Loading...
HomeMy WebLinkAbout49 Development Permit 281 KD Timmons SH30 SH6 ChevronDEVELOPMENT PERMIT PERMIT NO. #281 FOR AREAS INSIDE THE SPECIAL FLOOD HAZARD AREA RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE SITE LEGAL DESCRIPTION: Lot 3, Block 1, Harv ey Road East SITE ADDRESS: Corner of SH 30 and SH 6 Frontage Road OWNER: L T"\ • 1 11 t. Tall Properties r--""""\t~ \...J.1\-WfoY\ 1220 South College College Station DRAINAGE BASIN: Carter Creek TYPE OF DEVELOPMENT: This permit is valid for fill only, per the approved g rading plan. Fill must be spread immediately. As per the City of College Station Drainage Ordinance, all areas that are graded and stripped of natural cover shall receive at least a 6" finish layer of topsoil and be reseeded. Contractor shall prevent silt and debris from leaving the site in accordance with the City of Coll ege Station Drainage Policy and Design Criteria. Owner and/or contractor shall be responsible for any damage to existing city streets or infrastructure due to heavy machinery and/or equipment. This permit being temporary, is valid for sixty (60) days from the date shown below, and is not intended to allow the complete development of the site as proposed. Any work peiformed after the expiration of this permit is not cove red, and is considered unauthorized.) use this paragraph for fill permits and partial permits In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that debris from construction , erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities. I hereby grant this permit for development of an area inside/outside the special fl od hazard area. All development shall be in accordance with the plans and s cifications submitted to and approved by the City Engineer in the development e mit application for the above named project and all of the codes and ordinances of , City of College S tion that apply. Date Figur·e XU Development Permit City of College Station, Texas Site Legal Description : lot 3 H-<>-(V'/ eo,._J ~+-5~liu\~ Address : I '2. 'ZO ~O ofl {.,; t les c Telephone: __ L_\ O"'l-=---_-__ '&_2-_2_--_1....::~~A-'-t_.__f Site Owner: _l'--~-1 \ __ µ_Po__J.p_~ r_+_'IP_~_\..._}--C___ Architect/ Engineer : --'~""-"'"'-'-f-'r'--e-"--tf---"-'---'\=:_-_"'$~,_·~---Address : ____________ _ Telephone No : __________ _ lJ ( Contractor: -=)0:....>L)!<....V\'-'-.'-'°)+----'L®='---'--'-}r"""'--"-°'-'-'-'cto......_l'---5~ Address: ttWi Z I \).l?st-----'---+--'--"--=------ Telephone No : _5?.=i-"'i=-=--1__,_,,tR<->0""-'~=----- Date Application Filed : __ 3>_-_2._Y_-t1_S __ _ Approved : ___________ _ Application is hereby made for the following development specific waterway alterations: 0 0 t·,11 +or £, , desig n engineer, hereby acknowledge or affirm that: ~ ·::~ 90 () .... ~,; The infonnati ~~~~(§.Q.1~~ ··~-contained in the above plans and supporting documents comply with the current ~t~~~~~g-o f the City of College Station, Texas City Code, Chapter 13 and its associated Drainage Policy and Design Standards . As a condition of approval of this permit application, I agree to ~nstruct the improvements proposed in this application a;o~diJ to the se documents and the requirements of Chapter 13 of -the-C-ol-1~-re -hs ~·'--o -L../_:-'--~-~--£3 /~/~fl , #J/12-J ~ ~t1 /;S fo~ Property Ow r(s) Contract ~ Figure XII Continued CERTIFICATIONS: (for proposed alterations within designated flood hazard areas.) A. I, , certify that any nonresidential structure on or proposed to be on this site as part of this application is designated to prevent damage to the structure or its contents as a result of flooding from the 100 year storm. 3-2~-9~ Date , •, <:>~ , 11,~~··.~ISTE~~_...~<ct.: D ate •• .r,()· ........ ~~"\; '" NAL "'" ---,,,,,,,,,,, ... I, , do certify th at the proposed alterations do no t raise the level of the 100 year fl oo d above elevation established in the latest Federal Insurance Administration Flood Hazard Study. Engineer Date Conditions or comments as part of approval ___________________ _ In accordance with Chapter 13 of th e Code of Ordinances of the City of College Station, measures shall be taken to in su re that debris from construction, erosion, and sedimentation shall not be d epos ited in c ity streets . or existing drainage facilitie s . I hereby grant this permit for development . All deve lopment shall be in accordance with the plans and specifications submitted to and approved by the City Engineer for the above named project . All of the applicable codes and ordinances of the City of College Station shall apply . XI. Drainage Plan Submittal Requirements A . Review Process The development permitting process requires an approved drainage plan for any subdivision platting activity, any replatting process, any development requiring site plan review only, and any development on existing commercial, high-density, or industrial lot or tract. The review process for any drainage plan involves a two-or three-step process. The preliminary drainage conference with the Administrator and a final drainage plan is required for all development permits . If desired, a preliminary drainage plan may be submitted . B. General Drainage Plan Requirements The submitted drainage plan must satisfy the requirements of the City of College Station Stormwater Management Ordinance, the requirements of the City of College Station Drainage Policy and Design Standards, and the specific requirements of this section of the Standards. C. Preliminary Drainage Conference 1 . The drainage design concept for the proposed development shall be discussed with the Administrator prior to the development of any specific design or plan preparation. The parties representing the proposed development shall obtain all resources , plans , and references necessary to discuss the items below . The conference shall address the following information relative to the proposed development. a. General Location (1) Local streets, within and adjacent to the development (2) Primary and secondary drainageways and drainage facilities in the vicinity (3) Names of surrounding developments b. Property Description (1) Acreage (2) Type of land cover (both existing and proposed) (3) Name of Owner and type of development (4) Current zoning status and proposed change, if any c . Primary Drainage Basin Description ( l) Basin drainage characteristics (2) Related previous drainage studies (3) Flood Insurance Maps d. Secondary Drainage Basin Description -Discussion of onsite and offsite drainage flow patterns and anticipated impact on existing and ultimate development e. Drainage Facility Design (1) General Concept a .) Discussion of concept and typical drainage patterns (This shall include the delineation of the pathways for conducting the discharges from the site to the Primary Drainage System) b.) Discussion of compliance with offsite runoff considerations c .) Discussion of the content of tables , charts , figures , or drawings to be presented in the report (2) Specific Details a.) Discussions of drainage and erosion problems encountered and proposed solutions at specific design points both onsite and offsite b.) Discussion of detention/retention storage and outlet design , if any c.) Discussion of maintenance access and aspects of the design d .) Discussion of the areas to be set aside as drainage easement and right-of-way f . References -Reference all criteria , master plans, and technical information used in support of concept 2. Upon completion of the preliminary drainage conference , the Administrator may require the submission of a preliminary drainage report and plans. These shall be prepared along the lines of the requirements of.the Final Drainage Report and Drawings . D . Final Drainage Report and Drawings 1. The purpose of the Final Drainage Report is to identify and define conceptual solutions to the problems which may occur onsite and offsite as a result of the development. All reports shall be typed on 8-1/2" x 11" paper and bound together. The report shall include a cover letter presenting the proposed design for review and shall be prepared by a Registered Professional Engineer licensed in Texas. The report shall contain a certification sheet as follows : "I hereby certify that this report (plan) for the drainage design of (Name of Development) was prepared by me (or under my supervision) in accordance with the provisions of the City of College Station Drainage Policy and Design Standards for the owners thereof." Registered Professional Engineer State of Texas No . ~~~~~~~~~~- (Affix Seal) 2 2 . Report Contents The Final Drainage Report shall be in accordance with the following outline and contain the applicable information listed : a. General Location and Description (1) Location a .) Local streets within and adjacent to the development b.) Primary Drainage System drainageways and facilities c.) Names of surrounding developments (2) Description of Property a .) Acreage b .) Land cover c .) Primary and Secondary System drainageways within the property d.) General project description b . Drainage Basins and Sub-Basins (1) Primary Basin Description a.) Reference to Primary Drainage System planning studies such as flood hazard delineation reports and flood insurance rate maps b.) Primary Basin drainage characteristics (2) Secondary Drainage Basin Description -Discussion of offsite drainage flow patterns and impact of development on existing and proposed pathways to Primary Drainage System c . Drainage Design Criteria (1) Regulations -Discussion of the optional criteria selected or the deviation from the Standards, if any (2) Development Criteria Reference and Constraints a.) Discussion of previous drainage studies for the site in question that influence or are influenced by the drainage design and how the plan will affect drainage design for the site b.) Discussion of the drainage impact of site constraints such as streets , existing structures, and development or site plan (3) Hydrological Criteria a .) Identify design rainfall b.) Identify runoff calculation method c.) Identify detention discharge and storage calculation method, if any d.) Identify design storm recurrence intervals e .) Discussion and justification of other criteria or calculation methods used that are not presented in or referenced by the Standards 3 (4) Hydraulic Criteria a.) Identify various capacity references b.) Identify detention/retention outlet type , if any c.) Discussion of other drainage facility design criteria used that are not presented in the Standards d. Drainage Facility Design (1) General Concept a .) Discussion of concept and typical drainage patterns b.) Discussion of compliance with offsite runoff considerations c .) Discussion of the content of tables, charts, figures, or drawings presented in the report d .) Discussion of anticipated and proposed drainage patterns (2) Specific Details a .) Discussion of drainage problems encountered and solutions at specific design points b .) Discussion of detention storage and outlet design , if any c .) Discussion of maintenance access and aspects of the design e . Conclusions (1) Compliance with standards of the City of College Station Drainage Policy and Design Standards (2) Effectiveness of drainage design to control damage from stormwater flows (3) Explanation of the effectiveness of existing and proposed improvements with regard to controlling the discharges of the 100 year storm with ultimate development conditions of the secondary system basins affected by the proposed development f. References -Reference all criteria and technical information used g. Appendices (Where Applicable) (1) Hydrologic Computations a.) Land use assumptions regarding adjacent properties b .) Minor and major storm runoff at specific design points c .) Historic and fully developed runoff computations at specific design points d .) Hydrographs at critical design points (2) Hydraulic Computations a .) Culvert capacities b.) Storm sewer capacity c .) Street capacity d.) Storm inlet capacity including inlet control rating at connection to storm sewer 4 e.) Open channel design f.) Detention area/volume capacity and outlet capacity calculations E. Final Drainage Report Drawing Contents 1. Sheet #1 -General Location Map a. Depicts drainage flows entering and leaving the development site b. Identifies major construction along path of drainage c. Illustrates general drainage flow within entire basin d . Is drawn at a scale of 1 ti = 500' to 1 ti = 2000' 2. Sheet #2 -Floodplain Information a. Copies of existing City of College Station 100-year floodplain maps showing the location of the subject development 3 . Sheet #3 -Drainage Plan -Map(s) of the proposed development at a scale of 1 ti = 20' to 1" = 200' on a 24" x 36" drawing shall be included. The plan shall show the following: a. Existing and proposed contours at 2-feet maximum intervals b . Property lin es and easements with purposes noted c. Streets d. Existing drainage facilities , roadside ditches , drainageways , gutter flow directions , and culverts (All pertinent information such as material, size , shape, slope, and location shall also be included) e. Overall drainage area boundary and drainage sub-area boundaries f. Propo sed type of st reet flow , roadside ditch , a nd/or gutter flow directions g. Proposed storm sewers and open drainageways , including inlets , manholes , culverts , and other appurtenances . h . Proposed outfall point for runoff from the developed area and facilities to convey flows along the proposed pathways to the final outfall points in the primary drainage system without damage to downstream properties , or exceeding the capacities of the receiving facilities as defin ed in these standards. 1. Routing and accumulation of flows at various critical points for th e minor storm runoff. j. Path (s) chosen for computation of time-of-concentration k. Details of detention /retention storage facilities and outlet works I. Location and elevations of all defined floodplains affecting the property m. Location and elevations of all existing and proposed utilities affected by or affecting the drainage design n. Routing of offsite drainage flow through the development F . Construction Drawings and Specifications 1. Where drainage improvements are to be constructed in accordance with the approved Final Drainage Report , the construction plans (on 24" x 36" sheets) and specifications shall be submitted for review and approval prior to construction . The plans and specifications for the drainage improvements will include: 5 a . Storm sewers, inlets, and outlets b. Culverts, end sections, and inlet/outlet protection c . Channels , ditches , and swales d . Erosion control facilities e. Detention pond grading, pilot channels, outlets, and landscaping f. Other drainage related structures and facilities g. Maintenance access considerations h . Finished floor elevations of adjacent buildings 1. Existing and Ultimate 100-year water surface elevations J. Engineer certifications k . Approval by the City 2. The information required for the drawings and specifications shall be in accordance with sound engineering principles , these Standards , and the City requirements for subdivision designs . Construction documents shall include geometric, dimensional, structural, foundation, bedding , hydraulic, landscaping, and other details as needed to construct the storm drainage facility . The approved Final Drainage Plan shall be included as part of the construction documents for all facilities affected by the drainage plan. G . "As -Built Drawings" As constructed finished plans (" As-Builts ") for all public improvements shall be attested to by a professional engineer registered in Texas and submitted to the City before the City will accept the improvements. The construction drawings are acceptable if they remain true after construction and are attested to by a registered engineer to represent "As-Built" conditions consistent with the intent of the approved plan. XII . Development Permitting Process The City of College Station Stormwater Management Ordinance requires the acquisition of a development permit prior to beginning "development" activities defined within the Ordinance. A blank Development Application Form (for areas within and outside established flood hazard areas is included in the section as Figure XII . 6 I I - . I \ ( 1****************************************************** 1 * WATER SURFACE PROFILES * * VERSION OF NOVEMBER 1976 * * UPDATED MAY 1984 * * IBM-PC-XT VERSION * * RUN DATE 03/21/95 TIME 06:09:47 * ****************************************************** x x x x x x xxxxxxx x x x 03/21/95 06:09:47 ************************************************** HEC2 RELEASE DATED NOV 76 UPDATED MAY 1984 ERROR CORR -Ol,02,03,04,05,06 MODIFICATION -50,51,52,53,54,55,56 IBM-PC-XT VERSION . ************************************************** Tl CARTER'S GROVE EXISTING CONDITIONS T2 FLOODWAY DETERMINATION METHOD 4 T3 *** EQUAL CONVEYANCE *** Jl ICHECK INQ NINV IDIR STRT x x x xxxxxxx x x xx xx x x xxxxxxx METRIC **** * u * T * 6 * D * ( **** xxxxx xxxxx x x x x x x x xxxxx xxxxx x x x x x xxxxx xxxxxxx THIS RUN EXEC HVINS Q WSEL FQ .. . o. 2 . o. o. .000000 .00 . 0 0. 256.310 .o J2 NPROF I PLOT PRFVS XSECV XSECH FN ALLDC IBW CHNIM ITR 1.000 .000 .000 .000 .000 .000 .000 .000 .000 J3 VARIABLE CODES FOR SUMMARY PRINTOUT 110.000 200.000 38.000 1.000 4.000 53.000 54.000 21.000 22.000 NC .035 .035 .030 .100 .300 .000 .000 .ooo ET .000 .000 10.400 .000 .000 .000 .000 .ooo 1 QT 2.000 1022.000 1022.000 .000 .ooo .000 .000 .000 Xl 1.000 48.000 4125.000 4294.000 1. 000 1.000 1.000 .000 GR 257.600 600.000 256.250 707.000 255.940 778.000 254.790 900.000 GR 252.900 1055.000 248.190 1061.000 248.190 1067.000 244.400 1078.000 GR 251.100 1315.000 250.300 1470.000 249.320 1624.000 248.470 1714.000 GR 249.000 1931.000 249.790 2074.000 250.200 2214.000 250.140 2356.000 GR 250.800 2627.000 248.420 2648.000 239.050 2663.000 238.320 2693.000 GR 250.300 2762.000 249.540 2840.000 249.630 2870.000 252.000 2900.000 GR 248.000 3135.000 248.000 3152.000 250.000 3360.000 248.600 3500.000 GR 250.000 3800.000 251.000 3970.000 252.430 4015.000 252.410 4045.000 GR 252.000 4175.000 252.000 4235.000 247.990 4282.000 251. 690 4294.000 GR 254.000 4407.000 256.000 4542.000 258.000 4775.000 .000 .000 NC .035 .035 .030 .100 .300 .000 .000 .000 Xl 2.000 25.000 1302.000 1337.000 538.000 50.000 235.000 .000 GR 257.600 660.000 257.250 720.000 254.000 745.000 252.000 760.000 GR 255.000 798.000 254.000 845.000 253.720 890.000 253.600 960.000 GR 256.000 1000.000 256.000 1046.000 255.000 1122.000 254.000 1163.000 GR 254.900 1302.000 250.670 1310.000 249.840 1322.000 250.570 1332.000 GR 255.100 1392.000 254.280 1470.000 255.000 1538.000 256.000 1570.000 . Xl 3.000 9.000 1175.000 1215.000 400.000 50.000 200.000 .000 GR 258.000 830.000 256.000 970.000 254.000 1175.000 251.180 1190.000 GR 254.000 1215.000 254.380 1250.000 256.000 1400.000 258.000 1430.000 1 03/21/95 06:09:47 NC .020 .035 .030 .100 .300 .000 .000 .000 Xl 4.000 9.000 1221. 000 1259.000 250.000 250.000 250.000 .ooo GR 260.000 1000.000 258.000 1020.000 258.040 1221. 000 252.520 1223.000 GR 252.500 1257.000 257.940 1259.000 258.150 1300.000 259.000 1465.000 Xl 5.000 10.000 1215 .000 1260.000 19.000 19.000 19.000 .000 GR 260.000 1000.000 258.000 1030.000 257.620 1165.000 259.040 1215.000 GR 252.400 1240.000 252.430 1258.000 258.940 1260.000 258.740 1315.000 NC .035 .035 .013 .100 .300 .000 .000 .000 Xl 6.000 10.000 1215.000 1260.000 1.000 1. 000 1.000 .000 GR 260.000 1000.000 258.000 1030.000 257.620 1165.000 259.040 1215.000 GR 252.400 1240.000 252.350 1258.000 258.940 1260.000 258.740 1315.000 SB 4.013 .500 2.600 .000 4.000 6.000 35.000 8.300 Xl 7.000 10.000 1215.000 1260.000 35.000 35.000 35.000 .000 X2 .000 .000 2.000 .000 257.620 .000 .000 .000 BT -7.000 1000.000 260.000 .000 1030.000 258.000 .000 1165.000 BT .000 1215.000 259.040 .000 1260.000 258.940 .000 1315.000 BT .000 1465.000 259.000 .000 .000 .000 .000 .000 GR 260.000 1000.000 258.000 1030.000 257.620 1165.000 259.040 1215.000 GR 252.400 1240.000 252.430 1258.000 258.940 1260.000 258.740 1315.000 NC .035 .035 .013 .100 .300 .000 .000 .000 Xl 8.000 10.000 1215.000 1260.000 1.000 1.000 1. 000 .000 GR 260.000 1000.000 258.000 1030.000 257.620 1165.000 259.040 1215.000 2 GR 252.400 1240.000 252.430 1258.000 258.940 1260.000 258.740 1315.000 NC .035 .035 .030 .100 .300 .000 .000 .000 Xl 1050.000 18.000 114.000 158.000 15.000 15.000 15.000 .000 GR 252.190 .000 259.190 50.000 258.390 100.000 257.890 114.000 GR 250.990 124.100 250.390 130.000 250.790 138.000 253.190 138.100 GR 259.200 202.000 259.590 213.000 258.490 225.000 258.390 250.000 GR 259.390 340.000 259.120 365.000 259.500 371. 000 .000 .000 Xl 1150.000 17.000 143.000 177.000 100.000 100.000 .000 GR ~ .000 260.290 50.000 260.890 100.000 a 143.000 GR 162.000 252.990 166.000 255.990 169.000 5"9'0 177.000 GR . 0 250.000 258.890 300.000 258.890 337.000 258.790 347.000 GR 259.530 368.000 259.980 370.000 .000 .000 .000 .ooo Xl 1200.000 19.000 166.000 200.000 100.000 100.000 100.000 .000 GR 259.090 .000 259.390 50.000 260.690 100.000 260.490 150.000 GR 256.290 180.000 252.990 180.100 250.490 190.000 252.890 194.000 GR 258.090 200.000 259.390 207.000 260.290 220.000 260.090 250.000 GR 259.090 344.000 258.690 355.000 260.130 367.000 260.430 368.000 EJ .000 .000 .000 .000 .000 .000 .000 .000 1 03/21/95 06:09:47 SECNO DEPTH CWSEL CRIWS WSELK EG HV HL OLOSS BANK ELEV Q QLOB QCH QROB ALOB ACH AROB VOL TWA LEFT/RIGHT TIME VLOB VCH VROB XNL XNCH XNR WTN ELMIN SSTA SLOPE XLOBL XLCH XLOBR ITRIAL IDC I CONT CORAR TO PW ID END ST *PROF 1 CCHV= .100 CEHV= .300 *SECNO 1. 000 1. 00 17.99 256.31 .00 256.31 256.31 .00 .00 .00 251.78 1022. 969. 39. 14. 20617. 854. 551. o. 0. 251. 69 .00 .05 .05 .03 .035 .030 .035 .000 238.32 702.24 .000000 1. 1. 1. 0 0 0 .00 3875.87 4578.11 0 CCHV= .100 CEHV= .300 *SECNO 2.000 2.00 6.46 256.30 .oo .oo 256.31 .01 .00 .oo 254.90 1022. 631. 221. 169. 1036. 180. 350. 137. 26. 254.67 .18 .61 1. 23 .48 .035 .030 .035 .000 249.84 727.23 .000076 538. 235. 50. 0 0 0 .00 883.07 1610.30 0 *SECNO 3.000 3.00 5.13 256.31 .oo .00 256.37 .06 .04 .02 254.00 1022. 281. 476. 265. 272. 177. 243. 144. 30. 254.00 .21 1. 03 2.69 1. 09 .035 .030 .035 .000 2 51. 18 948 .16 .000419 400. 200 . 50. 0 0 0 .00 456.52 1404.68 0 CCHV= .100 CEHV= .300 *SECNO 4.000 3 3301 HV CHANGED MORE THAN HVINS 4.00 3.26 255.76 .00 .00 257.00 1. 24 .28 .35 258.04 1022. 0. 1022. 0. o. 114. 0. 147. 31. 257.94 .22 .00 8.94 .00 .020 .030 .035 .000 252.50 1221.82 . 008274 250 . 250. 250. 3 0 0 .00 36.38 1258.20 0 *SECNO 5.000 3301 HV CHANGED MORE THAN HVINS 5.00 4.24 256.64 .00 .00 257.15 .51 .08 .07 259.04 1022. 0. 1022. 0. o. 178. 0. 147. 31. 258.94 .22 .00 5.73 .00 .020 .030 .035 .000 252.40 1215.73 .002437 19. 19. 19. 3 0 0 .oo 43.56 1259.29 0 1 03/21/95 06:09:47 SECNO DEPTH CWSEL CRIWS WSELK EG HV HL OLOSS BANK ELEV Q QLOB QCH QROB ALOB ACH AROB VOL TWA LEFT/RIGHT TIME VLOB VCH VROB XNL XNCH XNR WTN ELMIN SSTA 0 SLOPE XLOBL XLCH XLOBR ITRIAL IDC I CONT CORAR TO PW ID END ST CCHV= .100 CEHV= *SECNO 6.000 6.00 4.31 1022. 0. . 22 .00 .000441 1. SPECIAL BRIDGE .300 256.66 1022. 5.66 1. .00 0. .00 1. 5227 DOWNSTREAM ELEV IS 255.48 ,NOT SB XK 4.01 *SECNO 7.000 XKOR .50 3265 DIVIDED FLOW COFQ 2.60 PRESSURE AND WEIR FLOW EGPRS 263.28 7.00 1022. • 23 .000119 EGLWC 257.65 6.25 53. .39 35. HJ 258.65 4 969. 3.62 35. . 00 RDLEN .00 QWEIR .00 0. .00 35. 435 • .00 0 . .035 0 257.15 181. .013 0 .50 0. .035 0 .00 147. .000 .00 .00 31. 252.35 43.59 259.04 258.94 1215.72 1259.30 256.66 HYDRAULIC JUMP OCCURS DOWNSTREAM (IF LOW FLOW CO BWC 4.00 QPR 588. .oo 258.85 136. .035 2 268. .013 0 BWP 6.00 BAREA 35.00 BAREA TRAPEZOID 35. .19 o . .000 6 AREA 529388. 1. 69 147. .000 .oo SS 8.30 ELLC .00 .00 31. 252.40 225.93 EL CHU 252.43 ELTRD 257.62 259.04 258.94 1020.21 1259.91 ELC 252. 0 CCHV= .100 CEHV= .300 *SECNO 8.000 3265 DIVIDED FLOW 8.00 6.25 258.65 .00 .00 258.85 .19 .00 .00 259.04 1022. 53. 969. 0. 136. 268. 0. 147. 31. 258.94 .23 .39 3.62 .oo .035 .013 .035 .000 252.40 1020.22 .000119 1. 1. 1. 0 0 0 .oo 225.92 1259.91 0 1 03/21/95 06:09:47 SECNO DEPTH CWSEL CRIWS WSELK EG HV HL OLOSS BANK ELEV Q QLOB QCH QROB ALOB ACH AROB VOL TWA LEFT/RIGHT TIME VLOB VCH VROB XNL XNCH XNR WTN ELM IN SSTA SLOPE XLOBL XLCH XLOBR I TRIAL roe I CONT CORAR TO PW ID END ST CCHV= .100 CEHV= .300 *SECNO 1050.000 3265 DIVIDED FLOW 3280 CROSS SECTION 1050.00 EXTENDED 6.55 FEET 1050.00 8.35 258.74 .oo .oo 258.86 . 12 .oo .01 257.89 1022. 325. 656. 41. 166. 211. 54. 147. 31. 256.89 .23 1. 97 3.11 .76 .035 .030 .035 .000 250.39 .00 . 000591 15 . 15. 15. 2 0 0 .00 247.23 307.54 0 *SECNO 1150.000 3265 DIVIDED FLOW 3301 HV CHANGED MORE THAN HVINS 1150.00 8.24 258.43 .00 .oo 259.15 .72 .11 .18 259.09 1022. 0. 1009. 13. o. 147. 10. 148. 32. 257.59 .23 .oo 6.85 1. 26 .035 .030 .035 .000 250.19 143.89 • 003090 100 . 100. 100. 2 0 0 .00 61. 46 357.34 0 .. 0 1 *SECNO 1200.000 3301 HV CHANGED MORE THAN HVINS 1200.00 1022. .23 .008058 7.97 0. .oo 100. 258.46 1022. 9.33 5 100. .00 0. 1. 23 100. PROFILE FOR STREAM QUAL CONVEYANCE *** .oo 0. .035 2 259.81 110. .030 0 1. 35 0. .035 0 .47 148. .000 .00 . 19 32 . 250.49 29.82 260.19 258.09 172.19 202.02 PLOTTED POINTS (BY PRIORITY}-E-ENERGY,W-WATER SURFACE,I-INVERT,C-CRITICAL W.S.,L-LEFT BANK,R-RIGH ELEVATION 235. 240. 245. 250. 255. 260. 265. 270. 275. SECNO CUMDIS 1. 00 0. c I RL E M 10. c I . L E M 20. c I. L E M 30. c I L E M 40. c .I RL E M 50. c . I L E M 60. c I L E M 70. c I L E M 80. c I RL E M 90. c I L E M 100. c I L E M 110. c I L E M 120. c I . RL E M 130. c I. L E M 140. c . I . L . EM 150. c . . I . RL . EM 160. c . . I . RL . EM 170. c . . I . L . EM 180. c . . I . L . EM 190. c . . I . RL. EM 200. c . . I . RL. EM 210. c . . I . L. EM 220. c . . I . L. EM 230. c . . I. RL EM 2.00 240. c . . I RL EM 250. c . . I RL EM 260. c . . I RL EM 270. c . . I RL EM 280. c . . I L. EM 290. c . . I L. EM 300. c . . I L. EM 310. c . . . I L. EM 320. c . . . I L . EM 330. c . . . I L . EM 340. c . . . I L . E M 350. c . . . I L. E M 360. c . . . I L . E M 370. c . . . I RL . E M 380. c . . . I RL. E M 390. c . . . I L . E M 400. c . . . I L . E M 410. c . . . I L . E M 6 420. c . . . I L . E M 430. c . . . I L . E M 3.00 440. c . . . I L . E M 450. c . . . I L . E M 460. c . . . I L. E M 470. c . . . I L. WE M 480. c . . . I L. WE M 490. c . . . I L WE M 500. c . . . I L WE M 510. c . . . I L WE M 520. c . . . I .LWE M 530. c . . . I .LWE M 540. c . . . I .LWE M 550. c . . . I .RWE M 560. c . . . I . WE M 570. c . . . I . WE M 580. c . . . I . WE M 590. c . . . I . WE M 600. c . . . I . WLE M 610. c . . . I . WLE M 620. c . . . I . W E M 630. c . . . I . W E M . 640. c . . . I . W E M . 650. c . . . I . W EL M . 660. c . . . I . W EL M . 670. c . . . I . W EL M 680. c . . . I . W E L M 4.00 690. c . . . I . W E L M . 700. c . . . I . W E LM . 5.00 710. c . . . I . WE L . 6.00 720. c . . . I . WE L . 730. c . . . I . WE L . 7.00 740. c . . . I . WE . 8.00 750. c . . . I . WE . 1050.00 760. c . . . I M . R LWE . 770. c . . . I M . R LWE . 780. c . . . I M . R LWE . 790. c . . . I M . R WE . 800. c . . . I M R WE . 810. c . . . I . M R WE . 820. c . . . I . MR WE . 830. c . . . I . R WE . 840. c . . I . R WE . 850. c . . I . R WE . 1150.00 860. c . . I . R WE M 870. c . . I . R WEM. 880. c . . . I . R W E . 890. c . . . I . R W E . 900. c . . . I . RW E. 910. c . . . I . RW E . 920. c . . . I . RW EL 1 930. c .I 940. c . I 950. c .I 1200.00 960. c . I 7 03/21/95 06:09:47 ************************************************** HEC2 RELEASE DATED NOV 76 UPDATED MAY 1984 ERROR CORR -Ol,02,03,04,05,06 MODIFICATION -50,51,52,53,54,55,56 IBM-PC-XT VERSION ************************************************** Tl CARTER'S GROVE EXISTING CONDITIONS T2 FLOODWY DETRMINATION METHOD 4 T3 *** EQUAL CONVEYANCE *** Jl I CHECK INQ NINV IDIR STRT 0. 3 . o. 0. .000000 J2 NPROF I PLOT PRFVS XSECV XSECH 15.000 .000 .000 .000 .000 1 03/21/95 06:09:47 RW EL RWMEL RWMEL RWM E THIS RUN EXEC METRIC HVINS Q WSEL FQ .00 . 0 0. 257.310 . 0 FN AL LDC IBW CHNIM ITR .000 .000 .000 .000 0 0 SECNO Q TIME SLOPE *PROF 2 DEPTH QLOB VLOB XLOBL CWSEL QCH VCH XLCH CCHV= .100 CEHV= .300 *SECNO 1. 000 CRIWS QROB VROB XLOBR WSELK ALOB XNL ITRIAL EG ACH XNCH IDC HV AROB XNR I CONT HL VOL WTN CORAR OLOSS TWA ELMIN TO PW ID BANK ELEV LEFT/RIGHT SSTA END ST 2800 NAT Ql= 32653.61 WSEL= 256.31 ENC Ql= 32653.61 WSEL= 257.31 RATIO= 257.31 .0000 NAT Ql= 41773. RATIOS LOB,CH,ROB= .9405 .0402 .0193 WSEL= 3470 ENCROACHMENT STATIONS = 1666.8 4294.0 TYPE= 4 TARGET= .218 1.00 18.99 257.31 1022. .oo .000000 971. . 05 1. 51. .05 1. CCHV= .100 CEHV= .300 *SECNO 2.000 .00 o . .oo 1. 256.31 257.31 .oo 18590. 1023. 0. .035 .030 .035 0 0 0 2800 NAT Ql= 1174.00 WSEL= 256.30 ENC Ql= 1174.00 WSEL= NAT Ql= 2245. RATIOS LOB,CH,ROB= .6304 .1520 .2176 WSEL= 3280 CROSS SECTION 2.00 EXTENDED .31 FEET 8 .00 .00 251. 78 o. 0. 251. 69 .000 238.32 1666.83 .00 2627.17 4294.00 257.30 RATIO= 257.30 .0000 3470 ENCROACHMENT STATIONS= 904.9 1337.0 TYPE= 4 TARGET= .477 2.00 7.46 257.30 .00 256.30 257.31 .01 .00 .oo 254.90 1022. 735. 287. 0. 1015. 215. 0 . 124. 18. 254.67 . 15 .72 1. 33 .00 .035 .030 .035 .000 249.84 904.93 .000077 538. 235. 50. 1 0 0 .00 432.07 1337.00 *SECNO 3.000 0 1 0 0 2800 NAT Ql= 499.19 WSEL= 256.31 ENC Ql= 499.19 WSEL= 257.31 RATIO= 257.31 .0000 NAT Ql= 1020. RATIOS LOB,CH,ROB= .3620 .3196 .3185 WSEL= 3470 ENCROACHMENT STATIONS= 1135.0 1239.2 TYPE= 4 TARGET= .511 3.00 6.09 257.27 .00 256.31 257.39 . 12 .04 .03 254.00 1022. 219. 670. 133. 123. 216. 76. 131. 20. 254.00 .18 1. 78 3.11 1. 75 .035 .030 .035 .000 251. 18 1135.01 .000431 400. 200. 50. 2 0 0 .00 104.15 1239.16 CCHV= .100 CEHV= .300 *SECNO 4.000 2800 NAT Ql= 112.35 WSEL= 255.76 ENC Ql= 172.50 WSEL= 256.76 RATIO= -.5354 NAT Ql= 173. RATIOS LOB, CH, ROB= .0000 1.0000 .0000 WSEL= 256.76 03/21/95 06:09:47 SECNO DEPTH CWSEL CRIWS WSELK EG HV HL OLOSS BANK ELEV Q QLOB QCH QROB ALOB ACH AROB VOL TWA LEFT/RIGHT TIME VLOB VCH VROB XNL XNCH XNR WTN ELMIN SSTA SLOPE XLOBL XLCH XLOBR ITRIAL IDC I CONT CORAR TO PW ID END ST 3470 ENCROACHMENT STATIONS= 1221.0 1259.0 TYPE= 4 TARGET= .000 4.00 4.66 257.16 .00 255.76 257.75 .59 .22 .14 258.04 1022. 0. 1022. 0. 0. 166. 0. 132. 21. 257.94 .19 .00 6.15 .00 .020 .030 .035 .000 252.50 1221.32 . 002616 250 . 250. 250. 2 0 0 .oo 37.40 1258.72 *SECNO 5.000 2800 NAT Ql= 207.02 WSEL= 256.64 ENC Ql= 291.04 WSEL= 257.64 RATIO= -.4059 NAT Ql= 291. RATIOS LOB,CH,ROB= .0000 1.0000 .0000 WSEL= 257.64 3470 ENCROACHMENT STATIONS= 1215.0 1260.0 TYPE= 4 TARGET= .000 5.00 5.05 257.45 .oo 256.64 257.81 .35 1022. 0. 1022. 0. 0. 214. 0. .19 .00 4.77 .00 .020 .030 .035 .001384 19. 19. 19. 2 0 0 CCHV= .100 CEHV= .300 *SECNO 6.000 2800 NAT Ql= 486.68 WSEL= 256.66 ENC Ql= 682.35 WSEL= NAT Ql= 682. RATIOS LOB,CH,ROB= .0000 1.0000 .0000 WSEL= .04 .02 259.04 132. 21. 258.94 .000 252.40 1215.48 .00 44.06 1259.54 257.66 RATIO= -.4020 257.66 3470 ENCROACHMENT STATIONS= 1215.0 1260.0 TYPE= 4 TARGET= .000 9 6.00 5.11 257.46 .00 256.66 257.81 .35 .00 .00 259.04 1022. 0. 1022. 0. 0. 216. 0. 132. 21. 258.94 .19 .00 4.73 .00 .035 .013 .035 .000 252.35 1215.47 .000254 1. 1. 1. 0 0 0 .00 44.08 1259.55 0 SPECIAL BRIDGE SB XK XKOR COFQ RD LEN BWC BWP BAREA SS EL CHU ELC 4.01 .50 2.60 .00 4.00 6.00 35.00 8.30 252.43 252. *SECNO 7.000 2800 NAT Ql= 937.53 WSEL= 258.65 ENC Ql= 1141.29 WSEL= 259.65 RATIO= -.2173 NAT Ql= 1400. RATIOS LOB,CH,ROB= .1429 .8152 .0419 WSEL= 259.65 WATER EL=CHANGE FROM NATURAL PROFILES BRIDGE 3280 CROSS SECTION 7.00 EXTENDED .46 FEET 3470 ENCROACHMENT STATIONS= 1215.0 1260.0 TYPE= 4 TARGET= .185 1 03/21/95 06:09:47 SECNO DEPTH CWSEL CRIWS WSELK EG HV HL OLOSS BANK ELEV Q QLOB QCH QROB ALOB ACH AROB VOL TWA LEFT/RIGHT TIME VLOB VCH VROB XNL XNCH XNR WTN ELMIN SSTA SLOPE XLOBL XLCH XLOBR ITRIAL IDC I CONT CORAR TO PW ID END ST 7.00 7.06 259.46 .00 258.65 259.63 .18 .00 .02 259.04 1022. 0. 1022. o. 0. 304. 0. 133. 21. 258.94 .20 .oo 3.37 .00 .035 .013 .035 .000 252.40 1215.00 .000090 35. 35. 35. 0 0 6 .00 45.00 1260.00 0 0 0 CCHV= .100 CEHV= .300 *SECNO 8.000 2800 NAT Ql= 937.47 WSEL= 258.65 ENC Ql= 1141.32 WSEL= NAT Ql= 1400. RATIOS LOB,CH,ROB= .1429 .8152 .0419 WSEL= 3280 CROSS SECTION 8.00 EXTENDED .46 FEET 259.65 RATIO= -.2174 259.65 3470 ENCROACHMENT STATIONS= 1215.0 1260.0 TYPE= 4 TARGET= .185 8.00 7.06 259.46 .00 258.65 259.63 .18 1022. 0. 1022. 0. 0. 304. 0. .20 .00 3.37 .00 .035 .013 .035 .000090 1. 1. 1. 0 0 0 CCHV= .100 CEHV= .300 *SECNO 1050.000 2800 NAT Ql= 420.45 WSEL= 258.74 ENC Ql= 420.45 WSEL= NAT Ql= 711. RATIOS LOB,CH,ROB= .3242 .5207 .1551 WSEL= 3280 CROSS SECTION 1050.00 EXTENDED 7.25 FEET .00 .oo 259.04 133. 21. 258.94 .000 252.40 1215.00 .00 45.00 1260.00 259.74 RATIO= 259.74 .0000 3470 ENCROACHMENT STATIONS= 31. 0 158.0 TYPE= 4 TARGET= .408 10 1050.00 9.05 259.44 .00 258.74 259.64 .21 .00 .01 257.89 1022. 99. 923. o. 80. 242. o. 133. 21. 256.89 .20 1. 23 3.82 .00 .035 .030 .035 .000 250.39 31. 03 .000795 15. 15. 15. 2 0 0 .00 126.97 158.00 *SECNO 1150.000 2800 NAT Ql= 183.85 WSEL= 258.43 ENC Ql= 250.85 WSEL= 259.43 RATIO= -.3644 NAT Ql= 299. RATIOS LOB, CH, ROB= .0006 .8383 .1611 WSEL= 259.43 3470 ENCROACHMENT STATIONS= 143.0 177.0 TYPE= 4 TARGET= .162 1150.00 9.15 259.34 .oo 258.43 259.85 .51 . 12 .09 259.09 1022. 0. 1022. o. 0. 178. 0. 133. 21. 257.59 0 1 0 1 .20 .00 5.74 .00 .035 .030 .035 .000 250.19 143.00 . 001881 100. 100. 100 . 2 0 0 .00 34.00 177.00 03/21/95 06:09:47 SECNO DEPTH CWSEL CRIWS WSELK EG HV HL OLOSS BANK ELEV Q QLOB QCH QROB ALOB ACH AROB VOL TWA LEFT/RIGHT TIME VLOB VCH VROB XNL XNCH XNR WTN ELMIN SSTA SLOPE XLOBL XLCH XLOBR ITRIAL IDC I CONT CORAR TOPWID END ST *SECNO 1200.000 2800 NAT Ql= 113.85 WSEL= 258.46 ENC Ql= 158.69 WSEL= 259.46 RATIO= -.3939 NAT Ql= 166. RATIOS LOB,CH,ROB= .0105 .9583 .0312 WSEL= 259.46 3280 CROSS SECTION 1200.00 EXTENDED .28 FEET 3470 ENCROACHMENT STATIONS= 166.0 200.0 TYPE= 4 TARGET= .042 1200.00 8.88 259.37 .00 258.46 260.24 .87 .28 .11 260.19 1022. 0. 1022. 0. 0. 136. 0. 134. 21. 258.09 .21 .00 7.51 .oo .035 .030 .035 .000 250.49 168.95 . 004591 100 . 100. 100. 2 0 0 .00 31. 05 200.00 PROFILE FOR STREAM QUAL CONVEYANCE *** PLOTTED POINTS (BY PRIORITY}-E-ENERGY,W-WATER SURFACE,I-INVERT,C-CRITICAL W.S.,L-LEFT BANK,R-RIGH ELEVATION 235. 240. 245. 250. 255. 260. 265. 270. 275. SECNO CUMDIS 1. 00 o. c I RL E 10. c I . L E 20. c I. L E 30. c I L E 40. c .I RL E 50. c . I L E 60. c I L E 11 70. c . I . . L . E 80. c . I . . RL . E 90. c . I . . L . E 100. c . I . . L . E 110. c . I . . L . E 120. c . I . . RL . E 130. c . I. . L . E 140. c . I . L . ME 150. c . . I . RL . ME 160. c . . I . RL . ME 170. c . . I . L . ME 180. c . . I . L . ME 190. c . . I . RL. ME 200. c . . I . RL. ME 210. c . . I . L. ME 220. c . . I . L. ME 230. c . . I. RL ME 2.00 240. c . . I RL ME 250. c . . I RL ME 260. c . . I RL ME 270. c . . I RL ME 280. c . . I L. ME 290. c . . I L. E 300. c . . I L. E 310. c . . .I L . E 320. c . . . I L. E 330. c . . .I L . E 340. c . . . I L. E 350. c . . . I L . E 360. c . . . I L . E 370. c . . . I RL. E 380. c . . . I RL. E 390. c . . . I L . EM 400. c . . . I L . EM 410. c . . . I L . EM 420. c . . . I L . EM 430. c . . . I L . EM 3.00 440. c . . . I L . EM 450. c . . . I L . EM 460. c . . . I L. EM 470. c . . . I L. EM 480. c . . . I L. EM 490. c . . . I L EM 500. c . . . I L WEM 510. c . . . I L WE M 520. c . . . I .L WE M 530. c . . . I .L WE M 540. c . . . I .L WE M 550. c . . . I .RL WE M 560. c . . . I . L WE M 570. c . . . I . L WE M 580. c . . . I . RLWE M 590. c . . . I . LWE M 600. c . . . I . LWE M 610. c . . . I . LWE M 12 620. c . . . I . WE M 630. c . . . I . WE M. 640. c . . . I . WE M. 650. c . . . I . WE M. 660. c . . . I . WE M. 670. c . . . I . WE M. 680. c . . . I . WEL M . 4.00 690. c . . . I . W E M . 700. c . . . I . WELM . 5.00 710. c . . . I . WE L . 6.00 720. c . . . I . WE L . 730. c . . . I . WEL . 7.00 740. c . . . I . LE. 8.00 750. c . . . I . LE. 1050.00 760. c . . .I M . R L E. 1 770. c . I 780. c . I 790. c . I 800. c . I 810. c . I 820 . c . I 830. c . I 840. c I 850. c I 1150.00 860. c I 870. c I 880. c . I 890. c . I 900. c . I 910. c . I 920. c . I 930. c . I 940. c . I 950. c . I 1200.00 960. c . I 03/21/95 06:09:47 ************************************************** HEC2 RELEASE DATED NOV 76 UPDATED MAY 1984 ERROR CORR -Ol,02,03,04,05,06 MODIFICATION -50,51,52,53,54,55,56 IBM-PC-XT VERSION ************************************************** M R L E. M R L E. M. R L E . M R L E . . M R L E . MR L WE R L WE R MLWE R LWE R LWE R LWE R WE R WE R WE R WE R WE R WE R MwE R MWE R MWE THIS RUN EXEC NOTE-ASTERISK (*) AT LEFT OF CROSS-SECTION NUMBER INDICATES MESSAGE IN SUMMARY OF ERRORS LIST QUAL CONVEYANCE *** 13 SUMMARY PRINTOUT SECNO CWSEL TO PW ID SSTA END ST STCHL STCHR 1.000 256.31 3875.87 702.24 4578.11 4125.00 4294.00 1.000 257.31 2627.17 1666.83 4294.00 4125.00 4294.00 2.000 256.30 883.07 727.23 1610.30 1302.00 1337.00 2.000 257.30 432.07 904.93 1337.00 1302.00 1337.00 3.000 256.31 456.52 948.16 1404.68 1175.00 1215.00 3.000 257.27 104.15 1135.01 1239.16 1175.00 1215.00 4.000 255.76 36.38 1221.82 1258.20 1221.00 1259.00 4.000 257.16 37.40 1221.32 1258.72 1221.00 1259.00 5.000 256.64 43.56 1215.73 1259.29 1215.00 1260.00 5.000 257.45 44.06 1215.48 1259.54 1215.00 1260.00 6.000 256.66 43.59 1215.72 1259.30 1215.00 1260.00 6.000 257.46 44.08 1215.47 1259.55 1215.00 1260.00 * 7.000 258.65 225.93 1020.21 1259.91 1215.00 1260.00 7.000 259.46 45.00 1215.00 1260.00 1215.00 1260.00 8.000 258.65 225.92 1020.22 1259.91 1215.00 1260.00 8.000 259.46 45.00 1215.00 1260.00 1215.00 1260.00 1050.000 258.74 247.23 .00 307.54 114.00 158.00 1050.000 259.44 126.97 31. 03 -158.00 114.00 158.00 1150.000 258.43 61. 46 143.89 357.34 143.00 177.00 1150.000 259.34 34.00 143.00 177.00 143.00 177.00 1200.000 258.46 29.82 172.19 202.02 166.00 200.00 1200.000 259.37 31. 05 168.95 200.00 166.00 200.00 1 03/21/95 06:09:47 QUAL CONVEYANCE *** SUMMARY PRINTOUT TABLE 110 SECNO CWSEL DIFKWS EG TOPWID QLOB QCH QROB PERENC ST 1.000 256.31 .00 256.31 3875.87 969.35 38.88 13.77 .00 1.000 257.31 1. 00 257.31 2627.17 970.54 51. 46 .00 .22 16 2.000 256.30 .00 256.31 883.07 631. 50 221.33 169.17 .oo 2.000 257.30 1. 00 257.31 432.07 734.94 287.06 .00 .48 9 14 3.000 256.31 .00 256.37 456.52 281. 02 476.25 264.73 .00 3.000 257.27 .97 257.39 104.15 219.17 670.09 132.74 .51 11 4.000 255.76 .00 257.00 36.38 .00 1022.00 .00 .oo 4.000 257.16 1. 40 257.75 37.40 .00 1022.00 .oo .00 12 5.000 256.64 .00 257.15 43.56 .00 1022.00 .oo .oo 5.000 257.45 .81 257.81 44.06 .00 1022.00 .00 .00 12 6.000 256.66 .00 257.15 43.59 .00 1022.00 .00 .oo 6.000 257.46 .80 257.81 44.08 .00 1022.00 .00 .oo 12 * 7.000 258.65 .00 258.85 225.93 53.23 968.77 .00 .oo 7.000 259.46 .80 259.63 45.00 .oo 1022.00 .00 . 18 12 8.000 258.65 .00 258.85 225.92 53.21 968.79 .00 .oo 8.000 259.46 .80 259.63 45.00 .00 1022.00 .00 .18 12 . 1 1 1050.000 258.74 .00 258.86 247.23 325.27 1050.000 259.44 .70 259.64 126.97 98.62 1150.000 258.43 .00 259.15 61.46 .oo 1150.000 259.34 .91 259.85 34.00 .00 1200.000 258.46 .00 259.81 29 .82 .00 1200.000 259.37 .90 260.24 31. 05 .00 03/21/95 06:09:47 SUMMARY OF ERRORS AND SPECIAL NOTES CAUTION SECNO= 7.000 PROFILE= 1 HYDRAULIC JUMP D.S. 03/21/95 06:09:47 FLOODWAY DATA, PROFILE NO. 2 QUAL CONVEYANCE *** 655.97 923.38 1009.07 1022.00 1021.53 1022.00 -------FLOODWAY -------WATER SURFACE ELEVATION STATION 1. 000 2.000 3.000 WIDTH SECTION MEAN WITH WITHOUT DIFFERENCE 2627. 432. 104. AREA VELOCITY FLOODWAY FLOODWAY 19613. 1230. 415. 15 . 1 .8 2.5 257.3 257.3 257.3 256.3 256.3 256.3 1. 0 1. 0 1. 0 40.76 .00 .oo .41 12.93 .00 .oo .16 1 .4 7 .00 .00 .04 1 ·. 1 4.000 37. 166. 6.2 257.2 5.000 44. 214. 4.8 257.4 6.000 44. 216. 4.7 257.5 7.000 45. 304. 3.4 259.5 8.000 45. 304. 3.4 259.5 1050.000 127. 322. 3.2 259.4 1150.000 34. 178. 5.7 259.3 1200.000 31. 136. 7.5 259.4 03/21/95 06:10:10 ************************************************** HEC2 RELEASE DATED NOV 76 UPDATED MAY 1984 ERROR CORR -Ol,02,03,04,05,06 MODIFICATION -50,51,52,53,54,55,56 IBM-PC-XT VERSION ************************************************** 255.8 1.4 256.6 .8 256.7 . 8 258.7 . 8 258.7 . 8 258.7 . 7 258.4 .9 258.5 . 9 THIS RUN EXEC -. I Cl2~~ DDP ;:;c..e- /KO Ti"f.Ntt>-c.I~ VsH.Jo/sHG. (/ CHe"V:tffy\..) Memorandum to File File: K.D. Timmons Proposed Chevron Northeast Corner SH30 and SH6 Frontage Road Subject: Unpermitted grading From: Brett McCully, Engineering Project Manager Date: January 30, 1995 The following transpired yesterday, February 13th. 1. Jerry Jones asked me if the FutTows grading was finally approved since they were moving dirt in front. It became clear that the work in question was not on the Furrows site but on the corner properties. We checked with Veronica to see of a DDP had been issued for this work, and none had been. I directed Jerry to go out, shut down the contractor and have Larry Young call me as soon as possible. 2. Larry Young called and I informed him that he was filling in a floodplain without a permit which was a big no-no. He said that he thought the owner had a permit to dump the fill there "since it needed to be filled above the creek anyway". I told him that he needed to get erosion control up on both sides of the creek, and not to do any more work until a permit was issued. Larry said he would call the owner to inform him. 3. The owner, K.D. Timmons called and I recapped the situation. He asked what he needed to do now. I explained the DDP process, and that he needed the permit for any work he was doing or planning to do . I explained that the submittal would need to come from an engineer, and he mentioned that he was already working with Earl at Garrett. I suggested he get with Eari and maybe the three of us could meet to go over details and possible plans to speed the process up. His main concern was missing on some free fill dirt. 4. Earl Havel called, and I gave him the rundown as well. I told him I needed a grading plan of the proposed fill, and since we are in a floodplain, the floodway limit. he said he would look at the site survey and get back with me tomorrow. 5. I spoke with Veronica to make sure we were being consistent with our requirements. We agreed that Earl had the choice of showing the floodway, or showing that the proposed grading would not increase the flood elevation by more that 12 inches. From: Jim Callaway To: Jane Kee, Shirley Volk Subject: KD Timmons/SH30. ===NOTE===============2/07/95==1:57pm== George Ball just spoke to me re: the Timmons Chevron/Restaurant project at the NW corner of SH30 and SH6 (by Furrows). George wanted to confirm that our position had not changed on the platted and unplatted parcels. I confirmed that they could combine the paltted and unplatted parcels into a building plot since they were both legitimate building plots at this time. I advised that a plat may be best if there are to be any easements dedicated and that a plat would be needed if any boundaries changed. Page: 1 Morris & Associates Engineers, Inc. 10235 West Little York, STE. 450 Houston, Texas 77040 713/896-1090 Fax: 713/896-1750 DOCUMENT TRANSMIT AL TO: // c I'-OtVJcA CIL>~qAP DATE : 9-/1/-f) M&A#: /'! Z,), t:Jo.J-lr PROJECT NAME: llWP Jot EALT tlY/IA.rJ WE ARE FORWARDING THE FOLLOWING : ~PRINTS ESTIMATES PROPOSAL REPRODUCIBLES SPECIFICATIONS ORIGINALS COPIES CALCULATIONS MEETING NOTES BY: MAIL __ FEDERAL EXPRESS MESSENGER _PERSONAL PICKUP FACSIMILE PGS. TO FOLLOW FOR YOUR INFORMATION & COMMENTS ~AS PER YOUR REQUEST FOR COORDINATION PURPOSE FOR YOUR FILES . FOR YOUR APPROVAL OR CORRECTION FOR YOUR REVIEW _PLEASE GIVE THIS MA TIER YOUR IMMIDATE ATTENTION FOR FIELD USE COPIES TO :~ft',--"-/~t-_,,e:=..__ ______ _ Morris & Associates Engineers, Inc. 10235 West Little York, STE. 450 Houston , Texas 77040 713/896-1090 Fax : 713/896-1750 TO : L/ E /( OAI /Ctt L'/Ol'lgM Cly o.f Call7e J/A..iJof'.J WE ARE SENDING YOU THE FOLLOWING ITEMS : 1iJ. Prints o Reproducibles o Copies o Letter O Proposal o Meeting Notes VIA: "G( Mail b Federal Express o Messenger D Personal Pickup o For Your Information & Comments o As Per Your Request o For Coordination Purpose Ji! For Your F i les o For Your Approval Or Correction Copies To : -~____./~'--e=---------- LETTER OF TRANSMITTAL 'r 'RECEIVED 3:.. 2 5 19951 DATE : Cf-l_/ ~ '!.) I M&A# If ZS: CJOJ/1 RE : clJ//_fi:t;E rrAr/b,J o Estimates o Specifications o Shop Drawings o _______ _ O Facsimile - _Pages To Follow O For Your Review o For Field Use O Submit _Copies For Distribution O Return _Corrected Prints /'I /)I" Federal Emergency Management Agency MT Region VI, Federal Center, 800 North Loop 288 Denton, Texas 76201-3698 February 26, 1996 Ms. Veronica J.B. Morgan, P.E. City of College Station P.O. Box 9960 College Station, Texas 77842-9960 RE: Request for a Conditional Letter of Map Revision for Carter's Grove Tributary in College Station, Texas. Dear Ms. Morgan: This will acknowledge receipt of the above referenced request dated February 21, 1996. The information provided has been forwarded to our headquarters off ice for appropriate review and processing. If additional information is needed, you will be contacted by them directly. Sincerely, a ~~* a ivil Engineer Mitigation Division USAAirbill From (p ease rintl u\ /Jt1" 1062-6302-7 . ~ Li\Y Sender 's FedEx Account Number ---------------------Date ~~~:rs _~--'--"~-~-.., -~-l+----Phone(4tYt I 1w~~f151o ~ OeptJAoor/Su~e/Room CITY DF COLLE E STA TIC Companv -----------------------------------------11 1 TEXAS AVE Address -----------------------------------------COLLEGE STATI 7 7 a 4 o City Zip ___________ _ 1!:"11 Your Internal Billing Reference Information ~ l Opt1onal)I F1rst24 characters will appear on 1nvo1ce) -~Q.::::!::.A-:....:.._=.::_ __ -A~---------------To (please printl • ~e~~~nrs f:,i.{ A. ~ ili\ur c..,\ DeptJAoor/Su ite/Room City For HOLD at FedEx Location check here D Hold Weekday INot1va1lablew1th FedExf1rs10vernight) D Hold Saturday (No1ava1l1ble11 all louttons) !Not 1v111able with FedEx First Overnight or FedEx S1andardOvern1ght) SeMce Conditions. Declared Value. and Limit ofLiability -Byugng hsArtJI, you lg(ee to the sef\llCe condruons in OO" current Service GUide or US. GovefMlent SeMce Guide. Both are ava~able on request. See back d Sender s Copy rA tM 8lrbil for information and addiboo8I terms. !Alewi not be responsible for any clam in excess ofSIOO per package whether the rasult of loss. damage, or delay, non-delivery, ITllSdellvef'y, or IT'ISlllformaliOO, unless you declare a hlghef"value,payaoaddrtlooalch&rge,anddoc:~youracruallossna~mnier.'!'OIJ nght to recover from us for any loss 11'1Cludes llltrinSIC value of the package, loss of sales, llltel'est, profil. anomey's fees. costs. and 01tlef forms of damage,~ direct, 1"1Cidental, consequenoal, or special, and IS limlted to the greatef" of $100 or the declared value bt.I cannoc exceed actual documented loss. The mamun declared value for any F9d'Ex lettltf and FedEx Pak JS $500 Federal Express may, ~ YIXf request. and ~ some linltatK>ns. refund al 1ransponaoon charoes paid. See the FedEx Service Guide for further details. 22 Sender"s Go y 200 63693759 601 ft · ~ Service Oehvery commitment may be laterm some areas ~ FedEx Pnonty Overnight D FedEx Standard Overnight ~ (Nutbusmess morning! (Next business atternoonl D FedEx 2Day* (Second business day) D FedEx Govt. Overnight D \Authonzeduseronlyl ---------'---'-_J D FedEx Overnight Freight D FedEx 2Day Fre ight L__!Forpackagesover ISO pounds Callfordelrveryschedulel __J D NEWFedEx First Overnight tEarhestnextbusinessmormngdelrverytoselec1locatJons) !H1gherra1esepply l •FedExlanerRateno1av11lable Mm1mumcharge One pound FedEx 20ay rate b Packag ing D FedEx D Fe dEx Lette r* Pak* L__ Declared value 1im1tSSOO ___J 'lo!7redEx ~Box D FedEx Tube D Other Packaging ti Special Handling Does this shipment contain dangerous goods? D Yes 1Aspa11111ehtd D Yes (ShppersOeci..non ShippersOecllratml na11'9Ql#edJ D Dry Ice Orylce,9,UN 1845111 ____ • ____ kg 904 CA 0 Car go Aircraft Only (OangerousGoodsSh1pper'sOeclarat1onnotrequ1red) d Payment Bill to : Sender Account no.in ection1wdlbebtlted) D Recipient D Third Party D Credit Card D ~~~~k ~ (EnterFedEx1ccountnoorCred1tCardno. belowl __J FedEx Account No.------------------------ Credit Exp Card No------------------Date ______ _ T~eight Total Declared Value .00 •When dect mg a value h~her than SIOO per pack1g1, you P'Y an add1t1onal charge See SERVICE CONOITIONS , OECLAREO VALUE AND LIMIT OF LIABILITY section for further mtorma11on Ill Release Signature Your signature authorizes Federal Express to deliver this ship- men! without obtainmg a signature and agrees to indemnify and hold harmless Federal Express from any resulting claims Total Charges Questions? Call 1·800·Go·FedEx (1-8 00-463-3339) The World On Tim~ FORM ID NO 0200 WCSL 1195 Rev. Date 10/95 •PART #147381 (!)1994-95 FedEx • PRINTED IN US.A. Terms And Conditions Definitions On this airbill, we, our and us refer to Federal Express Corporation, its employees, and agents. You and your refer to the sender, its employees, and agents. Agreement To Terms By giving us your package to deliver, you agree to all the terms in our current Service Guide, which is available on request You also agree to those terms on behalf of any third party with an interest in the package. If there is a conflict between the Service Guide and this Airbill , the Service Guide will control. No one is authorized to change the terms of our Agreement Responsibility For Packaging And Completing Airbill You are responsible for adequately packaging your goods and properly filling out this airbill. If you omit the number of packages and/or weight per package, our billing will be based on our best estimate of the number of packages we received and/or an estimated "default" weight per package as determined by us. Responsibility For Payment Even if you give us different payment instructions, you will always be primarily responsible for all delivery costs, as well as any cost we incur in either returning your package to you or warehousing it pending disposition. Limitations On Our Liability And Liabilities Not Assumed • Our liability for loss or damage to your package is limited to your actual damage or $100, unless you declare a higher value, pay an additional charge, and document your actual loss in a timely manner. You may pay an additional charge for each additional $100 of declared value. The declared value does not constitute, nor do we provide cargo liability insurance. • In any event, we will not be liable for any damage, whether direct, incidental, special, or consequential in excess of the declared value of a shipment, whether or not Federal Express had knowledge that such damages might be incurred including but not limited to loss of income or profits. • We won't be liable: -for your acts or omissions including but not limited to improper or insufficient packing, securing, marking, or addressing or those of the recipient or anyone else with an interest in the package -if you or the recipient violate any of the terms of an Agreement -for loss or damage to shipments of prohibited items -for loss, damage, or delay caused by events we cannot control, including but not limited to acts of God, perils of the air, weather conditions, acts of public enemies, war strikes, civil commotions, or acts of public authorities with actual or apparent authority. Declared Value Limits •The highest declared value allowed for FedEx Letter and FedEx Pak shipments is $500. • For other shipments, the highest declared value allowed is $5~.000 unless your package contains items of "extraordinary value," in which case the highest declared value allowed is. $500. •Items of "extraordinary value" include shipments containing such items as artwork, jewelry, furs, precious metals, negotiable instruments, and other items listed in our Service Guide. •You may send more than one package on this airbill and fill in the total declared value for all packages , not to exceed the $100, $500 or $50,000 per package limit described above. (Example: 5 packages can have a total declared value of up to $250,000.) In that case, our liability is limited to the actual value of the package(s) lost or damaged, but may not exceed the maximum allowable declared value(s) or the total declared value, whichever is less. You are responsible for proving the actual loss or damage. Filing A Claim YOU MUST MAKE ALL CLAIMS IN WRI TING and notify us of your claim witpin strict time limits set out in the current Service Guide. We'll consider your claim filed if you notify our Customer Service Department at 1·80{}Go·FedEx and make your claim in writing as soon as possible. Within 90 days after you·notify us of your claim, you must send us all the information you have about it We aren't obligated to act on any claim until you have paid all transportation charges, and you may not deduct the amount of your claim from those charges. If tile recipient accepts your package without noting any damage on the delivery record, we will assume the package was delivered in good condition. For us to process your claim, you must make the original shipping cartons and packing available for inspection. Right To Inspect w'e may at our option open and inspect your packages before or after you give them to us to deliver. Right Of Rejection We reserve the right to reiect a shipment when sucl1 shipment would be likely to cause delay or damage to other shipments, equipment, or pers,onnel or if its shipment is prohibited by law; or if1he shipment would violate any terms of our Agreement or our current Service Guide. C.O.D. Services C.0.0. SERVICE IS NOT AVAILABLE WITH THIS AIRBILL If C.0.0. Service is required, please use a Federal Express C.0.0. airbill Air Transportation Tax Included Our basic rate includes a federal tax required by Internal Revenue Code Section 4271 on the air transportation portion of this service. Money-Back Guarantee In the event of untimely delivery, Federal Express will at your request and with some limitations, refund or credit all transportation charges. See current Service Guide for more information. Part#147381/147382 •Rev 10/95