Loading...
HomeMy WebLinkAbout4 DP Pebble Creek Ph 9D 05-05DRAINAGE REPORT FOR PEBBLE CREEK SUBDIVISION PHASES 9D & 9F February 2005 (Revised May 2005) MBESI No. 10650007 Pebble Creek Subdivision, Phases 9D & 9F Revised Drainage Report MBESI #10650007 CERTIFICATION Date SUMMARY This Revised Drainage Report for Pebble Creek Subdivision, Phase 9D and 9F was prepared in coajunction with a modified drainage system design for Phases 9E and 9D . The previous design for Phase 9E carried water to an existing system in Phase 9B, but the developer chose this alternate design to avoid working in an established neighborhood . The new system makes use of a small detention pond in Phase 9E whose purpose is to minimize the pipe sizes that are necessary for the outfall in Phase 9D . Most of the general information in this revised report is the same as previously submitted, but the computations for the storm drain system in Phase 9D have changed . The drainage system of Pebble Creek Subdivision, Phase 9D and 9F meets all requirements of the City of College Station's Drainage Policy and Design Standards . It will effectively control the stormwater runoff from the site with no significant adverse impacts to the surrounding or downstream properties . The information that follows shows the parameters under which the design was prepared . Specific details are included in the applicable exhibits at the end of the report . GENERAL INFORMATION Area encompassed by this phase : Anticipated land use: Anticipated number of lots : Notes on surrounding deve lopment: FLOOD HAZARD INFORMATION FEMAFIRMMap #: 48041C0205 D 36.4 acres Single famil y residential 79 lots The area surrounding the site is partially developed with existing phases of Pebble Creek to the north, undeveloped phases of Pebble Creek to the west, undeveloped property owned by Animate Habitat to the south, and property owned by the City of College Station (Lick Creek Park) to the east. Effective Date: February 9 , 2000 Co mments : No portion of the site is shown to be within the 100-year floodplain, so it is not currently regulated under the National Flood Insurance Program. Applicable Exhibits : A -Excerpt of FEMA FIRM DESCRIPTION OF DRAINAGE SYSTEMS Primary System : The majority of the site is wooded with dense undergrowth except along the south property line where much of the underbrush and trees have been previously cleared . The topography slopes gently southward toward Alum Creek. The primary drainage channel for the area is Alum Creek. Secondary System: Runoff from most residential lots will flow into the streets where it will be captured by inlets and conveyed through underground pipes to two outfalls into Alum Creek. Residential lots along on the southern property line of the two phases will sheet flow directly into Alum Creek. Applicable Exhibits : B-1 -Drainage Area Map (Proposed Conditions) SECONDARY STORM DRAIN DESIGN Design Storm : Design Methodology Hydrology : Software Model: 10-yr Return Period Time of Concentration: Rational Formula Excel Spreadsheet 10 min. Runoff Coefficients : Hydraulics : Software Model: Manning's N : 0 .40 -Undeveloped area 0 .55 -Residential areas 0 .90 -Paved areas Manning's Equation Excel Spreadsheet 0.014 (concrete pipe and HDPE pipe*) * Note: HDPE pipe is being proposed as an alternate design in the plans for pipes 36" diameter or less . Applicable Exhibits: C-1 Rational Formula Drainage Area Calculations Inlet Computations C-2 C-3 C-4 C-5 D-1 Pipe Size Calculations Hydraulic Grade Line Calculations (10 yr.) Hydraulic Grade Line Calculations (100 yr .) Hydraulic Grade Line Schematic DETENTION REQUIREMENTS General Note: Previous studies have been conducted on the entire Pebble Creek Subdivision to demonstrate that the peak flow from the development will pass through the primary drainage system before the peak flow from the remainder of the drainage basin reaches the Pebble Creek outfall. Consequently, there is no increase in water surface elevations downstream of the subdivision. For this reason, the City of College Station has not required detention in any previous phases of the development. The development of Phases 9D and 9F will not alter that existing drainage pattern. EROSION AND SEDIMENTATION CONTROLS Control Measures : SWPPP : Silt fence Hydromulch seeding Inlet protection Construction entrance/exit The contractor shall be responsible for establishing and maintaining the SWPPP in accordance with TCEQ requirements . ZONEX NTS EXHIBIT A Flood Insurance Rate Map Excerpt Brazos County, Texas and Incorporated Areas Map Numbers: 48041C0205D Effective Date: February 9, 2000 < ~ w c 0 D:: w _. _. < < IL < LL w w 0 j::: ... c (!) D:: _. z < z < w z w 0 ~ ::c < w z _. ~~ c ::E _. D:: ... ~ w < ~ iii w (!) > ... >z 0 z D:: w < 0 o~ c ... ::::> < D:: IL ... NO. AC. 0.41 0.55 0.9 ft. 9C 13.05 4.57 0.00 8.48 9.46 25.0 9C1 1.56 0.00 1.56 0.00 0.86 1.0 9C2 1.25 1.25 0.00 0.00 0.50 1.0 Pond 0.59 0.59 0.00 0.00 0.24 1.0 Pond2 0.98 0.98 0.00 0.00 0.39 1.0 1 1.07 0.00 1.07 0.00 0.59 1.0 2 1.34 0.00 1.34 0.00 0.74 1.0 3 1.35 0.00 1.35 0.00 0.74 1.0 4 0.67 0.00 0.67 0.00 0.37 1.0 5 1.01 0.00 1.01 0.00 0.56 1.0 6 0.86 0.00 0.86 0.00 0.47 1.0 7 0.93 0.00 0.93 0.00 0.51 1.0 8 0.75 0.00 0.75 0.00 0.41 1.0 8.1 0.00 0.00 0.00 0.00 0.00 1.0 9 0.74 0.00 0.74 0.00 0.41 1.0 9.1 0.00 0.00 0.00 0.00 0.00 1.0 9.2 0.00 0.00 0.00 0.00 0.00 2.0 10 1.19 0.00 1.19 0.00 0.65 1.0 10.1 0.00 0.00 0.00 0.00 0.00 1.0 11 0.99 0.00 0.99 0.00 0.54 1.0 12 0.99 0.00 0.99 0.00 0.54 1.0 12.1 0.00 0.00 0.00 0.00 0.00 1.0 13 0.65 0.00 0.65 0.00 0.36 1.0 14 0.63 0.00 0.63 0.00 0.35 1.0 14.1 0.00 0.00 0.00 0.00 0.00 1.0 15 1.04 0.00 1.04 0.00 0.57 1.0 16 0.73 0.00 0.73 0.00 0.40 1.0 16.1 0.00 0.00 0.00 0.00 0.00 1.0 17 0.73 0.00 0.73 0.00 0.40 1.0 17.1 0.00 0.00 0.00 0.00 0.00 1.0 18 0.95 0.00 0.95 0.00 0.52 1.0 19A 1.01 0.00 1.01 0.00 0.56 1.0 198 0.67 0.00 0.67 0.00 0.37 1.0 20 0.89 0.00 0.89 0.00 0.49 1.0 21 0.99 0.00 0.99 0.00 0.54 1.0 22 0.93 0.00 0.93 0.00 0.51 1.0 23A 0.65 0.00 0.65 0.00 0.36 1.0 238 1.12 0.00 1.12 0.00 0.62 1.0 24 0.98 0.00 0.98 0.00 0.54 1.0 25 1.06 0.00 1.06 0.00 0.58 1.0 EXHIBIT C-1 Rational Formula Drainage Area Calculations Pebble Creek Phase 9C, 90 & 9F ~ 0 ~ ~ _. LL 0 0 r c _. _. z LL LL ~ < D:: ::c D:: 0 u _. w ... w ... u D:: _. I: (!) I: _. 0 ... u w _. ::::> z ::::> _. _. w >< (!) ~ (!) ~ \~ . ii !/) a .,, 0 LL 0 ::::> ~ !!? a ft. ft. ft. ft/s~ min min In/Hr cfs In/Hr cfs 1.0 1250.0 6.0 1.4 15.5 15.5 5.11 48.3 6.3 59.4 1.0 1.0 1.0 10.4 0.0 10.0 6.33 5.4 7.7 6.6 1.0 1.0 1.0 10.4 0.0 10.0 6.33 3.2 7.7 3.8 1.0 1.0 1.0 10.4 0.0 10.0 6.33 1.5 7.7 1.8 11.0 1.0 1.0 21.5 0.0 10.0 6.33 2.5 7.7 3.0 1.0 1.0 1.0 10.4 0.0 10.0 6.33 3.7 7.7 4.5 1.0 1.0 1.0 10.4 0.0 10.0 6.33 4.7 7.7 5.7 1.0 1.0 1.0 10.4 0.0 10.0 6.33 4.7 7.7 5.7 1.0 1.0 1.0 10.4 0.0 10.0 6.33 2.3 7.7 2.8 1.0 1.0 1.0 10.4 0.0 10.0 6.33 3.5 7.7 4.3 1.0 1.0 1.0 10.4 0.0 10.0 6.33 3.0 7.7 3.6 1.0 1.0 1.0 10.4 0.0 10.0 6.33 3.2 7.7 3.9 1.0 1.0 1.0 10.4 0.0 10.0 6.33 2.6 7.7 3.2 1.0 1.0 1.0 10.4 0.0 10.0 6.33 0.0 7.7 0.0 1.0 1.0 1.0 10.4 0.0 10.0 6.33 2.6 7.7 3.1 1.0 1.0 1.0 10.4 0.0 10.0 6.33 0.0 7.7 0.0 2.0 2.0 2.0 10.4 0.0 10.0 6.33 0.0 7.7 0.0 1.0 1.0 1.0 10.4 0.0 10.0 6.33 4.1 7.7 5.0 1.0 1.0 1.0 10.4 0.0 10.0 6.33 0.0 7.7 0.0 1.0 1.0 1.0 10.4 0.0 10.0 6.33 3.4 7.7 4.2 1.0 1.0 1.0 10.4 0.0 10.0 6.33 3.4 7.7 4.2 1.0 1.0 1.0 10.4 0.0 10.0 6.33 0.0 7.7 0.0 1.0 1.0 1.0 10.4 0.0 10.0 6.33 2.3 7.7 2.8 1.0 1.0 1.0 10.4 0.0 10.0 6.33 2.2 7.7 2.7 1.0 1.0 1.0 10.4 0.0 10.0 6.33 0.0 7.7 0.0 1.0 1.0 1.0 10.4 0.0 10.0 6.33 3.6 7.7 4.4 1.0 1.0 1.0 10.4 0.0 10.0 6.33 2.5 7.7 3.1 1.0 1.0 1.0 10.4 0.0 10.0 6.33 0.0 7.7 0.0 1.0 1.0 1.0 10.4 0.0 10.0 6.33 2.5 7.7 3.1 1.0 1.0 1.0 10.4 0.0 10.0 6.33 0.0 7.7 0.0 1.0 1.0 1.0 10.4 0.0 10.0 6.33 3.3 7.7 4.0 1.0 1.0 1.0 10.4 0.0 10.0 6.33 3.5 7.7 4.3 1.0 1.0 1.0 10.4 0.0 10.0 6.33 2.3 7.7 2.8 1.0 1.0 1.0 10.4 0.0 10.0 6.33 3.1 7.7 3.8 1.0 1.0 1.0 10.4 0.0 10.0 6.33 3.4 7.7 4.2 1.0 1.0 1.0 10.4 0.0 10.0 6.33 3.2 7.7 3.9 1.0 1.0 1.0 10.4 0.0 10.0 6.33 2.3 7.7 2.8 1.0 1.0 1.0 10.4 0.0 10.0 6.33 3.9 7.7 4.7 1.0 1.0 1.0 10.4 0.0 10.0 6.33 3.4 7.7 4.1 1.0 1.0 1.0 10.4 0.0 10.0 6.33 3.7 7.7 4.5 0 .,, 0 .... .,, N !: a ~ a In/Hr cfs In/Hr cfs 7.1 67.0 8.1 76.7 8.6 7.4 9.9 8.5 8.6 4.3 9.9 4.9 8.6 2.0 9.9 2.3 8.6 3.4 9.9 3.9 8.6 5.1 9.9 5.8 8.6 6.4 9.9 7.3 8.6 6.4 9.9 7.3 8.6 3.2 9.9 3.6 8.6 4.8 9.9 5.5 8.6 4.1 9.9 4.7 8.6 4.4 9.9 5.0 8.6 3.6 9.9 4.1 8.6 0.0 9.9 0.0 8.6 3.5 9.9 4.0 8.6 0.0 9.9 0.0 8.6 0.0 9.9 0.0 8.6 5.7 9.9 6.5 8.6 0.0 9.9 0.0 8.6 4.7 9.9 5.4 8.6 4.7 9.9 5.4 8.6 0.0 9.9 0.0 8.6 3.1 9.9 3.5 8.6 3.0 9.9 3.4 8.6 0.0 9.9 0.0 8.6 4.9 9.9 5.6 8.6 3.5 9.9 4.0 8.6 0.0 9.9 0.0 8.6 3.5 9.9 4.0 8.6 0.0 9.9 0.0 8.6 4.5 9.9 5.2 8.6 4.8 9.9 5.5 8.6 3.2 9.9 3.6 8.6 4.2 9.9 4.8 8.6 4.7 9.9 5.4 8.6 4.4 9.9 5.0 8.6 3.1 9.9 3.5 8.6 5.3 9.9 6.1 8.6 4.7 9.9 5.3 8.6 5.0 9.9 5.7 ~ In/Hr 9.2 11.1 11.1 11.1 11.1 11.1 11.1 11.1 11.1 11.1 11.1 11.1 11.1 11.1 11.1 11.1 11.1 11.1 11.1 11.1 11.1 11.1 11.1 11.1 11.1 11.1 11.1 11.1 11.1 11.1 11.1 11.1 11.1 11.1 11.1 11.1 11.1 11.1 11.1 11.1 0 ~ 0 0 0 .... a !: a cfs In/Hr cfs 86.9 10.4 98.0 9.6 12.5 10.7 5.6 12.5 6.3 2.6 12.5 3.0 4.4 12.5 4.9 6.6 12.5 7.4 8.2 12.5 9.2 8.3 12.5 9.3 4.1 12.5 4.6 6.2 12.5 7.0 5.3 12.5 5.9 5.7 12.5 6.4 4.6 12.5 5.2 0.0 12.5 0.0 4.5 12.5 5.1 0.0 12.5 0.0 0.0 12.5 0.0 7.3 12.5 8.2 0.0 12.5 0.0 6.1 12.5 6.8 6.1 12.5 6.8 0.0 12.5 0.0 4.0 12.5 4.5 3.9 12.5 4.3 0.0 12.5 0.0 6.4 12.5 7.2 4.5 12.5 5.0 0.0 12.5 0.0 4.5 12.5 5.0 0.0 12.5 0.0 5.8 12.5 6.5 6.2 12.5 7.0 4.1 12.5 4.6 5.5 12.5 6.1 6.1 12.5 6.8 5.7 12.5 6.4 4.0 12.5 4.5 6.9 12.5 7.7 6.0 12.5 6.8 6.5 12.5 7.3 4/28/2005 10650007-pond sizing.xis Exhibit C-1 \ " .. c( 3': w c 0 0:: w ...I ...I c( ~ 0. c( LL 0 I-c w 0:: i== z c( z (!) ...I c( w z w 0 c( ::c c( w ...I > ::E ...I ...I I-z c( ~~ c w c( 0:: (!) ~ u; I-~ I-Wz 0 ~~ w 0 >w c I-0:: 0. I-0 ...I NO. AC. 0.4 0.55 0.9 ft. 26A 0.96 0.00 0.96 0.00 0.53 1.0 268 0.95 0.00 0.95 0.00 0.52 1.0 26 0.00 0.00 0.00 0.00 0.00 1.0 Pond Out 8.00 2.00 3.00 3.00 5.15 300.0 1E 1.24 0.00 1.24 0.00 0.68 100.0 2E 0.98 0.00 0.98 0.00 0.54 150.0 3E 0.96 0.00 0.96 0.00 0.53 200.0 4E 1.08 0.00 1.08 0.00 0.59 200.0 5E 1.19 0.00 1.19 0.00 0.65 150.0 6E 0.68 0.00 0.68 0.00 0.37 150.0 7E 0.72 0.00 0.72 0.00 0.40 160.0 6E.1 0.00 0.00 0.00 0.00 0.00 1.0 EXHIBIT C-1 Rational Formula Drainage Area Calculations Pebble Creek Phase 9C, 90 & 9F 3': 0 3': 3': !{ ...I LL 0 0 c ...I ...I z LL LL c( 0:: ::c ~ ..... ( 0 u ...I w I-I-u 0:: ...I I= (!) 0 I-.; w ...I :::> z :::> ...I ...I w > c( ~ ii !/) a .., 0 LL (!) ~ (!)~ 0 :::> £! !!! a ft. ft. ft. ft/s min min In/Hr cfs In/Hr cfs 1.0 1.0 1.0 10.4 0.0 10.0 6.33 3.3 7.7 4.1 1.0 1.0 1.0 10.4 0.0 10.0 6.33 3.3 7.7 4.0 1.0 1.0 1.0 10.4 0.0 1n.o 6.33 0.0 7.7 0.0 2.0 1600.0 4.0 0.9 35.6 !.'35.f,i II' 3.10 16.0 3.9 20.0 1.0 200.0 1.2 1.1 4.5 10.0 6.33 4.3 7.7 5.2 1.0 50.0 0.5 0.7 4.8 10.0 6.33 3.4 7.7 4.1 2.0 160.0 1.0 0.9 6.4 10.0 6.33 3.3 7.7 4.1 2.0 160.0 1.0 0.9 6.4 10.0 6.33 3.8 7.7 4.6 1.5 100.0 0.6 0.9 4.6 10.0 6.33 4.1 7.7 5.0 1.5 115.0 0.8 0.9 4.7 10.0 6.33 2.4 7.7 2.9 1.0 80.0 0.5 0.7 5.6 10.0 6.33 2.5 7.7 3.0 1.0 1.0 1.0 10.4 0.0 10.0 6.33 0.0 7.7 0.0 l ,; Cl It) Cl ... It) N !: a £! a In/Hr cfs In/Hr cfs 8.6 4.6 9.9 5.2 8.6 4.5 9.9 5.2 8.6 0.0 9.9 0.0 4.5 22.9 5.1 26.4 8.6 5.9 9.9 6.7 8.6 4.7 9.9 5.3 8.6 4.6 9.9 5.2 8.6 5.1 9.9 5.9 8.6 5.7 9.9 6.5 8.6 3.2 9.9 3.7 8.6 3.4 9.9 3.9 8.6 0.0 9.9 0.0 ~ In/Hr 11.1 11.1 11.1 5.8 11.1 11.1 11.1 11.1 11.1 11.1 11.1 11.1 Cl 5! Cl Cl Cl ... a !: a cfs In/Hr cfs 5.9 12.5 6.6 5.8 12.5 6.5 0.0 12.5 0.0 30.1 6.6 34.1 7.6 12.5 8.5 6.0 12.5 6.8 5.9 12.5 6.6 6.6 12.5 7.4 7.3 12.5 8.2 4.2 12.5 4.7 4.4 12.5 5.0 0.0 12.5 0.0 4/28/2005 10650007-pond sizing.xis Exhibit C-1 \ ~ ,• • E 0 < E--1 u 0 z ~ -~ ~ 00 E--1 < Q ~ .... E--1 ~ ·~ z 0 0 ~ QJ .... E--1 E--1 E--1 ~ # # Ac. min yr 1 2 0 .6 10.0 10 2 3 1.3 10.2 10 3 s 2 .1 10.3 10 4 s 0.4 10 .0 10 s 7 3 .0 11 .6 10 6 7 O.S 10 .0 10 7 8 4 .0 12.S 10 8 8 .1 4.4 12 .9 100 8 .1 17 .1 4 .4 13.4 100 9 10 .1 0 .4 10.0 10 9 .2 10.1 8 .9 36 .2 10 10 10 .1 0 .7 10 .0 10 10.1 12.1 10 .0 36 .3 10 11 12 .1 O.S 10 .0 10 12 12.1 O.S 10 .0 10 12 .1 14.1 11.1 37 .2 10 13 14 .1 0.4 10.0 10 14 14 .1 0 .3 10.0 10 14.1 16.1 11 .8 38 .1 10 1S 16.1 0 .6 10 .0 10 16 16.1 0.4 10 .0 10 16.1 17 12 .7 39.0 10 17 17.1 13.1 39 .8 100 17 .1 HW17 17.S 40.0 100 18 198 O.S 10 .0 10 19A 198 0 .6 10.0 10 198 21 1.4 10.8 10 20 21 O.S 10 .0 10 21 22 2.S 11 .6 10 22 238 3 .0 12 .1 10 23A 238 0.4 10.0 10 238 26 .1 4 .0 12.4 100 24 2S O.S 10.0 10 25 268 1.1 10.2 10 26A 268 O.S 10.0 10 268 26 .1 2 .2 10.7 100 26 .1 HW26 6 .1 13.2 100 Pond0u1 9 .2 S.2 3S .6 10 1E 2E 0 .7 10.0 10 2E SE 1.2 10 .2 10 3E 4E O.S 10.0 10 4E SE 1.1 10 .2 10 SE 7E 3 .0 11 .0 100 6E 7E 0.4 10.0 100 7E 6E .1 3 .8 11 .6 100 6E .1 9 .2 3 .8 12 .0 100 EXHIBIT C-3 PIPE SIZE CALCULATIONS Pebble Creek Phase 9C, 90 & 9F Q 't ·~ Q « Q QJ « ~ ·~ QJ QJ QJ "' Q. Q. 'C ~ QJ ~ 0 QJ (;j -'C Q. i.. "' QJ ~ QJ = = -=--0 . ..., "'« 'O 'C it: ·-~ .:, it: it: t ~ 0 N =-'C 0 c 0 ·c: .... ;;;J Iii;; <~ z ~ Iii;; 00 ~ ~ ~ cfs cfs # cfs O/o " fps S.1 6.6 1 6.6 0 .46 18 3 .7 11.4 14 .8 1 14.8 0 .49 24 4.7 t ff& =_">!7 .6 1 17.6 0 .21 f 30 3 .6 3 .2 4 .1 1 4 .1 0 .47 1S 3.4 C:24'!2 -24 .~ 1 24.2 0.40 '-30 4 .9 4 .1 S.3 1 S.3 0 .78 1S 4 .3 ... ,.2 1 31 .2 0 .2S £38 4 .4 .. . ., 1 49.4 0 .28 <..42' S.1 •8.6 1 48.6 0 .27 C42 ~ S.O 3 .S 4 .6 1 4 .6 O.S8 1S 3 .7 --.. ~ 1 39.3 0.40 (Jj1 S.6 S.7 7 .3 1 7 .3 1.49 1S 6 .0 C:4a.9 --43.Q 1 43.9 0 .22 @ 4 .6 4.1 6 .1 1 6 .1 1.03 1S S.O 4 .7 6.1 1 6 .1 1.03 1S S.O , ~1 .'! 1 47 .9 (0 .2~ (4~ S.O ·- 3 .1 4.0 1 4 .0 0 .44 1S 3 .3 3 .0 3 .9 1 3 .9 0.42 1S 3 .2 .__ 50.~ 1 S0 .2 ~.zg C-42 S.2 4 .9 6.4 1 6.4 1.14 1S S.2 3 .S 4 .S 1 4 .S O.S6 1S 3 .7 ·--~ 53:6 !>1 S3 .6 (0~3 1 Y"l S.6 a:1 .& 1 81 .6 \.()76 > G i 8 .S 'tOlt!S ~1oe-:-3 1 108 .3 0 .66 A8 8 .6 4 .S S.9 1 S.9 0 .36 1 8 3 .3 4 .8 6 .2 1 6 .2 2 .30 13 6 .8 12.1 1S .7 1 1S .7 O.S6 24 S.O 4 .2 S.S 1 S.S 0 .32 18 3 .1 20 .1 26 .1 1 26 .1 1.54 24 8 .3 ~=8 ·-23.8 1 23 .8 0 .68 t 2H 6 .0 3 .1 4 .0 1 4.0 0 .9S 13 4.4 -~ ;::--48..5 ~1 4S .S 0 .54 l 36l 6.4 4 .7 6 .1 1 6 .1 0 .38 18 3 .4 9 .6 12.S 1 12 .S 1.64 18 7 .1 4 .6 S.9 1 S.9 2 .08 13 6 .4 26 .S 34.4 1 34.4 2.67 24 10 .9 6 8 .4 68 .4 1 68.4 0 .6S box 8 .6 •V ~'9' '"'1 22 .9 0 .36 C:30 ~ 4 .7 S.9 7 .7 1 7 .7 0 .27 21 3 .2 10.S 13.6 1 13 .6 0.42 24 4 .3 -4.6 S.9 1 S.9 0 .16 21 2 .S -·n·~ 9.6' 1 9.6 0 .11 (27 2 .4 ~~!). 36.2 ~1 36.2 0 .34 C:36 S.1 -4 .7 6 .1 1 6 .1 1.02 1S s.o i4A~ -44.3 1 44 .3 O.S1 (3i 6 .3 43:'8 -43.8 1 43 .8 o.so C36 6 .2 *Includes 33 % Flow Increase for pipe sizes <27" dia. •-:See Pian & PrOfi le for pipe slope used (Pipe s fO pe >or= Friction slope) QJ .5 = 'C E--1 = E--1 E--1 = es \!) 'ii ~ E--1 @ z ~ ~ .... ~ i.. ~ ~ ~ E--1 E--1 ' min min ' ' 41 31 292 31 2S6 31 10S 149 224 .3-1 \.33 26S 266 31 291 ri 266'1 JS 322 266 "3"'1 110 1,266'1) 1« 40 1S8 13 247 37 23S 107 13 309 31 239 13 44 154 1SS 30 210 30 S9 210 30 129 130 0 .18 10.18 0 .11 10.29 1.36 11 .6S 0 .1S 10.1S 0 .87 12.S1 0 .12 10 .12 0.40 12 .91 0.48 13.40 0 .74 14.14 0 .14 10 .14 0 .10 36 .2S 0 .74 10 .74 0 .97 37 .22 0 .10 10.10 0 .98 10.98 0 .89 38.11 0 .18 10.18 1.70 11 .70 0 .8S 38.96 0 .10 10.10 O.SO 10.SO 0 .79 39.7S 0.28 40.04 0.08 40.12 0 .79 10.79 0 .03 10.03 0 .82 11 .62 0 .20 10 .20 0.47 12 .09 0 .30 12 .38 O.OS 10.0S 0 .80 13 .19 0 .1S 10.1S O.S6 10.71 0.03 10.03 0 .07 10 .78 0 .30 13.48 4 2 O.SS 36 .1S 0 .16 10.16 0 .81 10.97 0 .20 10.20 0.41 10.61 0 .68 11 .6S 0 .10 10.10 0 .34 11 .99 0 .3S 12 .34 4/28/200S 106S0007-pond sizing .xis Exhibit C-3 l HB ' I I McCLURE & BROWNE ENGINEERING/SURVEYING, INC. July 6 , 2005 1008 Woodcreek Drive, Suite 103 •College Station, Texas 77845 (979) 693-3838 • Fax (979) 693-2554 • Email: rncclure@tca .net Bridgette George Development Coordinator Planning and Development Services, City of College Station College Station , TX 77840 Re .: Pebble Creek Phase 9D & 9F Construction Documents MBESI Proj No.: 1065-0007 Dear Ms . George: Below is the summary of the revisions made per the staffs comments . COMMENT #1 : j ACTION: COMMENT#2: J ACTION: COMMENT#3: }ACTION : COMMENT#4: ACTION : -~---_/_ ··-~: COMM T#6: ACTION : COMMENT#?: ACTION : Off-site easement for water line through Phase For blanket easement will be required prior to construction plan approval. Duly noted. Add s idewalk to Cascades Court and to the PAE between Lots 48 and 49 as noted on Preliminary Plat. A 4 ' sidewalk has been added to Cascades Court and through the Public Access Easement between Lots 48 & 49 . Show conflict with storm sewer (Sht 13, WA-3). The plans have been revised to address this comment. Show conflict with water line (SHT 7, both profiles) The only place the)Nater line crosses the storm drain is in the Storm Drain -N profileY The water line location has been added to that profile. Show conflict with sanitary sewer (SHT 8). The plans have been revised to address this comment. The construction plans will be approved for Phase 9D only. Duly noted. / Plans show previous storm sewer sizes for conflicts (SHT 12, 14). The plans have been revised to address this comment. ~S·~~ L\~ ---i -l ·<JS L\~S5~ COMM T#8: ACTION : COMMENT#9 : ~TION : COMMENT #10 : ~ION: A portion of the 42-inch storm sewer on Sheet 7 is mislabeled HOPE.. / The label has been adjusted to show RCP. The layout of the storm sewer at the end of Olympic Court in the construction documents does not match the drainage report . The Hydraulic Grade Lines and the pipe connections in the Phase 9E drainage report have been updated to match the plans. Drainage Report -A note is provided that indicates flow is increased 33% for pipes in excess of 27 inch diameter, however , the numbers don't appear to reflect that in comparing the unadjusted with adjusted flows columns . The note at the bottom of Exhibit C-3 states the flows are increased by 33% for all pipes under 27". This is done to accomplish a similar result as reducing the cross section of all pipes under 27" by 25%. The adjusted flow column reflects this change. COMMENT #11 : Drainage Report -Many of the pipe lengths in Exhibit C do not match 4 the lengths indicated on the plans. VD ACTION : \ The lengths shown in the Drainage Report were found to match the 6 plans. COMM T#12 : Drainage Report -What do inlets 19A, 198, 26A, and 268 represent? ACTION : Inlets 19 and 26 are low point inlets that accept street flow from two directions. The "A " and "B " drainage area represent the flow to the inlet from the two different directions. COMMENT #13 : ~TION : COMM§NT #14 : V ACTION : COMMENT #15 : Z TION : Sincerely , Drainage Report -Drainage area calculations for Pond Out are not the same as those provided in the drainage report for Phase 9E. Verify. The drainage area calculations have been adjusted in both Phase 9E and 9D to match the outflow from the pond shown in Exhibit E of the Phase 9E Drainage Report. Provide detention pond design information . This information has been added to the Drainage Report for Phase 9E in Exhibit E. If oversize participation is requested , it has to be considered by Council before DP can be issued . Duly noted. ~R:~t.tE M~~LURE & BROWNE ENGINEERING/SURVEYING , INC. WATER & SEWER SYSTEM ANALYSIS FOR PEBBLE CREEK SUBDIVISION PHASES 9D & 9F February 2005 MBESI No. 10650007 WATER AND SEWER SYSTEM ANALYSIS PEBBLE CREEK, PHASES 9D & 9F Area encompassed by this phase: Anticipated land use: Anticipated number of lots : Notes on surrounding development: Primary water supply lin e: Secondary water supply lin es: Software model: Average daily flow: Peaking factor: Estimated peak domestic demand: Estimated fire demand: Pipe material: Most Hydraulically R emote Point: General Information 36.4 acres Single family residential 79 lots The area surrounding the site is partially developed with existing phases of Pebble Creek to the north, undeveloped phases of Pebble Creek to the west, undeveloped property owned by Animate Habitat to the south, and property owned by the City of College Station (Lick Creek Park) to the east. Water System Analysis Existing 12" line on Pebble Creek Pkwy Existing 8" line on Cascades Dr. & 6" line on Quaker Ridge PIPE2000 (Kentucky Pipe Network Model) 267 gpd (0.185 gpm) per residential lot 4.0 0.75 gpm per residential lot 1000 gpm PVC (C909) Node #9Dl (This point was determined by calculating the lo west pressure under static conditions. -See Exhibits A & D) Table of Results R egu lated Items , I As I R . , D . d ! equi rement : Notes esi e ! : _ _t.vfin. Pr~~~~r.~J~_D_____ 96.58~· 20 i Fire flow conditions _____ _ -~fax. V~g~i!2'. {fps) ------------~~~~:--ft i Fire flow conditio~s _M_axJ;~~p-~~~I?:g!h -x:_Cf!) 370 _J 500 _l;------- _ _Max . P~p~-~~1?:g!h-6" (ft) 466 -1--SOO-· ! Dead-end line Max. Pipe Length -6" (ft) 820 1500 i With connections on both ends Conclusion: The proposed water system exceeds the requirements of TCEQ and the Cities of Bryan and College Station Applicable Exhibits: Exhibit A Schematic Water System Layout Exhibit B City of College Station Fire Flow Test Report 1 Exhibit C City of College Station Fire Flow Test Report 2 Exhibit D PIPE2000 Model Output for Pebble Creek 9D & 9F (static) Exhibit E PIPE2000 Model Output for Pebble Creek 9D & 9F (fire flow) Pebble Creek, Pha ses 90 & 9F Pa ge l of2 MBESI #10650007 General Note: Primary outfall lin e: Software model: Average daily flow : P eaking factor : Pipe Material: Manning 's N valu e: Spreadsh eet Notes: Conclusion: Applicable Ex hibits: Sewer System Analysis This sewer system is the same one that was submitted with Phase 9E . The lots in that phase accounted for only a portion of the capacity for the entire system. It was designed to accommodate Phases 9D, 9E , 9F and future phase 9C. Existing 16 " near the southern property line of Phase 9D Microsoft EXCEL Spreadsheet based on Manning's Equation 267 gpd per residential lot 4.0 PVC (D3034 and D2241) 0.013 The spreadsheet in Exhibit H computes the minimum slope of the lines needed to carry water at 2 .5 feet per second or faster . If that slope is less than the minimum slope required by the Cities of Bryan and College Station, the calculated slope value appears in red and indicates that the line has adequate capacity even when laid on the minimum slope All of the lines in the spreadsheet on Exhibit H have computed slopes shown in red that are less than the minimum required by the Cities of Bryan and College Station. Therefore, we conclude that the lines are adequately sized and will easily carry the sewage flows that are expected to pass through them. Exhibit F Schematic Sewer System Layout Exhibit G Sewer Model Spreadsheet Exhibit H Copy of Letter to TCEQ Pebbl e Creek , Ph ases 9 0 & 9F Page 2 of2 MBESI #10650007 DEVELOPMENT PERMIT PERMIT NO. 05-05 CITY OF COLLEGE STATION Planning & Developmem &rvicts FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE SITE LEGAL DESCRIPTION: Pebble Creek Subdivision Phase 9D All Lots DATE OF ISSUE: 07/18/05 OWNER: Pebble Creek Development Co -Davis Young 4500 Pebbel Creek Parkway SITE ADDRESS: Congressional and Pebble Creek Parkway DRAINAGE BASIN: Alum Creek VALID FOR 9 MONTHS CONTRACTOR: College Station , Texas 77845 TYPE OF DEVELOPMENT: Full Development Permit SPECIAL CONDITIONS: All construction must be in compliance with the approved construction plans All trees required to be protected as part of the landscape plan must be completely barricaded in accordance with Section 7.5.E., Landscape/Streetscape Plan Requirements of the City's Unified Development Ordinance , prior to any operations of this permit. The cleaning of equipment or materials within the drip line of any tree or group of trees that are protected and requ ired to rema in is strictly prohibited . The disposal of any waste material such as , but not limited to , paint, oil, solvents, asphalt, concrete, mortar, or other harmful liquids or materials within the drip line of any tree required to remain is also prohibited . ****TCEQ PHASE II RULES IN EFFECT**** The Contractor shall take all necessary precautions to prevent silt and debris from leaving the immed iate construct ion site in accordance with the approved erosion control plan as well as the City of College Station Drainage Policy and Design Criteria . If it is determined the prescribed erosion control measures are ineffective to retain all sediment onsite, it is the contractors responsibility to implement measures that will meet City, State and Federal requirements . The Owner and/or Contractor shall assure that all disturbed areas are sodden and establishment of vegetation occurs prior to removal of any silt fencing or hay bales used for temporary erosion control. The Owner and/or Contractor shall also insure that any disturbed vegetat ion be returned to its original condition, placement and state . The Owner and/or Contractor shall be responsible for any damage to adjacent properties , city streets or infrastructure due to heavy machinery and/or equipment as well as erosion, siltation or sedimentation resulting from the permitted work. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that debris from construction, erosion, and sedimentation shall not be deposited in city streets , or existing drainage facilities. I hereby grant this permit for development of an area outside the special flood hazard area. All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer in the development permit application for the above named project and all of the codes and ordinances of the City of College Station that apply. D'7-LB--o £ Date •• Pebble Creek, P ha se 9D & 9F R evised Engineer's Estimate July 14, 20 05 Item Description Unit Quantity Unit Price Total Pavement Construction 1 Clearing and Grubbing Acre 6 .8 3,000.00 20 ,400 2 Excavation C .Y. 11 ,776 3.75 44 ,160 3 1.5" HMAC Surface Course S.Y. 16 ,420 5 .75 94 ,415 4 6" Lime Stabilized Subgrade S.Y. 21 ,171 3.50 74 ,099 5 Extra Lime Ton 115 100 .00 11 ,500 6 6" Crushed Limestone Base S.Y. 16 ,420 7 .25 119 ,045 7 All Types Curb and Gutter L.F. 9,217 8.50 78 ,345 8 Concrete Apron and Knuckle S.Y. 1,447 33.00 47 ,751 9 4" Sidewalk S.F . 23 ,408 3 .00 70,224 10 Sidewalk Ramps S.F. 874 8 .00 6,992 11 Type ill Barricade EACH 8 500.00 4,000 Paving Subtotal 570 ,930 Drainage System Construction 12 15" Reinf. Concrete Pipe, Str. Backfill L.F. 167 39 .00 6 ,513 13 18" Reinf. Concrete Pipe, Str. Backfill L.F. 506 43 .00 21 ,758 14 18" IIDPE Pipe, Non Str. Backfill L.F. 134 35 .00 4,690 15 21 " Reinf. Concrete Pipe, Str. Backfill L.F. 288 50 .00 14 ,400 16 24" Reinf. Concrete Pipe, Str. Backfill L.F. 517 54.00 27 ,918 17 24 " Reinf. Concrete Pipe, Non Str. Backfill L .F . 44 50 .00 2,200 18 27" Reinf. Concrete Pipe, Str. Backfill L.F . 460 60 .00 27 ,600 19 30" Reinf. Concrete Pipe, Str. Backfill L.F. 64 67.00 4,288 20 30" Reinf. Concrete Pipe, Non Str. Backfill L.F. 296 63.00 18 ,648 21 36" Reinf. Concrete Pipe, Str. Backfill L.F. 489 90 .00 44 ,010 22 36" Reinf. Concrete Pipe, Non Str. Backfill L.F. 533 85 .00 45 ,305 23 42" Reinf. Concrete Pipe, Str. Backfill L.F. 985 115 .00 113 ,275 24 42" Reinf. Concrete Pipe, Non Str. Backfill L.F. 144 105 .00 15 ,120 25 48" Reinf. Concrete Pipe, Non Str. Backfill L.F. 22 125 .00 2,750 25 4'x 2' Reinf. Cone . Box Culvert, Non Str. Backfill L.F. 154 200 .00 30 ,800 26 4' Wide Flume L.F . 155 25 .00 3,875 27 10' Curb inlet EACH 12 3 ,000 .00 36 ,000 28 5' Curb inlet EACH 14 2,300 .00 32 ,200 29 Standard junction box EACH 3 2,500 .00 7,500 30 Storm Drain Manhole (0-8' depth) EACH 2 2 ,200 .00 4,400 31 Storm Drain Manhole (8'-10" depth) EACH 3 2 ,500.00 7,500 32 45 degree Bend for 27" RCP EACH 1 1,000 .00 1,000 33 45 degree bend for 4'x 2' RCBC EACH 1 2,500 .00 2,500 34 Sloped headwall for 4'x 2' RCBC EACH 1 3,000 .00 3,000 35 Sloped headwall for 48" RCP EACH 1 1,800 .00 1,800 36 Sloped headwall for 18" IIDPE EACH 2 500 .00 1,000 Page 1 of 3 MBESI 10650007 Item 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 Pebble Creek, Phase 9D & 9F Revised Engineer's Estimate July 14, 2005 Description Unit Quantity Inlet Protection EACH 26 Dry Rip Rap S .F . 1,935 Fibermulch Seeding S .Y. 10 ,980 Silt Fence L.F. 2,335 Construction Exit EACH 2 Stormwater Pollution Prevention Plan (SWPPP) Lump Sum Unit Price 75 .00 5 .50 0 .50 2 .00 1,500 .00 4,000 .00 Drainage System Subtotal Water System Construction 3" PVC, D2241 Water Line, Str. Backfill L.F. 804 15 .00 3" PVC, D2241 Water Line, Non-Str. Backfill L .F . 520 10.00 6" PVC, C909 Water Line, Str. Backfill L.F. 1,797 24 .00 6" PVC, C909 Water Line, Non-Str. Backfill L.F. 510 20 .00 8" PVC, C909 Water Line, Str. Backfill L.F. 906 28 .00 8" PVC, C909 Water Line, Non-Str. Backfill L.F. 1,007 22 .00 Fire Hydrant Assembly EACH 6 2,600 .00 8" Gate Valve EACH 8 800 .00 6" Gate Valve EACH 5 650 .00 2" Blow-Off Assembly EACH 7 600 .00 8" x 13" Anchor Coupling EACH 9 225 .00 6" x 13" Anchor Coupling EACH 8 150 .00 8"x 8" Cross EACH 1 700 .00 8 "x 6" Cross EACH 1 600 .00 6 "x 3" Reducer EACH 4 200 .00 8 " x6" Tee EACH 2 400 .00 8" x 1.5" Tapped Tee EACH 5 200 .00 6" x 1.5'' Tapped Tee EACH 1 150 .00 3" x 2" Tapped Tee w/reducer EACH 1 125 .00 6" x 45 degree bend EACH 4 300 .00 1.5" Water service (long) EACH 12 1,000 .00 1.5" Water service (short) EACH 17 500 .00 l" Water service (long) EACH 11 850 .00 l " Water service (short) EACH 11 400 .00 Water System Construction Sewer System Construction 6" PVC, D-3034, Str. Backfill 5'-8' cut L.F. 514 34 .00 6 " PVC, D-3034, Str. Backfill 8'-10' cut L.F. 302 36.00 6" PVC, D-3034, Str. Backfill 10'-12' cut L.F. 80 38.00 6" PVC, D-3034 , Non-Str. Backfill 0-5' cut L.F. 42 17 .00 6" PVC, D-3034, Non-Str . Backfill 5'-8' cut L.F. 1,2 15 18 .00 Page 2 of3 Total 1,950 10 ,643 5,490 4,670 3,000 4,000 509 ,803 12 ,060 5,200 43 ,128 10 ,200 25 ,368 22 ,154 15 ,600 6 ,400 3,250 4,200 2,025 1,200 700 600 800 800 1,000 150 125 1,200 12 ,000 8 ,500 9,3 50 4,400 190 ,410 17 ,476 10 ,872 3,040 714 21 ,870 MBESI 10650007 ' . Item 72 73 74 75 76 77 · 78 79 80 81 82 83 84 85 86 87 Pebble Creek, Phase 9D & 9F Revised Engineer's Estimate July 14, 2005 Description Unit Quantity 6" PVC, D-3034 , Non-Str. Backfill 8-10' cut L.F. 1,236 6" PVC, D-3034, Non-Str . Backfill 10'-12" cut L.F. 161 6" PVC, D-3034, Non-Str. Backfill 12'-14" cut L.F. 374 6" PVC, D-2241 , Str. Backfill 5-8' cut L.F. 20 6" PVC, D-2241 , Str. Backfill 8-10' cut L.F. 40 Standard Manhole, 6-8 ft deep EACH 5 Standard Manhole, 8-10 ft deep EACH 3 Standard Manhole, 10-12 ft deep EACH 1 Standard Manhole, 12-14 ft deep EACH 1 Drop Manhole 14'-16' (single incoming drop) EACH 2 Drop Manhole 18'-20' (dual incoming drops) EACH 1 Drop Manhole 20'-22' (dual incoming drops) EACH 1 Standard Clean Out EACH 4 4" Sewer Service (long) EACH 25 4" Sewer Service (short) EACH 16 Trench Safety (sewer) L.F. 2,829 Unit Price 21.00 24 .00 27 .00 20 .00 22.00 2,6 00 .00 2,800 .00 3,000 .00 3,300.00 4,500 .00 5,800 .00 6,500 .00 500 .00 1,3 00 .00 600 .00 2 .00 Sewer System Subtotal Total Estimated Cost Page 3 of3 Total 25,956 3,864 10 ,098 400 880 13 ,000 8,400 3,000 3,300 9,000 5,800 6 ,500 2,000 32,500 9,600 5,658 193 ,928 I s1,46s,011 MBESI 10650007 From: To: Date: Subject: Jeff, Alan Gibbs Robertson, Jeff 5/5/2005 1 :34 :48 PM Fwd : Pebble Creek 90 , 9E , & 9F Additionally, with regard to participation , a few things must be demonstrated : 1. The City is requiring a design that is an oversizing of infrastructure over what is generally acceptable and needed for the development. So, both designs and associated engineer's estimates need to be submitted ; and 2. A quantified request for OP also needs to be submitted . With regard to drainage , the City will only consider OP for a maximum 30% of all drainage pipe or box costs (satisfying the item above) for sizes in excess of 24-inches in diameter, not including inlets , flumes, pavement, etc. Thanks , Alan »>Alan Gibbs 5/5/2005 10 :50 :08 AM»> Jeff, I have reviewed the drainage calculations and I have a few comments , primarily on Exhibit C-3 : 1. A note is provided that indicates flow is increased 33% for pipes in excess of 27 inch diameter, however the numbers don't appear to reflect that in comparing the Unadjusted and adjusted flows columns . 2. Some of the friction slopes appear too small in comparison with the plans , i.e . reaches : 12 .1 -14.1 , 14 .1-16.1 ,16 .1 -17 , and 17 -17 .1. 3. Some of the pipe lengths do not match the plans , i.e . reaches : 9.2 -10 .1, 12.1 -14 .1, 14 .1 -16 .1, and 16.1 -17 . I haven't fully reviewed the plans , however , I did have two additional questions : 4. A descrepency in labeling a storm sewer as HOPE in profile on sheet 7. Similarly , please verify the only HOPE proposed is the temporary culvert at the end of St. Andrews Drive . 5. Have easements been acquired from Animate Habitat in the vicinity of Riviera Ct. and Ballybunion Ct.? Contact me by phone or email to discuss further. Thanks , Alan CC: Smith , Mark From: To: Date: Subject: Alan Gibbs Sm ith , Mark 51512005 11 :00 :56 AM Fwd : Pebble Creek 90 , 9E , & 9F Mark, additionally , their cover letter s imply asks , "Ou r client is interested in knowing the amount the C ity is willing to participate in the proposed storm drain system ." The submitted engineer's estimates are summarized as follows : Phase 90 -this is the phase adjacent to Animate Habitat the reroute would go through pavement $334 ,097 drainage $357,76 1 water $150 , 985 sewer $106 . 174 total $949 ,017 Phase 9E pavement $111,421 drainage $103 ,786 water $50 ,560 sewer $60,908 total $326 ,675 »> Alan Gibbs 5/5/2005 10:50 :08 AM »> Jeff, I have rev iewed the drainage calculations and I have a few comments , primarily on Exhibit C-3 : 1. A note is provided that indicates flow is increased 33% for p ipes in excess of 27 inch d iameter, however the numbers don 't appear to reflect that in comparing the Unadjusted and ad j usted flows columns . 2 . Some of the friction slopes appear too small in comparison with the plans , i.e. reaches : 12 .1 -14 .1, 14 .1-16.1,16.1 -17 , and 17 -17.1. 3. Some of the pipe lengths do not match the plans , i.e . reaches : 9 .2 -10.1, 12 .1 -14.1, 14 .1 -16 .1, and 16 .1 -1 7. I haven 't fully reviewed the plans , however, I did have two add itional questions : 4 . A descrepency in labeling a storm sewer as HOPE in profile on sheet 7 . Similarly , please verify the only HOPE proposed is the temporary culvert at the end of St. Andrews Drive . 5. Have easements been acquired from Animate Habitat in the vicinity of Riviera Ct. and Ballybunion Ct.? Contact me by phone or email to d iscuss further. Thanks , Alan 4-d-9 --0 3:sa- McCLURE & BROWNE ENGINEERING/SURVEYING, INC. ~ 1008 Woodcreek Drive, Suite 103 • College Station, Texas 77845 (979) 693-3838 •Fax (979) 693-2554 •Email: mcclurebrowne@verizon.net TO: TRANSMITTAL LETTER Alan Gibbs, PE Assistant City Engineer City of College Station DATE: April 28 , 2005 RE: Pebble Creek Phase 9D , 9E, & 9F Phone: 764-3570 Fax: 764-3496 PRJT No.: 1065-0006 ATTACH . DESCRIPTION 1 . Cover Letter 2. Revised Set of Phase 9E Plans 3. Revised Set of Phase 9D & 9F Plans 4 . Drainage Calculations for New Storm Drain System 5. Revised Cost Estimate THESE ARE BEING SENT : o At your request o For your signature o For your approva l oFor _________ _ REMARKS: o For your i nformation o For further action as noted 181 For rev iew and comment o At request of ______ _ If you have any questions or need any additional info rmation , pie F:\1065 -Davis Young\0006 -Pebble Creek -Pha se 9E\Correspondence\COCS -Gibbs01 -Tletter.wpd o Per our conversation o Per contract o For your use o Original will follow by mail McCLURE & BROWNE ENGINEERING/SURVEYING, INC. 1008 Woodcreek Drive, Suite 103 • College Station, Texas 77845 (979) 693-3838 • Fax (979) 693-2554 • Email: mcclurebrowne2 @verizon.net April 28 , 2005 Alan Gibbs, PE Development Engineer Planning and Development Services , City of College Station College Station , TX 77840 Re.: Pebble Creek Subdivision , Revised Phase 9D & 9E Construction Plans Dear Mr. Gibbs : Attached to this letter please find a copy of the revised construction plans for Pebble Creek, Phases 9D & 9E. The revised plans show how the storm drain originally designed to be placed in Durban Court has been re-aligned . The new alignment will convey the stormwater from Phase 9E to the south through Phase 9D and to Alum Creek . A copy of the new drainage calculations and cost estimate are included with the plans . Our client is interested in knowing the amount the City is willing to participate in the proposed storm drain system. Please review the attached documents and let us know any comments that you have . Sincerely, ~lf/f;y E tdt 1 URE & BROWNE ENGINEERING/SURVEYING, INC. Item 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 3 1 32 33 34 35 36 37 38 39 Pebble Creek, Phase 9D Revised Engineer's Estimate April 28, 2005 Description Unit Quantity Unit Price Pavement Construction Clearing and Grubbing Acre 5 .5 3,000 .00 Excavation C.Y. 7 ,229 3 .75 1.5" HMAC Surface Course S.Y. 9 ,667 5.50 6 " Lime Stabilized Subgrade S.Y. 12 ,622 3.50 Extra Lime Ton 70 100.00 7" Crushed Limestone Base S.Y. 2,505 8 .50 6" Crushed Limestone Base S.Y. 7 ,162 7 .25 All Types Curb and Gutter L.F . 5,430 8 .50 Concrete Apron and Knuckle S.Y. 940 33 .00 4" Sidewalk S .F . 10 ,257 3 .00 Sidewalk Ramps S.F. 435 8 .00 Type III Barricade EACH 3 500.00 Paving Subtotal Drainage System Construction 15 " Reinf. Concrete Pipe, Str. Backfill L.F. 167 35 .00 18" Reinf. Concrete Pipe, Str. Backfill L.F . 41 42 .00 18" HDPE Pipe, Non Str. Backfill L .F . 134 33 .00 21" Reinf. Concrete Pipe, Str. Backfill L.F . 0 45 .00 24" Reinf. Concrete Pipe, Str. Backfill L.F. 323 58 .00 27" Reinf. Concrete Pipe, Str. Backfill L.F . 361 60 .00 30" Reinf. Concrete Pipe, Str. Backfill L.F . 64 70 .00 30" Reinf. Concrete Pipe, Non Str. Backfill L.F. 296 60 .00 36" Reinf. Concrete Pipe, Str. Backfill L.F. 489 95 .00 36" Reinf. Concrete Pipe, Non Str. Backfill L .F. 224 85 .00 42" Reinf. Concrete Pipe, Str. Backfill L.F. 984 115.00 42 " Reinf. Concrete Pipe, Non Str. Backfill L.F. 144 105 .00 48" Reinf. Concrete Pipe, Non Str. Backfill L.F. 22 125 .00 4' Wide Flume L.F. 145 10.00 1 O' Curb inlet EACH 6 3,000 .00 5' Curb inlet EACH 11 2,600 .00 Standard junction box EACH 2 2,500 .00 Storm Drain Manhole (0-8 feet depth) EACH 2 2 ,200 .00 Storm Drain Manhole (8-10 feet depth) EACH 3 2 ,500 .00 Sloped headwall for 48" RCP EACH 1 2 ,000.00 Sloped headwall for 18" HDPE EACH 2 750 .00 Inlet Protection EACH 17 75 .00 Dry Rip Rap S .F . 1,800 5 .00 Fibermulch Seeding S.Y. 3,355 0 .50 Silt Fence L.F . 1,3 55 2 .00 Construction Exit EACH 1 1,500 .00 Stormwater Pollution Prevention Plan (SWPPP) Lump Sum 1 2,000 .00 Drainage System Subtotal Page 1 of3 Total 16 ,500 27 ,109 53 ,169 44 ,177 7 ,000 21 ,293 51 ,925 46 ,155 31 ,020 30 ,771 3,480 1,500 334 ,097 5,845 1,722 4 ,422 0 18 ,734 21 ,660 4,480 17 ,760 46 ,455 19 ,040 113 ,160 15 ,120 2,750 1,450 18 ,000 28 ,600 5,000 4,400 7,500 2 ,000 1,500 1,275 9,000 1,678 2,710 1,500 2,000 357,761 MBESI l 0650007 .J Item 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 Pebble Creek, Phase 9D Revised Engineer's Estimate April 28, 2005 Description Unit Quantity Unit Price Water System Construction 3" PVC, D2241 Water Line, Str. Backfill L.F. 614 15 .00 6" PVC, C909 Water Line, Str. Backfill L.F . 1,644 24 .00 6" PVC, C909 Water Line, Non-Str. Backfill L.F . 127 20 .00 8" PVC, C909 Water Line, Str. Backfill L.F. 906 28 .00 8" PVC, C909 Water Line, Non-Str. Backfill L.F. 1,007 23.00 Fire Hydrant Assembly EACH 4 2,600 .00 811 Gate Valve EACH 8 850 .00 6tl Gate Valve EACH 3 650.00 2tl Blow-Off Assembly EACH 3 650 .00 l ti Blow-Off Assembly EACH 1 450 .00 8" x 13" Anchor Coupling EACH 8 225 .00 6 ti x 13 ti Anchor Coupling EACH 5 150 .00 8tlx 8tl Cross EACH 1 700 .00 8tlx 6tl Cross EACH 1 600 .00 6 "x 3 ti Reducer EACH 2 200 .00 8tl x 6" Tee EACH 2 400 .00 8" x 1.5" Tapped Tee EACH 5 200.00 6" x 45 degree bend EACH 4 300 .00 1.5'' Water service (long) EACH 8 1,000.00 1.5'' Water service (short) EACH 14 500 .00 1" Water service (long) EACH 5 850 .00 l" Water service (short) EACH 8 400 .00 Water System Construction Page 2 of3 Total 9,210 39,456 2,540 25 ,368 23 ,161 10 ,400 6 ,800 1,950 1,950 450 1,800 750 700 600 400 800 1,000 1,200 8,000 7 ,000 4 ,250 3 ,200 150 ,985 MBESI 106 50007 Item 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 Pebble Creek, Phase 9D Revised Engineer's Estimate April 28, 2005 Description Un it Quantity Unit Pri ce Sewer System Construction 6" PVC, D-3034, Str. Backfill 5'-8' cut L.F. 42 30 .00 6" PVC, D-3034, Str. Backfill 10'-12' cut L.F. 64 40 .00 6" PVC, D-3034, Non-Str. Backfill 5'-8' cut L .F. 173 25 .00 6" PVC, D-3034 , Non-Str. Backfill 8-10' cut L.F. 690 27 .00 6" PVC, D-3034 , Non-Str. Backfill 10'-12" cut L.F. 24 30 .00 6" PVC, D-2241 , Str. Backfill 8-10' cut L.F. 20 32 .00 8" PVC , D-3034 , Str. Backfill 5'-8' cut L.F. 74 32 .00 8" PVC, D-3034, Non-Str. Backfill 5'-8' cut L.F. 506 30.00 8" PVC, D-2241 , Non-Str. Backfill 5-8' cut L.F. 20 30 .00 8" PVC , D-3034, Str. Backfill 8-10' cut L.F. 57 42 .00 8" PVC, D-3034, Non-Str. Backfill 8-10' cut L.F. 97 29 .00 8" PVC, D-3034, Str. Backfill 10-12' cut L.F. 81 50 .00 8" PVC, D-3034, Non-Str. Backfill 12-14' cut L.F. 360 42 .00 Standard Manhole, 5-8 ft deep EACH 2 2,800 .00 Standard Manhole, 8-10 ft deep EACH 2 3,000 .00 Standard Manhole, 10-12 ft deep EACH 1 3,200 .00 Double Drop Manhole 18-20 feet deep EACH 1 5,000 .00 Standard Clean Out EACH 1 500 .00 4" Sewer Service (long) EACH 6 1,300 .00 4" Sewer Service (short) EACH 5 600 .00 Trench Safety (sewer) L.F. 2,208 2 .00 Sewer System Subtotal Total Estimated Cost Page 3 of 3 Total 1,260 2,560 4,3 25 18 ,630 720 640 2,366 15 ,180 600 2,394 2,813 4,050 15 ,120 5,600 6 ,000 3,200 5,000 500 7,800 3,000 4,416 106 ,174 $949,017 MBESI 10650007 Item 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 Pebble Creek, Phase 9E Revised Engineer's Estimate April 28, 2005 Description Unit Quantity Unit Price Pavement Construction Clearing and Grubbing Acre 1.01 3,000 .00 Excavation C.Y. 2,234 3 .75 1.5" HMAC Surface Course S.Y. 3,120 5.50 6" Lime Stabilized Subgrade S.Y. 4 ,063 3 .50 Extra Lime Ton 50 100 .00 6" Crushed Limestone Base S .Y. 3,120 7 .25 All Types Curb and Gutter L.F. 1,933 8 .50 Concrete Apron and Knuckle S.Y. 249 33 .00 4" Sidewalk S .F. 4,601 3.00 Sidewalk Ramps S.F. 195 8 .00 Type ill Barricade EACH 2 500.00 Paving Subtotal Drainage System Construction 15" Reinf. Concrete Pipe, Str. Backfill L.F. 31 39 .00 21" Reinf. Concrete Pipe, Str. Backfill L.F. 62 45 .00 21" Reinf. Concrete Pipe, Non Str. Backfill L.F. 175 42 .00 24" Reinf. Concrete Pipe, Str. Backfill L.F. 109 58 .00 24" Reinf. Concrete Pipe, Non Str. Backfill L.F. 101 55.00 27" Reinf. Concrete Pipe, Str. Backfill L.F. 59 60.00 27" Reinf. Concrete Pipe, Non Str. Backfill L.F. 20 57 .00 30" Reinf. Concrete Pipe, Non Str. Backfill L.F. 93 60 .00 36" Reinf. Concrete Pipe, Str. Backfill L .F . 155 95.00 36" Reinf. Concrete Pipe, Non Str. Backfill L.F. 175 85.00 10' Curb inlet EACH 1 3,000 .00 5' Curb inlet EACH 7 2,600 .00 Standard Junction Box EACH 1 2,200.00 Storm Drain Manhole (0-8 feet depth) EACH 2 2 ,200 .00 Storm Drain Manhole (8-10 feet depth) EACH 1 2,500 .00 Sloped HW for 27" RCP EACH 1 1,200 .00 Inlet Protection EACH 8 75 .00 Fibermulch Seeding S.Y. 7 ,200 0 .50 Silt Fence L.F. 750 2 .00 Construction Exit EACH 1 1,500 .00 Stormwater Pollution Prevention Plan (SWPPP) Lump Sum 1 2 ,000 .00 Drainage System Subtotal Page 1 of2 Total 3,030 8,378 17 ,162 14 ,221 5,000 22 ,620 16,431 8,217 13 ,803 1,560 1,000 111 ,421 1,209 2,790 7 ,350 6 ,322 5,555 3,540 1,140 5,580 14 ,725 14 ,875 3,000 18 ,200 2,200 4 ,400 2 ,500 1,200 600 3 ,600 1,500 1,500 2 ,000 103 ,786 Pebble Creek, Phase 9E Revised Engineer's Estimate April 28, 2005 Item Description Unit Quantity Unit Pri ce Water System Construction 33 3" PVC, D2241 Water Line, Str. Backfill L.F. 309 15 .00 34 6" PVC, C909 Water Line, Str. Backfill L.F. 160 24 .00 35 8" PVC, C909 Water Line, Str. Backfill L.F . 715 28 .00 36 8" DIP , Cl 350 Water Line, Str. Backfill L.F . 20 32.00 37 Fire Hydrant Assembly EACH 1 2,600.00 38 8" Gate Valve EACH 3 850 .00 39 6" Gate Valve EACH 2 650 .00 40 2" Blow-Off Assembly EACH 2 650 .00 41 1" Blow-Off Assembly EACH 1 450 .00 42 8" x 13" Anchor Coupling EACH 3 225 .00 43 6" x 13" Anchor Coupling EACH 5 150 .00 44 8"x 6" Reducer EACH 1 250 .00 45 6"x 3" Reducer EACH 1 200.00 46 8" x 6" Tee EACH 3 400 .00 47 6" x 45 degree bend EACH 2 300 .00 48 1.5" Water service > 20 ft. (avg .= 49 ft.) EACH 4 1,000 .00 49 1.5" Water service S 20 ft. (avg.= 3 ft.) EACH 2 500 .00 50 1" Water service > 20 ft. (avg.= 44 ft.) EACH 5 400 .00 51 l" Water service S 20 ft. (avg.= 3 ft.) EACH 3 850 .00 Water System Construction Sewer System Construction 52 8" PVC, D-3034 , Str. Backfill 5'-8' cut L.F . 53 8" PVC, D-3034 , Non-Str. Backfill 5'-8' cut 54 8" PVC , D-2241 , Non-Str. Backfill 5-8' cut 55 8" PVC, D-3034 , Non-Str . Backfill 8-10' cut 56 8" PVC, D-3034, Non-Str. Backfill 10'-12" cut 57 Standard Manhole, 5-8 ft deep 58 Standard Manhole, 8-10 ft deep 59 Standard Clean Out 60 4" Sewer Service> 20 ft. (avg. = 48 ft.) 61 4" Sewer Service S 20 ft. (avg. = 7 ft.) 62 Trench Safety (sewer) L.F . L.F . L .F . L.F . EACH EACH EACH EACH E ACH L.F . 138 32 .00 666 30 .00 20 32 .00 156 29 .00 108 34 .00 4 2,800 .00 1 3,000 .00 1 500.00 5 600.00 6 1,3 00 .00 1,088 2 .00 Sewer System Subtotal Total Estimated Cost Page 2 of2 To tal 4,635 3,840 20 ,020 640 2,600 2,550 1,300 1,300 450 675 750 250 200 1,200 600 4,000 1,000 2,000 2,550 50 ,560 4,416 19 ,980 640 4,524 3,672 11 ,200 3,000 500 3,000 7,800 2,176 60 ,908 $326,675 Exhibit B Pebble Creek Phases 9D & 9F City of College Station Fire Flow Test Report 1 Flow Test Report Date: ~-3-oL/ Time: 0 °I.' Lf(} Test made by: L ?;-:; ~£: Location: .~t211 &y:.r&/ ~L&?J Purpose of test: Flow Test Representative: City of College Station Witness: A !rA/~.5 , L (!.;/ 7 Flow Hydrant #: /L-c; f?/ Nozzle size: 2 .S- Pitot reading: _ _,_7-=S-___ G.P.M.: It/~~ Static Hydrant#: tl-o~~ Static PSI: /0 t" Residual PSI: /(} h Comments: --------------------- Date: ~ .3-oc/ Exhibit C Pebble Creek Phases 9D & 9F City of College Station Fire Flow Test Report 2 Flow Test Report Time: O 9-' .2 s;- Test made by: __ f~_,c_/,~..L./..LJ:;-.a"k~..!:....A--=----------'---- Location: ~ /ltclse di ~t:rS.sJCl/Vt/ Purpose of test: Flow Test Representative: City of College Station Witness: A3. k0 / h."9#<s.5 Flow Hydrant#: LL -/C/2-Nozzle size: 2 , S- Pitot reading: ~ff't"'---'-0~--G.P.M.: /S-LJO Static Hyckant #: L/-I ${3 Static PSI: /I A Residual PSI: --4-9__,..,6~-- * * * * * * * * * * K Y P I P E 4 * * * * * * * * * * * * * * * * University of Kentucky Network Modeling Software Copyrighted by KPFS 1998 Version 2.000 -04/24/2003 * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * Date & Time: Thu Feb 03 08:54:13 2005 INPUT DATA FILENAME --------------F:\1065-D-1\0006-P-l\Design\KyPipe\Pebble\Pebblle .DT2 TABULATED OUTPUT FILENAME--------F:\1065-D-l\0006-P-l\Design\KyPipe\Pebble\Pebblle-.OT2 POSTPROCESSOR RESULTS FILENAME ---F:\1065-D-l\0006-P-l\Design\KyPipe\Pebble\Pebblle=.RS2 ************************************************ S U M M A R Y 0 F 0 R I G I N A L DAT A ************************************************ U N I T S S P E C I F I E D FLOWRATE ........... . HEAD (HGL ) ......... . PRESSURE ........... . p I p E L I N E D AT A STATUS CODE: xx -CLOSED p I p E NODE N A M E #1 gallons/minute feet psig PIPE CV -CHECK VALVE NAMES LENGTH DIAMETER #2 (ft) (in) ROUGHNESS COEFF. MINOR LOSS COEFF. ------------------------------------------------------------------------------- P-1 FH (U-041) J-1 375.00 6.07 119. 4518 2.70 P-2 J-9E3 J-9Dl 250.00 8.07 119. 4518 2.10 P-4 J-9D7 J-9Fl0 315.00 8.07 119. 4518 2.20 P-5 J-9Fl0 J-9Fl3 285.00 8.07 119.4518 2.20 P-6 J-9Fl3 J-9Fl6 275.00 8.07 119. 4518 2.60 P-7 J-9Fl6 J-9Fl7 185.00 8.07 119. 4518 3.20 P-10 J-9D4 J-9D5 385.00 6.07 119.4518 2.10 P-11 J-9D7 J-9D8 275.00 6.07 119. 4518 2.10 P-12 J-9F10 J-9Fll 240.00 6.07 119.4518 2.10 P-13 J-9Dl J-9D4 830.00 6.07 119. 4518 4.10 P-14 J-9D4 J-9D7 315.00 8.07 119. 4518 2.60 P-15 J-9F13 J-9F14 250.00 6.07 119. 4518 2.10 P-16 J-9El J-9E2 215.00 8.07 119. 4518 2.10 P-17 J-9D5 J-9D6 345.00 3.07 119. 4518 0.70 P-18 FH (U-14) J-3 390.00 6.07 119. 4518 3.30 P-19 J-9E3 J-9E4 320.00 3 .07 119. 4518 2 .20 P-20 J-9D4 J-9D3 155.00 8.07 119.4518 2.20 P-25 J-1 J-2 310.00 6.07 119.4518 2.60 P-3 J-9Dl J-9D7 570.00 1. 05 120.0000 1. 80 P-30 J-9D8 J-9D9 400.00 3.07 119. 4518 0.70 P-31 J-9Fll J-9F12 370.00 3.07 119. 4518 0.70 P-32 J-9F14 J -9F15 355.00 3.07 119.4518 0.70 P-33 J-2 J-3 875.00 6.07 119. 4518 2.40 ~ P-35 J-9E2 J-9E3 205.00 8.07 119. 4518 2.10 ~ P-8 J-9F17 FH (U-14) 785.00 6.07 119.4518 2.60 ..... ~ P-9 J-3 J-9El 220.00 6 .07 119.4518 3.20 "'I 00 « rlJ ..... ~ = P U M P/L 0 S S E L E M E N T DA TA ~~ THERE IS A DEVICE AT NODE FH (U-14) DESCRIBED BY THE FOLLOWING DATA: (ID= 1) ~ e: ... 'a' rlJ ... HEAD FLOWRATE EFFICIENCY .... (ft) (gpm) (%) 00 ~ ..... ~ 264.46 0 .00 75.00 ..... ... 255.23 750.00 75 .00 r') Cl 227.54 1500.00 75.00 0 = Q. ... -THERE IS A DEVICE AT NODE FH (U-041) DESCRIBED BY THE FOLLOWING DATA: (ID= 2) 5· = rlJ HEAD FLOWRATE EFFICIENCY (ft) (gpm) (%) 249.23 0.00 75 .00 245.77 727.50 75.00 235.38 1455.00 75.00 E N D N 0 D E DAT A FH NODE NAME (U -14) FH(U-041) J-1 J-2 J-3 J-9Dl J-9D3 J-9D4 J-9D5 J-9D6 J-9D7 J-9D8 J-9D9 J-9El J-9E2 J-9E3 J-9E4 J-9F10 J-9Fll J-9F12 J-9F13 J-9F14 J-9F15 J-9F16 J-9Fl 7 0 u T P U T NODE TITLE 0 p T I 0 N EXTERNAL DEMAND (gpm) 0.00 0.00 0.00 2.25 0.00 10.50 4.50 5.25 8.25 3.00 6.00 4.50 0.00 0.00 6.00 2.25 3.00 5.25 2.25 3.00 6.00 0.00 16.50 DAT A JUNCTION ELEVATION (ft) 253.0 0 260.00 255.00 262.00 254.00 255.00 250.00 252.00 240.00 240.00 248.00 244.00 244.00 253.00 253.00 253.00 251.00 247.00 240.00 240.00 253.00 238.00 238.00 247.00 250.00 EXTERNAL GRADE (ft) 253.00 260.00 OUTPUT SELECTION: ALL RESULTS ARE INCLUDED IN THE TABULATED OUTPUT s y s T E M c 0 N F I G U RAT I 0 N NUMBER OF PIPES ••...•••••••••••••. (p) 26 NUMBER OF END NODES .......•....... ( j) 23 NUMBER OF PRIMARY LOOPS ..•.•.•••.. (1) 2 NUMBER OF SUPPLY NODES •••.•••••••• (f) 2 NUMBER OF SUPPLY ZONES •••••••••••• ( z) 1 ================================================================================ ~ ~ -~ "'I 00 '-< ~ -~ = > trj = ~ ~ -'-< .... ~ O" ~· .... ..... 00 0 -~ -;:;· ~ ¢ = c. -· -cs· = ~ Case: 0 RESULTS OBTAINED AFTER 10 TRIALS: ACCURACY 0.00095 S I M U L A T I 0 N D E S C R I P T I 0 N (L A B E L) P I P E L I N E R E S U L T S STATUS CODE: XX -CLOSED PIPE CV -CHECK VALVE ~ ~ .... P I P E NODE NUMBERS FLOWRATE HEAD MINOR LINE HL/ ('D ., NAME #1 #2 LOSS LOSS VELO. 1000 00 (gpm) (ft) (ft) (ft/s) (ft/ft) "< {ll .... -------------------------------------------------------------------------------('D P-1 FH (U-041) J-1 0.00 0.00 0.00 0.00 0.00 a P-2 J-9E3 J-9Dl 29.73 0.01 0.00 0.19 0.03 ~~ P-4 J-9D7 J-9F10 -10.02 0.00 0.00 0.06 0.00 e:. So P-5 J-9F10 J-9F13 -20.52 0.00 0.00 0.13 0.02 ~ ... P-6 J-9F13 J-9F16 -31.77 0.01 0.00 0.20 0.04 -· O"' {ll ... I .... P-7 J-9F16 J-9Fl 7 -31.77 0.01 0.00 0.20 0.05 00 ~ P-10 J-9D4 J-9D5 9.75 0.01 0.00 0.11 0.02 .... ~ P-11 J-9D7 J-9D8 9.00 0.00 0.00 0.10 0.01 .... ;::;· P-12 J-9F10 J-9Fll 8.25 0.00 0.00 0.09 0.01 (j P-13 J-9Dl J-9D4 27.14 0.09 0.01 0.30 0 .11 Q P-14 J-9D4 J-9D7 6.89 0.00 0.00 0.04 0.00 = Q. P-15 J-9F13 J-9F14 9.00 0.00 0.00 0.10 0.01 -· .... P-16 J-9El J-9E2 35.73 0.01 0.00 0.22 0.05 s· = P-17 J-9D5 J-9D6 5.25 0.05 0.00 0.23 0.14 {ll P-18 FH (U-14) J-3 40.23 0.08 0.01 0.45 0.24 P-19 J-9E3 J-9E4 6.00 0.06 0.00 0.26 0.18 P-20 J-9D4 J-9D3 0.00 0.00 0.00 0.00 0.00 P-25 J-1 J-2 0.00 0.00 0.00 0.00 0.00 P-3 J-9Dl J-9D7 0.34 0.09 0.00 0.13 0.16 P-30 J-9D8 J-9D9 6.00 0.07 0.00 0.26 0.18 P-31 J-9Fll J-9F12 5.25 0.05 0.00 0.23 0.14 P-32 J-9F14 J-9Fl5 6.00 0.06 0.00 0.26 0.18 P-33 J-2 J-3 0.00 0.00 0.00 0.00 0.00 P-35 J-9E2 J-9E3 35.73 0.01 0.00 0.22 0.05 P-8 J-9Fl 7 FH (U-14) -48.27 0.24 0.01 0.54 0.32 P-9 J-3 J-9El 40.23 0.05 0.01 0.45 0. 26 P U M P/L 0 S S E L E M E N T R E S U L T S INLET OUTLET PUMP EFFIC-USEFUL INCREMTL TOTAL #PUMPS #PUMPS NPSH NAME FLOW RATE HEAD HEAD HEAD ENCY POWER COST COST PARALLEL SERIES Avail. (gpm) (ft) (ft) (ft) (%) (Hp) ($) ($) (ft) -------------------------------------------------------------------------------------------------------- FH (U-14) 88.50 0.00 264.33 264.3 ** ** 33.2 Device "FH(U-041)" is closed EN D N 0 D E R E S U L T s ~ ~ NODE NODE EXTERNAL HYDRAULIC NODE PRESSURE NODE .... ~ ., NAME TITLE DEMAND GRADE ELEVATION HEAD PRESSURE 00 (gpm) (ft) (ft) (ft) (psi) « (I'> .... ------------------------------------------------------------------------------~ FH (U-14) 517.33 253.00 264 .33 114. 54 8 FH (U-041) 517.24 260.00 257.24 111.47 > ~ = J-1 0.00 517.24 255.00 262.24 113. 64 ~ =-J-2 0.00 517.24 262.00 255.24 110. 60 «"' -· (I'> O" J-3 0.00 517.24 254.00 263.24 114. 07 -· (I'> -· J-9Dl 2.25 517.15 255.00 262 .15 113.60 * Lowest pressure in ..... 00 ~ J-9D3 0.00 517.06 250.00 267.06 115. 73 Phases 9D or 9F .... ~ J-9D4 10.50 517.06 252.00 265.06 114.86 .... J-9D5 4.50 517.05 240.00 277.05 120.06 ;· (.) J-9D6 5.25 517.01 240.00 277.01 120.04 = J-9D7 8.25 517. 06 248.00 269.06 116. 59 = Q. J-9D8 3.00 517. 06 244.00 273.06 118.32 -· .... J-9D9 6.00 516.99 244.00 272. 99 118. 29 s· = J-9El 4.50 517.18 253.00 264.18 114. 48 (I'> J-9E2 0.00 517.17 253.00 264.17 114. 4 7 J-9E3 0.00 517.16 253.00 264.16 114. 4 7 J-9E4 6.00 517.10 251.00 266.10 115. 31 J-9F10 2.25 517. 06 247.00 270.06 117. 03 J-9Fll 3.00 517. 06 240.00 277.06 120.06 J-9F12 5.25 517.01 240.00 277.01 120.04 J-9F13 2.25 517.07 253.00 264.07 114. 43 J-9F14 3.00 517.06 238.00 279.06 120.93 J-9F15 6.00 517.00 238.00 279.00 120.90 J-9F16 0.00 517.08 247.00 270.08 117. 03 J-9F17 16.50 517.09 250.00 267.09 115. 7 4 s u MM AR y 0 F I N F L 0 W s A N D 0 U T (+) INFLOWS INTO THE SYSTEM FROM SUPPLY NODES (-) OUTFLOWS FROM THE SYSTEM INTO SUPPLY NODES NODE FLOWRATE NODE NAME (gpm) TITLE -------------------------------------------- FH (U-14) NET SYSTEM INFLOW NET SYSTEM OUTFLOW NET SYSTEM DEMAND 88.50 88.50 0.00 88.50 ***** HYDRAULIC ANALYSIS COMPLETED ***** F L 0 W s ~ ~ .... ~ ., 00 "< t'1 .... ~ 3 > ~ = ~ s. «"" rlJ -· -· O"' rlJ -· ..... rJj ~ .... ~ .... ;· ~ 0 = Q. -· .... ~· = t'1 * * * * * * * * * * K Y P I P E 4 * * * * * * * * * * * * * * * * * University of Kentucky Network Modeling Softwa re Copyrighted by KPFS 1998 Version 2 .000 -04/24/2003 * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * Date & Time : Thu Feb 03 09:15:53 2005 INPUT DATA FILENAME --------------F :\1065-D-1\0006-P-1\Design\KyPipe\Pebble\Pebblle .DT2 TABULATED OUTPUT FILENAME--------F :\1065 -D-l\0006-P-1\Design\KyPipe\Pebble\Pebblle-.OT2 POSTPROCESSOR RESULTS FILENAME ---F:\1065-D-l\0006 -P-1\Design\KyPipe\Pebble\Pebblle=.RS2 ************************************************ S U M M A R Y 0 F 0 R I G I N A L DAT A ************************************************ U N I T S S P E C I F I E D FLOWRATE ........... . HEAD (HGL) ......... . PRESSURE p I p E L I N E DA TA STATUS CODE: xx -CLOSED p I p E NODE N A M E #1 gallons/minute feet psig PIPE CV -CHECK VALVE NAMES LENGTH DIAMETER #2 (ft) (in) ROUGHNESS COEFF. MINOR LOSS COEFF. ------------------------------------------------------------------------------- P-1 FH (U-041) J-1 375 .00 6.07 119 . 4518 2 .70 P-2 J-9E3 J-9Dl 250.00 8.07 119 . 4518 2.10 P-4 J-9D7 J-9F10 315.00 8 .0 7 119. 4518 2.20 P-5 J-9F10 J-9F13 285 .00 8.07 119. 4518 2.20 P-6 J-9Fl3 J-9F16 275 .00 8 .07 119 . 4518 2.60 P-7 J-9F16 J -9F17 185 .00 8.07 119 . 4518 3 .20 P-10 J-9D4 J-9D5 385.00 6 .07 119. 4518 2 .10 ~ ~ .... ~ "'l rJ1 '< {'-I .... ~ 9 > = ~ trj «"" e: {'-I ;;;· O"' ~ .... ...... ::;· trj ~ ~ 0 ~ ~ 0 = Q. -· .... o· = {'-I P-11 J-9D7 J-9D8 275 .00 6.07 119. 4518 2 .10 P-12 J-9F10 J-9Fll 240.00 6.07 119. 4518 2.10 P -13 J-9Dl J -9D4 830.00 6 .07 119 . 4518 4.10 P-14 J -9D4 J -9D7 315.00 8.07 119 .4518 2.60 P-15 J-9F13 J-9F14 250 .00 6.07 119.4518 2 .10 P-16 J-9El J-9E2 215 .00 8.07 119. 4518 2 .10 P-17 J-9D5 J -9D6 345 .00 3 .07 119 . 4518 0 .70 P -18 FH (U-14) J-3 390 .00 6 .07 11 9. 4 5 18 3.30 P -19 J-9E3 J-9E4 320 .00 3.07 119. 4518 2.20 P-20 J-9D4 J-9D3 155.00 8 .07 119. 4518 2.20 P-25 J -1 J-2 310.00 6.07 119 . 4518 2.60 P-3 J -9Dl J -9D7 570.00 1. 05 120 .0000 1. 80 P-30 J-9D8 J -9D9 400.00 3.07 119. 4518 0.70 P-31 J-9Fll J-9F12 370.00 3.07 119. 4518 0.70 ~ P-32 J-9F14 J-9Fl5 355.00 3.07 119 . 4518 0.70 ~ -P-33 J -2 J-3 875.00 6 .07 119 . 4518 2 .40 ~ "'I P -35 J -9E2 J -9E3 205 .00 8 .07 119 . 4518 2 .10 IJ.J « P-8 J-9Fl 7 FH (U-14) 785.00 6 .07 119. 4518 2.60 ('1 -P-9 J-3 J-9El 220.00 6.07 119. 4518 3.20 ~ 8 > = ~ trj -P/L 0 S S « So P U M E L E M E N T DAT A ('1 ~· .... I C"' THERE IS A DEVICE AT NODE FH (U-14) DESCRIBED BY THE FOLLOWING DATA: (ID= 1) ~ .... -:;· trj ~ HEAD FLOW RATE EFFICIENCY ~ (ft) (gpm) (%) 0 264. 46 0.00 75.00 ~ 255 .23 750.00 75.00 ('"'.) 0 227.54 1500 .00 75.00 = Q. -· -=· THERE I S A DEVICE AT NODE FH (U-041) DESCRIBED BY THE FOLLOWING DATA : (ID= 2) = ('1 HEAD FLOWRATE EFFICIENCY (ft) (gpm) (%) 249 .23 0.00 75 .00 245.77 727.50 75.00 235 .38 1455 .00 75.00 EN D N 0 D E DAT A FH NODE NAME (U -14) FH (U-041) J-1 J-2 J-3 J-9Dl J-9D3 J-9D4 J -9D5 J-9D6 J -9D7 J-9D8 J -9D9 J -9El J-9E2 J-:9E3 J -9E4 J -9Fl0 J-9Fll J-9Fl2 J-9Fl3 J-9Fl4 J-9Fl5 J-9Fl6 J -9Fl 7 0 U T P U T NODE TITLE 0 P T I 0 N EXTERNAL DEMAND (gpm) 0 .00 0.00 0 .00 1002 .25 0 .00 10 .50 4.50 5.25 8 .25 3 .00 6.00 4.50 0 .00 0 .00 6.00 2 .25 3.00 5 .25 2 .25 3 .00 6.00 0.00 16.50 DAT A JUNCT I ON ELEVATION (ft) 2 5 3.00 260.00 255 .00 262.00 254.00 2 5 5 .00 2 5 0 .00 252 .00 240 .00 2 4 0 .00 248.00 244.00 244 .00 2 5 3 .00 253 .00 253 .00 2 5 1 .00 247.00 2 4 0 .00 240.00 253.00 238 .00 2 3 8 .00 247 .00 250 .00 EXTERNAL GRADE (ft) 253.00 260 .00 OUTPUT SELECTION: ALL RESULTS ARE INCLUDED IN THE TABULAT ED OUTP UT s y s T EM c 0 N F I G U R A T I 0 N NUMBER OF PIPES ...••••.•.••.••..•• (p ) 26 NUMBER OF END NODES ....•.....•.... ( j) 23 NUMBER OF PRIMARY LOOPS ••.••.••.•. (1) 2 NUMBER OF SUPPLY NODES .••••.••.••. (f ) 2 NUMBER OF SUPPLY ZONES •••••••••••• ( z) 1 ================================================================================ ~ ~ ~ ~ "I rJ:J "< ~ ~ ~ 9 > = ~ trj -"< s. ~ (;;' ... ~ ~ ... .... :;· trj ~ ~ 0 ~ ~ 0 = e: ~ Q. = ~ Case: 0 RESULTS OBTAINED AFTER 5 TRIALS: ACCURACY 0.00257 S I M U L A T I 0 N D E S C R I P T I 0 N (L A B E L) P I P E L I N E R E S U L T S STATUS CODE: XX -CLOSED PIPE CV -CHECK VALVE ~ ~ ..... P I P E NODE NUMBERS FLOWRATE HEAD MINOR LINE HL/ ~ ., NAME #1 #2 LOSS LOSS VELO. 1000 r;n '-< (gpm) (ft) (ft) (ft/s) (ft/ft) ~ ..... ~ -------------------------------------------------------------------------------= P-1 FH (U-041) J-1 250.52 2.38 0.32 2.78 7.20 > P-2 J-9E3 J-9Dl 671.18 2.45 0.58 4.21 12.09 = P-4 J-9D7 J-9F10 -368.57 1. 02 0.18 2.31 3.80 !. t:r1 P-5 J-9F10 J-9F13 -379.07 0.97 0.19 2.38 4.07 ~. ~ P-6 J-9F13 J-9F16 -390.32 0.99 0.24 2.45 4.46 ~ .... I O'" P-7 J-9F16 J-9F17 -390.32 0.66 0.30 2.45 5.19 .... ~ ..... P-10 J-9D4 J-9D5 9.75 0.01 0.00 0.11 0.02 :;· t:r1 ~ P-11 J-9D7 J-9D8 9.00 0.00 0.00 0.10 0.01 ~ P-12 J-9F10 J-9Fll 8.25 0.00 0.00 0.09 0.01 ~ P-13 J-9Dl J-9D4 -325.59 8.55 0.83 3.62 11. 30 ~ P-14 J-9D4 J-9D7 -345.84 0.90 0.19 2.17 3.47 () ~ P-15 J-9F13 J-9F14 9.00 0.00 0.00 0.10 0.01 = P-16 J-9El J-9E2 677.18 2 .14 0.59 4.25 12.68 Q. -· ..... P-17 J-9D5 J-9D6 5.25 0.05 0.00 0.23 0.14 s· P-18 FH (U-14) J-3 431.16 6. 76 1.17 4.79 20.34 = ~ P-19 J-9E3 J-9E4 6.00 0.06 0.00 0.26 0.18 P-20 J-9D4 J-9D3 0.00 0.00 0.00 0.00 0.00 P-25 J-1 J-2 250.52 1. 97 0.31 2.78 7.35 P-3 J-9Dl J-9D7 -5.49 15.56 0.12 2.04 27.50 P-30 J-9D8 J-9D9 6.00 0.07 0.00 0.26 0.18 P-31 J-9Fll J-9F12 5.25 0.05 0.00 0.23 0.14 P-32 J-9F14 J-9F15 6.00 0.06 0.00 0.26 0.18 P-33 J-2 J-3 250.52 5.55 0.29 2.78 6.67 P-35 J-9E2 J-9E3 677.18 2.04 0.59 4.25 12.81 P-8 J-9Fl7 FH (U-14) -406.82 12.22 0.82 4.52 * 16.61 P-9 J-3 J-9El 681. 68 8.90 2.85 7.57 53.42 * Highest Velocity in Phases 90 or 9F P U M P/L 0 S S E L E M E N T R E S U L T S INLET OUTLET PUMP EFFIC-USEFUL INCREMTL TOTAL #PUMPS #PUMPS NPSH NAME FLOWRATE HEAD HEAD HEAD ENCY POWER COST COST PARALLEL SERIES Avail. (gpm) (ft) (f t) (f t) (%) (Hp) ($) ( $) (ft) -------------------------------------------------------------------------------------------------------- FH (U-14 ) 837.98 0.00 252 .94 252.9 ** ** 33 .2 FH (U-041) 250.52 0 .00 248 .82 248 .8 ** ** 33.2 ~ E N D N 0 D E R E s u L T s ~ ..... ('D ""I NODE NODE EXTERNAL HYDRAULIC NODE PRESSURE NODE 00 '< NAME TITLE DEMAND GRADE ELEVATION HEAD PRESSURE {'-I ..... (gpm) (ft) (ft) (ft) (p s i) ('D a ------------------------------------------------------------------------------> FH (U-14) 505.94 253 .00 252.94 109 .61 = FH(U-041) 508 .82 260 .00 248 .82 107.82 ~ ~ «" ~ J-1 0 .00 506.12 255.00 251.12 108 .82 ~ J-2 0.00 503 .84 262.00 241.84 104.80 i;;· ... I O" J -3 0.00 498 .01 254.00 244 .01 105 .74 ... ~ ..... J-9Dl 1002 .25 477.88 255.00 222 .88 96 .58 ** Lowest Pressure in ::;· ~ ('D J-9D3 0 .00 487 .26 250.00 237 .26 102.81 Phases 9D o r 9 F ~ J-9D4 10.50 487 .26 252.00 235.26 101. 95 0 J-9D5 4 .50 487.25 240.00 247.25 107.14 ~ J-9D6 5 .25 487 .21 240 .00 247 .21 107.12 ~ 0 J-9D7 8 .25 488 .35 248 .00 240.35 104 .15 = J-9D8 3.00 488.35 244.00 244.35 105 .88 Q. -· ..... J-9D9 6 .00 488.28 244.00 244 .28 105 .85 c;· J-9El 4 .50 486 .25 253 .00 233.25 101.08 = ~ J-9E2 0 .00 483 .53 253 .00 230.53 99 .90 J-9E3 0.00 480 .90 253.00 227.90 98 .76 J-9E4 6.00 480 .84 251.00 229 .84 99 .60 J-9F10 2 .25 489 .55 247.00 242.55 105 .11 J-9Fll 3.00 489.55 240.00 249.55 108 .14 J-9F12 5.25 489.50 240.00 249.50 108 .11 J-9F13 2.25 490.71 253.00 237 . 71 103.01 J-9F14 3 .00 490.71 238 .00 252 .71 109 .51 J-9F15 6 .00 490 .64 238.00 252.64 109.48 J-9F16 0.00 491.94 247.00 244.94 106 .14 J-9F17 16 .50 492.90 250.00 242 .90 105.26 S U M M A R Y 0 F I N F L 0 W S AND (+) INFLOWS INTO THE SYSTEM FROM SUP P LY NODES (-) OUTFLOWS FROM THE SYSTEM INTO SUPPLY NODES NET NET NET NODE NAME FH (U-14) FH (U-041) SYSTEM INFLOW SYSTEM OUTFLOW SYSTEM DEMAND FLOWRATE (gpm) 837.98 250.52 1088 .50 0 .00 1088.50 NODE T I T LE 0 U T F L 0 W S ***** HYDRAULIC ANALYSIS COMPLETED ***** ~ ~ -~ ., 00 '< Cl.I -~ = > = ~ M -'< ~ Cl.I (;;. .... "O" ~ .... ...... :;· M ~ ~ Q ~ ~ Q = Q. -· -~· = Cl.I Exhibit G Sewer Analysis for Pebble Creek Phase 9D and 9F (analyzed in conjunction with Phase 9E and with allowances for future Phases 9C) Outfall #1 (Ex 16" SIL) -Serves Phase 9D, 9E, 9F and future Phase 9C Line Area of Contributing Land Uses Flow Calculations Proposed Sewer System l~ ~ l ~ Type ]g ·~ !::: 2=3034 Cale. Min. From To ~ ~ i Average Daily Infiltration Peaking Peak Flows Size PVC, Material Inside Slope Slope Peak Flow :3 ~ Flows(ADF) (10%ADF) Factor Type Diameter Peak Peak Velocity ..... ~ 3=2241 Flows Flows ..... ~ 0 ~ ~ PVC MH# MH# Ac. Ac. Lots GPD GPD CFS CFS CFS GPM MGD (in.) Inches % % fps 1 2 0 0 so 13,350 0.02 0.00 4.00 0.08 38 0.055 g 2 D3034 7.754 0.01 0.40 1.45 2 4 0 0 8 13,350 15,486 0.02 0.00 4.00 0.10 44 0.063 8 3 D2241 7.961 0.01 0.40 1.47 3 4 0 0 6 . 1,602 0.00 0.00 4.00 O.Dl s 0.007 8 2 D3034 7.754 0.00 0.40 0.74 4 s 0 0 26 17,088 24,030 0.04 0.00 4.00 0.15 68 0.099 8 2 D3034 7.754 0.02 0.40 1.70 6 7 0 0 13 . 3,471 O.Dl 0.00 4.00 0.02 10 0.014 6 2 D3034 5.793 0.00 0.80 1.26 7 8 0 0 13 3,471 6,942 0.Dl 0.00 4.00 0.04 20 0.028 6 2 D3034 5.793 0.01 0.80 1.55 9 10 0 0 14 . 3,738 O.Dl 0.00 4.00 0.02 11 O.DIS 6 2 D3034 5.793 0.00 0.80 1.30 11 12 0 0 16 . 4,272 O.Dl 0.00 4.00 0.03 12 0.018 6 2 D3034 5.793 0.00 0.80 1.34 Cale. Min. Ave. Daily Slope Slope Flow ADF ADF Velocity % % fus 0.00 0.40 0.96 0.00 0.40 0.98 0.00 0.40 0.45 O.Ql 0.40 1.15 0.00 0.80 0.86 0.00 0.80 1.06 0.00 0.80 0.86 0.00 0.80 0.91 Ave. Daily Flow Depth Inches 0.78 0.80 0.00 1.16 0.00 0.58 0.00 0.29 if, ~ ~ ""l t1'j ~ e: ~ O" 8 :=.: >~ = ~ ~ ~-"' Mil McCLURE & BROWNE ENGINEERING/SURVEYING, INC. I . February 11 , 2005 1008 Woodcreek Drive, Suite 103 •Coll ege Station, Texas 77845 (979) 693 -38 38 •Fax (979) 693 -2554 •Email : mcclurebrnwne@verizon.net Exhibit H Mr. Louis C. Herrin, ill, P .E . TCEQ-MC 148 Copy of Letter to TCEQ P .O . Box 13087 Austin, TX 78711-3087 Re: Chapter 317 Summary Transmittal Letter Permittee: City of College Station Permit Number: TPDES 10024-003 Project Name: Pebble Creek Subdivision, Phase 9D & 9F County: Brazos MBESI #10650007 Dear Mr. Herrin: The purpose of this letter is to provide the TCEQ with the information necessary to comply with the requirements of §317 .1 (a )(3 )(D) of the TCEQ' s rules titled, Design Criteria for Sewerage Systems . The necessary information includes: 1. &gineering Firm : McClure & Browne Engineering/Surveying, Inc. 1008 Woodcreek Dr., Suite 103 College Station, Texas 77845 2 . Design Engineer: Michael R McClure, P .E . No. 32740 3 . Facility Owner : City of College Station, Brazos County, Texas 4 . The plans and specifications which describe the project identified in this letter are in substantial compliance with all requirements of Chapter 317. 5. Project Description: The wastewater improvements that are detailed within this project are located within the City of College Station in Brazos County, Texas, and are designed to connect to the existing wastewater collection system. The project involves the extension of a sewer line into a new phase of this residential subdivision located near the intersection of SH 6 and Greens Prairie Road. The project consists of two new gravity wastewater line and their associated appurtenances. Wastewater from this subdivision will flow to the Lick Creek Wastewater Treatment Plant. This is the same system described in my January 14, 2005 letter for Phase 9E of the subdivision. The system was designed to accommodate the additional lots in Phases 9D & 9F. The following is a general description of the new collection system : Mr. Louis C . Herrin, ill, P .E. February 11, 2005 Page2 Gravity Wastewater Lines : Number of Services : Residential -79 Amountffype of Wastewater Pipe to be Installed: Pipe Size Material inear Feet L (in .) 8 AS1M D3034, SDR 26 PVC 1,922 8 AS1M D2241, SDR 26 PVC 362 Number of Manholes: 9 Distance between manholes range from 106 LF t o 393 LF. Grade(%) Min. Max. 0.40 3 .12 0.40 0.40 The plans will be reviewed by the City of College Station and they will also provide construction inspection. If you have any questions regarding this project, please contact me at 979- 693-3838 . Sincerely, /~! Kent Laz.a, P.E. r- Project Administrator cc: TCEQ Region 9 Office, Wastewater Program City of College Station, Development Services Department FOR OFFICE USE ONLY P&Z CASE NO.: V ~ -?Q DATE SUBMITTED: oa- CITY OF COLLEGE STATION Plann ing & Development Services FINAL PLAT APPLICATION (Check one) 0 Minor ($300.00) D Amending ($300.00) ~ Final ($400.00) 0 Vacating ($400.00) D Replat ($600.00)" '*Includes public hearing fee The following items must be submitted by an established filing deadline date for P&Z Commission consideration . MINIMUM SUBMITTAL REQUIREMENTS: 181 Filing Fee (see above) NOTE: Multiple Sheets -$55 .00 per additional sheet NIA Variance Request to Subdivision Regulations -$100 (if applicable) 181 Development Permit Application Fee of $200.00 (if applicable). 181 Infrastructure Inspection Fee of $600.00 (applicable if any public infrastructure is being constructed) 181 Application completed in full. NIA Copy of original deed restrictions/covenants for replats (if applicable). 181 Thirteen (13) folded copies of plat. (A signed mylar original must be submitted after staff review.) NIA One (1) copy of the approved Preliminary Plat and/or one (1) Master Plan (if applicable). 181 Paid tax certificates from City of College Station, Brazos County and College Station l.S.D. 181 A copy of the attached checklist with all items checked off or a brief explanation as to why they are not. 181 Two (2) copies of public infrastructure plans associated with this plat (if applicable). NIA Parkland Dedication requirement approved by the Parks & Recreation Board, please provide proof of approval (if applicable). Date of Preapplication Conference: ________________________ _ NAME OF SUBDIVISION __ ..:....P-=eb=b=le:<....=C.!...:re=e..:..:.k-=S=u=bd=iv.!."'-is=io=n-'-'--'-P....:..:h=as=e"-'9=0:__ _______________ _ SPECIFIED LOCATION OF PROPOSED SUBDIVISION (Lot & Block)--------------- APPLICANT/PROJECT MANAGER'S INFORMATION (Primary Contact for the Project): Name Pebble Creek Country Club. Inc . Street Address ___ 4_,_,5=0=0_,_P_,,e=b=bl=e-=C:..:..;re=e=k'-'-P-"'a""'rk=w=a::..J.y __ City College Station State TX Zip Code 77845 E-Mail Address ------------- Phone Number _---""'(9"-'7-=-9.,_) 6=9=0___,-0=9=9=-2 ____ _ Fax Number (979) 690-6081 PROPERTY OWNER'S INFORMATION : Name (Same as above) Street Address ------------------City ----------- State _____ Zip Code _____ _ E-Mail Address ____________ _ Phone Number -----------Fax Number _____________ _ ARCHITECT OR ENGINEER'S INFORMATION: Name McClure & Browne Engineering/Surveying. Inc. Street Address __ 1'-"0=0=8 _,_W,__,o=o=d=cr=e=ek"-=D!..!..riv,_,,e,...... =S=ui=te,,_1,,_,,0=3'--------City College Station State TX Zip Code --"'"-77'-'8~4-=-5 __ E-Mail Address _ ___,_,_m=ik=e..:..:.m=@;:;..:m..:..:.c=c=lu::..:...re=b::..:...ro=w=n=e=.c=o~m"-- Phone Number (979) 693-3838 Fax Number ___ ~(9~7=9.,_) 6=9=3~-2=5=5~4 _____ _ 6/13/03 1 of5 1~/30 /20 0 6 14 :24 19798 232659 I LETTER OF COMPLETION I CITY ENGINEER • J' CITY OF COLLEGE STATION COLLEGE STATION, TEXAS Dear Sir: BRA ZOS PAVI NG PAGE 02/02 O\? OS-D~ DATE: lO' (2<P /of.,e RE: COMPLETION OF 3?~bb\, <:kt:~k ~-~b The purpose of our letter is to request t hat the following listed improvements be approved and aooepted as being constructed under City inspection and completed according to plans and specifications as approved and required by the City of College Station , Texas. This approval and acceptance by the City is requested in order that we .may .finalize any suboontracts. and to affirm their warranty on the work . This approval and acceptance by the City of the improvements listed below does hereby void the letter of guarantee for the listed improvements on the above referenced project. The one~year warranty is hereby affirmed and agreed to by if'a.r. \~( f#<k b"=·"~lse1~,.,-t- and by their subcontractors as ind icated by signatures below. · WORK COMPLETED '5/llNi ~¥ ~~n'. ~41?E'ET"'~ ~ .6JJ>~Wf\-l/<s Owner: r~»~k Cru~ ~Jup_J. Mailing Address :. _____ _ Revised 10!12/00 PATE 8(20/o<e 8 /20/0(o r I 8/20/o(o Contractor: ]?1y(z.os ;Ffu,i,..cr J,..,c. Address : ffi. 3:$::,x-714. Bityw , :rn ~ 77$Cl<Q Signature: J3:Jfr~ /fJ-·-ob ~0/30/2006 14:24 19798232659 LETTER OF COMPLETION CITY ENGINEER CITY OF COLLEGE STATION COLLEGE STATION, TEXAS Dear Sir: BRAZOS PAVING PAGE 02/02 DATE: lO' (2-<t> /DCe RE: COMPLETION OF 3?.-£}nb\r f.kt:{k ~. <i b The purpose of our letter is to request that the following listed improvements be approved and accepted as being constructed under City inspection and oompleted according to plans and specifications as approved and required by the City of College Station, Texas. This approval and acceptance by the City is requested in order that we .may .finalize any subcontracts and to affirm their warranty on the work . This approval and a6ceptance by the City of the improvements listed below does hereby void the letter of guarantee for the listed improvements on the above referenced project . The one-year warranty is hereby affirmed and agreed to by ::f'aB \a.(gµ.k. D,-;.11t.IQf?1wtiu.+- and by their subcontractors as indicated by signatures below. · WORK COMPLETED '5~~i~¥ ~11..)~lf!_ ~-h2.EET'~ .+. .fupewA-1/<s Owner. r~»~k &tt~ ~~p_) Mailing Address:. _____ _ Revised 10112/00 DATE 8(20/oee g /20/o<c ) I . Bf 20/ofa Contractor: l? l't:ft"t.os .:fb,,:,..,r J rJc . Address : ffi. 3'.?ox= 11'-I. Bttyw , :@ ~ 7 7 $Q<C Signature: SJfr~ /fJ -·-ob *******i******************************************************************************************** * · . P. 01 * * TRANSACTION REPORT * * NOV-01-2006 WED 08:15 AM * * * * DATE START RECEIVER TX TIME PAGES TYPE NOTE M~ DP * * * * NOV-01 08: 14 AM 88232658 31 11 2 SEND OK 446 * * * * * * TOTAL : 31S PAGES: 2 * * * **************************************************************************************************** Public Works CITY OP COLLEGE STA'T'ION al:_ ... _...... ...---..... -~- o Admini stration u Engineering o Fncility Maintcn~mcc u Plccl o Sanitation o Strccls/Dnlinagc o Traffic Signals (company name) J ...... n This FA.Xis being sent to youfrom:_~b_~~--- This fax contains ~-f)(l~es inclu~ing the cover sheet, please call if you didn't receive all the mfonnatwn. Ac1ditional Comments: CME Testing and Engineering, Inc. 1806 Welsh Avenue, Suite C College Station, Texas 77840 (979)764-8700 BILL TO Mr. Israel Koite City of Co ll ege Station P .O . Box 9960 College Station, Texas 77842 PROJECT NUMBER PROJECT 25131 Pebble Creek Subdi vision Phase 9D, 9E, 9F ITEM DESCRIPTION CATEGORY Tech . Labor Engi neering Technician Labor/Services Labor Depth Check Depth Check of Cru shed Limestone Base Field Test Material ASTM C31 Castin g of(6" X 12") Concrete Test Cylinders Field Test ASTM C 23 1 Air Content of Freshly Mixed Concrete Field Test Pickup Charge Co ll ection of Co ncrete Test Cylinders from Jo b Pickup Charge Site (9/15) ASTM C39 Compression of (6 " X 12") Concrete Test La boratory Test Cylinders Tex-200-F Sieve Analysis of Fi ne and Coarse Aggregates Laboratory Test Tex-236-F Asphalt Content by Ignition Method Laboratory Test Tex-208-F Hveem Stability Laboratory Test Tex-207-F Bulk Specific Gravity (Density) Laboratory Test Tex-227-F Theoretical Maxim um Specific Gravity Laboratory Test ASTM D 3549 Determination of thickness ofHMAC cores Labo ratory Test ASTM D5 361 Samplin g Compacted Bituminous Mixtures fo r Field Test Laboratory Testing (Core Drilling) ol*-~ -y~ \ " ,· ' '--o?-' ":M Invoice DATE INVOICE# 10/13/2006 2092 BILLING PER IOD TERMS 911 -10/12 /06 Net 30 P .O. NUMBER COR RE SPON DING REPORTS 102 -110 QTY/HR S RATE AMOUNT 14 32.00 448.00 16 10 .00 160.00 4 12 .00 48 .00 1 15.00 15 .00 1 40.00 40 .00 7 12.00 84 .00 1 40 .00 40.00 1 110.00 110.00 1 150 .00 150 .00 I 45 .00 45 .00 1 40 .00 40 .00 23 5.00 115.00 23 30.00 690.00 Total $1,985.00 City of College Station Accounts Receivable [IDaf1f1a~@ fru(g@QJJa®atra@oo Date this reques t: \ \ I "O I ol!> 5end Invoice to: Business : fbn:a.c~ Povi~ Attention : ___________ _ Address: P.o. enx -, lt..\ \OfyG.o , n 'J') ida Telephone : 910, ~ °''Q, :i loDIQ Customer ID : __________ _ Cu stome r Type: __________ _ Ch arge Date(s) This information has been rev iewed and is hereby recommended for billing as indicated: t.ha1•=~) \\-~-Olp Authoriz Sl9Mture Date Approved Pub\ t' C. WDI 'LS Department ~'508 Extension Code Quantity Amount of Service Description of Services Rendered Gil Account Number a 3''a .OO tra4-01 ~\e.1 d l l l I ! :>· .,c_ ...... <...: LU ~ zrs -· z -;....... ;;: 7::: ~) 0 o · G:: a: (~ '>J U .. l I I I Total $ 44 .Dn FOR INTERDEPARTMENTAL USE ONLY Please forward immediately to Accounts Receivable for invo icing to customer and recording to proper accounts. Special Billing Instructions:----------- P..e \-ece,t oo\· 44lDl ·'$10 · L\14D ACCOUNTING USE ONLY Invoice Number ____ _ Period __ _ AJE/Posting Ref. ____ _ Other Ref erence ____ _ Prepared by ____ _ Date __ _ AIR Approval ____ _ D ate __ _ 11/01/2006 14:29 9797646900 CME Testing and Engineering, Inc. 1806 Welsh Avenue, Suite C College Station, Texas 77840 (979)764-8700 Bill TO Mr. T~rael Koitc City of College Station P.O . Box 9960 College Srntion, Texas 77842 CMETESTING [ PAGE 05/06 Invoice DATE INVOICE# 7126/2006 2041 BILLING PERIOD TERMS 6/1-6130106 Net30 P.O. NUMBER PROJECT NUMBER PROJECT CORRESPONDING REPORTS 25131 Pebble Creek Subdivision Phase 90, 9E , 9F 65-81 ITEM DESCRIPTION CATEGORY QTY/HRS RATE AM OU ITT Tech. Labor Engineering Technicinn LaborlScrvices Labor 14.5 32.00 464 .00 ASTMD4.318 Liquid and PIMtic Limits Laboratory te." 7 22.00 154.00 ASTM D l 140 Amount of Material in Soils Finer Than No . 200 Labora.tory te:st 7 12.00 84 .00 Sieve ASTM 0421 Dry Sieve Analysis ofSoiVT.ime Mixture (Percent Labor.otory test. 7 10.00 70 .00 Pa.ssing l 3/411 Sieve) ASTM 0421 Dry Sieve Ant\lysiR of St>il/Limc Mixture (Percent Laboratory tt!:St 7 10.00 70 .00 Passing No . 4 Sieve) ASTM 04972 PH of Soil~ (Method A) Laboratory test 7 15.00 105.00 A.STM 0698 Stnndard Effort Compiiction Curve Labomtory tCllt 7 I I0.00 770.00 Dcpfu Check !Xpt:h Check of Lime Trc:ltted Subgrade Depth check 17 10.00 170 .00 ASTMD2922 Field Mois1ure-Dcn~ity Ti:sts , min. 3 per trip , Field test 17 22.00 374.00 en.ch ASThfD2922 Field Moisture.Density Tests, min. 3 per trip, Field test 61'7-o~. 2 22.00 44.00 each (retest) f;w'I ~ ASTMC31 Casti11g of (6" X 12") Concrci:e Test Cylinders Field t~t 8 12 .00 96.00 ASTM C39 Compre!sicin of(6" X 12") Concrete Test Uihoratory test I 12.00 l2.00 Cylinders ASTM C231 Air Content ofFrc9hly Mi)(cd Concrete Field te$t 2 15.00 30.00 Pickup Charge Collection of Concrete Test Cylinder~ from Job Pickup charge 2 40 .00 80.00 Site (6124, 6128) ASTMC 136 Sieve Analysis ofConr.;e Aggregates Laborntory test 4 40 .00 160 .00 Dl fr,~ A~~ I /-oJ--0 6 It i~ !l. plea.sure working with you! Please send pn.yment to the nbove address. Thank you! Total $2,683 .00 City of College Station Accounts Receivable 00011.11.aoo® OO[g@QJJa®a!fa@oo Dat a thi s requ est: l \ -O -Dlo 5end Invoice to : Business : ~fQ.~ fuv \~ Attention : ____________ _ Address : P.O . klo~ I l 4 ~GO. n :n?.J)4o Telephone : QJCt iaa:HoO<o Customer ID : __________ _ Customer Type: __________ _ Charge Date(s) This infonnation has been reviewed and is hereby recommended for billing as indicated : thn I 1~n Q \..ltlrt!\4] b,.) Authoed Signature f', bl i c.. u.:Jo-r \C. ~ Department l 1-0 -CXp Date Approved 'bSO% Extension Code Quantity Amount of Service Description of Services Rendered GIL Account Number 4 °'3'.00 '&-\-O(o t:\c..\d I l I ! I :>· z ~'I '"' LLl ~ (~ z -:-z r ~J 0 o · < I (\ •.._/ lL ! I ! I Total $ ~Koo FOR INTERDEPARTMENTAL USE ONLY Please forward immediately to Accounts Receivable for invo icing to customer and recording to proper accounts. ~e.:\-e~+ OOl · 4ltl91 ·SI?. -Yl40 ACCOUNTING USE ONLY Invoice Number ____ _ Period __ _ A.JE/Posting Ref. ____ _ Othe r Reference ____ _ Prepared by ____ _ Spe cial Billing In struction s:-----------Date __ _ AIR Approv al Date __ _ 11/01/2006 14:29 9797646900 CMETESTING • CME Testing and Engineering , In c. 1806 Welsh Avenue , Suite C College Station , Texas 77840 (979)764-8700 BILL TO Mr. Israel Koitc City of College Station P .O. Box 9960 College Station, Tci111!1 77842 PR OJECT NUMBER PROJECT 2513 1 Pebble Crcclc. Subdivision Phase 90, 9E , 9f" ITEM DESC RIPTION CATEGORY Teeh . tnbor Engi neering Technician Labor/Service.ci Labor ASTM D 1557 Modified Effort Compaction Cuivc Laboratory test Tex-104-106 -E Liquid and PIMtic Limits Laboratory test Tc11-l 07-E,r.2 Linear B11t Shrinkage Laboratory te.'!t Tcx-116-E Wet Ball Mill Laboratory test Tex-110-E Sieve Annlysis (Gr3dation) of B11sc Material Laboratory test ASTM 02922 Field Moisture-Density Test s, min . 3 per trip , Field test each ASTM 02922 Field Moisturc-Oen!rity Tms, min, 3 per trip, F'ltild test CftCh (retc5t) ASTMC:31 Casti ng; of(6" X 12") Concrete Te:1t Cylinder' Field test ASTMC39 Compression of (6" X I 2") Concrete Test Laboratory test Cyli nder.i ASTM C231 Air Content of Preshly Milled Concrete Field test Pickup Charge Collection of Concrete Test Cy!inde!'9 from Job Pickup charge Site (811 , 813, 8/5) 0 (_ d-vPr 5121 ~0~ ( (-02-Cl Tt is fl plcn.'l\lre worki ng with you I Plc11se ~nd payment to d'ie nbove nddre$~. Thank you ! PAGE 06/06 ~lo I nvoice DATE INVOICE# 911812006 2077 BILLING PERIO D TERMS 711-8131 106 Net30 P.O. NUMBER COR RES PONDING RE PO RTS 82·101 QTY/HRS RATE AMOUNT 17 32.00 544.00 I 120.00 120.00 I 22 .00 22.00 1 20.00 20 .00 1 160.00 160.00 2 60.00 120.00 16 22.00 352 .00 4 22.00 88 .00 16 12.00 192.00 13 12 .00 156 .00 4 15 .00 60.00 3 40.00 120 .00 Total $1 ,9.54 .00 City of College Station Accounts Receivable ®01111000@ rru ~@QJO ®OIJO@ OO Date this requ est: ~ -:J-d!J 5end Invoice to: Business : ----=e,"""'--'-fl~IJ--_______ _ Attent ion : ____________ _ Address : ____________ _ Telephon e: ------------- Customer ID : ___________ _ Cu stomer Type: ___________ _ Cha rg E Date(s) This information has been rev iewed and is hereby recommended for bill ing as indicated : Authorized Signature Date Approved Department Extension Code Qu ant ity Amount of Service Description of Services Rendered GIL Account Number ~ a~.oo 1-a Ir°' \=\ c.\ d ("{\ d?>~ ~~1-i \t"St (:JDl-44 (p\-451 C>-414° l \ \~.OD 1-~lD-D~ C..OOue.h \cs+ ~,·,M\e.cs OD\-4Ulol-'$1~ -L\ 1 40 I l L\ L\O . 00 1-7-l--Oli LA Por °'---'oi\...\ Tc ~-\-OO\· 4 L\(pf -Slb-L\\41 ~ I :>· ·-' z 0 w 0. -~"'' 't' "·' z -;..... z 1::. ~) () o · < a: n ·-/ ;i .. l i ! I Total $ :l.\\.o FOR INTERDEPARTMENTAL USE ONLY Pleas e forw ard imm ediately to Accounts Rece ivable for invoicing to customer and recording to proper accounts. -Spe ci al Billing In st ruction s:----------- ACCOUNTING USE ONLY Invoice Number ____ _ Period AJE!Po sting R ef. ____ _ Other Ref erence ____ _ Prepared by ____ _ Dat e __ _ AIR Approv al ____ _ Dat e __ _ CME Testing and Engineering, Inc. 1806 Welsh Avenue, Suite C College Station , Texas 77840 (979)764-8700 BILL TO Mr. Israel Koite City of College Station P .O. Box 9960 College Station , Texas 77842 Invoice DATE INVOI CE# 7/26 /2006 2041 BILLING PERIOD TERMS 6/ 1-6/30/06 Net 30 P.O. NUMBER PROJECT NUMBER PROJECT CORRESPONDING REPORTS 25131 Pebble Creek Subdivision Phase 9D , 9E, 9F 65-8 1 ITEM DESCRIPTION CATEGORY QTY/HRS RATE AMOUNT Tech . Labor Engineering Technician Labor/Services Labor 14.5 32 .00 464 .00 ASTM D431 8 Liquid and Plastic Limits Laboratory test 7 22 .00 154.00 ASTM D 1140 Amount of Material in Soil s Finer Than No. 200 Laboratory test 7 12 .00 84.00 Sieve ASTMD421 Dry Sieve Analysis of Soil/Lime Mixture (Percent Laboratory test 7 10.00 70.00 Passing I 3/4" Sieve) ASTMD421 Dry Sieve Analysis of Soil/Lime Mixture (Percent Laboratory test 7 10.00 70.00 Passing No. 4 Sieve) ASTM D4972 PH of Soil s (Method A) Laboratory test 7 15.00 105.00 ASTMD698 Standard Effort Comp action Curve Laboratory test 7 110.00 770.00 Depth Check Depth Check of Lime Treated Sub grade Depth check 17 10 .00 170.00 ASTMD2922 Field Moi sture-Density Tests, min . 3 per trip, Field test 17 22 .00 374.00 each ASTMD2922 Field Moi sture-Density Tests, min . 3 per trip, Field test 2 22.00 44.00 each (retest) ASTMC31 Casting of (6" X 12") Concrete Test Cylinders Field test 8 12.00 96.00 ASTMC39 Compression of(6" X 12") Concrete Test Laboratory test 1 12 .00 12 .00 Cylinders ASTM C 231 Al~·Content of Freshly Mixed Concrete Field test 2 15 .00 30.00 Pickup Charge Collection of Concrete Test Cylind ers from Job Pickup charge 2 40.00 80.00 Site (6 /24, 6/28) ASTMC 136 Sieve Analysis of Coarse Aggregates Laboratory test 4 40 .00 160 .00 ~ C;'\Y P~Y ( ,f ' "') -~ 12c) ~\ C"'-'t. +l ' ~+ .._ -+P lf (/ -to (.P>i\-\-r,,<.. Tt .r or~ rj-D p~ <~]) ~t.( \ . l~ r ·,t.-A.. v b /" [.,,') -\ -C 0 It is a pleasure working with you! Please send payment to the above address. Th ank you! Total $2,683.00 City of College Station Accounts Receivable IIDD 11.11.a 00@ rru ~@l!JJ D®DIJD@!M Date this request: §? -=i-d.o 5end Invoice to: Business: ---='°~P...1I..._____;::---"---__::_-"----'---'--'-­ Attention: -----~~-~-1---~ Address: P .0 2)0{, 71 \ lt . ~<lo'·\\{ f)f'l'6Cl.I \ I Extension v Amount Description of Services Rendered GA... Account Number O:a .oo \~.OD \:°\ ~\ d ('(\ ~~ {X.r)i ~ Tt" st <.::>o\ · L\ 4 ~ \ · 45 -rc,·4 t4 ° ~uili -re:<:>+ Ct..(t.mc\e.cs t?o\· lfU~l· '$•?, -L\ 1 4o LA Por<A..~ Tc~-\-oo\· 4 L\<ol · S,b-4\4 Please f0rward immediately to 'Accounts 'Receivable fo r' invoicing to customer and recording to proper accounts. Invoice Number -~-'--'--­ AJE/Posting Ref. -~....::........C-­ Other-Referance --~-­ Prepared by --'---'-----"-- AIR Approval ---'-'----- Date --'--'--- Date ---'-'--- ,. J CME Testing and Engineering, Inc. 1806 Welsh Avenue, Suite C College Station , Texas 77840 (979)764-8700 BILL TO Mr. Israel Koite City of College Station P .0. Box 9960 College Station, Texas 77842 PROJECT NUMBER PROJECT 25131 ITEM Tech . Labor ASTM D4318 ASTM D 1140 ASTMD421 ASTMD421 ASTM D4972 ASTMD698 Depth Check ASTMD2922 ASTMD2922 ASTMC31 ASTMC39 ASTM C231 Pickup Charge Pebble Creek Subdivision Phase 90, 9E, 9F DESCRIPTION Engineering Technician Labor/Services Liquid and Plastic Limits Amount of Material in Soil s Finer Than No. 200 Sieve Dry Sieve Analysis of Soil/Lime Mixture (Percent Passing I 3/4" Sieve) Dry Sieve Analysis of Soil/Lime Mixture (Percent Passing No . 4 Sieve) PH of Soil s (Method A) Standard Effort Compaction Curve Depth Check of Lime Treated Subgrade Field Moi sture-Density Tests, min . 3 per trip, each Field Moi sture-Den sity Tests, min . 3 per trip, each (retest) Casting of(6" X 12") Concrete Test Cylinders Compression of (6" X 12") Concrete Test Cylinders Atr Content of Freshly Mixed Concrete Collection of Concrete Test Cylinders from Job Site (6 /24 , 6/28) Sieve Anal ysis of Coarse Aggregates CATEGORY Labor Laboratory test Laboratory test Laboratory test Laboratory tes t Laboratory test Laboratory test Depth check Field test Field tes t Field test Laboratory test Field test Pickup charge Laboratory test It is a pleasure working with you! Please send payment to the above address. Thank you! Invoice DATE INVOICE# 7/26/2006 204 1 BILLING PERIOD TERMS 6/ I -6/30/06 Net 30 P .O. NUMBER CORRESPONDING REPORTS 65-8 1 QTY/HRS RATE AMOUNT 14 .5 32.00 464 .00 7 22 .00 154.00 7 12 .00 84.00 7 10 .00 70.00 7 10.00 70 .00 7 15 .00 105.00 7 110 .00 770.00 17 10.00 170.00 17 22 .00 374.00 2 22.00 44.00 8 12.00 96.00 I 12 .00 12.00 2 15 .00 30.00 2 40.00 80.00 4 40.00 160 .00 Total $2,683.00 CITY OF COLLEGE STAT ION CITY INFRASTRUCTURE INSPECTION NOTICE Pla nning & Devel.opmen t Se rvices Date: 07/18/05 To: L8J Bob Mosley ( 2 ) D Diane Broadhurst ( 0 ) From: Deborah Grace RE : Pebble Creek Phase 9D Location : Congressional and Pebble Creek Parkway L8J Public Water Lines/Fire Hydrants L8J Public Sanitary Sewer L8J Public Storm Sewer L8J Public Streets D Public Detention Facility D Driveway Connection to Public Street D Private Construction within easement D No Inspection Required Comments : p :\group\htltr\pzltr\prod\pz2005\p0011489 .doc 1:8:] Engineer's Estimates Attached L8J Construction Plans Attached D Site Plan Attached o ____ _ DEVELOPMENT PERMIT PERMIT NO. 05-05 CITY OF COLLEGE STATION Pla.nn-it;g ~ ~/Qpmen.t &rvi~t! FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE SITE LEGAL DESCRIPTION: Pebble Creek Subdivision Phase 9D All Lots DATE OF ISSUE: 07/18/05 OWNER: Pebble Creek Development Co -Davis Young 4500 Pebbel Creek Parkway SITE ADDRESS: Congressional and Pebble Creek Parkway DRAINAGE BASIN: Alum Creek VALID FOR 9 MONTHS CONTRACTOR: College Station, Texas 77845 TYPE OF DEVELOPMENT: Full Development Permit SPECIAL CONDITIONS: All construction must be in compliance with the approved construction plans All trees required to be protected as part of the landscape plan must be completely barricaded in accordance with Section 7.5.E., Landscape/Streetscape Plan Requirements of the City's Unified Development Ordinance, prior to any operations of this permit. The cleaning of equipment or materials within the drip line of any tree or group of trees that are protected and required to remain is strictly prohibited . The disposal of any waste material such as , but not limited to, paint, oil, solvents, asphalt, concrete, mortar, or other harmful liquids or materials within the drip line of any tree required to remain is also prohibited . ****TCEQ PHASE II RULES IN EFFECT**** The Contractor shall take all necessary precautions to prevent silt and debris from leaving the immediate construction site in accordance with the approved erosion control plan as well as the City of College Station Drainage Policy and Design Criteria . If it is determined the prescribed erosion control measures are ineffective to retain all sediment onsite, it is the contractors responsibility to implement measures that will meet C ity, State and Federal requirements . The Owner and/or Contractor shall assure that all disturbed areas are sodden and establishment of vegetation occurs prior to removal of any silt fencing or hay bales used for temporary erosion control. The Owner and/or Contractor shall also insure that any disturbed vegetation be returned to its original condition, placement and state. The Owner and/or Contractor shall be responsible for any damage to adjacent properties, city streets or infrastructure due to heavy machinery and/or equipment as well as erosion , siltation or sedimentation resulting from the permitted work. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that debris from construction, erosion, and sedimentation shall not be deposited in city streets , or existing drainage facilities . I hereby grant this permit for development of an area outside the special flood hazard area . All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer in the development permit application for the above named project and all of the codes and ordinances of the City of College Station that apply. Date Owner/ AgenUContractor Date Client: Mr. Israel Koite City of College Station P .O. Box 9960 CME Testing and Engineering, Inc. 1806 Welsh A venue, Suite C College Station, Texas 77840 (979) 764-8700 Fax (979) 764-6900 Report Date: Project No.: Report No.: 9/15 /06 25131 106 College Station, Texas 77842 Technician: Arrival Time : Juan Vasquez 10 :30 AM Time Charged: Requested By: 1.5 Hours Israel Koite (City of C.S.) PROJECT: PEBBLE CREEK SUBDIVISION PHASE 9D, 9E & 9F ~~~~~~~~~~~~~~~~~~ CONCRETE OBSERVATION REPORT Date Sampled: September 14, 2006 No. of Sets Cast: 1 of 1 Sample Represents : Sidewalk for Ballybunion Lane at Station 81 +00 , Left of Centerline Required Compressive Strength at 28 Days, (psi): 3,000 LABORATORY TEST DATA Sample Identification No. Date Tested Age Cross-sectional Maximum Compressive (Da s) Area (in2 .) Load (lbf.) Strength (psi.) ~~--~~~-----~--~__,....__....___._-t PCS 45 PCS 46 PCS 47 PCS 48 09 121106 10 /12/06 10/12/06 7 28 28 Reserve 28.27 28.27 28.27 28.27 Note: Some information on this report provided by others . Testing and reporting was conducted in general accordance with the following applicable ASTM methods: C 31 , C 39 , C 138 , C 143, C 231 , & C 1064 . FIELD TEST DATA Supplier: Truck No.: Ticket No .: Mix No.: Accumulated Yards: Weather: Remarks: Field Contact: Copies To: Young Ready Mix 37 217207 30NGC30M 10 Partly Cloudy Time Batched: Time Sampled: Concrete Temp , (°F): Ambient Temp, (°F): Slump (in.): 10:05 AM 11:02 AM 89 90 5.75 Air Content,(%): Unit Weight, (pct): Sample Type: Sample Size : Water Added on Site , (gal): ND -Not Determined; NP -Not Provided; NA -Not Applicable Mr. Jim Wade (Brazos Paving, Inc.) was informed of field test results. Mr. Billy Prewitt, Brazos Paving, Inc. Mr. Mike McClure, McClure & Browne Engineering/Surveying, Inc . CME Testing and Engineering, Inc. 6.0 ND Cylinder 6 in. dia. 0 Client: Mr. Israel Koite City of College Station P.O. Box 9960 CME Testing and Engineering, Inc. 1806 Welsh A venue, Suite C College Station, Texas 77840 (979) 764-8700 Fax (979) 764-6900 Report Date: Project No.: Report No.: 9/21 /06 25131 107 College Station, Texas 77842 Technician: Juan Vasquez PROJECT: PEBBLE CREEK SUBDMSION PHASE 9D, 9E & 9F CONCRETE COMPRESSIVE STRENGTH TEST REPORT Date Sampled: No. of Sets Cast: September 14, 2006 1of1 Sample Represents: Sidewalk for Ballybunion Lane at Station 81 +00, Left of Centerline Required Compressive Strength at 28 Days, (psi): 3,000 LABORATORY TEST DATA Sample Date Age Cross-sectional Maximum Identification No. Tested (Days) Area (in2 .) Load (lbf.) PCS 45 09/21/06 7 28 .27 70,670 PCS 46 10/12/06 28 28.27 PCS 47 10/12/06 28 28 .27 PCS 48 -----Reserve 28 .27 Compressive Strength (psi.) 2,500 Note: Some information on this report provided by others . Testing and reporting was conducted in general accordance with the following applicable ASTM methods: C 31 , C 39 , C 138, C 143, C 231, & C 1064. FIELD TEST DATA Supplier: Young Ready Mix Time Batched: 10:05 AM Air Content,(%): Truck No.: 37 Time Sampled: 11:02 AM Unit Weight, (pct): Ticket No.: 217207 Concrete Temp, (°F): 89 Sample Type: Mix No.: 30NGC30M Ambient Temp, (°F): 90 Sample Size : Accumulated Yards: 10 Slump (in.): 5 .75 Water Added on Site, (gal): Weather: Partly Cloudy Remarks: ND -Not Determined; NP -Not Provided; NA-Not Applicable Field Contact: Mr. Jim Wade (Brazos Paving, Inc.) was informed of field test results. Copies To: Mr. Billy Prewitt, Brazos Paving, Inc. Mr. Mike McClure, McClure & Browne Engineering/Surveying, Inc. CME Testing and Engineering, Inc. 6.0 ND Cylinder 6 in. dia. 0 10/13/2006 14:35 9797646900 1806 Welsh Avenue, Suite C College Station , Texas n840 Phone : 979.764 .8700 Fax 979.764.6900 To: Israel Koite City of College Station Fmo 979-764-3489 Phonr. 979-777-6871 CMETESTING From: Paul Evans Pages: 6 (Including Cover Sheet) Datei 10/13/06 Pebble Creek Subdivision Phase 90, 9E &C~ Mr. Billy Prewitt, Brazos Paving, Inc. 9F Project No. 25131 Report Nos. 108-109 D Urgant Ill For Review Cl Pleas• Comment D Please Reply • C011H1•nts1e Call me at 764-8700 if you have any questions. PAGE 01/0 6 10/13/2006 14:35 9797646900 Clie.ut: Mr. Israel Koite City of College Station P.O. Box 9960 College Station , Texas 7784i CME TESTING CME Testing and Engineering, lttc. 1806 Welsh Avenue, Suite C College Station, Texas 77840 (979) 764-8700 Fax (979) 764 -6900 PROJECT: PEBBLE CREEK SUBDMSION PHASE 9D, 9E & 9F T\le8day, September 26, 2006 Report Date : Project No.: Report No.: PAGE 02 /06 9/26/06 2513 1 108 At the request of Mr. Israel Koite with City of College Station, Mr. Juan Vasquez and Mr . Eric Miller of CME Testing and Engineering, Inc. traveled to the project site referred to as "Pebble Creek Subdivision Phase 9D , 9E & 9F" in College Station , Texas. Messrs. Vasquez and Miller arrived o.n site at 8:00 a.m . on Tuesday, September 26 , 2006 to obtain nin.eteen (19) HMAC pavement cores from the constructed pavement sections of the Pebble Creek Subdivision Phase 9D & 9F. All of the core locations were selected by Mr. Koitc . The HMAC cores were collected in general accordance with ASTM D 5361. Each core sample was measured for thickness in accordance with ASTM D 3549 . The results of the thickness m.ea.surem.ents arc presented in the accompanying Tablc: 1 of this report . Time Charge : Juan Vasquez-3.0 Hours Eric Miller-3.0 Hours Copies To : Mr. Billy Prewitt , Brazos Paving, In c. Mr. Mike McClure, McClure & Brown.e Engineering/Surveying, Inc . CME Testing and Engineering, Inc. -· _ _!0/13/2006 14: 35 9797646900 CMETESTING .... .. .. .... .. . ...... Jilli.... . ........ J ... . . ..... L . ..... JJ ...... .Ji.. . dY ... CME TESTING ANC> ENGINEERING INC. Pebbfo Creek Subdivision Phase 90, 9E & 9F Report No . l 08 -HMAC Core Te.~ting September 26 , 2006 TABLE 1. RESULTS OF HM4C CORE THICKNESS MEASUREMENTS CORE SJ;lECJMEN LOCATION AVG. SPECIMEN THICKNESS fin.) 1•2 Ballybunion Lane Station 8o+50 , 6' Left of Centerline 2 .35 Station 82+50 , 4' Right of Center.line 2.15 Station 85+50, S' Left of Centerline 1.85 Station 87+50, 6' Right of Centerlin.e 2.15 Ballybunion Court Station 89+50, 6' Left of Centerline 2.50 Station 91+50 , 7' Right of CenterHne 2.00 Station 93+50, 6' Left of Centerline 2.15 Station 94+50, 8' Right of Centerline 1.90 St. Andrews Drive Station 55+50 , 10 ' Right of Centerline 2.35 Station 57+50 , 8 ' Left of Centerline l.35 Station 59+50 , 4' Right of Centerline 1.85 Station 61+50, 9' Left of Centerline 2.60 Cascades Drive Station 18+75, 9' Left of Centerline 2.05 Station 2o+75, 10' Right of Centerline 2.30 Station 22+75 , 5' Left of Centerline 2.J.5 Station 24+75, 7' Right of Centerline 2.35 2 PAGE 03/06 .. 9797646900 CMETESTING PAGE 04 /06 .... .1.. .. .... J .... J . .. ... .!... t!M. . .. A . ............ .............. ...... ..:. .. ........ !... ....... .1.. ............. . CME TESTING AND ENGINEERING INC. Pebble Creek Subdivfaion Pba.~ 9D , 9E & 9F Report No. l 08 -HMAC Core Testing §evtember 26, 2006 "' TABLE I. fCONTINUED> RESULTS OFHMAC CORE THICKNESSM)1ASUREMENTS CORE SPEC1MEN LOCATION AVG. SPECIMEN TBICl{NESS <in.) t,z Cascades Court Station :2.6+75 , 6' Left of Centerline 2.00 Station 28+75 , 8' Right of Centerline l.65 Station 29+75 ) 2' Left of Centerline 1.75 Notes: 1. Average specimen thickness was detennined using calipers as specified in ASTM D 3549 . 2. Per project plans and specification m1nimum of 1.5 in.ches of HM.AC. 3 ...... ..: 10/13/2006 14:35 9797646900 Client: Mr. Israel Koite City of College Station P.O. Box 9960 College Statiot1 , Texas 77842 CMETESTING CME Testing and Engineering, l11c. 1806 Welsh Avenue, Suite C College Station, Texas 77840 (979) 764-8700 Fax (979) 764-6900 PROJECT: PEBBLE CREEK SUBDMSION PHASE 9D, 9E & 9F Wednesday, September 27, 2006 Report Date: Project No .: Report No.: PAGE 05/06 9/27/06 25131 109 At the request of Mr. Israel :r<oitc with City of College Station, Mr. Juan Vasquez and Mr. Blake Disher of CME Testing and Engineering, Inc. traveled to the project site refened to as "Pebble Creek Subdivision Phase 9D, 9E & 9F" in. College Station, Texas. Messrs. Vasquez and Disher arrived on site at 3:30 p.m. 011 Wednesday, September 27, 2006 to obtain four (4) HMAC pavement cores from the constructed pavement sections of the Pebble Creek Subdivision Phase 9D & 9F. All of the core locations were selected by Mr. Koite. The HMAC cores were collected in general accordance with ASTM D 5361. Each core sample was measured for thickness in accordance with ASTM D 3549 . The results of the thickness measurements are presented in the accompanying Table 1 of this report . Tim .c: Charge : .Tuan Vasquer.: -1.5 Hours Blake Disher -1.5 Hours Copies To: Mr. Billy Prewitt, Brazos Paving , Inc. Mr. Mike McClure ., McClure & Browne Engineering/Surveying, Inc. CME Testing and Engineering, Inc. 10 /13/2006 14:35 9797646900 CMETESTING • ..... . ...... J.. . ...... ...4 ..... . ...... LL ......... J. ..... A . . ........ _L . L .. CME TESTING AND ENGINEERING INC. Pebble Creek Subdivision Phase 9D, 9.E & 9F Report No. 109 -HMAC Core Testing September 27, 2.006 TABLE I. RESULTS OF HMAC CQRE THIC](NESS MEAS.UR£MENTS CQRE SPECIMEN LOCATION AyG. SPECIMEN TffiCJ<NESS Cfn,l t,z St. Andrews Drive Station 56+50 , 8' Left of Centerline 1.55 Station 57+50 , 8' Right of Centerline 1.75 Statlon 57+50, 3' Left of Centerline l.35 Station 58+5 0, 8' Left of Centerline 1.80 Notes: 1. Average specimen tbl.clo.1ess was detennined using calipers as specified in ASTM D 3549. 2. Per project plans and specification minimum of 1.5 inches of HMAC. PAGE 06 /06 .......... J .JJI.. '06/27/2006 13:38 9797646900 1806 Welsh Avenue, Suite C College Station , Texas n840 Phone: 979 . 764 .8700 Fax 979.764 .6900 To: Israe l Koite City of College Station CMETESTING PAGE 01/04 From = Pau l Evans Fax: 979-764--3489 Pages: 4 (Including Cover Sheet) Phonel 979-777-6871 Datr. 6127/06 Re: Pebble Creek SubdMsion Phase 90, 9E & cc: 9F Project No. 25131 Report No . 78 0 U.,,ent 12!1 For Review D Pleas@ Comment 0 Plea•• R~ • ~ants: Call me at 76~700 if you have any questions. D Please Recyde \ 06/27/2006 13:38 9797646900 Client: Mr. Israel Koitc Ci1y of College Station P.O . Box 9960 College Station, Texas 77842 CMETESTING CME Tesdng and Engi11eel'ing, Inc. I 806 Welsh A venue , Suite C College Stafon, Texas 77840 (979) 764~8700 Fax (979) 764-6900 PROJECT: PEBBLE CREEK SUBDMSION PHASE 9D, 9E & 9F l\1onday,June26,2006 Report Date: Project No .: Report No.: PAGE 02/04 6/27/06 25131 78 At the request of Mr. Israel Koite of the City of College Station , Mr. Juan Vasquez of CME Testing and Engineering, Inc . (CME) obtained two bulk samples of coarse aggregates on Monday, June 26, 2006 for laboratory analysis . The aggregate samples were obtained from stockpiles at Young Contractors ' material yard located off of Highway 21 in Bryan, Texas . A sieve analysis was performed on each of the samples to evaluate compliance with ASTM C 33 gradation specification at the request of Mr . Koitc. The samples were tested in general accordance with ASTM Method C 136 . The .results of the laboratory analys is are presented on pages 2 and 3 . Time Charge: Juan Vasquez -1.5 Hours Copies To : Mr. Kent Dalsing, Brazos Paving, Inc. Mr. Mike McClure , McClure & Browne Engineering/Surveying, lt1c . CME Testing and Enginee1ing, Inc . \ 06/2 7/2006 1 3:38 97 976 469 00 CMETE STI NG PA GE 03/04 ·--·--•--.. •---········ .--lll. __ llll .... lll __ .111 .... 111 ..... 111 .... 111 .... 1111 ..... 111 .... 111 .. ••1!1!11 .. 11.1111!1 .....•..... l!l!l ..... 1!!1! .... 11!1. .... •. lmlll!I. __ !!!! .... 1!!1! ..... 1!!1! ..... lll!l ..... ~ .... ~ ..... l!llll! •... 11111!_ ... !l!l ..... !'!'l .... ll!I., ~ .. -1!11!!1!1!! ................... , ........... ·.· ... .44. ··-··· ......... .¥ ........................................ ,. ···················· ........... . CME TESTING AN[) ENGINEERING INC . Pebb le Creel< Subdivision Phase 9D , 9E & 9F Report No. 78 -Lllboratory Test Results June 27, 2006 Lab No.: Mn terinl Description : Material Source: Material Locati on: 33 6 Coarse Aggregate "Hanson -Pea Gravel" Young Contr8ctors Inc.'s Material Yard Sto ckpile Coarse Aggregate (Requirements for Coarse Aggregates , "Standard Spec ifications for Concrete Aggregates", ASTM C 33) SIEVE SIZE (U. S. Standard Size) 1/2 " 3/8" No.4 No.8 No. 16 PERCENT PASSING,% 100 100 84 3 COARSE AGGREGATE SIZE NO. 8 REQUlREMENTS PERCENT PASSING,% 100 85 to 100 10 to 30 Oto 10 0 to 5 2 COMMENT OR OBSERVATION Meets specification . Meets soecification . Does not meet St>Ccification. Does not meet specification . Meets specification. . \ 06 /2 7/2006 1 3 :38 97976469 00 CMETE STI NG PAGE 04/0 4 #P ... A ....... JI ................................................. 442... .. CME TESTING AND ENGINEERING INC . Pebble Creek Subdivision Pbase 9D , 9E & 9F Report No . 78 -Laboratory Tc..'lt Re..<rults June 27 , 2006 Lab No .: Material. Description : Material Source : Material Location: 337 Coarse Aggregate "Scamardo • .Pen Grave l" Young Contractors Inc .' s Material Yard St.ockpile Coarse Aggregate (Requirements for Coarse Aggregates , "Standard Specifications for Concrete Aggregates", ASTM C 33) SIEVE SIZE PER CENT COA~SE AGGREGATE COMMENT OR (U.S. Standard Size) PASSING,% SIZE NO. 8 REQ UIREMENTS OBSERVATION PERCENT PASSING,% 1./2" 100 100 Meet s snec ifi cation. 3/8" 99 85 to 100 Meets soccification . No.4 20 10 to 30 Meets suecifi.cation . No . 8 3 Oto 10 Meets soecification. No . 16 1 0 to 5 Meets snecification . 3 06/26/2006 14:05 ' 9797646900 1806 Welsh Avenue , Suite C College Station, Texas 77840 Phone: 979 .764.8700 Fax 979.764.6900 Israel Korte City of College Station CME TESTING PAGE 01/04 From: Paul Evans FaJCI 979-764-3489 P .. er. 4 (Including Cover Sheet) Date: 6/26/06 Re: Pebble Creek Subdivision Phase 90, SE: & CC: 9F Project No. 25131 Report Nos. 76-n c Urgent IE! For Review 0 Please Comment 0 Please Reply • Comments: Call me at 764-8700 if you have any questions . D Pleaso R9C:Jcle 06/26/2006 14:05 9797646900 \ Client: Mr . Israel Koite City of College Station P.O. Bo~ 9960 College StatJ.oll , Texas 77842 CMETESTING CME Testing a11.d E11gineering, Inc. 1806 Welsh Avenue, Suite C College Station, Texas 77840 (979) 764-8700 Fax (979) 764-6900 PROJECT: PEBBLE CREEK SUBDIVISION PHASE 9D, 9E & 9F Friday, .June 23, 2006 Report Date: Project No.: Report No .: PAGE 02/04 6/26/06 25131 76 At the request of Mr . Israel Koi.te of the City of College Station, Mr. Juan Vasquez of CME Testing and Engineering, Inc. traveled to the site of the ~ject referred to as "Pebble Creek Subdivision. Phase 9D, 9E & 9F' in College Station, Texas. Mr. Vasquez arrived at the project site at 10:.50 a.m . on Friday, June 23, 2003 to cast one set of four concrete test cylinders for laboratory compressive strength determination . The results of the field observations relative to the concrete activities are presented. in Report No . 77. In addition to and at the request of Mr . Koite, Mr. Vasquez also transported a sample of the freshly mixed concrete to GME's office for laboratory analysis. A sieve analysis of the fresh concrete was petfonned to evaluate compliance with ASTM C 33 gradation specification at the reque..cit of Mr. Ko it.e . The sample was tested in general accordance with ASTM Me th od C 136. The results of the laboratory analysis are pre sented on page 2. Time Charge: Juan V a.squez -l .5 Holll'S Copies To: Mr. Kent Dalsing, Brazos Paving, Inc. Mr. Mike McClure , McClure & Browne Engineering/Surveying, Inc. CME Testing and Engineering, Inc. _b?/6.__j=--- 06 /26/2006 14:05 979764690 0 CMETESTI NG PAGE 03 /04 \ .¢ ..... bl ' ................... "' ' ......................... ' ............... '" ' ....................... "' .............. ..!¥.'' a CME TESTING AN[) ENGINEERING INC . Pebble Creek Subdivi sion Pha~e 90, 9E & 9F Rep ort No . 76-1.Miomtory Test Resu~ Jutte 26, 2006 Lab No.: 328 Material Description : Fresh Concrete Curb Mix No. 30C6140M Sample Represents: Curb and Gutter fur Cascades Court at Station 27+-00 , Left ofCenterli.ne Coarse Aggregate (Requirements for Coarse Aggregates , "StllD.dard Specifications for Concrete Aggregates '', ASTM C 33) SIEVE SIZE PERCENT COARSE AGGREGATE COMMENT OR (U. S. Stnnditrd Size) PASSING,% SlZE NO• 8 REQUIREMENTS OBSERVATION PERCENT PASSING, % 1/2" lOO 100 Meets soecitic ation .. 3/8" 100 85 to JOO Meets soecification. No.4 86 lOto 30 Does not meet snecification. No .8 19 0 to 10 Does not .tJJ.eet snecification . No.16 0 0 to 5 Meets snecification. 2 06/26/2006 14:05 9797646900 CMETESTING PAGE 04 /04 Client: Mr. Tsrael Kojte City of College Station P.O. Box 9960 CME Testing and Engineering, Inc. 1806 Welsh A venue, Suite C College Station~ Texas 77840 (979) 764-8700 Fax (979) 764-6900 Report Date: Project No.: Report No.: 6/24/06 25131 77 College Station, Texas 77842 Technician: Juan Vasque?; PROJECT: PEBBLE CREEK SUBDMSION PHASE 9D, 9E & 9F CO~CRETE OBSERV ATIONREPORT Date: Sampled: No. of Sets Cast: June 23 , 2006 1of1 Sample Represents: Curb and Gutt.er for Cascades Court at Station 27+00, Left of Centerline Required Compressive Strength at 28 Days, (psi): 3,000 LABORATORY TEST DATA Sample Date Age Cross~sectional Maximum Compressive Arca (in2.) Identification No. Tested Load lbf. Stren h si. PCS 21 06/30/06 7 28.27 PCS 22 07/21106 28 28.27 PCS 23 07/21/06 28 28.27 PCS 24 Reserve 28.27 Note: Some information on thi~ report provided by others . Testi.ng and reporting was conducted in general accordance with the following applicable ASTM methods: C 31 , C 39, C 138 , C 143, C 231 , & C 1064. FJELD TEST DAT A Supplier: Truck No.: Ticket No.: Mix No.: Accumulated Yards: Weather: Remarks: Field Contact: Copies To: Young Ready Mix 28 214842 30C6140M 50 Partly Cloudy Time Batched: Time Sampled: Concrete Temp, (°F): Ambient Temp, ("F): Slump (in.): 9:55AM 11:20 AM 90 94 1.5 Air Content,(%): Unit Weight, (pcf): Sample Type: Sample Size: Water Added on Site, (gal): ND -Not Detcnnined; NP-Not Provided; NA-Not Applicable Mr. Israel Koite (City of College Station) was infonncd of field test .results. Mr. Kent Dalsing, Brazos Paving, Inc. Mr. Mike McClure, McClure & Browne Engineering/Surveying, Inc. CME Testing and En~.ccring, Inc . 4.0 ND Cylinder 6 in. dia. 8 :.. 06/2 8/2006 09:42 9 79764690 0 To: 1806 Welsh Avenue, Su ite C College Station , Texas 77840 Phone : 979. 764 .8700 Fax 979.764 .6900 Israel Kolte City of College Station Fax; 979-764-3489 Phone: 979-777-6871 CMETESTI NG PA GE 01/04 CME r~TIN ;r··.::im~~~g ~ INC. 18ll6WajqH·,,.. . •:,.Sut'l'EC • <.."OJ..tEGUTATIOi:i'~~7~1t ''·l 'l'l !I. 764.8700 • .\lAX 97 ~.7M.\\\IOO '~h/ From: Pa ul Evans P89M= 4 (Including Cover Sheet) Dale: 6/28106 Re: Pebble Creek Subdivision Phase 90, 9E & 9F CC: Project No. 25131 Report Nos . 79--80 Cl Urgent im For Review D Please Comment D Please Reply • Commaitts' Call me at 764-8700 if you have any questions . 0 Pl..-Recycle 06/28/2006 09:42 9797646900 CMETESTING PAGE 03/04 .................... XII! ................... . ..... !. ......... . .......................................... .!.. CME TESTING AND ENGINEERING INC . Pebble Creek Subdivision Phase 9D , 9E & 9F Report No. 79 -Laboratory Test Results Juue 28 , 2006 Lab No.: 342 Material Description : Fresh Concrete Curb Mi.x No. 30C6140M Sample Represents: Curb and Gutter for Ballybunion Court at St3.tion 91+00 , Right of Centerline Coarse Aggregate (Requimncnts for Coarse AgiJ'egates, "Standard Specifications for Concrete Aggregates", ASTM C 33) SIEVE SIZE PERCENT COARSE AGGREGATE COMMENT OR (U. S. Standard Si7.e) PASSING, 0/n SIZE NO. 8 REQUIREMENTS OBSERVATION PERCENT PASSING,% 1/2" 100 100 Meets soeci.:fication. 3/8" 100 85 to 100 Meets soecification. No. 4 47 10 to 30 Does not meet .imecification. No. 8 11 0 to lO Does not meet snecification. No.16 l 0 to S Meets snccification. 2 06 /28/2006 09:42 9797646900 CMETE STI NG PAGE 04/04 ( . ' .. Client: Mr. Israel Koitc City of College Stati.on P.O. Box 9960 CME Testi.ng and Engineering, Inc. 1806 Wolsh Avenue , Suite C College Station, Texas 77840 (979) 764-8700 Fax (979) 764-6900 Report Date: Project No .: Report No.: 6/28/06 25131 80 College Station, Texas 77842 Technician: Jimmy Ledford PROJECT: PEBBLE CREEK SUBDMSION PHASE 9D, 9E & 9F CON.CRETE OBSERVATION REPORT Date Samp led: No. of Sets Cast: June 27, 2006 1 of 1 Sample Represents: Curb and Gutter for Ballybun.ion Court at Station 91 +oO, Right of Centerline Required Compressive Strength at 28 Days, (psi): 3,000 LABORATORY TEST DATA Sample Date Age Cross-sectional Maximum Compressive Area (in2.) Identification No. Tested Load lbf. Strcn h si. PCS 25 07 104106 7 28.27 PCS 26 07/25/06 28 28.2 7 PCS 27 07 /25/06 28 28.27 PCS 28 Reserve 28 .27 Not.e : Some infonnation on this report provided by others. Testing and repo.rti:n.g was conducted in general accordance with the following applicable ASTM methods: C 31 , C 39, C 138 , C 143 , C 231 , & C 1064 . FIELD TEST DATA Supplier: Young Ready Mix Time Batched: Jl:31 AM Air Content ,(%): Truck No.: 45 Time Sampled : 1:28 PM UnH Weight, {pcf): Ticket No .: 215000 Concrete Temp , (°F): 91 Sample Type : Mix No .: 30C6140M Ambient Temp , (°F): 94 Sample Size : Accumulated Yards : 80 Slump (in.): 1.0 Water Added on Sii:c, (gal): Weather : Clear Remarks : ND -Not Detemtin.ed.; NP -Not Provided ; NA -Not Applicable Field Contact : Mr. Ilias Castaneda (Brazos Paving, Inc .) was informed of fi eld test: resu lts . Copies To : Mr. Kent Dalsing, Brazos Paving , Inc . Mr. Mike McClure, McClure & Browne Engineering/Surveyin.g , Inc . CME Tcstiug and Engineeri.n.g , Inc. 2 .6 ND Cyli nder 6 .i.n . dia. 0 Client: Mr. Israel Koite City of College Station P.O. Box 9960 College Station, Texas 77842 CME Testing and Engineering, Inc. 1806 Welsh A venue, Suite C College Station, Texas 77840 (979) 764-8700 Fax (979) 764-6900 PROJECT: PEBBLE CREEK SUBDIVISION PHASE 9D, 9E & 9F Tuesday, September 26, 2006 Report Date: Project No.: Report No.: 9126106 25131 108 At the request of Mr. Israel Koite with City of College Station, Mr. Juan Vasquez and Mr. Eric Miller of CME Testing and Engineering, Inc. traveled to the project site referred to as "Pebble Creek Subdivision Phase 9D, 9E & 9F" in College Station, Texas. Messrs. Vasquez and Miller arrived on site at 8:00 a.m. on Tuesday, September 26, 2006 to obtain nineteen (19) HMAC pavement cores from the constructed pavement sections of the Pebble Creek Subdivision Phase 9D & 9F. All of the core locations were selected by Mr. Koite. The HMAC cores were collected in general accordance with ASTM D 5361. Each core sample was measured for thickness in accordance with ASTM D 3549. The results of the thickness measurements are presented in the accompanying Table 1 of this report. Time Charge: Juan Vasquez -3.0 Hours Eric Miller-3.0 Hours Copies To: Mr. Billy Prewitt, Brazos Paving, Inc. Mr. Mike McClure, McClure & Browne Engineering/Surveying, Inc. CME Testing and Engineering, Inc. CME TESTING AND ENGINEERING INC. ·----~ 5ST7KWI WE J $ CT --TE 3 • Pebble Creek Subdivision Phase 9D, 9E & 9F Report No. 108 -HMAC Core Testing September 26 , 2006 ·g T777 TABLE 1. RESULTS OF HMAC CORE THICKNESS MEASUREMENTS r -r I F CORE SPECIMEN LOCATION A VG. SPECIMEN TIDCKNESS (in.) 1•2 Ballybunion Lane Station 80+50, 6' Left of Centerline 2.35 Station 82+50, 4' Right of Centerline 2.15 Station 85+50, 5 ' Left of Centerline 1.85 Station 87+50, 6' Right of Centerline 2.15 Ballybunion Court Station 89+50, 6' Left of Centerline 2.50 Station 91+50, 7' Right of Centerline 2.00 Station 93+50, 6 ' Left of Centerline 2.15 Station 94+50, 8' Right of Centerline 1.90 St. Andrews Drive Station 55+50 , 10' Right of Centerline 2.35 Station 57+50, 8' Left of Centerline 1.35 Station 59+50, 4 ' Right of Centerline 1.85 Station 61+50, 9' Left of Centerline 2.60 Cascades Drive Station 18+75, 9' Left of Centerline 2 .05 Station 20+75 , 10' Right of Centerline 2.30 Station 22+75 , 5' Left of Centerline 2.15 Station 24+75, 7' Right of Centerline 2.35 2 WW CME TESTING AND ENGINEERING INC. Pebble Creek Subdivis ion Phase 9D , 9E & 9F Report No . 108 -HMAC Core Testing September 26 , 2006 3 TABLE 1. (CONTINUED) RESULTS OF HMAC CORE THICKNESS MEASUREMENTS CORE SPECIMEN LOCATION AVG. SPECIMEN TIDCKNESS (in.) 1•2 Cascades Court Station 26+75 , 6' Left of Centerline 2.00 Station 28+75 , 8' Right of Centerline 1.65 Station 29+75, 2 ' Left of Centerline 1.75 Notes: 1. Average specimen thickness was determined using calipers as specified in ASTM D 3549. 2. Per project plans and specification minimum of 1.5 inches ofHMAC. 3 rm f ; Client: Mr. Israel Koite City of College Station P.O. Box 9960 College Station, Texas 77842 CME Testing and Engineering, Inc. 1806 Welsh A venue, Suite C College Station, Texas 77840 (979) 764-8700 Fax (979) 764-6900 PROJECT: PEBBLE CREEK SUBDIVISION PHASE 9D, 9E & 9F Wednesday, September 27, 2006 Report Date: Project No.: Report No .: 9/27 /06 25131 109 At the request of Mr. Israel Koite with City of College Station, Mr. Juan Vasquez and Mr. Blake Disher of CME Testing and Engineering, Inc. traveled to the project site referred to as "Pebble Creek Subdivision Phase 9D, 9E & 9F" in College Station, Texas. Messrs . Vasquez and Disher arrived on site at 3:30 p.m. on Wednesday, September 27 , 2006 to obtain four (4) HMAC pavement cores from the constructed pavement sections of the Pebble Creek Subdivision Phase 9D & 9F. All of the core locations were selected by Mr. Koite . The HMAC cores were collected in general accordance with ASTM D 5361. Each core sample was measured for thickness in accordance with ASTM D 3549. The results of the thickness measurements are presented in the accompanying Table 1 ofthis report . Time Charge: Juan Vasquez -1.5 Hours Blake Disher -1.5 Hours Copies To: Mr. Billy Prewitt, Brazos Paving, Inc. Mr. Mike McClure, McClure & Browne Engineering/Surveying, Inc. CME Testing and Engineering, Inc. j CME TESTING AND ENGINEERING INC. Pebble Creek Subdivision Phase 9D , 9E & 9F Report No . 109 -HMAC Core Testing September 27 , 2006 TABLE 1. RESULTS OF HMAC CORE THICKNESS MEASUREMENTS CORE SPECIMEN LOCATION A VG. SPECIMEN TIDCKNESS (in.) 1•2 St. Andrews Drive Station 56+50, 8' Left of Centerline 1.55 Station 57+50, 8' Right of Centerline 1.75 Station 57+50, 3' Left of Centerline 1.35 Station 58+50, 8' Left of Centerline 1.80 Notes: 1. Average specimen thickness was determined using calipers as specified in ASTM D 3549 . 2. Per project plans and specification minimum of 1.5 inches of HMAC. 2 Client: Mr. Israel Koite City of College Station P.O. Box 9960 CME Testing and Engineering, Inc. 1806 Welsh A venue, Suite C College Station, Texas 77840 (979) 764-8700 Fax (979) 764-6900 Report Date: Project No.: Report No.: 10/12/06 25131 110 College Station, Texas 77842 Technician: Juan Vasquez PROJECT: PEBBLE CREEK SUBDIVISION PHASE 9D, 9E & 9F CONCRETE COMPRESSIVE STRENGTH TEST REPORT Date Sampled: No. of Sets Cast: September 14 , 2006 1of1 Sample Represents: Sidewalk for Ballybunion Lane at Station 81 +00, Left of Centerline Required Compressive Strength at 28 Days, (psi): 3,000 LABORATORY TEST DATA Sample Date Age Cross-sectional Maximum Compressive Identification No. Tested (Days) Area (in2 .) Load (lbf.) Strength (psi.) PCS 45 09121106 7 28.27 70,670 2,500 PCS 46 10/12/06 28 28 .27 94,845 3,350 PCS 47 10/12/06 28 28.27 100,125 3,540 PCS 48 -----Reserve 28.27 Note: Some information on this report provided by others. Testing and reporting was conducted in general accordance with the following applicable ASTM methods : C 31, C 39, C 138, C 143, C 231, & C 1064. FIELD TEST DATA Supplier: Young Ready Mix Time Batched: 10:05 AM Air Content,(%): Truck No.: 37 Time Sampled: 11:02 AM Unit Weight, (pct): Ticket No.: 217207 Concrete Temp, (°F): 89 Sample Type: Mix No.: 30NGC30M Ambient Temp, (°F): 90 Sample Size: Accumulated Yards: 10 Slump (in.): 5.75 Water Added on Site, (gal): Weather: Partly Cloudy Remarks: ND -Not Determined; NP -Not Provided; NA-Not Applicable Field Contact: Mr. Jim Wade (Brazos Paving, Inc.) was· informed of field test results. Copies To: Mr. Billy Prewitt, Brazos Paving, Inc. Mr. Mike McClure, McClure & Browne Engineering/Surveying, Inc. CME Testing and Engineering, Inc. 6.0 ND Cylinder 6 in. dia. 0