Loading...
HomeMy WebLinkAbout42 The Gardens Lot 1&2 HentonWRITTEN CLARIFICATION Written Clarification No._1 July 24, 2003 PROJECT: Lots 1 & 2 Henton Subdivision I Lot 2R One Liilcoln Place and The Gardens at University Infrastructure Improvements FOR: Sanitary Sewer Pipe Material TO: Tex con General Contractors College Station, Texas FAX (979) 690-9797 FROM: Kling Engineering & Surve1J.'"~'l--'r Bryan, Texas FAX 846-8252 The Sanitary Sewer line for both the Henton Subdivision /One Lincoln Place & Gardens at University is to be constructed with SDR 26 PVC pipe meeting ASTM D3034 standards. At all locations where proposed water line crosses the proposed sanitary sewer line, 1 joint of SDR 26 PVC pipe meeting ASTM D2241 standards is to be installed centered at the crossing with cement stabilized sand embedment per TNRCC Rules. The work covered by this written clarification shall be performed under the same terms and conditions as set forth and included in the original construction contract. Se nt By: TEXCON; 979 690 9797 ; Jul -30-0 3 1 :4 8P M; Page 2 /3 ·-----••· 1'"'"Ct\:IC 4::: 07 /29/03 11 ; 08 '5'979 846 8252 Kl.ING ENGINEERIN ... ~_, T=E=.'tC=O:..:.;N~: ______ ....;::~,,_o_o.;.;..2 __ CHANGE ORDER ~Ne;J2,/_e;FJ.~r C\..(ec£ Change-Order No._1 \)OL---L'SLOe--J ~ July29, 2003 PROJECT: Lots 1 & 2 Henton Subdivision I Lot 2R One Lincoln Place and Th.e Gardens at University J nfrastruc:ture Improvements FOR: TO : Sahara Realty Group, Ltd _ Texcon General Contractors U:illege Station, Texas · FAX (979) 690-9797 FROM: ~in& Engin~g & Surveyffiii Bryan, T~ FAX 846-8252 Changes to the PlanJ: Lots 1 & 2 Henton Subdivision I Lot 2R One Lincoln Place Waterline Sheet W-2 8" Waterline: "B" Sta 2+43.44 -Change Location of Cross & Appunenance1 to Sta 2"'"39 .07 Reviled Installation of 8" Gate V1dve & Fire Hydrant per Drawing Install Additional &"Gate Valve with Valve Box Bid It.em 7• . Current Bid nem EST. UNrT ITEM DESCRIPTION UNIT PRICE QTY. 3 EA FIM"nillh and lnstaH a· Gate Vatve end Valve I eoo .oo / EA Box complete and In place R evised Bid Item EST . UNIT ITEM DESCRIPTION UNIT PRICE QTY. • EA Furnish an.d lnstan s· Ga~ Valve and Valve $ 600.QQ/ EA Box complete Md In place Total Cost ADDED TOTAL COST ADDED Page: l of2 TOTAL PRICE 11 .800 ,0Q TOTAL PR.ICE ; J2.400,00 ' ) - (fl$ 600 .00 1()0,00 <:>t i ll oy . I C:A\,Ul~1 ~I~ o9U 9/9 / j Ju l-30-0 3 1 :4 9P M; Page 3 /3 07 1 29 /03 11 : 09 't!979 846 8252 • _;,.--,,~ r d'*' ID' ..::> KLING ENCINEER IN -+ .. ~ TE.ICO N! Revjscd 'Contract Amount Previous contract amount S 26Sl.185 _8Q Amount of this order (increase) ~deetease} tno dwagc) S 600,00 Revised contract amount S 269,785180 An (increuc) (dcc1cuc} (no <;hange) of _ _.O..___ days in the contract time is hereby authorized , Chaa&e.1 Approved Sahara Realty Group, Ltd , Texcon General Contra.cton, Inc . Kling Engineering & Surveying Iii 00 3 The work covered by this written clarification shall be performed under the same terms and conditions as set forth and included in the original construction contract. Page 2of2 \ \ \ \ \ ' ' ,; ',,,.CHANGE ORDER #1 ---'~ ',',,, ',,,, ! ,,,,' ' \ \ \ \ \ \ \ \ \ \ \ ', \ ' ...... --' ....... '-, PROPOSED a• PVC WATER LINE •9•, (AWWA C=900, DR=t4','-clA$s,2po) , , , , I , , , , ," , ............. ...... ',, ............. , .... .... .... .... .... ,' ......... __ , I I I , , , , , , , / , , ............ ..._ ............ ............ ', ---~"" , , ~ ....... .... ........ ___ _ / ,' , ,,'--.... ........ ..., .... .... / ,; ,' ," ............ :'-------........ / ,' ,,' ,' ........ , ........ INSTALL 20' OF a• PVC ' , ',~ /WATER LINE. INSTALL MJ ---------- ...... ....... ...... / PLUG & MARK 0 ....... __ SURFACE ,, ', I ... __ ..,,., --- I I I I I I I , , , , , , , , , , , I -~-ob~~~~------------------------------------------------! ~?'----~~ --Pw-•----------~w I ~/ 20' PUBLIC UTILITY \EASEMENT 1 PWI I I I I I I I I r \ \ _______________ J _________________________________ J ________ J __ I I I -----~---------------------~ ---------------------- I I I I I ,' ,' ' ,' I I I I I , I I ,"' I ,_,, I , I ________ .... ' STA 2+39.07 I I I I ---" ,' , I I I I I ' I I I I =,-------------·INSTALL a·xa· DI MJ CROSS. INSTALL a• GATE VALVE & VALVE BOX ON LEFT BRANCH OF CROSS. INSTALL STANDARD COCS TYPE 1 FIRE HYDRANT (PLACE TEE 9' LEFT OF CROSS). INSTALL A TOTAL OF 20 LF OF a• LINE LEFT OF CROSS. INSTALL MJ PLUG AT END OF 20 LF OF a• LINE. INSTALL a• GATE VALVE & VltJ..VE BOX ON RIGHT BRANCH OF CROSS IN CLOSED POSmON. PLUG VALVE. PW TP=306.23 ~i H FIELD CHANGE Field Change No._1 AugustS,2003 PROJECT: Lots 1 & 2 Henton Subdivision I Lot 2R One Lincoln Place and The Gardens at University FOR: TO : Infrastructure Improvements Sanitary Sewer I Storm Sewer T excon General Contractors College Station, Texas FAX (979) 690-9797 FROM: ~ngineering & Surveying Bryan, Texas FAX 846-8252 Sanitary Sewer: Revision to Plans : Sanitary Sewer stub-out into existing sanitary sewer manhole @ sta 7+58.46 Sheet SS-2 of Lots 1 & 2 Henton Subdivision I Lot 2R One Lincoln Place Flowline of stub-out into existing SSMH to be revised to 293 .90 Storm Sewer: Slope of stub-out to be revised to 1. 7% Horizontal alignment revised to miss existing underground electric vault Flowline of end of 25' stub-out revised to 294 .33 Provide l' clearance from top of electrical conduit to bottom of sanitary sewer line Revision to Plans : East Storm Sewer 36" RCP stub-out into proposed grate inlet @ sta 4+08.47 Sheets ST-1, ST-2 of The Gardens at University Flowline ofEast stub-out into proposed grate inlet to be revised to 304.19 Slope of stub-out to .remain at 0 .60% Flowline of stub-out end(@ 38 lt) to be revised to 304 .42 W-1 of The Gardens at University Sta 1+28 .82 36" RCP storm sewer crossing: flowline of storm sewer to be revised to 304.41, top of pipe elevation 307 .74 SS-1 of The Gardens at University Sta 1+68 .71 36" RCP storm sewer crossing : flowline of storm sewer to be revised to 304 .33 The work covered by this written clarification shall be performed under the same terms and conditions as set forth and included in the original construction contract. CHANGE ORDER #2 c '7</ eo-1':'L11'22D~ Change Order No.2._ August14 ,2003 PROJECT: Lots 1 & 2 Henton Subdivision I Lot 2R One Lincoln Place and The Gardens at University Infrastructure Improvements FOR: Waterline TO: Texcon General Contractors College Station, Texas FAX (979) 690-9797 FROM: Kling Engineering & Surveying Bryan, Texas FAX 846-8252 Waterline: Revision to Plans : 8" Waterline 'B' lateral stub-out@ sta 2+39.07 ----·· --- .•' -·· Sheet W-2 of Lots 1 & 2 Henton Subdivision I Lot 2R One Lincoln Place Install 2" Blow off valve at end of 20' length of pipe extending left of cross PROPOSED a• PVC WA~K LINE "8"-., (AW<N'1. C-900, DR-i4;· CLASS-·200) ·--••• ' l ... -... XO INSTALL B"xe· MJ CROSS. -· .. INSTALL 8" G4TE VALVE • VALVE BOX OH LEFT BJWolCH OF' CROSS. INSTAU. STANMRD COCS l'l'PE 1 F1RE HYDRANT (PLACE TEE 9' L£fT OF ~SS), INSTALL A TOTAL OF 20 LF or a• LINE LEFT OF CROSS. INSTALL MJ PWG AT END Of' 20 Lf' OF 8" LINE. INSTALL 8" ~TE VALVE • VALVE BOX OH RIGHT BRANCH OF CROSS IN CLOSED POSmOH. PUJG V/llLVF.. PW lP-306~3 Page 1 of2 Se nt By: TEXCO N; 979 6 90 9797 ; Au g -15 -0 3 8:11AM ; Page 2 /2 08! 141 03 16: 49 ft979 846 8252 . _ ..... -_..... . ----..., KLING ENGINUERIN ~1~ TEXCON Sid ltllm 8: Current Bid Item EST. UNIT ITEM DESCRIPTION UNIT PRICE QTY. 2 EA Fumlah and lnataU 2· Blow-off Valve to Include S 450.00/EA M.J. bppad plu!J oamplef.e-li!nd n plac:.,,__ __ _ Reviaed Bkf Item EST. UNIT ITEM DESCRIPTION UNJT PRICc QTY . 3 EA Furnish and lnstilil 2· Slow·off Val"Je to inch.Ide M.J . tapped plug complete and in place i 450.00/ EA Total Cost ADDED TOTAL COST ADDED Previous contract amount Amount of this order (increase) (dccwnc) (no chauge1 Revised contract amount ~003 TOTAL PRICE $900.00 TOTAL PRICE 11 .350 .00 (!)$ 450.00 f '50.00 S 269J85.SQ s 42_0 00 s 270 ,235.80 An (:inaease) ~deuease) (no change) of _ _.O...__ da.ys in the contract ti.me is hereby authorized . Changes Approv~ Sahara ReaJty Group, Ltd. Texcon General Contractors, Inc. Kling Engineering & Surveying T he work cov ered by this Change Order shall be performed under the same terms and conditions as set forth and included in the original construction contract . P age 2 of 2 Sent By: TEXCON; Rqc61Ved: 10/ 'l/03 12:00PM: 10 /07 /0l 11:47 '8'979 846 8252 979 690 9797 ; Oct -8 -0 3 9:29AM; 979 84e 8252 -> TEXCUN; ~~~c ~ KLING ENGINEERJ N ...,_, .. TEXCON Page 2 /5 ~.~~-- CHANGE ORDER #3 ~1-.J()/J__ I e; N<:-ctl.J ~ ~GtSca--J ~ Change Order No . .1_ October 6 , 2003 PROJECT: Lots J & 2 Henton Subdivision I Lot 2R _One Lincoln Place and The Gardens at University Infrastructure Impmvemenu FOR: Streets & Drainage, Sanitary Sewer TO: Texcon General Contractors College Station, Texas FAX (979) 690-9797 Streets&, Drainage: Revision to Plans : Mornlla Boulevard .FROM: Kling Engineering & Surveying Bryan, Texas F A..X 846-8252 Sheets ST-1 & ST-2 of The Gardens at University Construction of crown street section instead of V -section to include : EST. UNIT ITEM DESCRIPTION UNIT PRICE TOTAL PRICE QTY. 2 EA Installation of 2-6' Recessed Curb Inlets ~ 2,800,00 I EA ~S,600 .00 onto existing RCP 'torm sewer stub-outs complete and in place 2 EA Extend ~sting tops of grate inlets per det;; il ~ 900.00 I EA ii ~QQ,00 complete and in place >--· 2 EA Remove Grates on existing grate inlets &. $ 7QO 00 I ;6A Sl,400.00 Fumish & Install Stor:m Sewer Manhole Lids complete and in place Streets Total: $8,800.00 Refer to Revis~ Construction Plans for SheetS ST-1 & ST-2 of Th~ Garden~ at University -Revision Date 09-11-03. Pagel of 4 ::.en L t::1y : l t:.l\~u 1 ~, ::J l :::::J u-=iu -=i 1 -=i 1, v.._1.. u v v -'·---.. ,, 979 846 8252 ·> T~~~UN; r~wa ~ . -::.--· - 10/07 /03 11 : 411 '6'979 848 8252 KU.NG ENGINF.E.IUJll .... 1 TEXCON @) 003 Sanitary Sewer: Reyjsion to Plans : Sanitary Sewer Line 'A' EllOIT Sheet SS-I of L-Otll 1 & 2 Hepton Sybdiyjsion I Lot 2R One Lincoln Place & Sheet SS-1 of The Gardens at Univcrsitr Omit SaniLUy Sewer Stub-Out at STA 1+89.82, Install Sanitary Sewer Manhole into C'Xisting non -active SS line at STA 1+50, Install Sanitary Sewer Stub-Out 45' right at STA 1+50 CliANC"JE ORD .ER #3 ··,"-. S.{NtJARY SEWER LINE 'A ' \. EXISTING s · PVC 0 1 ~% (SOR 2&. ASTM 30.3-i . Cl..ASS"·-t SO) Page 2 of 4 '•, .- Sent By: TEXCON; 979 690 9797; Oc t-8 -0 3 9:30AM; Page 4 /5 @004 Rec .. .:Lveo : 10/ 7103 12 :01PM; 979 846 8252 -> Tt~~UN; ~~~~ - 10/0i/03 11 :49 'ft979 846 8252 KLING ENGINEERJN ~~~ TE!CON Lots 1 &. 2 Henton Subdivision I Lot 2R One Lincoln Place EST. UNIT ITEM DESCRIPTION UNIT PRICE : TOT AL PRlCE QTY. I EA Adjust Existing Sanitary Sewer Manhole Tot i 250.00 I EA S250 .0Q @STA 1+89,82 -0 .27 feet vertically down from elcv=309 .9S to elev=309.68 to be flush with pavement complete and in place -12 LF Furn.iih and Install 8" PVC Sanitary Sewer ~ 26 .00 /,Lf $-312 .00 Main (SDR 26, ASTM 3034, Class 160) -6'-10' Bury (Standard Backfill@ 90% ASTM D-698) complete and in place: -33 LF Furnish and Install 8" PVC Sanitary Sewer ~ 38 .00 I LF ~-l.~54 .QQ Main (SDR 26, ASTM 3034, Class 160) -6'-10' Bury (Full Depth Cement Stabilized Backfill) complete and in place ; Sanitary Sewer Sub-Total 1: i-11316.00 Sheet SS-1 of The Gardens at University EST. UNIT ITEM DESCRIPTION UNIT PRICE TOTAL PRICE QTY. l EA Adjust Existing Sanitary Sewer Manhole To~ ~ ~QQ oo I EA S500 .QQ @STA O+oo 1.2 feet vertically up from elc'V""312 .5 to elev=313.7 6 LF Furnish and Install 8" PVC Sanitary Sewer ~ i6.00 I LF $156.00 Main (SDR 26, ASTM 3034, Class 160) ~·-10• Bury (Standard Backfill@90% ASTM D-698) complete an d in place 39 LF Furnish and Inscall 8" PVC Sanitary Sewer ~ 38 .00 I LF ~l.4~,,00 Main (SDR 26, ASTh{ 3034, Class 160) -6'-10' Bury (Full Depth Cement Stabilized . Backfill) complete and in place l EA Furnish and Install Standard City of College s 30QQ .OO I EA ~3,00Q,QQ Station Sanitary Sewer Manhole -8'-9' Deptl into existing non-active line complete and in place Sanitary Sewer Sub-Tot.a.I 2: SS,1~8.00 Sanitary Sewer Total: Sl.Ul.QO Page 3 of 4 ,, .. Aec.,iv.,d; 10/ 7/0:l 1 2:02PM; l0 /07 /03 11 :49 '8-979 8~6 11252 Changes Appro,·ed Sahara Realty Group, Ltd. Texcon General Contractors, Inc . Kling Engineering & Surveying Q79 946 8252 -> TE.XCUN j r-'t:.fCP - ...... -............. , I C~t ...J / ..J KLINC ENGINEERIN -.~ .... TEXCON @oos Revised ContrAct Amoµnt Previous contract amount S 270,~3~.SQ Amount of this order (increase) tdccs ease) (110 change) $ 12.622.00 Revised contract amount S 282,857.SO_ days in the contract time is hereby authorized . The work covered by this Change Order shall be performed under the same terms a.nd conditions as set forth and included in the original construction contract. D .. o .. '1nf4