60.80 63.80 1.50 1.41 294.92 3.66 15 4.55 9.48 66.93 70.29 1.68 1.52 295.03 3.80 16 4.16 8.70 71.96 75.64 1.84 1.61 295.12 3.92 17 3.77 7.93 75.96 79.89 1.97 1.69 295.20 4.01 18 3.38 7.15 78.98 83.11 2.06 1.74 295.25 4.08 19 2.99 6.37 81.09 85.35 2.13 1.78 295.29 4.12 20 2.60 5.59 82.35 86.69 2.17 1.80 295.31 4.15 21 2.21 4.82 82.80 87.17 2.18 1.81 295.32 4.16 22 1.83 4.04 82.49 86.84 2.17 1.81 295.32 4.15 23 1.44 3.26 81.47 85.75 2.14 1.79 295.30 4.13 24 1.05 2.49 79.78 83.96 2.09 1.76 295.27 4.09 25 0.66 1.71 77.46 81.49 2.01 1.72 295.23 4.04 26 0.27 0.93 74.55 78.40 1.92 1.66 295.17 3.98 27 0.00 0.27 71.20 74.83 1.81 1.60 295.11 3.91 28 0.00 0.00 67.79 71.20 1.70 1.54 295.05 3.83 29 0.00 0.00 64.59 67.79 1.60 1.48 294.99 3.75 30 0.00 0.00 61.55 64.59 1.52 1.42 294.93 3.68