Loading...
HomeMy WebLinkAbout32 Development Permit 01-14 Add Parking Covenant Family Church 4010 HarveyC$·w ( ('l If • '-.1 :\flU'- DEVELOPMENT PERMIT PERMIT NO . 100014 DP-COVENANT FAMILY CH-ADD PKING FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA RE : CHAPTER 13 OF THE COLLEGE STATION CITY CODE SITE LEGAL DESCRIPTION: COVENANT FAMILY CHURCH DA TE OF ISSUE: JUNE 28, 2001 OWNER: POST OAK CHRISTIAN CENTER INC C/O DANIEL GREEN-PASTOR COLLEGE STATION , TX 77842-0152 SITE ADDRESS: 4010 HARVEY RD DRAINAGE BASIN: UNAMEDCHANNELTOCC v ALID FOR 12 MONms CONTRACTOR: TYPE OF DEVELOPMENT: PARKING LOT AND DETENTION SPECIAL CONDITIONS: Temporary berm approved. All construction must be in compliance with the approved construction plans . All trees must be barricaded, as shown on plans , prior to any construction . Any trees not barricaded will not count towards landscaping points . Barricades must be l' per caliper inch of the tree diameter. The Contractor shall take all necessary precautions to prevent silt and debris from leaving the immediate construction site in accordance with the approved erosion control plan as well as the City of College Station Drainage Policy and Design Criteria. The Owner and/or Contractor shall assure that all disturbed areas are sodden and establishment of vegetation occurs prior to removal of any silt fencing or hay bales used for temporary erosion control. The Owner and/or Contractor shall also insure that any disturbed vegetation be returned to its original condition, placement and state . The Owner and/or Contractor shall be responsible for any damage to adjacent properties , city streets or infrastructure due to heavy machinery and/or equipment as well as erosion, siltation or sedimentation resulting from the permitted work. Any trees required to be protected by ordinance or as part of the landscape plan must be completely fenced before any operations of this permit can begin. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that debris from construction, erosion , and sedimentation shall not be deposited in city streets, or existing drainage fac ilities . I hereby grant this permit for development of an area outside the special flood hazard area . All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer in the development permit application forthe above named project and all of the codes and ordinances of the City of College Station that apply. If it is determined the prescribed erosion control measures are ineffective to retain all sediment ons ite, it is the contractors responsibility to implement measures that will meet City, State and Federal requirements . Date ~1d°'~I Dat ~ .1 9:, 2"0 I c s c I Engineenng & Environmental Consultants , Inc . Ma y 2 1, 2001 Mr. S pe ncer Thomp so n C ity of College Station Deve lo pm ent Serv ices I I 0 I Texas A venu e Co ll ege Stat io n, TX 77 840 Re: Drain age Report fo r Covenant Fam il y C hur c h (Harvey Hill s ide S ubdi v is io n) Co ll ege Station (Brazos Cou nty), Texas Dear Mr. T ho mp so n: CSC Eng in ee rin g & Environm e ntal Co ns ult a nt s, In c. (CSC) is pleased to s ubmit the e nc losed drain age reports (four co pi es) fo r the Cove nant Family C hu rch deve lopme nt. These repo rt s are s ubmitted on beha lf of th e Cove nan t Fa mil y C hur c h in co mpli a nce with curre nt City of Co ll ege Stat io n draina ge req uir ements. The s it e is locate d at 40 I 0 Harv ey Road in College Stat io n, Texas . As previou s ly documented in "Drai na ge Repo rt for Cove na nt Family C hurch , Lots 22 & 23 , Bl ock I Harvey Hill s id e Subdi vis io n ( 1.03 acres), May 3, 1999" pre pa red by Klin g Eng in ee rin g & Survey in g, the 5.04-acre s it e is o nl y pa rtiall y s itu ated w ithin the c ity lim its of Co ll ege Stati on. However, the owne r has e lected to pro v id e detenti o n fo r futur e deve lopment in acco rdance wit h th e d rainage po li cy of the C ity of Co ll ege Stat io n. In fo rm ation re lative to futur e deve lopment is di sc ussed in detailed in the enc losed reports. These reports are bei ng s ubmitt ed fo r rev iew by the C ity of Co ll ege Stat ion in accordance w ith the pro vis ions of the C ity of Co lle ge Station Drain age Po li cy and Design Sta nd ards Manual. Plea se contact eithe r of the und ers igned indi vidua ls at 778-28 10 if yo u have any questions or need ad diti ona l info rmation co ncerning this matt er. Res pectfully , W.R . C ull e n, P.E. Project Ma nager M. Frederick Con lin , P.E . Se ni or Eng in eer WR C:mf Via Hand Delivery cc: Fami ly Covenant Chur ch 3407 Tabor Road Bryan, Texas 77808 Phone (979) 778-2810 Fax(979)778-0820 , oven a1i t Family Church "Success Begins On Sunday " June 13, 2001 Danny & Janet Green Pastors Spencer Thompson · City of College Station Development Services 1101 Texas Ave. · College Station, TX 77840 RE: Covenant Family Church Detention Pond I Dear Spencer, As we discussed, total planned construction for Covenant Family Church will be completed in three phases. ) Phase One will be two bqys of concr(!te paving, apptoximately 16, 000 sq. ft., which will drain to -storm inleis that dump into the proposed detention pond. This paving is less t~an 25% of total planned construction. Phase Two will be an additional 16, 000 sq. ft. of concrete paving surface draining to the detention pond. The final phase will be d new sanctuary building oj approximately 30, 000 sq. ft. with an additional drive and parking of appro,ximately 10, 000 sq. ft. The time frame for Phase One and Two construction f1as not been determinf!d. Therefore , it is requested that the detention pond as designed be scaled down to accommodate only the water runoff created by Phase One pavi~g., Specifically, our consultant (CSC Engineering and Environmental Consultant, Inc.) indicates that ~he increase runoff attributed to the Phase I construction will be on the order of 3.0 c.fs. As a result, we propose to construct a temporary earthen berm in place of the proposed concrete wall. The berm will be appr(Jximately 18-inch high and have an 18-inch outlet structure to control discharge to the 36-inch c.m.p . beneath Marcy Lane. During the construction of Phase Two the earthen berm will be removed and · . replaced with a permanent concrete wall as indicated in our previous submittal to the City of College., Station. ' If you need any additional information, contact me at your convenience. Sincerely, COVENANT FAMILY CHURCH ' . Construction Consultant DJR!nr 40/0 Harve y Road (Hwy 30 ) PO. Box 10152 College Stati on, Texas 77842 Office (979) 774-1269 Fax (979) 776 -5498 E-mai l: Gre enCFC@ao l.com www.covenant-family -church.org 'I KLING ENGINEERING & SURVEYING Consulting Engineers • Land Surveyors 4103 Teus Avenue, Suite 212 Bryan, Teus 77802 Poat OfYlce Box 4234 B..J. Kling, P.E., R.P.LS. S.M. Kling, R.P.LS. FEBRUARY 23, 2001 TO: FROM: Ted Mayo, P.E . B.J. Kling, P.E. Stacy King Telephone 97918464»212 Fax 979/846-8252 Bryan, Teus 77805 RE: Family Covenant -Detention Requirements for Additional Parking PURPOSE Family Covenant Church has proposed to build two additional parking bays crossing Lots 22 and 23, to build one future parking bay crossing Lots 23 and 24 and to modify the existing parking bay adjacent to Marcy Lane . These lots are within the Harvey Hillside Subdivision in College Station and Brazos County. The construction of the parking bays requires the removal of the existing buildings located on Lots 23 and 24 . The purpose of this letter is to document the handling of the increased runoff from the three additional parking bays . HISTORY The Church is located along the south side of State Highway 30 near the intersection of Marcy Lane . The majority of the property is located in Brazos County and the remainder ls located in College Station. In 1999 the church constructed two parking bays on the portion of the property located in College Station with the approval of the City. The runoff from the two parking bays was directed to a storm sewer system which discharged into a creek located on the portion of the property in Brazos County. No detention was provided since the discharge was in Brazos County and the downstream cross-sections were determined to have capacity for the increase in runoff. (Refer to the 1999 report titled "Drainage Report for Covenant Family Church , Lots 22 & 23, Block 1" and Appendix 6: "Hydraulic Calculationsn in the 1999 report for the capacity of the downstream cross-sections.) The result of this was a reduction in the predeveloped runoff flowing into the drainage ditch along State Highway 30 in College Station , a net decrease of 4.52 cfs for the hundred year storm event. (Refer to Appendix 5: Hydrologic Calculations in the 1999 report for the predeveloped and postdeveloped runoff calculations from the year 1999.) DRAINAGE Notes: 1. All runoff quantities are for the 100 year storm event. 2 ; Sample Calculations attached. Runoff Into Brazos County The runoff from the two proposed parking bays is directed into the storm sewer system constructed in 1999 whose outlet is in the creek located in Brazos County. The full flow capacity of the existing storm sewer system is 21. 92 cfs . The first grate inlet in the storm sewer system has capacity for 6 .22 cfs at a depth of 0.20 ft and the second grate inlet has capacity for 16.58 cfs at a depth of 0.80 ft . The existing runoff into the storm sewer system is 10.35 cfs, 6 .22 cfs flows to the system via the first inlet and the remaining 4 .13 cfs overflows into the second inlet. The runoff from the Proposed Parking Bay 1 and the surrounding landscaped areas contributes 1. 91 cfs to the existing storm sewer system . This runoff bypasses the first grate inlet and overflows into the second inlet. The runoff from the Proposed Parking Bay 2 and the surrounding landscaped areas contributes 2 . 04 cfs to the existing storm sewer system . This runoff flows directly to the second inlet. The total runoff that flows into the second grate inlet including existihg and proposed runoff is 8. 08 cfs at a depth of 0.34 ft. The total runoff that flows into the existing storm sewer system including the existing and proposed runoff is 14.30 cfs which is less than the capacity of the system (21.92 cfs}. Runoff Into College Station The runoff from the Future Parking Bay is directed into the ditch along State Highway 30 located in College Station. The increase in runoff from the Future Parking Bay and additional paving in the existing parking bay is 1.41 cfs. The decrease in the predeveloped runoff as mentioned previously allows for an increase in runoff of 4.52 cfs to the ditch per the 1999 report. Therefore, the postdeveloped runoff from the Future Parking Bay is less than the predeveloped runoff by 3.11 cfs. -II 0 cP 0 II 0 ~ I 0 8 II •• .J) - (' •I 9 _J (fJ II I\ -0 ~ i-' 0 0 I\ -- II 0 U1 oP I \ 0 11 £' ,, 0 _J 0 0 June 1, 2001 CITY OF COLLEGE STATION DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 College Station, Texas 77842 Phone (979) 764-3570 I Fax (979) 764-3496 MEMORANDUM TO: Covenant Family Church, Via fax 776-5498 FROM: Bridgette George, Asst. Development Review Manager PROJECT: Covenant Family Church Parking Lot-Additional Parking Staff reviewed the above-mentioned site plan as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information by Monday at 10:00 a .m. for further staff review: Two (2) copies of the revised construction plans; and, Modified Puls routing spreadhsheet. If you have any questions or need additional information, please call me at 764-3570. Attachments : Staff review comments cc: CSC Engineering & Environmental Consultants, Inc. l/l lA-fd* 1/3 '"'Odd-a Case file #01-14 Home of Texas A&M University ENGINEERING REVIEW COMMENTS No. 1 DP-COVENANT FAMILY CH-ADD PKING (01 00100014) 1. I need to review a complete routing of stormwater through the proposed pond and through the 36" CMP. There is an area to the west that drains through here. Please include a drainage area map. 2. Please show what call-outs in hex boxes refer to, Sheet C-1 . Many of the numbers did not show up in the printing process . Some of the information may have been misread. 3. Will the parking lot storage depth of 8" be exceeded when the new lots drain into the existing grates? Please show calculations. 4. Please explain discharge calculations for 36" CMP. What is the flow line elevation and slope? 5. Please include Modified Puls routing spreadsheet. Reviewed by: Spencer Thompson Date: May 29, 2001 Home of Texas A&M University SITE PLAN APPLICATION MINIMUM SUBMITTAL REQUIREMENTS 'v Site plan application completed in full . 'I' $100.00 Application Fee. __ $100.00 Development Permit Application Fee. or. ()1 -1 lf; 1:UA.. $300.00 Public Infrastructure Inspection Fee if applicable. (Ibis fee is payable if construction of a public waterline, sewerline, sidewalk, street or drainage facilities is involved.) "'J Ten ( 10) folded copies of site plan. ~ A copy of the attached site plan checklist with all items checked off or a brief explanation as to why they are not checked off. APPLICATION DATA NAMEOFPROJECT Site Plan for Additional Parkin g ADDRESS 4010 Harvey Road . LEGALDESCRIPTION Lot 22,23 & 24, Harvey Hillside Subdivision, Vol 264, Pg 484 APPLICANT (Primary Contact for the Project): Name Covenant Family Church StreetAddress 4010 Harvey Road State TX Zip Code 77842 Phone Number ( 979) 77 4-1269 PROPERlY OWNER'S INFORMATION: Name Same as applicant City College Station E-Mail Address ------------- Fax Number ----------------- Street Address City ---------------~ -------------- State Zip Code _____ E-Mail Address ------------- Phone Number Fax Number -------------' ----------------- ARCIIlTECT OR ENGINEER'S INFORMATION: Name Kling Engineering and Surveying StreetAddress 4103 Texas Ave. Suite 212 City __ B_r_y_an _________ _ State TX Zip Code 77802 E-Mail Address stacy@kl i ngen g . com Phone Number ( 979) 8 46-8612 FaxNumber (97 9 ) 8 46-8 252 OTIIER CONTACTS (Please specify type of contact, i.e. project manager, potential buyer, local contact, etc.) Name N/A ---------------------------------- StreetAddress ---------------~ City------------~ State Zip Code _____ E-Mail Address ------------ Phone Number Fax Number ________________ _ SITE PLAN APPLICATION SITEAPP.DOC OJn.5199 CURRENT ZONING ~-0 -Agri cultura 1 Open PRESENT USE OF PROPER1Y Chu~ch and ,parkinq PROPOSED USE OF PROPER1Y Parkin VARIANCE(S) REQUESTED AND REASON(S) _;..:...no:....;..n;..:;.e _______________ _ #OF PARKING SPACES REQUIRED __ 1_55 __ Not A licable -Proposed Parking Only 0 MULTI-FAMILY RESIDENTIAL Total Acreage ___ _ Floodplain Acreage __ Housing Units ---- # of 1 Bedroom Units # of 2 Bedroom Units # of 3 Bedroom Units # of 4 Bedroom Units FOR 2 BEDROOM UNITS ONLY __ # Bedrooms ~ 132 sq. ft. __ # Bedrooms < 132 sq. ft. #OF PARKING SPACES PROVIDED 255 0 COMMERCIAL Total Acreage Building Square Feet ___ _ Floodplain Acreage ---- The applicant has prepared this application and certifies that the facts stated herein and exhibits attached hereto are tru co"ect. er, Agent or Applicant SITE PLAN APPLICATION SITF.APP rYV' n'tn~/QQ '23 &6 2od I Date 2 of3 SUPPLEMENTAL DEVELOPMENT PERMIT INFORMATION .\pplication is hereby made for the following development specific waterway alterations: ACKNOWLEDGMENTS: L Jonat han A. Poe design engineer/owner, hereby acknowledge or affirm that: The information and conclusions contained in the above plans and supporting documents comply with the current requirements of the City of College Station, Texas City Code, Chapter 13 and its associated Drainage Policy and Design Standards. As a co · tion of approval of this permit application, I agree to construct the improvements proposed in this application according to t11Cit'<llOc$llllllC:nts and the requirements o hapter 13 of the College Station City Code. Contractor CERTIFICATIONS: (for proposed alterations within designated flood hazard areas.) A L certify that any nonresidential structure on or proposed to be on this site as part of this application is designated to prevent damage to the structure or its contents as a result of flooding from the 100 year storm. Engineer Date B. L certify that the finished floor elevation of the lowest floor, including any basement, of any residential structure, proposed as part of this application is at or above the base flood elevation established in the latest Federal Insurance Administration Flood Ha7.ard Study and maps, as amended. Engineer Date C . L certify that the alterations or development covered by this permit shall not diminish the flood-Qlll)'ing capacity of the waterway adjoining or crossing this permitted site and that such alterations or development are consistent with requirements of the City of College Station City Code, Chapter 13 ·concerning encroachments of floodways and of floodway fringes. Engineer Date D . L do certify that the proposed alterations do not raise the level of the 100 year flood above elevation established in the latest Federal Insurance Administration Flood Ha7.ard Study. Engineer Date Conditions or comments as part of approval:--------------------------- . In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities . ' hereby grant this permit for development All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer for the above named project All of the applicable codes and ordinances of the City of College Station shall apply. SITE PLAN APPLICATION SITEAPP.DOC 03/25199 3of3 W. R. Cu ll en, P.E . Pr oj ect Ma nage r R ~v, -wEIJ FOR FI LE t COMPLI JUN 21 20 ENGINEERING ~ ~ DRAINAGE REPORT FOR COVENANT FAMILY CHURCH (5.04 ACRES), HARVEY HILLSIDE SUBDIVISION COLLEGE STATION (BRAZOS COUNTY), TEXAS Pr epared for Cove nant Fami ly Chu rc h 40 I 0 Ha rvey Roa d Co ll ege Stat ion , Texa s 77845 Prepared by CSC Eng in ee rin g & Enviro nm e nt a l Co ns ult a nts, In c . 34 0 7 Tabor Road Co ll ege Station , Texa s 77808 May 2 1, 2001 Se ni or Eng in eer csc Dra in age Re port for Covena nt Fam il y C hurc h TABLE OF CONTENTS Page GENE RAL DESCRIPT ION 01: S ITE AND P RO POSED DEVELOP M ENT ...................................... . P R E-DEVELO P ME 1T DRA INAGE PATTE RNS AND MA J OR DRA INAGE BAS INS .................... 2 SCOPE OF RE PORT AND ORAi "AGE DES IG 1 C RI TER IA ............................................................. 2 STO R MWATE R RUNOFF COMPUTAT IONS ..................................................................................... 2 USE OF T H E R/\ T IONAI. FO RMULA........................................................................................ 2 R UNOFF COEFF IC IENTS (C) ..................................................................................................... 3 T IME OF CONCENT RAT IO (TcJ............................................................................................. 4 RAINFALL INTENS II.Y_LJ..}.......................................................................................................... 5 AREA OF S ITE (A)....................................................................................................................... 5 STORM W ATER R UNOFF QUANTIT IES................................................................................... 6 STO RMWATER DETE 1T ION CO MPUTAT IO S .............................................................................. 6 REQU IR ED M IN IMUM DETE TION STO RAGE VOLUME................................................... 6 DETE 1T ION STO RAGE AREA.................................................................................................. 7 STO R MWATE R RO UT ING CO MPUTAT IONS................................................................................... 7 METHODOLOGY......................................................................................................................... 7 ROUT ING COMPUTATIONS AND CONCLUS IONS................................................................ 8 CERTIF ICAT ION .................................................................................................................................... 9 R EFE R E, CES ........................................................................................................ ." ................................ 10 LIST OF TABLES Ta bl e I. S um marv of R unoff Coefficient ("C") Values for Pre-a nd Post-Deve lopment Co ndition s............................................................................................................................. 4 Table 2. Co m puted Rai n fa ll lnten s itv Val ues for Refe re nced Sto rm Return Per iod.......................... 5 Table 3. Ca lculation of Pre -and Post-Deve lopment Sto rn nvater Run off Rates Using the F ig ure I . F ig ure 2. F ig ur e 3 . F ig ure 4 . Figure 5 . Fi g ure 6. F ig ure 7. Rat ional Form u la .................................................................................................................. 6 LIST OF FIGURES S it e Locati o n ma p Fo r Pro posed Covena nt Famil y C hurc h Deve lo pm e nt Ca rt e r C reek Dra in age Bas in S it e M ap Fo r Pro pose d Cove nant Family C hurc h Deve lo pm e nt Pre-a nd Post-Deve lo pm e nt Hy drog raph s fo r 25-Y ear St o rm Eve nt C umul ative O utfl ow (Di sc harge) Ve rs us De pth of Stora ge Infl ow a nd O ut fl ow Hydrogra ph s Illu stra t in g Ro ut ing fo r 25-Year Sto rm Eve nt Infl ow a nd O utfl ow Hy d rogra ph s Illu st ratin g Ro utin g fo r I 00-Year Sto rm Event II csc Drainage Report for Covenant Family C hurch GENERAL DESCRIPTION OF SITE AND PROPOSED DEVELOPMENT The s ite , wh ich is the s ubj ect of this drain age report, is located a t 40 I 0 Harvey Ro ad in Co ll ege Station (Brazos County). Texas. The s ubj ect property, d e picted in Figure I , is s ituated on a 5 .04-acre tract o f contiguous prope 1ty located o n the no 1th east co rn er of th e State Highway 30 (Harvey Road) and Marcy La ne intersection . The s it e is pa rtiall y d eve lo pe d a t the present time . Existing s urface vegetati ve cover at the s it e co ns ists of isolated nat ive trees and grasses . The s urfa ce topograp hy across th e und eve lo pe d po rti o ns of the si te ge nera ll y s lopes to the east toward Marcy La ne. Adjacent properti es can be described as full y to partially developed . As previously me ntion ed . th e s it e ca n be co ns id e red as partiall y developed, and co ns ists of the fo llowin g covered areas : • Structures -church/office a rea (8 ,000 ft 2) a nd t wo s upport buildin gs ( 1,990 and 1,344 ft2, respectively) • Pavement and s idewalks -cumulative support pa veme nt and s ide wa lk s ( 11 ,334 ft2) This report has been developed to address detenti o n requi re m e nt s for "full y " developed conditions at the subject prop erty. Initi a ll y , the owner proposes .to construct a pprox imatel y 25,5 00 ft2 of a dditi o nal parkin g area a lo ng t he western portion of th e s it e adjacent to S tate Hi g hway 30 . Future development plan s w ill a lso e nt ai l the co ns tru ct ion of a s in g le-story building near the cente r of th e prop erty a nd associated parking on the easte rn po 1t ion of the s ubj ec t property. The p ro po sed new church buildin g foo tprint w ill e nco mp ass a n area of approximately 3 0 ,000 ft 2 and th e s upport paving w ill e nc o mpass an area of approximately 18 ,000 ft 2. As previously me nti o ned . the west pa rkin g area w ill be the only improvement mad e during th e initial ph ase of th e development . Howeve r, the owner has ex pressed int e rest in th e d es ig n of a n a ppli cab le detention facility fo r '·full y develo pe d " conditions . T h e following additional structures and res pecti ve covered areas are planned for the proposed deve lo pm e nt (full y developed): • S tru ct ures -new church buildin g (30 ,000 ft 2) • Pavem ent and s idewa lks -west parkin g a rea (25,500 ft 2) and east parkin g area ( 18 ,000 ft2) The total in crease in impervious cover assoc iated with the proposed improvements rs approximately 72 ,500 ft 2 ( 1.66 ac res). It s hould be no te d that the g ra ss cover and associated s lopes for g reen s pace a nd land sca pe d areas pro posed to be developed on the s ite are s imilar in c haracter a nd grad e to the existin g "pre -deve lopm e nt .. co nditi o n s . As a resu lt , these landscaped a reas were not considered as adding to the quanti ty o r rate of sto rm wate r run off assoc iate d wi th post-de ve lo pment conditi o ns. csc Drainage Report for Covenant Famil y C hurch PRE-DEVELOPMENT DRAINAGE PATTERNS AND MAJOR DRAINAGE BASINS The 5.04-acre s it e is located in the Ca 11er C reek Drainage basin as illu strated on Figure 2. Topographically, the s urface elevatio n decreases by approximately 13 ft , from E l 3 14 ms ! near the northeast corner to E l 30 I m s l o n the southwest corner of the properfy. These topographic condition s occur over a distance of approximate ly 500 ft , resulting in an average slope of 2.6%. A re lati vely small depression is present o n th e so uthern corner of the property, immediately upstream of a 36-inch CMP cu lve 11 that provides s to rn1\\ater drainage beneath Marcy Lane . Ca pacity is s ues relative to this drainage structure have been addressed in the referenced drainage report dated M ay 3, 1999 , as prepared by Klin g Eng ineerin g & Survey in g. There is a man -mad e draina ge cha nn e l that is located along the southwest boundary of the project s ite . Stormwater runoff fr o m th e s it e is a combination of s heet flow and subsurface flow from a 24-inch storm sewer that was in stall e d during previou s con struction activities at the s ite. The I 00-year floodplain is not present within the s ite boundari es . SCOPE OF REPORT AND DRAINAGE DESIGN CRITERIA This report addresses the need for d e tenti o n of draina ge from the subject s ite following th e construction of the "pha se d·· future improvements to the Covena nt Famil y C hurch s ite . Th e report ha s been developed to e n s ur e drain age conditio ns as previou s ly documented in "Drainage Report for Covenant Fami ly Church . Lots 22 & 23, Block I Harvey Hill s id e Subdi vision ( 1.03 acres), May 3, 1999" prepared by Kling Engineer in g & Surveyi ng. The s ite and proposed deve lopment were evaluated in accordance with the crite ri a o utlin e d in the Drainage Policy and Design Standards Manual (DPDSM) of the City of College Station. Texas. The DP DSM is part of th e Storm water Management Plan for the City of Co ll ege Station . This report also discusses s pecific drainage control structure s related to the detention of stormwater runoff from th e pro p osed development. STORM WATER RUNOFF COMPUTATIONS USE OF THE RA TI ON AL FORMULA The Rational Fo rmul a was use d to compute the total volume of storm water runoff generated from the full y developed s ite a nd to assess the quantity of sto rm water w hich was required to be detained to 2 csc Draina ge Re port fo r Covenant Family Church "offset" the in c reased runoff associated with th e n ew d eve lopment. Use of the Rational Formula is rea so nable for thi s proj ect since the contributory area of runoff is less than 50 acres, an area sometimes referenced in the literature as an upper limit for use of the Rational Formu la. Therefore, the Rational Formula was used to determine the peak discharge for both pre-and post-development conditions. The general eq uati o n for the Rational Formula is well known: Q =C I A where: Q =di sc harge of sto rmwater in unit s of cubic feet per second (cfs) C = coefficient that represents the average runoff characteristics of the land cover within the draina ge area of interest, i.e., the runoff coefficient, which is dimensionless I = rainfall intensity in unit s of inches per hour (in/hr), and A = a rea of the s ite that contributes to the stonnwater runoff in units of acres The values for each of these components used to com pute .the sto rmwater runoff at the subject site are discussed in the following sections. RUNOFF COEFFICIENTS (C) The run off coefficient s or .. C " va lu es were computed for both pre-development (current co nditi o n s) and po s t-development conditions for the entire 5.04-acre s it e . Pre-development condition s were assumed to represent the '·current" conditions as s ummarized in th e "General Desc ription of Site and Proposed Devel opm e nt" of thi s report . The post development conditions were established to repre sent "full y developed '. conditions subsequent to the addition of the single-story building, paved parkin g and drive areas, and landscaped areas. The values of the runoff coefficients used for the pre-and po st- development conditions were the values presented in Table 111-1 of the DPDSM for different types of s urface covers and land uses. The pre-and post-development "C" values were determined from the referenced table for the specific ty pes of site cover and were applied to the spec ific areas of the s ite overlaid by the specifically named cover mater ia ls . Specific types of cover and the corresponding "C' va lues used in the analysis are listed in Table I . Also presented in Table I are calcu lated "average" "C" va lues for the pre-and post- developed s ite . 3 csc Dra in age Re port fo r Cove nant Fa mily Chu rc h Ta bl e I . Summ ary of Run off Coeffic ie nt ("C'.) Va lu es fo r Pre -a nd Post-Deve lo pm ent Co nditi o ns T y pe of Ground Cover Pre-D e velopm ent (C urrent Co ndit ion:;) Ex istin g Buildin gs and Stru ctures Pa rkin g and Dri ves Und eve lo ped Gra ss and La nd scape d A reas S ummation Area of Coverage, (square feet) 11 ,334 66 ,791 14 1,4 17 219,542 T y pical "C " Values 0.90 0.90 0.4 0 Extended Multiplication of "C" Values x Area 10 .2 00 60 ,112 56.566 126 ,878 Ave ra ge Pre-Deve lo pm e nt "C" va lu e = 126 ,87 8 squ are fee t I 2 19,542 squ a re fee t = 0 .5 7 Pos t-De velopment (Fu lly De ve loped) Ex istin g Buildin gs and St ru ctures (I 1,334 ft2) an d ew Church Buil d in g (30 ,000 ft 2) Ex istin g Pa rkin g and Dri ve Area s (66 ,792 ft 2) and ew Wes t (25,5 00 ft 2) a nd East Pa rkin g ( 18 ,00 0 ft 2) Area s Re ma in ing Und eve lo pe d Grass a nd La nd sca ped Ar ea s S ummation 4 1,334 0.90 37 ,200 11 0,292 0.9 0 99 ,262 67 ,916 0.4 0 2 7,167 219,542 163 ,628 Ave ra ge Pos t-Deve lopme nt "C" va lu e = 16 3,62 8 sq uare fee t I 2 19,542 squ are fee t = 0 . 74 T he res ultin g wei g hted "C'' va lu e of 0 . 74 wa s used to re prese nt pos t-deve lo pm e nt drainage across th e s it e a nd in s ubse qu ent run off co mpu ta ti o ns pr ese nt ed he re in . TIME OF CONCE NTRATIO N (tc) T he tim e of co nce ntrat io n at a s ite is used to dete rmin e the intensity of th e rai nfa ll even t use d fo r co mpu ti ng storm water fl ow s a nd required dete nti o n vo lum es . The t im e of co nce nt ra ti o n is defin ed as "'th e tim e requ ired for th e ru noff to be es ta bli shed and fl o w fr o m the mo st remote pa rt o f th e dr a ina ge a rea to the po int und er des ign:· T he tim e of conce ntra tio n fo r th e s ubj ec t s ite wa s ca lc ul ated base d up o n th e e leva ti on differe nce a nd t he flow di sta nce fro m the no rt heast co rn e r of the s it e , to the ex istin g 24-in ch sto rm wa ter inl et loca ted in the nort h pa rkin g a rea , to a po int of di sc harge in t he ex ist ing d epr essed area at th e so uth east co rn er of th e s ubject prop erty as illu strated in Fig ure 3 . T he s lo pe or g rad e of the s it e fo r pre -deve lo pm e nt 4 csc Drai nage Re po rt fo r Covena nt Fa mil y C hurc h condi t io ns was d e termin e d fr o m th e re fe re nced Klin g Eng in ee ri ng & S urvey in g re po rt d a te d May 3 , 19 99. T he s lo pe fo r po st -d eve lo pm e nt conditi o ns w a s d e te rmin e d fr o m the pro posed s it e g radin g pl a n, which will be c o n s iste nt wi th th e ex istin g s it e to pog raphy with th e e xc e pti o n of lo cali zed g radin g near th e proposed s tru c tures . Us in g th e s ur face tra ve l di s ta nce o f a p prox imate ly 8 7 0 ft a nd a we ig hted fl ow ve loc ity compute d fro m th e var io us m e th o d s of co nveya nce a lo ng th e fl ow pa th (Fi g ure 3), a tim e of concent rat io n o f ap p rox im a te ly 2 .7 minutes was d e termin ed fo r pre-d eve lo pme nt fl ow. T he post- d eve lo pm e nt tim e of concentrati o n was compute d in a s imil a r ma nner to usi n g a fl ow di sta nce o f 8 35 ft . T he tim e of co nce n tra ti o n fo r post-d eve lo pm e nt c ondition s was a lso compute d to be 2.7 minutes us in g a w e ig hte d fl o w ve loc it y o f 6 .8 ft/sec (Fi g ure 3 ). Ba sed o n DPDSM c rite ri a, a minimum tim e o f conce nt ra ti o n o f 10 minutes is re quired for th e d es ig n of d ra ina ge system c o mpo ne nt s, in c ludin g dete nti o n fac iliti es . Accordin g ly , a tim e of c o nce nt ration of I 0 minutes was used in th e s ub sequ e nt drain age ca lc ul a ti o n fo r th e s it e. RAINFALL INTENSITY (I) T he rain fa ll in te ns ity va lu es we re compute d for th e 10-minute tim e o f concentra ti o n prev io us ly di scussed us in g th e inte ns it y-durati o n-fre que ncy c urv es d eve lo ped by th e T exas Depa rtm e nt o f Tran s po rt at io n . Th e co mputed int e ns iti es ca lc ulate d fo r sto rm eve nt s w it h "re turn pe riod s" of 5, 10 , 25 , 5 0 , a nd 100 years a re indicate d in Ta bl e 2. Ta bl e 2 . Comp uted Ra in fa ll lnt e nsity V a lu es fo r Refere nced Storm Return Pe ri o d Storm Return Period (years) AREA OF SITE (A) 5 10 25 50 10 0 Rainfall Intensity (inches/hour) 7.7 8.6 9 .9 I I. I 12 .3 As previ o us ly di sc ussed . th e s it e proposed for d eve lo pm e nt e nco mpa sses approx im a tel y 5.04 acres . Accordin g ly , co mputa ti o ns assoc ia te d w ith th e eva lua t io n o f sto rm wate r run o ff we re d e ve lo pe d us in g a n a rea o f 5.04 ac res . 5 csc Drainage Report for Covenant Fa mil y C hurc h STORM WAT E R RUNOFF QUANTITIES Sto nn water runoff rat es we re ca lc ul a te d us ing th e Rati o nal Formula . Run off rates were ca lc ulated for both pre-and post-development co ndition s for the 5.0 4-acre s it e a nd are present e d in Table 3. Table 3 . Ca lc ulati o n of Pre-and Post-Deve lopme nt Stormwater Run off Rates Us in g the Ration a l Formula Storm Site A r ea 11 ,. Site Area 11051 Intensity pre Inten s it y 11051 Q 1 pre Qpos t Q 1 difT Event (acres) (acres) Cprc Cpos t (in/hr) (in/hr) (cfs) (cfs) (cfs) 5 5.04 5.04 .57 .74 7 .7 7 .7 22 .1 28 .7 6.6 IO 5 .04 5.04 .57 .74 8 .6 8 .6 24.8 32.2 7.4 25 5 .04 5.04 .57 .74 9.9 9 .9 28.3 36 .8 8 .4 50 5.04 5 .04 .5 7 .74 I I. I I I. I 32.0 41.6 9 .6 100 5 .04 5 .04 .57 .74 12.3 12.3 25.3 45 .9 10 .5 No tes: I. Permitted rate or o uttl ow from detention basi n. 2. Difference in ll ow s th at wil l require deten tion . The calculate d pre-development flows prese nt e d in Tab le 3 for the 25-year storm eve nt rep resent th e maxi mum permiss ibl e di sc ha rge flo w rates from the d etent io n facility. The diffe re nce in the pre-a nd post-deve lo pm ent fl ows for the 25-year sto rm eve nt li sted in Tabl e 3 (Oct itT = 8 .4 cfs) represents the in c rease in fl ow rate fr o m th e development that mu st be detaine d . STORMWATER DETENTION COMPUTATIONS REQUIRED MINIMUM DETENTION STORAGE VOLUME The required s torage vo lum e of the d etenti o n ba si n was ca lcul ated s u c h th at the peak discharge of th e ul timate de ve lo pm e nt hy dro gra ph s fo r th e 25-year d es ig n sto rm was limited to a discharge le ss than a defined target disc h arge . The target di sc h a rge was de fin e d by t he DP DSM to be the peak di sc harge of the pre-deve lop m e nt hy drograph for the 25-year storm event. A s previous ly me nti o ned, d etenti o n requirements have bee n computed for ·'full y deve lo ped '' cond itio ns even th o u g h the site d evelopm e nt will occur in a phased approac h . T he req uired detention storage volume was determined as th e difference in a rea betwee n the pre- and po st-developm e nt hy drographs, w hi c h are d ep icted on Figure 4 . The Triangular Approximation M et hod was u sed to d ete rmin e th e hy drog raph s . The hydrograp hs were constructed by assuming that the peak discharge, as calculated from the Rati onal Formul a , occ urs at a time e qual to the time of conce ntrati o n and that o ne -third of the flow vo lum e occ urs before th e peak discharge is reached and two- 6 csc Dr a ina ge Rep o rt fo r Cove na nt Family C hurc h third s occ ur following th e peak discharge. T he Tr ia ng ular Approximation Met hod of developing hydro g raph s is generally co ns id ered to be acceptable fo r analysis of se co nd ary drain age syste ms wi th an a rea of less th an 50 ac res. whi ch is a ppli ca bl e to th e drainage bas in addre ssed in thi s report. By co mp a rin g th e two hydrogra ph s in Figure 4 , it is apparent that the difference 111 areas att ributabl e to in creased fl ow s from the pro posed development is relatively sma ll . As previously discussed , bot h the pre-a nd post-development flows we re deve loped for the e ntire 5 .0 4 acres of co ntributo ry drain age area . T he difference in area betwee n the two hydro grap hs, o r th e required minimum vo lum e of the detent io n storage area for th e 25-year sto rm eve nt , wa s calc ulated to be a pp rox imat e ly 7,600 ft 3 . A 10 % increase in the required volume as s pec ifi ed in th e DPDSM res ult ed in a des ig n dete nti on vo lum e of 8,360 ft'. DETENTION STORAGE AREA Give n th e relatively low storage vo lum e require d fo r detention and ex ist in g site co ndition s, the ow ne r has e lect ed to take advantage of the nat ural topographic features a nd co nst ru ct a detent io n area w ithin the ex istin g drainage area at the s it e. The locat io n of the propo se d stor mwat er dete nti o n basin is illu strat ed in Figure 2 . The average plan a rea o f the nat ur a l detenti o n ba s in is a ppro x im ate ly 2,095 ft2• The ave rage depth of the drainage basin is a ppro x im ate ly 4 ft (E l 295.0 to El 299.0 ms l). T hu s, the volume ava il ab le fo r detention is approx im ate ly 8,380 ft 3 . An o utl et struct ure will be constructed o n the north e nd of th e drainage basin to co ntr ol di charge from the dete nti o n facility. STORM WATER ROUTING COMPUTATIONS METHODOLOGY The detention basin wa s ana lyzed for fl ow rout in g through the areas under different storm eve nt s . T he purp ose of the routi ng a nalysi s was to s imul ate the perfo rm anc e of the detention bas in in the form of inflow and ou tfl ow hydrographs . T he storage-ro utin g analy s is was pe rform ed base d up o n the Pul s Method . The Pul s Method is a pro ced ure fo r grap hi ca ll y so lv in g the co ntinuity equ ation for sto rage re servoi rs us in g the c har.ac teri sti c hei ght-storage a nd he ig ht -d isc harge c ur ves. As prev ious ly di sc usse d , th e equ iva le nt of the he ight-storage c urv e was developed gra phi ca ll y fro m the gra din g plan and the invert elevation of the outlet st ructure . A heig ht -disc ha rge or disc harge versus depth of storage c ur ve was a lso developed for the o utl et structure. T he curve for the area of int erest is illustrated in Fig ure 5 -C umulati ve Outflow (D isc harge) ve rsus De pth of Storage. 7 csc Drai nage Re port fo r Covena nt Fami ly C hu rc h ROUTI NG COMP UTATIO NS A N D CONCLUSIONS Rout in g a na lysis was pe r for m ed fo r t wo sto rm eve nts: th e 25-year event, w hi c h re presents t he d es ig n sto rm ; and th e I 00-yea r eve nt as s pec ifi e d in th e DPD S M . Infl ow a nd o ut fl ow hy drogra ph s illu st ra ti ng ro utin g for 25-yea r a nd I 00-year sto rm event s a re p rese nt ed gra phi ca ll y o n F ig ures 6 and 7, res pecti ve ly. As can be see n fro m F ig ure 7, th e max imum o utfl ow fro m th e detenti o n bas in is a pp roximate ly 24% of th e max imum pre -d eve lo pm e nt ra te of28.3 cfs. T herefo re, th e detent io n bas in has th e ca pacity to s to re the excess vo lum e of sto rm wate r assoc iated w it h th e p la nn e d d eve lo pm e nt o f th e s ite a nd . di s c ha rge th e stored wate r a t a ra te th a t is "equal to or less th a n t he pea k di sc ha rges of th e pre - d eve lop men t hy d rographs fo r t he design [25-year] storm '· as spec ifi e d in t he DPDSM . In addit io n, t he res ult s of t he ro ut ing a na lys is for t he I 00-year eve nt as illu st ra ted in F igure 7 indi cate t hat t he hi g he r fl ows associa ted with thi s eve nt w ill flow ove r th e to p of t he co nc re te wa ll o utl e t structure onto a r ip- ra pp ed area prio r to disc harge t h ro ug h t he roa d way c ul ve rt a nd w ill no t adverse ly im pact th e integr ity of th e bas in . 8 csc Drainage Report for Cove nant Fam il y C hurch CERTIFICATION "I here by ce rtify that this repo1t fo r drainage design of the sto rmwater detention basin at the 5 .04-acre Cove na nt Family C hurc h locate d a t 40 I 0 Ha rvey Road in Co lle ge S tat io n (Bra zos Co un ty), Texas, was prepared und e r my s up e rvi sion in accordance with the prov isio ns of the City of Co lle ge Station DP DSM for the owners thereof . ., /f'ii £ e.,_v.._ 5/J1/c1 !/JJ. ~ . Ut___ W .R . C ull en , P .E. Registered Professional Eng in eer State of Texas P.E. Number 652 15 9 csc Drainage Repo11 for Cove nant Family Church REFERENCES Chow , Ven T., Maidment, David R. and May s, Larry W. 1988. Applied Hydrology . McGraw-Hill Book Company. New York , NY . City of Co ll ege Station, Texas . October 1992 . Drainage Design Guideline Manual. Davis , Victor D., and Soren e n, Kenneth E. 1969 . Handbook of Applied Hydraulic s. McGraw-Hill Book Co mpany . New York. NY. Mason, John M. and Rhombrerg. Edward L. 1980. On-Site Detention . Prepared for Texas Engineering Extension Service. Texas A&M University . Co ll ege Stat ion, TX. Publication No . PWP : 03355-0 I. McCuen, Richard H. 1982 . A _Guide to Hydrologic Analysis Using SCS Method s. Prentice-Hall , Inc . Englewood C li ffs , NJ. United States Department of Agriculture . January 1975 . Urban Hydrology for Small Watershed s. Technical Release No. 55 . Engi neering Division , Soi ls Co nservation Service , U.S. Department of Agriculture. Wanielista , Martin P. 1978 . Sto rmwater Management Quantity and Quality. Ann Arbor Science. Ann Arbor, Ml. Westaway , C.R. and Loomi s, A. W. 1979. Cameron Hydra ulic Data . (I 6111 Edition). In gerso ll-Rand . Woodcliff Lake , J. 10 FIGURES SUBJECT TRACT Prepared For: COVENANT FAMILY CHURCH NOT TO SCALE SITE LOCATION MAP FOR PROPOSED COVENANT FAMILY CHURCH COLLEGE STATION, TEXAS PROJECT : COVE NANT FAMILY CHURCH LOCATION : COLLEGE STATION TEXAS APPR: DATE : DRAWN BY : JBF SCALE : NOT TO SCALE DATE : 05/21/01 FIGURE : 1 \\Shared\shared c\G ra phicslcovenantldwg\FIG 1.dwg, 05/2 112001 06:31:27 AM C :\WINDOWS\TEMP\A$C4FCB56B7.DIB Prepared For: COVENANT FAMILY CHURCH • SITE LOCATION Carter Creek Drainage Basin PROJECT: COVENANT FAMILY CHURCH LOCATION : COLLEGE STATION TEXAS APPR: DATE: DRAWN BY: JBF SCALE: NOT TO SCALE DATE : 05/21/01 FIGURE : 2 1\Sharedlshared c\Graphics\covenanl\dwg\FIG2.dwg, 05/21/2001 00:24:51 /Wi 50 40 -Q post =36.8cfs J!? (.) -0 ~ 30 w (!) a:: <( :c 20 (.) Cl) -0 10 0 5 VOLUME OF DETENTION STORAGE (EQUALS DIFFERENCE IN AREA BENEATH EACH HYDROGRAPH) /POST-DEVELOPMENT ~1 HYDROGRAPH en (lJ ...... ...... ::J ::J c c E E 0 0 I"") I"") E E ~EVELOPMENT II II 1il 0 0 0 ~ a. a. I I ..J' 0 II II ...... I"") I"") ll 1il .... 0 HYDROGRAPH a. a. I I ~ ~ 10 15 20 25 30 35 TIME, (minutes) Prepared For: COVENANT FAMILY CHURCH Pre-and Post-Development Hydrographs for 25-Year Storm Event PROJECT: COVENANT FAMILY CHURCH LOCATION : COLLEGE STATION TEXAS APPR : DATE : DRAVVN BY: JBF SCALE : NOT TO SCALE DATE : 05121/01 FIGURE : 4 l\Sharedlshared c\Graph ic s\covenant\dwg\FIG4 .dwg , 05121/2001 06:28:45 AM 20 18 16 14 ~ 12 a w Cl a: 10 < ::c 0 !!1 c 8 6 4 2 0 0 IMlmffN: Of llElDl1DI PlllO 1 2 3 4 5 OEPTll OF WATER IN DETENTION PONO, (ft) I•\ Prepared For: COVENANT FAMILY CHURCH Flow through 18-inch Outlet Pipe vs. Depth of Water in Detention Pond PROJECT COVENANT FAM ILY CHURCH LOCATION: COLLEGE STATION TEXAS APPR: DATE : DRAWN BY : JBF SCALE : NOT TO SCALE DATE : 05/'21/01 FIGURE : 5 l \Shar ed\shared c\Graphics\covenant\dwg\FIGS.dwg, 0512112001 06:35:06 AM 40 35 30 ~ ~ 25 0 INFLOW w ~ 20 c:( ::c (.) 15 CJ) 0 10 5 0 0 10 20 30 40 TIME , (minutes) 1 1 C 8 c I Inflow and Outflow hydrographs _ . Illustrating Routing of 25-Year Storm Event :=======:P;=re=pa=red::::;:For::=. ====: PROJECT : COVENANT FAM ILY CHURCH COVENANT LOCATIO N: CO LL EG E STATION TEXAS FAMILY A PPR: DATE : CHURC H DR AWN BY: JBF SC A LE: NOT TO SCALE DATE : 05/21/01 FIGURE : 6 l \Shared\sha red c\Graph icslcovenant\dwg\FIG6.dwg , 05/2 1/2001 09:27 :42 AM 60 50 ~ 40 -0 w (!) ~ 30 :::c (.) (/') c 20 10 0 10 DETENTION POND AT CAPACITY / EMERGENCY SPILLOVER OCCURS / INFLOW=OUTFLOW 20 30 40 TIME, (minutes) 50 1 1 C 8 c I Inflow and Outflow hydrographs . Illustrating Routing of 100-Year Storm Event ~=====================~ Prepared For. PROJECT: COVENANT FAMILY CHURCH COVENANT LOCATION : COLLEGE STATION TEXAS FAMILY APPR : DATE : CHURCH DRAWN BY : JBF SCALE : NOT TO SCALE DATE : 05/21/01 FIGURE : 7 \\Sharedlsha red c\Graphics\coven antldwg\FIG7.dwg , 05121/2001 09:24 :44 AM l . - .. ' ' ) c s c I Engineering & Environmental Consultants . Inc . June 8, 200 I Mr. Spencer Thompson City of College Station Development Services I I 0 I Texas Avenue Co ll ege Station , TX 77 840 RE!VIEWED FOR ~ COMPLIA~ JUN 2 1 2001 \) COLLEGE STATION ENGINEERING Re: Response to City of Co ll ege Station Engineering Review Comments o . I Regarding The Drainage Report for Covenant Family C hurc h (Ha rvey Hillside Subdivis ion) College Station (Brazos County), Texas Dear Mr. Thomp son: CSC Engineering & Environmenta l Co nsultants , In c. (CSC), on behalf of the Covenant Family Church has prepared a re s ponse to the City of College Station 's review com ments dated May 29, 200 I. The City of Col lege Station's comment s are presented in itali cs, immedi ate ly followed by a response that addresses the comment. • I n eed to re view a co mplete routing of stormwater throug h the proposed pond and through the 36 " CMP. Ther e is an area to the west that drains through here. Please include a drainage area map. The drainage map for the subbasin does indicate that off-site runoff will be directed to the 36" CMP located along Marc y Lane. It is our understanding that details regarding drainage from off-site areas have bee n previ o us ly addressed in an engineering report prepared by Kling Engineering & Surveying (Kling) entitled ·'Dra ina ge Repo rt for Covenant Family Ch urch , Lots 22 & 23, Block I Harvey Hillside Subdi vis io n ( 1.0 3 acres), May 3 , 1999." The detention facility for this project has been designed in a manner th at will not restrict the current surface flow to the 36" CMP. A copy of the area drainage map is presented in Attachment A of this letter. • Please show what call-outs in hex boxes refer to , Sheet C -1. Many of the numb ers did not s how up in th e printing process. Som e of th e information may have been misread. A complete "plot copy" of th e project plans ha s been enclosed as part of this submittal. • Will th e parking lot storage depth of 8 " be exceeded when th e new lot s drain into the existing grates? Please show calculations. Inform ation pre sented in Kling 's referenced report ind ic ates that the flow from area 48 (which includes the two existing parking areas) is 5 .62 cfs for the I 0-year storm event and I 0.35 cfs for the I 00-year storm event. These flows will in crease s li g htly due to the construction of proposed parking bays I and 2 a nd will be conveyed throu g h two inlet grates to the existi ng 24" storm drain. Specifically, the construction of proposed parking ba y No. I wi ll increase the flow to grate 1 to 7 .04 cfs for the 10 -year storm event and to 12 .26 c fs for the 100-year sto rm event. It s hould be noted that due to the topography of the drive a rea between the two grates, once the depth of ponded stormwater at the grate I lo cation exceed 0.4 ft (or 4 .8 inches), ponded stormwater will begin to flow to grate 2. At 0.4 ft d epth of ponded water, approx im ately I 0.05 cfs w ill flow into grate 1. Thus, g rate 1 can handle all of the 7 .0 4 cfs flow from the I 0-year event and all but 2.2 1 cfs ( 12.26 cfs -I 0.05 cfs) from the I 00-year event. 3407 Tabor Road Bryan, Texas 77808 Phone (979) 778-2810 Fax (979) 778-0820 I c s c I Mr. Spencer Thompso n Page 2 Jun e 7, 200 I T he construction of proposed parkin g bay No. 2 has been desi g ned in a manner that w ill a ll ow sto rmwater run off to be con veyed p rim aril y by grate 2 . F low from p roposed parkin g bay 2 to grate 2 is calcu lated to be 1.42 cfs for the I 0-year st o rm eve nt and 1.9 cfs for the I 00-year storm event. The re s ul ti ng d epth of po nd ed storm water at the grate 2 locat ion , in c ludin g t he overflow from the g rate I locat io n for the I 00- year event, is estimated to be less th a n 0.3 ft for both event s. T he a ll owabl e storage depth prese nt ed in C ity of Co ll ege Statio n Drain age Policy an d Design Stand a rd s Manual is 0.83 ft for the I 0-year sto rm eve nt and 1.5 ft for th e I 00-year sto rm event. As indicated by the refere nc ed calc ul ations , both of th ese design limitation s wi ll not be exceeded for the propo sed parkin g a rea layout. Stormwater flow in the "future parking Bay 3 " w ill be conveyed via s heet flow to a sto rm water ditch a lo ng Hi g hway 30 as indicated in the referenced Klin g report a nd therefore w ill not have to routed to the reference d grated stotmwate r inl ets . • Please expla in disc harge calculations for th e 36 " CMP. What is the flo w lin e elevation and slope ? A s previ o u s ly stated , drain age iss ues relative to the 36" CMP have been addressed in the referenced e ng in eeri ng Klin g report. ln fomiat ion prov id ed by Kling indi cates th at the up stream fl ow lin e is at E l. 294.26 ms l a nd the downstream flo w line is at E l. 292.50 msl. The 36" CM P that conveys stormwater be neath Marcy Lane is approximate ly 26 ft long. The res ultin g s lope of th e 36" C MP is 6.7%. • Pl ea e include Modified Puls routing .spreads hee t. T he stormwater rout in g work s heets fo r the 25 -a nd I 00-year storm event s have been included in Attachm e nt A . The work s heet fo r th e 25 -year storm eve nt indicates a max imum o utflow of 7.9 cfs or approximate ly 25 % of the predeve lo pm e nt fl ow . In additio n, the wo rks heet for the I 00-year storm event indi cates that th e detent io n fac ili ty wa ll w ill be overtopped a s required by t he provi s ion s of t he City of Co ll ege Statio n Drainage Po li cy and Des ign Standards Manual. Plea se conta ct either of th e unders ig ned indi v idual s at 778-28 10 if yo u have any questi o n s or need ad diti o nal inform atio n concerning thi s matter. ~'~ Respectful ly, .. 'l.~·~1 1 R ;z_ I t .. ,,,.'"'~ 6li • ".:I l•i >' ,. '; • r ~~ ,,,; ~ .... ·-·····-.... ~ . -A. CUUEN.A ~ ·r...... .,~....-. .. ····~ W.R . C ullen , P .E. 1\ 65215 ~ /~J Se ni o r Eng ineer ,,.~··t~e! · ·~~!.~:& ,,~~~·· ··t.~~ w___ 1n,~~~~'"--... ~,..,. to/?/~1 M. Frederic k Con lin , P .E. Seni o r Eng in eer WRC:mf Enc losure Via Hand Delivery ATTACHMENT A Area Drainage Map Storage Depth Calculations Stormwater Routing Worksheets • c s c v I Engineering & En111ronmental Consultants, Inc.· ~ N ~ /II J \I rzi ~ --I..._ ,_ r l. < v ~ ' '.=: /h 'Z z: r ..... I-' I I j - r II' --r J(. ! .I < ( I "' . u ' Project: C OV ~ N 'A "'l F Id''\ 1 L 'f ~Date : --=-G+-}--=-fo+-/_l'.l -'--1 _ Created By: _W_lZ_c ____ _ Page_)_ of_/_ --I-I-- --~ I I"" K -1 l'I t~ n I- -- r ,_ I I\ I . I.-: ( ,, 1 ..., I I r; \ I'- 7 ' -~ , A -, __ ,_ 1-- \ -( ~ c ·~ -J ., l -.... 4 -1 ( I / -2 h I\ ·-'---11 t 0 J .I If ' ~ - I/ ' , \ .) " :r 1 I , I 2'. .... '\ •'-) I<. -A ~ ' D. . ' h r'\ -'1 , ' ' ' ( -·~ (. )."~ ~ I I\. "- I -I -.... ) ... 1' '-" -I I J .I (, I UI ,-I~ -,_ I n~ ""t"IK ' ~ , .. 11 <,<,I \ \ I" I ~ . c 1'-1. < • I~ <. \ 11 I --ID IJ I .. ~ I\. - :: I Cl I i,,' l 7J I ·~ -I ~ , ...-, IA '} ,..... I• r ~ y , \. I c.. ::. L r 7 ll ' . ~ 'J (~ () .,.. - • t ~. ~ ... I}~ l,, ~: Routing Calculations for 25 year storm Time Inflow lavgDt (min) (cfs) (ac-ft) 0 0.00 0.00 2 7.36 0.01 4 14.71 0.02 6 22.07 0.03 8 29.42 0.04 10 36.78 0.05 12 33.10 0.03 14 29.42 0.03 16 25.75 0.04 18 22.07 0.03 20 18.39 0.03 22 14.71 0.02 24 11.03 0.02 26 7.36 0.01 28 3.68 0.01 30 0.00 0.00 y1 S-ODt/2 S+ODt/2 y2 Outflow (ft) (ac-ft) (ac-ft) (ft) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.10 0.80 0.10 0.00 0.03 0.30 2.70 0.30 0.00 0.05 0.50 4.50 0.50 0.00 0.07 0.70 7.10 0.70 0.00 0.09 0.90 7.90 0.90 0.00 0.07 0.70 6.40 0.70 0.00 0.06 0.60 5.50 0.60 0.00 0.08 0.80 7.10 0.80 0.00 0.07 0.70 6.40 0.70 0.00 0.06 0.60 5.50 0.60 0.00 0.05 0.50 4.50 0.50 0.00 0.04 0.40 3.70 0.40 0.00 0.03 0.30 2.70 0.30 0.00 0.02 0.20 1.75 0.20 0.00 0.01 0.10 0.80 Time Inflow lavgot y1 5-0Dt/2 S+ODt/2 y2 Outflow (min) (cfs) (ac-ft) (ft) (ac-ft) (ac-ft) (ft) (cfs) 0 0.00 0.00 0.00 0.00 0.00 2 9.17 0.03 0.00 0.00 0.03 0.35 3.20 4 18.35 0.06 0.35 0.01 0.10 1.20 9.70 6 27.52 0.09 1.20 0.04 0.19 2.30 13.10 8 36.70 0.13 2.30 0.10 0.32 3.62 16.40 10 45.87 0.16 3.62 0.21 0.49 5.00 overtops wall 12 41.29 0.14 0.30 14 36.70 0.13 0.27 16 32.11 0.11 0.24 18 27.52 0.09 0.21 20 22.94 0.08 0.17 22 18.35 0.06 0.14 24 13.76 0.05 0.11 26 9.17 0.03 0.08 28 4.59 0.02 0.05 30 0.00 0.00 0.02