HomeMy WebLinkAbout9 DP Steeplechase Ph 7 00-500083Drajnage Report FO.lt STEEPLECHASE SUBDIVISION PHAS.l!i-, 7 VICINITY MAP NTS November, 2000 Prepared By: McClure Engineering, Inc. 1008 Woodcreek Dr., Suite 103 College Station, Texas 77845 (979) 693-3838 Dra1nage Report FOR STEEPLECHASE SUB.DIVISION PHASE 7 REVIEWED FOR C()~ADI IJ\ 'GE VICINITY MAP ' DEC 0 8 2000 NTS November, 2000 Prepared By: McClure Engineering, Inc. 1008 Woodcreek Dr ., Suite 103 College Station, Texas 77845 (979) 693-3838 COLLEGt: ! 1 101\J ENGlNEERING /!JI(/ CERTJFICATION I, Michael R. McClure, Registered Professional Engineer No . 32740, State of Texas, certify that this report for the drainage design for STEEPLECHASE SUBDIVISION, PHASE 7, was prepared by me in accordance with the provisions of the City of College Station Drainage Policy and Design Standards for the owners thereof DRAINAGE REPORT STEEPLECHASE 7 Michael R . McClure, P .E . # 32740 _,,,,,,,,. --~€. OF 7"i-'\' ;,(,,,~ .............. ..r..., •• ;'~ .. •• * •· .. ~ ,a '* .. .. *'I. '-*: ~*l ~···································~ l MICHAEL R. McCLURE l !···································I '?~··. ~ 327 40 ~ ////~ fai··f.G/STE~~··· ~ # "' Ss •••••••••• ~0 ..., \\~ONAL t-- INTRODUCTION TABLE OF CONTENTS STEEPLECHASE 7 GENERAL LOCATION AND DESCRIPTION FLOOD HAZARD INFORMATION DRAINAGE FACILITY DESIGN DRAINAGE DESIGN CRITERIA CONCLUSION EXIIlBITS 1 2 2 3 FEMA FLOOD INSURANCE RATE MAP EXCERPT "A" DRAINAGE AREA MAP -PROPOSED CONDITIONS "B-1" RATIONAL FORMULAS DRAINAGE AREA CALCULATIONS "C-1" INLET COMPUTATIONS "C-2" PIPE SIZE CALCULATIONS "C-3" PROPOSED DETENTION POND #1 ROUTING "D-1" PROPOSED DETENTION POND #2 ROUTING "D-2" COMBINED FLOWS OF DETENTION POND #1 and #2 "D-3" EXCERPT FROM STEEPLECHASE SUBDIVISION DRAINAGE REPORT "E-1" DRAINAGE REPORT 11 STEEPLECHASE 7 DRAINAGE REPORT STEEPLECHASE PHASE 7 INTRODUCTION: The purpose of this report is to study the effects of the development of Phase 7 of the Steeplechase Subdivision. The parameters used for the design of the proposed conditions of the on- site area are incorporated to show how the final drainage design will accomplish the desired drainage objectives per the City of College Station Drainage Policy and Design Standards (DPDS.) GENERAL LOCATION AND DESCRIPTION: The site is located in southern College Station, on Navarro Drive approximate 300' N .E. of the intersection of Wellborn Rd. (FM 2154) and Navarro Drive. The site is generally open with small clusters of trees throughout, and generally drains to the north. The terrain is gentle with average slopes between 0.5% and 1.0%. The south fork of Bee Creek Tributary Bis located north of the site . FLOOD HAZARD INFORMATION: This property is not in a 100-Year Flood Hazard Area according to the Flood Insurance Rate Maps for Brazos County, Texas and Incorporated Areas, effective July 2, 1992, prepared by the Federal Emergency Management Agency for the City of College Station (See Exhibit "A"). DRAINAGE REPORT STEEPLECHASE 7 DRAINAGE FACILITY DESIGN: Storm water from the site will be captured in the curbs and gutters and conveyed to the two . detention ponds . Both detention facilities will be located in the northern portion of the site . Storm water from the detention ponds will be discharged into an existing 2 7" RCP Outfall that was constructed with Steeplechase Phase 2. The water is conveyed by the existing Steeplechase storm drain syst em to the detention pond for Phases 1, 2 , and 3 . The point where the flow is combined between the two detention facilities will serve as Study Point A for this project. Exhibit "C-1" shows the rational calculations for the various drainage areas corresponding to the Drainage Area Map (Exhibit B-1 ). Exhibit "C-2" shows the inlet computations . Exhibit "C-3" shows the ·pipe size calculations for the storm drain. DRAINAGE DESIGN CRITERIA: All drainage is in accordance with the City DPDS. The design rainstorm is the 10 year event. Flow calculations for all drainage areas are based on the Rational Method. Manning's Roughness Coefficient "n" is 0.014 per the DPDS. The storage volume required for the detention facilities is based on a triangular hydrograph routing of the flows .(base = 3* Tc). The detention ponds serve to detain all design storms below the design capacity of the existing 27" RCP Outfall. The capacity of this pipe was determined to be 22.3 cfs by the Drainage Report for Steeplechase Subdivision dated November 1998 and Revised February 1999. Exhibit E-1 shows these calculations. Exhibits "D-1 ", "D-2", and "D-3" show the routing and hydrograph plots for the 5,10, 25, 50, and 100 year events for Detention Pond #1 , Detention Pond #2, and the combination of the two at Study Point A, respectively. DRAINAGE REPORT STEEPLECHASE 7 2 Design Event Detention Pond #1 Detention Pond #2 Combined (Peak Discharge) (Peak Di scharge) (Peak Disc harge) Q s 10.9 cfs 3.7 cfs 14.6 cfs Qi o 12.1 cfs 4.1 cfs 16.0 cfs Q 25 13.6 cfs 4.5 cfs 18 .0 cfs Q so 15 .2 cfs 5.0 cfs 20 .0 cfs Qi oo 16 .8 cfs 5.5 cfs 22.l cfs Ta bl e I Detention Pond # 1 is metered by a 15" by 20" opening in inlet #2, and Detention Pond #2 is metered by a 1 O" by 1 O" opening in inlet #3. The outflow from the ponds is combined at point A, which corresponds to the discharge from inlet #3. CONCLUSION: As shown in Table 1, the combination of flows from Detention Pond #1 and #2 for all storm events is less thari the design capacity of the 27" outfall line ; therefore, the existing Steeplechase storm drain system will adequately serve this new development without its capacity being exceeded. The drainage design for this site meets the requirements as stated in the City of College Station Drainage Policy and Design Standards. DRAINAGE REPORT STEEPLECHASE 7 3 EXHIBIT "A" f l ood Insurance Rote mop Excerpt Brozoe County. Texos ond Incorporated Areos I.lop Number: 48041.C0162C Effective Dote: July 2. 1992 <t =: w c 0 0:: w ...J ...J <t <t Q. <t u. w w 0 j::: I-c 0:: ...J 2 <t 2 (!) <t w 2 w (.) :s ~ <t w ...J > ~ ...J 2 <t ~~ c w <t 0:: (!) ~ I-Ci) > I-Wz 0 2 0:: w <t 0 >w c I-:::::> <t 0:: Q. I-0 ...J NO. AC. 0.35 0.55 0.9 ft. 1 0.18 0.00 0.18 0.00 0.10 210.0 2 2.28 0.24 1.15 0.89 1.52 210.0 3 1.01 0.10 0.51 0.40 0.68 230.0 EXHIBIT C-1 Rational Formula Drainage Area Calculations Steeplechase 7 =: 0 =: =: ...J u. 0 0 c ...J ...J 2 u. u. >-:s 0:: :c 0:: I-u () w I-w I-() 0:: ...J I-(!) I-...J 0 I-w ...J I-2 I-...J ...J ti w > <t :::::> w :::::> <t w (ij Cl) N I() 0 u. (!) ...J (!) u. > (.) :::::> £:! 0 ~ 0 ft. ft. ft. ft/s min min In/Hr cf s In/Hr cf s 1.0 1.0 1.0 0.5 7.2 10.0 6.33 0.6 7.7 0.8 0.6 1.0 1.0 0.4 9.3 10.0 6.33 9.6 7.7 11.7 0.7 1.0 1.0 0.4 9.8 10.0 6.33 4.3 7.7 5.2 0 I() 0 .,..... I() N !: 0 £:! 0 In/Hr cf s In/Hr cfs 8.6 0.9 9.9 1.0 8.6 13.1 9.9 15.0 8.6 5.8 9.9 6.7 ~ In/Hr 11.1 11.1 11.1 0 0 0 0 I() 0 ..... 0 !: 0 cf s In/Hr cfs 1.1 12.5 1.2 16.9 12.5 19.0 7.5 12.5 8.5 11/30/00 0014-dra1 .xis Exhibit C-1 w N ..... zz N ;J> ;l> f") Vl ..... . w ~ 1i:' 00 :..... \0 0 N 0 0 '.....! 0 Vl ...... • Vl ~ 00 • 00 \0 N N N -.) -.) -.) 0 ~ 0 °' ..... 0 ~ 0 '<f-'<f- w N ..... ~ ..... ~ Vl 00 Oo \0 ~ i g "' ~ "' 2.. 2.. 0 .... ...... t'"' P> ::l ~ ~ ~ 5' 0 '"'O ~ ::l 9. 0 ::l -.... 5' P> 0.. (l) ~ 0 N f") °' w 1i:' N w \0 ?' Ci ~ -.) = c .j:>. \0 ., a' -Cl ..... Vl 0 = ;;-- N '.....! 0 0 = N f") C') lir' ., lO -"' ~ .c -I Cl = ;;--"' .c I .j:>. = DRAINAGE AREA NO. Overflow Drainage Area Drainage area Q Q Carry Over Total Q at Inlet Street Width Required Street Slope(%) Inlet No. Total Q at Inlet ~ ~ rJ) (j ~ ..., ~ 0 'Z CAP. Per L.F. L. Reqd. L. Provided Q Carry Over Ponded Depth CAP. Per S.F . Area Required Area Provided z r CJ> m _ _..m ~ (") >< "C 0 J: -:s:: - (I) "'O CXJ (') -:::t c -f A> -f (") (I) > I (I) -f N "' 0 z CJ) e < c5 i.. E--u 0 z ~ -~ ~ rFJ E--z < = ~ Jo-I E--ell ~ ";;j 0 0 z u ~ Jo-I E--E--E--Q # # Ac. min yr 1 2 0.1 10.0 10 2 3 1.6 13.6 10 3 Out 2.3 14.2 10 •includes 25% Flow Increase for pipe sizes <27" dia. EXHIBIT C-3 PIPE SIZE CALCULATIONS Steeplechase 7 = .~ = « "' ~ .~ « Q ~ ~ "' Q. Q. ~ "O Q "' ·-0 ~ ~ ~ Q. 00 -"O i.. "' ~ ~ ~ = = -~ .s: ...... "' « ... "O :t .:. :t 0 :t -co:: 0 u "O 0 0 0 "i:: = -~ ;:;;;i i;.. <~ z i;.. cfs cfs # cfs O/o 0.9 0.9 1 0.9 0.02 16.8 16.8 1 16.8 0.34 16.9 16.9 1 16.9 0.34 ••See Plan & Profile for pipe slope used (Pipe slope >or= Friction slope) = E--0 ~ .J z ~ ~ ~ rFJ ~ " fps ' 15 0.7 150 27 4.2 160 27 4.3 30 ~ e "O ~ = ~ ~ ~ .... @) s co:: i.. u ~ E--E--min min ' 3.59 13.59 0.63 14.22 0.12 14.34 11/30/00 0014-dra1 .xis Exhibit C-3 E--= 0 Jo-I ~ = ' D.A.# "' .r. ... I! ei ~ :J: ..... Qp 0.8 Tc 10.0 Inc 1.0 Time cfs 0.0 0.0 1.0 0.1 2.0 0.2 3.0 0.2 4.0 0.3 5.0 0.4 6.0 0.5 7.0 0.5 8.0 0.6 9.0 0.7 10.0 0.8 11.0 0.7 12.0 0.7 13.0 0.6 14.0 0.6 15.0 0.6 16.0 0.5 17.0 0.5 16.0 0.5 19.0 0.4 20.0 0.4 21.0 0.3 22.0 0.3 23.0 0.3 24.0 0.2 25.0 0.2 26.0 0.2 27.0 0.1 28.0 0.1 29.0 0.0 30.0 0.0 31.0 0.0 32.0 0.0 33.0 0.0 34.0 0.0 35.0 0.0 36.0 0.0 37.0 0.0 38.0 0.0 39.0 0.0 40.0 0.0 41.0 0.0 42.0 0.0 43.0 0.0 44.0 0.0 45.0 0.0 46.0 0.0 47.0 0.0 48.0 0.0 49.0 0.0 50.0 0.0 51.0 0.0 52.0 0.0 53.0 0.0 54.0 0.0 55.0 0.0 58.0 0.0 57.0 0.0 58.0 0.0 59.0 0.0 60.0 0.0 61.0 0.0 62.0 0.0 63.0 0.0 64.0 0.0 PEAK FLOWS I 0.76 0.00 indicates inltal condition EXHIBIT "0-1" PROPOSED DETENTION POND1 ROUTING Steeplechase 7 D.A.# Pond Routlna EVENT= 5 c i c ..... a ::!! + .!. + + c ,, + ~ ~ c ..... c a 11.7 10.0 1.0 cfs cfs cfs cfs 0.0 1.24 0.00 0.00 0.00 1.2 3.73 0.77 1.24 0.24 2.3 6.22 2.93 4.50 0.78 3.5 6.70 6.42 9.15 1.37 4.7 11.19 10.25 15.12 2.44 5.6 13.68 13.49 21.44 3.96 7.0 16.17 16.42 27.16 5.37 8.2 16.65 19.20 32.59 6.69 9.3 21.14 22.40 37.86 7.73 10.5 23.63 25.96 43.54 6.79 11.7. 24.25 29.74 49.58 9.92 11.1 23.01 32.57 53.99 10.71 10.5 21.76 33.70 55.57 k10.94 9.9 20.52 33.62 55.46 10.92 9.3 19.27 32.67 54.13 10.73 8.6 16.03 31.22 51.94 10.36 6.2 16.79 29.53 49.25 9.86 7.6 15.54 27.70 46.32 9.31 7.0 14.30 25.77 43.24 8.74 6.4 13.06 23.79 40.07 8.14 5.8 11.81 21.76 36.84 7.54 5.3 10.57 19.72 33.58 6.93 4.7 9.33 18.02 30.29 6.13 4.1 8.06 16.52 27.35 5.42 3.5 6.84 15.11 24.60 4.75 2.9 5.60 13.75 21.95 4.10 2.3 4.35 12.41 19.34 3.47 1.6 3.11 11.09 16.76 2.84 1.2 1.87 9.77 14.20 2.21 0.6 0.62 6.28 11.64 1.66 0.0 0.00 6.24 6.91 1.33 0.0 0.00 4.24 6.24 1.00 0.0 0.00 2.74 4.24 0.75 0.0 0.00 1.69 2.74 0.53 0.0 0.00 1.04 1.69 0.32 0.0 0.00 0.64 1.04 0.20 0.0 0.00 0.39 0.64 0.12 0.0 0.00 0.24 0.39 0.06 0.0 0.00 0.15 0.24 0.05 0.0 0.00 0.09 0.15 0.03 0.0 0.00 0.09 0.09 0.00 o:o 0.00 0.09 0.09 0.00 0.0 0.00 0.09 0.09 0.00 0.0 0.00 0.09 0.09 0.00 0.0 0.00 0.09 0.09 0.00 0.0 0.00 0.09 0.09 0.00 0.0 0.00 0.09 0.09 0.00 0.0 0.00 0.09 0.09 0.00 0.0 0.00 0.09 0.09 0.00 0.0 0.00 0.09 0.09 0.00 0.0 0.00 0.09 0.09 0.00 0.0 0.00 0.00 0.09 0.00 0.0 0.00 0.09 0.09 0.00 0.0 0.00 0.09 0.09 0.00 0.0 0.00 0.09 0.09 0.00 0.0 0.00 0.09 0.09 0.00 0.0 0.00 0.09 0.09 0.00 0.0 0.00 0.00 0.09 0.00 0.0 0.00 0.09 0.09 0.00 0.0 0.00 0.09 0.09 0.00 0.0 0.00 0.09 0.09 0.00 0.0 0.00 0.09 0.09 0.00 0.0 0.00 0.09 0.09 0.00 0.0 0.00 0.09 0.09 0.00 0.0 0.00 0.09 0.09 0.00 11.67 10.94 c 0 ,, j ~;ii ft 266.5 286.6 288.8 266.9 267.1 267.2 287.4 287.5 267.6 267.6 267.9 288.0 l268.1 288.1 268.0 288.0 287.9 287.8 287.7 287.7 287.8 287.5 267.4 287.4 267.3 267.2 287.2 267.1 287.0 287.0 266.9 288.6 286.6 286.7 286.6 266.6 286.5 286.5 286.5 288.5 286.5 266.5 286.5 286.5 286.5 286.5 286.5 266.5 286.5 286.5 286.5 266.5 266.5 286.5 286.5 286.5 286.5 286.5 286.5 286.5 286.5 286.5 286.5 286.5 266.5 288.1 c l&I "' <i!f ._ 0 ~f cfs 0.00 0.24 0.78 1.37 2.44 3.96 5.37 6.69 7.73 8.79 9.92 10.71 10.94 10.92 10.73 10.36 9.66 9.31 8.74 8.14 7.54 6.93 6.13 5.42 4.75 4.10 3.47 2.84 2.21 1.66 1.33 1.00 0.75 0.53 0.32 0.20 0.12 0.06 0.05 0.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10.94 0014-dra1 Jds Emlblt D-1 DA.# 'It .Ii: Q. I! e ~ ~ Qp 0.9 Tc 10.0 inc 1.0 Time cfs 0.0 0.0 1.0 0.1 2.0 0.2 3.0 0.3 4.0 0.3 5.0 0.4 6.0 0.5 7.0 0.6 8.0 0.7 9.0 0.8 10.0 0.9 11.0 0.8 12.0 0.8 13.0 0.7 14.0 0.7 15.0 0.6 16.0 0.6 17.0 0.6 18.0 0.5 19.0 0.5 20.0 0.4 21.0 0.4 22.0 0.3 23.0 0.3 24.0 0.3 25.0 0.2 26.0 0.2 27.0 0.1 28.0 0.1 29.0 0.0 30.0 0.0 31.0 0.0 32.0 0.0 33.0 0.0 34.0 0.0 35.0 0.0 36.0 0.0 37.0 0.0 38.0 0.0 39.0 0.0 40.0 0.0 41.0 0.0 42.0 0.0 43.0 0.0 44.0 0.0 45.0 0.0 -46.0 0.0 47.0 0.0 48.0 0.0 49.0 0.0 50.0 0.0 51.0 0.0 52.0 0.0 53.0 0.0 54.0 0.0 55.0 0.0 56.0 0.0 57.0 0.0 58.0 0.0 59.0 0.0 60.0 0.0 61.0 0.0 62.0 0.0 63.0 0.0 64.0 0.0 PEAK FLOWS I 0.85 0.00 indicalea inltal coodition EXHIBIT "D-1" PROPOSED DETENTION POND1 ROUTING Steeplechase 7 DA# Pond Routing EVENT-10 c i c + 2 :E c + + :;: ~ c iii l!l a N E N 13.1 10.0 1.0 cfs cfs cfs cfs 0.0 1.40 0.00 0.00 0.00 1.3 4.19 0.86 1.40 0.27 2.6 6.98 3.35 5.05 0.65 3.9 9.77 7.30 10.32 1.51 5.2 12.56 11.25 17.07 2.91 6.6 15.35 14.70 23.81 4.55 7.9 18.15 17.90 30.05 6.08 9.2 20.94 21.27 36.05 7.39 10.5 23.73 25.12 42.20 8.54 11.8 26.52 29.28 48.65 9.78 13.1 27.22 33.66 55.60 10.97 12.4 25.82 37.63 61.08 11.73 11.8 24.43 39.32 63.45 12.06 11.1 23.03 39.53 63.74 12.11 10.5 21.63 38.66 62.56 11.94 9.8 20.24 37.08 60.32 11.62 9.2 18.84 34.95 57.32 11.19 8.5 17.45 32.42 53.79 10.66 7.9 16.05 29.92 49.87 9.98 7.2 14.66 27.48 45.97 9.25 6.6 13.26 25.08 42.13 8.53 5.9 11.86 22.70 38.34 7.82 5.2 10.47 20.34 34.56 7.11-4.6 9.07 18.29 30.81 6.26 3.9 7.68 16.52 27.36 5.42 3.3 6.28 14.90 24.20 4.65 2.6 4.89 13.35 21.18 3.91 2.0 3.49 11.84 18.24 3.20 1.3 2.09 10.36 15.33 2.49 0.7 0.70 8.88 12.45 1.79 0.0 0.00 6.74 9.57 1.42 0.0 0.00 4.61 6.74 1.06 0.0 0.00 3.02 4.61 0.80 0.0 0.00 1.86 3.02 0.58 0.0 0.00 1.15 1.86 0.36 0.0 0.00 0.71 1.15 0.22 0.0 0.00 0.44 0.71 0.14 0.0 0.00 0.27 0.44 0.08 0.0 0.00 0.17 0.27 0.05 0.0 0.00 0.10 0.17 0.03 0.0 0.00 0.06 0.10 0.02 0.0 0.00 0.06 0.06 0.00 0.0 0.00 0.06 0.06 0.00 0.0 0.00 0.06 0.06 0.00 0.0 0.00 0.06 0.06 0.00 0.0 0.00 0.06 0.06 0.00 0.0 0.00 0.06 0.06 0.00 0.0 0.00 0.06 0.06 0.00 0.0 0.00 0.06 0.06 0.00 0.0 0.00 0.06 0.06 0.00 0.0 0.00 0.06 0.06 0.00 0.0 0.00 0.06 0.06 0.00 0.0 0.00 0.06 0.06 0.00 0.0 0.00 0.06 0.06 0.00 ·0.0 0.00 0.06 0.06 0.00 0.0 0.00 0.06 0.06 0.00 0.0 0.00 0.06 0.06 0.00 0.0 0.00 0.06 0.06 0.00 0.0 0.00 0.06 0.06 0.00 0.0 0.00 0.06 0.06 0.00 0.0 0.00 0.06 0.06 0.00 0.0 0.00 0.06 0.06 0.00 0.0 0.00 0.06 0.06 0.00 0.0 0.00 0.06 0.06 0.00 0.0 0.00 0.06 0.06 0.00 13.10 12.11 c ~~ ~di ft 286.5 286.6 286.6 286.9 267.1 287.3 287.4 287.6 287.7 287.9 288.1 288.2 288.3 .. 288.3 288.2 288.2 288.1 288.0 287.9 287.8 287.7 287.6 287.5 287.4 287.4 287.3 287.2 287.1 287.1 287.0 286.9 286.8 286.8 286.7 286.6 286.6 286.6 286.5 286.5 286.5 286.5 286.5 286.5 286.5 286.5 286.5 286.5 286.5 286.5 286.5 286.5 286.5 286.5 286.5 286.5 286.5 286.5 286.5 286.5 286.5 286.5 286.5 286.5 286.5 286.5 288.3 a ... <I) ... ~ ~o gf cfs 0.00 0.27 0.65 1.51 2.91 4.55 6.08 7.39 8.54 9.78 10.97 11.73 12.06 12.11 11.94 11.62 11.19 10.68 9.98 9.25 8.53 7.82 7.11 6.26 5.42 4.65 3.91 3.20 2.49 1.79 1.42 1.06 0.60 0.58 0.36 0.22 0.14 0.08 0.05 0.03 0.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 12.11 0014-<lra1 Jds E>chibtt 0-1 D.A.# .. .c a. I! ~ ~ ... Op 1.0 Tc 10.0 inc 1.0 Time cfs 0.0 0.0 1.0 0.1 2.0 0.2 3.0 0.3 4.0 0.4 5.0 0.5 6.0 0.6 7.0 0.7 8.0 0.8 9.0 0.9 10.0 1.0 11.0 0.9 12.0 0.9 13.0 0.8 14.0 0.8 15.0 0.7 16.0 0.7 17.0 0.6 18.0 0.8 19.0 0.5 20.0 0.5 21.0 0.4 22.0 0.4 23.0 0.3 24.0 0.3 25.0 0.2 26.0 0.2 27.0 0.1 28.0 0.1 29.0 0.0 30.0 0.0 31.0 0.0 32.0 0.0 33.0 0.0 34.0 0.0 35.0 0.0 38.0 0.0 37.0 0.0 38.0 0.0 39.0 0.0 40.0 0.0 41.0 0.0 42.0 0.0 43.0 0.0 44.0 0.0 45.0 0.0 46.0 0.0 47.0 0.0 48.0 0.0 49.0 0.0 50.0 0.0 51.0 0.0 52.0 0.0 53.0 0.0 54.0 0.0 55.0 0.0 56.0 0.0 57.0 0.0 58.0 0.0 59.0 0.0 60.0 0.0 61.0 0.0 62.0 0.0 63.0 0.0 84.0 0.0 PEAK FLOWS 0.98 o.oo Indicates inital condition EXHIBIT "D-1" PROPOSED DETENTION POND1 ROUTING Steeplechase 7 D.A.# Pond Routlna EVENT= 26 c i c .. 0 t ... ... c + + c + ~ l!.l c N .E 0 15.0 10.0 1.0 cfs cfs cfs cfs 0.0 1.59 0.00 0.00 0.00 1.5 4.78 0.98 1.59 0.31 3.0 7.97 3.88 5.76 0.94 4.5 11.16 8.45 11.85 1.70 6.0 14.35 12.54 19.60 3.53 7.5 17.54 16.28 26.89 5.31 9.0 20.72 19.87 33.82 6.97 10.5 23.91 24.11 40.59 8.24 12.0 27.10 28.76 48.02 9.63 13.5 30.29 33.90 55.86 10.96 15.0 31.09 39.85 64.19 12.17 14.2 29.49 44.66 70.93 13.14 13.5 27.90 47.05 74.15 13.55 12.7 26.30 47.66 74.95 13.65 12.0 24.71 46.91 73.96 13.53 11.2 23.11 45.15 71.61 13.23 10.5 21.52 42.75 68.26 12.75 9.7 19.93 39.91 64.27 12.18 9.0 18.33 36.74 59.83 11.55 8.2 16.74 33.34 55.07 10.87 7.5 15.14 30.05 50.08 10.01 6.7 13.55 26.99 45.19 9.10 6.0 11.96 24.08 40.54 8.23 5.2 10.38 21.26 36.04 7.39 4.5 8.77 18.71 31.62 6.46 3.7 7.17 16.58 27.47 5.45 3.0 5.58 14.67 23.75 4.54 2.2 3.99 12.88 20.25 3.69 1.5 2.39 11.14 16.86 2.86 0.7 0.80 9.43 13.53 2.05 0.0 0.00 7.23 10.23 1.50 0.0 0.00 4.98 7.23 1.12 0.0 0.00 3.29 4.98 tl.84 0.0 0.00 2.00 3.29 0.63 0.0 0.00 1.25 2.03 0.39 0.0 0.00 0.77 1.25 0.24 0.0 0.00 0.48 0.77 0.15 0.0 0.00 0.29 0.48 0.09 0.0 0.00 0.18 0.29 0.06 0.0 0.00 0.11 0.18 0.00 0.0 0.00 0.07 0.11 0.02 0.0 0.00 0.07 O.D7 0.00 0.0 0.00 0.07 O.Q7 0.00 0.0 0.00 O.o7 0.07 0.00 0.0 0.00 0.07 0.07 0.00 0.0 0.00 0.07 0.07 0.00 0.0 0.00 0.o7 0.07 0.00 0.0 0.00 0.07 0.07 0.00 0.0 0.00 0.07 0.07 0.00 0.0 0.00 0.07 0.07 0.00 0.0 0.00 0.07 0.07 0.00 0.0 0.00 0.07 0.07 0.00 0.0 0.00 0.07 O.Q7 0.00 0.0 0.00 0.07 0.07 0.00 0.0 0.00 0.07 0.07 0.00 0.0 0.00 0.07 0.07 0.00 0.0 0.00 0.07 0.07 0.00 0.0 0.00. 0.07 0.07 0.00 0.0 0.00 0.07 0.07 0.00 0.0 0.00 0.07 0.07 0.00 0.0 0.00 0.07 0.07 0.00 0.0 0.00 0.07 0.07 0.00 0.0 0.00 0.07 0.07 0.00 0.0 0.00 0.07 0.07 0.00 0.0 0.00 0.07 0.07 0.00 14.96 13.65 c "D t c .. cf iii ft 286.5 286.6 288.8 287.0 287.2 287.3 287.5 287.7 287.9 288.1 288.3 288.5 288.6 288.6 288.6 288.5 288.4 288.3 288.2 288.0 287.9 287.8 287.7 287.6 287.5 287.4 287.3 287.2 287.1 287.0 286.9 286.9 286.8 286.8 286.7 286.6 286.6 286.5 286.5 286.5 286.5 286.5 286.5 286.5 286.5 286.5 286.5 286.5 286.5 286.5 286.5 286.5 286.5 286.5 286.5 286.5 286.5 286.5 286.5 286.5 286.5 286.5 286.5 286.5 286.5 288.6 D Ill .,, cl~ .... 0 gg: cfs 0.00 0.31 0.94 1.70 3.53 5.31 6.97 8.24 9.63 10.98 12.17 13.14 13.55 13.65 13.53 13.23 12.75 12.18 11.55 10.87 10.01 9.10 8.23 7.39 6.46 5.45 4.54 3.69 2.86 2.05 1.50 1.12 0.84 0.63 0.39 0.24 0.15 0.09 0.06 0.00 0.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 13.65 0014-dra1 Jds Elchlblt 0-1 DA.# "' ~ c. I! e ~ .... Qp 1.1 Tc 10.0 inc 1.0 Time cfs 0.0 0.0 1.0 0.1 2.0 0.2 3.0 0.3 4.0 0.4 5.0 0.6 6.0 0.7 7.0 0.8 8.0 0.9 9.0 1.0 10.0 1.1 11.0 1.0 12.0 1.0 13.0 0.9 14.0 0.9 15.0 0.8 16.0 0.8 17.0 0.7 18.0 0.7 19.0 0.6 20.0 0.6 21.0 0.5 22.0 0.4 23.0 0.4 24.0 0.3 25.0 0.3 26.0 0.2 21:0 0.2 28.0 0.1 29.0 0.1 30.0 0.0 31.0 0.0 32.0 0.0 33.0 0.0 34.0 0.0 35.0 0.0 36.0 0.0 37.0 0.0 38.0 0.0 39.0 0.0 40.0 0.0 41.0 0.0 42.0 0.0 43.0 0.0 44.0 0.0 45.0 0.0 46.0 0.0 47.0 0.0 48.0 0.0 49.0 0.0 50.0 0.0 51.0 0.0 52.0 0.0 53.0 0.0 54.0 0.0 55.0 0.0 56.0 0.0 57.0 0.0 56.0 0.0 59.0 0.0 60.0 0.0 61.0 0.0 62.0 0.0 63.0 0.0 64.0 0.0 PEAK FLOWS I 1.10 o.oo lodk:ales lnltal condition EXHIBIT ND-1" PROPOSED DETENTION POND1 ROUTING Steeplechase 7 DA.# Pond Rout I no EVENT" 60 c i c .. i c .. .. + c il5 Cl) a N .E N N 16.9 10.0 1.0 cfs cf$ cfs cfs 0.0 1.80 0.00 0.00 0.00 1.7 5.41 1.11 1.80 0.35 3.4 9.01 4.45 6.52 1.04 5.1 12.61 9.39 13.46 2.03 6.8 16.22 13.78 22.01 4.11 8.5 19.82 17.87 29.99 6.06 10.1 23.43 22.30 37.69 7.70 11.8 27.03 27.32 45.72 9.20 13.5 30.63 32.83 54.35 10.76 15.2 34.24 39.33 63.46 12.07 16.9 35.14 46.61 73.57 13.48 16.1 33.34 52.81 81.75 14.47 15.2 31.54 56.16 86.15 15.00 14.4 29.73 57.33 87.69 15.18 13.5 27.93 58.85 87.06 15.11 12.7 26.13 55.11 84.78 14.83 11.8 24.33 52.43 81.24 14.41 11.0 22.53 49.03 78.76 13.86 10.1 20.72 45.10 71.56 13.23 9.3 18.92 41.02 65.83 12.41 8.5 17.12 36.81 59.94 11.56 7.6 15.32 32.53 53.93 10.70 6.8 13.52 28.65 47.84 9.60 5.9 11.71 25.10 42.17 8.53 5.1 9.91 21.74 36.81 7.53 4.2 8.11 18.72 31.66 6.47 3.4 6.31 16.25 26.83 5.29 2.5 4.51 14.06 22.58 4.25 1.7 2.70 12.01 18.56 3.28 0.8 0.90 10.04 14.71 2.34 0.0 0.00 7.76 10.94 1.59 0.0 0.00 5.38 7.76 1.19 0.0 0.00 3.59 5.38 0.89 0.0 0.00 2.26 3.59 0.67 0.0 0.00 1.39 2.26 0.43 0.0 0.00 0.66 1.39 0.27 0.0 0.00 0.53 0.66 0.16 0.0 0.00 0.33 0.53 0.10 0.0 0.00 0.20 0.33 0.06 0.0 0.00 0.12 0.20 0.04 0.0 0.00 0.08 0.12 0.02 0.0 0.00 0.08 0.08 0.00 0.0 0.00 0.06 0.08 0.00 0.0 0.00 0.08 0.08 0.00 0.0 0.00 0.08 0.06 0.00 0.0 0.00 0.08 0.06 0.00 0.0 0.00 0.06 0.08 0.00 0.0 0.00 0.08 0.08 0.00 0.0 0.00 0.08 0.08 0.00 0.0 0.00 0.08 0.08 0.00 0.0 0.00 0.08 0.08 0.00 0.0 0.00 0.08 0.08 0.00 0.0 0.00 0.08 0.08 0.00 0.0 0.00 0.06 0.08 0.00 0.0 .o.oo 0.06 0.08 0.00 0.0 0.00 0.06 0.08 0.00 0.0 0.00 0.06 0.06 0.00 0.0 0.00 0.08 0.08 0.00 0.0 0.00 0.08 0.06 0.00 0.0 0.00 0.06 0.06 0.00 0.0 0.00 0.08 0.08 0.00 0.0 0.00 0.06 0.06 0.00 0.0 0.00 0.06 0.06 0.00 0.0 0.00 0.06 0.08 0.00 0.0 0.00 0.06 0.08 0.00 16.92 15.18 c "~ c .! tf w ft 286.5 286.6 286.8 287.0 287.2 287.4 287.8 287.8 288.0 288.3 288.5 288.8 288.9 288.9 288.9 288.8 288.7 288.6 288.5 288.3 288.2 288.0 287.9 287.7 287.6 287.5 287.3 287.2 287.1 287.1 287.0 286.9 286.8 286.8 286.7 286.6 266.6 286.5 286.5 266.5 286.5 286.5 286.5 286.5 286.5 286.5 286.5 286.5 286.5 286.5 286.5 286.5 266.5 286.5 286.5 286.5 286.5 266.5 286.5 286.5 286.5 266.5 286.5 286.5 286.5 288.9 c w Cl) -' ~ ~o ~ B: cf$ 0.00 0.35 1.04 2.03 4.11 6.06 7.70 9.20 10.76 12.07 13.48 14.47 15.00 15.18 15.11 14.83 14.41 13.86 13.23 12.41 . 11.58 10.70 9.60 8.53 7.53 6.47 5.29 4.25 3.28 2.34 1.59 1.19 0.89 0.67 0.43 0.27 0.16 0.10 0.06 0.04 0.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 15.18 0014-dra1 Jds ElltlibltD-1 D.A.# "' s: Q. I! ~ ~ :J: ..... Qp 1.2 Tc 10.0 inc 1.0 Time els 0.0 0.0 1.0 0.1 2.0 0.2 3.0 0.4 4.0 0.5 5.0 0.6 6.0 0.7 7.0 0.9 8.0 1.0 9.0 1.1 10.0 1.2 11.0 1.2 12.0 1.1 13.0 1.1 14.0 1.0 15.0 0.9 16.0 0.9 17.0 0.8 16.0 0.7 19.0 0.7 20.0 0.6 21.0 0.6 22.0 0.5 23.0 0.4 24.0 0.4 25.0 0.3 26.0 0.2 27.0 0.2 26.0 0.1 29.0 0.1 30.0 0.0 31.0 0.0 32.0 0.0 33.0 0.0 34.0 0.0 35.0 0.0 36.0 0.0 37.0 0.0 38.0 0.0 39.0 0.0 40.0 0.0 41.0 0.0 42.0 0.0 43.0 0.0 44.0 0.0 45.0 0.0 46.0 0.0 47.0 0.0 48.0 0.0 49.0 0.0 50.0 0.0 51.0 0.0 52.0 0.0 53.0 0.0 54.0 0.0 55.0 0.0 56.0 0.0 57.0 0.0 56.0 0.0 59.0 0.0 60.0 0.0 61.0 0.0 62.0 0.0 63.0 0.0 64.0 0.0 PEAK FLOWS 1.24 0.00 indicates lnital condition EXHIBIT "D-1" PROPOSED DETENTION POND1 ROUTING Steeplechase 7 D.A.# Pond Routing EVENT" 100 I c + 2 c + + + ~ c N E ill l(l 8 19.0 10.0 1.0 cfs cfs cfs cfs 0.0 2.02 0.00 0.00 0.00 1.9 6.07 1.25 2.02 0.39 3.8 10.12 5.05 7.32 1.14 5.7 14.17 10.27 15.17 2.45 7.6 18.22 15.03 24.45 4.71 9.5 22.27 19.54 33.25 6.85 11.4 26.32 24.88 41.82 8.47 13.3 30.37 30.75 51.20 10.22 15.2 34.42 37.66 61.13 11.73 17.1 38.47 45.48 72.08 . 13.30 19.0 39.48 54.49 83.95 14.73 18.1 37.46 62.17 93.97 15.90 17.1 35.44 66.61 99.63 16.51 16.2 33.41 68.46 102.04 16.79 15.2 31.39 68.34 101.67 16.76 14.3 29.36 66.68 99.73 16.52 13.3 27.34 63.79 96.04 16.12 12.4 25.31 59.94 91.13 15.59 11.4 23.29 55.48 85.26 14.69 10.5 21.26 50.55 78.76 14.11 9.5 19.24 45.29 71.81 13.26 8.6 17.21 40.09 64.52 12.22 7.6 15.19 34.93 57.30 11.16 6.7 13.16 30.07 50.11 10.02 5.7 11.14 25.77 43.23 8.73 4.6 9.11 21.60 36.90 7.55 3.6 7.09 16.34 30.91 6.28 2.9 5.06 15.53 25.43 4.95 1.9 3.04 13.05 20.59 3.77 1.0 1.01 10.74 16.09 2.67 0.0 0.00 6.37 11.76 1.69 0.0 0.00 5.64 6.37 1.27 0.0 0.00 3.94 5.64 0.95 0.0 0.00 2.51 3.94 0.71 0.0 0.00 1.55 2.51 0.48 0.0 0.00 0.95 1.55 0.30 0.0 0.00 0.59 0.95 0.16 0.0 0.00 0.36 0.59 0.11 0.0 0.00 0.22 0.36 0.07 0.0 0.00 0.14 0.22 0.04 0.0 0.00 0.08 0.14 0.03 0.0 0.00 0.06 0.08 0.00 0.0 0.00 0.06 0.06 0.00 0.0 0.00 0.08 0.08 0.00 0.0 0.00 0.08 0.06 0.00 0.0 0.00 0.06 0.06 0.00 0.0 0.00 0.06 0.08 0.00 0.0 0.00 0.08 0.08 0.00 0.0 0.00 0.06 0.06 0.00 0.0 0.00 0.06 0.06 0.00 0.0 0.00 0.08 0.08 0.00 0.0 0.00 0.06 0.06 0.00 0.0 0.00 0.08 0.08 0.00 0.0 0.00 0.06 0.08 0.00 0.0 0.00 0.08 0.08 0.00 0.0 0.00 0.06 0.06 0.00 0.0 0.00 0.06 0.06 0.00 0.0 0.00 0.06 0.06 0.00 0.0 0.00 0.06 0.08 0.00 0.0 0.00 0.06 0.08 0.00 0.0 0.00 0.08 0.06 0.00 0.0 0.00 0.08 0.06 0.00 0.0 0.00 0.06 0.08 0.00 0.0 0.00 0.08 0.08 0.00 0.0 0.00 0.06 0.08 0.00 19.01 18.79 c ~~ ~ i?i ft 286.5 286.7 286.9 287.1 287.3 287.5 287.7 287.9 288.2 288.5 288.8 289.1 289.2 v 289.3V 289.3 269.2 289.1 289.0 288.9 288.7 288.5 288.3 288.1 267.9 267.7 287.6 287.4 267.3 267.2 267.1 267.0 266.9 266.8 266.6 266.7 268.6 266.6 266.5 286.5 286.5 266.5 286.5 286.5 266.5 266.5 286.5 286.5 286.5 286.5 266.5 266.5 286.5 286.5 286.5 286.5 286.5 266.5 266.5 266.5 286.5 266.5 286.5 286.5 266.5 266.5 289.3 Q w 41) ... ~ ~o g IE Cfs 0.00 0.39 1.14 2.45 4.71 6.85 8.47 10.22 11.73 13.30 14.73 15.90 16.51 16.79 16.76 16.52 16.12 15.59 14.69 14.11 13.26 12.22 11.18 10.02 6.73 7.55 6.26 4.95 3.77 2.67 1.69 1.27 0.95 0.71 0.48 0.30 0.16 0.11 0.07 0.04 0.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 16.79 0014-dra1 .Jds Elchiblt D-1 DA.# -&. ... I! ~ } .., Qp 5.2 Tc 10.0 inc 1.0 Time cfs 0.0 0.0 1.0 0.5 2.0 1.0 3.0 1.6 4.0 2.1 5.0 2.6 6.0 3.1 7.0 3.6 8.0 4.2 9.0 4.7 10.0 5.2 11.0 4.9 12.0 4.7 13.0 4.4 14.0 4.2 15.0 3.9 16.0 3.6 17.0 3.4 18.0 3.1 19.0 2.9 20.0 2.6 21.0 2.3 22.0 2.1 23.0 1.8 24.0 1.6 25.0 1.3 26.0 1.0 27.0 0.8 28.0 0.5 29.0 0.3 30.0 0.0 31.0 0.0 32.0 0.0 33.0 0.0 34.0 0.0 35.0 0.0 36.0 0.0 37.0 0.0 38.0 0.0 39.0 0.0 40.0 0.0 41.0 0.0 42.0 0.0 43.0 0.0 44.0 0.0 45.0 0.0 46.0 0.0 47.0 0.0 46.0 0.0 49.0 0.0 50.0 0.0 51.0 0.0 52.0 0.0 53.0 0.0 54.0 0.0 55.0 0.0 56.0 0.0 57.0 0.0 56.0 0.0 59.0 0.0 60.0 0.0 61.0 0.0 62.0 0.0 63.0 0.0 64.0 0.0 PEAK FLOWS I 5.20 0. 00 indicatea ini1al condition EXHIBIT "D-2" PROPOSED DETENTION POND2 ROUTING Steeplechase 7 O.A.# Pond Routlno EVENT• 5 c Q i LU z c iii r i ::&; c r ... 8 + i(l c & .5 :!l cfs cfs cfs cfs cfs 0.0 0.52 0.00 0.00 0.00 0.5 1.58 0.42 0.52 0.05 1.0 2.60 1.64 1.98 0.17 1.6 3.64 3.61 4.24 0.31 2.1 4.68 6.26 7.25 0.50 2.6 5.72 9.32 10.94 0.81 3.1 6.76 12.44 15.03 1.30 3.6 7.79 15.61 19.20 1.79 4.2 8.83 18.82 23.41 2.29 4.7 9.87 22.23 27.66 2.72 5.2 10.13 26.07 32.10 3.01 4.9 9.61 29.63 36.21 3.29 4.7 9.09 3227 39.25 3.49 4.4 8.57 34.10 41.36 3.63 4.2 8.05 35.26 42.67 3.71 3.9 7.53 35.84 43.32 3.74 3.6 7.02 35.89 43.37 3.7411 3.4 6.50 35.47 42.91 3.72 3.1 5.98 34.63 41.97 3.67 2.9 5.46 33.44 40.60 3.56 2.6 4.94 31.97 38.90 3.47 2.3 4.42 30.24 36.90 3.33 2.1 3.90 28.29 34.65 3.18 1.8 3.38 26.15 32.18 3.02 1.6 2.86 23.85 29.53 2.84 1.3 2.34 21.40 26.70 2.65 1.0 1.82 19.07 23.74 2.33 0.8 1.30 16.91 20.89 1.99 0.5 0.78 14.86 18.21 1.67 0.3 0.26 12.90 15.64 1.37 0.0 0.00 11.01 13.16 1.07 0.0 0.00 9.38 11.01 0.82 0.0 0.00 8.12 9.38 0.63 0.0 0.00 7.02 '8.12 0.55 0.0 ·0.00 6.06 7.02 0.48 0.0 0.00 5.21 6.06 0.42 0.0 0.00 4.47 521 0.37 0.0 0.00 3.82 4.47 0.33 0.0 0.00 3.25 3.82 0.29 0.0 0.00 2.75 3.25 025 0.0 0.00 2.31 2.75 0.22 0.0 0.00 1.92 2.31 0.19 0.0 0.00 1.59 1.92 0.17 0.0 0.00 1.29 1.59 0.15 0.0 0.00 1.05 1.29 0.12 0.0 0.00 0.86 1.05 0.10 0.0 0.00 0.70 0.86 0.06 0.0 0.00 0.57 0.70 0.06 0.0 0.00 0.46 0.57 0.05 0.0 0.00 0.38 0.46 0.04 0.0 0.00 0.31 0.38 0.03 0.0 0.00 025 0.31 0.03 0.0 0.00 0.20 0.25 0.02 0.0 0.00 0.17 0.20 0.02 0.0 0.00 0.14 0.17 0.02 0.0 0.00 0.11 0.14 0.01 0.0 0.00 0.09 0.11 0.01 0.0 0.00 0.00 0.09 0.00 0.0 0.00 0.09 0.09 0.00 0.0 0.00 0.09 0.09 0.00 0.0 0.00 0.09 0.09 0.00 0.0 0.00 0.09 0.09 0.00 0.0 0.00 0.09 0.09 0.00 0.0 0.00 0.09 0.09 0.00 0.0 0.00 0.09 0.09 0.00 5.20 3.74 c 0 "D j c .. if iii ft 287.6 287.6 287.8 287.8 287.9 288.0 288.2 268.3 288.4 288.6 288.7 268.8 268.9 289.0 289.0 289.0 289.11.I 289.0 289.0 289.0 268.9 288.8 288.8 288.7 288.6 288.5 288.4 288.3 288.3 2882 288.1 288.0 288.0 288.0 287.9 287.9 287.9 287.8 287.8 287.8 287.8 287.8 287.8 287.7 287.7 287.7 287.7 287.7 287.7 287.6 287.6 287.6 287.6 287.6 287.6 287.6 287.6 287.6 287.6 287.6 287.6 287.6 287.6 287.6 287.6 289.1 Q LU U) ..... ~ ~o 8f cfs 0.00 0.05 0.17 0.31 0.50 0.81 1.30 1.79 2.29 2.72 3.01 3.29 3.49 3.63 3.71 3.74 3.74 3.72 3.67 3.56 3.47 3.33 3.18 3.02 2.84 2.65 2.33 1.99 1.67 1.37 1.07 0.82 0.63 0.55 0.48 0.42 0.37 0.33 0.29 025 0.22 0.19 0.17 0.15 0.12 0.10 0.06 0.06 0.05 0.04 0.03 0.03 0.02 0.02 0.02 0.01 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 3.74 001+dra2.xls Elchlbil 0-1 0.A.# "' .z: Q. I! ei -g, :c -Qp 5.8 Tc 10.0 Inc 1.0 Time cf5 0.0 0.0 1.0 0.6 2.0 1.2 3.0 1.7 4.0 2.3 5.0 2.9 6.0 3.5 7.0 4.1 8.0 4.7 9.0 5.2 10.0 5.8 11.0 5.5 12.0 5.2 13.0 5.0 14.0 4.7 15.0 4.4 16.0 4.1 17.0 3.8 18.0 3.5 19.0 3.2 20.0 2.9 21.0 2.6 22.0 2.3 23.0 2.0 24.0 1.7 25.0 1.5 26.0 1.2 27.0 0.9 28.0 0.6 29.0 0.3 30.0 0.0 31.0 0.0 32.0 0.0 33.0 0.0 34.0 0.0 35.0 0.0 36.0 0.0 37.0 0.0 38.0 0.0 39.0 0.0 40.0 0.0 41.0 0.0 42.0 0.0 43.0 0.0 44.0 0.0 45.0 0.0 46.0 0.0 47.0 0.0 46.0 0.0 49.0 0.0 50.0 0.0 51.0 0.0 52.0 0.0 53.0 0.0 54.0 0.0 55.0 0.0 56.0 0.0 57.0 0.0 58.0 0.0 59.0 0.0 60.0 0.0 61.0 0.0 62.0 0.0 ·63.0 0.0 64.0 0.0 PEAK FLOWS 6.a3 0.00 Indicates inilal condition EXHIBIT •D-2" PROPOSED DETENTION POND2 ROUTING Steeplechase 7 O.A.# Pond Rout11111 EVENT= 10 c a i II.I z c iii ... i + + ::e c + R + c ~ ll.l c E a cfs cfs cfs cf5 cfs 0.0 0.58 0.00 0.00 0.00 0.6 1.75 0.48 0.58 0.05 12 2.92 1.85 2.22 0.19 1.7 4.08 4.08 4.77 0.34 2.3 525 7.06 8.16 0.55 2.9 6.42 10.36 12.31 0.97 3.5 7.58 . 13.77 16.78 1.50 4.1 8.75 17.26 21.35 2.05 4.7 9.92 20.80 26.01 2.60 5.2 11.08 24.88 30.72 2.92 5.8 11.37 29.42 35.96 3.27 5.5 10.79 33.61 40.79 3.59 5.2 10.21 36.81 44.40 3.79 5.0 9.62 39.15 47.01 3.93 4.7 9.04 40.74 48.78 4.02 4.4 8.46 41.63 49.78 4.07 4.1 7.87 41.91 50.09 4.09 3.8 7.29 41.64 49.78 4.07 3.5 6.71 40.87 48.93 4.03 3.2 6.12 39.66 47.58 3.96 2.9 5.54 38.05 45.78 3.87 2.6 4.96 36.09 43.59 3.75 2.3 4.37 33.82 41.04 3.61 2.0 3.79 31.36 38.20 3.42 1.7 3.21 28.72 35.15 3.22 1.5 2.62 25.92 31.93 3.00 12 2.04 23.00 28.55 2.78 0.9 1.46 20.07 25.04 2.49 0.6 0.87 17.39 21.52 2.07 0.3 029 14.90 1826 1.68 0.0 0.00 12.56 15.19 1.32 0.0 0.00 10.56 12.56 1.00 0.0 0.00 9.03 10.56 0.76 0.0 0.00 7.82 9.03 0.61 0.0 0.00 6.76 7.82 0.53 0.0 0.00 5.82 6.76 0.47 0.0 0.00 5.01 5.82 0.41 0.0 0.00 4.29 5.01 0.36 0.0 0.00 3.66 4.29 0.31 0.0 0.00 3.11 3.66 028 0.0 0.00 2.63 3.11 0.24 0.0 0.00 2.20 2.63 0.21 0.0 0.00 1.63 2.20 0.19 0.0 0.00 1.50 1.83 0.16 0.0 0.00 123 1.50 0.14 0.0 0.00 1.00 1.23 0.11 0.0 0.00 0.81 1.00 0.09 0.0 0.00 0.66 0.81 0.08 0.0 0.00 0.54 0.66 0.08 0.0 0.00 0.44 0.54 0.05 0.0 0.00 0.36 0.44 0.04 0.0 0.00 0.29 0.36 0.03 0.0 0.00 0.24 0.29 0.03 0.0 0.00 0.19 024 0.02 0.0 0.00 0.16 0.19 0.02 0.0 0.00 0.13 0.16 0.01 0.0 0.00 0.10 0.13 0.01 0.0 0.00 0.09 0.10 0.01 0.0 0.00 0.09 0.09 0.00 0.0 0.00 0.09 0.09 0.00 0.0 0.00 0.09 0.09 0.00 0.0 0.00 0.09 0.09 0.00 0.0 0.00 0.09 0.09 0.00 0.0 0.00 0.09 0.09 0.00 0.0 0.00 0.09 0.09 0.00 6.83 4.09 c ~~ tf ~ ft 287.6 287.7 287.8 287.9 288.0 288.1 288.2 288.4 288.5 288.6 288.8 289.0 289.1 289.2 289.2 289.3 289.3 289.3 289.2 289.2 289.1 289.1 289.0 288.9 288.8 288.7 288.6 288.5 288.4 288.3 288.2 288.1 288.0 288.0 287.9 287.9 287.9 287.9 287.8 287.8 287.8 287.8 287.8 287.8 '1a7.7 '1a7.7 '1a7.7 W7.7 W7.7 W7.7 287.6 287.6 287.6 287.6 287.6 287.6 287.6 287.6 '1a7.6 287.6 287.6 287.6 287.6 287.6 287.6 289.3 a II.I Cl) ...I~ ~o e g: cfs 0.00 0.05 0.19 0.34 0.55 0.97 1.50 2.05 2.60 2.92 3.27 3.59 3.79 3.93 4.02 4.07 4.09 4.07 4.03 3.96 3.87 3.75 3.61 3.42 3.22 3.00 2.78 2.49 2.07 1.68 1.32 1.00 0.76 0.61 0.53 0.47 0.41 0.36 0.31 0.28 0.24 0.21 0.19 0.16 0.14 0.11 0.09 0.08 0.06 0.05 0.04 0.03 0.03 0.02 0.02 0.01 0.01 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4.09 0014-dra2.>ds Elchibit 0-1 DA.# 'It .c c.. t! "' e ~ .., Qp 6.7 Tc 10.0 inc 1.0 Time cfs 0.0 0.0 1.0 0.7 2.0 1.3 3.0 2.0 4.0 2.7 5.0 3.3 6.0 4.0 7.0 4.7 8.0 5.3 9.0 6.0 10.0 6.7 11.0 6.3 12.0 6.0 13.0 5.7 14.0 5.3 15.0 5.0 16.0 4.7 17.0 4.3 18.0 4.0 19.0 3.7 20.0 3.3 21.0 3.0 22.0 2.7 23.0 2.3 24.0 2.0 25.0 1.7 26.0 1.3 27.0 1.0 28.0 0.7 29.0 0.3 30.0 0.0 31.0 0.0 32.0 0.0 33.0 0.0 34.0 0.0 35.0 0.0 36.0 0.0 37.0 0.0 38.0 0.0 39.0 0.0 '40.0 0.0 41.0 0.0 42.0 0.0 43.0 0.0 44.0 0.0 45.0 0.0 48.0 0.0 47.0 . 0.0 48.0 0.0 49.0 0.0 50.0 0.0 51.0 0.0 52.0 0.0 53.0 0.0 54.0 0.0 55.0 0.0 56.0 0.0 57.0 0.0 58.0 0.0 59.0 0.0 60.0 0.0 61.0 0.0 62.0 0.0 63.0 0.0 64.0 0.0 PEAK FLOWS I 6.66 0.00 indicates lnillll condition EXHIBIT "D-2" PROPOSED DETENTION POND2 ROUTING Steeplechase 7 O.A.# Pond Routlna EVENT• 25 c Q ~ w z c iii + 2 :E c ,, + + + c 8 ~ !(! c .E Cl cfs cfs cfs cfs cts 0.0 0.67 0.00 0.00 0.00 0.7 2.00 0.54 0.67 0.06 1.3 3.33 2.13 2.54 0.21 2.0 4.66 4.69 5.46 0.39 2.7 6.00 8.10 9.35 0.63 3.3 7.33 11.72 14.09 1.18 4.0 8.66 15.50 19.05 1.77 4.7 9.99 19.40 24.16 2.38 5.3 11.32 23.73 29.39 2.83 6.0 12.66 28.63 35.05 3.21 6.7 12.99 34.04 41.29 3.63 6.3 12.32 39.17 47.03 3.93 6.0 11.66 43.17 51.49 4.16 5.7 10.99 46.16 54.82 4.33 5.3 10.33 48.24 57.15 4.45 5.0 9.66 49.53 58.56 4.52 4.7 8.99 50.09 59.19 4.55 4.3 8.33 50.00 59.09 4.54 4.0 7.66 49.31 58.33 4.51 3.7 6.99 48.08 56.97 4.45 3.3 6.33 46.38 55.06 4.35 3.0 5.66 44.26 52.71 4.22 2.7 5.00 41.76 49.92 4.06 2.3 4.33 38.93 48.76 3.92 2.0 3.66 35.78 43.26 3.74 1.7 3.00 32.44 39.45 3.50 1.3 2.33 28.97 35.44 3.24 1.0 1.67 25.38 31.30 2.96 0.7 1.00 21.70 27.05 2.67 0.3 0.33 18.28 22.70 2.21 0.0 0.00 15.17 18.61 1.72 0.0 0.00 12.54 15.17 1.31 0.0 0.00 10.54 12.54 1.00 0.0 0.00 9.02 10.54 0.76 0.0 0.00 7.81 9.02 0.60 0.0 0.00 6.75 7.81 0.53 0.0 0.00 5.82 6.75 0.47 0.0 0.00 5.00 5.82 0.41 0.0 0.00 4.29 5.00 0.36 0.0 0.00 3.66 4.29 0.31 0.0 0.00 3.11 3.66 0.28 0.0 0.00 2.62 3.11 0.24 0.0 0.00 2.20 2.62 0.21 0.0 0.00 1.83 2.20 0.19 0.0 0.00 1.50 1.83 0.16 0.0 0.00 1.22 1.50 0.14 0.0 0.00 1.00 1.22 0.11 0.0 0.00 0.81 1.00 0.09 0.0 0.00 0.66 0.81 0.06 0.0 0.00 0.54 0.66 0.06 0.0 0.00 0.44 0.54 0.05 0.0 0.00 0.36 0.44 0.04 0.0 0.00 0.29 0.36 0.03 0.0 0.00 0.24 0.29 0.03 0.0 0.00 0.19 0.24 0.02 0.0 0.00 0.16 0.19 0.02 0.0 0.00 0.13 0.16 O.Q1 0.0 0.00 0.10 0.13 0.01 0.0 0.00 0.06 0.10 O.Q1 0.0 0.00 0.06 0.08 0.00 0.0 0.00 0.06 0.06 0.00 0.0 0.00 0.06 0.06 0.00 0.0 0.00 0.06 0.06 0.00 0.0 0.00 0.06 0.06 0.00 0.0 0.00 0.06 0.06 0.00 6.66 4.55 c ,, j c J! ~ ... ft 287.6 . 287.7 287.8 287.9 288.0 288.1 288.3 288.4 288.6 288.8 289.0 289.2 289.3 289.4 289.5 289.5 289.6 289.6 289.5 289.5 289.4 289.4 289.3 289.2 289.0 288.9 288.8 288.7 288.5 288.4 288.3 2882 288.1 288.0 288.0 287.9 287.9 287.9 287.9 287.8 287.8 287.B 287.B 287.8 287.B 287.7 287.7 287.7 287.7 287.7 287.6 287.6 287.6 287.6 287.6 287.6 287.6 287.6 287.6 287.6 287.6 287.6 287.6 287.6 287.6 289.6 Q w (I) ... ~ ~o g g: cfs 0.00 0.06 0.21 0.39 0.63 1.18 1.77 2.38 2.83 3.21 3.63 3.93 4.16 4.33 4.45 4.52 4.55 4.54 4.51 4.45 4.35 422 4.08 3.92 3.74 3.50 3.24 2.96 2.67 2.21 1.72 1.31 1.00 0.76 0.60 0.53 0.47 0.41 0.36 0.31 028 0.24 0.21 0.19 0.16 0.14 0.11 0.09 0.08 0.06 0.05 0.04 0.03 0.03 0.02 0.02 . 0.01 0.01 O.Q1 0.00 0.00 0.00 0.00 0.00 0.00 4.55 0014-dra2.xls El<hibit D-1 DA.# • .c D. I! 8' ~ .... uo 7.5 Tc 10.0 Inc 1.0 Time cfs 0.0 0.0 1.0 0.8 2.0 1.5 3.0 2.3 4.0 3.0 5.0 3.8 6.0 4.5 7.0 5.3 8.0 6.0 9.0 6.6 10.0 7.5 11.0 7.2 12.0 6.8 13.0 6.4 14.0 6.0 15.0 5.6 16.0 5.3 17.0 4.9 18.0 4.5 19.0 4.1 20.0 3.8 21.0 3.4 22.0 3.0 23.0 2.6 24.0 2.3 25.0 1.9 26.0 1.5 27.0 1.1 28.0 0.8 29.0 0.4 30.0 0.0 31.0 0.0 32.0 0.0 33.0 0.0 34.0 0.0 35.0 0.0 36.0 0.0 37.0 0.0 38.0 0.0 39.0 0.0 40.0 0.0 41.0 0.0 42.0 0.0 43.0 0.0 44.0 0.0 45.0 0.0 46.0 0.0 47.0 0.0 48.0 0.0 49.0 0.0 50.0 0.0 51.0 0.0 52.0 0.0 53.0 0.0 54.0 0.0 55.0 0.0 56.0 0.0 57.0 0.0 58.0 0.0 59.0 0.0 60.0 0.0 61.0 0.0 62.0 0.0 63.0 0.0 64.0 0.0 PEAK FLOWS I 7.53 0.00 lndlcetes lnltal condition EXHIBIT "D-T' PROPOSED DETENTION POND2 ROUTING Steeplechase 7 DA.# Pond Routlna EVENT= 60 c c ~ w z t ii + ::!: c + + + c 8 il5 U) c c "' "' a cf& cfs cfs cfs cfs 0.0 0.75 0.00 0.00 0.00 0.8 2.26 0.61 0.75 0.07 1.5 3.77 2.42 2.87 0.23 2.3 5.27 5.32 6.18 0.43 3.0 6.78 9.06 10.59 0.77 3.8 8.28 13.05 15.83 1.39 4.5 9.79 17.24 21.33 2.05 5.3 11.30 21.68 27.03 2.67 6.0 12.80 26.84 32.98 3.07 6.8 14.31 32.61 39.64 3.52 7.5 14.68 39.06 46.91 3.92 7.2 13.93 45.19 53.75 4.28 6.8 13.18 50.03 59.12 4.54 6.4 12.42 53.76 63.21 4.73 6.0 11.67 56.46 66.18 4.66 5.6 10.92 58.24 68.13 4.95 5.3 10.17 59.17 69.15 4.99 4.9 9.41 59.33 69.33 5.00 4.5 8.66 58.79 66.74 4.98 4.1 7.91 57.61 67.45 4.92 3.8 7.15 55.66 65.52 4.83 3.4 6.40 53.57 63.01 4.72 3.0 5.65 50.81 59.97 4.58 2.6 4.89 47.62 56.46 4.42 2.3 4.14 44.09 52.52 4.21 1.9 3.39 40.24 48.23 3.99 1.5 2.64 36.12 43.63 3.76 1.1 1.88 31.64 38.76 3.46 0.8 1.13 27.48 33.72 3.12 0.4 0.38 23.05 28.61 2.78 0.0 0.00 18.84 23.43 2.30 0.0 0.00 15.34 18.64 1.75 0.0 0.00 12.68 15.34 1.33 0.0 0.00 10.64 12.68 1.02 0.0 0.00 9.09 10.64 0.77 0.0 0.00 7.88 9.09 0.61 0.0 0.00 6.81 7.88 0.53 0.0 0.00 5.87 6.81 0.47 0.0 0.00 5.05 5.87 0.41 0.0 0.00 4.33 5.05 0.36 0.0 0.00 3.69 4.33 0.32 0.0 0.00 3.14 3.69 0.28 0.0 0.00 2.65 3.14 0.24 0.0 0.00 2.22 2.65 0.21 0.0 0.00 1.85 2.22 0.19 0.0 0.00 1.52 1.85 0.16 0.0 0.00 1.24 1.52 0.14 0.0 0.00 1.01 1.24 0.11 0.0 0.00 0.62 1.01 0.09 0.0 0.00 0.67 0.62 0.06 0.0 0.00 0.54 0.67 0.06 0.0 0.00 0.44 0.54 0.05 0.0 0.00 0.36 0.44 0.04 0.0 0.00 0.29 0.36 0.03 0.0 0.00 0.24 0.29 0.03 0.0 0.00 0.20 0.24 0.02 0.0 0.00 0.16 0.20 0.02 0.0 0.00 0.13 0.16 0.01 0.0 0.00 0.11 0.13 O.Q1 0.0 0.00 0.09 0.11 0.01 0.0 0.00 0.09 0.09 0.00 0.0 0.00 0.09 0.09 0.00 0.0 0.00 0.09 0.09 0.00 0.0 0.00 0.09 0.09 0.00 0.0 0.00 0.09 0.09 0.00 7.63 5.00 c ~t c J! ~w ft 287.6 287.7 287.8 287.9 288.0 288.2 288.4 288.5 288.7 288.9 289.2 289.4 289.6 289.7 289.8 289.9 289.9 289.9 289.9 289.8 289.8 289.7 289.6 289.5 289.3 289.2 289.1 288.9 288.7 288.6 288.4 288.3 288.2 288.1 288.0 288.0 288.0 287.9 287.9 287.9 287.6 287.8 287.8 287.6 287.6 287.6 287.7 287.7 267.7 287.7 287.7 287.7 287.6 287.6 287.6' 287.6 287.6 267.6 287.6 287.6 287.6 287.6 287.6 287.6 287.6 289.9 c w U) ..Jf ~o 8f cfs 0.00 0.07 0.23 0.43 0.77 1.39 2.05 2.67 3.07 3.52 3.92 4.28 4.54 4.73 4.66 4.95 4.99 5.00 4.98 4.92 4.83 4.72 4.58 4.42 4.21 3.99 3.76 3.46 3.12 2.78 2.30 1.75 1.33 1.02 0.77 0.61 0.53 0.47 0.41 0.36 0.32 0.28 0.24 0.21 0.19 0.16 0.14 0.11 0.09 0.06 0.06 0.05 0.04 0.03 0.03 0.02 0.02 0.01 0.01 0.01 0.00 0.00 0.00 0.00 0.00 5.00 0014-dra2.Jds EmibitD-1 D.A.# -z: ~ "' e ~ .., Qp 8.5 Tc 10.0 Inc 1.0 Time cfs 0.0 0.0 1.0 0.8 2.0 1.7 3.0 2.5 4.0 3.4 5.0 4.2 6.0 5.1 7.0 5.9 8.0 6.8 9.0 1.6 10.0 8.5 11.0 8.0 12.0 1.6 13.0 7.2 14.0 6.8 15.0 6.3 16.0 5.9 17.0 5.5 18.0 5.1 19.0 4.7 20.0 4.2 21.0 3.8 22.0 3.4 23.0 3.0 24.0 2.5 25.0 2.1 26.0 1.7 27.0 1.3 28.0 0.8 29.0 0.4 30.0 0.0 31.0 0.0 32.0 0.0 33.0 0.0 34.0 0.0 35.0 0.0 36.0 0.0 37.0 0.0 38.0 0.0 39.0 0.0 40.0 0.0 41.0 0.0 42.0 0.0 43.0 0.0 44.0 0.0 45.0 0.0 46.0 0.0 47.0 0.0 48.0 0.0 49.0 0.0 50.0 0.0 51.0 0.0 52.0 0.0 53.0 0.0 54.0 0.0 55.0 0.0 56.0 0.0 57.0 0.0 58.0 0.0 59.0 0.0 60.0 0.0 61.0 0.0 62.0 0.0 63.0 0.0 84.0 0.0 PEAK FLOWS 8.48 0.00 Indicates lnltal condition EXHIBIT •0-2• PROPOSED DETENTION POND2 ROUTING Steeplechase 7 D.A.# Pond Routlna EVENTz 100 c 0 g w z c iii + a :!;! :i; c ~ t + 8 + ~ l(l a !: cfs cfs cfs cfs cfs 0.0 0.85 0.00 0.00 0.00 0.8 2.54 0.69 0.85 0.08 1.7 4.23 2.73 3.23 0.25 2.5 5.92 8.00 6.96 0.48 3.4 7.62 10.07 11.93 0.93 4.2 9.31 14.46 17.69 1.61 5.1 11.00 19.10 23.77 2.34 5.9 12.69 24.34 30.10 2.88 6.8 14.38 30.35 37.03 3.34 1.6 16.08 37.11 44.73 3.81 8.5 16.50 44.69 53.19 4.25 8.0 15.65 51.92 61.19 4.64 1.6 14.81 57.72 67.57 4.92 7.2 13.96 62.24 72.53 5.15 6.8 13.12 65.62 76.20 5.29 6.3 12.27 67.95 78.73 5.39 5.9 11.42 69.32 80.22 5.45 5.5 10.58 69.81 80.75 5.47 5.1 9.73 69.47 80.38 5.46 4.7 8.88 68.39 79.20 5.41 4.2 8.04 66.61 77.27 5.33 3.8 7.19 64.18 74.64 5.23 3.4 6.35 61.19 71.38 5.09 3.0 5.50 57.69 67.53 4.92 2.5 4.65 53.74 63.19 4.73 2.1 3.81 49.37 58.39 4.51 1.7 2.96 44.68 53.18 4.25 1.3 2.12 39.72 47.64 3.96 0.8 1.27 34.51 41.83 3.66 0.4 0.42 29.26 35.78 3.26 0.0 0.00 23.98 29.68 2.85 0.0 0.00 19.26 23.98 2.38 0.0 0.00 15.66 19.26 1.80 0.0 0.00 12.92 15.66 1.37 0.0 0.00 10.83 12.92 1.05 0.0 0.00 9.24 10.83 0.80 0.0 0.00 8.00 9.24 0.82 0.0 0.00 6.92 8.00 0.54 0.0 0.00 5.96 6.92 0.48 0.0 0.00 5.13 5.96 0.42 0.0 0.00 4.40 5.13 0.37 0.0 0.00 3.76 4.40 0.32 0.0 0.00 3.19 3.76 0.28 0.0 0.00 2.70 3.19 0.25 0.0 0.00 2.27 2.70 0.22 0.0 0.00 1.89 2.27 0.19 0.0 0.00 1.55 1.89 0.17 0.0 0.00 1.27 1.55 0.14 0.0 0.00 1.03 1.27 0.12 0.0 0.00 0.84 1.03 0.10 0.0 0.00 0.68 0.84 0.06 0.0 0.00 0.56 0.68 0.06 0.0 0.00 0.45 0.56 0.05 0.0 0.00 0.37 0.45 0.04 0.0 0.00 0.30 0.37 0.03 0.0 0.00 0.24 0.30 0.03 0.0 0.00 0.20 0.24 0.02 0.0 0.00 0.16 0.20 0.02 0.0 0.00 0.13 0.16 0.02 0.0 0.00 0.11 0.13 0.01 0.0 0.00 0.09 0.11 0.01 0.0 0.00 0.09 0.09 0.00 0.0 0.00 0.09 0.09 0.00 0.0 0.00 0.09 0.09 0.00 0.0 0.00 0.09 0.09 0.00 8.46 6.-47 c "t c .!! ~w ft 287.6 287.7 287.8 287.9 288.1 288.2 288.4 288.6 288.8 289.1 289.4 289.6 289.8 290.0 290.1 290.2 290.2 290.3 200.3 290.2 290.2 290.1 290.0 289.8 289.7 289.5 289.4 289.2 289.0 288.8 288.6 288.4 288.3 288.2 288.1 288.0 288.0 288.0 287.9 287.9 287.9 287.8 287.8 287.8 287.8 287.8 287.8 287.7 287.7 287.7 287.7 287.7 287.7 287.6 287.6 287.6 287.6 287.6 287.6 287.6 287.6 287.6 287.6 287.8 287.6 290.3 0 w .., ... ~ ~o g IE cfs 0.00 0.08 0.25 0.48 0.93 1.61 2.34 2.88 3.34 3.81 4.25 4.64 4.92 5.15 5.29 5.39 5.45 5.47 5.46 5.41 5.33 5.23 5.09 4.92 4.73 4.51 4.25 3.96 3.68 3.26 2.85 2.36 1.80 1.37 1.05 0.80 0.62 0.54 0.48 0.42 0.37 0.32 0.28 0.25 0.22 0.19 0.17 0.14 0.12 0.10 0.08 0.06 0.05 0.04 0.03 0.03 0.02 0.02 0.02 0.01 0.01 0.00 0.00 0.00 0.00 5.47 0014-dra2Jds ExhlbllD-1 I I EXHIBIT "D-3" I PROPOSED DETENTION POND ROUTING Steeolechase 7 Event 5 Pond# Pond# D.A. # "' 0 a. UJ e z "' iii 2 .,, ::E ~~ -"' 8 ... Tc inc 1.0 1.0 Time els els 0.0 0.0 0.0 0.0 1.0 0.2 0.0 0.3 2.0 0.8 0.2 1.0 3.0 1.4 0.3 1.7 4.0 2.4 0.5 2.9 5.0 4.0 0.8 4.8 6.0 5.4 1.3 6.7 7.0 6.7 1.8 8.5 8.0 7.7 2.3 10.0 9.0 8.8 2.7 11.5 10.0 9.9 3.0 12.9 11.0 10.7 3.3 14.0 12.0 10.9 3.5 14.4 13.0 10.9 3.6 14.6 14.0 10.7 3.7 14.4 15.0 10.4 3.7 14.1 16.0 9.9 3.7 13.6 17.0 9.3 3.7 13.0 18.0 8.7 3.7 12.4 19.0 8.1 3.6 11.7 20.0 7.5 3.5 11.0 21.0 6.9 3.3 10.3 22.0 6.1 3.2 9.3 23.0 5.4 3.0 8.4 24.0 4.7 2.8 7.6 25.0 4.1 2.7 6.8 26.0 3.5 2.3 5.8 27.0 2.8 2.0 4.8 28.0 2.2 1.7 3.9 29.0 1.7 1.4 3.0 30.0 1.3 1.1 2.4 31.0 1.0 0.8 1.8 32.0 0.7 0.6 ·1.4 33.0 0.5 0.5 1.1 34.0 0.3 0.5 0.8 35.0 0.2 0.4 0.6 36.0 0.1 0.4 0.5 37.0 0.1 0.3 0.4 38.0 0.0 0.3 0.3 39.0 0.0 0.3 0.3 40.0 0.0 0.2 0.2 41.0 0.3 0.2 0.5 42.0 0.3 0.2 0.5 43.0 0.2 0.1 0.4 44.0 0.2 0.1 0.3 45.0 0.2 0.1 0.3 46.0 0.2 0.1 0.2 47.0 0.1 0.1 0.2 48.0 0.1 0.1 0.2 49.0 0.1 0.0 0.1 50.0 0.1 0.0 0.1 51.0 0.1 0.0 0.1 52.0 0.1 0.0 0.1 53.0 0.0 0.0 0.1 54.0 0.0 0.0 0.0 55.0 0.0 0.0 0.0 56.0 0.0 0.0 0.0 57.0 0.0 0.0 0.0 58.0 0.0 0.0 0.0 59.0 0.0 0.0 0.0 60.0 0.0 0.0 0.0 61.0 0.0 0.0 0.0 62.0 0.0 0.0 0.0 63.0 0.0 0.0 0.0 64.0 0.0 0.0 0.0 PEAK FLOWS 10.9 3.7 14.6 0014-<Xllllbined.xls I EXHIBIT "D-3" PROPOSED DETENTION POND ROUTING Steeolechase 7 Event 10 Pond# Pond# D.A. # .c: 0 Q. w E z "' iii e .,, :E ~ .. 0 ~ N u IOo Tc inc 1.0 1.0 nme els cfs a.a a.a 0.0 o.a 1.0 0.3 a.1 a.3 2.0 0.9 0.2 1.0 3.0 1.5 0.3 1.9 4.0 2.9 0.6 3.5 5.0 4.6 1.0 5.5 6.0 6.1 1.5 7.6 7.a 7.4 2.0 9.4 6.0 6.5 2.6 11.1 9.0 9.6 2.9 12.7 10.0 11.0 3.3 14.2 11.0 11.7 3.6 15.3 12.0 121 3.6 15.9 13.0 12.1 3.9 16.0 14.0 11.9 4.0 16.0 15.0 11.6 4.1 15.7 16.0 11.2 4.1 15.3 17.0 10.7 4.1 14.6 16.0 10.0 4.0 14.0 19.0 9.2 4.0 13.2 20.0 6.5 3.9 12.4 21.0 7.6 3.6 11.6 22.0 7.1 3.6 10.7 23.a 6.3 3.4 9.7 24.0 5.4 3.2 6.6 25.0 4.6 3.0 7.6 26.0 3.9 2.6 6.7 27.0 3.2 2.5 5.7 26.0 2.5 2.1 4.6 29.0 1.6 . 1.7 3.5 30.0 1.4 1.3 2.7 31.0 1.1 1.0 2.1 32.0 0.6 0.6 1.6 33.0 0.6 0.6 1.2 34.0 0.4 0.5 0.9 35.0 0.2 a.5 a.7 36.a a.1 a.4 a.5 37.a a.1 a.4 a.4 36.a a.1 a.3 a.4 39.a a.a a.3 a.3 40.a o.a a.2 a.3 41.a a.a a.2 a.2 42.a a.3 a.2 a.5 43.a a.2 a.2 a.4 44.a a.2 a.1 a.4 45.a a.2 a.1 a.3 46.a a.2 a.1 a.3 47.a a.1 a.1 a.2 46.a a.1 a.1 a.2 49.a a.1 a.1 a.1 so.a a.1 o.a a.1 51.a a.1 a.a a.1 52.a a.1 a.a a.1 53.a a.a a.a a.1 54.a a.a a.a a.1 55.a a.a a.a o.a 56.a a.a a.a o.a 57.a a.a a.o a.a 56.a a.a a.a a.a 59.a a.a a.a a.a 60.a a.a a.a a.a 61.a a.a a.a a.a 62.a a.o 0.0 0.0 63.0 0.0 0.0 0.0 64.0 0.0 0.0 0.0 PEAK FLOWS 12.1 4.1 16.0 0014-rombined.xfs I EXHIBIT "D-3" I PROPOSED DETENTION POND ROUTING Steeplechase 7 Event 25 Pond# Pond# D.A. # .c 0 a. w I! z "' iii e " ~ ~ .. -~ llJO Tc Inc 1.0 1.0 Tlmo cfs cfs a.a a.a a.a a.a 1.a a.3 a.1 a.4 2.a a.9 a.2 1.1 3.a 1.7 a.4 2.1 4.a 3.5 a.6 4.2 5.a 5.3 1.2 6.5 6.a 7.0 1.8 8.7 7.a 8.2 2.4 1a.6 8.0 9.6 2.8 12.5 9.a 11.a 3.2 14.2 1a.a 12.2 3.6 15.8 11.a 13.1 3.9 17.1 12.a 13.6 4.2 17.7 13.a 13.6 4.3 18.a 14.a 13.5 4.5 18.0 15.a 13.2 4.5 17.B 16.0 12.B 4.5 17.3 17.a 12.2 4.5 16.7 18.a 11.5 4.5 16.1 19.0 1a.9 4.4 15.3 20.0 10.0 4.3 14.4 21.0 9.1 4.2 13.3 22.0 8.2 4.1 12.3 23.0 7.4 3.9 11.3 24.0 6.5 3.7 10.2 25.0 5.4 3.5 9.0 26.a 4.5 3.2. 7.8 27.0 3.7 3.0 6.6 28.0 2.9 2.7 5.5 29.0 2.a 2.2 4.3 30.0 1.5 1.7 3.2 31.0 1.1 1.3 2.4 32.0 a.B 1.0 1.8 33.0 0.6 0.8 1.4 34.a 0.4 0.6 1.0 35.0 0.2 0.5 0.8 36.0 a.1 a.5 0.6 37.0 0.1 0.4 0.5 38.0 0.1 0.4 0.4 -39.0 0.0 0.3 0.3 40.a 0.0 0.3 0.3 41.0 0.0 0.2 0.2 42.0 0.3 0.2 0.5 43.0 a.2 0.2 0.4 44.0 a.2 0.2 a.4 45.0 0.2 0.1 0.3 46.0 0.2 0.1 0.3 47.0 0.1 0.1 0.2 48.0 0.1 0.1 0.2 49.0 a.1 0.1 0.2 50.0 0.1 0.0 0.1 51.a 0.1 o.a 0.1 52.0 0.1 0.0 0.1 53.0 0.0 0.0 0.1 54.0 0.0 0.0 0.1 55.0 a.o . a.o 0.0 56.0 0.0 a.a 0.0 57.0 0.0 0.0 a.o 58.0 0.0 0.0 o.a 59.0 a.a. 0.0 0.0 60.0 0.0 0.0 0.0 61.0 a.o 0.0 0.0 62.0 0.0 0.0 0.0 63.0 0.0 o.a 0.0 64.0 0.0 0.0 0.0 PEAKF\.OWS I 13.S 4.5 18.0 0014-<:0mbined.Jds I I EXHIBIT "D-3" I I PROPOSED DETENTION POND ROUTING Steeplechase 7 Event 50 Pond# Pond# D.A. # .c c Q. UJ E z "' iii e " :E ~~ ~ N 8 ...... Tc Inc 1.0 1.0 Tlme cfs cfs 0.0 0.0 0.0 0.0 1.0 0.3 0.1 0.4 2.0 1.0 0.2 1.3 3.0 2.0 0.4 2.5 4.0 4.1 0.6 4.9 5.0 6.1 1.4 7.5 6.0 7.7 2.0 9.7 7.0 9.2 2.7 11.9 6.0 10.6 3.1 13.6 9.0 12.1 3.5 15.6 10.0 13.5 3.9 17.4 11.0 14.5 4.3 16.7 12.0 15.0 4.5 19.5 13.0 15.2 4.7 19.9 14.0 15.1 4.9 20.0 15.0 14.6 4.9 19.6 16.0 14.4 5.0 19.4 17.0 13.9 5.0 16.9 16.0 13.2 5.0 16.2 19.0 12.4 4.9 ·11.3 20.0 11.6 4.8 16.4 21.0 10.7 4.7 15.4 22.0 9.6 4.6 14.2 23.0 8.5 4.4 13.0 24.0 7.5 4.2 11.7 25.0 6.5 4.0 10.5 26.0 5.3 3.8 9.0 27.0 4.2 3.5 7.7 28.0 3.3 3.1 6.4 29.0 2.3 2.8 5.1 30.0 1.6 2.3 3.9 31.0 1.2 1.7 2.9 32.0 0.9 1.3 2.2 33.0 0.7 1.0 1.7 34.0 0.4 0.8 1.2 35.0 0.3 0.6 0.9 36.0 0.2 0.5 0.7 37.0 0.1 0.5 0.6 38.0 0.1 0.4 0.5 39.0 0.0 0.4 0.4 40.0 0.0 0.3 0.3 41.0 0.0 0.3 0.3 -42.0 0.3 0.2 0.5 43.0 0.2 0.2 0.5 44.0 0.2 0.2 0.4 45.0 0.2 0.2 0.4 46.0 0.2 0.1 0.3 47.0 0.1 0.1 0.3 48.0 0.1 0.1 0.2 49.0 0.1 0.1 0.2 50.0 0.1 0.1 0.1 51.0 0.1 0.1 0.1 52.0 0.1 0.0 0.1 53.0 0.0 0.0 0.1 5-4.0 0.0 0.0 0.1 55.0 0.0 0.0 0.1 56.0 0.0 0.0 0.0 57.0 0.0 0.0 0.0 58.0 0.0 0.0 0.0 59.0 0.0 0.0 0.0 60.0 0.0 0.0 0.0 61.0 0.0 0.0 0.0 62.0 0.0 0.0 0.0 63.0 0.0 0.0 0.0 64.0 0.0 0.0 0.0 PEAK FLOWS I 16.2 5.0 20.0 0014-<X>m bined.xls I I EXHIBIT "D-3" I PROPOSED DETENTION POND ROUTING Steeplechase 7 Event 100 Pond# Pond# DA# .c c c.. w I! z "' iii e 'D :E ~ .. -"' R r:>n Tc Inc 1.0 1.0 Tlme eta cfs 0.0 0.0 0.0 0.0 1.0 0.4 0.1 0.5 2.0 1.1 0.2 1.4 3.0 2.5 0.5 2.9 4.0 4.7 0.9 5.6 5.0 6.9 1.6 B.5 6.0 B.5 2.3 10.B 7.0 10.2 2.9 13.1 B.O 11.7 3.3 15.1 9.0 13.3 3.B 17.1 10.0 14.7 4.2 19.0 11.0 15.9 4.6 20.5 12.0 16.5 4.9 21.4 13.0 16.B 5.1 21.9 14.0 16.8 5.3 22.1 15.0 16.5 5.4 21.9 16.0 16.1 5.4 21.6 17.0 15.6 5.5 21.1 18.0 14.9 5.5 20.3 19.0 14.1 5.4 19.5 20.0 13.3 5.3 18.6 21.0 12.2 5.2 17.4 22.0 11.2 5.1 16.3 23.0 10.0 4.9 14.9 24.0 8.7 4.7 13.5 25.0 7.6 4.5 12.1 26.0 6.3 4.2 10.5 27.0 4.9 4.0 8.9 28.0 3.8 3.7 7.4 29.0 2.7 3.3 5.9 30.0 1.7 2.9 4.5 31.0 1.3 2.4 3.6 32.0 1.0 1.8 2.7 33.0 0.7 1.4 2.1 34.0 0.5 1.0 1.5 35.0 0.3 0.8 1.1 36.0 0.2 0.6 0.8 37.0 0.1 0.5 0.7 38.0 0.1 0.5 0.5 39.0 0.0 0.4 0.5 40.0 0.0 0.4 0.4 41.0 0.0 0.3 0.3 42.0 0.0 0.3 0.3 43.0 0.0 0.2 0.2 44.0 0.0 0.2 0.2 45.0 0.0 0.2 0.2 46.0 0.0 0.2 0.2 47.0 0.0 0.1 0.1 48.0 0.0 0.1 0.1 49.0 0.0 0.1 0.1 50.0 0.0 0.1 0.1 51.0 0.0 0.1 0.1 52.0 0.0 0.1 0.1 53.0 0.0 0.0 0.0 54.0 0.0 0.0 0.0 55.0 0.0 0.0 0.0 56.0 0.0 0.0 0.0 57.0 0.0 0.0 0.0 58.0 0.0 0.0 0.0 59.0 0.0 0.0 0.0 60.0 0.0 0.0 0.0 61.0 0.0 0.0 0.0 62.0 0.0 0.0 0.0 63.0 0.0 0.0 0.0 64.0 0.0 0.0 0.0 PEAK FLOWS I 1&.8 5.5 22.1 0014-combined.Jds 'II: 01 VJ INLET NO. I'll: ~ TO INLET ..... > m !"' TOTAL CA M >< :"I e. ()) = Tc ("1 M ~ ..... I'< 0 ., Desi!711 Storm 0 ~ I\) !'J n VJ ;;ri Unadiusted Desi!m Flow ~ rJ) ..., M I\) n I\) <;;'> VJ Adjusted Desi!!ll Flow* ..... :it: No. of Pipes I\) n I\) <;;'> VJ Flow Per Pipe M .,, t"' M ("1 M ::r: ~ > fJJ s; M 00 ~ §3 r: M 0 I 0 m ~ 0 "' Friction Slope"* --:s :s rJ) -0 I\) --..,J F' SIZE ~~ cr>"' VEL. I\) n I\)~ w "' Caoacity* 2 0 ~ > ~ M G; ..... ...., ~ r--LENGTH .,, 0 ~ ~a 01 -· ..., w = Travel Time ~ a w :;· Tc rii1 End 01 . WIDTH . HEIGHT ,, UJ ·:X ~ .. .J w 0 . ~. (" .. ~--; __ :J ., ~ Steeplechase Subdivision, Phase 7 Revised Engineer's Estimate December 12, 2000 Item Dcscriptioo Unit Quantity Estimated No. Unit Price Paving Constnu:tion I PrqJere Work Arca Lump Sum I 5000 .00 2 Eardlwort (cut) C.Y. 766 4.00 3 Eardlwort (imported fill -loose) C.Y. 3,535 7.00 4 6" Rcinbt:cd ConCretc PaYCmCnt w/curb S.Y. · 4,758 27.00 5 6" Lime Stabililx:d Subtuadc S.Y. 6,900 3.25 ·6 ExtnLlmc Ton 30 80 .00 7 5• Reinforced Coocrctc Driveway S.F. 15,945 2.75 8 4 • Cooac:tc Sidewalk S.f . 171 2.50 9 Colored Whcclchair Ramps S.F. 107 7.25 10 Remove conCrcte curb & gutjcr L.F. 85 5.00 II Remove concrete sidewalk S.F. 375 4.00 Paving Su btocal Dnainage System Construction 12 15" Rcint: Colla'Ctc Pipe, Str. Backfill L.F. 49 28 .00 13 27" Rein! Coocrctc Pipe, Str. Backfill L.F. 78 42.00 ·14 27" Rcint: Coocrctc Pipe, Non-Str. Bacldill L.F. 106 40.00 15 IO' Curb inlet Each I 3000.00 16 S' Curb inlet Each I 2300.00 17 Gmclalet Eadi I 2000.00 1.8 Reioixcod Coocrctc Flwnc S.F. 336 6.SO 19 Dooorative Block Wall -Pond l Lump Sum I 8000 .00 20 Dcoorativc B19Clc Wall -Pond 2 Lump Sum I 8000.00 2i Remove c:xistin~ inlet Each I 1000.00 22 Silt Fence L.F. 155 2.00 23 Inlet Protection Each 2 · S0.00 24 Hydromulch Seeding S.Y. 3,620 o.so Drainage System Subtocal Water Svstem Construction 25 8"PVC WataLine, S~. Backfill L.F. 20 24.00 26 6" PVC Wata Linc, Str. Backfill L.F. 300 22.00 27 6" PVC Water Line, Non-Str. Backfill L.F. 1,281 16.00 28 Fire Hydrant Assembly Each I 1900.00 29 8"x 6" Reducer Each I 125.00 30 6"x6"Tcc Each 5 200.00 31 6" Gate Valve Each 10 400.00 32 6"x24" Anchor Coupling Each I 200.00 33 6"x 13" Anchor Coupling Each II 125.00 34 6"x 45 dc:2xcc bend Each 5 IS0.00 35 6"x 22.S degxcc bend Each 3 150.00 36 6"x 11.25 degxcc bend Each 4 IS0 .00 37 6"Cap Each 2 15 .00 38 Remove cap & connect to existing pipe Each I 200.00 39 l.S" Water Ser. >10 ft (avg. -=45 ft.) Each 12 700.00 40 1.5" Water Ser. !:IO ft (avg.-= 7 ft.) Each 3 450.00 41 I" Water Sc:rvioc: (avg."' 13 ft.) Each 3 500.00 Watc:r System Subtocal Sewer System Construction 42 6" PVC. D-3034, Str. Baddill L.F . 637 25 .00 43 6" PVC. D-2241, Str. Bac:kfill L.F. 20 26.00 44 Standard Manhole, 0-6 1l deep Each I 1500.00 45 Standard Manhole, 1-10 ft. deep Each I 1800.00 46 Connect to c:xisWu!: manbolc Each 2 400.00 47 R.cmovc CIOD!C & n:placc wlcccadric cooc Each I 500.00 48 4" Sew« Sc:rvioc: !:: 20 1l (avg. .. 15 ft.) Each II 500.00 49 4" Sewa Sc:rvioc: > 20 1l (avg. .. SI ft.) Each t I 1000.00 so Tralch Safctv (sewer line) L.F. 454 1.00 Sewa System Subtocal Total Construction Cost Tocal 5,000 .00 3,06".00 24,745.00 128,466.00 22,425 .00 2,400.00 43,8"8 .75 427.SO 775.75 425.00 1,500.00 233,077.00 1,372.00 3,276 .00 4,240.00 3,000.00 2,300.00 2,000.00 2,114.00 8,000.00 8,000.00 l,000.00 1,510.00 100.00 1,810.00 38,792.00 480 .00 6,600.00 20,496.00 1,900.00 125.00 1,000 .00 . 4,000.00 200.00 1,375.00 750.00 450.00 600.00 IS0 .00 200.00 8,400 .00 1,350.00 1,500.00 49,576.00 15,925 .00 520.00 l,500.00 1,800.00 100.00 500.00 S,500.00 1,000.00 454.00 34,999.00 356..UC.OO Date: April 19 , 2001 To: Amanda Hudec, Accounting\\ ... J\ From : Bob Mosley, City Engineer~'\'- Subject: Completed Infrastructure from Private Development By the attached letter of completion for the Steeplechase phase 7 development, we have accepted the following improvements to the City of College Station infrastructure. Water: 6 inch main 8 inch main Fire Hydrant, assembly Subtotal Sanitary Sewer: 6 inch sanitary sewer main 4 foot diameter manholes Subtotal The value of the above infrastructure totals $356,444 .00. c: Natalie Ruiz, Development Coordinator John Logan, Engineering Technician Missy Green, Staff Assistant 1,581 linearfeet 20 linear feet 1 each $49,576.00 657 linear feet 2 each $34,999.00 02101 1 2001 WED 23:%6 FA! FILE No.361 02..-os ·01 ~ 10:~2 tD:~ a:JllTrcTffiS FAX:9708232797 la! 0021002 PAGE 2 LETTER OF CQM"PT '?'~TON CJ"N JtNQINlilmR CITY <)fl' COLL&O~ STATION COI..f,,EGE STA'l'll):'I , 'rE.'"<AS Den.r Sll': . OA'tt1_2}sj; OQ I R~; COMPLi.TION OF ____ _ :!> +tQ? I(, ' h 0,S" "l'hv p1n•p oisl! o l' om l1Hr<~1· i11 ui !'e q1 u!1L thaL t h~ Cl'J\low in" li!SL!!(l i mprov~:1 ~~1ttl;; l)e u1>tH'ov r~d and acccµct1d :~& bt1111i e<m11tru1 !L C<l undo~· city inepcceion and complotad l~(;Q~'dinq to planli Qnci Aptt<nfir.nt.ioru:. :.\~ ~tpprov 11d :.uvl r e quired by the City nf Cnlleu Stot\,;.n . 1'~xo.i;s . ~rhlil U!Jprclv:.11 und :.1ccuprnn ce by rh ,~ Cil~· i!S roqm>11to<l in <Jrd11r thut we in11y t:rnlize 1~ny Kub· conuncta nnd to :1t'f\rm th ~ir warrnnty on th" W()rk _ Thifl "l'l'lt'tJVal o.nd :1(:C.:~t>tu.n<; ... b~· t.h o Clty f'lf th~ im1,rov.,mrrnt11 \iittod below <lnf!8 hereby vnld ~he ltltttH' 1)( (Clj:u~ntr:u fca· thl.' U•~ti irnprovtrrttitntB on r.he nbovP. rc:Corcnco project. Th11: 1)1\1'! )'~ar w urrunt>' ilk h191·h~· II fftrrn<,1d ~111,I Qi'l'<?6ll to oy 'COv. vt9 ~ ~'f'~r5antl by th~ir i'lulJ ·<:~11tr11c.:tor-.,; 1H1 i ncii r.n ted by :;i~nQttu·~" hel uw . WQRK COMPLETED -=------ AC:CEPTA.NCE & AP PROV AL l 6l "<,B<J36 l 6=Xtl.:l i ' .... 'f'T.' ~ t) f!.) :Z,oo ( .. Cu\itrnct~n 'fOun~ ('.QJ1'{~('.s 1 l""nc.., Addr11t11 ; fo 'Bp t laj "/ Br \4 4+1 TX 1190'=1 OP OO-T53 02/0T/2001 WED 23 :%6 FA.1 iaioo21 002 FILE No.361 ()2..-06 '01 ~ 10:~ tD:~ cnm~::TIRS FAX:9798232797 PAGE 2 LETTER OF COMt>T 1(,,,TON Ct't'Y teNOIN~BR CITY <)fl' COLL&O~ S'l'A.TION COi.LEGE STA'l'll)~. TE.''CAS D~tl.r Slr: Rli:; COMPLJi;TlON OF ____ _ ;:, +tQ? It. ' r e..s t:. 1'hu J)IH'JlCJ IS<! uf U\\r l1Ht <~1· Lti :.n !'ertw!:i L t ha~ t h~ ft~\low \n~ li~ted imprOvl!:l~'-'l tt~ l~e ~l>prov r~ci 1i1.nd accoptud :a Ut1Lni c1m•t1•u 1~Lc c i undol.' ci ty inepcction and cotnplutad l~(;O~'dinq to plan~ ond. lllp1•mfko~ioM :l!j ~\pprnv•i r.i :mr{ r~quire d hy the Cii:y nf Collen Stot\.:.o . '\\~x4\~. ;rhh1 upproval und accuptnnce Ly r h1 ~ Cil~· i~ roqmHH.o<l in ''rd~r that we mn~ t:'llllize 1~ny Kub· com:rncta nnd Vi :'lt'f\rm their warrnnty on tho work. Thi~ 111H~t'tlVa\ o.nd :11 ;cl!!tltU.nr.:1t b~· I.ho Clty rifth• i m1H·ov.,mGntR liittod below dnf!e hereby vo id 1.he lf.He11r 1)C l'Cl~ur~ntc:o fo1· th1..• li•~d improvcrrt1i1nt11 on che nbovP. rdorcnco projec~. Tht: 1)1\P. )'t!ar wurrunt~· i ll h1ot1·h~· nfl1rrriod ~n~I u~l'C6tl too~ 'CPI.A Y19 CmJ.f'aGr5n11d by tMlr i11ulJ•1)1Jti.t r11cton; 1111 i n<lir.n ted hy i;il{nat1.u·e~ he I cw. WORK COMPLETED .. - ACCEPTA.NCE &. AP PROV AL 't) ~} -Z,oo ( . Con. trnct~l': ~ U rl~ Ca;d {(4tku· ..SI 'I'nC.. • AdclrtaU ; fo Bot 'aj ~ Br: \'4 4Vt TX 1J9o~ tlL 1£' :.i$.#Y\ 797~~/~/ 7~/ ~(/ ~/ <::v'(c/ 1~-z a f1f/ff ~~ ~~-z/ ~it! ~d'o:;> 0/1/~? 1 ~f FEMA SFHA : In or Out Expiration Date: ------ Watershed : ------ Permit#: ------ CITY INFRASTRUCTURE INSPECTION NOTICE Date: IZ--/6-&0 To: !5,,j, /lo;7r From: Deborah Grace RE: ~~k~ ~M,s/&72 ,r/~~~ 7 Location: ~Public Water Lines/Fire Hydrants ~ /ublic Sanitary Sewer if" Public Storm Sewer 0 Public Streets 0 ~ublic Detention Facility CT1' Driveway Connection to Public Street 0 Private Construction within easement 0 No Inspection Required Comments : } } ~Engineer's Estimates Attached ~Construction Plans Attached D D Site Plan Attached f \. ., ~ 0 ~ ... c::> ..;.. .; c::> _t i .. :J c::> N :... ... J, l!';) dJ jJ ,;::> ~ z ~.-= -1 u .. c:J w . "'' ~ .. , .. 0 _j z ·'-" '--_! w LU c 0 a.: (.) Steeplechase Subdivision, Phase 7 Revised Engineer's Estimate December 12, 2000 Item Description Unit Quantity Estimated No . Unit Price Paving Construction I Pn:parc Worlc Area Lump Sum 1 5000.00 2 Earthwodc (cut) C.Y . 766 4 .00 3 Earthwodc (imported fill -loose) C.Y. 3,535 7.00 4 6" Reinforced Concrcte Pavement w/curb S.Y. · 4,758 27.00 5 6" Lime Stabiliz.cd Subii.rade S.Y. 6,900 325 6 Extra Lime Ton 30 80 .00 7 5" Reinforced Concrete Driveway S.F. 15,945 2 .75 8 4" Concrete Sidewalk S.F. 171 2 .50 9 Colored Wheelchair Ramps S.F. 107 7.25 10 Remove conCrcte curb & gutter L.F. 85 5.00 II Remove concrcte sidewalk S.F . 375 4 .00 Paving Subtotal Drainage System Construction 12 15" Reini Concrete Pipe, Str. Backfill L.F. 49 28 .00 13 27" Rein! Conaetc Pipe, Str. Backfill L.F. 78 42.00 14 27" Reini Concrete Pipe, Non-Str. Backfill L.F. 106 40.00 IS 10' Curb inlet Each I 3000.00 16 S' Curb inlet Each I 2300.00 17 Grate Inlet Each I 2000.00 1.8 Reinfurccd Concrete Flume S.F. 336 6.50 19 Decorative Block Wall -Pond I Lump Sum I 8000.00 20 Dcoorativc Bl9ck Wall -Pond 2 Lump Sum I 8000.00 21 Remove existing inlet Each I 1000.00 22 Silt Fence L.F. 1SS 2 .00 23 Inlet Protection Each 2 S0 .00 24 Hvdromulch Sccdinit S.Y. 3,620 o.so Drainage System Subtotal Water System Construction 2S 8" PVC Water Linc, Str. Backfill L.F. 20 24.00 26 6" PVC Wattt Linc, Str. Baclcfill L.F. 300 22.00 27 6" PVC Water Linc, Non-Str. Backfill L.F. 1,281 16.00 28 Fire Hydrant Assembly Each I 1900.00 29 8 "x 6" Reducer Each I 12S.OO 30 6"x6"Tec Each s 200.00 31 6" Gate Valve Each 10 400.00 32 6"x 24 • Anchor Coupling Each I 200.00 33 6"x 13" Anchor Coupling Each II 12S.OO 34 6"x 4S dcgrcc bend Each s lS0.00 3S 6"x 22.S dcgrcc bend Each 3 lS0.00 36 6"x 1125 dcgrcc bend Each 4 150 .00 37 6"Cap Each 2 7S .OO 38 Remove cap & connect to existing pipe Each I 200.00 39 l.S" Water Ser.> 10 ft (avg.= 4S ft.) Each 12 700 .00 40 I .S" Water Ser. !:IO ft (avg.= 7 ft.) Each 3 4SO .OO 41 I" Water Service (avg.= 13 ft .) Each 3 S00 .00 Water System Subtotal Sewer Svstem Construction 42 6" PVC, D-3034, Str. Bacldi.11 L.F . 637 2S .OO 43 6" PVC, D-2241, Str. Backfill L.F. 20 26 .00 44 Standard Manhole, 0-6 ft. deep Each I IS00.00 4S Standard Manhole, 8-10 ft. deep Each I 1800 .00 46 Connect to existing manhole Each 2 400.00 47 Remove oooe & replace w/ccccntric cone Each I 500.00 48 4 • Sewer Service!:: 20 ft. (avg.= IS ft.) Each 11 S00 .00 49 4" Sewer Service> 20 ft. (avg.= 51 fl) Each 8 1000.00 50 Trench Safety (sewer line) L.F. 4S4 1.00 Sewer System Subtotal Total Construction Cost Total 5,000.00 3,064.00 24,745.00 128,466 .00 22,425 .00 2,400.00 43,848 .75 427.50 775 .75 425 .00 1,500.00 233,077.00 1,372.00 3,276.00 4,240 .00 3,000.00 2,300.00 2,000 .00 2,184 .00 8,000.00 8,000.00 1,000.00 1,510.00 100.00 1,810.00 38,792.00 480.00. 6,600.00 20,496.00 1,900.00 12S .OO 1,000 .00 4,000.00 200.00 1,37S .OO 7SO .OO 4SO .OO 600 .00 IS0 .00 200 .00 8,400 .00 l,3SO .OO 1,500 .00 49,S76 .00 IS,92S.OO S20.00 1,500.00 1,800.00 800.00 500.00 S,500 .00 8,000.00 4S4 .00 34,999 .00 356,444.00 FEMA SFHA: In or Out Expiration Date :------ Watershed: ------ Permit#: ------ CITY INFRASTRUCTURE INSPECTION NOTICE Date: To: From: Deborah Grace RE: Location: ~ Public Water Lines/Fire Hydrants ~ Public Sanitary Sewer ~ Public Storm Sewer 0 Public Streets 0 Public Detention Facility ~ Driveway Connection to Public Street 0 Private Construction within easement 0 No Inspection Required Corilments : Engineer's Estimates Attached Construction Plans Attached } D Site Plan Attached } D ~-~ COLLlGl STATION DEVELOPMENT PERMIT PERMIT NO. 500083 DP-STEEPLECHASE PH 7 FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE SITE LEGAL DESCRIPTION: STEEPLECHASE SUBDIVISION PHASE 7 DATE OF ISSUE: 12/18/00 OWNER: BRAZOS TRIAD LAND DEVELOPMENT PARTNERSHIP LTD BRYAN, TX 77805 SITE ADDRESS: 11901FM2154 DRAINAGE BASIN: BEE CREEK VALID FOR 12 MONTHS CONTRACTOR: TYPEOFDEVELOPMENT: FULLDEVELOPMENTPERMIT SPECIAL CONDITIONS: All construction must be in compliance with the approved construction plans All trees must be barricaded, as shown on plans , prior to any construction. Any trees not barricaded will not count towards landscaping points. Barricades must be 1' per caliper inch of the tree diameter. The Contractor shall take all necessary precautions to prevent silt and debris from leaving the immediate construction site in accordance with the approved erosion control plan as well as the City of College Station Drainage Policy and Design Criteria. The Owner and/or Contractor shall assure that all disturbed areas are sodden and establishment of vegetation occurs prior to removal of any silt fencing or hay bales used for temporary erosion control. The Owner and/or Contractor shall also insure that any disturbed vegetation be returned to its original condition, placement and state. The Owner and/or Contractor shall be responsible for any damage to adjacent properties , city streets or infrastructure due to heavy machinery and/or equipment as well as erosion , siltation or sedimentation resulting from the permitted work. Any trees required to be protected by ordinance or as part of the landscape plan must be completely fenced before any operations of this permit can begin. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that debr is from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities. I hereby grant this permit for development of an area outside the special flood hazard area. All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer in the development permit application for the above named project and all of the codes and ordinances of the City of College Station that apply . Date I z /1e )co r I Date Item No . 1 2 3 4 5 6 7 8 9 10 II 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 ~ 38 39 40 41 .... ) <.. ,, c:::> . -" '" c:::> .? 0 c:::> N 42 43 44 w Lr.) w s ,.-4 UJ ( .!) ~ w (.) -:: w ..LJ CJ > c. Cl ...JZ ...J w UJ (.) 0 a: (.) 45 46 47 48 49 50 Steeplechase Subdivision, Phase 7 Revised Engineer's Estimate December 12, 2000 Description Unit Quantity Paviol? Construction Prepare Work Area Lump Sum I Earthwork (cut) C.Y. 766 Earthwork (imported fill -loose) C.Y. 3,535 6" Reinforced Concrete Pavement w/curb S.Y. · 4,758 6" Lime Stabilized Sub1U11de S.Y. 6,900 Extra Lime Ton 30 5" Reinforced Concrete Driveway S.F. 15,945 4" Concrete Sidewalk S.F. 171 Colored Wheelchair Ramps S.F. 107 Remove conerete curb & gutter L.F . 85 Remove concrete sidewalk S.F. 375 Estimated Unit Price 5000 .00 4 .00 7.00 27.00 325 80 .00 2 .75 2.50 7.25 5.00 4 .00 Paving Subtotlll Draioa2e System Construction 15" Reint: Concrete Pipe, Str. Backfill L.F . 49 28 .00 27" Rclnt: Concrete Pipe, Str. Backfill L.F. 78 42 .00 27" Rcint: Concrete Pipe, Non-Str. Backfill L.F . 106 40.00 10' Curb inlet Each 1 3000.00 5' Curb inlet Each 1 2300.00 Grate Inlet Eacli 1 2000 .00 Reinfurced Concrete Flume S.F. 336 6 .50 Decorative Block Wall -Pond 1 Lump Sum l 8000.00 Decorative Block Wall -Pond 2 Lump Sum l 8000.00 Remove existing inlet Each 1 1000.00 Silt Fence L.F . 755 2 .00 Inlet Protection Each 2 50.00 Hvdromulch Seeding S.Y . 3,620 0 .50 Drainage System Subtotal Water Svstem Construction 8" PVC Water Line, Str. Backfill L.F . 20 24.00 6" PVC Water Line, Str. Backfill L.F . 300 22.00 6" PVC Water Line, Non-Str. Backfill L.F. 1,281 16.00 Fire Hydrant Assembly Each l 1900 .00 8"x 6" Reducer Each l 125.00 6"x6" Tee Each 5 200.00 6" Gate Valve Each 10 400.00 6"x 24 • Anchor Coupling Each l 200.00 6"x 13" Anchor Coupling Each 11 125 .00 6 "x 4 5 dcl!:ree bend Each 5 150 .00 6"x 22 .5 degree bend Each 3 150 .00 6"x 11 .25 degree bend Each 4 150 .00 6"Cap Each 2 75 .00 Remove cap & connect to existing pipe Each 1 200.00 l.5" Water Ser. >10 ft (avg.= 45 ft .) Each 12 700.00 l.5" Water Ser. :90 ft (avg .= 7 ft.) Each 3 450.00 l" Water Service (avg .= 13 ft .) Each 3 500 .00 Water System Subtotal Sewe r Svstem C on structio n 6" PVC, D-3034, Str. Backfill L.F. 637 25.00 6" PVC, D-2241, Str. Baclcfill L.F. 20 26.00 Standard Manhole, 0-6 ft. deep Each 1 1500.00 Standard Manhole, 8-10 ft. deep Each 1 1800.00 Connect to existing manhole Each 2 400 .00 Remove cone & replace w/ccccntric cone Each I 500.00 4" Sewer Service~ 20 ft. (avg.= 15 ft.) Each 11 500.00 4" Sewer Service> 20 ft. (avg.= 51 ft.) Each 8 1000.00 Trench Safety (sewer line) L.F. 454 1.00 Sewer System Subtotal T ota l C o nstru ction Cost Total 5,000 .00 3,064 .00 24,745 .00 128,466 .00 22 ,425.00 2,400 .00 43,848.75 427 .50 775 .75 425 .00 1,500 .00 233 ,077.00 1,372 .00 3,276 .00 4,240.00 3,000 .00 2,300 .00 2,000 .00 2,184.00 8,000.00 8,000.00 1,000.00 1,510 .00 100 .00 1,810.00 38,792.00 480.00. 6,600.00 20,496 .00 1,900 .00 125 .00 1,000 .00 4,000.00 200.00 1,375 .00 750.00 450 .00 600 .00 150 .00 200 .00 8,400 .00 1,350 .00 1,500.00 49,576 .00 15,925 .00 520 .00 1,500.00 1,800 .00 800.00 500 .00 5,500 .00 8,000 .00 454.00 34,999.00 356,444.00 ~-~ COLLlGE STATION DEVELOPMENT PERMIT PERMIT NO. 500083 DP-STEEPLECHASE PH 7 FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE SITE LEGAL DESCRIPTION: STEEPLECHASE SUBDIVISION PHASE 7 DATE OF ISSUE: 12118/00 OWNER: BRAZOS TRIAD LAND DEVELOPMENT PARTNERSHIP LTD BRYAN, TX 77805 SITE ADDRESS: 11901FM2154 DRAINAGE BASIN: BEE CREEK VALID FOR 12 MONTHS CONTRACTOR: TYPEOFDEVELOPMENT: FULLDEVELOPMENTPERMIT SPECIAL CONDITIONS: All construction must be in compliance with the approved construction plans All trees must be barricaded, as shown on plans, prior to any construction. Any trees not barricaded will not count towards landscaping points. Barricades must be 1' per caliper inch of the tree diameter. The Contractor shall take all necessary precautions to prevent silt and debris from leaving the immediate construction site in accordance with the approved erosion control plan as well as the City of College Station Drainage Policy and Design Criteria. The Owner and/or Contractor shall assure that all disturbed areas are sodden and establishment of vegetation occurs prior to removal of any silt fencing or hay bales used for temporary erosion control. The Owner and/or Contractor shall also insure that any disturbed vegetation be returned to its original condition, placement and state . The Owner and/or Contractor shall be responsible for any damage to adjacent properties, city streets or infrastructure due to heavy machinery and/or equipment as well as erosion , siltation or sedimentation resulting from the permitted work . Any trees required to be protected by ordinance or as part of the landscape plan must be completely fenced before any operations of this permit can begin. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station , measures shall be taken to insure that debris from construction, erosion , and sedimentation shall not be deposited in city streets , or existing drainage facilities. I hereby grant this permit for development of an area outside the special flood hazard area. All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer in the development permit application for the above named project and all of the codes and ordinances of the City of College Station that apply . Date I z /;e; )e, o r I Date Dec 18 00 11:20a Michael McClure 979 693 -2554 1 21 17 1 2000 SUN 23 :54 FAX BRAZOS TRIAD LAND DEVELOPMENT PARTNERSHIP, LTD. STEEPLECHASE SUBDIVISION December 18 ~ 2000 Mr. Ted Mayo Delivered by Electronic Transmission (979) 764-3496 Development Services City of College Station P . 0. Box 9960 Mail Delivery to Follow College Station, Texas 77840 Re : Steeplechase Subdivision , Phase 7 Dear Mr. Mayo : ln order to expedite our development plan for this phase of our development. we are requesting approval to begin construction of underground piping/conduits and earth moving prior to the final hearing by Planning and Zoning on January 4, 2001 . We recognize that we do not have an official approval to perfonn this work until the January 4lh hearing at which time we will be asking for approval by Planning and Zoning . We hold harmless the City of College Station for any costs we may incur in performing this work that might not be approved in the Planning 11nd Zoning hearing and accept the risk of beginning the work prior to that hearing . Sinccre1y, Brazos Triad Land Development Partnership, Ltd . BY.· razos Triad Corporation, General Partner 301 Earl Rudder Freeway • Bryan, Texas 77802 (409) 774-6101 •FAX (409) 716·3089 p. 1 ~001 1 0 0 1 OD-5c>Dog3 ~ 1Q-t-oo Q lf = '36~ SUPPLEMENTAL DEVELOPMENT PERMIT INFORMATION Application is hereby made for the following development specific site/waterway alterations: ACKNOWLEDGMENTS: I, ----------------' design enginee r/owner, hereby ackno wledge or affirm that: The information and concl usi ons contained in th e above plans and supporting documents com pl y with the current require ments of th e City of College Station , Texas City Code, Cha pter 13 and its associated Drainage Poli cy and Desi g n Standards. As a condition of approva l of this pennit application, I agree to construct the improvement s proposed in this application according to these documents a nd the requirements of Chapter 13 of the College Station City Code. Property Owner(s) Contractor CERTIFICATIONS: (for proposed alterations within designated flood haz.ard areas .) A. I, certify that any nonresidential structure on or proposed to be on this site as part of this application is designated to prevent damage to the structure or its contents as a result of flooding from the 100 year storm. Engineer Date B. I, certify that the finished floor elevation of the lowest floor, including any basement, of any residential structure, proposed as part of this application is at or above the base flood elevation established in the latest Federal Insurance Administration Flood Haz.ard Study and maps, as amended. Engineer Date C. I, Michael B McClure. P.E. , certify that the alterations or development covered by this permit ~'~'\\ diminish the flood-carrying capacity of the waterway adjoining or crossing ~s permitted site and that such altera~'t.·;;~ ••• ~-t-"'1. '•t development are consistent with requirements of the City of College Station City Code, Chapter 13 concerning ~~li f •• •• IS' •1. '-* • • *fl floodwa~s and of flood fringes . ii* : \ * ·~ ~············ .. ··· .. ···· ... ·······-'l ~d.. ~ ,1 · rz ~jz""o 1 .. M.l.9J:le.f.1.ft .. M~9hV.B§.J ~~'--+~~~~+--.__ __ H_~~~~~~~ j l . 1\ 32740 !$~ Engi eer Date ~~ f,o ·~~I".\ ~Q/ffi J' "•~ "•."tlST€.~··· ~"" "' Ss •••••••• "<A0J' D . L do certify that the proposed alterations do not raise the level of ~-.~ "P' flood above elevation established in the latest Federal Insurance Administration Flood Hazard Study. · Engineer Date Conditions or comments as part of approval :---------------------------- In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities . All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer for the above named project . All of the applicable codes and ordinances of the City of College Station shall apply. FINAL PLAT APPLICATION FNLPAPP .DOC 4114199 3 of3 / ... ~ FOR OFFICE USE ONLY 1lAnt~'~ pJ:~~ FINAL PLAT APPLICATION (check one) Minor __ Amending X Final __ Vacating __ Replat The following items must be submitted by an established filing deadline date for P & Z Commission consideration. MINIMUM SUBMITTAL REQUIREl'vIBNTS: ~Filing Fee of$200.00. __!.__Development Permit Application Fee of S 100.00 (if applicable). _x_ Infrastructure Inspection Fee of $300.00 (applicable if any public infrastructure i.s being constructed .). _!_Application completed in full. __.!._Thirteen (13) folded copies of plat (A signed mylar original must be submitted after staff review.) __ One (1) copy of the approved Preliminary Plat and/or one (1) Master Plan (if applicable). ~Paid tax certificates from City of College Station, Braz.as County and College Station LS.D. ~A copy of the attached chedclist with all items checked off or a brief explanation as to why they are not __J(Two (2)copies of public infrastructure plans associated with this plat (if applicable). APPLICATION DATA NAME OF SUBDMSION STEEPLECHASE SUBDIVISION, PHASE SEVEN SPECIFIED LOCATION OF PROPOSED SUBDMSION located along Navarro Drive APPLICANT/PROJECT MANAGER'S INFORMATION (Primary Contact for the Project): Name Mr. John DunCUin, BRAZOS TRIAD LAND DEVELOPMENT PAR'INERSHIP Street Address ---"3-"-0_1 _No;....;;_rth;....;:::..:c...=F.a::::r~l::......::..Rud=d=er=-_.:::;Fr-=ee-11~a=-yr.__ __ State TX Zip Code 77802 E-Mail Address ------------------~ Phone Number 823-8111 Fax Nwnber 776-3089 ---------~ PROPER1Y OWNER'S INFORMATION: Name Sarne as above StreetAddress ----------------City-------------- State Zip Code ______ E-Mail Address ------------- Phone Number __________ .Fax Nwnber _________________ _ ARCHITECT OR ENGINEER'S INFORMATION: Name McCLURE ENGINEERING, INC. Street Address 1 008 Woodcreek Drive City College Station State TX Zip Code _7_7_8_4_5___ E-Mail Address mcclure@tca.net Phone Number 693-3638 Fax Nwnber 693...:2554 ---------~ flNAL Pl.AT APPUCA llON FNLPAPP .CXX: JfH/99 I ofJ • TOTAL# OF LOTS 1 TOTAL ACRES OF SUBDIVISION 3. 698 Ac.R-0-W ACREAGE none ----- NUMBEROFLOTSBYZONINGDISTRICT P.D.D. /~1-----', / __ AVERAGE ACREAGE OF EACH RESIDENTIAL LOT BY ZONING DISTRICT: P.D.I:i. 3.698 Ac. I I I __ FLOODPLAIN ACREAGE none PARKLAND DEDICATION ACREAGE _____ OR FEE AMOUNT ____ _ A STA TE~ ADDRESSING ANY DIFFERENCES BETWEEN TIIE FINAL PLAT AND APPROVED MASTER DEVELOPMENT PLAN AND/OR PRELIMINARY PLAT (IF APPLICABLE): REQUESTED VARIANCES TO SUBDMSION REGULATIONS & REASON FOR SAME _______ _ REQUESTED OVERSIZE PARTICIPATION ----------------------- TOTAL LINEAR FOOTAGE OF PROPOSED: 1530 L.F. STREETS (Private) SIDEWALKS ----- 627 L.F. SANITARY SEWER LINES 1595 L.F. WATER LINES --=---CHANNELS 233 L.F. STORM SEWERS BIKE LANES I PA1HS ----- NOTE: DIGITAL COPY OF PLAT (IF APPLICABLE) MUST BE SUBMITTED PRIOR TO FILING. The applicant has prepared this application and certifies that the facts stated herein and exhibits attached hereto are true, correct and complete. The undersigned hereby requests approval by the City of College Station of the above identified final plat. Ja1f:#;rt~ FINAL PLAT APPLICATION FNLPAPP.DOC 3'2~199 Date /Z /r /zooo I 2 ofl Item No . I 2 3 4 5 6 7 8 9 10 I I 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 Steeplechase Subdivision, Phase 7 Engineer's Estimate December 1, 2000 Description Unit Quantity Paving Construction Prepare Work Area Lump Sum I Earthwork (cut) C.Y. 766 Earthwork (imported fill -loose) C .Y. 3,535 6" Reinforced Con crete Pavement w/curb S.Y . 4 ,758 6" Lime Stabilized Subgrade S.Y. 6,900 Extra Lime Ton 30 5" Reinforced Concrete Driveway S.F. 15,945 4 " Concrete Sidewalk S .F. 171 Co lored Wheelcha ir Ramps S.F. 107 Remove conc rete curb & g utt er L.F. 85 Remove .concrete s idewalk S .F . 375 Estimated Unit Price 5,000 .00 4 .00 7 .00 27 .00 3.25 80 .00 2.75 2 .50 7 .25 5.00 4.00 Paving Subtotal Drainage System Construction 15 " Re inf. Concrete Pipe, Str. Backfill L.F. 49 2 8 .00 27" Reinf. Concrete Pipe, Str. Backfill L.F. 78 42 .00 27 " Re inf. Concrete Pipe, Non-Str. Backfill L.F. 106 40.00 IO ' C urb inlet Each I 3000.00 5' Curb inlet Each I 2300.00 Grate Inlet Each I 2000 .00 Reinforced Concrete Flume S.F. 336 6.50 Decorative Block Wall -Pond I Lump Sum I 8000.00 Decorative Block Wall -Pond 2 Lump Sum I 8000.00 Remove existing inlet Each I 1000.00 Silt Fence L.F. 755 2.00 Inlet Protection Each 2 50.00 Hvdromulch Seedin~ S.Y. 3,620 0 .50 Drainage System Subtotal Water System Construction 8" PVC Water Line, Str. Backfill L.F . 20 24 .00 6" PVC Water Line, Str. Backfill L.F . 300 22.00 6" PVC Water Line, Non-Str. Backfill L.F. 1,281 16 .00 Fire Hydrant Assembly Each 1 1900.00 8"x 6" Reducer Each 1 125.00 6"x 6" Tee Each 4 200.00 6" Gate Val ve Each 8 400 .00 6"x 24" Anchor Coupling Each I 200.00 6"x 13" Anchor Coupling Each 8 125 .00 6 "x 45 degree bend Each 5 150.00 6 "x 22 .5 degree bend Each 3 150 .00 6 "x 11.25 degree bend Each 4 150.00 6" Cap Each 2 75 .00 Remove cap & connect to existing pipe Each I 200.00 1.5" Water Ser.> IO ft (avg.= 45 ft .) Each 12 700 .00 1.5" Water Ser. ~10 ft (avg.= 7 ft .) Each 3 450 .00 1" Water Service (av~.= 13 ft .) Each 3 500.00 Water System Subtotal Sewer System Construction 6" PVC, D-3034 , Str. Backfill L.F. 637 25.00 6" PVC, D-2241 , Str. Backfill L.F. 20 26 .00 Standard Manhole, 0-0 ft . deep Each I 1500.00 Standard Manhole, 8-10 ft . deep Each 1 1800.00 Connect to existing manhole Each 2 400.00 Remove cone & replace w/eccentric cone Lump Sum I 500.00 4" Sewer Service ~ 20 ft . (avg. = 15 ft .) Each II 500 .00 4" Sewer Service > 20 ft . (avg. = 51 ft.) Each 8 1000 .00 Trench Safety (sewer line) L.F. 454 1.00 Sewer System Subtotal Total Construction Cost Total 5,000 .00 3,064 .00 24 ,745.00 128,466 .00 22,42 5 .00 2,400 .00 4 3,848 .75 4 27 .50 775.75 425.00 1,500 .00 23 3,077.00 1,3 72 .00 3,276 .00 4,240.00 3,000.00 2,300.00 2 ,000 .00 2,184.00 8,000 .00 8,000.00 1,000.00 1,510 .00 100.00 1,810.00 38,792 .00 480 .00 6,600 .00 20,496.00 1,900.00 125 .00 800.00 3,200 .00 200 .00 1,000 .00 750.00 450.00 600 .00 150.00 200.00 8,400.00 1,350.00 1,500 .00 48,201.00 15 ,925 .00 520.00 1,500.00 1,800.00 800.00 500.00 5,500 .00 8,000 .00 454 .00 34,999.00 355,069.00 Steeplechase Subdivision, Phase 7 Engineer's Estimate December 1, 2000 Item Description Unit Quantity Estimated No. Unit Price Paving Construction I Prepare Work Area Lump Sum I 5,000.00 2 Ea rthwork (cut) C .Y . 766 4 .00 3 Ea rthwork (imported fill - loose) CY. 3 ,535 7.00 4 6" Reinforced Concrete Pavement w/curb S.Y . 4,758 27.00 5 6" Lime Stabilized Su bgrade S.Y . 6,900 3 .25 6 Extra Lime Ton 30 80.00 7 5" Reinforced Concrete Driveway S.F. 15 ,945 2 .75 8 4" Concrete Sidewalk S.F. 171 2.50 9 Colored Wheelchair Ra mps S.F . 107 7 .25 10 Remove concrete curb & g utter L.F . 85 5 .00 II Remove .concrete sidewa lk S.F. 375 4 .00 Paving S u btota l Drainage System Construction 12 15" Reinf. Concrete Pipe, Str. Backfill L.F . 4 9 28 .00 13 27" Reinf Concrete Pipe, Str. Backfill L .F. 78 42.00 14 27" Reinf. Concrete Pipe, Non-Str. Backfill L.F. 106 40 .00 15 IO' Curb inl et Each I 3000.00 16 5' C urb inlet Each I 2300 .00 17 Grate Inlet Each I 2000 .00 18 Reinforced Concrete Flume S.F. 336 6.50 19 Decorative Block Wall -Po nd I Lump Sum I 8000.00 20 Decorative Block Wall -Pond 2 Lump Sum I 8000.00 21 Remove existing inlet Each I 1000.00 22 Silt Fence L.F . 755 2.00 23 Inlet Protection Each 2 50.00 24 Hydromulch Seedin11; S.Y . 3,620 0 .5 0 Drainage System Subtotal Water System Construction 25 8 " PVC Water Line, Str. Backfill L.F. 20 24.00 26 6" PVC Water Line, Str. Backfill L .F. 300 22 .00 27 6" PVC Water Line, Non-Str. Backfill L .F. 1,281 16 .00 28 Fire Hydrant Assembly Each I 1900.00 29 8"x 6" Reducer Each I 125.00 30 6"x 6" Tee Each 4 200 .00 31 6" Gate Valve Each 8 400.00 32 6"x 24 " Anchor Coupling Each I 200 .00 33 6"x 13" Anchor Coupling Each 8 125 .00 34 6 "x 4 5 degree bend Each 5 150 .00 35 6"x 22.5 degree bend Each 3 150.00 36 6 "x 11 .25 degree bend Each 4 150.00 37 6" Cap Each 2 75 .00 38 Remove cap & connect to existing pipe Each I 200 .00 39 1.5" Water Ser.> 10 ft (avg.= 45 ft .) Each 12 700.00 40 1.5" Water Ser. ::::10 ft (avg.= 7 ft.) Each 3 450.00 41 I" Water Service (avg.= 13 ft .) Each 3 500.00 Water System Subtotal Sewer System Construction 42 6" PVC, D-3034, Str. Backfill L.F. 637 25 .00 43 6" PVC , D-2241 , Str. Backfill L.F. 20 26 .00 44 Standard Manhole, 0--0 ft . deep Each I 1500.00 45 Standard Manhole, 8-10 ft . deep Each I 1800.00 46 Connect to existing manhole Each 2 400 .00 47 Remove cone & replace w/eccentric cone Lump Sum I 500.00 48 4" Sewer Service :'.': 20 ft. (avg. = 15 ft .) Each II 500.00 49 4" Sewer Service > 20 ft. (avg.= 51 ft .) Each 8 1000.00 50 Trench Safety (sewer line) L.F . 454 1.00 Sewer System Subtotal Total Construction Cost Total 5,000.00 3 ,064 .00 24 ,745 .00 128 ,466 .00 22,425 .00 2,400 .00 43 ,848 .75 427 .50 775 .75 425 .00 1,500 .00 233,077 .00 1,372.00 3,276.00 4 ,2 40.00 3,000.00 2,300 .00 2,000 .00 2,184 .00 8 ,000 .00 8,000.00 1,000.00 1,5 10 .00 100 .00 1,810.00 38,792.00 480.00 6 ,600.00 20,496 .00 1,900.00 125 .00 800.00 3,200.00 200 .00 1,000.00 750.00 450.00 600.00 150.00 200 .00 8,400 .00 1,350.00 1,500 .00 48,201.00 15 ,925 .00 520.00 1,500.00 1,800.00 800 .00 500.00 5,500.00 8 ,000 .00 454 .00 34,999.00 355,069.00