HomeMy WebLinkAbout53 Westfeild Village 04-20 Ph 3TCEQ Office Use Only Notice of Intent (NOi) for Storm Water Discharges
Associated with Construction Activity under the
TPDES Construction General Permit (TXR150000)
For help completing th is application, read the TXR150000 NOi Instructions
(TCEQ -20022-lnstructions ).
TPDES Permit Number: TXR15•:_•:_•:_•:_••-NO
GIN Number: •:_•:_•:_•:_•:_•:_•:_00
I '' D"/ .. ~a
A., Construction Site Operator f!]New 0 No Change Customer Reference Number: CN _________ _
Name : Stylecraft Builders, Inc,
Mailing Address : 4090 State Highway 6 South City: College Station State : TX Zip Code : 77845
Country Mailing Information (if outside USA) Territory: _________ Country Code : ________ Postal Code : __ _
Phone Number: 979-690-1222 Extension: ___ ~2~0 ___ Fax Number: ____ ~9~7~9--6~9~0~-0~3~4~8~----
E-ma il Address: ewivagg@stylecraft-builders,com
Type of Operator: D Individual a Sole Proprietorship - D .B.A. [] Partnership ~Corporation Cl Federal Government a State Government D County Government D City Government [] Other: ____________________ _
Independent Operator? llJ Yes Cl No Number of Employees: D 0-20 r;J 21-100 ~ 101 -250 Cl 251-500 D 501 or higher
Federal Tax ID : 742485231 State Franchise Tax ID Number: 1-74-2485231-1 DUNS Number:
B, Billing Address
Name: Stylecraft Builders, Inc.
Mai li ng Address : 4090 State Highway 6 South City : College Station State : TX Zip Code : 77845
Country Mail ing Information (if outside USA) Territory: ________ Country Code : ________ Postal Code : __ _
C. Project I Site Information !!]New [JNo Change Regulated Entity Reference Number: RN _________ _
Name : Westfield Village, Phases Two and Three
Mailing Address : 4090 State Highway 6 South City :. College Station State : TX Zip Code : 77845
Physical Address : Springmist Drive@Barron Road City: College Station County:_B_RA_zo_s ___ Zip Code : 77845
Location Access Description : At the intersection of Barron Road and Springmist Drive and Windmeadows
Latitude :~ 0 33 '..filL" N Longitude :~• _1L' __§__" W Degrees(°), Minutes('), and Seconds(")
Lat itu de : ______ _ Longitude :--------Decimal Form
Standard Industrial Classification (SIC) code : 1521 Also, describe the construction activity at this site (do not repeat the SIC code):
Construction of Single Family Residences
Has a storm water pollution prevention plan been prepared as specified in the general perm it (TXR150000)? 00Yes D No
Estimated area of land disturbed (to the nearest acre): 21 Is the project I site located on Indian Country Lands? D Yes~ No
Does this project I site discharge storm water into a municipal separate storm sewer system (MS4 )? 00 Yes D No
W~s .pro~de~enamecl~eM~o~ra~~-C~o~l-~_g_e_S~~-t_io_n ______ ~------------------~
Provide the name or segment number of the water body that rece ives storm water from this project I site :_L_ic_k_C_re_e_k _______ _
0, Contact -If the TCEQ needs add iti onal information regarding this application, who should be contacted?
Name : Eric Wivagg Title : Arch_it_ec_t_u_r_a_I D_es_i_..g'-n_e_r ____________ _
Phone Number: 979-690-1222 Extens ion : 20 Fax Number: 979-690-0348 ---------------
E -ma i I Address: ewivagg@stylecraft-builders,com
E __ · _P_a..:..y_m_e_n_t_l_nf_o_r_m_a_t_io_n_-_c_h_ec_k_l_M_o_n_ey:...__O_rd_e_r_N_u_m_b_e-'r:==6=1=8=0==-N-a_m_e_o_n_Check I Money Order : Stylecraft Builders, Inc.
F, Certification
I certify under pen alty of law tha t this document was prepared under my direction or supervision in accordance with a system designed to assure that qualified
personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons
directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I am
aware there are significant penaltie s for submitting false information, includ ing the possibility of fine and imprisonment for knowing violations .
Construction Site 0
Middle : ------------------~~~.;;;_;;;-7'7'-hhf--c:l+:----tf'-----Suffix: _____ Title : Vice _P_re_s_i_d_e_nt~---,--------------
Signature : Date : &6/?>S --~..-,--~;..--~--------
1 f you have qu stions on how to fill out this form or about the storm water program, please contact us at (512) 239-4671.
Indiv iduals are ntitled to reque st and review their personal information that the agency gathers on its forms . They may also have any errors in their info rmation
corrected. To review such informat io n, contact us at (512) 239-3282.
TCEQ -20022 (05/03)
The completed NOi must be mailed to the following address. Use the attached document to submit the $100
application fee . Please note that the NOi and application fee are submitted separately to different addresses.
Texas Commission on Environmental Quality
Storm Water & General Permits Team; MC -228
P,O. Box 13087
Austin, Texas 78711-3087
Page 1of2
,,.
McCLURE & BROWNE ENGINEERING/SURVEYING, INC.
t;ngineers and Consultants
1008 Woodcreek Drive, Suite 103, College Station, Texas 77845
979-693-3838 877-245-4839 Fax: 979-693-2554 email: mcclure@ tca.net
April 15 , 2004
Mr. Spencer Thompson
City of College Station
P.O. Box 9960
College Station, Texas 77842
Re: Westfield Village, Phases 2 & 3
Dear Spencer:
Enclosed are the documents that we understand you need to split Phases 2 and 3
of Westfield Village into separate projects so the plats can be filed individually. With
this letter you will find:
• A letter of request from the developer, Mr. Randy French
• A signed/sealed Development Permit Application for Phase 3 of the
subdivision. The original Development Permit issued for this project will now
serve as the permit for Phase 2 only.
• A check for $800 for the associated fees -$200 Development Permit & $600
Infrastructure Inspection
Please let me know if other information is needed. Thank you.
Sincerely,
~Lr
Kent Laza, P .E.
Project Manager
.... '
April 15, 2004
Mr. Spencer Thompson
City of College Station
P.O. Box 9960
B-CS Development Co.
40910 S Highway 6, South
College Station, TX. 77845
979-690-1222xl 1
College Station, Texas 77842
Re: Westfield Village, Phases 2 & 3
Dear Spencer:
As you are aware, I recently submitted a preliminary plat and construction plans
for the development ofW estfield Village, Phases 2 & 3. A Development Permit was
issued and construction has just begun. In order to take advantage of anticipated
marketing opportunities, it is in my best interest to split the two phases into stand-alone
projects that can be approved as soon as construction on each is completed. This change
will not require any adjustments to the proposed infrastructure and no additional plans
will be submitted for review .
Please consider this letter as my formal request to split the development into
separate phases. My understanding of this process is that it requires a second
Development Permit Application and the associated fees. I have included those with this
let . Please advise me of any other information that is necessary for this process to
Thank you.
attachments
... , . • SUPPLEMENTAL DEVELOPMENT PERMIT INFORMATION
Application is hereby made for the following development specific site/waterway alterations :
Subdivision construction in the Drainage Basin of a tributary of Lick Creek.
ACKNOWLEDGMENTS:
I, Michael R. McClure. P.E., design engineer, hereby acknowledge or affirm that:
The information and conclusions contained in the above plans and support ing documents comply with the
current requirements of the City of College Station , Texas City Code, Chapter 13 and its associated Drainage
Po li cy and Des ign St ndards.
ff~
As a condition of approval of this permit application, I agree to construct the improvements proposed in this
application according to these documents and the requirements of Chapter 13 of the College Station City
Code .
Contractor
CERTIFICATIONS: (for proposed alterations within designated flood hazard areas.)
A. I, __ certify that any nonresidential structure on or proposed to be on this site as part of this application
is designated to prevent damage to the structure or its contents as a result of flooding from the 100 year
storm .
Eng ineer Date
B. I, __ certify that the finished floor elevation of the lowest floor, including any basement, of any
res idential structure , proposed as part of this application is at or above the base flood elevation established in
the latest Federal Insurance Administration Flood Hazard Study and maps , as amended.
Engineer Date
C . I, Michael R. McClure. P.E. certify that the alterations or development covered by thi~~h_all not
diminish the flood-carrying capacity of the waterway adjoining or crossing this permitte~~~~ such
alterations ?r development are consistent with requirements of the City of College Stat~~~·~ter
13 concerning encro hments of floodways and of floodway fringes. I: l ~ \ *'
17 A / ~··•••••••••••••••••••• .. •••• .. ~•~•~ ~ 4 '/$ o t. ~ .. M1.9.~.~~.~.R~M~9&V.ftg .. J
En ineer Date fi \~~ Q/!!J J
f4 ~,;.·.CJ/ ST E ~~··;~..#'
D. I, __ , do certify that the proposed alterations do not raise the level of the 100 year~~Sbo~6t-J
elevation established in the latest Federal Insurance Administration Flood Hazard Study. ~-
Engineer Date
Conditions or comments as part of approval: ----------------------
In accordance with Chapter 13 of the Code of Ordinances of the City of College Station , measures shall be
taken to insure that debris from construction , erosion , and sedimentation shall not be deposited in city streets ,
or . ~x1 si.i n,g drainage facilities. All ~evelo~ment shall be in accordan~ with the plans a~d specifications
subm ~~9 to ~nd approved by the City Engineer for the above named project. All of the applicable codes and
ordinances of th ~ City of College Station shall apply .
" i . •_;:'
(Check one)
" .~ ~ (\-\ C\-\JLt \{\-~'-V ~ ()~--~ n'('(\
~~~\:io'
FINAL PLAT APPLICATION
D Amending
($300 .00)
~Final
($400 .00)
D Vacating
($400 .00)
D Replat
($600.00)*
*Includes public hearing fee
The following items must be submitted by an established filing deadline date for P&Z Commission
consideration.
MINIMUM SUBMITTAL REQUIREMENTS:
~ Final plat review and filing fee (see above)
N/A Variance Request to Subdivision Regulations -$100 (if applicable)
N/A Development permit fee of $200.00 (if applicable). PAID WITH WESTFIELD PHASE 2
N/A Infrastructure inspection fee of $600.00 (applicable if any public infrastructure is being constructed)
N/A All replats must be accompanied with a copy of the deed restrictions/covenants for this plat.
~ Thirteen (13) folded copies of plat. (A signed mylar original must be submitted after staff review.)
~ One (1) copy of the approved Preliminary Plat and/or one (1) Master Plan (if applicable).
~ Paid tax certificates from City of College Station, Brazos County and College Station l.S.D.
~ A copy of the attached checklist with all items checked off or a brief explanation as to why they are not.
N/A Two (2) copies of public infrastructure plans associated with this plat (if applicable). SEE PHASE 2
~ Parkland Dedication requirement approved by the Parks & Recreation Board, please provide proof of
approval (if applicable).
NAME OF SUBDIVISION _______ W __ e_s_tfi_1e_ld_V_i_lla_g_e~. _P_ha_s_e_3 _____________ _
SPECIFIED LOCATION OF PROPOSED SUBDIVISION (Lot & Block) R. Stevenson League A-54
APPLICANT/PROJECT MANAGER'S INFORMATION (Primary Contact for the Project):
Name __ ~R~a __ n __ dy.___Fr~e~n~ch~·~S~fy~le.._c~r.._aft~B~ui_ld __ e_ra __ _ E-Mail rfrench@sMecraft-buildera.com
Street Address --------'4;...;:;0..:..9.;:;..0....;::;S..:...;H;....;6 __ S=o"""u=t'-'-h _________________ _
City College Station State TX Zip Code 77845
Phone Number 979.690.1222 x11 Fax Number 979.690.9069
CURRENT PROPERTY OWNER'S INFORMATION : ~ owners must be identified. Please attach an
additional sheet, if necessary)
Name BCS Development Company E-Mail rfrench@sMecraft-builders.com
Street Address 4090 SH 6 South
City ----"C""""o~lle'"""g..__e_.S~ta--t~io_n ____ State TX Zip Code 77845
Phone Number 979.690.1222 x11 Fax Number 979.690 .9069
ARCHITECT OR ENGINEER'S INFORMATION:
Name McClure Engineering Inc. E-Mail ___ _;m:..:..:..:..:.;ik=e=m:.io;:;@...,t=ca=·.:..:.ne=t'-----
Street Address 1008 Woodcreek Drive. Suite 103
City College Station State _____ T.._X.____ Zip Code 77845
Phone Number 979.693.3838 ----~;;:;...;..;;.."'""""..-....-----.----FaxNumber ___ ---=9~7=9~.6~9=3-=2=554.;:;..,;;._ ___ _
Acreage Total Property 16.581 acres Total# Of Lots 62 R-0-W Acreage --=3=.9=9....:::a=c""-!re=s
Existing Use: Vacant Proposed Use: -----~R~e~s~id~e~n-..tia=I ____ _
Number Of Lots By Zoning District/ §.f_ I R-1 __ / ____ _
Average Acreage Of Each Residential Lot By Zoning District:
0.18 ac/ R-1 / __ __/ __ __/ __
Floodplain Acreage None
A Statement Addressing Any Differences Between The Final Plat And Approved Master Development Plan
And/Or Preliminary Plat (If Applicable):
NIA
Requested Variances To Subdivision Regulations & Reason For Same: None
------------~
Requested Oversize Participation: Victoria Avenue/12" waterline along Victoria Ave/18" waterline along
Barron Road
Total Linear Footage of
Proposed Public:
3044 Streets
2369 Sidewalks
1531 Sanitary Sewer Lines
3645 Water Lines
370 Channels
2174 Storm Sewers
:Q:_ Bike Lanes I Paths
Parkland Dedication due prior to filing the Final Plat:
ACREAGE:
# of acres to be dedicated + $ ___ Development fee
# of acres in floodplain
# of acres in detention
# of acres in greenways
OR
FEE IN LIEU OF LAND:
# of Single-Family Dwelling Units X $556 = $ __
# of Multi-Family Dwelling Units X $452 = $ __ _
__ (date) Approved by Parks & Recreation Board
NOTE: DIGITAL COPY OF PLAT MUST BE SUBMITTED PRIOR TO FILING.
The applicant has prepared this application and certifies that the facts stated herein and exhibits attached
her o are true, correct and complete . The undersigned hereby requests approval by the City of College
ati of the above-identified final plat and attests that this request does not amend any covenants or
estr tions ass · ed with this plat.
Date
1-Aug-02 2 of 5
SUPPLEMENTAL DEVELOPMENT PERMIT INFORMATION
Application is hereby made for the following development specific site/waterway alterations :
Subdivision construction in the Drainage Basin of a tributary of Lick Creek.
ACKNOWLEDGMENTS:
I, Michael R. McClure . P.E., design engineer, hereby acknowledge or affirm that:
The information and conclusions contained in the above plans and supporting documents comply with the
current requirements of the City of College Station , Texas City Code , Chapter 13 and its associated Drainage
Pol icy and Design St ndards .
ff-~
As a condition of approval of this permit application , I agree to construct the improvements proposed in this
application according to these documents and the requirements of Chapter 13 of the College Station City
Code .
Contractor
CERTIFICATIONS: (for proposed alterations within designated flood hazard areas .)
A. I, __ certify that any nonresidential structure on or proposed to be on this site as part of this application
is designated to prevent damage to the structure or its contents as a result of flooding from the 100 year
storm .
Engineer Date
B. I, certify that the finished floor elevation of the lowest floor, including any basement , of any
residential structure, proposed as part of this application is at or above the base flood elevation established in
the latest Federal Insurance Administration Flood Hazard Study and maps , as amended .
Engineer Date
C . I, Michael R. McClure. P.E. certify that the alterations or development covered by th i~~h.all not
diminish the flood-carrying capacity of the waterway adjoining or crossing this permitt~t !-.~~ such
alterations or development are consistent with requirements of the City of College Stati · • ··crl!.• ter . ... .• 13 concerning encro hments of floodways and of floodway fringes. ~· l •. * r~ ~*· ~*~ ~··································.ta ~ .. M1.9.ti~.~~.R.Mg9~V.B!LJ
Engineer Date
Conditions or comments as part of approval : -----------------------
In accordance with Chapter 13 of the Code of Ordinances of the City of College Station , measures shall be
taken to insure that debris from construction , erosion , and sedimentation shall not be deposited in city streets ,
or ex isting drainage facilities. All development shall be in accordance with the plans and specifications
submitted to and approved by the City Engineer for the above named project. All of the applicable codes and
ordinances of the City of College Station shall apply .