HomeMy WebLinkAbout8 DP Redmond Terrace 05-14 309 Redmond Dr.CITY OF COL LEGE STATION *** CUSTOMER RECEIPT *** Ope r: Gt.SOUTH Type: CT Dra wer: 1
Date: 4/14/05 00 Receipt no: 203074
De scr iptio n Quantit y
2005 100014
PL PLANNING AND ZO NING
1.00
WOLF CREEi< PARTNERS
DEVELOPMHH PERMIT
GS
CK# 217
A1ount
$200 .00
Tender detai i
CK PERSONAL
Tot al tendered
Tot al pay1ent
217 $2 00.00
Trans date :
THANK YOU
$200 .00
$200 .00
4/14/05 T11e: 9:55 :59
DEVELOPMENT PERMIT
PERMIT NO. 05-14
CITY OF COLLEGE STATION
Planning & Devtlopmem &roius
FOR AREAS INSIDE THE SPECIAL FLOOD HAZARD AREA
RE : CHAPTER 13 OF THE COLLEGE STATION CITY CODE
SITE LEGAL DESCRIPTION:
Redmond Terrace , Bl 3, Lts 3-8
1.47 Acres -Part of Meridian Apartments
Phase 1
DATE OF ISSUE: 6/20/05
OWNER:
Wolf Pen Partners c/o Juan Creixell
8305 Shoal Creek Blvd
Austin, Texas 78757
SITE ADDRESS:
309 Redmond Drive
DRAINAGE BASIN:
Wolf Pen Creek
VALID FOR 6 MONTHS
CONTRACTOR:
G & M Construction c/o Freddie Mercado
910 East 151h Street
Austin , Texas 78702
TYPE OF DEVELOPMENT: Full Development Permit
SPECIAL CONDITIONS:
All construction must be in compliance with the approved construction plans
All trees required to be protected as part of the landscape plan must be completely barricaded in accordance with Section
7.5.E., Landscape/Streetscape Plan Requirements of the City's Unified Development Ordinance, prior to any operations of
this permit. The cleaning of equipment or materials within the drip line of any tree or group of trees that are protected and
required to rema in is strictly prohibited . The disposal of any waste material such as , but not limited to , paint , oil , solvents,
asphalt , concrete , mortar, or other harmful liquids or materials within the drip line of any tree required to remain is also
prohibited .
The Contractor shall take all necessary precautions to prevent silt and debris from leaving the immediate construction site
in accordance with the approved erosion control plan as well as the City of College Station Drainage Policy and Design
Criteria . If it is determined the prescribed erosion control measures are ineffective to retain all sediment onsite , it is the
contractors responsibility to implement measures that will meet City, State and Federal requirements . The Owner and/or
Contractor shall assure that all disturbed areas are sodden and establishment of vegetation occurs prior to removal of any
silt fencing or hay bales used for temporary erosion control. The Owner and/or Contractor shall also insure that any
disturbed vegetation be returned to its original condition , placement and state. The Owner and/or Contractor shall be
responsible for any damage to adjacent properties , city streets or infrastructure due to heavy machinery and/or equipment
as well as erosion, siltation or sedimentation resulting from the permitted work .
In accordance with Chapter 13 of the Code of Ordinances of the City of College Station , measures shall be taken to insure
that debris from construction , erosion , and sedimentation shall not be deposited in city streets , or existing drainage
facilities .
I hereby grant this permit for development of an area inside the special flood hazard area . All development shall be in
accordance w ith the plans and specifications submitted to and approved by the City Engineer in the development permit
application for the above named project and all of the codes and ordinances of the City of College Station that apply.
DatEI 1
Owner/ Agent/Contractor Date
DEVELOPMENT PERMIT
PERMIT NO. 05-14
CITY OF COLLEGE STATION
P/Jtnning & Dewlopmm t &rvius
FOR AREAS INSIDE THE SPECIAL FLOOD HAZARD AREA
RE : CHAPTER 13 OF THE COLLEGE STATION CITY CODE
SITE LEGAL DESCRIPTION:
Redmond Terrace, Bl 3, Us 3-8
1.47 Acres -Part of Meridian Apartments
Phase 1
DATE OF ISSUE: 6/20/05
OWNER:
Wolf Pen Partners c/o Juan Creixell
8305 Shoal Creek Blvd
Austin, Texas 78757
SITE ADDRESS:
309 Redmond Drive
DRAINAGE BASIN:
Wolf Pen Creek
VALID FOR 6 MONTHS
CONTRACTOR:
G & M Construction c/o Freddie Mercado
910 East 151h Street
Austin, Texas 78702
TYPE OF DEVELOPMENT: Full Development Permit
SPECIAL CONDITIONS:
All construction must be in compliance with the approved construction plans
All trees required to be protected as part of the landscape plan must be completely barricaded in accordance with Section
7 .5.E., Landscape/Streetscape Plan Requirements of the City's Unified Development Ordinance, prior to any operations of
this permit. The cleaning of equipment or materials within the drip line of any tree or group of trees that are protected and
required to remain is strictly prohibited. The disposal of any waste material such as , but not limited to, paint , oil, solvents,
asphalt , concrete , mortar , or other harmful liquids or materials within the drip line of any tree required to remain is also
prohibited .
The Contractor shall take all necessary precautions to prevent silt and debris from leaving the immediate construction site
in accordance with the approved erosion control plan as well as the City of College Station Drainage Policy and Design
Criteria. If it is determined the prescribed erosion control measures are ineffective to retain all sediment onsite , it is the
contractors responsibility to implement measures that will meet City, State and Federal requirements . The Owner and/or
Contractor shall assure that all disturbed areas are sodden and establishment of vegetation occurs prior to removal of any
silt fencing or hay bales used for temporary erosion control. The Owner and/or Contractor shall also insure that any
disturbed vegetation be returned to its original condition, placement and state . The Owner and/or Contractor shall be
responsible for any damage to adjacent properties , city streets or infrastructure due to heavy machinery and/or equipment
as well as erosion , siltation or sedimentation resulting from the permitted work .
In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure
that debris from construction, erosion , and sedimentation shall not be deposited in city streets, or existing drainage
facilities .
I hereby grant this perm it for development of an area inside the special flood hazard area . All development shall be in
accordance with the plans and specifications submitted to and approved by the City Engineer in the development permit
application for the above named project and all of the codes and ordinances of the City of College Station that apply.
DatEI 1
Owner/ Agent/Contractor Date
FOR OFFICE USE ONLY
CaseNo. Q~-\4
Date Submitted 04 -l 4 -DS
CnY OF COLL EGE STAT ro
DEVELOPMENT PERMIT
MINIMUM SUBMITTAL REQUIREMENTS
$200.00 development permit fee .
Drainage and erosion control plan , with supporting Drainage Report two (2) copies each
Notice of Intent (N .0 .1.) if disturbed area is greater than 5 acres
Date of *Required Preapplication Conference:. __________________ _
*(Required for areas of special flood hazard)
Red/neJ11d 7'Prrcace,,, BJock a,, L.oT 3, .11 ... ~ 6,, 7 ~ t;,
LEGAL DESCRIPTION Acras /. 417 ~pr t:J f2rt°d.lan A ts {Pf! iJ 1 ~
APPLICANT'S INFORMATION (Primary Contact for the Project):
($ '6 M <: cu1strut:. Tio,., 1 Name C/o Fr< dd.y /f1<2 f'COatJ E-Mail
Street Address t::1J 0 ~T / 5fi1 SI.
City A v.s 1; '1 State -~...:...X_____ Zip Code 7 i 70 2
Phone Number (S12.) 626-~303 Fax Number (512) 79S-J?80.3
PROPER~o9.w~~N~r;.~~~N :
Name ~Jt ../t.JC() Crei>«~IJ
StreetAd~ress f~o..s S'ho<»I CrtZ<Zk 13/vcl
E-Mail JC ('.@ c sa m 9 m f C0>'11
tr Q
City A v.rfin State _r._x_____ Zip Code 7~/57
Phone Number (sr~) .i.J.SJ-6S6G, :>c 212 Fax Number (S12)4j-J-6S7'7
ARCHITECT OR ENGINEER'S INFORMATION :
Name la;reric~ ~rfi 2. E-Mail Jerry@ LOC.STRuC/tJRAL.COJ'Y)
StreetAddress /000 f:d.r-7 C1e.rdr Cmllf2.Z Sf:
I
City A(.) sli I'? State _T__:;....Y____ Zip Code z J' '}0 2
Phone Number (s 12) ~99-tJ906' Fax Number {s-12) Jj 9/-d?Or
>
Application is hereby made for the following development specific site/waterway alterations :
ReJ:Bi r.s eJ r ;Aarl!inc; d.t?d r €-/din /n 9 ~I
ACKNOWLEDGMENTS :
I,.:::::::::::. design engi~ hereby acknowledge or affirm that:
The information and conclusions contained in the above plans and supporting documents comply with the
curren requ · ments of the tty of College Station, Texas City Code, Chapter 13 and its associated Drainage
Policy an esign S n r .
1of 2
As a e onditio~ of approval of this permit application , I agree to construct the improvements proposed in this
appli ion according to these documents and the requirements of Chapter 13 of the College Station C ity Code
11-tB \16\"P<::I ,,.j I LJ(o ~
~-N Q... P ~ '> f ('(...-0 P"V ?DP -------------,----...... A. I. __ , certify that ny nonresidential structure on or proposed to be on this site as part of this
application is designated to preven arnage to the structure or its contents as a result of flooding from
t he 100-year storm.
E ngineer Date
I. __ , certify that the finished floor elevation of the lowest floor. including any basement. of any
res idential structure , proposed as part of t his application is at or a bove the base f lood el evation
established in the latest Federal Insurance Administration Fl ood Hazard Study and maps , as amended .
( tJv--f i"f f GI O=<;f.JW } ( ~l fj ~ ow~ (_~I/'~)
Eng i neer Date
f. __ . certify that the alterations or development covered by this permit shall not diminish the ftood -
carrying capacity of the waterway adjoining or crossing t his permitted site and t hat such alterations or
development are consistent with requirements of t he City of Co llege Station Ci ty Code , Chapter 13
concern i ng encroachments of floodways a nd of floodways fringes . c f07Tf k\Pl'Ui U>{?CC-) _______ _
Engineer Date
I, __ , do certify that the proposed alterations do not raise the level of the 100 year flood a bove
elevation established in the latest Federal Insurance Administration Fl ood Hazard Study.
Engineer
(_ N"'\ fdPLi ~W ) ______ _
Date
ConditiollS or comments as part of approval:---------------------
In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be
taken to insure that debris from construction . erosion , and sedimentation shall not be deposited i n city streets .
or existing drainage facilities . All development shall be in accordance with the plans and specifications
submitted to and approved by the City Engineer for the above named project. All of the applicable codes and
ordinances of the City of College Station shall apply.
~$6 rf~~ 9V '*v-f c::;,~ TD APP!..-'( ~I~ * i:fttS f~ Apf1~ ONC\ 1"V ~ ~f
6113/03 aF-~ txtqltJG ~~"5 t>V[::;
Eff OCfL ~ UJ /.J <>ICT.VC.. IL~
Nt:)'V--) ~ ~&C ~ ~IUAGe ~ ~ -r~
~Lt .s:-r t f\Jb ~cc ' ~ "1-cn::-o c:i+= ~~ •
~ ~~-------------------_J
\
CITY OF COLLEGE STATION *** CUSTOMER RECEIPT ***
Ope r : GLSOUTH Typ e: CT Draw er: 1
Date : 4/14i05 0 Receipt no : 203074
Descr1pt1on Qu antity
20@5 100014
PL PLA."4N IN6 AND ZONING
1. 00
WOLF CREEK PAR TNER S
DEVELOPMENT PERMIT
GS
CK# 217
Tender deta ii
CK PERSONAL
Totai tend er ed
Tot al payae nt
217
A11oun t
$20 0.00
$20'0 .00
$200 .00
$200 .00
Tr ans date: 4/14 /05 Ti11e: 9:55 :59
THAl'>K YOU
CITY OF COLLEGE S TATION
Planning & Development Services
1101 T exas Avenue South, PO Box 9960
CoUeg e Station, T exas 77842
Phone 979. 764 .3570 I Fax 979. 764 .3496
MEMORANDUM
April 27, 2005
TO: Freddy Mercado, G&M Construction, via fax 512.795 .8303 /
FROM: Bridgette George , Development Coordinator
SUBJECT: DP-REDMOND TERRACE -Development Permit
Staff reviewed the above-mentioned construction documents as requested . The following page
is a list of staff review comments detailing items that need to be addressed . Please address the
comments and submit the following information for further staff review , approval and issuance of
the development permit:
__ Three (3) copies of the revised construction plans .
If there are comments that you are not addressing with the revised construction documents ,
please attach a letter explaining the details . If you have any questions or need additional
information, please call Alan Gibbs or myself at 979 . 764.3570.
Attachments: Staff review comments
cc : Juan Creixell, Wolf Creek Partners, 512.453 .6579 /
Terrence Ortiz, via fax 512.499.0907J
Case file# ( 05-00100014)
Home of Texas A&M University
STAFF REVIEW COMMENTS NO. 1
Project: DP-REDMOND TERRACE-DEVELOPMENT PERMIT( 05-00100014)
ENGINEERING
1. Please clarify if any of the details provided on Sheet S2 are proposed. If not, please cross
out the details .
2. Specify and locate how t he addit ional voids underneath the parking lot at 306 Redmond will
be addressed .
3. The landscaping needs to be brought into compliance with the approved plans . No
additional permits beyond the subject Development Permit will be issued until all associated
structural improvements, landscaping, and striping is completed and a Certificate of
Completion is issued.
Reviewed by : Alan Gibbs Date: 4/27 /5
NOTE : Any changes made to the plans , that have not been requested by the City of College Station, must be explained in your
next transmittal letter and "b ubbl ed " on your plans . Any additiona l changes on these plans that have not been pointed out
to the City , will constitute a completel y new review . Page 2 of 4
April 27 , 2005
CITY OF COLLEG E S TATI ON
Planning & Development S ervices
1101 Texa s Ave nue South, PO Box 9960
Colleg e Statio n , Te x a s 77842
Ph one 9 7 9 . 764 .3 570 I Fax 9 79. 7 6 4 .34 96
MEMORANDUM
TO : Freddy Mercado , G&M Construction, via fax 512 .795.8303
FROM : Bridgette George, Development Coordinator
SUBJECT : DP-REDMOND TERRACE -Development Permit
Staff reviewed the above-mentioned construction documents as requested . The following page
is a list of staff rev iew comments detailing items that need to be addressed. Please address the
comments and submit the following information for further staff review , approval and issuance of
the development permit:
__ Three (3) copies of the revised construction plans.
If there are comments that you are not addressing w ith the rev ised construction documents ,
please attach a letter explaining the details . If you have any questions or need additiona l
information, please call Alan Gibbs or myself at 979 .764.3570.
Attachments : Staff review comments
cc : Juan Creixell , Wolf Creek Partners , 5 12.453 .6579
Terrence Ortiz , via fax 512.499 .0907
Case fi le# ( 05-00100014)
Home of Texas A&M University
STAFF REVIEW COMMENTS NO. 1
Project: DP-REDMOND TERRACE-DEVELOPMENT PERMIT( 05-00100014)
ENGINEERING
1. Please clarify if any of the details provided on Sheet S2 are proposed . If not, please cross
out the details .
2. Specify and locate how the additional voids underneath the parking lot at 306 Redmond will
be addressed .
3. The landscaping needs to be brought into compliance with the approved plans. No
additional permits beyond the subject Development Permit will be issued until all associated
structural improvements, landscaping, and striping is completed and a Certificate of
Completion is issued.
Reviewed by : Alan Gibbs Date: 4/27/5
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your
next transmittal letter and "bubbled " on your plans . Any additional changes on these plans that have not been pointed out
to the City , will constitute a completely new review. Page 2 of 4
Date :
To:
From:
vr
CITY OF COLLEGE STATION
CITY INFRASTRUCTURE
INSPECTION NOTICE
Plan ning & Dew/.opment &rvices
6/20/05
Bob Mosley { 0)
Diane Broadhurst { 0)
Deborah Grace
RE: Meridian Apartment -Parking lot and creek retaining wall repair
Location: 309 Redmond Drive
D Public Water Lines/Fire Hydrants
D Public Sanitary Sewer
D Public Storm Sewer
D Public Streets
D Public Detention Facility
D Driveway Connection to Public Street
D Private Construction within easement
D No Inspection Required
Comments:
D Engineer's Estimates Attached
~ Construction Plans Attached
D Site Plan Attached
o ____ _
Bob -This is Private construction outside, but directly adjacent to a Public Easement along
Wolf Pen Creek. However, it may worthwhile to inspect the piers and retaining wall.
p:\group\htltr\pzltr\prod\pz2005\p0011334 .doc
CITY INFRASTRUCTURE
INSPECTION NOTICE
CITY OF COLLEGE STATION
P/.anning & Dt wlopment Stroiw
Date: 6/20/05
To: Bob Mosley ( 0)
Diane Broadhurst ( 0 )
From : Deborah Grace
RE: Meridian Apartment -Parking lot and creek retaining wall repair
Location: 309 Redmond Drive
D Public Water Lines/Fire Hydrants
D Public Sanitary Sewer
D Public Storm Sewer
D Public Streets
D Public Detention Facility
D Driveway Connection to Public Street
D Private Construction within easement
D No Inspection Required
Comments :
D Engineer's Estimates Attached
D Construction Plans Attached
D Site Plan Attached
o ____ _
Private construction outside, but directly adjacent to a Public Easement along Wolf Pen
Creek .
10 November 2005
Wolf Pen Partners
c/o Jan Creixell
8305 Shoal Creek Blvd
Austin , Texas 78757
CITY OF C O LLEGE S TATIO N
Planning & Development Services
RE: NOTICE OF NONCOMPLIANCE
With: Development Permit No . 05-14
Site: Meridian Apartments
309 Redmond Drive
College Station , Texas
Dear Permittee ,
A site Inspection conducted at 309 Redmond Drive , on 10 November 2005 identified the
following noncompliance issue :
Finding 1:
Portions of the old retaining wall that have fallen into the waterway have not been removed .
Requirement:
Item 1 of the SCOPE OF WORK as depicted on the approved SITE PLAN states :
1. Remove and dispose of section of concrete parking Jot that has been undermined
by erosion as will as portions of retaining wall that have fallen into the waterway.
Recommend Corrective Action:
Remove and dispose of the portions of the old retaining wall that have fallen into the
waterway .
Appropriate action must be taken to bring this site into compliance to ensure the health ,
safety and welfare of our community . If action can not be taken within 10 days of receipt of
this letter, please provide written documentation as to the reason for the delay , and the
expected time frame for taking actions to bring the site into compliance.
If corrective actions are not taken or written documentations to the reason for the delay is not
received within the allotted time period, enforcement action will be taken in accordance with
Chapter 13, § 7 of the Code of Ordinances.
P .O . BOX 9960 • 1101 TEXAS AVENUE
COLLEGE STATION •TEXAS • 77842
97 9 .764.3570
www.cstx.gov
. ...
If you have any questions or do not understand any of these requirements, please contact me.
Respectfully,
klltc:~
Drainage Inspector
(979) 764-6375
cc: Alan Gibbs, P .E., Senior Assistant City Engineer
G & M Construction c/o Freddie Mercado
~/llJc--.» CJaJ~E ;2_ /,,Er/ /1:).E:S5"16E /rrc:JS-
L,#d-if'J:) ~ C -S.4,,,D A<:: L-Jpv)d 6/~c?}~ .s:./·r~ ..;?:}cm~~.
/Y:9/&s l 11//for ,>??.,/d>V a al c: J ~ /-,_.,-/erl-
1 ~ ~ ...... ~ _,;¢. ~ ~ ! ~~ ~ /poyo~ r
-----------------------t
Pev·· V~A/tcA _i_ ~
___ --u'TY: ~ ~~ r..eer ' ~ -----------1
, Cl'1!f /N!T7A'fl:$> -PU: IE> ~.2~/ ~/ffe/e?Z. ----
" F u:e:> ~ I~ Bvt:>~ f/t?4/fM:1e /MS" ~ ,,vi:>/ -----
----+++----111/t/J/r::>c ~ P~) ~/;!;/o/\J e&>S/_:>_
----+++--'-~-~_/)oe:> P>T ~ Ht?~ /ii;~ 7Mt1t /b#P
-----"_7/11>_~ I~ A-MhNrQ"'~ ?~
t" i1/C U1Y _Jf!ON'r ~ ~ f'eN ~/ ~
~ CJQLU>~--6 · UJ,M.ll..
it M1~tJ&_?Wt€ /!? ~ PA/$tt ~I ff~H
Ai10 O/V B,tjl}~ T'!?_ f/\/lA-.VO( 171£ M4f!l_ >nm 'I
11/l ~ µ fO v;utA!' wUtt fl~
A:Y-<Jw' ~ ef-_ ~ fiow> JJ~er> #r _/bNP
-----t~ ps.yt_ Bvr ~ ~t/2€ Vt1?~ ~ m~ ~
fwot>f'l-t/N ~~~ _ _
------
411 309 Re dmond Drive ______ ,rl -------------------------------C-ol-le~ge_s_ta_ti_o n_.T_e_xa_s_7 _7 8-4 0-
M ER ID I AN
D ATE: lo I t3 I 05
T O: At!.e_ I\ -fD~
ME SSAGE: f\Je IA>
pe. r fY\; +-Eor
Se±
p~r ~;"J
oF
9 7 9/696 -3177 er \ 'd-' / F ax 9 79 /693 -2 6 14
I 0 -DJ
19 -I ~ k c;-'
v9
C 5A m t5 tvlT _r... rvc ·
cXr<d ttJ :o~ i"D rerueS.,+-
'01 re-p?«J rs