Loading...
HomeMy WebLinkAbout55 Development Permit 287 Varsity Ford Hi Ridge Subd.Date: September 27, 2000 To: Amanda Hudec, Accounting From : Bob Mosley, City Enginee¥ Subject: Completed Infrastructure from Private Development By the attached letter of completion for the Hope Pregnancy Center development, we have accepted the following improvements to the City of College Station infrastructure. Water: 6-inch PVC main (Fire Line) 90 linear feet Based upon our previous meeting, Development Services has begun providing us engineering estimates with the private development plans. This will allow us to identify the cost of the infrastructure in the future . We do not have the engineering estimates for this project. This memo provides a record of the infrastructure acceptance. However, the engineering cost estimates for this infrastructure will be required from Development Services . c : Natalie Ruiz, Development Coordinator Jerry Jones, Engineering Technician Missy Green, Staff Assistant '. CITY ENGINEER CITY OF COLLEGE STATION COLLEGE STATION, TEXAS Dear Sir: DATE: Z-4-oo RE: COMPLETION OF +/o(X2-:Pregtg,~ &e Fire lo1e -r The purpose of our letter is to request that the following listed improvements be approved and accepted as being constructed under city inspection and completed according to plans and specifications as approved and required by the City of College Station .. Texas. This approval and acceptance by the City is requested in order that we may finalize any sub-contracts and to affirm the~r warranty on the work. This approval and acceptance by the City of the improvements listed below does hereby void the letter of guarantee for the listed improvements on the above referenced project. . The one year warranty is hereby affirmed and agreed to by STA.,J()..¥-O AvTbt1t#?rl<.. hll£ Un;:IZP/ltse /..J'-and by their sub-contractors as indicated by signatures below.' · WORK COMPLETED (z" Fi.re lu1e 0()/T Utility Representative (s) DATE z:4-oo Owner: • kJLar, ,/L -d.~ Address: 3 ~ o?v '!' d 1 ;:!.. a'f- Contractor: STA..lbA'20 4-u._rf,lt.M-L'-J=,~ e;,.o-02Pt2-t s~,. c.... Address: t> .D . Box l'DcfO ~ et) l l~e ~c..L •• Jx:. 77gy-z_ ,... -,.. -=-~I ~- TEAL CONS'. 133 5 Brittmoon Hous ton, Texas ·, (7 13 ) 465-8 3 06 Pay: ***************' The City of Coll L NO . 041112 'l-4525 idred dollars and no cents CHECK NO. AMOUN T 41112 $ 300.00 _] '6·~ r CITY OF COLLEGE STATION ~ Planning Division VAfscrf ~D ~kMf~ ~s ~~~· wt e:mvifvvcc¢cii ,,___) uL cJ:JclwJ \~f rw~) * umJ-. CdXkJ ~ ~ ~ ~:> .s ,·J...W-r,,,.~ -:;::10 s,;;:1'?-VO't°''\J df . • • ('l<:>O\ilt} ~)..,_ j.....;;il !l-C'~ -n1()? .Sf.: • IJ•, 'AJ>1 . +.-..' .,.,,-.~,.,, ., -fJnl 4" A ····o·? ~•"'!I j• w~tuf' w4'tt •"'P f~~ JrlN -J~f'I-'! W)J -VJ/!} . ~ ~~-,,..,~rri-~~~,,,,.d~~ ~ ~~~~~~~~--Y~~ ~~ ~~~~~~~-¥-...-:=----------~ Slrlt-=z ,,, Drainage Report Prepared for : VARSITY FORD College Station Prepared by: Municipal Development Group 203 Holleman Drive East College Station, Texas 77840 February 1995 GENERAL LOCATION Varsity Ford's tract is bounded by Highway 6, East Loop Frontage Road to the southwest and by Cinemark II to the southeast. This site is on the northeast comer of the intersection of Highway 6 and Highway 30. The legal description is Lot 1, Block 1 of High Ridge Subdivision, Richard Carter League, Abstract No. 8 in Brazos County, Texas. PROPERTY DESCRIPTION The Varsity Ford site is a total of 10.00 acres. The area for expansion is currently unimproved grass, brush and trees in its natural state. Proposed expansion will add 7.93 acres to the total impervious area. This tract is zoned C2 and no change is proposed. PRIMARY DRAINAGE BASIN DESCRIPTION The tract currently sheetflows at approximately 5% to the east into Carters Creek tnoutary which passes beneath Highway 30. Portions of this tract lie within the 100 year flood plain based on the on- ground location of elevations stated in F .E .M .A-FIRM Community Panel No. 48041C0142C , July 1992 . . DRAINAGE FACILITY DESIGN The entire subject tract drains directly into Carter's Creek, a primary channel, thus requiring no detention facility construction. "The policy of the city is to encourage the rapid conveyance of Stormwater through and out of the city within the primary system" -page 8 of the City of College Station Drainage Policy and Design Standards. Proposed grading will allow for sheet flow over the pavement without the use of any storm sewers. (See Grading Plan provided at the end of this report.) Runoff is directed to the east end of the tract, exiting onto a concrete channel, which continues through the 30 ft. wide drainage easement and discharged into Carter Creek. The runoff enters the channel through a curb cut in the eastern curb. Two stilling basins are utilized to dissipate energy. Energy calculations are provided for seven different section of the flume. (All figures are based on the 100 year rainfall event.) These sections and the Energy Line on the Elevation View of the Channel A stilling basin end the channel where it discharges onto concrete rip rap and then to Carter Creek. Concrete rip rap is also utilized to stabilize steep slopes in the 30 ft drainage easement outside the channel at Carter Creek. DRAINAGE AREA -Varsity Ford Rational Method (Q • CIA) Pre-Development Alea Descrption (acres) ~ CC area) Landscaping 10.00 0.35 3.50 Impervious Alea Q 0.90 0.00 10.00 3.50 Cavg'"' 3.50 I 10.00 = 0.35 Post-Development Alea Description (acres) ~ CC area) Landscaping 2.07 0.35 0.72 Impervious Alea 7.93 0.90 7.14 10.00 7.86 Cavg = 7.86 I 10.00 = 0.79 Runoff Additional Frequency Intensity* Cpre Cpost Qpre Qpost Qdiff Vpre Vpost Volume ~ Cnlin) Ccfs) Ccfs) Ccfs) .@ .@ .@ 100 12.6 0.35 0.79 44.10 99.05 54.95 39Ell() 89149 49459 50 11.1 0.35 0.79 38.85 87.26 48.41 34965 78536 43571 25 9.9 0.35 0.79 34.65 n.F!fJ 43.18 31185 70046 38861 10 8.6 0.35 0.79 30.10 67.61 37.51 27000 EDJ48 33758 5 7.7 0.35 0.79 26.95 00.53 33.58 24255 54480 30225 "NOTE: Tc • 10 min 100 Year Hydrograph 100 ··r------r::i---------------.. 8 0 .. -·--·-·-----·--· .. ·--:·--·--·-·-· --·-··-·-·-·------····-·-............. -........................... -······--·-···---····-·---···-·-····-·--·-·-·-··-·-·---·······-·-··· ................... . w 60 -· -·--·-----·---·-----···-·-··· .. ·-·-··· ................................................... ----·--···· .. -·----·--·--................ -·-·-·--------·-·---·------·-·-·-·-·-........ ._ .............................. . 'O ....._... a 4 o -·----------··-· --··-----·-·-··-·--····----···--------·· --------·----·--·--······----····----·---·--·-··-----.. ·-· .......................................................................... .. 2 0 .. ·--------·· ··---·----·-· -................................ ·-·-····----------·-------·----·------······---·-·--·-·-······-·-·---·--····-·-·······-·--·-····-·-·-·········-· ..................... . . . ... ~ -----:-.....~ ·- 0 5 . 10 15 20 25 30 Time (min) I---Qpre --e-Qpost I I ~ 50 Year Hydrograph 100 ··.------------------. I 8 0 ·· ·-·-· ····-.. ·······-----·-··-··--·-····-·--·-··------·· --·-···-------------------······-·-·-··-·-···:··-·-·-······-·-···---·-··-------····--· ····-·-·-· ....... '~ 1 ~ so ·· ---------·-····--·-·--·----------------------------------------------------···-·-···-----------·····-------·-·· ...... . I 0 . . ........... 0 4 0 " ·-·-······-.. ·······-·-·-·····--·-·· -·-·····-·--···-·-·-····--·-· .. ···-·-··--······--·-·····-·-·-···-------·--·---·-··-··-·----·-·· ··--·-·--······-·-·-·--··---·-·-·--····-·--· .. ·-··""' ....... . 2 0 .. ·-·-·····-·-·-·· ·---·-·--·------------·-··-··-·-·-·-·-··-·--·-·-----------·--·--·-······-·--······-·-······-·-·-···--·-·· --·--····-·-···· ...... " .. . o--~~~~~~~~~~~~ 0 5 10 15 20 25 30 Time (min) I---Qpre --e-Qpost I 25 Year Hydrograph 80 ··~----------~ 6 0 .. -····--·-······-·---····-·-······-·-·-··-·-·-······-·-·-····-·-·-··--·--····-·-······-·-·-·········-······-·-· ·····-·-·----···-·-············-·-······-·-······-·-·-······-·-······-·-·-······-·-······-·---····--······-·-·-······-·-···· ....--... ~ ~ 4 0 .. ·-······-·-······--·-······-·-······-·-···-·-·-···--·-·-·--·-·---··-·--····-·-······-·-·-····--·-······-·-·-····---·---·-···--·-······-·-·-···· ·-······-·-·-······-·-···--·-·-·--·-··--·--···-·········-·-·-·········-···· a 2 0 --------------------------------------------------------s ·------ o --~~~~~~~~~~--=- 0 5 10 15 20 25 30 Time (min) 1---Qpre -B-Qpost I ......-... 10 Year Hydrograph 70 ··~----------- 6 0 --·-····-·-·-····-·-·-····--·-·-·--····--·-····-·-·--···-·-·-··-·--·-··-·-·-···-·-· --·-······-·-·-······-·-··-··-·-·--·---···-·-·-·-······----·-·-····-·-·-······-·-·-······--·-·--·-·-······-·-······--·--····-·--·· 5 0 .. ·--···-·-······-·-·-·····--···--·-·-·-··--·--····-·-·-··-··-·-·---····-·-·-·-·--·-····---·-··-· ·-···--·-·-··-·-:·---·-·-···-·-·--··--·-·-···-·-·--·-·--······---·--··-·-·--·--------··-·---·-· ~ 4 0 --······--······-·-·-···-·----·-·-······ ·-······-·-·-······-·-···-·--······-·-·--··--·--····-·-·--···-·---·----· --·-·-·--·--·-·-·-······-·-···--·-·-······--······-·-·-·-··--·-···-·-·-·-····-·-·-·-- 0 ..._.... 0 3 o ·· -·-···--·····-·-·-·---···· ·-·-······--·-···-·-·-······-·---·---·-·----·-····--·-·--··-·---·---·--····-·-·-·-·--·-···-·-······-·-··-·-·---·-·---··--·-····-·--······-·---·-·-·-·-·-·· ~:==~~=~====~====~~ 0 . 0 5 10 15 20 25 30 Time (min) 1---Qpre ---e-Qpost I I I I I I 5 Year Hydrograph 70 ···~-----------~ 6 0 .. ·-······-·-······-·-·-·--·---·--·-······-·-·--·--····--·-··-··-·-··-·-·····-·-·---·-······-·-·-······-·-······-·-·-······-·-·········--·--·-·---·-·-······-·-······--·-···-·-···-·-·-······-·········-·-·-· ........... . 5 0 .. ·-·-·-···-··· -·-·--·----·-······-·-···--·-·-······ ·--·--·-·---·-····-·-----·-·-·-·-···--·-·-···-·-·-·-···-·--····-·-·-······-----·-······-·-······-·-·-······---··-·-·--····-·--···-·-·-······-·-···· ............ ~ 4 0 .. -·····-·-····-·-·-···-·----·····-·-· ·--···-·-----····--····--·---··-·--···-·----·-·-·--·-···--·--··-·--·--······-·-···-·-·---·-·-·----·-·---·--····--·-······-·-···· 0 . .......... 3 0 .. ·--····-·-···-·-·----·--·-·····-·-···--·--··-·--·-·-·--·····--·-·-·--·--····-·--·--·-·-···-·-·-······-·--····-·-------·-···-·-·····-·-·-·---·-·---····-·-····--·-·-· ····-·-···· a 2 0 ----·-·-···--·---·--·-·--·-·-··-·-·-··-··-·-·-···-·-·-·····-·--··-·-···-·-····-·-·-·· -······-·-·-···--·--····-·-·-······--·-·-·····-·-····· ·-····--·----·-·····-·-······-·-·-···· ........ . 1 0 . ·---~ ····--·---···--····-·---·-·--·-·-·-·-······-·-·-···--···-·-·-··-·-··-·-·-·-·--·--····-·-·-·-----·-·-·-···-·----·-·--·-·--· ·-·-···-·-·-· ····-·-·-· Om:-------------~ 0 5 10 15 20 25 . 30 Time (min) I---Qpre -e---Qpost I 260 255 250 245 SCALE: HORIZ.: 1" = 20 ' VERT.: 1" = 5' NOTE : CHANNEL WALLS ARE TO BE CONSTRUCTED rMMETRICALLY. LEGEND: . FL = FLOW LINE OF CHANNEL TW = TOP OF CHA[NEL WALL ELEVATION VIEW OF · CHANNEL I. 260 255 250 Burne Section 1: y1 = 0.5 ft Open Area = 10 sf Q=v(A) Q = 99.05 cfs = v (10 sf) v = 9.91 ft.ls E1 = Y1+(v12/2g) CALCULATIONS = 0.5 ft + ( 9.91ft.ls)2 I2 ( 32.2 ft/s 2 ) El = 2.02 ft I Flume Section 2: y2 = 1.16 ft V2 = 7.10 ft.ls Ei = 1.16 ft+( 7.10 ft.ls) 2 I 2 ( 32.2 ft/s 2 ) Ei = 1.94 ft I Flume Section 3: y3 = 0.35 ft V3 = 23.47 ft.ls ·· 11 ' ~ = 0 .35 ft+ ( 23.47 ft.ls) 2 I 2 ( 32.2 ft/s 2 ) ~ = s.9oft I Burne Section 4: Fr* 3 = V3 I ( g Y1 ) 112 Fr* 3 = 23.47 ft.ls I ( ( 32.2 ft.ls 2 ) ( 0.35 ) ) 112 Fr* 3 = 6.99 I y4 /y3 =(-l+( 1+8(Fr*3)2 )112 )/2 y.ly3=(-1+(1+8(6.99)2 )112 )/2 Y• I Y1 = 9.40 .......... Y4 = 9.40 ( y3 ) = 9.40 ( 0.35 ) = 3.29 ft ~ = Q4 Y1 V3 = Y4 ( V4) V4 = ( Y1 V4) I Y4 v4 = ( 0.35ft )( 23.47 ft/s) I ( 3.29 ft) V4 = 2.50 ft/s E4 = 3.29 ft+ ( 2.50 ft/s) 2 I 2 ( 32.2 ft/s 2 ) E4 = 3.39 ft I Ft 4 = V4 I ( g Y4) 112 Ft 4 = 2.5 ft/s I (( 32.2 ft/s 2 )( 3.29 ft) )i'2 Ft 4 = 0.24 hL = 5.51 ft Energy Dissipated: Pd = (Pressure)( Area)( Velocity)( hL) Pd = ( 62.4 lb/ft)( 12 ft/s )( 0.35 ft)( 23.47 ft/s )( 5.51 ft) Pd = 33900 ft-Ibis Stilling Basin j4 ': Di = 8 inches -0.67 ft ( 8 inch is the minumum) End Sill: h4 I Di 1.35 -+ h4 = 0.90 ft -11 inches Baffle Pier: h 3 I Di = 1.60 -+ h3 = 1.07 ft -13 inches ( 0.2) h3 = 0.20 ft -2.5 inches HydraulicJump: L/y4 = 2.55 L = ( 2.55 )( 3.29 ft) = 8.40 ft -8 feet 5 inches Distance between Chute Blocks & Baffle Piers: ( 0.8 ) y4 = ( 0.8 )( 3.29 ft) = 2.63 ft -2 feet 8 inches Flume Section 5: Ys = 1.16 ft Vs = 7.10 ft/s Es = 1.16 ft+ ( 7.10 ft/s) 2 I 2 ( 32.2 ft/s 2 ) . Es = 1. 94 ft I Flume Section 6: y6 = 0.42 ft v6 = 19.64 ft/s E6 = 0.42 ft+ ( 19.64 ft/s) 2 I 2 ( 32.2 ft/s 2 ) E6 = 6.41 ft I Flume Section 7: Ft6 = v6/(gy6)112 Fr' 6 = 19.64 ft/s I (( 32.2 ft/s 2 )( 0.42 ) ) 112 Ft6 = 5.34 I y,/y6=(-1+(1+8(Ft6 )2)112 )/2 Y1 I Y6 = ( -1 + ( 1 + 8 ( 5.34 ) 2 ) 112 ) I 2 y,ly6 = 7.07 Y7 = 7.07 ( y6 ) = 7.07 ( .42) = 2.97 ft Q6 = Q, Y6(v6)= y7 (v7 ) v, = ( Y6 v6) I Y1 v7 = ( 0.42ft )( 19.64 ft/s) I ( 2.97 ft) V 7 = 2.77 ft/s , 4, E, = 2.97 ft+ ( 2.77 ft/s) 2 I 2 ( 32.2 ft/s 2 ) E, = 3.09 ft I Ft,= v,/(g y,)112 Ft1 = 2.77 ft/s I (( 32.2 ft/s 2 )( 2.97 ft) )112 Ft1 = 0.28 hL = 3.32 ft Energy Dissipated: Pd = ( Pressure ) ( Area ) ( Velocity ) ( hL) Pd = ( 62.4 lb/ft) ( 12 ft/s) ( 0.42 ft) ( 19.64 ft/s ) ( 3.32 ft) Pd = 20500 ft-lb/s Stilling Basin 'B': Di = 8 inches -0.67 ft ( 8 inch is the minumum) End Sill: h4 I Di = 1.30 -+ h4 = 0.87 ft -10.5 inches Baffle Pier: h3 I Di = 1.50 -+ h3 = 1.00 ft -12 inches ( 0.2 ) h 3 = 0.20 ft -2.5 inches Hydraulic Jump: LI y1 = 2.40 L = ( 2.40 )( 2.97 ft) = 7.13 ft -7 feet 2 inches Distance between Chute Blocks & Baffle Piers: ( 0.8) y7 = ( 0.8 )( 2.97 ft) = 2.38 ft -2 feet 5 inches CONCLUSIONS Approximately 79% of the land will be improved with buildings parking. With the assistance of "Roadcalc," we calculated the proposed grading for the site will hav e 21 ,921 c.y. of cut and 10 ,424 c.y. of fill. According to the College Station Drainage Policy and Design Standards, there are no detention facility requirements ; therefore, the flow will continue to discharge into Carters Creek without detention. Tue Time of Concentration for Carters Creek near the Varsity Ford Site was calculated to be just over 2 hours. The formula used for Time of Concentration is Tc = L/60v. Tc L v = = Time of Concentration in minutes Hydraulic Length in feet Velocity in feet per second Tc = [34000 I (60 X 4.5)] = 12 5.9 minutes A 10 niinutes Time of Concentration was used for the 10.0 acre Varsity Ford Site. Based on these figures this tract will be totally discharged before Carters Creek reaches maximum peak; therefore, the peak flood elevation will not be raised. The "Flood Plain -Floodway Determination for a Portion of Carters Grove Tributary to Carters Creek" shows a 100 year flow of 17 , 720 c.fs. at river mile 12 .37 which is in close proximity to the Varsity Ford Site. This 10.0 acres is calculated to increase runoff 54 .95 c.f s. which is relatively minimal especially due to the 116 minutes difference in the Times of Concentration. --- EASEMENT (DRAINAGE) THE STATE OF TEXAS KNOW ALL MEN BY THESE PRESENTS: COUNTY OF BRAZOS THAT, REGENCY PARKWAY, INC., a Texas Corporation ( "Grantor"), acting by and through its duly authorized o f ficer, the undersigned, of the County of Brazos and State of Texas, for and in consideration of the payment of the sum of TEN AND N0/100 DOLLARS ($10.00) cash, and other good and valuable consideration, paid to Grantor by TERRY PRUITT, TRUSTEE including the conveyance of Lot Three (3), Block One (1), HIGH RIDGE SUBDIVISION, a subdivision of the City of College Station, Brazos County, Texas, according to the plat thereof filed of record, Volume 1878, Page 53 in the Official Records of Brazos County ("Property"), in exchange herefor, the receipt and sufficiency of such consideration of which is hereby acknowledged, has GRANTED, SOLD AND CONVEYED and by these presents do GRANT, SELL AND CONVEY unto the said ANTHONY MAJORS ("Grantee") , the assignee of TERRY PRUITT, TRUSTEE and the present fee simple owner of Lot One (1), Block One (1), HIGH RIDGE SUBDIVISION, College Station, Brazos County, Texas, a right-of-way and perpetual easement for purposes of constructing, maintaining, repairing, and operating a drainage way and easement for draining, diverting, and/or channeling surface water, drainage water or other water which is or shall be deposited on the Property and/or that flows on or across the Property or any part thereof from adjacent lands so such water may flow and be let into Carter Creek. Which usage shall not impede the drainage of the adjacent tracts of Grantor, its heirs or assigns. The right-of-way and drainage easement shall be on, over, across under and/or through the following described land: All that certain .048 acre tract or parcel of land, being a 30' wide by 70' long drainage easement, lying and being situated in the RICHARD CARTER LEAGUE, Abstract No. 8, College Station, Brazos County, Texas, and being a portion out of that same 34.13 acre tract conveyed from Bert Wheeler, Inc. to Regency Parkway, Inc., as described by deed recorded in Volume 1082, Page 337 of the Official Records of Brazos County, Texas, and said .048 acre tract being more particularly described as follows: Commencing at a point on the southwesterly line of the forementioned 34.13 acre tract said point being the most Northerly corner of Lot One Block One of High Ridge Subdivision as shown in Volume 1878 page 53 of the Official Records of Brazos County; VOL 2315PAG: 151 / THENCE s 55° 12' 08" E with the northeast line of Lot One for a distance of 150.00 feet to the POINT OF BEGINNING; THENCE N 34° 47' 52" E for a distance of 70 feet to a corner in the creekbed of Carter Creek; THENCE S 55° 12' 08" E for a distance of 30 feet to another corner in the creekbed of Carter Creek; THENCE S 34° 47' 52" W for a distance of 70 feet to a corner being also on the northeast line of the forementioned Lot One; THENCE N 55° 12' 08" W for a distance of 30 feet along the northeast line of Lot One to the POINT OF BEGINNING containing .048 acres more or less Provided however, it is understood and agreed by Granter and Grantee that the overriding intent of this easement is to extend the drainage to the creekbed of the adjoining creek (Carter Creek); should that creek move or be diverted in the future by governmental authorities or by natural causes or otherwise then this right-of-way and easement shall be deemed and considered to be extended or reduced in length such that it extends to the creekbed of that creek so that the purposes for which this easement is granted can be fulfilled. Notwithstanding anything else contained herein to the contrary Granter, its heirs successors and assigns, reserves a 40 foot utility and access easement across the forementioned easement along with the drainage rights to .flow water over, under or through said easement for all properties that flow to/or within the easement in the forementioned 34.13 acre tract with the restriction that said drainage rights will not block or hinder the drainage of lot one (1) block one (1) High Ridge subdivision, College Station, Texas. Grantee, Grantee's heirs, successors and assigns, shall have the right to clean and cut trees and brush,place a culvert or waterway from time to time, place rip-rap and/or wood or concrete bulk heads and/or lay pipe or pipes and/or construct, place , replace, repair and maintain on said easement or under said easement and any and all other improvements which the Grantee, in Grantee's judgment deems necessary and appropriate for purposes of draining and/or holding surface water from all or any part or portion of the Property, being Lot 1, Block l, HIGH RIDGE SUBDIVISION, or any part thereof, to Carter Creek. This easement shall be perpetual and Grantee, Grantee's heirs, successors and assigns, are hereby granted the right to assign this right-of-way and easement or any part thereof, or any interest therein for the purposes as herein stated and/or to dedicate all or any part of the easement and right-of-way to the City of College Station and/or any other appropriate governmental body for drainage VO~ 2315PAG£152 of surface water purposes, and for the city and/or such governmental bodies to maintain. This right-of-way and easement is appurtenant to said Lot 1, Block 1, and shall be a covenant and easement running with the land and the Property. The Grantee, Grantee's heirs, successors and assigns, shall have all of the rights and benefits necessary or convenient for the full enjoyment and use of the rights herein granted, including but without limiting the same, the free right of ingress over and across said lands described in said easement only for purposes of inspecting, constructing, maintaining and/or improving said easement for the purposes herein stated . TO HAVE AND TO HOLD said right-of-way and easement unto Grantee, Grantee's heirs, successors, legal representatives and assigns, forever and the undersigned Granter hereby binds itself, its successors and assigns, to warrant and forever defend all and singular the said easement unto the Grantee, Grantee's heirs, successors and assigns, against every person whomsoever lawfully claiming or to claim the same or any part thereof. EXECUTED this the Joi} day of J1'k1zc;J, 1995 . Accepted ~~"'-REGENCY PARKWAY, IfCj By:~·~/(~ MICHAEL K. DAVIS President REGENCY PARKWAY I INC. THE STATE OF TEXAS COUNTY OF BRAZOS 1 . O~ This instrument was acknowledged before me on this the day of March, 1995, by MICHAEL K. DAVIS, PRESIDENT OF REGENCY PARKWAY, INC ., a Texas Corporati~n beha.lf of said Corporation and in the capacity therein stat . _ ~ _ .~ ~o,'$'!.!.~ , MONICA BARRIBALL -tv-<-L-·(~ .{~ Notary Public , State of Te xas ------....,,---.,..-, --------- ..... ~~ MyCommissionE xpires Notary Public in and for . 'SEPTEMBERS , 1997 The State of Texas THE STATE OF TEXAS COUNTY OF BRAZOS : /7 , This instrument was acknowle 1 ged,/~efore day of March, 1995, by ANTHONY MA OB.S ,../~ ,· , .. :" USA MARIE MILLER Nctaiy Public, State of Texas My Commlsalon ExplrH AUG. 13, 1996 - .// /~ VOL 2315PAG: 153 on ,/ CITY OF COLLEGE STATION December 18 , 1995 Pos t Office Box 9960 1101 T exa s Avenue College Station , Texas 77842-9960 (409) 764-3500 Texas Department of Transportation ATTN : Mr. Jay Page 1300 N. Texas Avenue Bryan, TX 77803 RE : Varsity Ford Traffic Control Plan for TxDOT Permit on State Highway 6 Dear Mr. Page, If you recall, you reviewed this project a few months ago . You explained to me that the traffic control plan submitted was incorrect and needed revision. Other than that , the application was in compliance with TxDOT criteria . The attached sheet is a copy of the corrected TCP for your records . Should you have any questions, please contact me at 764-3570. Sincerely, Samantha Smith Engineering Assistant Home of Texa s A&M University - ,_;. :.-• :::·z..'.' "'... :-.. -:~. ___ ;_.:..._~.~·~·-.~.~ .:._.:~~.-~.~-~ ~.-~--~-~ --- ' •• ,. ·s:· . - ·.:··t·. >:~f:f:~{~i:'~'.~o.· .. ~ ;..· ---..... ---' -. .::>' .. ·~-·. -~ ,..r~'v .. ~:~.~:./." ..... _,. 10 /13 /95 11 :28 FAX 409 693 4243 MD G Ill 00 2 See Reverse for lnstn.lctlons Form~ OM! -2Dlll4m ~ ...... :W1·15 ft EPA " ......... __ .. __ NPDES Washington . DC 20400 FORM '9'1 NoUca of Intent (NOi) for Stann Water Discharges Associated with lndusbial Activity Under the NPDES General Permit Submission of !Ills Nolice of Intent constitutes nclice !hat the~ Identified in Sedicn I of thl$ form lme~ 1D be auttiorized by a NPDES permit issued lor stDrm water di$Charges assoc:iateO with industriaJ adiv~in the 5181'8 iden~lied in Section II of !his term. Bea>mi~ a f:nniriee obligares such lfischarger 1D comoly witr1 !!'le tarms and conditions ol the permit. ALL N ESSARY INFORMATION MUST BE PROVIDED ON I FORM. - I. FacHlry ()petal.or Information Name: IAN ~HI q g "I 1MA~o.~1<>1 I I I I I I I I I I I I I I I Phone: ~L019 l/':1 r~ IQ1'21 '1'4I 11a,o,91 ,Tl;XAS, AV,L; I SumJS cf ~ Address : I I I I I r I I I I L I I r . r r r Owner/Operamr: City: 1B1~1Y1A1 rJ, 1· I I I I I L I I I I I I I I I I S'ta!&: 1r.x1 ZIP Code : l/L7181tJ131 • I I I I I IL Facl ll ry/Slta Llx:arion lnfomlalion -. - Natne: 1 VA 1gS, I, T,Y, ·1F,0,~{)1 I I I I I I I I I I I I I I I I I I ls !he FaciTny L.ccalB:! ai lnlfian L..ands' ~ « N) ~ Address : I ! I .Z....I I I I I I I I I I I I I I I I I I I I I I I I I I I I J City: ·1c10, [.....l-1 Gi l$e1 ,~r1 A,i';I p,~ r I I I I I I I Stain: 177X1 ZIP Code : r'?i71 B,4i g -I I I LJ Lalitude: I I I I I I I L..c!lgitude: I I ·1 I I I I I Quarter: l_i_J Seclicn: LLJ Townsh ip: I I I I I P.ange: I I I I I Ill. Sile Activity inlorma~on MS4 ~raror Name: 1~/,Z:~1 ,~F, l~o! ~ t.-ie/ffi!i 1 ~~A, "/101/tJ,_ I I I I I I t__J ' Rec:eMng Watar Body: 1~/t1 B J:e!Z. '. s: l~~c;~~ I I I I I I I I I I If Yau are Fir~ as a Co-permittse, Enter S!Drm ater General Permit Numaer. I I I I I l I . I I AittTh ~ [HJ ~Data~ (Y ar N) Is lhe Facirg!equired ID &lbmil Monitcring ? (1, 2, a 3) []] SIC or Desl!lnatad Primaiy; !?'iOi I Ac!ivity Code: I 2nd: I I I I I 3rd; I I I I J 4th : I I I I I If This Facil~s a Member cf a Grou~ Application. tar Group Appflcalion umber: I I I I I If You Have Other Existing NPOES I J I I I I Pennits, Enter Permit Numbers: I I I I I I I I I I I I I I I I I I I I I I I I IV. Add!donal Information Required fer Constrvetion AG1ivities Only Projed Completion Start Date ; Date: Is lhe Storm Water Pollu6on Pre11ention Plan 10,K1~. 111 , 51 I l213t ait I Z~I Ealimaled Atea to be 11,01 I in Compliance with Stal& nn<Vcr Local [Y] Disl!Jrbed CTn Acres): I I I Sediment and Erosion Plan.s? {Y or N) V. Certi fi calion : I eartify under penalty cf law Lr'lal tnis document and all attachmenrs W9fe ~ed under my direction or supervis ion in ac:a:irdanc:e with a system designed re assure Iha! qualified personnef properly gather and evaluate lhe infonnaticn submitted . Based on my il'lqui~ cf !he person a persons who managE! the system . or those persons directly respcnslb le tor gatheri~ the infcrmalion, tl'M! information subm itted is. le the bE!$t o my lcroN~e and belier , true. ao:urate , and complete. I am awara that there are significant penalties for subm itring false infcnnaticn. inciudirl!l the poSSlbility ol line an imprisonmem for knowing viola~on~ Print Name: Dare : 1f ,~.:,1.1 ,;11'11 ,R , Jl,;,,.,J(, I I I I I ! I r I I I ' I I I 101 Kl L..5'.1~,51 Signarure : {:;A;,a Y.:I I EPA Fo,..,., 3510-6 (8-92) @ Printlld on Rflcydlld Paper • • • June 11, 1993 David Pullen City Engineer City of College Station P. O. Box 9960 llUNICIPAL DEVELOPMENT GROUP 203 HOLLEMAN DRIVE EAST COLLEGE STATION, TX 77840 (409) 693-5359 College Station, TX 77842 Va"";~ /"ord ('t 281) .~ Re: Cost Estimates for 8" and 18" Water Lines for High Ridge Subdivision Dear David: We are attaching an Engineer's Estimate of the cost of the eight (8) inch diameter water line and appurtenances necessary to service the High Ridge Subdivision. This would be a DR 14 PVC line with deflected joints and blocking. · Also included is the Engineer's Estimate of the cost of extending the eighteen (18) inch diameter water line which would facilitate the city of College Station's overall needs for the future in this area. This would be a ductile iron class 52 pipe with mechanical joints and retainer glands. You will note that the calculated difference in the two estimates is $52,875.50. This is the figure that we would formally request as the basis for the City's participation in the cost of the proposed project. Sincerely, North Bardell, P .E. /kim 000414-E.05-04 (2170) COST OF 18" WATER LINE Quantity Description 1 EA Tie to Existing 18" Water Line 1370 LF 18" Class 52 Ductile Iron Pipe 1 EA 18" Butterfly Valve Assembly 1 EA 18" x 8" Tee 1 EA Standard Type 2 Fire Hydrants w /Appurtenances 1 EA 18" Plug w /2" Blow-off Valve 1 EA Air Relief Valve (2" Assembly) 17 EA Megalug Retainer Glands 3 EA 11.25 • 18" Ductile Iron Pipe Bends 1 EA 22.50 ° 18" Ductile Iron Pipe Bend 4 EA 45 • 18" Ductile Iron Pipe Bends TOTAL 000414-c.03-03 (2170) Price Cost $238.00 EA $238.00 40.25 LF 55,142.50 8,430.00 EA 8,430.00 655.00 EA 655.00 1,415.00 EA 1,415.00 530.00 EA 530.00 410.00 EA 410.00 197.40 3,355.80 1,002.40 3,007.20 1,002.40 1,002.40 1,002.40 4,009.60 $78,195.50 COST OF 8" WATER LINE Quantity Description Price Cost 1 EA Tie to Existing 18" Water Line $238.00 $238 .00 1370 LF 8" P.V.C . DR14 Pipe 16.10 LF 22,057.00 1 EA 8" Gate Valve 545.00 545.00 1 EA 8" by 8" Tee 4 9 0 .00 490 .00 1 EA Standard Fire Hydrants w /Appurtenances 1,315.00 1,315.00 1 EA 8" Plug w /2" Blow-off Valve 265 .00 265.00 1 EA Air Relief Valve (2" Assembly) 410.00 410.00 TOTAL $25,320.00 0 0 0414-c.0 3-03 (21 70 ) )epartmcnt f H hways u blic Trans rta n 1058-Rev 2- Permit to Construct Access Driveway Facilities on Highway Right of Way r-e (_I J_ 'Lj i1J/~5 r-e.. -t ' &_ 2-} 2t JC5 KENT L.,A:GA I CliY E:NG:{I "-.Jt:"CR. CiTY OF C0L-L.EG!6 SJ'A"TlOf'J Hwy. ___ Permit No. __ _ Control Section State Department of Highways and Public Transportation, hereinafter called the State, hereby authorizes _____ _ ,f<SITY FOf<D , hereinafter called the grantee, to (re) construct an access driveway on the highway : of way abutting highway no. ~ in CQLLE§E STATioN, ~S County, located APPROX· .zooo' ·Rlli OF HWY-' EAS"T FR.ot\J-r..A(;:{€ ~p. AND HWY-3o l....rfl:t\ISE:c,710,.J. ect to the following: The grantee is responsible for all costs associated with the construction of this access driveway. Design of facilities shall be as follows and/ or as shown on sketch: TWO 30' Ac.c.ess QRt\lEs ARE PROPo.SED ON HWY. ~ r=AST Ff<.ONTA6{E l=<OAD 1~7 ~F op E:.Xtsr. C-<..Jg5 PROFo5@ To BE: RE.r--toV'E.t> Fo~ All construction and materials shall be subject to inspection and approval by the State. Maintenance of facilities constructed hereunder shall be the responsibility of the grantee, and the State reserves the right • • : .'•8 r-'!. _ • e necessary to provide protection of life or property on or adja- • 1· ::i , nly with approval of the State. ppointed agents and employees against any action for personal ~xercise of this permit. ~r any portion of the highway right of way, and vehicle service shall be located at least twelve (12) feet from the right-of-way ~....ci:.=-=~..Jo<---__:~_;;..;..::...-==.:.:....;;~~~=-:;._:;_---1.res will be off the high way. referenced driveway facilities are not constructed within six (6) ---t~~~~-Ut~M.L<~~~~;.....;~~;..:.;.;..,....w;;;~,_...,,..-~------------------telephone ~ ~) hours prior to beginning the work authorized by this permit. State Department of Highways and Public Transportation District Engineer :onditions ~nnit for construction of an access _\LAJ~\l~Nv~W~~.~~~~~::::::::::..-L:.;:-Signe. ., ~ ;:J. £< .. G:c7 /z;"er.> Date: ___ ~cJ.--~/~/)~·-9''-""'-S-_______ _ DEVELOPMENT PERMIT PERMIT NO . #287R FOR AREAS INSIDE THE SPECIAL FLOOD HAZARD AREA RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE SITE LEGAL DESCRIPTION: Richard Carter League, Abstract No. 8, High Ridge Subdivision, Lot 1, Block 1 SITE ADDRESS: North of the Gateway Park (Hollywood 16) along Highway 6 OWNER: Anthony Majors, Varsity Ford DRAINAGE BASIN: Carter's Creek TYPE OF DEVELOPMENT: This permit is valid for all clearing, grading, underground utilities and drainage work as per the approved plans for Varsity Ford. The Contractor shall take all necessary precautions to prevent silt and debris from leaving the immediate construction site in accordance with the approved erosion control plan as well as the City of College Station Drainage Policy and Design Criteria. Contractor shall assure that all disturbed areas are sodden and establishment of vegetation occurs prior to removal of any silt fencing of hay bales used for temporary erosion control. Contractor shall also insure that any disturbed vegetation be returned to its original condition, placement and state. Contractor shall be responsible for any damage to adjacent properties, city streets or infrastructure due to heavy machinery and/or equipment as well as erosion, siltation or sedimentation resulting from the permitted work. This permit expires six months from the date of issuance. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities . I hereby grant this permit for development of an area outside the special flood hazard area. development shall be in accordance with the plans and specifications submitted to and a roved by the City Engineer in the development permit application for the above named project all of the codes d ordinances of the City of College Station that apply. Date Date Owner/ Agent Date DEVELOPMENT PERMIT PERMIT NO. #287 FOR AREAS INSIDE THE SPECIAL FLOOD HAZARD AREA RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE SITE LEGAL DESCRIPTION: Richard Carter League, Abstract No. 8, High Ridge Subdivision, Lot 1, Block 1 SITE ADDRESS: North of the Gateway Park (Hollywood 16) along Highway 6 OWNER: Anthony Majors, Varsity Ford DRAINAGE BASIN: Carter's Creek TYPE OF DEVELOPMENT: This permit is valid for all clearing and grading as per the approved plans for Varsity Ford. The Contractor shall take all necessary precautions to prevent silt and debris from leaving the immediate construction site in accordance with the approved erosion control plan as well as the City of College Station Drainage Policy and Design Criteria. Contractor shall assure that all disturbed areas are sodden and establishment of vegetation occurs prior to removal of any silt fencing of hay bales used for temporary erosion control. Contractor shall also insure that any disturbed vegetation be returned to its original condition, placement and state. Contractor shall be responsible for any damage to adjacent properties, city streets or infrastructure due to heavy machinery and/or equipment as well as erosion, siltation or sedimentation resulting from the permitted work. This permit expires six months from the date of issuance. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities. I hereby grant this permit for development of an area outside the special flood hazard area. All development shall be in accordance with the plans and specifications submitted to and roved by the City Engineer in the development permit application for the above named project n all of the c des and ordinances of the City of College Station that apply . Date I t Owner/ Agent 7 Date ~-~ r CITY OF COLLEGE STATION ~ Development Services -~ 'VoT h tA J ·I~ 1·s UJ Yl &C/Yl ().-~ u+-·fiiv ~f:h'0 Cen~·f p[,qV\, 1iJt o>'lC -;;h,, V' vi e> n F / t v1S i '> ~ « ..f-NZ> -W A-7 to n hj tr~l>n I <"' h; c_ (_,, ,Joe;J ~ rr 11 · Tn~ F,..J'e,r ~I 7 o u 11s.e +l-te.;r t -b -?]. ? {;v-1s Y'Y'rh . You ~V) p y-o b~ s ~ 7 {;)u-;r . s ":J'1 4-;; c 0iJ rh (., l i eY\mnc~ tv ~Ar1 ~, Ir '£PV l..,4 v<. ~(/,hons, Jo,)z..d- Jr;.,7 ftiJ( At f;.<VOT, S'~ · S -!S=:ZS 8-z..1 -Cfs 260 255 ,__ __ 250 245 SCALE : HORIZ.: 1" = 20' VERT.: 1" = S' 260 255 250 NOTE : CHANNEL WALLS ARE TO 245 BE CONSTRUCTED lYMMETRICALLY. LEGEND : I FL = FLOW LINE OF CHANNEL TW ~ TOP or CHA[NEL WALL ELEVATION VIEW OF · CHANNEL Burne Section I: y 1 = 0.5 ft Open Area = I 0 sf Q=v(A) Q = 9~.05 cfs = v (IO sf) v = 9.91 ft/s E1 = Y1 + ( v/ I 2 g) CALCULATIONS = 0.5 ft + ( 9.91ft/s)2 I2 ( 32.2 ft/s 2 ) E1 = 2.02 ft I Burne Section 2: y2 =1.l6ft V2 = 7.10 ft/s E 2 = 1.16 ft+ ( 7.10 ft/s) 2 I 2 ( 32.2 ft/s 2 ) ~ = 1.94 ft I Burne Section 3: y3 = 0.35 ft V3 = 23.47 ft/s " E 3 = 0.35 ft+ ( 23.47 ft/s) 2 I 2 ( 32.2 ft/s 2 ) ~ = 8.90 ft I Burne Section 4 : Fr" 3 = V3 I ( g YJ ) l /2 Fr" 3 = 23.47 ft/s I (( 32.2 ft/s 2 )( 0.35 ) ) 112 Fr" 3 = 6 .99 I Y4 I YJ = ( -1 + ( I + 8 (Fr" 3) 2 ) 112 ) I 2 y4/y3=(-1+(1+8(6.99)2 )112 )/2 y4/y3 = 9.40 Y4 = 9.40 ( y3 ) = 9.40 ( 0.35 ) = 3.29 ft ~ = Q4 Y3 V3 = Y4 ( V4) V4 = ( Y3 V4) I Y4 v4 = ( 0.35ft )( 23.47 ft/s) I ( 3.29 ft) V4 = 2.50 ft/s E4 = 3.29 ft+ ( 2.50 ft/s) 2 I 2 ( 32.2 ft/s 2 ) E4 = 3.39 ft I Ft 4 = V4 I ( g Y4) 112 Ff' 4 = 2.5 ft/s/ ( ( 32 .2 ft/s 2 ) ( 3.29 ft) )112 Ff' 4 = 0 .24 hL = 5.51 ft Energy Dissipated: Pd = ( Pressure ) ( Area ) ( Velocity ) ( hL) Pd = ( 62.4 lb/ft)( 12 ft/s )( 0.35 ft)( 23.47 ft/s )( 5.51 ft) Pd = 33900 ft-lb/s Stilling Basin ~ ': D 1 = 8 inches -0.67 ft ( 8 inch is the minumum) End Sill: h4 I D 1 = 1.35 -+ h4 = 0.90 ft -11 inches Batlle Pier: h3 I D1 = 1.60 -+ h3 1.07 ft -13 inches ( 0.2 ) h3 = 0.20 ft -2.5 inches Hydraulic Jump: LI y4 = 2.55 L = ( 2.55 ) ( 3.29 ft ) = 8.40 ft -8 feet 5 inches Distance between Chute Blocks & Baille Piers: ( 0.8 ) y4 = ( 0.8 )( 3.29 ft) = 2.63 ft -2 feet 8 inches Flume Section 5: Ys = 1.16 ft Vs = 7.10 ft/s Es = 1.16 ft+ ( 7.10 ft/s) 2 I 2 ( 32.2 ft/s 2 ) Es = 1.94 ft I Flume Section 6: y6 = 0.42 ft v6 = 19.64 ft/s E6 = 0.42 ft+ ( 19.64 ft/s) 2 I 2 ( 32.2 ft/s 2 ) E6 = 6.41 ft I Flume Section 7: Ft'6 = v6 I ( g Y6) u2 Ft' 6 = 19.64 ft/s I ( ( 32.2 ft/s 2 ) ( 0.42)) 112 ~~-F-t'-6~=~5.-34~~-., Y1 I Y6 = ( -1 + ( 1 + 8 (Ft'6 )2) 112 ) I 2 y7 /y6 =(-1+(1+8(5.34)2 )112 )/2 Y1 I Y6 = 7.07 y7 = 7.07 ( y6 } = 7 .07 ( .42} = 2.97 ft Q6 = Q7 Y6(v6)= Y1(v1) V1 = ( Y6 v6) I Y1 v 7 = ( 0.42ft )( 19.64 ft/s) I ( 2.97 ft) V7 = 2. 77 ft/s ~: E 7 = 2.97 ft+ ( 2.77 ft/s) 2 I 2 ( 32.2 ft/s 2 ) E7 = 3.09 ft I Ft' 1 = V7 I ( g Y1) 112 Ft'1 = 2.77ft/s/((32.2ft/s 2 }(2.97ft))112 Ft'1 = 0.28 hL = 3.32 ft Energy Dissipated: Pd = ( Pressure ) ( Area ) ( Velocity ) ( hL) Pd = ( 62.4 lb/ft) ( 12 ft/s) ( 0.42 ft) ( 19.64 ft/s ) ( 3 .32 ft) Pd = 20500 ft-lb/s Stilling Basin 'B': D 1 = 8 inches -0.67 ft ( 8 inch is the minumum) End Sill: h4 I D 1 1.30 -+ h4 = 0.87 ft -10.5 inches Baille Pier: h3 I D 1 = 1.50 -+ h3 = 1.00 ft -12 inches ( 0.2 ) h3 = 0.20 ft -2.5 inches Hydraulic Jump: LI y1 = 2.40 L = ( 2.40) ( 2.97 ft) = 7.13 ft -7 feet 2 inches Distance between Chute Blocks & Baille Piers: ( 0.8) y7 = ( 0.8 )( 2.97 ft) = 2.38 ft -2 feet 5 inches -* ~~~-- - ___ --=.....l\_11 ~~~ ~~ ~------_____, -t.~t--- --mL Md, m~ i ~ ~ >It ~~~vv_vvv;.- -~ Ol' ll~WkJ 'ftfa~-v --1 - .I.-~· / ... 'j I\ AY 0 THE ADER F : MUNICIPAL DEVELOPMENT GROUP (409) 693-5359 FAX #409 693-4243 203 HOLLEMAN ORNE EAST COLLEGE STATION, TX 77840 -cY/100 Dollars 77842-9973 ;roo ~ 2 q au• ... 1: Ii Ii 3i 1.088 q q1: 11•00 2 . ~ COMMERCE NATIONAL BANK 2405 TEXAS AVENUE SOUTH P.O. BOX 10089 COLLEGE STATION, TX 778-42 88-M9/1131 2292 Figure XII Application Form Development Permit Inside/Outsid:i"futablished Flood Hazard Areas City of College Sta-tion, Texas (re: Ordinance No. 1728) Owner: ANu-tof\)Y M.AslCf?.S VA~~TVJ fOf?-D Address: ~ t~S AV'e-:113/ZYA/J Telephone No.:(4!Jq)1-zq -aGk, 1- Architect/ Engineer: M · /). G[: Address: Zt>~ £3. HOlUMM1 c .~. 7X 7"18~o Telephone No.: {40q)~9:?-c;¥29 Contractor: Address: ---------------------,-,------------Telephone No.:---------- Date Application Filed:--------------Approved: __________ _ Application is hereby made for the following specific wate~ay alterations: No PEnpynoeJ 84t:,,/1,...1& 1'2 Pf<..OPo$ED "5/tJCE TH1-S eJ\J7lf<E. /@er D/<AtN S D/,e€l.TZ.'t /IVTV ~~ ~ I A ef!.JMAR.'t CHAIVNCJ.-. Attached as part of this application: ~Application Fee pa_ Signed Certificate 0 Site and Construction Plans, with supporting documentation: two (2) copies of each ~ Other: DMI NAGflt (2.€Pof2:1 ACKNOWLEDGEMENTS: I, ?HILL.IP 'f?. t<-112.K , as owner, hereby acknowledge or affim1 that: The above Drainage Plan and supporting documents complies wiht the requirements of Ordinance No. 1728, and ""~BL/ . Owner ~· Developer efJl .Stic., I -r;"a <. l ' ~C~o-nt~rc-1c-t<-1r----------------- ~ -/IJ-9.S- Date Date Date Page 1of2 CITY OF COLLEGE STATION Post Office Box 9960 1101 Texas Avenue June 26, 1995 Municipal Development Group 203 Holleman Drive East College Station, TX 77840 RE : Varsity Ford Driveway Permit Dear Sirs, College Station, Texas 77842-9960 (409) 764-3500 I ' Please find enclosed a copy of the driveway permit for Varsity Ford . If you have any questions, please feel free to call. st· crely, . ~ r;fj Ver:nica ~Jff.n .. Asst. City Engineer VM:djd Home of T e xas A&M University 08 /17 /95 10 :19 FAX 409 693 4243 M D G MUNICIPAL DEVELOPMENT GROUP 203 Holleman ~e East• College Statio11, TeJ:IJS n840 • 409-693-5359 • FAX: 409-693-4243 Engineering, Surveying, Planning and Environmental Consultants FAX# J(p~-?4o/'-. NQ.PAGESTOFOLLOW __ DATE g-11-95' TO VEf20NlCA MO~ If there is a problem with this transmission, please call .us at 409-693-5359. CONFIDENTIALITY NOTICE: This facsimile message and accompanying co11U71ll11ication and/or documents are fntended for th£ exclusive and confidential use of the individual or entity to which the message is addressed · \F ~----- 141001 08 /17 /95 10 :19 FAX 409 693 4243 MD G ~002 _i See Reverse for Instructions Form~ved. a. Ila.. 2116111111 .._.,, ...... , a.31..QS ft EPA uo;"'""""'""""'""""' ...... ,. ....... NPDES Washingmn . DC 20460 FORM ~I Notice of Intent (NOi) for Storm Water Discharges Associated with Industrial Activity Under the NPDES General Permit Subm ission of this Notice of lntenr c:cnsritutes notlca inar me party ~entilied in Section I of ltlis lorm intends u:i be aulhorized by a NP DES pennit issUIKI for storm warer di.sc~es associated with indusDial aC!ill~in !he Stale identified in Secticln II of this fonn . Becomi~ aJ10iitlee obliga!B!: such d~arger m amiply wi1h !tie terms conditions of !he permit ALL N ESSARY INFORMATION MUST BE PROVIDED ON I FORM . • I. Facility OperalDr lnformalion Name: IA.N. ~HI~~ Y, ,MA~0 1~1->1 I I I I I I I I I I I I I I I Phone: 141019 !/'f1 ft IQ1f.i.1 ~A-I 11 a,0L9L n~exA~t AV,e, I Sra!us ol ~ Address: I I ( ( I I I L I I I I I ( I I ( Owner~ratcr. Cif'f: ~1f<1'f'1A1 ,JI I · I I I I I I I I I I I I 1 · I I I Sta!B: 1f,X1 ZIP Code: [/171810131 • I I I I I II . Facility/Site Location Information -. Name: I v ,A , .(~. / I 77 YI .1 F,0,~/)1 ( I I I ! I I I I I I I I I I I I I Is Iha Facilily Ux:alBd at Indian Lsnds? (Y OI' N) ~ Address: I I I I I I I I I I I I I I I I I I l I l I I I I I I I I I I I I City : ·1c1o,1,,.., 1-, g tie, ,~'t'1A1'17I IOI~ I ! I I ! ! I I s:am: 17){1 ZIP Code : !7,7, 8,4, g -1 I ( I I L..alib.ide: I I [ I I I I Longi1~e :I I ·1 I I I I I Cuartet: Ls.J Sec:ticn; LLJ Tovmship: I I I I I Range: l L L I I Ill. Site Activity lnlormslion MS4 Operaror Name: 1~J ,TiY, ,(),F, IC-jo, ~ ~e/ii~ 1~7iA1 ~/101N_ I I I I I I I I ' ReceNing Water Body: 1t:1A1~~ef<1 '1~ !~~Ei6.~ I I I I ! I I I I I Ir You ar& Fifing as a Coilermil!M, Enter Storm Water General Pennit Number: I I ( I I I I I I I Ne There Existin~ I JI I OuamitaiiY8 Dala . (Y or N) ts Iha Fadr~ Rllq!Ji~ tri Suhmir Monitcring sta? (1, 2. or 3) []] SIC or Designallld Adf.lity c.ode: Primary: !.<601 I I 2nd: l I ! I I 3rd : I I ( I I 4th: I I I ( I If This Fadl~s a Member ol a Group Appllcarlon. ter Group Appfic:ation Number: I I I I I . II You Have Other Existing NPDES Permits, Enter Perm it Numbers : I ! I I I I I I r I I I I I I ( ( ( ( I I I I I I I I I I I JV. Additional Information Required for C.oostruclion ActNlties Only Project Comp letion Start Date: Dat1t: Is lhe Storm Water Pollution P~1'11ion Plan ~ f 0,ftti, l 1~.51 ll21.3IQ1t121~1 Estimated Area 11:1 be 11101 I in Compliance with State and'or lJx:aJ Distl.rrtied [an Aaes): I I I Sediment and Erosion Plans'? (Y or N) v. Certirlcation: I certify under penally of law !?'la! this document end aD attacl'lments well1 ~ under my direction or supervision in ao::omance wllh a system designed to assure that qualified personnel prcper1y galhe< and waluata Iha informalion submi!led. Based on my inqu iry of !ht! person et persons 'MIJ manage the ~stem . or thoS8 persons ciirectly responsible tor gathering ttie informarion, the information submined is. lo the best of my know~e attl belief. rrue . accurate. an eomplele . l am il\Alate ttiat there are signifrcant penaltillS for submiaing false information. including the possib ility or fine an imprisonment for knowing violations. Prlnl Name : Dare: 1 P .1.. , ; , r, 1 , ; , fl, ,B, I J{, i ,.,~ ( I I ( I ( I ( I ( I I I I I I (01 Kl L..5!~1.51 ~;,a// Signa ture: IT - EPA Fonn 3510·8 (8-92) @ Printed on Recyc/fld Papsr ' . ' Printed by Veronica Morgan From: Shirley Volk To: Sabina Kuenzel, Veronica Morgan Subj ec t: 1 wd: varsity Ford ===NOTE===============8/31/95==4:25pm== Are you ready to issue the full building permit on this project? (With, of course, the disclaimer that no corrbustibles are allowed on site until the fire hydrants and drive surfaces are installed, operable and accepted). CV, I believe the DDP will need to be changed if my memory serves correctly). Fwd=by:=Veronica=Morg=9/01/95==9:15am== Fwd to: Samantha Smith CC: Veronica Morgan sam, can you refresh my memory. what did you find on the site plan and our latest plan review. did we sign off with comments or without and what were the comments? thanks. Fwd=by:=Samantha=Smit=9/01/95=10:02am== Fwd to: Veronica Morgan CC: Shir l ey Volk We st~ them Approved without comments. Site plan was fine, but I don't think we received 3 copies (now 4) for our files (and now Tony's). I could be wrong, but it seems we only received enough for Building's sets. It looks as though you've revised the DDP (#287R), and it has been signed by you and Danny Johnson with Teal Construction. However, there is no record that the $300 inspection fee was paid. Fwd=by:=Veronica=Morg=9/01/95=10:08am== Fwd to: Samantha Smith, Shirley Volk shirley, we need the $300 inspection fee pd before we give them a bldg permit. i talked to danny about it and he was going to find out if mdg was responsible for that fee or varsity. i also need to make sure we have copies in our files and usc files (we are really having problem with that) other than that we are ok. Fwd=by:=Shirley=Volk==9/01/95=12:10pm== Fwd to: Veronica Morgan CC: Samantha Smith On every project I send approved site plans to Lawrence Carter (at Bill Riley's instruction since Samantha is no longer there), GTE and our files. have done this with Varsity, as well. If there's a problem with sHe plans, I'm the person who takes care of that. Since we're into this, I have been hearing from the Engr inspectors that they have not been receiving approved copies of the c~lete building plans. What's been happening to them? The latest person to contact me about that is John Logan re: Wings 'N More. I told him that we have 4 c~lete sets approved; one goes to contractor, one to fire, one to building and one to engineering. I really don't know who in engineering gets them now, but when I was there, we brought them to you, but I don't know the procedure now. Page: 1 9/01/95 3:08pm ~ . Printed by Veronica Morgan P.S. ~e did get a little behind during the first months of this year on getting the site plans to USC, but I'm slowly catching up. Lawrence, Bill, Cathy & I have talked about this. Fwd=by:=Veronica=Morg================== Fwd to: Shirley Volk shirley, the only one i have recieved recently was bethel baptist church. i dent know what has been happening to them -they are not coming to me or else we have not permitted any conmercial project in a long time. the plans we are having a problem with are the building permit sets not necessarily the site plans. we are not getting fire hydrant lines or other infrastructure (if they are attached to bl dg permit sets) into the engr. current const. drawer or the usc drawer. this is a big problem because if utilities does not have it it is not getting into their infrastructure inventory to maintain. or if the contractor comes in with a problem, we have to wait for in inspector to bring hi s plans back in or go get bldg's copy to talk about infrastructure plans. if the plans come in as separate civils we are not having this problem. Page: 2 9/01/95 3:08pm Printed by Samantha Smith 9/07/95 9:08am -~--------------------------------------------------------------------- Ff om: Shirley Volk To: Sabina Kuenzel, Veronica Morgan Subject: fwd: Varsity Ford ===NOTE===============8/31/95==4:25pm======================================= Are you ready to issue the full building permit on this project? (With, of course, the disclaimer that no combustibles are allowed on site until the fire hydrants and drive surfaces are installed, operable and accepted). CV, I believe the DDP will need to be changed if my memory serves correctly). Fwd=by:=Veronica=Morg=9/01/95==9:15am======================================= Fwd to: Samantha Smith CC: Veronica Morgan sam, can you refresh my memory. what did you find on the site plan and our latest plan review. did we sign off with conments or without and what were the corrments? thanks. Fwd=by:=Samantha=Smit=9/01/95=10:02am======================================= Fwd to: Veronica Morgan CC: Shirley Volk We starrped them Approved without comments. Site plan was fine, but I don't think we received 3 copies Cnow 4) for our files (and now Tony's). I could be wrong, but it seems we only received enough for Building's sets. It looks as though you've revised the DDP (#287R), and it has been signed by you and Danny Johnson with Teal Construction. However, there is no record that the $300 inspection fee was paid. Fwd=by:=Veronica=Morg=9/01/95=10:08am======================================= Fwd to: Samantha Smith, Shirley Volk shirley, we need the $300 inspection fee pd before we give them a bldg permit. i talked to danny about it and he was going to find out if mdg was responsible for that fee or varsity. i also need to make sure we have copies in our files and usc files (we are really having problem with that) other than that we are ok. Fwd=by:=Shirley=Volk==9/01/95=12:10pm======================================= Fwd to: Veronica Morgan CC: Samantha Smith On every project I send approved site plans to Lawrence Carter (at Bill Riley's instruction since Samantha is no longer there), GTE and our files. I have done this with Varsity, as well. If there's a problem with site plans, I'm the person who takes care of that. Since we're into this, I have been hearing from the Engr inspectors that they have not been receiving approved copies of the complete building plans. What's been happening to them? The latest person to contact me about that is John Logan re: Wings 'N More. I told him that we have 4 complete sets approved; one goes to contractor, one to fire, one to building and one to engineering. I really don't know who in engineering gets them now, but when I was there, we brought them to you, but I don't know the procedure now. P.S. We did get a little behind during the first months of this year on getting the site plans to USC, but I'm slowly catching up. Lawrence, Bill, Cathy & I have talked about this. Fwd=by:=Veronica=Morg=9/01/95==3:09pm======================================= Fwd to: Shirley Volk CC: Jeff Koska, Samantha Smith Page: 1 Printed by Samantha Smith 9/07/95 9:08am ... ~-.: .................................................................... . s Kirley the only one i have recieved recently was bethel baptist church. i dont kn~w what has been happening to them -they are not coming to me or else we have not permitted any commercial project in a long time. the plans we are having a problem with are the building permit sets not necessarily the site plans. we are not getting fire hydrant lines or other infrastructure Cif they are attached to bldg permit sets) into the engr. current const. drawer or the usc drawer. this is a big problem because if utilities does not have it it is not getting into their infrastructure inventory to maintain. or if the contractor comes in with a problem, we have to wait for an inspector to bring his plans back in or go get bldg's copy to talk about infrastructure plans. if the plans come in as separate civils we are not having this problem. Fwd=by:=Shirley=Volk==9/01/95==3:18pm======================================= Fwd to: Veronica Morgan The infrastructure construction drawings (4 sets you give me) are attached to the 4 sets of building plans. I don't know what is happening to the engineering dept set. You might want to check with David to see what they are doing with them. As far as the other 6 or more sets that you staqJ and sign -I don't have anything to do with the distribution of them, but I thought you had an system worked out that your people handled! Never mind checking with David -I'll do that and get back to you. Fwd=by:=Veronica=Morg=9/01/95==4:36pm======================================= Fwd to: Shirley Volk CC: Jeff Koska, Samantha Smith shirley, the other 6 or more sets we are NOT having problems with. those are the ones requested when we get separate civils. where we are experiencing problems is when the civils come in ALREADY attached to the bldg set. then we dont get extra sets to place in our files and usc's files. we are trying to find a way to fix this. Page: 2