Loading...
HomeMy WebLinkAbout46 White Creek DP 05-20 George BushFOR ~~5:4!!' Case No.----11U~-~:::;,,,,., i--,....;-=--.:...fi'....::::;,,,..--.,,...--I Date Submitted .:;)" fX3-(}:5" CITY OF COL LEG E STATION Planning & Devtlopment Service£ DEVELOPMENT PERMIT MINIMUM SUBMITTAL REQUIREMENTS D $200 .00 development permit fee . D Drainage and erosion control plan , with supporting Drainage Report two (2) copies each D Notice of Intent (N.0.1.) if disturbed area is greater than 5 acres Date of *Required P reap p I icati on Conference:_,..--,..--,..--,..--,..--,..--,..--,..--,..--,..--,..--,..--,..--,..--,..--,..--,..--,..--- * (Required for areas of special flood hazard) LEGAL DESCRIPTION See attached coordinates APPLICANT'S INFORMATION (Primary Contact for the Project): Name Mikae l Ol sen , PE E-Mail mo lsen @ppfs4. tamu. edu Street Address Boo A~ro nomy Rd. , Mail stop 13 71 City College Station Phone Number 979-458-0417 PROPERTY OWNER'S INFORMATION: Name Texas A&M Univers ity ( Street Address Mail Stop 44 72 City College St ation Phone Number 979-845-8761 State Texas Zip Code 77843-1371 State Texas Fax Number 979-862-1661 E-Mail d-helton@tamu.edu Zip Code 77843-4472 Fax Number 979-845-1348 ARCHITECT OR ENGINEER'S INFORMATION: E-Mail john.laser@jfthompson.com Name John Laser, PE, CFM Street Address 6110 Clarkson City Hous ton State----"T"""e_x""-as"------Zip Code _7_7_0...;_5_5 _____ _ Phone Number 713-956-4100, ext. 142 Fax Number 713-956-4121 Application is hereby made for the following development specific site/waterway alterations : White Creek ACKNOWLEDGMENTS : DONALD Helton, CHMM I, __ , design engineer/owner, hereby acknowledge or affirm that: The information and conclusions contained in the above plans and supporting documents comply with the curr 't requirements of the City of College Station , Texas City Code , Chapter 13 and its associated Drainage Pol' y and Desig S a dar . 6/13/03 1of2 As a condition of approval of this permit application , I agree to construct the improvements proposed in this application according to these documents and the requirements of Chapter 13 of the College Station City Code Contractor CERTIFICATIONS: A. I, __ , certify that any nonresidential structure on or proposed to be on this site as part of this application is designated to prevent damage to the structure or its contents as a result of flooding from the 100-year storm . Engineer Date 8. I, __ , certify that the finished floor elevation of the lowest floor, including any basement , of any residential structure , proposed as part of this application is at or above the base flood elevation established in the latest Federal Insurance Administration Flood Hazard Study and maps , as amended. Engineer Date C. l ,Micha~lc~rfifye fhlhhe alterations or development covered by this permit shall not diminish the flood - carrying capacity of the waterway adjoining or crossing this permitted site and that such alterations or development are consistent with requirements of the City of College Station City Code , Chapter 13 concerning encroachments of floodways and of floodways fringes. ~h'~ ______.___,'1,____....,.../2¢_0.r --~ Date f D . l ,Michae,1 dtSaeffititY1'hat the proposed alterations do not raise the level of the 100 year flood above elevation established in the latest Federal Insurance Administration Flood Hazard Study. ~~ ----.Da~,___/i __ sjo_.f _' --- Conditions or comments as part of approval : ----------------------- In accordance with Chapter 13 of the Code of Ordinances of the City of College Station , measures shall be taken to insure that debris from construction, erosion , and sedimentation shall not be deposited in city streets, or existing drainage facilities. All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer for the above named project. All of the applicable codes and ordinances of the City of College Station shall apply. 6/13/03 2 of 2 Date /lfav /~ ~5' r , To : Ca~ c~~ TEXAS A&M UNIVERSITY PHYSICAL PLANT ENGINEERING AND DESIGN SERVICES College Station, Texas 77 843-13 71 PHN: 979.845.5317 /FAX: 979.862.1661 LETTER OF TRANSMITTAL Project IAJh1 k &,ek, G/(5Ji ~ {oi,,me, p;~r,n'!(J 'I ~e~h/~M~~ We are sending you: Via : D Under separate cover ~ The following D Mail 0Messe nger 0 Express l8J. Hand Deli vered Qua nt ity I I By /Lf.O/~ Copies to: T; le... N :prjladmin\corsp\fonm\lct_ tran .doc Descriptio n J>e vdor~~1 f?eYPi:f I Finn h<Jtl>m,, fY? /,l,p s , 1Hu PW-0 s t ~CYI/> ~ ' I I I P~o!* Latitudes And Longitudes Detention Basin Site NAD 83 SP 3110810.0946N 1081592.5964W 30.604664° Latitude -96.352872° Longitude George Bush Library NAD 83 SP 3110047 .3251N 1081757.8118 30.597733° Latitude -96.351436° Longitude E.S.T.I. (Brayton Fire School Bridge) NAD83 SP 3107857.5007N 1081668.6550W 30.578022° Latitude -96.353181° Longitude Waste Water Treatment Plant - NAD 83 SP 3106884.8990N 1080085.8268W 30.569764° Latitude -96.370033° Longitude os-~0 <(~oO Texas A&M University -College Station, Texas White Creek Hazard Mitigation Texas Key Map ~ North insur;m,·e a g ~nt or call the Na1 ional Flood Insu rance Progra APPROXI MATE SC AL E 500 0 llATIOIAL fLOID IHllAm mm• nooo lllSUIANCE RATE MAP BRAZOS COUNTY , TEXAS AND INCORPORA TEO AREAS (Ill..,,,, INOIX "0111,.ANI~ NOT "flt !HTECll -li!lllllffl ttOOU Clll .a u• 1111 MAP NUMBER 48041C01 81 C EFFECT IVE DATE : JIJ LY2, 1992 Thi• le 11n ol'llclal COP/ Qf a portion of the liilbow referenced flood map, It wu extiacted ue lng F·MIT On-Une. Thi• map doee not r91ect changes or amendments which may haYe been made e ubsequent to the date on the title block. For the latest product Informati on about National Flood Insurance Progra m flood mepe check the FEMA Flood Map Store at www.mac.tema.gO\I Texas A&M University -College Station, Texas White Creek Hazard Mitigation George Bush Library and Conference Center Project Site • North ZON E X insurance agent or call rhe National flood Insurance Pr ogra APPROX I MA TE SCALE 600 0 IATIOMll flHD IMSllUCE PIOIUI FLOOD lllSURANC£ RATE MAP BRAZOS COUNTY , TEXAS AND INCORPORATED AREAS till MA' INDl)C POiit 'ANIL.& HOT '''IJ NTID) MAP NUMBER 4804 !C0 181 C EFFECTIVE DATE : JUL Y 2, 1992 Thi• 11 •n omc flll COPV of• portion of the 1bo'.<e teferenced flood m•p. It w.. extracted u1lng F-MIT On-Une. Thi• m•p doel not renect changee or 11mendment1 which m•y h•ve been m•de 1ubaequent t o the dste on the tltle b(ock. For the Jatnt product lnform.tlon •bout National Flood Insurance Prognwn ftood m•pe check the FEMA F lood Map Store at www.m1c:.fema.gov Texas A&M University -College Station, Texas White Creek Hazard Mitigation Emergency Services Training Institute (Brayton) Project Site • North ZONEX ZONE X insu rJn(·e agent or ca ll the National Flood l~uran ce Progra 500 APP RO XIMATE SCALE 0 IATlllAL fLHD lllSIUMCl PIOllAM FLOOD INSURANCE RATE MAP BRAZOS COUNTY , TEXAS AND INCORPORATED AREAS IN• M.V IHDUC l'O" ,ANILS NOT ,fllllNTIDI •IOOU 1111 'lllH 1111 MAP llUMBER 48041C011 1 C EFFECT IVE DATE : JULY 2, 1992 z .............................................................................................. 11 Thi• i• •n oftllcl•I COJ'>' af • portion of the above referenced flood m•p. It w.. extracted ualng F..MIT On-Line. 'Thi• map doe. not reftect eh•nQe9 or amendment• which may n .... been made aubrl9quent t o the data on the tttl• block. For the latut product Information about Nati onal Flood lnturance Program f\ood m•pe check the FEMA Flood Map Store at www.mac.rema.gov Texas A&M University-College Station, Texas White Creek Hazard Mitigation Waste Water Treatment Plant Project Site • North Texas A&M University -College Station, Texas White Creek Hazard Mitigation Project Sites .. North Texas A&M University -College Station, Texas White Creek Hazard Mitigation Proposed Detention Basin Project Site ~ North Texas A&M University -College Station, Texas White Creek Hazard Mitigation George Bush Library and Conference Center Project Site ~ North Texas A&M University -College Station, Texas White Creek Hazard Mitigation George Bush Library and Conference Center Project Site Location of Images ~ North 6 West view of bridge towards eros10n 7 North view from bridge showing erosion 8 North view from bridge showing erosion (enlarged) Texas A&M University -College Station, Texas White Creek Hazard Mitigation George Bush Library and Conference Center Project Site Location of Images 1 South view of erosion 2 South view of erosion 3 South view of erosion 4 North view of erosion 5 North view of erosion Texas A&M University -College Station, Texas White Creek Hazard Mitigation George Bush Library and Conference Center Project Site Location of Images 9 North view along path to Presidential grave site 1 0 North view along path to Presidential grave site (enlarged) 11 North view along path to Presidential grave site (enlarged) Texas A&M University -College Station, Texas White Creek Hazard Mitigation 12 North view along path to Presidential grave site (enlarged) George Bush Library and Conference Center Project Site Location of Images 13 North view of erosion 14 North view of erosion (enlarged) 15 North view of erosion (enlarged) 16 North view of erosion (enlarged) 1 7 North view of erosion (enlarged) Texas A&M University -College Station, Texas White Creek Hazard Mitigation George Bush Library and Conference Center Project Site Location of Images Texas A&M University -College Station, Texas White Creek Hazard Mitigation Emergency Services Training Institute (Brayton) Project Site ~ North Texas A&M University -College Station, Texas White Creek Hazard Mitigation Emergency Services Training Institute (Brayton) Project Site Location of Images i. North 5 North view from bridge 7 West view from bridge 8 West view from bridge 6 West view from bridge Texas A&M University -College Station, Texas White Creek Hazard Mitigation Emergency Services Training Institute (Brayton) Project Site Location of Images 1 North-West view of bridge 2 North-West view of bridge 3 North-West view of bridge 4 North-West view of bridge Texas A&M University -College Station, Texas White Creek Hazard Mitigation Emergency Services Training Institute (Brayton) Project Site Location of Images 1 South-East view of bridge 2 South-East view of bridge 3 East view of bridge 4 East view of bridge Texas A&M University -College Station, Texas White Creek Hazard Mitigation Emergency Services Training Institute (Brayton) Project Site Location of Images 5 South-East view from bridge 6 South-East view from bridge 7 East view from bridge 8 East view from bridge Texas A&M University -College Station, Texas White Creek Hazard Mitigation Emergency Services Training Institute (Brayton) Project Site Location of Images N A Texas A&M University -College Station, Texas White Creek Hazard Mitigation Waste Water Treatment Plant Project Site ~ North Texas A&M University -College Station, Texas White Creek Hazard Mitigation Waste Water Treatment Plant Project Site Location of Images ~ North 1 South view of blocked off area near eros10n 3 South view of blocked off area near eros10n 2 South view of blocked off area near eros10n 4 South view of blocked off area near erosion Texas A&M University -College Station, Texas White Creek Hazard Mitigation Waste Water Treatment Plant Project Site Location of Images 5 East view from blocked off area on W .W .T.P. access road 6 East view from blocked off area on W.W.T .P. access road 7 South-West view of erosion area towards blocked off section on W.W.T.P. access road 8 South-West view of erosion area towards blocked off section on W.W. T .P. access road Texas A&M University -College Station, Texas White Creek Hazard Mitigation Waste Water Treatment Plant Project Site Location of Images 9 North view towards bridge with blocked off area in the background 10 North-East view from bridge 11 North-East view from bridge 12 North-East view from bridge Texas A&M University -College Station, Texas White Creek Hazard Mitigation Waste Water Treatment Plant Project Site Location of Images 13 North-West view from bridge looking towards erosion 14 North-West view from bridge looking towards erosion Texas A&M University -College Station, Texas White Creek Hazard Mitigation Waste Water Treatment Plant Project Site Location of Images DEVELOPMENT PERMIT PERMIT NO. 05-20 CnY OF COLLEGE STATI ON Planning & !Xwlopmmt &rvices FOR AREAS INSIDE THE SPECIAL FLOOD HAZARD AREA RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE SITE LEGAL DESCRIPTION: TAMU -Bush Library White Creek Erosion Control DATE OF ISSUE: 06/21/05 OWNER: T AMU -c/o Mikael Olsen 600 Agronomy Rd -Mail Stop 1371 College Station , Texas 77843-1371 SITE ADDRESS: DRAINAGE BASIN: Wh ite Creek VALID FOR 18 MONTHS CONTRACTOR: TYPE OF DEVELOPMENT: Full Development Permit SPECIAL CONDITIONS: All construction must be in compliance w ith the approved construction plans All trees required to be protected as part of the landscape plan must be completely barricaded in accordance with Section 7.5.E., Landscape/Streetscape Plan Requirements of the City's Unified Development Ordinance , prio r to any operat ions of th is permit. The cleaning of equipment or materials within the drip line of any tree or group of trees that are protected and required to remain is strictly prohibited . The disposal of any waste ma terial such as, but not lim ited to , paint , oil , solvents , asphalt, concrete , mortar, or other harmful liquids or materials within the drip line of any tree required to remain is also prohibited . All construction should be in compliance with TPDES TXR 150000 General Storm Water Permit. The Contractor shall take all necessary precautions to prevent silt and debris from leaving the immed iate construction site in accordance w ith the approved erosion control plan as well as the C ity of College Station Drainage Policy and Design Criteria . If it is determined the prescribed erosion control measures are ineffective to retain all sediment onsite , it is the contractors responsibility to implement measures that will meet City, State and Federal requirements . The Owner and/or Con t ractor shall assure that all disturbed areas are sodden and establishment of vegetation occurs prior to removal of any silt fencing or hay bales used for temporary erosion control. The Owner and /or Contractor shall also insure that any disturbed vegeta ti on be returned to its original condition , placement and state . The Owner and/or Contractor shall be responsible for any damage to adjacent properties , city streets or infrastructure due to heavy machinery and/or equ ipment as well as erosion , siltation or sedimentation resulting from the permitted work . In accordance w ith Chapter 13 of the Code of Ord inances of the City of College Station , measures shall be taken to insure that debris from construction , erosion , and sedimentation shall not be depos ited in city streets , or existing drainage fac ilities . I hereby gran t th is perm it for development of an area inside the spec ial flood hazard area . All development shall be in accordance w ith the plans and spec ifications submitted to and approved by the C ity Engineer in the development permi t appl ication for the above named project and all of the codes and ordinances of the C ity of College Sta t ion that apply. Date 1 Da te DEVELOPMENT PERMIT PERMIT NO. 05-20 CITY OF C OLLEGE STATION Planning & Dewlopmntt Snvicn FOR AREAS INSIDE THE SPECIAL FLOOD HAZARD AREA RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE SITE LEGAL DESCRIPTION: TAMU -Bush Library White Creek Erosion Control DATE OF ISSUE: 06/21/05 OWNER: TAMU -c/o Mikael Olsen 600 Agronomy Rd -Mail Stop 1371 College Station, Texas 77843-1371 SITE ADDRESS: DRAINAGE BASIN: White Creek VALID FOR 18 MONTHS CONTRACTOR: TYPE OF DEVELOPMENT: Full Development Permit SPECIAL CONDITIONS: All construction must be in compliance with the approved construction plans All trees required to be protected as part of the landscape plan must be completely barricaded in accordance with Section 7.5.E., Landscape/Streetscape Plan Requirements of the City's Unified Development Ordinance, prior to any operations of this permit. The cleaning of equipment or materials within the drip line of any tree or group of trees that are protected and required to remain is strictly prohibited . The disposal of any waste material such as , but not limited to, paint, oil , solvents , asphalt, concrete , mortar, or other harmful liquids or materials within the drip line of any tree required to remain is also prohibited. All construction should be in compliance with TPDES TXR 150000 General Storm Water Permit. The Contractor shall take all necessary precautions to prevent silt and debris from leaving the immediate construction site in accordance with the approved erosion control plan as well as the City of College Station Drainage Policy and Design Criteria. If it is determined the prescribed erosion control measures are ineffective to retain all sediment onsite , it is the contractors responsibility to implement measures that will meet City, State and Federal requirements. The Owner and/or Contractor shall assure that all disturbed areas are sodden and establishment of vegetation occurs prior to removal of any silt fencing or hay bales used for temporary erosion control. The Owner and/or Contractor shall also insure that any disturbed vegetation be returned to its original condition, placement and state . The Owner and/or Contractor shall be responsible for any damage to adjacent properties, city streets or infrastructure due to heavy machinery and/or equipment as well as erosion, siltation or sedimentation resulting from the permitted work . In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that debris from construction, erosion, and sedimentation shall not be deposited in city streets , or existing drainage facilities . I hereby grant this permit for development of an area inside the special flood hazard area . All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer in the development permit application for the above named project and all of the codes and ordinances of the City of College Station that apply. Date Owner/Agent/Contractor Date