HomeMy WebLinkAbout28 DP Castlegate Sec 1 Ph 2 01-07 2270 Greens Prairie Rd. WDrainage Report
for
Castlegate Subdivision
Section 1, Phase 2
College Station, Texas
February 2001
Developer:
Greens Prairie Investors , Ltd.
By Greens Prairie Associates, LLC
5010 Augusta
College Station, Texas 77845
(979) 693-7830
Prepared By:
TEXCON General Contractors
I 707 Graham Road
College Station, Texas 77845
(979) 690-7711
REVIEWED FOR
\ COt\~DI IANCE
FEB 0 8 2001
COLLEGE STA 1'101\1
ENGlNEERlNG
a4
CE RTIFICATION
I, Joseph P . Schultz, Licensed Professional Engineer No . 65889 , State of Texas , certify that this
report for the drainage design for the Castlegate Subdivision, Section 1, Phase 2 was prepared
by me in accordance with the provisions of the City of College Station Drainage Policy and
Design Standards for the owners hereof.
__ ,,,'
--~~ O F /~\'' ti:~~ ····· ...... -!'_.., '• "' ~ .. ·· * ·· .. IS' •• '*.. ... *I. "*. ·*~ ~ .... : .............................. l
f .. A9.~.~fl! .. e;..~g-~.~!!~ ... J ,~ .... ~ 65889 Q/&~ \'-0.<-~··f.91sre.~~··0· ~
'-'.$' .... •••••••• _,. -:".:_ \\u/ONAL <;;.;;" ·•·;::. ,,,~ ..
~.:.:·i:;-.-,... 2 -7--~ \.
~~ Ginger L.~h,~
TABLE OF CONTENTS
DRAINAGE REPORT
CASTLEGATE SUBDIVISION
SECTION 1, PHASE 2
CERTIFICATION .................................................................................................................................................................. 1
TABLE OF CONTENTS ........................................................................................................................................................ 2
LIST OF TABLES .................................................................................................................................................................. 3
INTRODUCTION ................................................................................................................................................................... 4
GENERAL LOCATION AND DESCRIPTION .................................................................................................................. 4
FLOOD HAZARD INFORMATION .................................................................................................................................... 4
DEVELOPMENT DRAINAGE PATTERNS ....................................................................................................................... 4
DRAINAGE DESIGN CRITERIA ...........................................•............................................................................................ 5
STORM WATER RUNOFF DETERMINATION ............................................................................................................... 5
DETENTION FACILITY DESIGN ...................................................................................................................................... 7
STORM SEWER DESIGN .................................................................................................................................................... 7
CONCLUSIONS ..................................................................................................................................................................... 8
APPENDIX A .......................................................................................................................................................................... 9
Storm Sewer Inlet Design Calculations
APPENDIX B ........................................................................................................................................................................ 11
Storm Sewer Pipe Design Calculations
APPENDIX C ........................................................................................................................................................................ 36
Storm Sewer Drainage Channel No. 2 Design Calculations
EXJIIBIT A ............................................................................................................................................................................ 38
Of/site Infrastructure Plan for Castlegate Subdivision
EXIllBIT B ............................................................................................................................................................................ 40
Post-Deve lopment Drainage Area Map
2
LIST OF TABLES
TABLE 1 -Rainfall Intensity Calculations ........................................................................................................ 5
TABLE 2 -Post-Development Runofflnformation ........................................................................................... 6
3
DRAINAGE REPORT
CASTLEGATE SUBDIVISION
SECTION 1, PHASE 2
INTRODUCTION
The purpose of this report is to provide the hydrological effects of the construction of the
Castlegate Subdivision, Section 1, Phase 2 , and to verify that the proposed storm drainage
system meets the requirements set forth by the City of College Station Drainage Policy and
Design Standards.
GENERAL LOCATION AND DESCRIPTION
The project is located on a 162 acre tract located west of State Highway 6 along the north side
of Greens Prairie Road in College Station, Texas . This report addresses Section 1, Phase 2 of
this subdivision, which is made up of 26.01 acres. The site is wooded with the vegetation
primarily consisting of oak trees and yaupons. The existing ground elevations range from
elevation 312 to elevation 340. The general location of the project site is shown on the vicinity
map in Exhibit B.
FLOOD HAZARD INFORMATION
The project site is located in the Spring Creek branch of the Lick Creek Drainage Basin. The
site is located in a Zone X Area according to the Flood Insurance Rate Map prepared by the
Federal Emergency Management Agency (FEMA) for Brazos County, Texas and incorporated
areas dated July 2 , 1992 , panel number 48041C0205-C. Zone X Areas are determined to be
outside of the 500-year floodplain. LJA Engineering & Surveying, Inc. submitted a Request
for Conditional Letter of Map Revision (CLOMR) to FEMA to outline a proposed 100-year
floodplain area. This CLOMR No. 00-06-844R was approved by FEMA on 9/8/2000. The
proposed floodplain area does not affect Section 1. Section 1 will continue to be in a Zone X
Area.
DEVELOPMENT DRAINAGE PATTERNS
Prior to development, the storm water runoff for this tract flows in two general directions . A
majority of the acreage flows toward the east boundary of the tract and into existing drainage.
The northern portion of the acreage flows to the north and into existing drainage channels.
Ultimately, the runoff for the entire acreage of Section 1, Phase 2 flows north to the proposed
regional detention facility. Refer to the Offsite Infrastructure Plan in Exhibit A for the location
of this proposed detention facility .
4
DRAINAGE DESIGN CRITERIA
The design parameters for the storm sewer are as follows:
• The Rational Method is utilized to determine peak storm water runoff rates for the storm
sewer design.
• Design Storm Frequency
Storm Sewer system 10 and 100-year storm events
• Runoff Coefficients
Pre-development
Post-development (single family residential)
c = 0.30
c = 0.55
• Rainfall Intensity val ues for Brazos County for a minimum time of concentration of 10
minutes can be found in Table 1. Where a longer time of concentration was necessary, it is
noted in the respective table, and the intensities are calculated with the higher values where
required.
• Time of Concentration, tc -Due to the small sizes of the drainage areas, the calculated
times of concentration, tc, are less than 10 minutes. Therefore, a minimum tc of 10 minutes
is used in most cases to determine the rainfall intensity values. Where a longer time of
concentration was necessary, it is noted and used accordingly.
STORM WATER RUNOFF DETERMINATION
The peak runoff values were determined in accordance with the criteria presented in the
previous section for the 5, 10, 25, 50, and 100-year storm events . The runoff coefficients are
based on the future development of this tract. The drainage areas for post-development are
shown in Exhibit B. Post-development runoff conditions are summarized in Table 2 .
TABLE 1 -Rainfall Intensity Calculations
Rainfall Intensity Values (in/hr)
Storm t.:=
Event 10 min
Is 7 .693
110 8.635
125 9 .861
lso 11 .148
1100 11 .6 39
Brazos County:
5 y_ear storm 10 y_ear storm
b = 76 b = 80
d = 8 .5 d = 8.5
e = 0 .785 e = 0 .763
I = b I (tc+d)e
I = Rainfall Intensity (in/hr)
tc = U(V*60)
le= Time of concentration (min)
L = Length (ft)
V = Velocity (ft/sec)
25 y_ear storm 50 y_ear storm 100 y_ear storm
b = 89 b = 98 b = 96
d = 8.5 d = 8 .5 d = 8 .0
e = 0.754 e = 0.745 e = 0.730
(Data taken from State Department of Highway_s and Public Transportation Hy_draulic Manual, page 2-16)
5
TABLE 2 -Post-Development Runoff Information
A c
Area#
(acres)
8 0 .91 0 .55
9 2.20 0 .55
11 2.28 0.47
12 0 .87 0 .55
13 1.27 0 .55
14 0 .67 0.55
15 1 .63 0.55
16 1 .67 0.55
17 1.29 0.55
18 2.00 0 .55
19 1 .73 0.55
20 0.58 0.55
21 0.72 0 .55
22 0.41 0.55
23 0.55 0.55
24 0.63 0.55
25 0.59 0.55
26 0.45 0 .55
27 0.42 0 .55
28 0.48 0.55
29 0 .99 0 .55
30 1 .37 0 .55
31 0 .84 0.55
34 0 .46 0 .55
35 0 .88 0.55
37 1 .84 0 .55
38 2.27 0 .55
The Rational Method:
Q =CIA
Q =Flow (cfs)
A= Area (acres)
C = Runoff Coeff.
I = Rainfall Intensity (in/hr)
tc Os 010
(min) (cfs) (cfs)
10 3 .85 4.32
10 9.31 10.45
10 8 .24 9.25
10 3 .68 4.13
10 5 .37 6.03
10 2 .8 3 3.1 8
10 6 .90 7 .74
10 7 .07 7 .93
10 5.46 6.13
10 8.46 9.50
10 7 .32 8 .22
10 2.45 2 .75
10 3.05 3.42
10 1 .73 1 .95
10 2 .33 2 .61
10 2 .67 2 .99
10 2.50 2 .80
10 1.90 2 .14
10 1 .78 1 .99
10 2.03 2 .28
10 4 .19 4 .70
10 5.80 6 .51
10 3 .55 3 .99
10 1 .95 2 .18
10 3 .72 4.18
10 7 .79 8 .74
10 9.60 10 .78
6
025 Oso 0100
(cfs) (cfs) (cfs)
4.94 5.58 5.83
11 .93 13.49 14.08
10.57 11 .95 12.47
4 .72 5 .33 5 .57
6 .8 9 7.79 8.13
3 .63 4.11 4.29
8 .84 9 .99 10.43
9 .06 10 .24 10 .69
7 .00 7.91 8 .26
10 .85 12.26 12 .80
9 .38 10 .61 11 .07
3 .15 3 .56 3.71
3.90 4.41 4 .61
2.22 2.51 2.62
2.98 3 .37 3 .52
3.42 3 .86 4.03
3.20 3 .62 3 .78
2.44 2 .76 2 .88
2.28 2 .58 2 .69
2 .60 2 .94 3 .07
5 .37 6 .07 6.34
7.43 8.40 8 .77
4.56 5 .15 5 .38
2.49 2 .82 2.94
4 .77 5.40 5 .63
9 .98 11 .28 11 .78
12 .31 13 .92 14.53
DETENTION FACILITY DESIGN
The detention facility handling the runoff from this site will be a regional facility designed by
LJA Engineering & Surveying, Inc. Refer to the Offsite Infrastructure Plan in Exhibit A for the
location of this proposed detention facility. The runoff from this project flows into existing
drainages and then into Spring Creek. The detention facility is located adjacent to Spring
Creek prior to Spring Creek entering the State Highway 6 right-of-way. Some of the runoff
drains into the storm sewer system constructed for Section 1, Phase 1, and then flows under
Greens Prairie Road and through adjacent properties prior to reaching the detention facility.
The increased runoff in this area has been previously addressed in the Drainage Report for
Section 1, Phase 1.
STORM SEWER DESIGN
The storm sewer piping for this project has been selected to be Reinforced Concrete Pipe
(RCP) meeting the requirements of ASTM C-76, Class ill pipe. The curb inlets and junction
boxes will be cast-in-place concrete.
Appendix A presents a summary of the storm sewer inlet design parameters and calculations.
The inlets were designed based on a 10-year design storm. As per College Station guidelines,
the capacities of inlets in sump were reduced by 10% to allow for clogging.
Inlets were located to maintain a gutter flow depth of 5" or less, which will prevent the spread
of water from reaching the crown of the road for the 10-year storm event. The runoff
intercepted by the proposed storm sewer inlets was calculated using the following equations.
The depth of flow in the gutter was determined by using the Straight Crown Flow equation.
The flow intercepted by Inlets 108 thru 115 was calculated by using the Capacity of Inlets On
Grade equation. The capacities for the inlets in sumps (Inlets 116 thru 119) were calculated
using the Inlets in Sumps, Weir Flow equation with a maximum allowable depth of 7" (5"
gutter flow plus 2" gutter depression). These equations and the resulting data are summarized
in Appendix A.
Appendix B presents a summary of the storm sewer pipe design parameters and calculations.
All pipes are 18" in diameter or larger. For pipes with 18" and 24" diameters, the cross-
sectional area is reduced by 25%, as per College Station requirements. A summary of how this
was achieved is shown in Appendix B as well. The pipes for the storm sewer system were
designed based on the 10-year storm event; however, all will also pass the 100-year storm event
without any headwater. Based on the depth of flow in the street determined for the 100-year
storm event, this runoff will be contained within the street right-of-way until it enters the storm
sewer system. As required by College Station, the velocity of flow in the storm sewer pipe
system is not lower than 2.5 feet per second, and it does not exceed 15 feet per second . As the
data shows, even during low flow conditions, the velocity in the pipes will exceed 2.5 feet per
second and prevent sediment build-up in the pipes. The maximum flow in the storm sewer pipe
system will occur in Pipe No. 125. The maximum velocity for the pipe system in Section 1,
Phase 2 will be 13.4 feet per second and will occur in Pipe No . 116. Appendix B contains a
summary of the Manning pipe calculations as well as flow diagrams mapping the flows through
the storm sewer system for the 10 and 100-year events.
7
The storm sewer design also involves a drainage channel, Channel 2. Channel 2 is a
trapezoidal channel approximately 2.5 feet deep (includes 0.5 feet of freeboard) with 3: 1 side
slopes. It has a bottom width of 4 feet, and receives water from Pipe 125. The channel will be
seeded to establish grass cover, which allows a maximum velocity of 4.5 feet per second
(College Station Drainage Policy & Design Standards, Table VII-2, page 60). The calculated
velocity for this channel is well within this requirement. Refer to Appendix C for the channel
calculations.
CONCLUSIONS
The construction of this project will significantly increase the storm water runoff from this site.
The proposed storm sewer system should adequately control the runoff and release it into
existing drainages. Also, the regional detention facility and the proposed ponds in the park area
should adequately reduce the peak post-development runoff to less than the pre-development
runoff for the design storm event. This will prevent any impact on the properties downstream
of this project.
8
APPENDIX A
Storm Sewer Inlet Design Calculations
9
Castlegate Subdivis ion
Section 1, Phase 2
Inlet Length Calculations
Inlets In Sump
Inlet# Length & Type Flow from
Area#
A
(acres)
Section 1/Phase 1 ·for informational purposes only
101 15' Standard 1 1.75
67 1.05
401 10· Standard 68 0 .49
70 1.18
102 s· Standard 2 0 .71 -66 0 .34
106 10' Standard
10 1.51 -12 0 .87
107 15' Standard ~ 2.2
13 1.27
121 10' Standard 31 0 .84
36 1.06
122 10' Standa rd 34 0 .48
35 0 .88
124 5' Standard 32 0 .37
33 0 .85
Sectio n 1/Phase 2
116 10· Standard 25 0 .59
22 0 .41
117 5' Standard 24 0.63
23 0.55
118 10' Standard 29 0.99
26 0.45
119 5' Standard 28 0 .48
27 0.42
c a,. a.: .. ., ......
(els) (els) fromlnlot#
0.55 8.31
0.55 4.99
0.55 2.33 ------
0 .55 5.60
0.55 3.37
0.55 1.61
0.55 7.17 0 .84 103
0.55 4.13
0.55 10.45
0.55 8.03 0 .82 104,108,109
0.55 3.99
0.55 5.03
0.55 2 .18 0 .00 123
0.55 4.18 2.20 120
0.55 1.76
0 .55 3 .09
0 .55 2 .80 3.69 114
0 .55 1.95 2.02 115
0 .55 2 .99
0 .55 2 .61
0 .55 4 .70
0 .55 2 .14
0 .55 2.28
0 .55 1.99
10 year storm
Q T•Uo l Q Tot.1+10'111 Y 10 ... ctu•I L ,,~.,.·11 L 11 .. ctuol
(els) (els) (ft) (in) (ft) (ft)
8.3 1 9.14 0.342 4 .1 1 10.95 15
4 .99 5 .49 0 .283 3 .39
2 .33 2 .58 0 .2 12 2 .55 6 .53 10
5 .60 6 .16 0 .295 3 .54
3.37 3.71 0 .24 4 2 .93 4 .11 5
1.61 1.78 0 .185 2 .22
8.01 8.81 0 .337 4 .05 10.00 10
4 .13 4 .55 0 .263 3.16
10.45 11 .49 0 .373 4 .47 14.25 15
8.85 7.54 0 .318 3.82
3.99 4 .39 0 .260 3.12 7 .43 10
5.03 5 .54 0 .284 3.40
2.18 2.40 0 .207 2 .49 7.05 10
6.38 7.01 0 .310 3.72
1.76 1.93 0 .191 2.29 3.99 5
3 .09 3.40 0.238 2.83
6 .49 7.14 0.312 3.74 8.6 1 10
3 .96 4.36 0.259 3.11
2.99 ~ 0.233 ~ 4.62 5
2 .81 2.87 0.222 2.66
4 .70 5.17 0.276 3.32 5.83 10
2 .14 2.35 0.206 2.47
2.28 2 .51 0.211 2.53 3.52 5
1.99 2.19 0.200 2.40
UHllil y...., •7"•0.543'
Inlets On Grade I 10 year storm
Inlet# Length & Type Flow from y,. O pert.ot O u pac lty
Area# (ft) (In) (ft) (els)
Section 1/Phase 1 ·fo r Informati onal pu rpo se• only
103 S' Recessed 7 0 .257 3.09 0.55 2 .77
104 10' Recessed 8 0 .275 3.31 0.57 5.71
120 1 O' Recessed 37 0 .361 4.34 0.65 6 .54
123 1 O' Recessed 30 0 .359 4.30 0.65 6 .52
Section 1/Phase 2
110 1 O' Recessed 15 0 .363 4.38 0.66 6 .56
111 1 O' Recessed 16 0 .366 4 .40 0.66 6 .59
108 10' Recessed 14 0 .327 3.92 0.59 5 .66
109 10' Recessed 17 0 .406 4.87 0.66 6 .64
112 10' Recessed 18 0 .359 4.30 0.65 6 .52
113 10' Recessed 19 0.340 4.06 0.63 6 .33
114 5' Recessed 21 0.309 3.71 0.54 2 .71
115 5' Recessed 20 0 .274 3.29 0.52 2 .62
Transverse (Crown) slope (ft/ft )= 0 .038
Straigh t Crown Flow (S o lved to find actu al depth offlow, yl:
a = o.s6 • (zin) • s 'n • y"'"' y = (Q / [0.56 • (zin) • s "'n"'
n =Roughness Coefficient = 0 .0 18
z = Reciprocal of crown slope = 26
S = SlreeVGulter Slope (ft/ft)
y = Deplh of now at inlet (ft)
Capacity of Inlets on grade :
0c = 0.7 • [1/(H,-H2)] • [H,512 -H2
512]
0 0 =Flow capacity of inlet (els)
H1 =a+ y
H2 =a = gutter depression (2" Standard; 4 " Recessed)
y = Deplh of now in approach gulter (ft)
ab, ..... O uptu,.d
(els) (els)
0 .84 2 .77
-1 .39 ~
2 .20 6 .54
-0.01 6 .51
1.18 6 .56
1.34 6 .59
-2 .67 3 .18
-0.52 6 .13
2 .98 6 .52
1.89 6 .33
0 .71 2 .71
0 .13 2 .62
O unyner O i.ypotr.1 Qupl:Obl
(els) from lnlett (els) (els)
0.84 2 .77
0 .00 4 .32
2 .20 6 .54
0 .00 8.51
1.18 8.58
1.34 8.59
1.18 110 0 .00 4 .36
1.34 111 0 .82 6.95
2 .98 8.52
1.89 6.33
2 .98 112 3.69 2.71
1.89 113 2.02 2.62
In lets In sumps Weir Flow:
L = Q I (3 • y"') .:> y = (Q I 3L)"'
L = Length of inlet opening (ft)
Q =Flow at inlet (els)
y = total depth of now on inlet (ft)
max y for in let in sump = 7" = 0 .583'
0 10.Tottol
(els)
3 .81
4 .32
8 .74
6 .51
7.74
7 .93
4 .36
7.77
9 .50
8.22
6 .40
4 .64
100 year storm
a, .. a curyonr Q T.UI Q Tobil•10'!1o y, ..
(els) (els) from lnl•lf (els) (els) (ft) (In)
11 .20 11 .20 12.32 0 .577 6.92
8 .72 8.72 7 .39
3.14 3.14 3.45 0 .538 6 .43
7.55 7 .55 8.31
4 .55 4 .55 5 .00 0.624 7.49
2.18 2 .18 2 .39
9.67 1.95 103 11.62 12 .78 0.735 8.82
5 .57 5 .57 8.13
14 .08 14.08 15.49 0.788 9.45
8.13 8.38 10-i,108,109 14.51 15.96
5 .38 5 .38 5.91 0.584 7.00
8.79 6 .79 7.46
2.94 1.83 123 4 .77 5.25 0 .878 8 .13
5.63 4.81 120 10 .44 11 .48
2.37 2 .37 2.6 1 0 .6 12 7.34
4.18 4 .18 4 .58
3 .78 7 .82 114 11 .40 12.54 0 .795 9 .54
2 .82 5 .3 1 115 7.94 8 .73
4 .03 4.03 4 .44 0 .874 8 .09
3 .52 3.52 3.87
6 .34 8.34 6 .97 0.485 5 .82
2 .88 2 .88 3.17
3.07 3 .0 7 3.38 0.563 6.76
2 .69 2 .69 2 .96
100 year storm
y, .. Ope•'-" Ouptoclty Oi.y"" .. O uptur.c1 O urryowor Q brp-c.ota • O uptOtlll Q IOO ·Tot.I s L•CW•I
(ft) (In) (ft) (els) (els) (e ls) (els) from ln!.tt (els) (els) (els) (ft/ft) (ft)
0.288 3.46 0 .5 8 2.92 1.95 2 .92 1.95 2.92 4 .87 0.0270 5
0.308 3 .70 0 .60 8.02 -0.20 5.83 0.00 5 .83 5 .83 0 .0270 ----;o
0.404 4 .85 0 .70 8.97 4 .81 6 .97 4 .81 6.97 11 .78 0 .0260 10
0.401 4 .81 0.69 8.94 1.63 6 .94 1.83 8.94 8 .77 0 .0150 10
0.406 4 .87 0.70 6 .99 3.44 6 .99 3.44 6.99 10.43 0 .0199 10
0.41 0 4 .92 0.70 7 .03 3.68 7 .03 3.66 7 .03 10.69 0 .0199 10
0 .399 4 .78 0.62 6 .19 -1.90 4 .29 3.44 110 ~ 5 .84 ~ 0 .0110 ----;o -
0.477 5 .72 0.71 7 .09 1.17 7 .09 3.66 111 4 .83 7 .09 11 .92 0 .0110 10
0 .40 1 4 .81 0.69 6 .94 5 .86 6 .94 5 .86 6 .94 12 .60 0.0319 ~
0 .380 4 .58 0.67 6 .73 4 .35 6 .73 4.35 6 .73 11 .07 0.0319 ~
0 .372 4 .48 0 .57 2 .85 1.78 2 .85 5.88 112 7.62 2 .85 10.47 0.0319 ~
0 .337 4 .05 0 .55 2 .75 0 .97 2 .75 4.35 113 5.31 2 .75 8 .06 0 .0319 5
APPENDIXB
Storm Sewer Pipe Design Calculations
11
Castlegate Subdivision
Pipe Calculations -Section 1, Phase 2
Inlet Outlet 1 o year storm 100 year storm
Pipe# Size Length Slope Invert Invert
Elev Elev *Actual Flow Design Flow v,. % Full
Travel Time , tr 11 *Actual Flow Design Flow V100 %Full
Travel Time, t noo
(in) (ft) (%) (ft) (ft) (cfs) (cfs) (fps) (sec) (min) (cfs) (cfs) (fps) (sec) (min)
114 18 26 .8 1 .75 319.64 319.17 6 .59 10 .64 8.16 69.2 3 0 .05 7 .03 11 .35 8 .24 72 .8 3 0 .05
113 24 145.6 1.50 318.67 316.49 13.15 21 .24 9 .15 69 .3 16 0 .27 14 .02 22 .64 9 .24 72.8 16 0 .26
112 24 147.8 1 .50 316.39 314.17 13.15 2 1 .24 9 .15 69 .3 16 0 .27 14 .02 22 .64 9 .24 72.8 16 0 .27
110 27 42.3 0 .85 313.94 313.58 24.46 7 .57 75 .8 6 0 .09 26 .95 7 .60 83.5 6 0 .09
109 27 129.4 0 .85 313.48 312.38 24.46 7 .57 75.8 17 0 .28 26 .95 7.60 83.5 17 0 .28
108 27 112.9 0 .88 312.28 311 .29 24.46 7 .69 74 .6 15 0 .24 26 .95 7 .73 81 .9 15 0 .24
~
11 1 18 27 .1 2 .00 315.23 314.69 6 .95 11 .22 8 .70 68 .5 3 0 .05 7 .09 11 .45 8 .73 69 .5 3 0 .05
120 18 24 .0 1 .35 316.32 316.00 5 .60 9 .04 7 .12 67 .5 3 0 .06 7 .55 12.19 7 .10 93 .5 3 0 .06
115 18 26 .9 1 .10 323.9 5 323.65 6 .33 10.22 6 .60 81 .9 4 0 .07 6 .73 10.87 6 .52 89.4 4 0.07
116 18 117.6 4 .50 323.56 318.27 12.85 20 .75 13.35 82 .2 9 0 .15 13 .67 22.08 13 .15 90 .3 9 0 .15
~
117 24 93 .0 1 .10 317.77 316.75 12.85 20 .75 7 .98 77.2 12 0.19 13 .67 22 .08 7 .99 82.2 12 0 .19
118 27 27 .1 0.40 316.50 316.39 15.56 5 .14 71 .2 5 0 .09 16.52 5 .18 74 .7 5 0 .09
119 27 23 .8 0.40 316.29 316.19 18.18 5 .21 81 .9 5 0.08 19.27 5 .16 88.8 5 0 .08
119A 27 33.0 0.40 316 .10 315.97 18.18 5 .21 81 .9 6 0 .11 19.27 5 .16 88.8 6 0 .11
121 42 120 .1 0.40 314.72 314.24 34.23 6 .37 54.6 19 0 .31 46 .16 6 .79 66 .5 18 0 .29
122 42 90 .8 0.40 314.14 313.78 34.23 6 .37 54.6 14 0 .24 46 .16 6.79 66 .5 13 0 .22
123 42 144.7 0.40 313.68 313.10 34.23 6 .37 54.6 23 0 .38 46.16 6 .79 66 .5 2 1 0 .36
124 42 24.0 0 .40 313.00 312.90 41 .07 6 .63 61 .4 4 0 .06 55.38 6 .98 76 .8 3 0.06
125 42 120.0 0.40 312.80 312.32 45.34 6 .77 65.7 18 0 .30 61 .14 6 .98 85.5 17 0 .29
City of College Station requirement to Reduce Cross-Sectional Area of 18" & 24" Pipes by 25%
Using Mann ings Equation from page 48 of the College Station Drainage Policy & D e s ign Standards Manual :
Q = 1.49/n *A * R213 * S 112
Q = Flow Capacity (cfs)
18" Pipe:
Pipe size (inches)= 18
Wetted Perimete r W P· (ft) = 4 . 71
Cross-Sectional Area A , (ft2 ) = 1 .766
Reduced Area A R, (tt2) = 1 .325
Hydraulic Radius R =A/W P, (ft)= 0 .375
Reduced Hydr Radius R R = A R/W p, (ft)= 0 .281
Roughness Coefficient n = 0 .014
Friction Slope of Conduit S r. (ft/ft) = 0 .01
Example Calculation:
Slope Flow Capacity Reduced Flow Capacity % Difference
s Q Oreduced O red uce d/Q
0 .005 6 .91 4 .28 0.619
0 .006 7 .57 4 .69 0.619
0 .007 8 .18 5 .06 0.619
24" Pipe:
Pipe size (inches) = 24
Wetted Perimeter W P, (ft)= 6 .28
Cross-Sectional Area A , (tt2) = 3 .14
Reduced Area A R, (tt2 ) = 2.3 55
Hydraulic Radius R =A/WP, (ft)= 0 .5
Reduced Hydr Radius R R = A R/W P, (ft)= 0 .375
Roughness Coefficient n = 0 .014
Friction Slope of Conduit S r. (ft/ft) = 0 .01
Example Calculation:
Slope Flow Capaci ty Reduced Flow Capacity % Difference
s Q O reduced O reducei Q
0 .005 14 .89 9 .22 0.619
0 .006 16.31 10 .1 0.619
0 .007 17.61 10.9 0.619
Conclusion:
Multiply a ctual Q in 18" & 24" pipes by 1.615 to refl e ct a 25% reduction in the
cross-sec t ional area called for on page 47 , parag raph 5 of the College Station
Drainage Policy & Design Standards manual.
Inlet 113 1 6 .33
J,
Pipe 1151 6 .33
J,
Inlet 112 1 6 .52
J,
Pipe 1161 12 .85
J,
June Box 104
J,
Pipe 1171 12 .85
J,
Inlet 114 1 2 .71
J,
P ipe 1181 15 .56
J,
Inlet 115 1 2 .62
J,
Pipe 1191 18 .1 8
J,
June Box 104A
J,
Pipe 119A I 18.18
J,
Inlet 116 1 10.45
J,
Pipe 121 I 34 .23
J,
June Box 105
J,
Pipe 1221 34.23
J,
June Box 106
J,
Pipe 1231 34 .23
J,
Inlet 118 1 6 .84
J,
Pipe 1241 41 .07
J,
Inlet 119 1 4 .27
J,
llPipe 1251 45 .34 II 7'
Castlegate Subdivision
Section 1, Phase 2 -Pipe Flow Diagram
010 (cfs)
lnlet117 / 5.60
i
Pipe 1201 5.60
Pipe 125 flows into Channel No. 2 and
then into an existing drainage channel.
Inlet 111 I 6 .59
i
Pipe 1141 6 .59
J,
Inlet 110 1 6.56
i
Pipe 1131 13 .15
J,
June Box 103
J,
Pipe112I 13 .15
J,
Inlet 108 1 4 .36
J,
Pipe 11 OI 24.46
i
June Box 102
J,
Pipe 1091 24.46
J,
June Box 101
J,
Pipe 1081 24.46
J,
into Sect 1, Ph 1
Inlet 109 1 6.95
J,
Pipe 111 I 6 .95
Inlet 113 1 6 .73
J,
Pipe 1151 6 .73
J,
Inlet 112 1 6.94
J,
P ipe 1161 13 .67
J,
Ju ne Box 104
J,
Pipe 1171 13.67
J,
Inlet 114 1 2.85
J,
Pipe 1181 16 .52
J,
Inle t 1151 2 .75
J,
Pipe 1191 19.27
J,
June Box 104A
J,
Pipe 119A I 19 .27
J,
lnlet 116 I 19.34
J,
Pipe 121 1 46 .16
J,
June Box 105
J,
Pipe 1221 46 .16
J,
Jun e Box 106
J,
Pipe 1231 46 .16
J,
Inlet 118 1 9 .22
J,
Pipe 1241 55.38
J,
Inlet 119 1 5.76
J,
jlPipe125I 61 .1411 /I
Castlegate Subdivision
Section 1, Phase 2 -Pipe Flow Diagram
0 100 (cfs)
Inlet 117 1 7 .55
J,
Pipe 1201 7.55
Pipe 125 flows into Channel No. 2 and
then into an existing drainage channel.
Inlet 111 I 7 .03
J,
P ipe 1141 7 .03
J,
Inlet 110 1 6 .99
J,
Pipe 1131 14.02
J,
June Box 103
J,
Pipe 1121 14 .02
J,
Inlet 108 1 5 .84
J,
Pipe 1101 26 .95
J,
June Box 102
J,
Pipe 1091 26 .95
J,
June Box 101
J,
Pipe 1 OB I 26 .95
J,
into Sect 1, Ph 1
Inlet 1091 7 .09
J,
Pipe 111 I 7 .09
Pipe 108 -10 Year Storm
Manning P i pe Calculator
Giv en Input Data :
Shape .......................... .
Solv ing for .................... .
Diameter ....................... .
Flowrate ....................... .
Slope .......................... .
Manning' s n .................... .
Computed Results:
Depth .......................... .
Area ........................... .
Wetted Area .................... .
Wetted Perimeter ............... .
Perimeter ...................... .
Velocity ....................... .
Hy draulic Radi us ............... .
Percent Full ................... .
Full flow Flowrate ............. .
Full flow velocity ............. .
Circular
Depth of Flow
27.0000 in
24.4600 cfs
0 .0088 ft /ft
0.0140
20.1511 in
3.9761 ft2
3.1827 ft2
56.3209 in
84 .8230 in
7.685 4 fps
8 .1373 in
74 .6338 %
26.9775 cfs
6.7850 fps
Pipe 108 -100 Year Storm
Manning Pipe Calculator
Given Input Data:
Shape .......................... .
Solving for .................... .
Diameter ....................... .
Flowrate ....................... .
Slope .......................... .
Manning ' s n .................... .
Computed Results:
Depth .......................... .
Area ........................... .
Wetted Area .................... .
Wetted Perimeter ............... .
Perimeter ...................... .
Velocity ....................... .
Hy draulic Radius ............... .
Percent Full ................... .
Full flow Flowrate ............. .
Full flow v elocity ............. .
Circul a r
Depth of Flow
27.0000 in
26.9500 cfs
0.0088 ft/ft
0.0140
22.1049 in
3.9761 ft2
3.4843 ft2
61.07 1 7 in
84.8 2 30 in
7.7346 fps
8.2157 i n
81 .8 7 00 %
26 .9775 cfs
6.7850 fps
Cast l egate Subdiv ision, Section 1, Phase 2
College Station, Tex as
Pipe 109 -1 0 Yea r Storm
Manning Pipe Calculator
Giv en Input Data :
Shape .......................... .
Solv ing for .................... .
Di ameter ....................... .
Flowrate ....................... .
Slope .......................... .
Manning ' s n .................... .
Computed Resu l ts :
Depth .......................... .
Area ....................... · ... ·
Wetted Area .................... .
Wetted Perime t er ............... .
Perimeter ...................... .
Velocity ....................... .
Hy draulic Radius ............... .
Percent Full ................... .
Full flow Flowrate ............. .
Full flow velocity ............. .
Circular
Depth of Flow
27.0000 in
24.4600 cfs
0.0085 ft/ft
0 . 0140
20 .4559 in
3.9761 ft2
3 .2320 ft2
57 .0265 in
84 .8230 in
7.5681 fps
8.1613 in
75 .7624 %
26.5137 cfs
6 .6683 fps
Pipe 109 -100 Year Storm
Manning Pipe Calculator
Given Input Data :
Shape .......................... .
Solving for .................... .
Diameter ....................... .
Flowrate ....................... .
Slope .......................... .
Manning ' s n .................... .
Computed Results:
Depth .......................... .
Area ........................... .
Wetted Area .................... .
Wetted Peri meter ............... .
Perimeter ...................... .
Velocity ....................... .
Hy drauli c Radius ............... .
Percent Full ................... .
Full flow Flowrate ............. .
Full flow v elocity ............. .
Circular
Depth of Flow
27.0000 in
26 .9500 cfs
0.0085 ft/ft
0. 0140
22.5538 in
3.9761 ft2
3.5480 ft2
62 .2589 in
84 .8230 i n
7 .5958 fps
8 .2062 in
83 .53 2 6 %
26 .5137 cfs
6.6683 fps
Castlegate Subdiv ision, Section 1, Phase 2
College Station, Texas
Pipe 110 -10 Year Storm
Manning P i pe Calcul ator
Giv en Input Data :
Shape .......................... .
Solv ing for .................... .
Diameter ....................... .
F lowrate ....................... .
Slope .......................... .
Manning ' s n .................... .
Computed Results :
Depth .......................... .
Area ........................... .
Wetted Area .................... .
Wetted Perimeter ............... .
Perimeter ...................... .
Velocity ....................... .
Hy draulic Radius ............... .
Percent Full ................... .
Full flow Flowrate ............. .
Full flow v elocity ............. .
Circul ar
Depth of Flow
27.0000 in
24.4600 cfs
0.0085 ft/ft
0.014 0
20.4559 in
3.9761 ft2
3.2320 ft2
57.0265 in
84.8230 in
7.5681 fps
8.1613 i n
75 .7624 %
26 .5137 cfs
6 .6683 fps
Pipe 110 -100 Year Storm
Manning Pipe Calculator
Giv en I nput Data:
Shape .......................... .
Solv ing for .................... .
Di ameter ....................... .
F l owrate ....................... .
Slope .......................... .
Manning ' s n .................... .
Computed Results :
Depth .......................... .
Ar ea ........................... .
Wetted Area .................... .
Wetted Pe r imeter ............... .
Pe r imete r ...................... .
Velocity ....................... .
Hy draulic Radius ............... .
Pe r cent Full ................... .
Full flow Flowrate ............. .
Full flow v elocity ............. .
Circular
Depth of Flow
27.0000 in
26.9500 cfs
C .0085 ft/ft
0 . 0140
22.5538 in
3 .976 1 ft2
3.5480 ft2
6 2 .2 589 in
84.8230 in
7.5958 fps
8.2 06 2 i n
83.53 2 6 %
26 .513 7 cfs
6.6683 fps
Castlegate Subdiv ision, Section 1, Phase 2
College Station, Tex as
Pipe 111 -10 Year Storm
Manning Pipe Calcul ator
Giv en Input Data:
Shape .......................... .
Solv ing for .................... .
Diameter ....................... .
Flowrate ....................... .
Slope .......................... .
Manning ' s n .................... .
Computed Results :
Depth .......................... .
Area ........................... .
Wetted Area .................... .
Wetted Perimeter ............... .
Perimeter ...................... .
Velocity ....................... .
Hy draulic Radius ............... .
Percent Full ................... .
Full flow Flowrate ............. .
Full flow velocity ............. .
Circular
Depth of Flow
18.0000 in
11.2200 cfs
0.0200 ft /ft
0.0140
12.3284 in
1.7671 ft2
1.2899 ft2
35 .0931 in
56 .5487 in
8.6981 fps
5.2931 in
68.4912 %
13.7943 cfs
7.8060 fps
Pipe 111 -100 Year Storm
Manning Pipe Calculator
Giv en Input Data:
Shape .......................... .
Solving for .................... .
Diameter ....................... .
Flowrate ....................... .
Slope .......................... .
Manning' s n .................... .
Comp u ted Results :
Depth .......................... .
Area ........................... .
Wetted Area .................... .
Wetted Perimeter ............... .
Perimeter ...................... .
Velocity ....................... .
Hy draulic Radius ............... .
Percent Full ................... .
Fu l l flow Flowrate ............. .
Full flow v elocity ............. .
Circular
Depth of Flow
18.0000 in
11.4500 cfs
0.0200 ft/ft
0. 0140
12.5176 in
1. 7671 ft2
1.3118 ft 2
35.5022 in
56.5487 in
8.7284 fps
5 .3208 in
69.5422 %
13 .794 3 cfs
7.8060 fps
Castlegate Subdiv ision, Section 1, Phase 2
College Station , Tex as
Pipe 1 1 2 -1 0 Year Storm
Manning Pipe Calcul ator
Giv en I nput Data:
Shape .......................... .
Solv ing for .................... .
Di ameter ....................... .
F l owrate ....................... .
Slope .......................... .
Manning ' s n .................... .
Computed Results:
Depth .......................... .
Area ........................... .
Wetted Area .................... .
Wetted Perimeter ............... .
Perimeter ...................... .
Velocity ....................... .
Hy draul i c Radius ............... .
Percent Full ................... .
Full flow Flowrate ............. .
Full flow v elocity ............. .
Circular
Depth of Flow
24 .0000 in
21 .2400 cfs
0.0150 ft /ft
0.0140
16 .6 21 9 in
3.141 6 ft2
2 .3 2 1 6 ft2
47.1883 in
75 .398 2 in
9.1488 fps
7 .0847 in
69 .2581 %
25 .7 2 76 cfs
8.1894 fps
Pipe 11 2 -100 Year Storm
Manning Pipe Calcul ator
Given Input Data:
Shape .......................... .
Solv ing for .................... .
Diameter ....................... .
Flowrate ....................... .
Slope .......................... .
Manning' s n .................... .
Computed Results :
Depth .......................... .
Area ........................... .
Wetted Area .................... .
Wetted Perimeter ............... .
Perimeter ...................... .
Velocity ....................... .
Hy d r au li c Rad i us ............... .
Percent Full ................... .
Full flow Flowrate ............. .
Full fl ow v elocity ............. .
Circul a r
Depth o f Flow
24 .0000 in
22 .6400 cfs
0 .015C ft/ft
0.0140
17 .47 2 3 in
3.1416 ft 2
2 .450 2 ft2
49.06 37 in
75.39 8 2 in
9.240 2 fps
7 .1 911 i n
72.80 12 %
25.7276 cfs
8.18 94 fps
Castlegate Subdiv ision, Section 1, Ph ase 2
College Station, Tex as
Pipe 113 -10 Year Storm
Manning Pipe Calculator
Gi ven Input Data:
Shape .......................... .
Solv ing for .................... .
Diameter ....................... .
Flowrate ....................... .
Slope .......................... .
Manning ' s n .................... .
Computed Results :
Depth .......................... .
Area ........................... .
Wetted Area .................... .
Wetted Perime t er ............... .
Perimeter ...................... .
Velocity ....................... .
Hy drau lic Ra di us ............... .
Percent Full ................... .
Full flow Flowrate ............. .
Full flow veloci t y ............. .
Circular
Depth of Flow
24.0000 in
21.2400 cfs
0.0150 ft/ft
0. 0140
16.6219 in
3.1416 ft2
2.3216 ft2
47.1 883 in
7 5 .3982 in
9.1488 fps
7.0847 i n
69 .2581 %
25 .7276 cfs
8.1894 fps
Pipe 113 -100 Year Storm
Manning Pipe Calculator
Given Input Data:
Shape .......................... .
Solving for .................... .
Diameter ....................... .
F l owrate ....................... .
Slope .......................... .
Manning ' s n .................... .
Co mputed Results :
Depth .......................... .
Area ........................... .
Wetted Area .................... .
Wetted Perimeter ............... .
Perimeter ...................... .
Velocity ....................... .
Hy draulic Radius ............... .
Percent Full ................... .
Full flow Flowrate ............. .
Full flow v elocity ............. .
Circular
Depth of Flow
24.0000 in
22.6400 cfs
0 .0150 ft/ft
0 . 0140
1 7.4723 in
3 .1416 ft2
2.450 2 ft2
49.0637 in
75.3982 in
9.240 2 fps
7.1911 in
72.8012 %
2 5 .72 7 6 cfs
8.1894 fps
Ca s t lega t e Subdiv ision, Section 1 , Phase 2
College S t a t ion , Texas
Pipe 114 -10 Year Storm
Manning P i pe Calculator
Giv en Input Data:
Shape .......................... .
Solv ing for .................... .
Diameter ....................... .
Flowrate ....................... .
Slope .......................... .
Manning ' s n .................... .
Computed Results:
Depth .......................... .
Area ........................... .
Wetted Area .................... .
Wetted Perimeter ............... .
Perimeter ...................... .
Velocity ....................... .
Hy draulic Radius ............... .
Percent Full ................... .
Full flow Flowrate ............. .
Full flow v elocity ............. .
Circular
Depth of Flow
18 .0000 in
10.6400 cfs
0.0175 ft/ft
0 .0140
12.4553 in
1.7671 ft2
1.3046 ft2
35.3670 in
56.5487 in
8.1556 fps
5. 3119 in
69 .1961 %
12 .9034 cfs
7.3018 fps
Pipe 114 -100 Year Storm
Manning Pipe Calculator
Giv en Input Data:
Shape .......................... .
Solv ing for .................... .
Diameter ....................... .
Flowrate ....................... .
Slope .......................... .
Manning' s n .................... .
Computed Results :
Depth .......................... .
Area ........................... .
Wetted Area .................... .
Wetted Perimeter ............... .
Perimeter ...................... .
Velocity ....................... .
Hy draulic Radius ............... .
Percent Full ................... .
Full flow Flowrate ............. .
Full flow v elocity ............. .
Circular
Depth of Flow
18 .0000 in
11.3500 cfs
0.0175 ft/ft
0 .0140
13.0997 in
1.7671 ft 2
1.3777 ft 2
36.7876 in
56.5487 in
8.2383 fps
5.3929 in
72.7761 %
12 .9034 cfs
7.3018 fps
Castlegate Subdivision, Sect i on 1, Phase 2
College Station, Texas
Pipe 115 -10 Year Storm
Manning Pipe Calculator
Given I nput Data:
Shape .......................... .
Solving for .................... .
Diameter ....................... .
Flowrate ....................... .
Slope .......................... .
Manning' s n .................... .
Computed Results :
Depth .......................... .
Area ........................... .
Wetted Area .................... .
Wetted Perimeter ............... .
Perimeter ...................... .
Velocity ....................... .
Hy draulic Radius ............... .
Percent Full ................... .
Full flow Flowrat e ............. .
Full flow velocity ............. .
Ci rcular
Depth of Flow
18.0000 in
10.2200 cfs
0. 0110 ft/ft
0.0140
14.7371 in
1. 7671 ft2
1.5486 ft2
40 .7158 in
56 .5487 in
6 .5993 fps
5.4771 in
81.8728 %
10.2301 cfs
5.7891 fps
Pipe 115 -100 Year S t orm
Manning Pipe Calculator
Given Input Data:
Shape .......................... .
Solving for .................... .
Diameter ....................... .
Flowrate ....................... .
Slope .......................... .
Manning' s n .................... .
Co mputed Results:
Depth .......................... .
Area ........................... .
Wetted Area .................... .
Wetted Perimeter ............... .
Perimeter ...................... .
Velocity ....................... .
Hy draulic Radius ............... .
Percent Full ................... .
Full flow Flowrate ............. .
Full flow veloci t y ............. .
Ci rcular
Depth of Flow
18 .0000 in
10 .8700 cfs
0.0110 ft/ft
0 . 0140
16 .0865 in
1.7671 ft2
1.6665 ft2
44.5925 in
56.5487 in
6.5225 fps
5.3817 i n
89.3695 %
10.2301 cfs
5 .7891 fps
Ca stlegate Subd ivision, Section 1 , Phase 2
College Station, Texas
Pipe 1 1 6 -10 Year Storm
Manning Pipe Calcu l ator
Giv en Input Data :
Shape .......................... .
Solv ing fo r .................... .
Diameter ....................... .
Flowrate ....................... .
Slope .......................... .
Manning ' s n .................... .
Computed Results :
Depth .......................... .
Area ........................... .
Wetted Area .................... .
Wetted Perimeter ............... .
Perimeter ...................... .
Velocity ....................... .
Hy draulic Radius ............... .
Percent Full ................... .
Full flow Flowrate ............. .
Full flow v elocity ............. .
Circular
Depth of Flow
18.0000 in
20.7500 cfs
0 .0450 ft/ft
0 .0140
14.8002 in
1. 7671 ft2
1.554 7 ft2
40.8802 in
56 .5487 in
13.3467 fps
5.4764 in
82.2234 %
20.6914 cfs
11.7089 fps
Pipe 116 -100 Year Storm
Manning Pipe Calculator
Given Input Data:
Shape .......................... .
Solving for .................... .
Diameter ....................... .
Flowrate ....................... .
Slope .......................... .
Manning' s n .................... .
Computed Results:
Depth .......................... .
Area ........................... .
Wetted Area .................... .
Wetted Perimeter ............... .
Perimeter ...................... .
Velocity ....................... .
Hy draul i c Rad i us ............... .
Percent Full ................... .
Full flow F l owrate ............. .
Full flow v elocity ............. .
Circular
Depth of Flow
18.0000 in
22.0800 cfs
0.0450 ft/ft
0.0140
16.2503 in
1.7671 ft2
1.6789 ft2
45.1 3 45 in
56.548 7 in
13.1512 fps
5.3566 in
90.2 7 9 7 %
2 0.69 1 4 cfs
11 .7089 fps
Castlegate Subdiv ision, Section 1, Phase 2
College Station, Tex as
Pipe 117 -10 Year Storm
Manning Pipe Calculator
Given Inpu t Data:
Shape .......................... .
Solving for .................... .
Diameter ....................... .
Flowrate ....................... .
Slope .......................... .
Manning ' s n .................... .
Computed Results:
Depth .......................... .
Area ........................... .
Wet ted Area .................... .
Wet ted Perimeter ............... .
Perimeter ...................... .
Ve locity ....................... .
Hydraulic Radius ............... .
Percent Full ................... .
Full flow Flowrate ............. .
Full flow ve locity ............. .
Circular
Depth of Flow
24.0000 in
20.7500 cfs
0. OllO ft/ft
0. 0140
18.5240 in
3 .1 416 ft2
2 .60 19 ft2
51.4943 in
7 5.3 982 in
7.9750 fps
7.2760 in
77.1833 %
22.0318 cfs
7.0129 fps
Pipe 117 -100 Year Storm
Manning Pipe Calculator
Given Input Data:
Shape .......................... .
Solvi ng for .................... .
Diame ter ....................... .
Flowrate ....................... .
Slope .......................... .
Manning ' s n .................... .
Computed Results:
Depth .......................... .
Area ........................... .
Wetted Area .................... .
Wette d Pe rimeter ............... .
Perimete r ...................... .
Veloci t y ....................... .
Hydraulic Radius ............... .
Percent Full ................... .
Full flow Flowrate ............. .
Full flow ve locity ............. .
Circular
Depth of Flow
24.0000 in
22.0800 cfs
O.OllO ft/ft
0.0140
19 .7193 in
3 .1 416 ft2
2.7621 ft2
54.4696 in
7 5.3982 in
7.9940 fps
7 .3020 in
82.1638 %
22.0318 cfs
7.0129 fps
Cast legate Subdiv ision, Section 1, Phase 2
Coll ege Station, Texas
Pipe 118 -10 Year Storm
Manning Pipe Calculator
Given Input Data:
Shape .......................... .
Solving for .................... .
Diame te r ....................... .
Flowrate ....................... .
Slope .......................... .
Manning ' s n .................... .
Computed Results:
Depth .......................... .
Area ........................... ·
Wetted Area .................... .
Wetted Perimeter ............... .
Perimeter ...................... .
Velocity ....................... .
Hy draulic Radius ............... .
Percent Full ................... .
Full flow Flowrate ............. .
Full flow v elocity ............. .
Circular
Depth of Flow
27.0000 in
15.5600 cfs
0.0040 ft /ft
0.0140
19.2184 in
3 .9761 ft2
3.0273 ft2
54.2213 in
84.8230 in
5.1400 fps
8.0397 in
71.1793 %
18.1882 cfs
4.5744 fps
Pipe 118 -100 Year Storm
Manning Pipe Calculator
Given Input Data :
Shape .......................... .
Solv ing for .................... .
Diameter ....................... .
Flowrate ....................... .
Slope .......................... .
Manning' s n .................... .
Computed Results:
Depth .......................... .
Area ........................... .
Wetted Area .................... .
Wetted Perimeter ............... .
Perimeter ...................... .
Velocity ....................... .
Hy draulic Radius ............... .
Percent Full ................... .
Full flow Flowrate ............. .
Full flow v elocity ............. .
Circular
Depth of Flow
27.0000 in
16.5200 cfs
0.0040 ft/ft
0. 0140
20.1814 in
3.9761 ft2
3 .187 6 ft2
56.3906 in
84.8230 in
5 .1826 fps
8 .1399 in
74.7461 %
18.1882 cfs
4.5744 fps
Castlegate Subdiv ision, Section 1, Phase 2
College Station, Texas
Pipe 119 -10 Year Storm
Manning Pipe Calculator
Given Input Data:
Shape .......................... .
Solv ing for .................... .
Diameter ....................... .
Flowrate ....................... .
Slope .......................... .
Manning ' s n .................... .
Computed Results:
Depth .......................... .
Area ........................... .
Wetted Area .................... .
Wetted Perimeter ............... .
Perimeter ...................... .
Velocity ....................... .
Hydraulic Radius ............... .
Percent Full ................... .
Full flow Flowrate ............. .
Full flow velocity ............. .
Circular
Depth of Flow
27.0000 in
18.1800 cfs
0.0040 ft/ft
0. 0140
22.1188 in
3 .9761 ft2
3 .4863 ft2
61 .1079 in
84 .8230 in
5.2146 fps
8 .2155 in
81. 9216 %
18.1882 cfs
4.5744 fps
Pipe 119 -100 Year Storm
Manning Pipe Calculator
Given Input Data:
Shape .......................... .
Solving for .................... .
Diameter ....................... .
Flowrate ....................... .
Slope .......................... .
Manning' s n .................... .
Computed Results:
Depth .......................... .
Area ........................... .
Wetted Area .................... .
Wetted Perimeter ............... .
Perimeter ...................... .
Velocity ....................... .
Hy draulic Radius ............... .
Percent Full ................... .
Full flow Flowrate ............. .
Full flow v elocity ............. .
Circular
Depth of Flow
27.0000 in
19.2700 cfs
0 .0040 ft/ft
0.0140
23.9846 in
3.9761 ft2
3.7328 ft2
66 .4230 in
84.8230 in
5.1624 fps
8.0924 in
88.83 20 %
18 .1882 cfs
4.5744 fps
Castlegate Subdiv ision, Section 1, Phase 2
College Station, Texas
Pipe 119A -10 Year Storm
Manning Pipe Calculator
Given Input Data:
Shape .......................... .
Solving for .................... .
Diameter ....................... .
Flowrate ....................... .
Slope .......................... .
Manning' s n .................... .
Computed Results:
Depth .......................... .
Area ........................... .
Wetted Area .................... .
Wetted Perimeter ............... .
Perimeter ...................... .
Velocity ....................... .
Hydraulic Radius ............... .
Percent Full ................... .
Full flow Flowrate ............. .
Full flow velo city ............. .
Circular
Depth of Flow
27.0000 in
18.18 00 cfs
0.0040 ft/ft
0. 0140
22 .1188 in
3.9761 ft2
3.4863 ft2
61.1079 in
84.8230 in
5.2146 fps
8.2155 in
81.9216 %
18.1882 cfs
4.5744 fps
Pipe 119A -100 Year Storm
Manning Pipe Calculator
Given Input Data:
Shape .......................... .
Solving for .................... .
Diameter ....................... .
Flowrate ....................... .
Slope .......................... .
Manning' s n .................... .
Computed Results:
Depth .......................... .
Area ........................... .
Wetted Area .................... .
Wette d Perimeter ............... .
Perimeter ...................... .
Velocity ....................... .
Hydraulic Radius ............... .
Percent Full ................... .
Full flow Flowrate ............. .
Full flow v elocity ............. .
Circular
Depth of Flow
27.0000 in
19.2700 cfs
0.0040 ft/ft
0. 0140
23.9846 in
3.9761 ft2
3.7328 ft2
66.4230 in
84 .8230 in
5.1624 fps
8.0924 in
88.8320 %
18.1882 cfs
4.5744 fps
Castlegate Subdiv ision, Sect ion 1, Phase 2
College Station, Texas
Pipe 1 2 0 -10 Year Storm
Manning Pipe Calculator
Given Input Data:
Shape .......................... .
Solv ing for .................... .
Diameter ....................... .
Flowrate ....................... .
Slope .......................... .
Manning ' s n .................... .
Computed Results :
Depth .......................... .
Area ........................... .
Wetted Area .................... .
Wetted Perimeter ............... .
Perimeter ...................... .
Velocity ....................... .
Hy draulic Radius ............... .
Percent Full ................... .
Full flow Flowrate ............. .
Full flow velocity ............. .
Circular
Depth of Flow
18.0000 in
9.0400 cfs
0.0135 ft/ft
0 .0140
12.1525 in
1.7671 ft2
1.2694 ft2
34.7159 in
56.5487 in
7 .1214 fps
5.2655 in
67.5138 %
11.3332 cfs
6.4133 fps
Pipe 120 -100 Year Storm
Manning Pipe Calculator
Given Input Data:
Shape .......................... .
Solv ing for .................... .
Diameter ....................... .
Flowrate ....................... .
Slope .......................... .
Manning ' s n .................... .
Computed Results :
Depth .......................... .
Area ........................... .
Wetted Area .................... .
Wetted Perimeter ............... .
Perimeter ...................... .
Velocity ....................... .
Hy draulic Radius ............... .
Percent Full ................... .
Full flow Flowrate ............. .
Full flow v elocity ............. .
Circular
Depth of Flow
18.0000 in
12.1900 cfs
0. 0135 ft/ft
0. 0140
16 .8226 in
1.7671 ft2
1.7180 ft2
47.2382 in
56.5487 in
7.0956 fps
5.2370 in
93.4592 %
11.3332 cfs
6.4133 fps
Castlegate Subdiv ision, Section 1, Phase 2
College Station, Texas
Pipe 1 21 -10 Year Storm
Manning Pipe Calcul ator
Given Input Data :
Shape .......................... .
Solv ing for .................... .
Diameter ....................... .
Flowrate ....................... .
Slope .......................... .
Manning ' s n .................... .
Computed Results:
Depth .......................... .
Area ........................... .
Wetted Area .................... .
Wetted Perimeter ............... .
Perimeter ...................... .
Velocity ....................... .
Hydraulic Radius ............... .
Percent Full ................... .
Full flow Flowrate ............. .
Full flow v elocity ............. .
Circular
Depth of Flow
42.0000 in
34.2300 cfs
0.0040 ft/ft
0. 0140
22.9444 in
9. 6211 ft2
5.3769 ft2
69.8679 in
131 .9469 in
6.3661 fps
11.0819 in
54.6296 %
59.0861 cfs
6 .1413 fps
Pipe 121 -100 Year Storm
Manning Pipe Calculator
Given Input Data:
Shape .......................... .
Solving for .................... .
Diameter ....................... .
Flowrate ....................... .
Slope .......................... .
Manning ' s n .................... .
Computed Results :
Depth .......................... .
Area ........................... .
Wetted Area .................... .
Wetted Perimeter ............... .
Perimeter ...................... .
Ve locity ....................... .
Hydraulic Radius ............... .
Percent Full ................... .
Full flow Flowrate ............. .
Full flow ve locity ............. .
Circular
Depth of Flow
42.0000 in
46 .160 0 cfs
0.0040 ft/ft
0.0140
27.93 2 0 i n
9. 6211 ft2
6.7951 ft2
80.10 24 in
131.94 69 in
6 .7932 fps
12.2155 in
66.50 47 %
59.08 61 cfs
6.141 3 fps
Castlegate Subdiv ision, Section 1, Phase 2
College Station, Texas
Pipe 1 22 -10 Year Storm
Manning Pipe Calculator
Given Input Data:
Shape .......................... .
Solving for .................... .
Diameter ....................... .
Flowrate ....................... .
Slope .......................... .
Manning ' s n .................... .
Computed Results:
Depth .......................... .
Area ........................... .
Wetted Area .................... .
Wetted Perimeter ............... .
Perimeter ...................... .
Velocity ....................... .
Hy draulic Radius ............... .
Percent Full ................... .
Full flow Flowrate ............. .
Full flow v elocity ............. .
Circular
Depth of Flow
42.0000 in
34.2300 cfs
0.0040 ft/ft
0.01 40
22.9444 in
9. 6 211 ft2
5 .3769 ft2
69.8679 in
131.9469 in
6.3661 fps
11 .0819 in
54.6296 %
59.0861 cfs
6.1413 fps
Pipe 122 -100 Year Storm
Manning Pipe Calculator
Given Input Data :
Shape .......................... .
Solving for .................... .
Diameter ....................... .
Flowrate ....................... .
Slope .......................... .
Manning 's n .................... .
Computed Results:
Depth .......................... .
Area ........................... .
Wetted Area .................... .
Wetted Perimeter ............... .
Perimeter ...................... .
Ve locity ....................... .
Hydraulic Radius ............... .
Percent Full ................... .
Full flow Flowrate ............. .
Full flow v elocity ............. .
Circular
Depth of Flow
42.0000 in
46.1600 cfs
0.0040 ft/ft
0.0140
27 .9320 in
9. 6211 ft2
6.7951 ft2
80.10 24 in
131.9469 in
6 .793 2 fps
12 .21 55 in
66 .504 7 %
59.0861 cfs
6 .1 413 fps
Castlegate Subdivi sion, Section 1, Phase 2
College Station, Tex as
Pipe 123 -10 Year Storm
Manning Pipe Calculator
Given Input Data:
Shape .......................... .
Solv ing for .................... .
Diameter ....................... .
Flowrate ....................... .
Slope .......................... .
Manning ' s n .................... .
Computed Results:
Depth .......................... .
Area ........................... .
Wetted Area .................... .
Wetted Perimeter ............... .
Perimeter ...................... .
Velocity ....................... .
Hydraulic Radius ............... .
Percent Full ................... .
Full flow Flowrate ............. .
Full flow ve locity ............. .
Circular
Depth of Flow
42 .0000 i n
34.2300 cfs
0.0040 ft/ft
0.0140
22.9444 in
9 . 6211 ft2
5.3769 ft2
69.8679 in
131.9469 in
6.3661 fps
11.0819 in
54.6296 %
59.0861 cfs
6.1413 fps
Pipe 123 -100 Year Storm
Manning Pipe Calculator
Given Input Data:
Shape .......................... .
Solv ing for .................... .
Diameter ....................... .
Flowrate ....................... .
Slope .......................... .
Manning's n .................... .
Computed Results:
Depth .......................... .
Area ........................... .
Wetted Area .................... .
Wetted Perimeter ............... .
Perimeter ...................... .
Velocity ....................... .
Hy draulic Radius ............... .
Percent Full ................... .
Full flow Flowrate ............. .
Full flow ve locity ............. .
Circular
Depth of Flow
42.0000 in
46.1600 cfs
0.0040 ft/ft
0.0140
27.9320 in
9 . 6211 ft2
6 .7951 ft2
80.10 24 in
131.9469 in
6.793 2 fps
12 .21 55 in
66.504 7 %
59.0861 cfs
6 .1413 fps
Castlegate Subdiv ision, Section 1, Phase 2
College Station, Texas
Pipe 124 -10 Year Storm
Manning Pipe Calculator
Given Input Data:
Shape .......................... .
Solving for .................... .
Diameter ....................... .
Flowrate ....................... .
Slope .......................... .
Manning ' s n .................... .
Computed Results:
Depth .......................... .
Area ........................... .
Wetted Area .................... .
Wetted Perimeter ............... .
Perimeter ...................... .
Velocity ....................... .
Hy draulic Radius ............... .
Percent Full ................... .
Full flow Flowrate ............. .
Full flow velocity ............. .
Circular
Depth of Flow
42.0000 in
41.0700 cfs
0.0040 ft/ft
0. 0140
25. 7713 in
9 . 6211 ft2
6 .1901 ft2
75.6000 in
131.9469 in
6.6348 fps
11.7907 in
61.3601 %
59.0861 cfs
6.1413 fps
Pipe 124 -100 Year Storm
Manning Pipe Calculator
Given Input Data:
Shape .......................... .
Solving for .................... .
Diameter ....................... .
Flowrate ....................... .
Slope .......................... .
Manning ' s n .................... .
Computed Results :
Depth .......................... .
Area ........................... .
We tted Area .................... .
Wetted Perimeter ............... .
Perimeter ...................... .
Velocity ....................... .
Hy draulic Radius ............... .
Percent Full ................... .
Full flow Flowrate ............. .
Full flow velocity ............. .
Circular
Depth of Flow
42.0000 in
55.3800 cfs
0.0040 ft/ft
0.0140
32.2740 in
9 .6211 ft2
7.9332 ft2
89.7753 in
131.9469 in
6.9808 fps
12. 7249 in
76.8430 %
59.0861 cfs
6.141 3 fps
Castlegate Subdivision, Section 1, Phase 2
College Station, Texas
Pipe 125 -10 Ye ar Storm
Manning Pipe Calculator
Giv en Input Data:
Shape .......................... .
Solv ing for .................... .
Diameter ....................... .
Flowrate ....................... .
Slope .......................... .
Manning ' s n .................... .
Computed Results:
Depth .......................... .
Area ........................... .
Wetted Area .................... .
Wetted Perimeter ............... .
Perimeter ...................... .
Velocity ....................... .
Hydraulic Radius ............... .
Percent Full ................... .
Full flow Flowrate ............. .
Full flow velocity ............. .
Circular
Depth of Flow
42.0000 in
45.3400 cfs
0.0040 ft/ft
0. 0140
27.5775 in
9. 6211 ft2
6.6972 ft2
79 .3537 in
131 .9469 in
6.7700 fps
12.1531 in
65.6608 %
59 .0861 cfs
6.1413 fps
Pipe 125 -100 Year Storm
Manning Pipe Calculator
Given Input Data :
Shape .......................... .
Solving for .................... .
Diameter ....................... .
Flowrate ....................... .
Slope .......................... .
Manning ' s n .................... .
Computed Results :
Depth .............. : ........... .
Area ........................... .
Wetted Area .................... .
Wetted Perimeter ............... .
Perimeter ...................... .
Velocity ....................... .
Hy draulic Radius ............... .
Percent Full ................... .
Full flow Flowrate ............. .
Full flow v elocity ............. .
Circular
Depth of Flow
42.0000 in
61.1400 cfs
0.0040 ft/ft
0. 0140
35.9047 in
9. 6211 ft2
8.7585 ft2
99.1172 in
131.9469 in
6.9806 fps
12.7246 in
85.4873 %
59.0861 cfs
6 .1413 fps
Castlegate Subdivision, Sect i on 1, Phase 2
College Station, Texas
APPENDIXC
Storm Sewer Drainage Channel No. 2 Design Calculations
36
Drainage Channel No. 2 -10 Year Storm
Channel Calculator
Giv en Input Data:
Shape .......................... .
Solvi ng for .................... .
Flowrate ....................... .
Slope .......................... .
Manning's n .................... .
Height ......................... .
Bottom width ................... .
Left slope ..................... .
Right slope .................... .
Computed Results :
Depth .......................... .
Velocity ....................... .
Full Flowrate .................. .
Flow area ...................... .
Flow perimeter ................. .
Hydraulic radius ............... .
Top width ...................... .
Area ........................... .
Perimeter ...................... .
Percent full ................... .
Trapezo i dal
Depth of Flow
45.3400 cfs
0.00 4 0 ft/ft
0.0300
24 .0 000 in
48.0000 in
0.3300 ft/ft (V/H)
0 .330 0 ft/ft (V/H)
19.4255 in
3.1451 fps
71.1918 cfs
14.4160 ft2
171.9752 in
12.0710 in
165 .7 304 in
20 .1212 ft2
201.1699 in
80.9396 %
Drainage Channel No. 2 -100 Year Storm
Channel Calculator
Given Input Data:
Shape .......................... .
Solving for .................... .
Flowrate ....................... .
Slope .......................... .
Manning's n .................... .
Height ......................... .
Bottom width ................... .
Left slope ..................... .
Right slope .................... .
Computed Results:
Depth .......................... .
Velocity ....................... .
Full Flowrate .................. .
Flow area ...................... .
Flow perimeter ................. .
Hy draulic radius ............... .
Top width ...................... .
Area ........................... .
Perimeter ...................... .
Percent full ................... .
Trapezoidal
Depth of Flow
61.1400 cfs
0 .0040 ft/ft
0 .0300
24.0000 in
48 .0000 in
0 .3300 ft/ft (V/H)
0.3300 ft/ft (V/H)
22.3620 in
3 .4010 fps
71.1918 cfs
17.977 2 ft2
190.7163 in
13.5736 in
183 .5275 i n
20 .1212 ft2
201.1699 in
93.1751 %
Castlegate Subdivision, Section l, Phase 2
College Station, Texas
EXHIBIT A
Offsite Infrastructure Plan for Castlegate Subdivision
38
Cf W
COLLEGl STATION
DEVELOPMENT PERMIT
PERMIT NO . 100007
DP-CASTLEGA TE SUB SEC 1 PH 2
FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA
RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE
SITE LEGAL DESCRIPTION:
CASTLEGATE SUBDIVISION
SECTION 1, PHASE 2
DATE OF ISSUE: MARCH 02, 2001
OWNER:
WALLACE PHILLIPS
GREENS PRAIRIE INVESTORS, LDT .
5010 AUGUSTA
COLLEGE STATION, TEXAS 77845
SITE ADDRESS:
2270 GREENS PRAIRIE RD W
DRAINAGE BASIN:
SPRING CREEK
VALID FOR 12 MONTHS
CONTRACTOR:
TYPE OF DEVELOPMENT: FULL DEVELOPMENT PERMIT
SPECIAL CONDITIONS:
All construction must be in compliance with the approved construction plans
All trees must be barricaded, as shown on plans, prior to any construction . Any trees not barricaded will not count
towards landscaping points. Barricades must be l' per caliper inch of the tree diameter.
The Contractor shall take all necessary precautions to prevent silt and debris from leaving the immediate construction
site in accordance with the approved erosion control plan as well as the City of College Station Drainage Policy and
Design Criteria. The Owner and/or Contractor shall assure that all disturbed areas are sodden and establishment of
vegetation occurs prior to removal of any silt fencing or hay bales used for temporary erosion control. The Owner
and/or Contractor shall also insure that any disturbed vegetation be returned to its original condition, placement and
state. The Owner and/or Contractor shall be responsible for any damage to adjacent properties, city streets or
infrastructure due to heavy machinery and/or equipment as well as erosion , siltation or sedimentation resulting from
the permitted work.
Any trees required to be protected by ordinance or as part of the landscape plan must be completely fenced before any
operations of this permit can begin.
In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to
insure that debris from construction, erosion, and sedimentation shall not be deposited in city streets , or existing drainage
facilities .
I hereby grant this permit for development of an area outside the special flood hazard area. All development shall be in
accordance with the plans and specifications submitted to and approved by the City Engineer in the development permit
application for the above named project and all of the codes and ordinances of the City of College Station that apply.
~A:zt~~
Owner/ Agent/Contractor
Date
(?j·PZ-o/
Date
, • ,,.,..
TEXCON GENERAL CONTRACTORS 2 6 -Feb -0 1
CONSTRUCTION COST ESTIMATE
CASTLEGATE SUBDIVISION
COLLEGE STATION, TEXAS
SECTION 1, PHASE 2 -74 LOTS
Item Estimated Unit Estimated
No . Description Quantity Price Cost
Sitework
1 Mobilization/Layout (entire phase two) 1.0 LS $10 ,000.00 $10 ,000
2 Erosion Control/Seeding 1 LS $12,000 .00 $12,000
3 Site Preparation 5.0 AC $3 ,000 .00 $15,000
4 Topsoil Stripping & Replacement 1,500 CY $4.00 $6 ,000
5 Excavation/Grading 4 ,500 CY $3 .50 $15 ,750
6 Lime Stabilized Subgrade 10,380 SY $3 .00 $31, 140
7 Concrete Laydown Curb 6,620 LF $7 .00 $46,340
8 Base Material -6" depth 8,150 SY $5 .75 $46 ,863
9 Asphalt Paving - 1 1/2" depth 8,150 SY $4 .25 $34,638
10 Concrete Aprons 960 SF $5 .00 $4 ,800
Subtotal $222,530
Storm Drainage
11 Drainage Pipe -18" RCP -structural 105 LF $36 .00 $3 ,780
12 Drainage Pipe -18" RCP -non -structural 118 LF $26 .00 $3 ,068
13 Dra i nage Pipe -24" RCP -structural 0 LF $42 .00 $0
14 Dra inage Pipe -24" RCP -non -structural 387 LF $32 .00 $12 ,384
15 Drainage Pipe -27" RCP -structural 84 LF $46 .00 $3~~64
16 Drainage Pipe -27" RCP -non -structural 285 LF $36 .00 $.10~260
17 Drainage Pipe -42" RCP -structural 24 LF $105 .00 $2,520
18 Dra i nage Pipe -42" RCP -non-structural 476 LF $85 .00 ., $40,460
19 Inlets 5' wide/j unc"tion boxes 11 EA $2,400 .00 $26,400
20 Inlets 1 O' wide 8 EA $3 ,200 .00 $25,600
21 Headwalls -42" RCP EA $3,500 .00 $3 ,500
Subtotal $131,836
· Water Lines
22 6" Water PVC CL200 (C900) structural 170 LF $26 .00 $4,420
23 6" Water PVC CL200 (C900) non-structural 1,330 LF $18 .00 $23,940
24 8" Water PVC CL200 (C900) structural 75 LF $30 .00 $2 ,250
25 8" Water PVC CL200 (C900) non -structural 1,425 LF $20 .00 $28 ,500
26 Gate Valves -6" 2 EA $500 .00 $1 ,000
27 Gate Valves -8" 3 EA $600 .00 $1 ,800
28 M.J. Bends -6" 1 EA $275.00 $2 75
29 M.J. Tees -6" 2 EA $275 .00 $550
30 M.J. Bends -8" 11 EA $300.00 $3,300
31 M.J. Tees -8" 7 EA $300 .00 $2 ,100
32 W ater Servi ce s REVIE\/\/ED F:._;r-1
40 EA $700.00 $28 ,000
33 Water Tie-in at existin ~stub out 2 EA $200 .00 $400
' f\ I .) ill' ~ ..
34 2" Blow off Assem ~ ( '·· 11 }")I ~ ;.; :-.. ! 11_,,. E: 2 EA $400 .00 $800
35 Fire Hydrant Assembly MA R 0 9 2001 5 EA $2 ,000 .00 ~10,000
Subtotal $107,335
COLj L 1 -· .. : ·-, \ ,, . L.. .. .... '-·· '··~' ., ~ ·, ' : ... -.' ~
ENGINEERING
Page 1of2
Sanitary Sewer Lines
36 6" ASTM 2261 pressure pipe -structural 5 LF $30 .00 $150
37 6" ASTM 2261 pressure pipe -non-struct. 35 LF $22.00 $770
38 6" SOR 26 Pipe -structural 345 LF $25 .00 $8,625
39 6" SOR 26 Pipe -non-structural 1,600 LF $20 .00 $32,000
40 Sewer Services 31 EA $700 .00 $21,700
41 Sewer Services -Finish to exist. line 9 EA $500 .00 $4 ,500
42 Manholes -average depth 8' 9 EA $2,000 .00 $18 ,000
43 Sewer Tie-in at existing line/manhole 2 EA $400 .00 $800
44 Modify & tie-in to existing manhole 2 EA $800 .00 $1,600
Subto tal $88,145
Total Sitework $222,530
Total Sto rm Drainage $131,836
Total Water $107,335
To ta l Sa nitary Sew er 88145
TOT A L CO NSTRUCTION $549,846
Eng ineering an d S u rvey@ 5% $27,492
Conti n gency@ 5% $27,492
TOTAL I $6 04,831 I
Page 2 of 2
(f W
COLllGl STATION
DEVELOPMENT PERMIT
PERMIT NO. 100007
DP-CASTLEGA TE SUB SEC 1 PH 2
FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA
RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE
SITE LEGAL DESCRIPTION:
CASTLEGA TE SUBDIVISION
SECTION 1, PHASE 2
DATE OF ISSUE: MARCH 02 , 2001
OWNER:
WALLACE PHILLIPS
GREENS PRAIRIE INVESTORS , LDT.
5010 AUGUSTA
COLLEGE STATION, TEXAS 77845
SITE ADDRESS:
2270 GREENS PRAIRIE RD W
DRAINAGE BASIN:
SPRING CREEK
VALID FOR 12 MONTHS
CONTRACTOR:
TYPE OF DEVELOPMENT: FULL DEVELOPMENT PERMIT
SPECIAL CONDITIONS:
All construction must be in compliance with the approved construction plans
All trees must be barricaded , as shown on plans, prior to any construction. Any trees not barricaded will not count
towards landscaping points. Barricades must be 1' per caliper inch of the tree diameter.
The Contractor shall take all necessary precautions to prevent silt and debris from leaving the immediate construction
site in accordance with the approved erosion control plan as well as the City of College Station Drainage Policy and
Design Criteria. The Owner and/or Contractor shall assure that all disturbed areas are sodden and establishment of
vegetation occurs prior to removal of any silt fencing or hay bales used for temporary erosion control. The Owner
and/or Contractor shall also insure that any disturbed vegetation be returned to its original condition, placement and
state. The Owner and/or Contractor shall be respon si ble for any damage to adjacent properties, city streets or
infrastructure due to heavy machinery and/or equipment as well as erosion, si ltation or sedimentation resulting from
the permitted work.
Any trees required to be protected by ordinance or as part of the landscape plan must be completely fenced before any
operations of this permit can begin.
In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to
insure that debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage
facilities.
I hereby grant this permit for development of an area outside the special flood hazard area. All development shall be in
accordance with the plans and specifications submitted to and approved by the City Engineer in the development permit
application for the above named project and all of the codes and ordinances of the City of College Station that apply.
Owner/ Agent/Contractor
Date
<2..S-t?Z-v/
Date
'
Design Report
Proposed Sanitary Sewer Line Improvements
for
Castlegate Subdivision
Section 1, Phase 2
College Station, Texas
February 2001
Prepared By:
TEXCON General Contractors
1707 Graham Road
College Station, Texas 77845
(979) 690-7711
REVIEWED FOR
CO~-~p1 I.ANGE
FEB 0 8 2001
COLLEGE STATION
ENG IN EE~
"'1:2o,.. o 1-0 i
2-2-fJ/
f
1.0 INTRODUCTION & DESCRIPTION
The purpose of this report is to provide a description of the proposed sanitary sewer to be
constructed with the Castlegate Subdivision, Section 1, Phase 2, and to provide the
criteria used in the design of this sanitary sewer system. The project will include the
construction of approximately 3,370 feet of sanitary sewer line. The line will service the
proposed development of the Castle gate Subdivision, Section 1, Phase 2, and tie into the
existing lines constructed during the development of Section 1, Phase 1.
2.0 SANITARY SEWER -Design Flow and Pipe Size Calculations
The proposed sewer line is to be constructed of 6" and 8" diameter SDR-26, PVC pipe
which meets the requirements of ASTM-D3034 . The proposed manholes are 4' diameter
. manholes, and vary from 6' to 17' in depth, with sewer line slopes ranging from 1.16% to
5.00%. The maximum distance between manholes is less than 500 feet, as required by the
Texas Natural Conservation Commission (TNRCC). The minimum allowable slopes for
8" and 6" pipes per TNRCC requirements are 0.33% and 0.50% respectively. All
construction shall meet the current City of College Station Standard Specifications for
Sanitary Sewer Construction. The sewer line information is summarized in Table 1.
3.0 DETERMINATION OF PEAK FLOW VALUES
The peak flows were based on using a daily use of 300 gallons per day for each dwelling
unit. The design peak flow is determined by multiplying the average daily flow by 1.5,
which results in the adjusted daily flow. This value is then multiplied by 3.0 to determine
the peak hourly flow. The velocities for the lines were calculated using Manning's
Equation . According to the TNRCC, the minimum velocity for sewer systems flowing full
is 2.0 feet per second. As shown in Table 1, the minimum anticipated flow velocities for
the proposed sewer lines at 50% full meet this requirement. The flow for 100% full will
not be less than the flow for 50% full; therefore, the TNRCC requirement is met. The
TNRCC requires that the maximum velocity for sewer systems flow full not exceed 10 feet
per second. The values in Table 1 are well below this maximum velocity.
•
TABLE 1 -SEWER LINE FLOW DATA
0 Manhole No . of Units From Cumulat ive Average Percent 50% Full z Size Length Slope Peak Flow
Q) Number Dwell ing Unit Merging Dwelling Daily Flow Full Flow Velocity c
:.J From To (in) (ft) (%) Services Lines Units (gpm) (cfs) (cfs) (%) (cfs)
Existing Development to Manhole 111 26 -26 5.42 0 .0121 •: 0 .0543 --
111 110 8 187.90 0.40 4 -30 6.25 0.0139 . 0.0626 19.4 0 .3841 ..
·110 109 8 206.30 0.40 4 -·~ ~ 34 '.7.08 0.0158 0 .0710 20.6 0.3841
..... '109 108 8 365 .70 0.40 5 .. 22(S1-6) 61 12.71 0'.0283.~ 0:1274 27 .6 0.3841 . . ..... . .
;. 0 . .1712 ., en 108 .. 107 8 145.80 0.40 1 20(S1-5) 82 '17.08 0.0380 -32.2 0.3841
~.107 :,.106 8 .,; "134.34 . -0.40 3
. .. 85 'r-17 .71 0 .0394 · • 0.1775 32.8 0.3841
106 105 8 . 167.63 0.40 2 -87 . '18.12 0 .0404 · '0.1817 33 .2 0 .3841
105 •. 104 8 182.62 0.40 1 7(S1-4) 95 ,. 19.79 0 ~0441 . 0 .1984 34 .8 0.3841 ~
Shaded area has been previously submitted for Section 1, Phase 1, and is included for informational purposes only.
'7 ..... 122 121 6 196.80 2.20 8 -8 1.67 0 .0037 0.0167 9.8 0.4161 en
"'t ..... 123 105 6 168 .00 5.00 7 -7 1.46 0 .0032 0.0146 7.6 0 .6273 en
126 125 6 237 .20 1.16 8 -8 1.67 0 .0037 0 .0167 11 .4 0 .3022 If 125 124 6 276 .00 3.50 8 16 3.33 0.0074 0 .0334 ..... -12 .2 0 .5249 en
124 108 6 249 .70 2 .00 4 -20 4.17 0.0093 0 .0418 15.6 0 .3968
130 129 6 215.40 3.60 8 -8 1.67 0 .0037 0 .0167 8.7 0 .5323
<£? 129 128 6 360 .90 1.80 6 -14 2.92 0 .0065 0 .0292 13 .5 0 .3764 ..... en 128 127 6 117 .80 1.50 6 -20 4 .17 0 .0093 0.0418 16 .7 0 .3436
127 109 6 157 .60 2.09 2 -22 4.58 0 .0102 0 .0459 15 .4 0.4056
n = 0.013
Refer to construction drawings for manhole locations .
4.0 CONCLUSIONS
It is our determination based on the criteria and data developed that the proposed sewer
line will provide sufficient capacity for the anticipated wastewater flows generated by this
development.
2
(fps)
-
2 .2
2 .2
2.2
2 .2
2 .2
• 2.2
2.2
4 .2
6.4
3.1
5 .3
4 .0
5 .4
3 .8
3 .5 -
4.1
TEXCON GENERAL CONTRACTORS 26-Feb-0 1
CONSTRUCTION COST EST IMATE
CASTLEGATE SUBDIVISION
COLLEGE STATION , TEXAS
SECTION 1, PHASE 2 -74 LOTS
Item Estimated Unit Estimated
No . Description Quantity Price Cost
Sitework
Mobilization/Layout (entire phase two) 1.0 LS $10 ,000.00 $10,000
2 Erosion Control/Seeding 1 LS $12,000 .00 $12,000
3 Site Preparation 5.0 AC $3,000.00 $15 ,000
4 Topsoi l Stripping & Replacement 1,500 CY $4 .00 $6,000
5 Excavation/Grading 4,500 CY $3 .50 $15 ,750
6 Lime Stabilized Subgrade 10,380 SY $3 .00 $31, 140
7 Concrete Laydown Curb 6,620 LF $7 .00 $46,340
8 Base Material -6" depth 8, 150 SY $5.75 $46 ,863
9 Asphalt Paving -1 1 /2" depth 8,150 SY $4 .25 $34,638
10 Concrete Aprons 960 SF $5 .00 $4,800
Subtotal $222,530
Storm Drainage
11 Drainage Pipe -18" RCP -structural 105 LF $36 .00 $3,780
12 Drainage Pipe -18" RCP -non-structural 118 LF $26 .00 $3,068
13 Drainage Pipe -24" RCP -structural 0 LF $42 .00 $0
14 Drainage Pipe -24" RCP -non-structural 387 LF $32.00 $12,384
15 Drainage Pipe -27" RCP -structural 84 LF $46 .00 $3,864
16 Drainage Pipe -27" RCP -non-structural 285 LF $36 .00 $10 ,260
17 Drainage Pipe -42" RCP -structural 24 LF $105.00 $2,520
18 Drainage Pipe -42" RCP -non-structural 476 LF $85 .00 $40,460
19 Inlets 5' wide/junction boxes 11 EA $2,400 .00 $26,400
20 Inlets 10' wide 8 EA $3,200 .00 $25 ,600
21 Headwalls -42" RCP EA $3,500 .00 $3,500
Subtotal $131,836
Wate r Lines
22 6" Water PVC CL200 (C900) structural 170 LF $26 .00 $4,420
23 6" Water PVC CL200 (C900) non-structural 1,330 LF $18 .00 $23,940
24 8" Water PVC CL200 (C900) structural 75 LF $30 .00 $2,250
25 8" Water PVC CL200 (C900) non-structural 1,425 LF $20 .00 $28,500
26 Gate Valves -6" 2 EA -$500 .00 $1,000
27 Gate Valves -8" 3 EA $600 .00 $1,800
28 M.J. Bends -6" 1 EA $275 .00 $275
29 M.J. Tees -6" 2 EA $275.00 $550
30 M.J . Bends -8" 11 EA $300 .00 $3,300
31 M.J. Tees -8" 7 EA $300.00 $2 , 100
32 Water Services RE V IE VV ED 1-..: C• r·) 40 EA $700 .00 $28 ,000
33 Water Tie-in at existin~stub ou1t 1 ·~· , r-· 2 EA $200 .00 $400
34 2" Blow off Assem(iY ( "!\ 11 P .. ~ u , 7\1C1::: 2 EA $400 .00 $800
35 Fire Hydrant Assembly MA R O 9 2001 5 EA $2,000 .00 ~10,000
Subtotal $107,335
COLL.U.:·· .. ::"; ':.,, !' _,.,.
ENGI NEERING
Page 1of2
... ;-
36
37
38
39
40
41
42
43
44
Sanitary Sewer Lines
6" ASTM 2261 pressure pipe -structural
6" ASTM 2261 pressure pipe -non-struct.
6" SOR 26 Pipe -structural
6" SOR 26 Pipe -non-structural
Sewer Services
Sewer Services -Finish to exist. line
Manholes -average depth 8'
Sewer Tie-in at existing line/manhole
Modify & tie-in to existing manhole
5 LF $30.00 $150
35 LF $22 .00 $770
345 LF -$25 .00 $8,625
1,600 LF $20 .00 $32,000
31 EA $700 .00 $21,700
9 EA $500.00 $4,500
9 EA $2,000 .00 $18,000
2 EA $400.00 $800
2 EA $800.00 $1,600
Subtotal $88,145
Total Sitework $222,530
Total Storm Drainage $131,836
Total Water $107,335
Total Sanitary Sewer 88145
TOT AL CONSTRUCTION $549,846
Engineering and Survey@ 5% $27,492
Contingency@ 54Yo $27,492
TOTAL I $604,831 I
Page 2 of 2
~
,,, _,,./
. ,.,.
TEXCON GENERAL CONTRACTORS 26-F eb-0 1
CONSTRUCTION COST ESTIMATE
CASTLEGATE SUBDIVISION
COLLEGE STATION, TEXAS
SECTION 1, PHASE 2 -7 4 LOTS
Item Estimated Unit Estimated
No . Description Quantity Price Cost
Sitework
1 Mobilization/Layout (entire phase two) 1.0 LS $10 ,000 .00 $10,000
2 Erosion Control/Seeding 1 LS $12,000 .00 $12 ,000
3 Site Preparation 5.0 AC $3 ,000 .00 $15,000
4 Topsoil Stripping & Replacement 1,500 CY $4 .00 $6,000
5 Excavation/Grading 4 ,500 CY $3 .50 $15 ,750
6 Lime Stabilized Subgrade 10,380 SY $3 .00 $31 , 140
7 Concrete Laydown Curb 6,620 LF $7 .00 $46,340
8 Base Material -6" depth 8,150 SY $5.75 $46,863
9 Asphalt Paving -1 1 /2" depth 8, 150 SY $4 .25 $34,638
10 Concrete Aprons 960 SF $5.00 $4,800
Subtotal $222,530
Storm Drainage
11 Drainage Pipe -18" RCP -structural 105 LF $36 .00 $3 ,780
12 Drainage Pipe -18" RCP -non-structural 118 LF $26 .00 $3,068
13 Drainage Pipe -24" RCP -structural 0 LF $42 .00 $0
14 Drainage Pipe -24" RCP -non -structural 387 LF $32.00 $12 ,384
15 Drainage Pipe -27" RCP -structural 84 LF $46 .00 $3 ,864
16 Drainage Pipe -27'' RCP -non-structural 285 LF $36 .00 $10 ,260
17 Drainage Pipe -42" RCP -structural 24 LF $105.00 $2 ,520
18 Drainage Pipe -42" RCP -non-structural 476 LF $85 .00 $40,460
19 Inlets 5' wide/junction boxes 11 EA $2,400 .00 $26,400
20 Inlets 1 O' wide 8 EA $3,200 .00 $25,600
21 Headwalls -42" RCP EA $3 ,500 .00 $3,500
Subtotal $131,836
Water Lines
22 6" Water PVC CL200 (C900) structural 170 LF $26.00 $4,420
23 6" Water PVC CL200 (C900) non-structural 1,330 LF $18.00 $23,940
24 8" Water PVC CL200 (C900) structural 75 LF $30 .00 $2 ,250
25 8" Water PVC CL200 (C900) non-structural 1,425 LF $20 .00 $28 ,500
26 Gate Valves -6" 2 EA $500 .00 $1,000
27 Gate Valves -8" 3 EA $600 .00 $1,800
28 M.J . Bends -6" EA $275 .00 $275
29 M.J . Tees -6" 2 EA $275 .00 $550
30 M.J . Bends -8" 11 EA $300 .00 $3 ,300
31 M.J. Tees -8" 7 EA $300 .00 $2,100
32 Water Services REVIEWED Fur. 40 EA $700 .00 $28 ,000
33 Water Tie-in at existin stub out 2 EA $200.00 $400
34 f':\ r"1p1 lllr\.ICE 2 EA $400 .00 $800 2" Blow off Assem I ,
35 Fire Hydrant Assembly MAR O 9 2001 5 EA $2 ,000.00 ~10 .000
Subtotal $107,335
COLLI::\.;~ L:'. ~ I;, j !Vi"
ENGINEERING
Page 1of2
,.
... .. ,,
Sanitary Sewer Lines
36 6" ASTM 2261 pressure pipe -structural
37 6" ASTM 2261 pressure pipe -non-struct.
38 6" SOR 26 Pipe -structural
39 6" SOR 26 Pip e -non-structural
40 Sewer Services
41 Sewer Services -Finish to exist. line
42 Manholes -average depth 8'
43 Sewer Tie-in at existing line/manhole
44 Modify & tie-in to existing manhole
5
35
345
1,600
31
9
9
2
2
LF
LF
LF
LF
EA
EA
EA
EA
EA
$30 .00
$22.00
$25 .00
$20.00
$700 .00
$500 .00
$2,000 .00
$400 .00
$800.00
Subtotal
$150
$770
$8,625
$32,000
$21,700
$4 ,500
$18,000
$800
$1,600
$88,145
Total Sitework $222,530
Total Storm Drainage $131,836
Total Water $107,335
Total Sanitary Sewer~_-""='=8,,,.8'=1=45..,
TOT AL CONSTRUCTION $549,846
~---~
Engineering and Survey@ 5% $27,492
Contingency@ 5% $27,492
TOTAL~, -$-6-04-,8-3~1 j
Page 2 of 2
TEXCON GENERAL CONTRACTORS 26-F eb-0 1
CONSTRUCTION COST ESTIMATE
CASTLEGATE SUBDIVISION
COLLEGE STATION , TEXAS
SECTION 1, PHASE 2 -74 LOTS
Item Estimated Unit Estimated
No . Description Quantity Price Cost
Sitework
Mobilization/Layout (entire phase two) 1.0 LS $10 ,000 .00 $10 ,000
2 Erosion Control/Seeding 1 LS $12 ,000 .00 $12,000
3 Site Preparation 5.0 AC $3 ,000 .00 $15 ,000
4 Topsoil Stripping & Replacement 1,500 CY $4 .00 $6,000
5 Excavation/Grading 4,500 CY $3 .50 $15,750
6 Lime Stabilized Subgrade 10,380 SY $3 .00 $31,140
7 Concrete Laydown Curb 6,620 LF $7 .00 $46,340
8 Base Material -6" depth 8,150 SY $5 .75 $46,863
9 Asphalt Paving -1 1 /2" depth 8,150 SY $4 .25 $34 ,638
10 Concrete Aprons 960 SF $5 .00 $4,800
Subtotal $222,530
Storm Drainage
11 Drainage Pipe -18" RCP -structural 105 LF $36 .00 $3,780
12 Drainage Pipe -18" RCP -non-structural 118 LF $26 ,00 $3,068
13 Drainage Pipe -24" RCP -structural 0 LF $42 .00 $0
14 Drainage Pipe -24" RCP -non-structural 387 LF $32 .00 $12,384
15 Drainage Pipe -27" RCP -structural 84 LF $46 .00 $3,864
16 Drainage Pipe -27" RCP -non-structural 285 LF $36 .00 $10,260
17 Drainage Pipe -42" RCP -structural 24 LF $105 .00 $2,520
18 Drainage Pipe -42" RCP -non-structural 476 LF $85.00 $40,460
19 Inlets 5' wide/junction boxes 11 EA $2,400 .00 $26,400
20 Inlets 1 O' wide 8 EA $3 ,200 .00 $25,600
21 Headwalls -42" RCP EA $3,500 .00 $3.500
Subtotal $131,836
Water Lines
22 6" Water PVC CL200 (C900) structural 170 LF $26.00 $4,420
23 6" Water PVC CL200 (C900) non-structural 1,330 LF $18 .00 $23,940
24 8" Water PVC CL200 (C900) structural 75 LF $30 .00 $2,250
25 8" Water PVC CL200 (C900) non -structural 1,425 LF $20 .00 $28,500
26 Gate Valves -6" 2 EA $500.00 $1,000
27 Gate Va lves -8" 3 EA $600.00 $1,800
28 M.J. Bends -6" EA $275 .00 $275
29 M.J. Tees -6" 2 EA $275 .00 $550
30 M .J. Bends -8" 11 EA $300 .00 $3,300
31 M.J. Tees -8" 7 EA $300 .00 $2, 100
32 Water Services 40 EA $700 .00 $28 ,000
33 Water Tie-in ate · f u ED FOH 2 EA $200.00 $400
34 2" Blow off Asse 2 EA $400 .00 $800
35 ""Pl fl\, ICE 5 EA $2 ,000 .00 ~10,000
Subtotal $107,335
MA R 0 9 2001
COLL EUL ~!A 1 IUl\J
ENGINEER IN G
Page 1of 2
Sanitary Sewer Lines
36 6" ASTM 2261 pressure pipe -structural 5 LF $30 .00 $150
37 6" ASTM 2261 pressure pipe -non-struct . 35 LF $22 .00 $770
38 6" SOR 26 Pipe -structural 345 LF $25 .00 $8,625
39 6" SOR 26 Pipe -non-structural 1 ,600 LF $20.00 $32,000
40 Sewer Services 31 EA $700 .00 $21,700
41 Sewer Services -Finish to exist. line 9 EA $500 .00 $4,500
42 Manholes -average depth 8' 9 EA $2,000 .00 $18,000
43 Sewer Tie-in at existing line/manhole 2 EA $400 .00 $800
44 Modify & tie-in to existing manhole 2 EA $800.00 $1.600
Subtotal $88,145
Total Sitework $222,530
Total Storm prainage $131,836
Total Water $107,335
Total Sanitary Sewer i881145
TOT AL CONSTRUCTION I $549,8461
Engineering and Survey@ 5% $27,492
Contingency@ 5% $27,492
TOTALj $604,831 I
Page 2 of 2
TEX CON
G enera l Co ntra ctors
D iv. of CDS Enterp ri ses , Inc .
1707 Graham Rd. • College Station , TX 77845 • 979-690-7711 • Fax: 979-690-97 97
February 26 , 2001
Ted Mayo, P .E .
Asst. City Engineer
City of College Station
1101 Texas Avenue South
College Station, TX 77842
RE: Castlegate Subdivision, Section 1, Phase 2 -College Station, Texas
Dear Mr. Mayo:
Attached are two (2) revised copies of the Engineer 's Cost Estimate . Corrections were
made as per our phone conversation.
If you have any questions or need additional information, please do not hesitate to give
me a call at (979) 690-7711.
Sincerely Yours ,
Jo Schultz, P .E.
Civil Engineer
Attachments
Design Report
Proposed Sanitary Sewer Line Improvements
for
Castlegate Subdivision
Section 1, Phase 2
College Station, Texas
February 2001
Prepared By:
TEXCON General Contractors
1 707 Graham Road
College Station, Texas 77845
(979) 690-7711
REVIEWED FOR
cn~~PI l.Af\JCE
FEB 0 8 2001
COLLEGE STATION
ENG IN EE~
er""' v... .., '"'-c:.J I
9:2oMt o t-o 7
1--2 -fJ/
1.0 INTRODUCTION & DESCRIPTION
The purpos e of this report is to provide a description o f the proposed sanitary sew er to b e
constructed with the Castlegate Subdivision, Section 1, Phase 2 , and to provide the
criteria used in the design of this sanitary sewer system . The project will include the
construction of approximately 3 ,370 feet of sanitary sewer line. The line will service the
proposed development of the Castlegate Subdivision, Section 1, Phase 2 , and tie into the
existing lines constructed during the development of Section 1, Phase 1.
2.0 SANITARY SEWER -Design Flow and Pipe Size Calculations
The proposed sewer line is to be constructed of 6" and 8" diameter SDR-26 , PVC pipe
which meets the requirements of ASTM-D3034. The proposed manholes are 4 ' diameter
manholes , and vary from 6' to 17' in depth, with sewer line slopes ranging from 1.16% to
5.00%. The maximum distance between manholes is less than 500 feet, as required by the
Texas Natural Conservation Commission (TNRCC). The minimum allowable slopes for
8" and 6" pipes per TNRCC requirements are 0.33% and 0 .50% respectively. All
construction shall meet the current City of College Station Standard Specifications for
Sanitary Sewer Construction. The sewer line information is summarized in Table 1.
3.0 DETERMINATION OF PEAK FLOW VALUES
The peak flows were based on using a daily use of 300 gallons per day for each dwelling
unit. The design peak flow is determined by multiplying the average daily flow by 1.5 ,
which results in the adjusted daily flow. This value is then multiplied by 3.0 to determine
the peak hourly flow. The velocities for the lines were calculated using Manning's
Equation. According to the TNRCC, the minimum velocity for sewer systems flowing full
is 2 .0 feet per second. As shown in Table 1, the minimum anticipated flow velocities for
the proposed sewer lines at 50% full meet this requirement. The flow for 100% full will
not be less than the flow for 50% full; therefore, the TNRCC requirement is met. The
TNRCC requires that the maximum velocity for sewer systems flow full not exceed 10 feet
per second. The values in Table 1 are well below this maximum velocity.
TABL E 1 -S EWER LINE FLOW DAT A
0 Manhole No. o f Uni ts From Cumula tive Average Perc e nt 50% Full z Size Length Slope Peak Flow
QI Number Dwe lling Un it Merging Dw elling Daily Flow Full Flow Velocity c
..J From To (in) (ft) (%) Servic es Lines Units (gpm) (cfs) (cfs) (%) (cfs) (fps)
Existing Development to Manhole 111 26 - 26 5.42 0.0121 0 .0543 ---
111 110 8 187 .90 0.40 4 -30 6 .25 0 .0139 0.0 626 19.4 0 .3841 2 .2
110 109 8 206 .30 0.40 4 -34 7.08 0 .0158 0 .0710 20 .6 0 .3841 2 .2
'7 109 108 8 365 .70 0.40 5 22(51-6) 61 12 .71 0 .0283 0.1274 27 .6 0.3841 2 .2 ..-
(/') 108 107 8 145 .80 0.40 1 20(51-5) 82 17 .08 0 .0380 0.1712 32.2 0 .3841 2 .2
107 106 8 134.34 0.40 3 -85 17.71 0 .0394 0 .1775 32 .8 0.3841 2 .2
106 105 8 167 .63 0.40 2 -87 18.12 0 .0404 0 .1817 33 .2 0 .3841 2.2
105 104 8 182 .62 0.40 1 7(51-4) 95 19.79 0 .0441 0 .1984 34 .8 0 .3841 2.2
Shaded area has been previously submitted for Section 1, Phase 1, and is included for informational purposes only.
C? ...... 122 12 1 6 196.80 2.2 0 8 -8 1.6 7 0.003 7 0.0167 9.8 0.416 1
(/')
...,
...... 123 105 6 168 .00 5 .00 7 -7 1.4 6 0 .0032 0 .0 14 6 7.6 0 .6273
(/')
126 125 6 23 7.2 0 1.16 8 -8 1.6 7 0 .003 7 0 .0 167 11.4 0.3022 'f 12 5 124 6 27 6 .00 3 .50 8 16 3.33 0.0074 0 .033 4 12 .2 0 .52 4 9 ...... -
(/')
124 108 6 249.70 2.00 4 -20 4.17 0.0 093 0 .04 18 15.6 0.3968
130 129 6 215.40 3.6 0 8 -8 1.67 0 .0037 0.01 67 8.7 0.5323
<9 129 128 6 36 0 .90 1.80 6 -14 2 .92 0 .0065 0 .0292 13 .5 0 .3764 ......
(/') 128 127 6 117 .80 1.50 6 -20 4 .17 0 .0 093 0 .04 18 16.7 0 .3436
127 10 9 6 157 .60 ?..0 9 2 -22 4 .58 0.010 2 0 .0459 15 .4 0.4056
n = 0 .01 3
R e fer to co n struction drawings fo r m a nhole loca ti o n s.
4.0 CONCLUSIONS
It is our d e te rminati o n b ased on the crite ria and d ata d e velop ed that th e prop osed sew e r
lin e will provid e suffici e nt capa city for the anticip ate d wastewater flow s ge nerated b y thi s
d e velopm e n t.
2
4.2
6.4
3 .1
5.3
4 .0
5.4
3.8
3.5
4 .1
)
Design Report
Proposed Sanitary Sewer Line Improvements
for
Castlegate Subdivision
Section 1, Phase 2
College Station, Texas
February 2001
Prepared By:
TEXCON General Contractors
1707 Graham Road
College Station, Texas 77845
(979) 690-7711
REVIEWED FOR
CO~.~Pf IANCE
FEB 0 8 2001
COLLEGE STAflON
ENGINEERING
A
1.0 INTRODUCTION & DESCRIPTION
The purpose of this report is to provide a description of the proposed sanitary sewer to be
constructed with the Castlegate Subdivision., Section 1, Phase 2 , and to provide the
criteria used in the design of this sanitary sewer system. The project will include the
construction of approximately 3,370 feet of sanitary sewer line. The line will service the
proposed development of the Castlegate Subdivision, Section 1, Phase 2, and tie into the
existing lines constructed during the development of Section 1, Phase 1.
2.0 SANITARY SEWER -Design Flow and Pipe Size Calculations
The proposed sewer line is to be constructed of 6" and 8" diameter SDR-26, PVC pipe
which meets the requirements of ASTM-D3034. The proposed manholes are 4' diameter
manholes , and vary from 6' to 17' in depth, with sewer line slopes ranging from 1.16% to
5.00%. The maximum distance between manholes is less than 500 feet , as required by the
Texas Natural Conservation Commission (TNRCC). The minimum allowable slopes for
8" and 6" pipes per TNRCC requirements are 0.33% and 0.50% respectively. All
construction shall meet the current City of College Station Standard Specifications for
Sanitary Sewer Construction. The sewer line information is summarized in Table 1.
3.0 DETERMINATION OF PEAK FLOW VALUES
The peak flows were based on using a daily use of 300 gallons per day for each dwelling
unit. The design peak flow is determined by multiplying the average daily flow by 1.5 ,
which results in the adjusted daily flow . This value is then multiplied by 3 .0 to determine
the peak hourly flow. The velocities for the lines were calculated using Manning's
Equation. According to the TNRCC, the minimum velocity for sewer systems flowing full
is 2.0 feet per second. As shown in Table 1, the minimum anticipated flow velocities for
the proposed sewer lines at 50% full meet this requirement. The flow for 100% full will
not be less than the flow for 50% full; therefore, the TNRCC requirement is met. The
TNRCC requires that the maximum velocity for sewer systems flow full not exceed 10 feet
per second. The values in Table 1 are well below this maximum velocity.
TABLE I -SEWER LINE FLOW DATA
0 Manhole No . of Units From Cumula tive Average Percen t 50% Full z Size L eng th Slope Peak Fl ow
QI Number Dwelling Unit Merging Dwelling Daily Flow Full Flow Velocity c
...J From To (in) (ft) (%) Services Lines Units (gpm) (cfs) (cfs) (%) (cfs) (fps)
Existing Development to Manhole 111 26 -26 5.42 0 .0121 0.0543 ---
111 110 8 187 .90 0.40 4 -30 6 .25 0.0139 0 .0626 19 .4 0 .384 1 2.2
110 109 8 206 .30 0 .4 0 4 -34 7.08 0 .0158 0 .0710 20.6 0 .384 1 2.2
"";" 109 108 8 365 .70 0.40 5 22(S1-6) 61 12.71 0 .0283 0.1274 27.6 0 .3 841 2.2 ......
CJ) 108 107 8 145 .80 0.40 1 20(51-5) 82 17 .08 0 .0380 0 .1712 32.2 0 .384 1 2 .2
107 106 8 134.34 0.40 3 -85 17.71 0.0394 0.1775 32 .8 0 .3841 2.2
106 105 8 167 .63 0.40 2 -87 18.12 0.0404 0.1817 33.2 0 .3841 2 .2
105 104 8 182 .62 0.40 1 7(S1-4) 95 19.79 0 .0441 0.1984 34.8 0 .384 1 2.2
Shaded area has been previously submitted for Section 1, Phase 1, and is included for informational purposes only.
'? ...... 122 12 1 6 196 .80 2.20 8 -8 1.67 0.0037 0.0167 9 .8 0.4161
CJ)
'i" ...... 123 105 6 168 .00 5.00 7 - 7 1.46 0.0032 0 .0 14 6 7.6 0 .6273
CJ)
126 125 6 23 7.20 1.16 8 -8 1.6 7 0.0037 0.0167 11.4 0 .3022 'f 125 ...... 124 6 276.00 3.50 8 -16 3.33 0 .0074 0.0334 12.2 0 .5 249
CJ)
124 10 8 6 249.70 2.00 4 -20 4 .17 0.0093 0.04 18 15.6 0 .3968
130 129 6 2 15.40 3.60 8 -8 1.67 0 .0037 0.0167 8 .7 0 .5323
'f 129 128 6 360 .90 1.80 6 -14 2.92 0.0065 0.0292 13 .5 0 .3764 ...... ~ -----------
CJ) 128 127 6 117 .80 1 SQ 6 -20 4 .17 0 .0093 0.0418 16 .7 0 .3436 ---
127 109 6 157 .60 2 09 2 -22 4 .58 0.0102 0 .0 459 15.4 0.4056
n =0 .013
Refer to construction drawin gs for m a nhol e location s.
4.0 CONCLUSIONS
It is our d etermination based on the cri teria and data deve loped that th e proposed sewer
line will pro v ide s u fficient capac it y fo r the a nti cipate d wastewater t1ow s gen erated by this
developm ent.
2
4 .2
6.4 '
3.1
5.3
4 .0
5.4
3.8 --
3.5
4 .1
-
::P.0,1-07 ~ ~----t71 -r 'f ~ -ifJllA.
SUPPLEMENTAL DEVELOPMENT PERMIT INFORMATION
~plication is hereby made for the following development specific site/waterway alte rations :
?UJ?D\VL?Lo.;> .:Plft:As-relAlJV~ ~Tf)J.Lnw--J
ACKNOWLEDGMENTS:
L ~ VW\L-Ll'PS , design engineer/o~ hereby acknowledge or affinn that:
The infonnation and conclusions contained in the above plans and supporting docwnents comply with the current requirements of
the City of College Station, Texas City Code, Chapter 13 and its associated Drainage Policy and Design Standards.
As a condition of approval of this permit application, I agree to construct the improvements proposed in this application according tc
these documents and~the req~n of ~I.apter 13 of the College Station City Code. U A ~ ~c _\\n"'+t--L tt-----"-~p~~~----
Property Owner(s) Contra~~
CERTIFICATIONS: (for proposed alterations within designated flood ha7.ard areas.)
A. L certify that any nonresidential structure on or proposed to be on this site as part
of this application is desi~:ted to prevent damage to the structure or its contents as a result of flooding from the l 00 year storm.
Engineer Date
L , certify that the finished floor elevation of the lowest floor, including any
..ement, of any residential structure, proposed as part of this application is at or above the base flood el~ · in the
latest Federal Insurance Administration Flood Hazard Study and maps, as amended. '~"'"i~ ....... 7'"~-r:''"
;<::> •• ··*·· .. -<; 't "* .·· \IS' ., ---------~"* .. ·. * ~ E . D 1;i!l• .............. *~ ngmeer ate JOSEPH .P ................... i
•••••••••••••••• ~ •• SCHULTZ j
C. L 1, b?ef~ ? . ~~ l=t:; , certify that the alterations or development cove j}~-... {;;ji.'i:i J
diminish the flood-anying capacity of the waterway adjoining or crossing this permitted site and that"i~~¥~~'l
deYelopment are consistent with requirements of the City of College Station City Code, Chapter 13 con~~~ of
~::~:is.~ -z. -l-t\\ "---
Enginee;r=v Date
D. L j 0 ?eytt 7. $~".C:. , do certify that the proposed alterations do not raise the level of the 100 year
flood above elevation establis in the test Federal Insurance Administration Flood Hazard Study.
P. 7__-I -D l
Date
Conditions or comments as part of approval:---------------------------
.::cordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that debris
rrom construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities .
All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer for the
above named project. All of the applicable codes and ordinances of the City of College Station shall apply .
FINAL PLAT APPLICATION
FNLPAPP .DOC Jn5199
3 of3
l /
..
·,
;'
. '
FOR OFFICE USE ONL\'
P&Z CASE NO.:~ -=st
ATE SUBMITTED: -5.-0
tf: 21> /df\
FINAL PLAT APPLICATION
(check one) Minor _Amending /Final _Vacating _Replat
1be following items must be submitted by an established filing deadline date for P & Z Commission consideration.
MINIMUM SUBMITTAL REQUIREMENTS:
~Filing Fee of $200.00.
~Development Permit Application Fee of$100 .00 (if applicable).
~Infrastructure Inspection Fee of $300.00 (applicable if any public infrastructure is being constructed.).
~Application completed in full.
~Thirteen (13) folded copies of plat. (A signed mylar original must be submitted after staff review.)
-=-One (I) copy of the approved Preliminary Plat and/or one (I) Master Plan (if applicable).
L_ Paid tax certificates from City of College Station, Brazos County and College Station I.S.D.
~A copy of the attached checklist with all items checked off or a brief explanation as to why they are not.
v Two (2)copies of public infrastructure plans associated with .this plat (if applicable).
APPLICATION DATA
-\ME OF SUBDMSION lhn. .. e~&re SA2121111$1 oN , Se:Gn oA) I) Pfftbe-2--
jECIFIED LOCATION OF PROPOSED SUBDMSION /Jo@H Of~ fPhelE: °eD,
>
W$C oF :ate P~f'1JZM2 snrrc: rh&Hw1tt .fO.
APPLICANf/PROJECT MANAGER'S INFORMATION (Primary Contact for the Project):
Name ~ 'PeAieu~. IiJ~~TOeb, L..112. -~ --P+t1w.ps
Street Address 5b I 0 h.v.r,u ill y gU.E.-City {QUG6z£;. Sr'lfl7 o,<J
State TX Zip Code J-ZCf>4? E-MailAddress -----------
PhoneNumber 11'1-b13 -7'0?o FaxNumber 11'l-fR'lO-I ff;o
PROPER1Y OWNER'S INFORMATION: ~·{p: 'f1&/-l::>-S-44-b'7
Name ~ Perue\E .TJJV~ng.~ ~T'{).
I
StreetAddress 5blo MiUSV\' (Jef..tL City CotLH;:£.. 5~
State n Zip Code {I. Mr:;-E-Mail Address -----------
Phone Number 'TJj ... f.d1?-1f'fi"PD Fax Number Cf11-~?O -14-W
ARCHITECT OR ENGINEER'S INFORMATION:
Name rGU.PkJ -( \oe Scwt.-r.'.b, p.e-.
Street Address (1o1 G~ J?J). City Cnc1A%1-e SJfrWt.1
Zip Code 11<6 f:S E-Mail Address j Of sdi,u.Jf 1:-@ feu.on . nef
Phone Number q1~ -"'fQ-/JI / Fax Number Cf 11-(p Cf O -'J' 79 7
State rt
FINAL PLAT APPLICATION
FNLPAPP J)()(' in~/QQ
l oC3
TOTAL ACRES OF SUBDMSION 2'-'.0\ R-0-W ACREAGE 4 -1~ TOTAL# OF LOTS --...J7.._4L--__
TUMBER OF LOTS BY ZONING DISTRICT 14 I PJ2D11' I ! __
AVERAGE ACREAGE OF EACH RESIDENTIAL LOT BY ZONING DISTRICT:
0. 2.~ I JQ2--K' I I / __
FLOODPLAIN ACREAGE ()
PARKLAND DEDICATION ACREAGE f OR FEE AMOUNT ____ _
*~ 'C€DlCAiloN 1~ ~oN I / Pt-I-. I ~ ~ 2.1 fH-1.
A STATEMENT ADDRESSING ANY DIFFERENCES BETWEEN TIIE FINAL PLAT AND APPROVED MASTER
DEVELOPMENT PLAN AND/OR PRELIMINARY PLAT (IF APPLICABLE):
()~
REQUESTED VARIANCES TO SUBDMSION REGULATIONS & REASON FOR SAME ______ _
~~ 11? WD-H wt-?1~ SnttJ"QAeDS
REQUESTED OVERSIZE PARTICIPATION O(fs-2171£ LJ~tJe kp,_j{;. tJog..itf.
1l...-o--V\\ of f%QPC?l£i2 satre tbGUWkt 4o
TOTAL LINEAR FOOTAGE OF PROPOSED:
-~?~\ Z.:~$~' _STREETS
0 SIDEWALKS -~-----=2.o;..;::;__:;"2..!"-"~"-'_SANITARY SEWER LINES
3obl' WATERLINES -----__ ---""z.._c::,_•_CHANNELS
-~\~4~1~1-'_STORMSEWERS zzA·o 1 BIKE LANES / PA ms --=------'--='----
NOTE: DIGITAL COPY OF PLAT (IF APPLICABLE) MUST BE SUBMITTED PRIOR TO FILING.
The applicant has prepared this application and certifies that the facts stated herein and exhibits attached
hereto are true, co"ect and complete. The undersigned hereby requests approval by the City of College Station
of the above identified final plat.
~L0~~ Agnature and Title
,2'-tt//-oj
Date
FINAL PLAT APPLICATION 2 of3
SUBMIT APPLICATION AND Tll:
LIST CHECKED OFF WITH ]
FOLDED COPIES OF PLAT FOR REVIE'
FINAL PLAT MINIMUM REQUIREMENTS
(ALL CITY ORDINANCES MUST BE MEl)
INCLUDING BUT NOT LIMITED TO THE FOLLOWING:
(Requirements based on field survey and marked by monuments and markers.)
l. Drawn on 24 " x 36" sheet to scale of 100 ' per inch or larger.
2. Vicinity map which includes enough of surrounding area to show general location of subject property in
relationship to College Station and its City Limits . No scale required but include north arrow .
3. Title Block with the following information:
~ Name and address of subdivider, recorded owner, planner, engineer and surveyor.
CTV Proposed name of subdivision . (Subdivision name & street names will be approved through
Braz.os County 911.) (Replats need to retain original subdivision name .)
C3"" Date of preparation.
a" Engineer's scale in feet .
liJ" Total area intended to be developed .
ca"' 4 . North Arrow .
tJ/A o
5 . Subdivision boundary indicated by heavy lines .
6 . If more than l sheet, an index sheet showing entire subdivision at a scale of 500 feet per inch or larger.
7 . All applicable certifications based on the type of final plat.
~ Ownership and Dedication
13"' Surveyor and/or F.ngineer
C3"' City .Engineer (and City Planner, if a minor plat)
C9"" Planning and Zoning Commission (delete if minor plat)
[!( Braz.os County Clerk
D Brazos County Conunissioners Court Approval (ETJ Plats only)
8. Paid tax certificates .
9 . If submitting a replat where there are existing inlprovements , submit a survey of the subject property showing
the improvements to ensure that no encroachments will be created .
10. If using private septic systems, add a general note on the plat that no private sewage facility may be installed
on any lot in this subdivision without the issuance of a license by the Braz.os . County Health Unit under the
provisions of the private facility regulations adopted by the Commissioner 's Court of Brazos County, pursuant
to the provisions of Section 21.004 of the Texas Water Code .
11 . Location of the l 00 Year Floodplain and flood way , if applicable, according to the most recent available data .
12 . Lot comer markers and survey monuments (by symbol) and clearly tied to basic survey data.
flNAL PLAT CHECKLIST l oC2
m.IJ llr'V rvV' /\'! I'> < .lnO
av' 13. Matches the approved preliminary plat and/or master development plan .
14 . The location and description with accurate dimensions, bearings or deflection angles and radii, area, center
angle, degree of curvature, tangent distance and length of all curves for all of the following : (Show existing
items that are intersecting or contiguous with the boundary of or forming a boundary with the subdivision, as
well as, those within the subdivision).
Existing Proposed
NOTE:
c:sY' C9' Streets . Continuous or end in a cul-de-sac, stubbed out streets must end into a temp . tum around
unless they are shorter than 100 feet. ~ Public and private RO.W. locations and widths. (All existing and proposed RO .W.'s sufficient to
D
D
D
D
D
meet Thoroughfare Plan.) ~ Street offsets and/or intersection angles meet ordinance .
D tJ/f. Alleys.
(g'" Easements.
o:r
~
A number or letter to identify each lot or site and each block.
Greenbelt area/park linkages/parldand dedication ( All proposed dedications must be reviewed by
the Parks and Recreation Board prior to P & Z Conunission consideration.)
15. Construction documents for all public infrastructure drawn on 24" x 36" sheets and properly sealed by a
Licensed Texas Professional F.ngineer that include the following:
ur1 Street, alley and sidewalk plans, profiles and sections. One sheet must show the overall street,
alley and/or sidewalk layout of the subdivision. (may be combined with other utilities).
[gl' Sanitary sewer plan and profile showing depth and grades . One sheet must show the overall sewer
layout of the subdivision. (Utilities of sufficient size/depth to meet the utility master plan and any
,/ future growth areas.)
0 Water line plan showing fire hydrants, valves, etc. with plan and profile lines showing depth and
grades. One sheet must show the overall water layout of the subdivision. (Utilities of sufficient
size/depth to meet the utility master plan and any future growth areas .) ~ Storm drainage system plan with contours, street profile, inlets, storm sewer and drainage
channels, with profiles and sections . Drainage and runoff areas, and runoff based on 5, 10, 25, 50
and 100 year rain intensity. Detailed drainage structure design, channel lining design & detention
if used. One sheet must show the overall drainage layout of the subdivision. ~ Detailed cost estimates for all public infrastructure listed above sealed by Texas P .E.
~ Drainage Report. ~ Erosion Control Plan (must be included in construction plans).
16 . All off-site easements necessary for infrastructure construction must be shown on the final plat with a volume
and page listed to indicate where the separate instrument easements were filed. . Separate instrument easements
must be filed prior or concurrently with Final Plat.
17. Are there impact fees associated with this development? lilX es O No
Impact fees for R-1, R-2, & R-3 mned final plats, must be paid prior to filing.
18. Will any construction occur in TexDOT rights-of-way? o Yes ~o
If yes, TexDOT permit must be submitted along with the construction documents .
1. We will be requesting the corrected Final Plat to be submitted in digital form if available prior to filing the plat
. at the courthouse.
2. If the construction area is greater than 5 acres, EPA Notice of Intent (NOQ must be submitted prior to
issuance of a development permit.
FINAL PLAT CHECKUST 2 of2
r ,-r---
:) : ~;. \ .· .
; hi.:·~ c~:r i.:i . f i.•::.:, i :·:: i .:~:;1 .J (:d i>y 1.i;·:nr11 .1; 1 .. ( r~tJliO'o') ~-.JINN
. •.) r-1.. h (': i .. (;" i. r1 ~! (-: i°I t j t .i (~ f ; : f; r · •'i 7. () f: l : ~· l I l 1 t y ( G :I )
Col l ege ~t~tion City (C2j
,. :1 r ci u ~!I 1 :~ 0 '°' '' i ;·; 1-; ··,' "' ;--; t c <• 1. J (~ ~1 (~ ::'. i .. ;,; t .i (; r1 T '.;_; u ( ~; 2 )
------------------------
· i· o p ~: t t y ~I [J ; I: :i 0 / 7 .1 ": Ci'.·.' n t~ r J 0 : l G o f : f, 5
1 c <.: i> u 11 t: N u 111 ; '' ~) G <I 0 1. · 0 0 0 ::~ · 0 0 2 0
~005401 H S TE'/[N::::ON ( TC'l.). TFU~CT ·~ :~,
GfiEEN:~ r:-un:n:1 ~ TN\/E STO:I::> LTD
s010 AllGusrr~ crn
C 0 I. I. ::. G f~ ~; T :), T t 0 N , T ;; 7 7 8 <l ~-
.·hi.:; <:lo ··:um H ni ... ·;::. t·;,) (:G rti.fy th,')t .. ;fi:c r· ,:; c,:;1 ·;~-fu l. c h ;)(::·( <Jf t h =~ t.:;1< r ·e ·~or ·d :.:
.. :' th j :.:: ('ff i l.: t~ , i..l 1 ~': f c• 11 ow j ti g c t 1t .. , .. <Hll~ o r de Li n q u en t t. <; x e s , pen .:11. tie~: , ;:: n d
'nLerc:>t. are du;~ on t h e prop::irt.y f•)t" ·t h e td:<.ing enti.ti.<!::~ descr .ibed .:i:)ov .:::
.. ntity Yenr St~te m e nt TDx Out: Di se:. /P0iJ r~tt. fee Tot .:;l [Ju(:
·r i) t ."; l IJ I.I >">. () n f\ l 1. f-l '· l_ l_ '3 ! $0.0 0
C2 T <~>:es
!) 1. Taxe :::;
S2 Tr;xes
Pc id for
f> a i.. d f <) r ·
p ·" i cJ .:: C• r-'
2000
;~ CH}C~
2 00 0
:
:
:
:~3.268.74
$ 3. 1 ;~ '.3. 1 4
:n2 . ~iL1s. 4 2
This certificate is issued on real
estate only. It does not includ e
minerals and/ or personal prop erty.
SPECIAL CONDmONS EXIST ON
THIS ACCOUNT , SEE BELOW ·
*** End of T~x Certi..fi..cat o ~*~
f appli..cablc, th e a bove described pr ope rty i..s recei..vi..ng 3pebial v~luatlon
·~sed un Jts us~. Additional rollback taxes whic h mDy become due b~sed on
he provisions of tho '3pecial valuation are not i n dic ated ln t~ls document.
his certifJcate does not cleBr ~buse of granted exemptions ~s defined in
. .::: c t i. o n 1. 1. • 4 :3 , :> ·'1 r .~ g r .:i p h ( i. ) o f th 0 r '~ x d s P r o p c r t y T a x C o')(J c .
8 quested by GREENS PR AIRIE
·, .. f8(:: collected .
Date of Issue: 01/25/0 ~
THIS FORM REPLACES PREVIOUS FORM 3510-6 (8-98)
See Reverse for Instructions
Form Approved . OMB No. 204-0-0188
NP DES
FORM &EPA
United States Environmental Protection Agency
Washington, DC 20460
Notice of Intent (NOi) for Storm Water Discharges Associated with
CONSTRUCTION ACTIVITY Under a NPDES General Permit
Submission of this Notice of Intent constitutes notice that the party identified in Section I of this form intends to be authorized !)'/ o NPDES permit Issued
for storm water discharges associated with construction activity in the Statallndian Country Land identified in Section II of this form. Submission of this Notice
of Intent also constitutes notice that the party identified in Section I of this form meets the eligibility requirements in Part l.B. ol the general permit (including
those related to protection ol endangered species determined through the procedures in Addendum A ol the general permit), understands that continued
authorization lo discharge Is contingent on maintaining permit eligibility, and that implementation of the Storm Water Pol1ution Prevantion Plan required under
Part IV of the general permit will begin at the time the permittee commences work on the construction project identified in Secion II below. IN ORDER TO
OBTAIN AUTHORIZATION, ALL INFORMATION REQUESTED MUST BE INCLUDED ON THIS FORM . SEE INSTRUCTIONS ON BACK OF FORM .
I. Owner/Operator (Appllcanl) Information
Name : 1Gr 1~ 1c 1"1s1 ,Ar,~,; ,r, ,·,e., 1frrqvp·1s1-bo1r1S1 1L1f-icli I
Address: I s; 0 I ( I 0 I 1 ft1 (( I ~ I u I ..S I t1 QI I ~ / I r I '-I f 1 e I I I I I I I I I I I
City: 1C.101l1l1t.1j1e1 1.S1+1~1t1,.101"-1 I I I I I I I State:~
Phone :
I I I
Status of
Owner/Operator :
II. Project/Site Information Is the facility located on lncfian
Country Lands?
P<aioct Name o 11'.'.1•151b / 1~1~'+1e 1 151Q1h1J,i1•1i1s11' 1• 1• 1 I 1 1 1 1 1 1 I v,. D No[]"'
ProjectAddressllocation:IN1 101 1 1{,1r1~1e1"1s1 1P1r1111l1r1:1~1 1~d1 1l1.1D1 1Mc.:1 1W l"P-.f/{£,
City: "101'd1~1~1e1 1S1±Jc.qt1; I' 1"'1 I I I I I I I I State: lZlKJ ZipCode: !?171811,51 -1 I I I I
Latitude :l3101311101ul Longitude : I 1'161 MolJ10I Coun1y:IB1r1a1z.101j1 I I I I I I I I I I 1 1 I
Has the Storm Water Pollution Prevention Plan (SWPPP) been prepared? Yes ~ No 0
Optional : Address of location ol
SWPPP for viewing ~ress in Section I above 0 Address in Section II above 0 Other address (ii known) below:
SW PPP Phone:
Address: I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I
City: I I I I I I I I I I I I I I I I I I I I I I I State: LLJ Zip Code: I I I I I 1-1 I I ' I I
I I Name ol Receiving Water : l._~_14f""""'l._r-'1._1-'. 1L..:.n.LI1 ...... ~,_.1.___,1._~__._r_,1._~_1._~_l.._,~__.l.__l.__l.__l.._,l.___,l.._,l.._,l.._,l.._,l.._,I.__.__.
0 't
11Qt1l161Z10101ol 10ij13101yo,01/l
Month Day Year Month Day Year
Estimated Construction Start Date Estimated Completion Date
Estimate ol area to be disturbed (to nearest acre): I I I I I 21.51
Estimate ol Likelihood ol Discharge (choose only one):
1. 0 Unlikely 3. (!j"Once per week 5. 0 Continual
2. 0 Once per month 4 . 0 Once per day
Ill. Certification
Based on instruction prOYided in Addendum A ol the permit, are
there any listed endangered or threatened species, or designated
critical habitat in the project area?
Yes 0 No[{)"
I have satisfied permit eligibility with regard to protection of
endangered species through the incficated section ol Part l.B .3.e.(2)
ol the permit (check one or more boxas):
ca1Wi"blO (c)O (dl0
I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system
designed to assure that qualified personnel properly gather and evaluate the inlormation submitted. Based on my inquiry ol the person or persons who
manage this system, or those persons directly responsible lor gathering the information, the information submitted is, to the best o1 my knowledge and
belief, true, accurate, and complete . I am aware that there are signilicant penalties for submitting lalse information, including the possibility ol fine and
imprisonment !or knowing violations .
Date : 10111111 I 0101
EPA Form 3510 ·9 replaced 3510~ (8-98)
IBIS FORM REPU\CES PREVIOUS FORM 3510-6 (8-98) Form Approve d . OMB No. 2040-0166
See Reverse fo r Ins truc tions
OEPA United States E nvironmental Protection Agoro;
NP DES Wash ington. DC 20460
FORM Notice of Intent (NOi) for Storm Water Discharges Associated with
CONSTRUCTION ACTIVITY Under a NPDES General Permit
Submission of this Notice of Intent constitutes notice that the party identified in Section I of this f0<m intends to be authorized by a NPDES permit Issued
lo< storm water <fischarges associated with construction activity in the State/lndian Country Land identified in Section II of this f0<m . Submission of this Notice
of Intent also constitutes notice that the party identified in Section I of this form meets the eligibllity requirements in Part 1.8. of the general permit (including
those related to protection of endangered species determined through the procedures in Addendum A of the general permit), understands that continued
authorization to discharge is contingent on maintaining permit eligibility, and that implementation of the Storm Water Pollution Prevention Plan required under
Part IV of the general permit will begin at the time the permittee commences work on the construction project identified in Secion II below. IN ORDER TO
OBTAIN AUTHORIZATION. ALL INFORMATION R E QUESTED MUST BE INCLUDED ON THIS FORM. SEE INSTRUCTIONS ON BACK O F FOAM.
t. Owner/Operator (Applicant) Information
Name: 1l1f1/\1l101f\li I(, 1/E 1rJ 1~1~ ft-il-1 1l101N1T 1i<i-A1L 1Tio1.li.)1 I I I Phone : 111112161q101]1]1f1l I
Address: 11 i11 0 I JI lbl~I ~f:ii/t1~ 1f2.101A1P1
Status of fEJ I I I I I I I I I I I I I I I I Owner/Operator :
C ity: I LI 01 L-i f....1 &"1(,If1 1.5"1"'f1A1f1Lu1~ 1 I I I I I I I State: l.LJl9 Zip Code: 17171S14151 -1 I I ~ I
II . Project/Site Information Is the lacility located on Indian
Country Lands?
Project Name: 1~A,.s ,1, ~f1 G1A1T1if1 l..sl (.(1G1D I Ii v, Xi.S 1I1!.)1tv1 I I I I I I I I Yes O No~
Project Address/Location: 1N I() I ( rh~ I 1~1t1 I~ 1f IC ~ I"-~ I 1e1r1~1i I f11' 1 c1 d!1 0 rfit {)_ I I I I • I 0 I~ . lJl . Q f JH f,
City: 1ti c::i L, i,c 1 ~,~ i51!1Ai r1r~ ,N, I I I I I I I I State: ([rLJ Zip Code: 17171\~ll 4-1f1 -I I I I I
I er 0 l 0
County: J31R.1A.1Z.101S1 Latitude: 13 I() (3 ~ Im I {)I Longitude : I I ~1fo I I 1f>1 l1 ()I I I I I I I I I I I I I I
Has the Storm Water Pollution ~revention Plan {SWPPP) bee n prepared ? Ye s ~ NoQ
Optional: Addre ss of location of
~ress in Section I above SWPPP lo< viewing 0 Address in Section II above 0 Other address {ii known) below:
SWPPP Phone :
Address: I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I 'I I
City: I I I I I I I I I I I I I I I I I I I I I I I State: LLJ Zip Code: I I I I I 1-1 I I I l
1~151 Pi B-r1 f.11 Gi 1G&£1~1K'1 I
Name of Receiving Water: I I I I I I I I I I
1/101od1~010101 101'l 1JP 1~10101 l l Based on instruction provided in Addendum A of the permit. are
Month Day )Mr Month Day Year there any ~sted endange<ed 0< threatened species. or designated
Estimated Construction Start Date Estimated Completion Date critical habitat in the project area?
Estimate ol area to be disturbed {to nearest acre): I I I I 121S1 Yes EJ No~
Estimate of UkeUhood of Discharge {choose only one): I have satisfied permit eligl.>ifity with regard to protection of
3 . ~Once per w eek
endangered species thrC>Ugl the indicated section of Part l.B.3 .eo .(2)
1. 0 Unlikely 5 . 0 Continual of 1he permit {c heck one or more boxe s ):
2 . 0 Onca per month 4 . 0 O nce per da y 1ai~bl O i c i O (d)o
Ill. Certification
t certify under penalty of law thal this document and all attac hments were prepared unde r my dtr ect ion or supervision in accordanc e with a syst em
designed to assure that qualified personnel properly qather and evaluate the information submitted . Ba sed on my inquiry of the person or persons who
manage this system . °' those persons directly responsible for gathering the information. the inl0<mation submitted is , to the bes t of my knowledge and
belief. true. accurate , and complete . I am aware that there a re si gnificant penalties 10< submitting fa ls e inlormation. including the possibilit y of line and
1mpcisooment lor knowing violalions .
Print Name: 1(ift1 ~ ~ Y1_ ..1\ 15:1ML'"Ctii I I I I I I I I I I I I I I I I I Date : ID1j1 l1Jl 0 1ol
Signature : 17-~
/)
(JS-$ ------. ----·--· ------
E PA For m 3510 -9 replaced 3510-6 (6-98)
•
DEVELOPMENT SERVICES
TRANSMITTAL LETTER
Name/Finn: Date: 1 -CS -7.-oo l
Address: Phone: CllO -7 7 I I
Fax: fttlo -17Tl
We are transmitting the following for Development Services to review and comment: (Check all that apply.):
0 Master Development Plan
0 Preliminary Plat
B Final Plat
D FEMA CLOMA/CLOMR/LOMNLOMR
0 Site Plan
0 Grading Plan
0 Landscape Plan
0 Irrigation Plan
0 Building Construction Documents
w/ 0 Redlines
w/ 0 Redlines
w/ 0 Redlines
w/ 0 Redlines
w/ 0 Redlines
w/ 0 Redlines
w/ 0 Redlines
w/ D Redlines
w/ 0 Redlines
.FRASTRUCTURE AND ENGINEERING DOCUMENTS
All infrastructure documents must be submitted as a complete set.
The following are included in the complete set:
0 Waterline Construction Documents w/ D Redlines
G Sewerline Construction Documents w/D Redlines
~ Drainage Construction Documents w/ D Redlines
8' Street Construction Documents w/ D Redlines
r:3" Easement application with metes & bounds decsription
G:t Drainage Letter or Report w/ D Redlines
D Fire Flow Analysis w/ D Redlines
l!:'.J Development Permit App.
0 Conditional Use Permit
D Rezoning Application
D Variance Request
D Other -Please specify
D Tx.DOT Driveway Permit
D Tx.DOT Utility Permit
D Other -Please specify
Special Instructions :
TRANSMrIT AL LETIER
TRANSMff.DOC 03123199
loft .·