Loading...
HomeMy WebLinkAbout48 A&M Consolidated Baseball & Softball Renovation14-174 DPC ITY OF CollEGE S TATION Home of Texas A&M Univers ity • FOR Off ICE USfi ONLY CASE NO .: l~ -t1L\ DATE SUBMITIED: 1-\ \-14 TIME : b ·. \ 1- STAFF : _,CT)=-'-""'-------- DEVELOPMENT PERMIT APPLICATION MINIMUM SUBMITTAL REQUIREMENTS: ~ $600 (minimum) Development Permit Application I Public Infrastructure Review and Inspection Fee . Fee is 1% of acceptable Engineer's Estimate for public infrastructure , $600 minimum (if fee is > $600 , the balance is due prior to the issuance of any plans or development permit). ~ Two (2) copies of the grading , drainage, and erosion control plans with supporting drainage report. t-lod.r~. 0 ~ Two (2) copies of the Public infrastructure plans and supporting documents (if applicable). r~ I ~UlQv Date of Optional Preapplication or Stormwater Management Conference SPECIAL FLOOD HAZARD AREA? 0 Yes ~No (Zone A or Zone AE on FEMA FIRM panels) NAME OF PROJECT A&M Consolidated Baseball & Softball Renovation ADDRESS 1801 Harvey Mitchell Parkway South & 2118 Welsh Avenue LEGAL DESCRIPTION (Lot, Block, Subdivision) Southwood Ph . 5, Lot TR 1 & Athletic Complex, Block 1, Lot 1 APPLICANT I PROJECT MANAGER'S INFORMATION (Primary contact for the project): Name Mitchell & Morgan, LLP CIO Veronica Morgan E-mail v@mitchellandmorgan.com Street Address 3204 Earl Rudder Freeway South City College Station State Texas Zip Code 77845 ------- Phone Number 979-260-6963 Fax Number 979-260-3564 ---------------- PROPERTY OWNER'S INFORMATION : Name College Station Independent School District CIO Jon Hall E-mail jhal/@csisd.org Street Address 1812 Welsh ------------------~ City College Station State Texas Zip Code 77840 ------------- Phone Number 979-777-7497 Fax Number ---------------- ARCHITECT OR ENGINEER'S INFORMATION: Name VLK Architects CIO Ken Hutchens E-mail khutchens@vlkarchitects.com Street Address 7915 FM 1960 West, Suite 214 City Houston State Texas Zip Code 77070 ------- Phone Number 281-671-2300 Fax Number 281-671-2313 ---------------- CERTIFICATIONS REQUIRED FOR ALL DEVELOPMENT Owner Certification: 1. No work of any kind may start until a permit is issued . 2. The perm it may be revoked if any false statements are made herein . 3. If revoked , all work must cease until permit is re-issued . 4 . Development shall not be used or occupied until a Certificate of Occupancy is issued . 5. The permit will exp ire if no sign ificant work is progressing with in 24 months of issuance. 6 . Other permits may be required to fulfill local, state , and federal requirements. Owner will obtain or show compliance with all necessary State and Federal Permits prior to construction including NOi and SWPPP . 7. If required , Elevation Certificates will be provided with elevations certified during construction (forms at slab pre- pour) and post construction . 8. Owner hereby gives consent to City representatives to make reasonable inspections required to ve ri fy compliance . 9. If, stormwater mitigation is required, including detention ponds proposed as part of th is project , it shall be designed and constructed first in the construction sequence of the project. 10 . In accordance with Chapter 13 of the Code of Ord inances of the City of College Station , measures shall be taken to insure that all debris from construction , erosion , and sedimentation shall not be deposited in city streets , or existing drainage facilities. All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer for the above named project. All of the applicable codes and ordinances of the City of College Station shall apply . 11 . The information and conclusions contained in the attached plans and supporting documents will comply with the current requirements of the City of College Station , Texas City Code , Chapter 13 and associated BCS Unified Design Gu idelines Technical Specifications, and Standard Details. All development has been designed in accordance with all applicable codes and ordinances of the City of College Station and State and Federal Regulations . 12 . Release of plans to (name or firm ) is authorized for bidding purposes only . I understand that final approval and release of plans and development for construction is contingent on contractor signature on approved Development Perm it. 13 . I, THE OWNER, AGREE TO AND CERTIFY THAT ALL STATEMENTS HEREIN , AND IN ATIACHMENTS FOR THE DEV LO M RMIT APPLICATION , ARE , TO THE BEST OF MY KNOWLEDGE, TRUE , AND ACCUR Date Engineer Certification: 1. The project has been designed to ensure that stormwater mitigation, including detention ponds , proposed as part of the project will be constructed first in the construction sequence. 2. I will obtain or can show compliance with all necessary Local , State and Federal Permits prior to construction including NOi and SWPPP . Design will not preclude compliance with TPDES : i.e ., Project over 10 acres may require a sedimentation basin . 3. The information and conclusions contained in the attached plans and supporting documents comply with the current requirements of the City of College Station , Texas City Code , Chapter 13 and associated BCS Unified Des ign Guidelines. All development has been designed in accordance w ith all applicable codes and ord inances of the City of College Station and State and Feder e ulations. 4 . I, E ENGINEER , AGREE TO AND CERt ~ TATEMENTS HEREIN , AND IN ATIACHMENTS J~E ~~VELOPMENT PERMIT APJ:l ....... :r:t<w "\ ir ~~THE BEST OF MY KNOWLEDGE , TRUE , AND !'iieRoNicA .ia"""""\r-·~ ..., _,11 -r f _f.-U,LUNllat;~.lillJl.'J;::::=:::::::'.__ ___ 4-!.!:!.~ .......... · ... MOR1,;1oG.~.NH~iO---,-/-f--+~+l --'-+------ ~ -tJ . ,,, •• , •..•••....• #! \ ~ \ 77689 difel '~ ... '9~ ().•'{ii~ '• ··.~<11snV>~/-£-.: The following CERTIFICATIONS apply to development in Special Flood Hazard Areas. Required for Site Plans, Final Plats, Construction Plans, Fill / Grading Permits, and Clearing Only Permits:* A I, -----=---N~1A __ certify , as demonstrated in the attached drainage study , that the alterations or development covered by this permit, shall not: (i) increase the Base Flood elevation ; (ii) create additional areas of Special Flood Hazard Area ; (iii) decrease the conveyance capacity to that part of the Special Flood Hazard Area that is not in the floodway and where the velocity of flow in the Base Flood event is greater than one foot per second . This area can also be approximated to be either areas within 100 feet of the boundary of the regulatory floodway or areas where the depth of from the BFE to natural ground is 18 inches or greater; (iv) reduce the Base Flood water storage volume to the part of the Special Flood Hazard Area that is beyond the floodway and conveyance area where the velocity of flow in the Base Flood is equal to and less than one foot per second without acceptable compensation as set forth in the City of College Station Code of Ordinances , Chapter 13 concerning encroachment into the Special Flood Hazard Area ; nor (v) increase Base Flood velocities . beyond those areas exempted by ordinance in Section 5 .11 .3a of Chapter 13 Code of Ordinances. N/8 NI ft I Engineer Date Initial D * If a platting-status exemption to this requirement is asserted , provide written justification under separate letter in lieu of certification. Required for Site Plans, Final Plats, Construction Plans, and Fill / Grading Permits: B. I, N~ A , certify to the following : (i) that any nonresidential or multi-family structure on or proposed to be on this site as part of this application is designed to prevent damage to the structure or its contents as a result of flooding from the 100-year storm. NIA N }Et Engineer Date Additional certificatior for Floodway Encroachments: C. I, N rfi , certify that the construction , improvement, or fill covered by this permit shall not increase the base flood elevation . I will apply for a variance to the Zoning Board of Adjustments. Engineer Date Required for all projects proposing structures in Special Flood Hazard Area (Elevation Certificate required). Residential Structures: D. I , rJ ~ /1 , certify that all new construction or any substantial improvement of any residential structure s all have the lowest floor, including all utilities , ductwork and any basement, at an elevation at least one foot above the Base Flood Elevation . Required Elevation Certificates will be provided with elevations certified during construction (forms at slab pre-pour) and post construction . Engineer I Surveyor N/:A Date Commercial Structures: E. I, N / J1 , certify that all new construction or any substantial improvement of any commercial, industrial, or other non-residential structure are designed to have the lowest floor, including all utilities, ductwork and basements , elevated at least one foot above the Base Flood Elevation N}A. N)fr- Engineer I Surveyor Date OR I, I\j }~ , certify that the structure with its attendant utility, ductwork, basement and sanit~ryfacilies is designed to be flood-proofed so that the structure and utilities , ductwork, basement and sanitary facilities are designed to be watertight and impermeable to the intrusion of water in all areas below the Base Flood Elevation, and shall resist the structural loads and buoyancy effects from the hydrostatic and hydrodynamic conditions. Required Elevation Certificates will be provided with elevations certified during construction (forms at slab pre- pour) and post construction . Engineer I Surveyor Date Conditions or comments as part of approval: Print Form MITCHELL MM MORGAN We are sending you: D Drawings D Letter 3204 Earl Rudder Fwy S College Station, TX 77845 (979) 260-6963 Phone (979) 260-3564 Fax info@mitchellandmorgan.com www.mitchellandmorgan.com D Letter Of Transmittal Date: 1'/ lt[/lf Job: Attention: Re:JMn e~1datd &M *~ ~e f'C\ICJIL>Y\ Under separate cover via ____ the following: [ii Attached D Plans D Order D Prints D Samples D Specifications D Other _______________ _ Transmitted as checked below: D For approval D Approved as noted D Resubmit. ___ copies for approval D For your use D Approved as submitted D Submit. ___ copies for distribution D As requested D Returned for corrections D Retum ____ corrected copies D For review D Other ___________ _ If you have any questions or comments, please contact us at 979-260-6963. Copy to: _Q~· { __ f ______ Signed: ~- DATE : TO : FROM : SUBJECT: CrTY OF Cou.EGE STATION Hom e of Texas A&M Univ ersity " -- MEMORANDUM July 14, 2014 Jon Hall, CSISD , via; jhall@csisd .org Carol Cotter, Senior Assistant City Engineer CSISD A&M CONSOLIDATED BASEBALL & SOFTBA --- Thank you for the submittal of your Development Permit application. I have been assigned to review this project and it is anticipated that the review will be completed and any staff comments returned to you on or before Monday, July 28 , 2014. If you have questions in the meantime, please feel free to contact me . PC: Ken Hutchens , VLK Architects , via ; khutchens@vlkarchitects .com P&DS Project No . 14-00900174 Pla11ni11g & Development Services P.O. BOX 996 0 • 1101 TEXAS AVENUE · COLLEGE STKflON ·TEXAS · 77 842 TEkn9J64.3570 ·FAX. 979.764.3496 cst>1.gov/devservices -····--...... ,. _. .... , .. _,,.~.... ... . ...... ~ .... ., . ..... : ,. - DEVELOPMENT PERMIT PERMIT NO. 14-174 ::::1TY OF C OLLEGE ST,\T ION l'lf.JhNlfK d-n~n:W1"11n1t .~n:ioo FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE SITE LEGAL DESCRIPTION: Southwood Phase 5 Lot TR1 & Athletic Complex, Blk 1, Lot 1 AMCHS Baseball/Softball Renovation DATE OF ISSUE: 07/22/14 OWNER: CSISD c/o Jon Hall 1812 Welsh Ave College Station, Texas 77840 SITE ADDRESS: 2118 Welsh Ave DRAINAGE BASIN: Bee Creek Trib. "B" VALID FOR 24 MONTHS CONTRACTOR: TYPE OF DEVELOPMENT: Full Development Permit CONDITIONS: 1. No work beyond limits covered in permit is authorized . 2. The permit may be revoked if any false statements are made herein . If revoked, all work must cease until permit is re- issued . 3. The permit will expire if no significant work is progressing within 24 months of issuance. 4 . Other permits may have been required to fulfill local , state and federal requirements . Construction will be in compliance with all necessary State and Federal Permits. 5. Stormwater mitigation , including detention ponds will be constructed first in the construction sequence of the project. 6 . In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that all debris from construction , erosion , and sedimentation shall not be deposited in city streets , or existing drainage facilities . Construction Site Notice or Notice of Intent (NOi) along with Stormwater Pollution Prevention Plan (SWP3) will be kept and maintained on-site during construction as per TPDES permitting requirements . If it is determined that the prescribed erosion control measures are ineffective to retain all sediment on-site, it is the Contractor 's responsibility to implement measures that will meet City , State, and Federal requirements . 7. All disturbed areas will be re-vegetated prior to Letter of Completion or Certificate of Occupancy . 8. All trees required to be protected as part of the landscape plan must be completely barricaded in accordance with the Landscaping and Tree Protection Section of the City's Unified Development Ordinance , prior to any operations of this permit. The cleaning of equipment or materials within the drip line of any tree or group of trees that are protected and required to remain is strictly prohibited . The disposal of any waste material such as, but not limited to, paint, oil, solvents, asphalt, concrete , mortar, or other harmful liquids or materials within the drip line of any tree required to remain is also prohibited . 9. All construction shall be in accordance with the stamped approved plans and specifications for the above-named project and all of the codes and ordinances of the City of College Station , as well as State and Federal Regulations that apply . Only those deviations from BCS Unified Design Guidelines, Specifications and Details specifically requested and approved will be allowed . 10 . Special Conditions : l,_2.-...... a""e""-.,:;h......_--'-J..!i~e;.::.,;~~··r,_\Ao.~=~""'"-----' the Contractor, hereby agree to comply with all conditions herein . ~f!lLzJ.I ~ractor Signature -S/7/111 Date ~\O-l-f I~· 07'3L( "%.t~~.'.rNr"-Qj"e.f',-1.u>!o\ Phone number E-mail I hereby grant this permit for development. Contact ~ '\"~ 1'\'\.,,..Cit.\i , the Public Works Ins ctor assigned to this project 24 hours prior to beginning construction for scheduling required Inspections. 6{te I