Loading...
HomeMy WebLinkAbout12 DP Henton Sub Linclon Ave 00-5000842 3 4 5 6 7 ENGINEER'S ESTIMATE FOR REP LAT OF LOT 3 -HENTON SUBDIVISION ~ WATER LINE & SANITARY SEWER LINE CONST~~(oQ November a, 2000 X:.-~'\.:. ~cS . c""_,\ \ ' \ !>-: 217 LF Furnish and Install 12" PVC Water Main (AWWA C-900, DR 14, Pressure Class 200) -Standard Depth-4'-6' Bury complete and in place for Dollars and Cents per linear foot. 96 LF Furnish and Install 12-PVC Water Main (AWWA C-900, DR 14, Pressure Class 200) -Extra Depth-6'-8' Bury complete and in place for Dollars and Cents per linear foot. 114 LF Furnish and Install 12" PVC Water Main (AWWA C-900, DR 14, Pressure Class 200) -Extra Depth-8'-1 O' Bury complete and in place for Dollars and Cents per linear foot. 322 LF Furnish and Install 8" PVC Water Main (AWWA C-900, DR 14, Pressure Class 200) -Standard Depth-4'-6' Bury complete and In place for Dollars and Cents per linear foot. 225 LF Furnish and Install 6" PVC Water Main (AWi/i/A C-900, DR 14, Pressure Class 200) -Standard Depth-4'-6' Bury complete and in place for Dollars and __________ Cents per lin ear foot. 233 LF Furnish and Install 6" PVC Water Main (AWi/i/A C-900, DR 14, Pressure .Class 200) -Extra Depth-6'-8' Bury complete and in place for Dollars and Cents per linear foot. 22 LF Furnish and Install 6" PVC Water Main (AWWA C-900, DR 14, Pressure Class 200) -Extra Depth-8'-1 O' Bury complete and in place for Dollars and Cents per lin ea r foot. $29.00 $31.00 $33.00 $21.25 $21.12 $23.00 $25.00 $6,293.00 $2,976.00 $3 ,762.00 $6,842.50 $4,752.00 $5,359 .00 $550.00 8 1 LS Furnish and Install 12" 45 Bend, Valve and Valve Box and 4" Blow-off Valve as detailed on sheet W-1 In Inset complete and in place for Dollars $3,100.00 $3,100 .00 and Cents per lump sum . 9 1 EA Furnish and Install Tapping Sleeve and 12" Gate Valve on Existing 16M Water Line to include all necessary thrust blocking complete and in place for Dollars $3,750.00 $3,750.00 and Cents per each. 10 1 EA Furnish and Install Tapping Sleeve and 8" Gate Valve on Exlsting 16" Water Line to include all necessary thrust blocking complete and In place for Dollars $2,542 .00 $2 ,542 .00 and Cents per each . 11 1 EA Furnish and Install 12" x 12" M.J . Tee to include all necessary thrust blocking complete and in place for Dollars $800.00 $800 .00 and Cents per each . 12 4 EA Furnish and Install 12M x 6" M.J . Tee to include all necessary thrust blocking complete and in place for Dollars $800.00 $3 ,200.00 and Cents per each . 13 1 EA Furnish and Install 12" x 6" M.J. Reducer to include all necessary thrust blocking complete and in place for Dollars $750 .00 $750.00 and Cents per each . 14 5 EA Furnish and Install 12" M.J. 45 Bend to include all necessary thrust blocking complete and in place for Dollars $750.00 $3 ,750.00 and Cents per each . 15 EA Furnish and Install 12" Gate Valve and Box to include all necessary thrust blocking complete and in place for Dollars $1,500 .00 $1 ,500.00 and Cents per each . 16 1 EA Furnish and Install 8" M.J. 90 Bend to include all necessary thrust blocking complete and In place · $300.00 for Dollars $300.00 and Cents per each . .J..,J..I' VV ' VV .&.V" VV 17 2 EA 18 2 EA 19 8 EA 20 6 EA 21 1 EA 22 1 EA ... VO V V ""1l V V_V .. Furnish and Install 6" M .J. 90 Bend to include all necessary thrust blocking complete and In place for Dollars and Cents per each . Furnish and Install 6" M.J. 45 Bend to include all necessary thrust blocking complete and in place for Dollars and Cents per each . Furnish and Install 6" Gate Valve and Box to include all necessar"Y thrust blocking complete and in place for Dollars and Cents per each. Furnish and Install M.J. Plug on 6" Line include all necessary thrust blocking complete and in place for Dollars and Cents per each. Furnish and Install 2" Blow-off Valve on 8" Water Line to include all necessary thrust blocking complete and in place for Dollars and Cents per each. Furnish and Install Std . City of College Station Fire Hydrant w/appurtenances including all necessary tees , valves and thrust blocking complete and in place for and Dollars Cents per each. WATER LINE -SUB-TOTAL 1 Items( 1-22 ) ~VV "'I $200 .00 $400.00 $190 .00 $380 .00 $500.00 $4,000.00 $295.00 $1,770.00 $350 .00 $350.00 $1,825 .00 $1 ,825 .00 $58,951.50 .L .L I .., _. • ---------·---··----------------- 23 101 LF Furnish and Install 8" PVC Sanitary Sewer Main (SOR 26 , ASTM 2241, CLASS 160) -Standard Depth-4'-6' Bury complete and in place for Dollars $19 .50 $1,969 .50 and Cents per linear foot. 24 442 LF Furnish and Install S" PVC Sanitary Sewer Main (SOR 26 , ASTM 2241 , CLASS 160) -Extra Depth-6'-8 ' Bury complete and in place for Dollars $20 .80 $9,193 .60 and Cents per linear foot. 25 138 LF Furnish and Install a· PVC Sanitary Sewer Main (SOR 26 , ASTM 2241 , CLASS 160) -Extra Depth-8'-10' Bury complete and in place for Dollars $23 .60 $3 ,256.80 and Cents per linear foot 26 86 LF Furnish and Install 12" PVC Sanitary Sewer Main (SOR 26 , ASTM 2241 , CLASS 160) -Extra Depth-6'-8' Bury complete and in place for Dollars $30 .00 $2 ,580.00 and Cents per linear foot. 27 127 LF Furnish and Install 12" PVC Sanitary Sewer Main (SOR 26 , ASTM 2241, CLASS 160) -Extra Depth-8'-1 O' Bury compl ete and in place for Dollars $33 .00 $4 ,191 .00 and Cents per linear foot. 28 89 LF Furnish and Install 4" PVC Sanitary Sewer Service (SOR 26 , ASTM 2241, CLASS 160) -Standard Depth ... 4'-6' Bury complete and in place for Dollars $18.00 $1,602 .00 a nd Cents per linear foot. 29 63 LF Furnish and Install 4" PVC Sanitary Sewer Service (SDR 26 , ASTM 2241, CLASS 160) -Extra Depth-6'-8 ' Bury complete and in place for Dollars $20 .00 $1 ,260 .00 and Cenffi per linear foot. 30 5 EA Furn ish and Install 8" x 4" Wye compl ete and in place for Dollars $50 .00 $250.00 and Cents per each. 31 2 EA Furnish and Install 8" x 4 ft Double Wye complete and in place for Dollars $75.00 $150 .00 a nd C ents per each . ................... ..,, ..... ~ ... •• .......... & .............. . "CJ vvu ..L U• V V .. ..., . ..., ..... -. ................ - 32 3 EA Furnish and Install 4" x 4" Double Wye complete and in place for Dollars $50 .00 $150 .00 and Cents per each. 33 1 EA Furnish and Install 12" x 4" Double Wye complete and in place for Dollars $50 .00 $50 .00 and Cents per each. 34 3 EA Furnish and Install standard City of College Station Manhole -Extra Depth-8'-10' complete and In place for Dollars $1,800 .00 $5,400 .00 and Cents per each . 35 2 EA Furnish and Install standard City of College Station Manhole -Extra Depth-10'-12' complete and In place for Dollars $1,950.00 $3,900 .00 and Cents per each. 36 1 EA Furnish and Install Standard City of College Station Manhole in existing line-Extra Depth-8'-10' complete and in place for Dollars $2,000 .00 $2,000 .00 and Cents per each. 37 2 EA Furnish and Install Standard City of College Station 8" 0 .1.P . Drop Connection complete and in place for Dollars $1,270 .00 $2 ,540.00 and Cents per each . 38 1 EA Furnish and Install Standard City of College Station 4" D.l.P . Drop Connection complete and In place tor Dollars $1 ,000 .00 $1 ,000 .00 and Cents per each . 39 1 EA Furnish and Install Standard City of College Station 8" 0 .1.P. Drop Connection on Existing Manhole complete and in place tor Dollars $1,270.00 $1 ,270 .00 and Cents per each. 40 1 EA Furnish and Install Standard City of College Station 4" 0.1 .P. Drop Connection on Existing Manhole complete and in place $1 ,000 .00 $1 ,000.00 for Dollars and Cents per each. 41 2 EA Tie New sanitary sewer line Into Existing Manhole .complete and in place for Dollars $700 .00 $1 ,400 .00 and Cents per each . 42 156 LF Grout fill and abandon Existing 8" Sanitary Sewer line complete and in place for Dollars $10.90 $1 ,700.40 and Cents per each. SANITARY SEWER LINE· SUB-TOTAL 2: $44,863.30 Items (23-42) 43 1 LS Provide Contractor red-lines As-Built Drawings within 7 days of project completion and closeout complete for Dollars $350.00 $350.00 and Cents per lump sum. 44 1 LS Furnish and Install all necessary Barricades, Signs and Traffic Control Devices complete and in place for Dollars $500 .00 $500.00 and Cents per lump sum. 45 1321 LF Furnish and Install all necessary Trench Safety complete and in p lace for Dollars $2 .50 $3 ,302.50 and Cents per linear foot. INCIDENTALS -SUB-TOTAL 3: $4, 162.50 Items (43-45) ~..L ' .... -• - - _ ............... ----.... -........................................ .-.. . ENGINEER'S ESTIMATE FOR REPLA T OF LOT 3 • HENTON SUBDIVISION WATER LINE & SANITARY SEWER LINE CONSTRUCTION November a, 2ooo' WATER LINE -SUB-TOTAL 1: SANITARY SEWER LINE· SUB-TOTAL 2: INCIDENTALS· SUB-TOTAL 3: TOTAL: 10% CONTINGENCY: $58,951.50 $44,863.30 $4, 152.60 $107,967.30 $10,796.73 $118,764.03 «~ COLLEGE STATION DEVELOPMENT PERMIT PERMIT NO. 500084 DP-HENTON SUBDIVISION LOT 3 FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE SITE LEGAL DESCRIPTION: Lot 3, Henton Subdivision Richard Carter Survey, A-8 DATE OF ISSUE: 12112/00 OWNER: David Scarmardo 111 FM2818 Bryan, Texas 77805 SITE ADDRESS: LINCOLN AVE DRAINAGE BASIN: Burton Creek VALID FOR 4 MONTHS CONTRACTOR: Brazos Valley Utilities No. 2 Bronze West Bryan, Texas 77807 TYPE OF DEVELOPMENT: STOCKPILE MATERIAL, ROUGH GRADING SPECIAL CONDITIONS: All construction must be in compliance with the approved construction plans All trees must be barricaded , as shown on plans, prior to any construction. Any trees not barricaded will not count towards landscaping points. Barricades must be l' per caliper inch of the tree diameter. The Contractor shall take all necessary precautions to prevent silt and debris from leaving the immediate construction site in accordance with the approved erosion control plan as well as the City of College Station Drainage Policy and Design Criteria. The Owner and/or Contractor shall assure that all disturbed areas are sodden and establishment of vegetation occurs prior to removal of any silt fencing or hay bales used for temporary erosion control. The Owner and/or Contractor shall also insure that any disturbed vegetation be returned to its original condition, placement and state. The Owner and/or Contractor shall be responsible for any damage to adjacent properties, city streets or infrastructure due to heavy machinery and/or equipment as well as erosion, siltation or sedimentation resulting from the permitted work. Any trees required to be protected by ordinance or as part of the landscape plan must be completely fenced before any operations of this permit can begin. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station , measures shall be taken to insure that debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities. I hereby grant this permit for development of an area outside the special flood hazard area. All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer in the development permit application for the above named project and all of the codes and o dinances of the City of College Station that apply. Owner/ Agent/ Contractor Date FOR OFFICE USE ONLY ~ CASE N0.;00 -:5ooe>8'f DATE SUBMITTED: I 0\-b-co /0 A-(V- DEVELOPMENT PERMIT MINIMUM SUBMITTAL REQUIREMENTS __ $100 .00 Development Permit Application Fee. __ Drainage and erosion control plan, with supporting Drainage Report two (2) copies each. __ Notice oflntent (N.O.I.) if disturbed area is greater than 5 acres. APPLICANT (Primary Contact for the Project): Name fieA-zo.? j/~y1 t'T/~T~ Street Address /th. 2 ~ ~ UJ,s.,[, State __ "N. ...... y: __ Zip Code 77 Bo 7 ~SMd­ City &z;:nY1 E-Mail Address -------------- Phone Number 7 -~n Fax Number ----------~ ------------------~ PROPER1Y OWNER'S INFORMATION: Name .L::::bv,'d. $c.Gw ~t'~ Street Address ----'l~ll..___,_p-'-'-_,___2.---'6""'--'-I _,,,Cf,________ City _ _..t?o......Y,__,V\~c:::;"-"tc=..~--------- f State -,:;''*'2 Zip Code 17 8o s; E-Mail Address ------------- Phone Number ~ 7 7 9-7209 Fax Numb er------------------ ARCHITECT OR ENGINEER'S INFORMA TlON: Name Street Address -----------------City -------------- State Zip Code ______ E-Mail Address ------------- Phone Number Fax Number -----------------------------~ Application is hereby made for the following development specific site/waterway alterations: ~L /Y}qLc.(? "2>7 ~/ 3 ~L ~~>~n ACKNOWLEDGMENTS: I, -----------~ design engineer/owner, hereby acknowledge or affirm that: The information and conclusions contained in the above plans and supporting documents comply with the current requirements of the City of College Station, Texas City Code, Chapter 13 and its associated Drainage Policy and Design Standards. ' " a condition of approval of this pem1it application , I agree to construct the improvements proposed in this application ;ording to these documents and the requirements of Chapt of the C City Code. ~ Property Owner(s) DEVELOPMENT PERMIT DPERMIT.DOC 3124/99 1 of2 .... .'.'\ t • y -~RTIFICATIONS: (for proposed alterations within designated flood hazard areas .) A . I, certify that any nonresidential structure on or proposed to be on this site as part of this application is designated to prevent damage to the structure or its contents as a result of flooding from the 100 year storm . Engineer Date B. I, certify that the finished floor elevation of the lowest floo r, including any basement, of any residential structure, proposed as part of this application is at or above the base flood elevation established in the latest Federal Insurance Administration Flood Hazard Study and maps, as amended . Engineer Date C. I, certify that the alterations or development covered by this permit shall not diminish the flood-carrying capacity of the waterway adjoining or crossing this permitted site and that such alterations or development are consistent with requirements of the City of College Station City Code, Chapter 13 concerning encroachments offloodways and offloodway fringes . . 1gineer Date D . I, do certify that the proposed alterations do not raise the level of the 100 year flood above elevation established in the latest Federal Insurance Administration Flood Hazard Study. Engineer Date Conditions or comments as part of approval : ~~~~~~~~~~~~~~~~~~~~~~~~~~ In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that debris from construction, erosion, and sedimentation shall not be deposited in city streets , or existing drainage facilities. All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer the above named project. All of the applicable codes and ordinances of the City of College Station shall apply. DEVELOPMENT PERMIT DPERMIT.DOC 3124199 2of2 UNCOlN AVENUE-60' R.0. W. ___ 7 =)' b ---------------------------~ i l-f'OST ORM)f 24. @ EROSION CONTRO L t.oT ~ /,I~ ~YdN ~>' ~ ~ ~J't&e4i-Y .,;:f)'~h~ A41A LJ ~-~ COlllGl STATION DEVELOPMENT PERMIT PERMIT NO. 500084 DP-HENTON SUBDIVISION LOT 3 FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA RE: CHAPTER 13 OF THE COLLEGE ST A TION CITY CODE SITE LEGAL DESCRIPTION: Lot 3, Henton Subdivision Richard Carter Survey, A-8 DATE OF ISSUE: 12/12/00 OWNER: David Scarmardo 111FM2818 Bryan, Texas 77805 SITE ADDRESS: LINCOLN AVE DRAINAGE BASIN: Burton Creek VALID FOR 4 MONTHS CONTRACTOR: Brazos Valley Utilities No. 2 Bronze West Bryan, Texas 77807 TYPE OF DEVELOPMENT: STOCKPILE MATERIAL, ROUGH GRADING SPECIAL CONDITIONS: All construction must be in compliance with the approved construction plans All trees must be barricaded, as shown on plans, prior to any construction. Any trees not barricaded will not count towards landscaping points. Barricades must be l' per caliper inch of the tree diameter. The Contractor shall take all necessary precautions to prevent silt and debris from leaving the immediate construction site in accordance with the approved erosion control plan as well as the City of College Station Drainage Policy and Design Criteria. The Owner and/or Contractor shall assure that all disturbed areas are sodden and establishment of vegetation occurs prior to removal of any silt fencing or hay bales used for temporary erosion control. The Owner and/or Contractor shall also insure that any disturbed vegetation be returned to its original condition, placement and state. The Owner and/or Contractor shall be responsible for any damage to adjacent properties, city streets or infrastructure due to heavy machinery and/or equipment as well as erosion, siltation or sedimentation resulting from the permitted work. Any trees required to be protected by ordinance or as part of the landscape plan must be completely fenced before any operations of this permit can begin. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that debris from construction, erosion , and sedimentation shall not be deposited in city streets, or existing drainage facilities. I hereby grant this permit for development of an area outside the special flood hazard area. All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer in the development permit application for the above named project and all of the codes and ordinances of the City of College Station that apply. ~~~~cc Date Owner/ Agent/ Contractor Date r-: FOR OFFICE USE ONLY CASE No.:ao-soo08'f DATE SUBMITTED: I ~ti-co ID A-fV- DEVELOP MENT P ER M IT MINIMUM SUBMITTAL REQUIREM ENTS $100.00 Development Permit Application Fee. __ Drainage and erosion control plan, with supporting Drainage Report t __ Notice oflntent (N.0.1.) if disturbed area is greater than 5 acres. wo (2) copies each. '--· LEGALDESCRIPTION l~ =-:, / b\-o~ S'-'bd\~\$\;~ . e,cJ-_()¥'l_ CL SN~.., A.-8 APPLICANT (Primary Contact for the Project): Name 8.eA-zo:> ~Y PT/tC./T~ --~ SA ~ffe Street Address ~ 2 ~;;z.... ~/. City _ ~~ State 7\f: Zip Code 77 Bo 7 E-Mail Address Phone Number W7 -~>7 Fax Number ----- PROPER1Y OWNER'S INFORMATION: Name .r::::hv• · d. $c. av»·-..-,~~ f)l'.:!6<:::1 ...-..... i Street Address } I\ £:~ 261 '6 City _ State 1?f2 Zip Code 17Bo<;; E-Mail Address Phone Number ~ 777 ... 72c::>9 Fax Number ____ _ ARCIIlTECT OR ENGINEER'S INFORMATION: Name ----------------------- Street Address -----------------City _ State ____ Zip Code ______ E-Mail Address Phone Number Fax Number ---------------- Iterations : ~~.S/;~ Application is hereby made for the following development specific site/waterway a ~L ff)?,/.,,,~ /2n ~/ 3 ~L ACKNO WLEDGMENTS: I,-----------~ design engineer/owner, hereby acknowledge or affirm that: ments comply with the current The information and conclusions contained in the above plans and supporting docu requirements of the City of College Station, Texas City Code, Chapter 13 and its as sociated Drainage Policy and Design Standards . • <> a condition of approval of this pem1it application, I agree to construct the impro vements proposed in this application :;ording to these documents and the requirements of Chapt of the C~:ge..~ ~ze . Property Owner(s) DEVELOPMENT PERMIT DPERMIT.DOC 3124199 ~ 1 ofl - . ' y -'"'ERTIFICATIONS: (for proposed alterations within designated flood hazard areas .) A. I. certify that any nonresidential structure on or proposed to be on this site as part of this application is designated to prevent damage to the structure or its contents as a result of flooding from the 100 year storm. Engineer Date B. I. certify that the finished floor elevation of the lowest floor, including any basement, of any residential structure, proposed as part of this application is at or above the base flood elevation established in the latest Federal Insurance Administration Flood Hazard Study and maps, as amended . Engineer Date C. I, certify that the alterations or development covered by this permit shall not diminish the flood-carrying capacity of the waterway adjoining or crossing this permitted site and that such alterations or development are consistent with requirements of the City of College Station City Code, Chapter 13 concerning encroachments of floodways and of floodway fringes . .igineer Date D . I. do certify that the proposed alterations do not raise the level of the 100 year flood above elevation established in the latest Federal Insurance Administration Flood Hazard Study. Engineer Date Conditions or comments as part of approval: --------------------------- In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities . All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer the above named project. All of the applicable codes and ordinances of the City of College Station shall apply. DEVELOPMENT PERMIT DPERMrr.nor. '\n4}1)Q 2oC2 LINCClH A~-60' R.O.W. -·-7 =), bu ----------------------------, i @ EROSION CONTROL t.or ~ #iN?a¥ ~ao-W u.y ~ ~ T.PM~#Y ~~~~ A44!'A LJ ~-v COLllGl STATION DEVELOPMENT PERMIT PERMIT NO . 500084 DP-HENTON SUBDIVISION LOT 3 FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA RE : CHAPTER 13 OF THE COLLEGE STATION CITY CODE SITE LEGAL DESCRIPTION: Lot 3, Henton Subdivision Richard Carter Survey , A-8 DATE OF ISSUE: 12/12/00 OWNER: David Scarmardo 111 FM2818 Bryan, Texas 77805 SITE ADDRESS: LINCOLN AVE DRAINAGE BASIN: Burton Creek VALID FOR 4 MONTHS CONTRACTOR: Brazos Valley Utilities No. 2 Bronze West Bryan, Texas 77807 TYPE OF DEVELOPMENT: STOCKPILE MATERIAL, ROUGH GRADING SPECIAL CONDITIONS: All construction must be in compliance with the approved construction plans All trees must be barricaded, as shown on plans , prior to any construction . Any trees not barricaded will not count towards landscaping points. Barricades must be 1' per caliper inch of the tree diameter. The Contractor shall take all necessary precautions to prevent silt and debris from leaving the immediate construction site in accordance with the approved erosion control plan as well as the City of College Station Drainage Policy and Design Criteria. The Owner and/or Contractor shall assure that all disturbed areas are sodden and establishment of vegetation occurs prior to removal of any silt fencing or hay bales used for temporary erosion control. The Owner and/or Contractor shall also insure that any disturbed vegetation be returned to its original condition, placement and state . The Owner and/or Contractor shall be responsible for any damage to adjacent properties, city streets or infrastructure due to heavy machinery and/or equipment as well as erosion, siltation or sedimentation resulting from the permitted work. Any trees required to be protected by ordinance or as part of the landscape plan must be completely fenced before any operations of this permit can begin . In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that debris from construction , erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities. I hereby grant th is permit for development of an area outside the special flood hazard area . All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer in the development permit application for the above named project and all of the codes and ordinances of the City of College Station that apply . ~~2~/r;: Date Owner/ Agent/ C ontractor Date oa,-w--FOR OFFICE USE ONLY u -CASE No.:t>O-SOoo8'f DATE sUBMITIEn: I cr6-oo ID f+t'V- DEVELOPMENT PERMIT MINIMUM SUBMIIT AL REQUIREMENTS __ $100.00 Development Permit Application Fee. __ Drainage and erosion control plan, with supporting Drainage Report two (2) copies each. __ Notice oflntent (N.O.I .) if disturbed area is greater than 5 acres. LEGALDEscruPTioN Lo-\-=s, b\.oy-., s'"'bd-\~,s,;~ _ e.~~d_ Cl~:S~~'l A.-8 APPLICANT (Primary Contact for the Project): Name 8.eA-zo.:> Y~:Y /7T/c:./T~ --~~/# Street Address /th. 2 ,&2? :,;z...-u..i.._5 .j. City &-z;nn Zip Code 778o7 E-Mail Address --------------State __ "N_.y: __ Phone Number "'17 -~n Fax Number ----------~ ------------------- PROPER1Y OWNER'S INFORMATION : Name .r:::bv• ·d_ $c.ay """"'<='~ Street Address \I\ £:\.\ 2. 61 i City --"'f>~y'--'""<-tq=...---..,,__,._ _______ _ ! State 11f=s. Zip Code 17 Bos; E-Mail Address ------------- Phone Number ~ 779-7209 Fax Number ------------------- ARCHITECT OR ENGINEER'S INFORMATION: Name ------------------------------------- Street Address -----------------City -------------- State ____ Zip Code ______ E-Mail Address -------------- Phone Number Fax Number ------------------------------ Application is hereby made for the following development specific site/wateiway alterations : ~L ~c(Z /2n ~,) 3 ~L 5U~.s:~n ACKNOWLEDGMENTS: I, -----------~ design engineer/owner, hereby acknowledge or affirm that: The information and conclusions contained in the above plans and supporting documents comply with the current requirements of the City of College Station, Texas City Code, Chapter 13 and its associated Drainage Policy and Design Standards. • " a condition of approval of this pem1it application, I agree to construct the improvements proposed in this application ;ording to these documents and the requirements of Chapt of the C City Code. Property Owner(s) DEVELOPMENT PERMIT DPERMIT.DOC 3124199 l ofl I s y -~RTIFICATIONS: (for proposed alterations within designated flood hazard areas.) A. I. certify that any nonresidential structure on or proposed to be on this site as part of this application is designated to prevent damage to the structure or its contents as a result of flooding from the 100 year storm. Engineer Date B. I, certify that the finished floor elevation of the lowest floor, including any basement, of any residential structure, proposed as part of this application is at or above the base flood elevation established in the latest Federal Insurance Administration Flood Hazard Study and maps, as amended. Engineer Date C. I, certify that the alterations or development covered by this permit shall not diminish the flood-carrying capacity of the waterway adjoining or crossing this permitted site and that such alterations or development are consistent with requirements of the City of College Station City Code, Chapter 13 concerning encroachments offloodways and offloodway fringes . . 1gineer Date D. I, do certify that the proposed alterations do not raise the level of the 100 year flood above elevation established in the latest Federal Insurance Administration Flood Hazard Study. Engineer Date Conditions or conunents as part of approval: --------------------------- In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities. All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer the above named project. All of the applicable codes and ordinances of the City of College Station shall apply. DEVELOPMENT PERMIT DPERMrr.~ '\n4}1)() 2of2 LNC0t.N AVFNUE-60' R.0.W. ___ 7 =). b ----------------------------, i @ EROSION CONTROL t.or ~ lllN?.\il ~•vo-N ~y ~ ~ 1.PMJ'beA#Y ~~h~ A4~A LJ