DEVELOPMENT PERMIT
PERMIT NO . 235
FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA
RE : CHAPTER 13 OF THE COLLEGE STATION CITY CODE
SITE LEGAL DESCRIPTION:
Lot 5 &6 of Anderson Ridge Subdivision -Phase 4
SITE ADDRESS:
1912 Texas Ave.
OWNER:
Buddy Forehand
DRAINAGE BASIN:
Wolf Pen Creek
TYPE OF DEVELOPMENT:
This permit is valid for site construction as per approved plans for the E l Chico Restaurant.
The Contractor shall take all necessary precautions to prevent silt and debris from leaving the
imm ediate construction site in accordance with the City of Co llege Station Drainage Policy and
Design Criteria. Contractor shall assure that all disturbed areas are sodded and establishm ent
of vegetation occurs prior to removal of any silt fencing of hay bales used for temporary erosion
control. Owner and contractor shall also be responsible for any damage to adjacent properties,
city streets or infrastructure due to heavy machinery and/or equipment as well as erosion,
siltation or sedimentation resulting from the permitted work.
This permit expires six months from the date of issuance.
In accordance with Chapter 13 of the Code of Ordinances of the City of College Station,
measures shall be taken to insure that debris from construction, erosion, and sedimentation shall
not be deposited in city streets, or existing drainage facilities .
I hereby grant this permit for development of an area outside the special flood hazard area.
development shall be in accordance with the pl ans and speci Ji,;ations submitted to and
roved by the City Engineer in the development permit application i o r the above named project
all of the codes and ordinances of the City of College Station that apply .
Date
?-2 :< =---t~Y __ _
Date
7-zz-9i'
Date
~ckco ·.
~ ~ -(o ~ ~ ~ o,J., uJJ., CL %cfdd
f l!lilA ~ct &L ~C~)fd,~~ ~.
~ ~ ~ ~,;:,, ~&o IU)\ UWfS UM.., 0-'f<•\llt,,
v ·°'~o.#~·~ WtwiU ~~tk~ ~ ~~
~ ·J: W1ll ~ ~~s <\ii~· ~~
~
DEVELOPMENT PERMIT
PERMIT NO. 235
FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA
RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE
SITE LEGAL DESCRIPTION:
Lot 5 &6 of Anderson Ridge Subdivision -Phase 4
SITE ADDRESS:
1912 Texas Ave.
OWNER:
Buddy Fore hand
DRAINAGE BASIN:
Wolf Pen Creek
TYPE OF DEVELOPMENT:
This permit is valid for site construction as per approved plans for the El Chico Restaurant.
The Contractor shall take all necessary precautions to prevent silt and debris from leaving the
immediate construction site in accordance with the City of College Station Drainage Policy and
Design Criteria. Contractor shall assure that all disturbed areas are sodded and establishment
of vegetation occurs prior to removal of any silt fencing of hay bales used for temporary erosion
control. Owner and contractor shall also be responsible for any damage to adjacent properties,
city streets or infrastructure due to heavy machinery and/or equipment as well as erosion,
siltation or sedimentation resulting from the permitted work.
This permit expires six months from the date of issuance.
In accordance with Chapter 13 of the Code of Ordinances of the City of College Station,
measures shall be taken to insure that debris from construction, erosion, and sedimentation shall
not be deposited in city streets, or existing drainage facilities .
I hereby grant this permit for development of an area outside the special flood hazard area.
All development shall be in accordance with the plans and specifications submitted to and
approved by the City Engineer in the development permit application for the above named project
and all of the codes and ordinances of the City of College Station that apply .
Date
2-/i-9t
Date
Date
Figure XII
Application Form
Development Permit
-..:lmifle/ utside Established Flood Hazard Areas
y of College Station, Texas
(re: Ordinance ~o. 1728)
Si~~ga~Descri~~n:~~~·~5~!~·~~~6~~~~~~·~1~~~~~~~~~~~~~~~~,~~~~/~ecv/~-~~~s~~~-~~~-~e~~~~
Site Address: /9tz #MS
Owner: lx.Jhf>/ ,@,.e~
Architect/ ,A Address: ff'¢'¢'~~~ ;M' zt';. 77T"v
Engineer: _ _,M;.a.t.L~+::L:..LT'C_.__--"""'filk.:....:..:.=~'------------Telephone No.: ~f:: __ ~-~ -~
//--,,, o./ ~tP r/,. \ /S.PI 5'v1f,<11r ~1 . 't.Pn/, 7~tJZ./ JffWctftttHGtirJtte!v "$~ 5A71?L/ft/O,._r iv ~A'ddress:,,Jtr ;~Alttlr ~_,, ,,, 1'W• ei' Contractor:
Telephone No.: '1 (]ft.., Jn -3'3,---r~
Date Application Filed: __ 1_.__--1_;;$_--'9-+i----------Approved:-----------
Attached as part of this application:
13"' Application Fee
E(Signed Certificate
B Site and Construction Plans, with supporting documentation: two (2) copies of each
O Other: ------------------
ACKNOWLEDGEMENTS:
I, }>tfA1il£ ~# (dcmv?-J , as owner, hereby acknowledge or affirm that:
The above Drainage Plan and supporting documents complies wiht the requirements of Ordinance No. 1728,
and
~U~l c Owner
?-/3-?/
Date
Developer Date
'7
-=--------------------~ Contractor Date
Page 1of2
GARRETT ENGINEERING
COllSUL TlllG EllGlllEERJllG & LAllD SURVEVlllG
4444 CARTER CREEK PARKWAY, SUITE 108 -BRYAN, TEXAS 77102 -(409) 14'-2681 -(44n) 8...,-3094
TO: Date:
RE:
We Are Sending You : /Herewith __ Under Separate Cover The Following:
Copies Date Description
_L 1_-15-9./ /&c.Z: ak
I 7-is-fc/ h1cA-77&J /P/41/ -k~d/fNY
( 7-13 -9/ ~M!M~£ ~.-#orAz?&~
Remarks:
By:~ c ~==-~)
0; . _/'/ /{ ( ··------· ...
71?-&r,r
CITY OF COLLEGE STATION
$/QC.D O
Paid by _ Check/ cl.0' 3 / Cash ___ _ THANK YOU L{f6
•••••••........ c;f:--O:-:".:-:-.... :::::::::::r::: ........• .,-;;-;.~ ........ ~..... :-;":-;;;~o=o....-.....,.=~·'=····;~;-;-;-:-:-:-:n-::.;.:-::. .. •••• .!..:..!!..:..:. • ... ;=:o--: ............... .
GARRETT ENGINEERING
PH . 846-2688
4444 CA RTER CREEK PKWY . SUITE 108
BRYAN , TEX A S 77802
VICTORIA BANK & TRUST
P. 0. DRAWER 913 / BRYAN. TEXAS 77805-0913
MEMBER VICTORIA BANKS HARES. LNCJFDLC
12831
66 -231 /11 3 1
__ _..__._/-=3 __ 1 gL'f-
$ 100,
·=nDLLAR S ~
f\L-E
-wr Bt~
~C,~
~ ch:l: (Q~~J
~s.o~~\~
-;. ~~e, ~QA, ~ ~\:; 1ia ot..~~ 1 r~t cw1 Mlaiut ~ slzl * l'IW-01-be-"•old.1 u."
.. '61.~~ ~·a'
----··--....... _
__ J
I
(
!
McCORD ENGINEERING, INC.
7-307 ~.:tsnn ~r:< :n'1e. Suite · 02. :J 'J . 3cx ~ CDJ./
Cc1leqe 3tati c n. T~xas i/842 t'-'V91 -s~-d:5o
F3x ('109) 754-:!64'1
·!,__~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
I
I
I
I
Mr. Ray Havens
Electric Transmission &
Distribution Superintendent
City of College Station
P. 0. Box 9960
College Station, Texas 77842
June 28, 1994
RE: El Chico Restaurant -Electric Service
Dear Ray:
In accordance with your request , we have reviewed the load and service requirements
for the El Chico Restaurant proposed for construction at Texas Avenue and Holleman Drive.
We have planned the on-site electric distribution layout to ser\re this project to be underground,
in accordance with the requirements of your City's line extension policy . Enclosed herewith
. for your review and use are five (5) copies of our proposed electric distribution layout for this
facility. A Bill of Material and a Project Cost Estimate for the above referenced project are
also enclosed. A diskette has been provided which includes this project electrical layout for
your use.
-1-_,_ ..... ....-J A 300 kVA, three-phase, 12,470 GNDY/7,200 volt primary to 208Y/120 volt secondary
pad-mounted transformer has been planned for installation to provide the requested service
utilization voltage level for the El Chico Restaurant. Metering for El Chico Restaurant is
proposed to be accomplished at the transformer using 600/5 ampere current transformers and
a meter with demand indication of at least 4.0 . Specifications for your use in purchasing this
transformer are enclosed.
In accordance with your City policy , the developer should plan to furnish and install,
in compliance withTity specifications , all required elec trical conduit and pour the required
concrete pad for said 300 kVA transformer and the junction box. The electric layout drawing
enclosed provides details regarding the required number and sizes of conduit , installation depth,
proposed conduit locations, riser pole conduit requirements, etc; the transformer pad details
should be furnished when the dimensions of the transformer and junction box proposed to be
used are known.
In accordance with the new policy of your City, the developer is responsible for
reimbursing your City for 20% of the cost of installation, including labor, materials, and
standard fee percentages for engineering and overhead cost for the proposed electric layout.
. .
City of College Station
June 28, 1994
Page Two
We compute that the 20% contribution required for the El Chico Restaurant 's Portion computes
to be $3, 146. 80. This cost estimate was calculated based on a total project cost estimate of
$15,734.00. The total underground cost includes a standard allowance of 30% to cover your
City's labor related overhead costs, 7% material handling costs, and 8.5% to cover your City's
administrative and engineering costs.
I trust we have provided herein the information you need on this project. If not, or if
questions arise, please let us know .
DW/mw
Enclosures
cc: Ms. Veronica Morgan (w/encl.)
Mr. Bob Pohl
Yours very truly,
McCORD ENGINEERING, INC.
David Witte
Engineering Assistant
Revised 1/88
CITY OF COLLEGE STATION
THREE-PHASE
PAD-MOUNTED TRANSFORMER
SPECIFICATION PMT-2
AND
BID SHEET
Pa ge l of l
PROJECT: El Chico Restaurant
Item Quantity Description
1 1 300 kV A, three-phase, 60 hertz, oil-filled, compartmented, pad-mounted
Manufacturer
Catalog Number
transformer, 12,470Y/7,200 volt primary voltage to 208Y/120 volt
secondary voltage, 95 kV BIL, wye-grounded wye-grounded connection
with standard accessories and two 2 -1/2 % taps above and below normal
voltage. Transformer to have a deadfront with a loop feed high-voltage
termination to consist of six (6) universal bushing wells and have access
doors with side hinges to permit horizontal swing. Transformer is to be
protected with a Bay -0-Net drawout fuse assembly, and is to have thread-
ed in-line copper stud se ~ondary bushings with jamnut and standard
NEMA , 6-hole, copper with tin plating , H spade terminals attached there-
to.
Bid As Specified
(Item 1 )
Alternate Bid
(Item lA )
No Load Loss (Watts)
Load Loss (Watts)
Impedance (%)
Delivery
Unit Bid Price ($)
Total Item Price ($)
Total Item Owning Cost ($)
(Computed Per Given Formula)
Bidder
Signature --Bidder's Sales Representatives
Date
• " McCord Engineering, Inc.
CS-13-E.7
M A T E R I A L
CODE ITEM NO.
----------25 a 1
25 c 2
25 c 5
25 c 6
25 c 7
25 c 8
25 c 10
25 d 14
f 19
g 26
25 j 38
28 UL so
27 bu 64
25 p 65
28 ae 128
28 af 131
29 Ugp 139
25 ai 150
25 aj 156
al 159
28 ap 168
28 Uhe 197
24 bs 213
24 bv 220
29 Ugp 223
29 Ugp 225
29 Ugp 226
29 Ugp 227
27 Uhp 230
27 Ugk 232
Uhg 272
Uhb 274
28 Uhb 276
av 282
25 cm 286
cu 294
26 Uj 303
28 f d 330
ek 338
24 zz 377
CITY OF COLLEGE STATION
EL CHICO RESTAURANT
B I L L 0 F M A T E R I A L
CATALOG
MATERIAL DESCRIPTION REF. NO.
------------------------------------LARGE GR PIN TYPE 7.2 28503500009.
1/2" X 6" MACHINE BOLT 32002000001
POLE TOP PIN 20" 28504700012
5/8" X 12" MACHINE BOLT 32002000014
5/8" X 14" MACHINE BOLT 32002000015
5/8" X 16" MACHINE BOLT 32002000016
5/8" X 20" MACHINE BOLT 32002000018
2" X 2" SQUARE WASHER 32002000031
CROSSARM PIN 7.2KV 28504700003
8' CROSSARM 28502400001
LAG SCREY 1/2" X 4" 28504700010
UG EQUIPMENT LOCK 832040
1/0 H-TAP COPPER CONN 28502200003
CONNECTOR COMPRESSION 285022
MOV LIGHTNING ARRESTER 28500300001
100 AMP OPEN TYPE S&C 28502800001
AL-18 2 HOLE 350 LUG 28502200021
8' COPPERWELD GROUND ROD 28503800001
5/8" GROUND ROD CLAMP 28504700025
WIRE STAPLES
SMALL HOTLINE CLAMP 28504700027
LARGE METAL JUNCTION 28504500005
5/8" X 10" S.U. BOLT 32002000024
WRS 352 STIRRUP 28504700081
1/2" X 2 1/2" BRASS BOLT 32002200002
1/2' BRASS NUT 32002200004
1/2" BRASS ROUND WASHER 32002200005
1/211 BRASS LOCK WASHER 32002200006
1/0 LOADBREAK ELBOW 28508200001
1/0 POLE TYPE TERMINATOR 28508200003
LBC 3 3-WAY FEED THRU 28509500002
URD DUST CAP ASSBLY. 28509500004
URD BUSHING INSERT 28509500006
6 SOFT DRAWN COPPER 28001600003
355 INSULATOR SPOOL 28503500011
28 11 WOOD CROSSSARM BRACE 28504700015
STANDOFF POLE TYPE 28504700022
R3-CA 3 POSITION EQU. MT 28504700058
3/811 LOCKNUT NA
40' CONCRETE POLE 54007000010
06/08/94
WORK ORDER NO. ----
TOTAL UNIT TOTAL
QTY. COST $ COST $ -----------------------3 2.95 8.85
2 .59 1.18
1 2.86 2.86
4 .67 2.68
6 .78 4.68
1 .96 .96
2 1.69 3.38
16 .15 2.40
2 1.75 3.50
1 24.76 24.76
5 .44 2.20
2 6.00 12.00
6 1.74 10.44
6 .29 1. 74
3 26.40 79.20
3 39.77 119.31
24 5.35 128.40
4 8.33 33.32
4 .72 2.88
40 .00 .00
3 6.01 18.03
1 625.00 625.00
1 2.15 2.15
3 7.37 22.11
24 1.54 36.96
24 .36 ·8.64
48 .42 20.16
24 .08 1.92
9 45.00 405.00
3 24.98 74.94
2 109.00 218.00
3 13.91 41. 73
6 17.99 107.94
40 .OS 2.00
1 .87 .87
2 3.87 7.74
3 8.44 25.32
2 75.74 151.48
4 .12 .48
1 680.00 680.00
... . McCord Engineering, Inc.
CS-13-E.7
M A T E R I A L
CODE ITEM NO.
----------28 Uan 410
27 Uhv 523
25 p 759
28 an 780
27 cj 783
28 FUSE 800
Uhs 27 868
CITY OF COLLEGE STATION
EL CHICO RESTAURANT
B I L L 0 F M A T E R I A L
CATALOG
MATERIAL DESCRIPTION REF. NO.
------------------------------------300 KVA PADMOUNT 120/208 28508600041
1/0 URD AL. PRIMARY 28008000001
#6 H3 COPPER CONNECTOR 28502200002
TRANSFORMER GROUND LUG 28502200026
1/0 BARE STRANDED COP~ER 28008000009
25 AMP FUSELINK . 28503400009
COLD SHRINK SLEEVE 28508200019
06/08/94
\./ORK ORDER NO. ----
TOTAL UNIT TOTAL
QTY. COST $ COST $ -----------------------1 5112.00 5112.00
.990 1189.00 11n.11
5 .so 2.50
3 1.30 3.90
12 .36 4.32
3 2.56 7.68
10 10.19 101.90
---------9304.62
• • McCord Engineering, Inc.
CS-13-E.7
06/08/94
\JORK ORDER NO. ---
LETTER
CODE
------------*40-2C
*C1
M2-1
UC2
UD#1/0 URD
UG17-300
UM6-1
UM6-6
UM6-10
UM6-21
UM33
UM48-2
CITY OF COLLEGE STATION
El CHICO RESTAURANT
PROJECT COST ESTIMATE -CONSTRUCTION UNITS
COST ($) PER 1 ASSEMBLY
-------------------------ASSEMBLY DESCRIPTION QTY LABOR MAT. TOTAL
-----------------------------------------------------
40 CLASS 2 CONCRETE POLE -HOT 1 487.50 700.00 1187.50
3 PH SINGLE SUPPORT-HOT 1 46.50 56.00 102.50
POLE GROUND 1 15.00 11.84 26.84
3 PH UG CABLE TERMINAL POLE 1 247.00 514.51 761.51
1/0 PRIMARY URD CABLE .990 1050.00 1189.00 2239.00
3 PH 300 KVA PADMOUNT 1 372.00 5436.22 5808.22
LOAD BREAK ELBOW 9 65.00 55 .19 120.19
GROUND ROD ASSEMBLY 3 8.00 9.05 17.05
INSULATED PROTECTIVE CAP 200 AMP 3 10.00 13.91 23.91
3 POINT JUNCTION 200 AMP 2 75.00 109.00 184.00
SECTIONALIZING ENCL. MULTI PHASE 1 500.00 643. 14 1143.14
MULTI-PHASE UG GROUNDING SPEC. 1 .01 .00 .01
TOTAL LABOR =
TOTAL MATERIAL =
TOTAL =
LABOR OVERHEAD 30% =
MATERIAL HANDLING 7% =
TOTAL
ENGINEERING & OVERHEAD 8.5% =
GRAND TOTAL
ROUNDED TO
DEVELOPERS CONTRIBUTION 20% =
* DENOTES HOT \JORK
TOTAL
COST $
---------1187.50
102.50
26.84
761.51
2216.61
5808.22
1081.71
51.15
71.73
368.00
1143.14
.01
---------12818.92
3496.51
9304.62
---------12801.13
1048.95
651.32
----------14501.40
1232.62
----------15734.02
$15,734.00
----------$3,146.80