HomeMy WebLinkAbout19 DP Gateway Phase 2 University Dr. EastD ~c-19 -00 10:19A
12 /04 /00 09 :59 '5'919 764 3496 DEVEI.O P.1ENT SVCS
DEVELOPl\!IENT PERIYIIT
MX NI.lVfCM SUBMITTAL RE QUIREMENTS
L $l00 op Develoµment Permit Appii c;riion F ~~e
___ Drainage and erosicn control plan, wirh supp orting Drainage Report two (2 ) copies each
No tice oflntent {XO .I.) if distu rbed area is greater than 5 acres .
Narne ·-----··---··-··---·-.. ------
Street Addre.s$ ---··--------·-··-------------------·-·-
State Zip Code E-Mail Address --------·---·········
.Phone Nu mber -------·-----............... _____ Fax Number---·
PROPERT!OWN.E R 'S INFORMA T ION :
__ ........ ,., ___ ........................ ------
Str ee t Address ·--·----· .. -· .......... ------·-----··------Ciry ... _._ _______________________ _. ..... _______ _
State Zi p Cod e E-Ma il Add ress
Jlhone N umb er Fax Number ············--·-· ··-·-·-···-··· .. ········-····-······ ... ·· ·--:-·-·-·::··· ·······•···-·-·-···-·····-·····
P .01
!41002
.Appl ica tio n is he reby rnade for the fi.;llowtng deve lopmc
1
nt spc;:ific s itei waterwa y aftcrntions '. /J /
__ _1,1Jd!__.,,je,, ~~ -f(2Tdfobd +,;,...._ @IA-)~~ e50P~-
_. ____ /..o.. __ .o__~:/~_;_/_.~·--·-.............................. -... -... -------.. ----··-.. --.. ---------··-··-.. ·-··-·-·-··-.. --..... ___ .............. .
L ···-···-···· .. ---·-.. ·-···········--··--··--:-·-... -....... -------~
........... 'design ~ngin e er/ovm c r, h~re by ackn•iwlcdg e nr affirm tli:tL
·n :e infonnation and co nc!u s tons cG nl~.mc d in t.hc: abovt~ p h\n s and ~uppo nir \g documen ts enmpty \1,·ith the current
reql1iremems of the City nf Cdlege S ta t ion, T·:~~rns Ct ty Cod<~, C hapter l3 and lts a ss oci«t e.d Drai.nage Policy ::u1d Design
St:mdards .
-a condit ion ofapprovnl o r'r.h is i;cm 1it applic;itio n. I agr<:.e i o c r.nst ruct tb e impr6wmt.nts p roposed in thi s application
.or ding to the~e docurnc r,(s ;~ml the rcqutrcn:<::'H.5 of Chn pte r ! 3 o f the Co!!eg~; Stat1011 Ctty Cude .
~.dk-4--;-. Proper~.' 0>'1cr(s) Cuncr21cwr
0£V£L0f'ME:-11' !'ERM.IT
Di1 ~:R.NiIT .OOC '.lt'l·i/~)9
Name/Firm:
Address:
DEVELOPMENT SERVICES
TRANSMITTAL LETTER
We are transmitting the following for Development Services to review and comment: (Check all that apply.):
0 Master Development Plan w/ 0 Redlines ~Development Permit App.
0 Preliminary Plat w/ 0 Redlines 0 Conditional Use Permit
0 Final Plat w/ 0 Redlines 0 Rezoning Application
0 FEMA CLOMA/CLOMR/LOMA/LOMR w/ 0 Redlines 0 Variance Request
D Site Plan w/ D Redlines D Other -Please specify
D Grading Plan w/ 0 Redlines
D Landscape Plan w/ D Redlines
D Irrigation Plan w/ D Redlines
0 Building Construction Documents w/ D Redlines
INFRASTRUCTURE AND ENGINEERING DOCUMENTS
All infrastructure documents must be submitted as a complete set.
The following are included in the complete set :
D Waterline Construction Documents w/ D Redlines
0 Sewerline Construction Documents
D Drainage Construction Documents
0 Street Construction Documents
w/O Redlines
w/ 0 · Redlines
w/ D Redlines
D Easement application with metes & bounds decsription
D Drainage Letter or Report w/ D Redlines
0 Fire Flow Analysis w/ D Redlines
TRANSMIIT AL LEITER
TRANSMIT.DOC 04/09199
/
I ofl
~~
COlllGl STATION
DEVELOPMENT PERMIT
PERMIT NO. 500089
DP-GATEWAY PH 2
FOR AREAS INSIDE THE SPECIAL FLOOD HAZARD AREA
RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE
SITE LEGAL DESCRIPTION:
DATE OF ISSUE: 01/02/01
OWNER:
ROSENBERG, STANLEY D
700 N ST MARY'S , STE 800
SAN ANTONIO , TX 78205
TYPE OF DEVELOPMENT: Clearing and Grading Onl y
SPECIAL CONDITIONS:
SITE ADDRESS:
1401 UNIVERSITY DRE
DRAINAGE BASIN:
BURTON CREEK
VALID FOR 3 MONTHS
CONTRACTOR:
All construction must be in compliance with the approved Erosion Control Plan .
The Contractor shall take all necessary precautions to prevent silt and debris from leaving the immediate con struction site
in accordance with the approved erosion control plan as w ell as the City of College Station Drainage Policy and Design
Criteria. The Owner and/or Contractor shall assure that all disturbed areas are sodden and establishment of v egetation
occurs prior to removal of any silt fencing or hay bales used for temporary erosion control. The Owner and /or Contractor
shall also insure that any disturbed vegetation be returned to its original condition , placement and state . The Owner
and /or Contractor shall be responsible for any damage to adjacent properties, city streets or infrastructure due to heavy
machinery and /or equipment as well as erosion , siltation or sedimentation resulting from the permitted work.
Any trees required to be protected by ordinance or as part of the landscape plan must be completely fenced before any
operations of this permit can begin.
In accordance with Chapter 13 of the Code of Ordinances of the City of College Station , measures shall be taken to
insure that debris from construction , erosion , and sedimentation shall not be deposited in city streets, or existing drainage
facilities.
I hereby grant this permit for development of an area inside the special flood hazard area. All development shall be in
accordance with the plans and specifications submitted to and approved by the City Engineer in the development permit
application for the above named project and all of the codes and ordinances of the City of College Station that apply .
Date j /
J JS D/
DateT 1
Contractor Date
TO: File DP 00-500089
FROM: Tom Vennochi
RE: Gateway Phase 2
1401 University Drive East
DATE: 02/JAN/01
Reference the applicant's transmittal letter. They wish to clear what is necessary to gain
access for their boring equipment and vehicles in order to take soil samples.
Therefore, it is not necessary for them to obtain a full permit at this time.
A partial permit for clearing and grading only is all that is required this time.
Furthermore, item #3 (Grading Plan) on the Development Permit Issuance Checklist is
not necessary, at this time, for a partial permit, but is eventually necessary for a full
permit.
TO: File DP 00-500089
FROM: Tom Vennochi
RE: Gateway Phase 2
1401 University Drive East
DATE: 02/JAN/01
Reference the applicant's transmittal letter. They wish to clear what is necessary to gain
access for their boring equipment and vehicles in order to take soil samples.
Therefore, it is not necessary for them to obtain a full permit at this time.
A partial permit for clearing and grading only is all that is required this time .
Furthermore, item #3 (Grading Plan) on the Development Permit Issuance Checklist is
not necessary , at this time, for a partial permit, but is eventually necessary for a full
permit.