ENGINEER'S ESTIMATE
FOR
REP LAT OF LOT 3 -HENTON SUBDIVISION ~
WATER LINE & SANITARY SEWER LINE CONST~~(oQ
November a, 2000 X:.-~'\.:. ~cS
. c""_,\ \ ' \ !>-:
217 LF Furnish and Install 12" PVC Water Main (AWWA C-900, DR
14, Pressure Class 200) -Standard Depth-4'-6' Bury
complete and in place
for Dollars
and Cents per linear foot.
96 LF Furnish and Install 12-PVC Water Main (AWWA C-900, DR
14, Pressure Class 200) -Extra Depth-6'-8' Bury complete
and in place
for Dollars
and Cents per linear foot.
114 LF Furnish and Install 12" PVC Water Main (AWWA C-900, DR
14, Pressure Class 200) -Extra Depth-8'-1 O' Bury complete
and in place
for Dollars
and Cents per linear foot.
322 LF Furnish and Install 8" PVC Water Main (AWWA C-900, DR 14,
Pressure Class 200) -Standard Depth-4'-6' Bury complete
and In place
for Dollars
and Cents per linear foot.
225 LF Furnish and Install 6" PVC Water Main (AWi/i/A C-900, DR 14,
Pressure Class 200) -Standard Depth-4'-6' Bury complete
and in place
for Dollars
and __________ Cents per lin ear foot.
233 LF Furnish and Install 6" PVC Water Main (AWi/i/A C-900, DR 14,
Pressure .Class 200) -Extra Depth-6'-8' Bury complete and in
place
for Dollars
and Cents per linear foot.
22 LF Furnish and Install 6" PVC Water Main (AWWA C-900, DR 14,
Pressure Class 200) -Extra Depth-8'-1 O' Bury complete and
in place
for Dollars
and Cents per lin ea r foot.
$29.00
$31.00
$33.00
$21.25
$21.12
$23.00
$25.00
$6,293.00
$2,976.00
$3 ,762.00
$6,842.50
$4,752.00
$5,359 .00
$550.00
8 1 LS Furnish and Install 12" 45 Bend, Valve and Valve Box and 4"
Blow-off Valve as detailed on sheet W-1 In Inset complete and
in place
for Dollars $3,100.00 $3,100 .00
and Cents per lump sum .
9 1 EA Furnish and Install Tapping Sleeve and 12" Gate Valve on
Existing 16M Water Line to include all necessary thrust blocking
complete and in place
for Dollars $3,750.00 $3,750.00
and Cents per each.
10 1 EA Furnish and Install Tapping Sleeve and 8" Gate Valve on
Exlsting 16" Water Line to include all necessary thrust blocking
complete and In place
for Dollars $2,542 .00 $2 ,542 .00
and Cents per each .
11 1 EA Furnish and Install 12" x 12" M.J . Tee to include all necessary
thrust blocking complete and in place
for Dollars $800.00 $800 .00
and Cents per each .
12 4 EA Furnish and Install 12M x 6" M.J . Tee to include all necessary
thrust blocking complete and in place
for Dollars $800.00 $3 ,200.00
and Cents per each .
13 1 EA Furnish and Install 12" x 6" M.J. Reducer to include all
necessary thrust blocking complete and in place
for Dollars $750 .00 $750.00
and Cents per each .
14 5 EA Furnish and Install 12" M.J. 45 Bend to include all necessary
thrust blocking complete and in place
for Dollars $750.00 $3 ,750.00
and Cents per each .
15 EA Furnish and Install 12" Gate Valve and Box to include all
necessary thrust blocking complete and in place
for Dollars $1,500 .00 $1 ,500.00
and Cents per each .
16 1 EA Furnish and Install 8" M.J. 90 Bend to include all necessary
thrust blocking complete and In place ·
$300.00 for Dollars $300.00
and Cents per each .
.J..,J..I' VV ' VV .&.V" VV
17 2 EA
18 2 EA
19 8 EA
20 6 EA
21 1 EA
22 1 EA
... VO V V ""1l V V_V ..
Furnish and Install 6" M .J. 90 Bend to include all necessary
thrust blocking complete and In place
for Dollars
and Cents per each .
Furnish and Install 6" M.J. 45 Bend to include all necessary
thrust blocking complete and in place
for Dollars
and Cents per each .
Furnish and Install 6" Gate Valve and Box to include all
necessar"Y thrust blocking complete and in place
for Dollars
and Cents per each.
Furnish and Install M.J. Plug on 6" Line include all necessary
thrust blocking complete and in place
for Dollars
and Cents per each.
Furnish and Install 2" Blow-off Valve on 8" Water Line to
include all necessary thrust blocking complete and in place
for Dollars
and Cents per each.
Furnish and Install Std . City of College Station Fire Hydrant
w/appurtenances including all necessary tees , valves and
thrust blocking complete and in place
for
and
Dollars
Cents per each.
WATER LINE -SUB-TOTAL 1
Items( 1-22 )
~VV "'I
$200 .00 $400.00
$190 .00 $380 .00
$500.00 $4,000.00
$295.00 $1,770.00
$350 .00 $350.00
$1,825 .00 $1 ,825 .00
$58,951.50
.L .L I .., _. • ---------·---··-----------------
23 101 LF Furnish and Install 8" PVC Sanitary Sewer Main (SOR 26 ,
ASTM 2241, CLASS 160) -Standard Depth-4'-6' Bury
complete and in place
for Dollars $19 .50 $1,969 .50
and Cents per linear foot.
24 442 LF Furnish and Install S" PVC Sanitary Sewer Main (SOR 26 ,
ASTM 2241 , CLASS 160) -Extra Depth-6'-8 ' Bury complete
and in place
for Dollars $20 .80 $9,193 .60
and Cents per linear foot.
25 138 LF Furnish and Install a· PVC Sanitary Sewer Main (SOR 26 ,
ASTM 2241 , CLASS 160) -Extra Depth-8'-10' Bury complete
and in place
for Dollars $23 .60 $3 ,256.80
and Cents per linear foot
26 86 LF Furnish and Install 12" PVC Sanitary Sewer Main (SOR 26 ,
ASTM 2241 , CLASS 160) -Extra Depth-6'-8' Bury complete
and in place
for Dollars $30 .00 $2 ,580.00
and Cents per linear foot.
27 127 LF Furnish and Install 12" PVC Sanitary Sewer Main (SOR 26 ,
ASTM 2241, CLASS 160) -Extra Depth-8'-1 O' Bury compl ete
and in place
for Dollars $33 .00 $4 ,191 .00
and Cents per linear foot.
28 89 LF Furnish and Install 4" PVC Sanitary Sewer Service (SOR 26 ,
ASTM 2241, CLASS 160) -Standard Depth ... 4'-6' Bury
complete and in place
for Dollars $18.00 $1,602 .00
a nd Cents per linear foot.
29 63 LF Furnish and Install 4" PVC Sanitary Sewer Service (SDR 26 ,
ASTM 2241, CLASS 160) -Extra Depth-6'-8 ' Bury complete
and in place
for Dollars $20 .00 $1 ,260 .00
and Cenffi per linear foot.
30 5 EA Furn ish and Install 8" x 4" Wye compl ete and in place
for Dollars $50 .00 $250.00
and Cents per each.
31 2 EA Furnish and Install 8" x 4 ft Double Wye complete and in place
for Dollars $75.00 $150 .00
a nd C ents per each .
................... ..,, ..... ~ ... •• .......... & .............. . "CJ vvu
..L U• V V
.. ..., . ..., ..... -. ................ -
32 3 EA Furnish and Install 4" x 4" Double Wye complete and in place
for Dollars $50 .00 $150 .00
and Cents per each.
33 1 EA Furnish and Install 12" x 4" Double Wye complete and in place
for Dollars $50 .00 $50 .00
and Cents per each.
34 3 EA Furnish and Install standard City of College Station Manhole
-Extra Depth-8'-10' complete and In place
for Dollars $1,800 .00 $5,400 .00
and Cents per each .
35 2 EA Furnish and Install standard City of College Station Manhole
-Extra Depth-10'-12' complete and In place
for Dollars $1,950.00 $3,900 .00
and Cents per each.
36 1 EA Furnish and Install Standard City of College Station Manhole in
existing line-Extra Depth-8'-10' complete and in place
for Dollars $2,000 .00 $2,000 .00
and Cents per each.
37 2 EA Furnish and Install Standard City of College Station 8" 0 .1.P .
Drop Connection complete and in place
for Dollars $1,270 .00 $2 ,540.00
and Cents per each .
38 1 EA Furnish and Install Standard City of College Station 4" D.l.P .
Drop Connection complete and In place
tor Dollars $1 ,000 .00 $1 ,000 .00
and Cents per each .
39 1 EA Furnish and Install Standard City of College Station 8" 0 .1.P.
Drop Connection on Existing Manhole complete and in place
tor Dollars $1,270.00 $1 ,270 .00
and Cents per each.
40 1 EA Furnish and Install Standard City of College Station 4" 0.1 .P.
Drop Connection on Existing Manhole complete and in place
$1 ,000 .00 $1 ,000.00 for Dollars
and Cents per each.
41 2 EA Tie New sanitary sewer line Into Existing Manhole .complete
and in place
for Dollars $700 .00 $1 ,400 .00
and Cents per each .
42 156 LF Grout fill and abandon Existing 8" Sanitary Sewer line complete
and in place
for Dollars $10.90 $1 ,700.40
and Cents per each.
SANITARY SEWER LINE· SUB-TOTAL 2: $44,863.30
Items (23-42)
43 1 LS Provide Contractor red-lines As-Built Drawings within 7 days of
project completion and closeout complete
for Dollars $350.00 $350.00
and Cents per lump sum.
44 1 LS Furnish and Install all necessary Barricades, Signs and Traffic
Control Devices complete and in place
for Dollars $500 .00 $500.00
and Cents per lump sum.
45 1321 LF Furnish and Install all necessary Trench Safety complete and
in p lace
for Dollars $2 .50 $3 ,302.50
and Cents per linear foot.
INCIDENTALS -SUB-TOTAL 3: $4, 162.50
Items (43-45)
~..L ' .... -• - -
_ ............... ----.... -........................................ .-.. .
ENGINEER'S ESTIMATE
FOR
REPLA T OF LOT 3 • HENTON SUBDIVISION
WATER LINE & SANITARY SEWER LINE CONSTRUCTION
November a, 2ooo'
WATER LINE -SUB-TOTAL 1:
SANITARY SEWER LINE· SUB-TOTAL 2:
INCIDENTALS· SUB-TOTAL 3:
TOTAL:
10% CONTINGENCY:
$58,951.50
$44,863.30
$4, 152.60
$107,967.30
$10,796.73
$118,764.03
«~
COLLEGE STATION
DEVELOPMENT PERMIT
PERMIT NO. 500084
DP-HENTON SUBDIVISION LOT 3
FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA
RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE
SITE LEGAL DESCRIPTION:
Lot 3, Henton Subdivision
Richard Carter Survey, A-8
DATE OF ISSUE: 12112/00
OWNER:
David Scarmardo
111 FM2818
Bryan, Texas 77805
SITE ADDRESS:
LINCOLN AVE
DRAINAGE BASIN:
Burton Creek
VALID FOR 4 MONTHS
CONTRACTOR:
Brazos Valley Utilities
No. 2 Bronze West
Bryan, Texas 77807
TYPE OF DEVELOPMENT: STOCKPILE MATERIAL, ROUGH GRADING
SPECIAL CONDITIONS:
All construction must be in compliance with the approved construction plans
All trees must be barricaded , as shown on plans, prior to any construction. Any trees not barricaded will not count
towards landscaping points. Barricades must be l' per caliper inch of the tree diameter.
The Contractor shall take all necessary precautions to prevent silt and debris from leaving the immediate construction site
in accordance with the approved erosion control plan as well as the City of College Station Drainage Policy and Design
Criteria. The Owner and/or Contractor shall assure that all disturbed areas are sodden and establishment of vegetation
occurs prior to removal of any silt fencing or hay bales used for temporary erosion control. The Owner and/or Contractor
shall also insure that any disturbed vegetation be returned to its original condition, placement and state. The Owner
and/or Contractor shall be responsible for any damage to adjacent properties, city streets or infrastructure due to heavy
machinery and/or equipment as well as erosion, siltation or sedimentation resulting from the permitted work.
Any trees required to be protected by ordinance or as part of the landscape plan must be completely fenced before any
operations of this permit can begin.
In accordance with Chapter 13 of the Code of Ordinances of the City of College Station , measures shall be taken to
insure that debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage
facilities.
I hereby grant this permit for development of an area outside the special flood hazard area. All development shall be in
accordance with the plans and specifications submitted to and approved by the City Engineer in the development permit
application for the above named project and all of the codes and o dinances of the City of College Station that apply.
Owner/ Agent/ Contractor Date
FOR OFFICE USE ONLY ~ CASE N0.;00 -:5ooe>8'f
DATE SUBMITTED: I 0\-b-co
/0 A-(V-
DEVELOPMENT PERMIT
MINIMUM SUBMITTAL REQUIREMENTS
__ $100 .00 Development Permit Application Fee.
__ Drainage and erosion control plan, with supporting Drainage Report two (2) copies each.
__ Notice oflntent (N.O.I.) if disturbed area is greater than 5 acres.
APPLICANT (Primary Contact for the Project):
Name fieA-zo.? j/~y1 t'T/~T~
Street Address /th. 2 ~ ~ UJ,s.,[,
State __ "N. ...... y: __ Zip Code 77 Bo 7
~SMd
City &z;:nY1
E-Mail Address --------------
Phone Number 7 -~n Fax Number
----------~ ------------------~
PROPER1Y OWNER'S INFORMATION:
Name .L::::bv,'d. $c.Gw ~t'~
Street Address ----'l~ll..___,_p-'-'-_,___2.---'6""'--'-I _,,,Cf,________ City _ _..t?o......Y,__,V\~c:::;"-"tc=..~---------
f State -,:;''*'2 Zip Code 17 8o s; E-Mail Address -------------
Phone Number ~ 7 7 9-7209 Fax Numb er------------------
ARCHITECT OR ENGINEER'S INFORMA TlON:
Name
Street Address -----------------City --------------
State Zip Code ______ E-Mail Address -------------
Phone Number Fax Number -----------------------------~
Application is hereby made for the following development specific site/waterway alterations:
~L /Y}qLc.(? "2>7 ~/ 3 ~L ~~>~n
ACKNOWLEDGMENTS:
I, -----------~ design engineer/owner, hereby acknowledge or affirm that:
The information and conclusions contained in the above plans and supporting documents comply with the current
requirements of the City of College Station, Texas City Code, Chapter 13 and its associated Drainage Policy and Design
Standards.
' " a condition of approval of this pem1it application , I agree to construct the improvements proposed in this application
;ording to these documents and the requirements of Chapt of the C City Code. ~
Property Owner(s)
DEVELOPMENT PERMIT
DPERMIT.DOC 3124/99
1 of2
....
.'.'\ t
•
y -~RTIFICATIONS: (for proposed alterations within designated flood hazard areas .)
A . I, certify that any nonresidential structure on or proposed to be on this site as part
of this application is designated to prevent damage to the structure or its contents as a result of flooding from the 100 year
storm .
Engineer Date
B. I, certify that the finished floor elevation of the lowest floo r, including any
basement, of any residential structure, proposed as part of this application is at or above the base flood elevation established
in the latest Federal Insurance Administration Flood Hazard Study and maps, as amended .
Engineer Date
C. I, certify that the alterations or development covered by this permit shall not
diminish the flood-carrying capacity of the waterway adjoining or crossing this permitted site and that such alterations or
development are consistent with requirements of the City of College Station City Code, Chapter 13 concerning
encroachments offloodways and offloodway fringes .
. 1gineer Date
D . I, do certify that the proposed alterations do not raise the level of the 100 year
flood above elevation established in the latest Federal Insurance Administration Flood Hazard Study.
Engineer Date
Conditions or comments as part of approval :
~~~~~~~~~~~~~~~~~~~~~~~~~~
In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure
that debris from construction, erosion, and sedimentation shall not be deposited in city streets , or existing drainage facilities.
All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer
the above named project. All of the applicable codes and ordinances of the City of College Station shall apply.
DEVELOPMENT PERMIT
DPERMIT.DOC 3124199
2of2
UNCOlN AVENUE-60' R.0. W.
___ 7 =)' b ---------------------------~ i
l-f'OST ORM)f 24.
@ EROSION CONTRO L
t.oT ~ /,I~ ~YdN
~>' ~ ~ ~J't&e4i-Y
.,;:f)'~h~ A41A
LJ
~-~
COlllGl STATION
DEVELOPMENT PERMIT
PERMIT NO. 500084
DP-HENTON SUBDIVISION LOT 3
FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA
RE: CHAPTER 13 OF THE COLLEGE ST A TION CITY CODE
SITE LEGAL DESCRIPTION:
Lot 3, Henton Subdivision
Richard Carter Survey, A-8
DATE OF ISSUE: 12/12/00
OWNER:
David Scarmardo
111FM2818
Bryan, Texas 77805
SITE ADDRESS:
LINCOLN AVE
DRAINAGE BASIN:
Burton Creek
VALID FOR 4 MONTHS
CONTRACTOR:
Brazos Valley Utilities
No. 2 Bronze West
Bryan, Texas 77807
TYPE OF DEVELOPMENT: STOCKPILE MATERIAL, ROUGH GRADING
SPECIAL CONDITIONS:
All construction must be in compliance with the approved construction plans
All trees must be barricaded, as shown on plans, prior to any construction. Any trees not barricaded will not count
towards landscaping points. Barricades must be l' per caliper inch of the tree diameter.
The Contractor shall take all necessary precautions to prevent silt and debris from leaving the immediate construction site
in accordance with the approved erosion control plan as well as the City of College Station Drainage Policy and Design
Criteria. The Owner and/or Contractor shall assure that all disturbed areas are sodden and establishment of vegetation
occurs prior to removal of any silt fencing or hay bales used for temporary erosion control. The Owner and/or Contractor
shall also insure that any disturbed vegetation be returned to its original condition, placement and state. The Owner
and/or Contractor shall be responsible for any damage to adjacent properties, city streets or infrastructure due to heavy
machinery and/or equipment as well as erosion, siltation or sedimentation resulting from the permitted work.
Any trees required to be protected by ordinance or as part of the landscape plan must be completely fenced before any
operations of this permit can begin.
In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to
insure that debris from construction, erosion , and sedimentation shall not be deposited in city streets, or existing drainage
facilities.
I hereby grant this permit for development of an area outside the special flood hazard area. All development shall be in
accordance with the plans and specifications submitted to and approved by the City Engineer in the development permit
application for the above named project and all of the codes and ordinances of the City of College Station that apply.
~~~~cc Date
Owner/ Agent/ Contractor Date
r-: FOR OFFICE USE ONLY
CASE No.:ao-soo08'f
DATE SUBMITTED: I ~ti-co
ID A-fV-
DEVELOP MENT P ER M IT
MINIMUM SUBMITTAL REQUIREM ENTS
$100.00 Development Permit Application Fee.
__ Drainage and erosion control plan, with supporting Drainage Report t
__ Notice oflntent (N.0.1.) if disturbed area is greater than 5 acres.
wo (2) copies each.
'--·
LEGALDESCRIPTION l~ =-:, / b\-o~ S'-'bd\~\$\;~ . e,cJ-_()¥'l_ CL SN~.., A.-8
APPLICANT (Primary Contact for the Project):
Name 8.eA-zo:> ~Y PT/tC./T~ --~ SA ~ffe
Street Address ~ 2 ~;;z.... ~/. City _ ~~
State 7\f: Zip Code 77 Bo 7 E-Mail Address
Phone Number W7 -~>7 Fax Number -----
PROPER1Y OWNER'S INFORMATION:
Name .r::::hv• · d. $c. av»·-..-,~~
f)l'.:!6<:::1 ...-.....
i
Street Address } I\ £:~ 261 '6 City _
State 1?f2 Zip Code 17Bo<;; E-Mail Address
Phone Number ~ 777 ... 72c::>9 Fax Number ____ _
ARCIIlTECT OR ENGINEER'S INFORMATION:
Name -----------------------
Street Address -----------------City _
State ____ Zip Code ______ E-Mail Address
Phone Number Fax Number ----------------
Iterations :
~~.S/;~
Application is hereby made for the following development specific site/waterway a
~L ff)?,/.,,,~ /2n ~/ 3 ~L
ACKNO WLEDGMENTS:
I,-----------~ design engineer/owner, hereby acknowledge or affirm that:
ments comply with the current The information and conclusions contained in the above plans and supporting docu
requirements of the City of College Station, Texas City Code, Chapter 13 and its as sociated Drainage Policy and Design
Standards .
• <> a condition of approval of this pem1it application, I agree to construct the impro vements proposed in this application
:;ording to these documents and the requirements of Chapt of the C~:ge..~ ~ze .
Property Owner(s)
DEVELOPMENT PERMIT
DPERMIT.DOC 3124199
~
1 ofl
-
. '
y -'"'ERTIFICATIONS: (for proposed alterations within designated flood hazard areas .)
A. I. certify that any nonresidential structure on or proposed to be on this site as part
of this application is designated to prevent damage to the structure or its contents as a result of flooding from the 100 year
storm.
Engineer Date
B. I. certify that the finished floor elevation of the lowest floor, including any
basement, of any residential structure, proposed as part of this application is at or above the base flood elevation established
in the latest Federal Insurance Administration Flood Hazard Study and maps, as amended .
Engineer Date
C. I, certify that the alterations or development covered by this permit shall not
diminish the flood-carrying capacity of the waterway adjoining or crossing this permitted site and that such alterations or
development are consistent with requirements of the City of College Station City Code, Chapter 13 concerning
encroachments of floodways and of floodway fringes .
.igineer Date
D . I. do certify that the proposed alterations do not raise the level of the 100 year
flood above elevation established in the latest Federal Insurance Administration Flood Hazard Study.
Engineer Date
Conditions or comments as part of approval: ---------------------------
In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure
that debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities .
All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer
the above named project. All of the applicable codes and ordinances of the City of College Station shall apply.
DEVELOPMENT PERMIT
DPERMrr.nor. '\n4}1)Q
2oC2
LINCClH A~-60' R.O.W.
-·-7 =), bu ----------------------------, i
@ EROSION CONTROL
t.or ~ #iN?a¥ ~ao-W
u.y ~ ~ T.PM~#Y
~~~~ A44!'A
LJ
~-v
COLllGl STATION
DEVELOPMENT PERMIT
PERMIT NO . 500084
DP-HENTON SUBDIVISION LOT 3
FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA
RE : CHAPTER 13 OF THE COLLEGE STATION CITY CODE
SITE LEGAL DESCRIPTION:
Lot 3, Henton Subdivision
Richard Carter Survey , A-8
DATE OF ISSUE: 12/12/00
OWNER:
David Scarmardo
111 FM2818
Bryan, Texas 77805
SITE ADDRESS:
LINCOLN AVE
DRAINAGE BASIN:
Burton Creek
VALID FOR 4 MONTHS
CONTRACTOR:
Brazos Valley Utilities
No. 2 Bronze West
Bryan, Texas 77807
TYPE OF DEVELOPMENT: STOCKPILE MATERIAL, ROUGH GRADING
SPECIAL CONDITIONS:
All construction must be in compliance with the approved construction plans
All trees must be barricaded, as shown on plans , prior to any construction . Any trees not barricaded will not count
towards landscaping points. Barricades must be 1' per caliper inch of the tree diameter.
The Contractor shall take all necessary precautions to prevent silt and debris from leaving the immediate construction site
in accordance with the approved erosion control plan as well as the City of College Station Drainage Policy and Design
Criteria. The Owner and/or Contractor shall assure that all disturbed areas are sodden and establishment of vegetation
occurs prior to removal of any silt fencing or hay bales used for temporary erosion control. The Owner and/or Contractor
shall also insure that any disturbed vegetation be returned to its original condition, placement and state . The Owner
and/or Contractor shall be responsible for any damage to adjacent properties, city streets or infrastructure due to heavy
machinery and/or equipment as well as erosion, siltation or sedimentation resulting from the permitted work.
Any trees required to be protected by ordinance or as part of the landscape plan must be completely fenced before any
operations of this permit can begin .
In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to
insure that debris from construction , erosion, and sedimentation shall not be deposited in city streets, or existing drainage
facilities.
I hereby grant th is permit for development of an area outside the special flood hazard area . All development shall be in
accordance with the plans and specifications submitted to and approved by the City Engineer in the development permit
application for the above named project and all of the codes and ordinances of the City of College Station that apply .
~~2~/r;: Date
Owner/ Agent/ C ontractor Date
oa,-w--FOR OFFICE USE ONLY u -CASE No.:t>O-SOoo8'f
DATE sUBMITIEn: I cr6-oo
ID f+t'V-
DEVELOPMENT PERMIT
MINIMUM SUBMIIT AL REQUIREMENTS
__ $100.00 Development Permit Application Fee.
__ Drainage and erosion control plan, with supporting Drainage Report two (2) copies each.
__ Notice oflntent (N.O.I .) if disturbed area is greater than 5 acres.
LEGALDEscruPTioN Lo-\-=s, b\.oy-., s'"'bd-\~,s,;~ _ e.~~d_ Cl~:S~~'l A.-8
APPLICANT (Primary Contact for the Project):
Name 8.eA-zo.:> Y~:Y /7T/c:./T~ --~~/#
Street Address /th. 2 ,&2? :,;z...-u..i.._5 .j. City &-z;nn
Zip Code 778o7 E-Mail Address --------------State __ "N_.y: __
Phone Number "'17 -~n Fax Number
----------~ -------------------
PROPER1Y OWNER'S INFORMATION :
Name .r:::bv• ·d_ $c.ay """"'<='~
Street Address \I\ £:\.\ 2. 61 i City --"'f>~y'--'""<-tq=...---..,,__,._ _______ _
! State 11f=s. Zip Code 17 Bos; E-Mail Address -------------
Phone Number ~ 779-7209 Fax Number -------------------
ARCHITECT OR ENGINEER'S INFORMATION:
Name -------------------------------------
Street Address -----------------City --------------
State ____ Zip Code ______ E-Mail Address --------------
Phone Number Fax Number ------------------------------
Application is hereby made for the following development specific site/wateiway alterations :
~L ~c(Z /2n ~,) 3 ~L 5U~.s:~n
ACKNOWLEDGMENTS:
I, -----------~ design engineer/owner, hereby acknowledge or affirm that:
The information and conclusions contained in the above plans and supporting documents comply with the current
requirements of the City of College Station, Texas City Code, Chapter 13 and its associated Drainage Policy and Design
Standards.
• " a condition of approval of this pem1it application, I agree to construct the improvements proposed in this application
;ording to these documents and the requirements of Chapt of the C City Code.
Property Owner(s)
DEVELOPMENT PERMIT
DPERMIT.DOC 3124199
l ofl
I
s
y -~RTIFICATIONS: (for proposed alterations within designated flood hazard areas.)
A. I. certify that any nonresidential structure on or proposed to be on this site as part
of this application is designated to prevent damage to the structure or its contents as a result of flooding from the 100 year
storm.
Engineer Date
B. I, certify that the finished floor elevation of the lowest floor, including any
basement, of any residential structure, proposed as part of this application is at or above the base flood elevation established
in the latest Federal Insurance Administration Flood Hazard Study and maps, as amended.
Engineer Date
C. I, certify that the alterations or development covered by this permit shall not
diminish the flood-carrying capacity of the waterway adjoining or crossing this permitted site and that such alterations or
development are consistent with requirements of the City of College Station City Code, Chapter 13 concerning
encroachments offloodways and offloodway fringes .
. 1gineer Date
D. I, do certify that the proposed alterations do not raise the level of the 100 year
flood above elevation established in the latest Federal Insurance Administration Flood Hazard Study.
Engineer Date
Conditions or conunents as part of approval: ---------------------------
In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure
that debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities.
All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer
the above named project. All of the applicable codes and ordinances of the City of College Station shall apply.
DEVELOPMENT PERMIT
DPERMrr.~ '\n4}1)()
2of2
LNC0t.N AVFNUE-60' R.0.W.
___ 7 =). b ----------------------------, i
@ EROSION CONTROL
t.or ~ lllN?.\il ~•vo-N
~y ~ ~ 1.PMJ'beA#Y
~~h~ A4~A
LJ