Loading...
HomeMy WebLinkAbout34 Horse Haven Ph 3 04-70 2710 Horse HavenCITY OF COLLEGE STAT ION Planning & Dewlopment Svvices SITE LEGAL DESCRIPTION: Horse Haven Estates Phase 3 DATE OF ISSUE: May 11, 2005 OWNER: Alton Ofczarzak 4816 Close Quarters College Station , TX 77845 TYPE OF DEVELOPMENT: SPECIAL CONDITIONS: DEVELOPMENT PERMIT PERMIT NO. 04-70 FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE SITE ADDRESS: Horse Haven Lane DRAINAGE BASIN: Wolf Pen Creek VALID FOR 12 MONTHS CONTRACTOR: Full Development Permit All construction must be in compliance with the approved construction plans All trees required to be protected as part of the landscape plan must be completely barricaded in accordance with Section 7.5.E., Landscape/Streetscape Plan Requirements of the City's Unified Development Ordinance , prior to any operations of this permit. The cleaning of equipment or materials within the drip line of any tree or group of trees that are protected and required to remain is strictly prohibited . The disposal of any waste material such as , but not limited to, paint, oil , solvents, asphalt , concrete , mortar, or other harmful liquids or materials within the drip line of any tree required to remain is also prohibited. The Contractor shall take all necessary precautions to prevent silt and debris from leaving the immediate construction site in accordance with the approved erosion control plan as well as the City of College Station Drainage Policy and Design Criteria. If it is determined the prescribed erosion control measures are ineffective to retain all sediment onsite , it is the contractors responsibility to implement measures that will meet City , State and Federal requirements . The Owner and/or Contractor shall assure that all disturbed areas are sodden and establishment of vegetation occurs prior to removal of any silt fencing or hay bales used for temporary erosion control. The Owner and /or Contractor shall also insure that any disturbed vegetation be returned to its original condition , placement and state . The Owner and/or Contractor shall be responsible for any damage to adjacent properties , city streets or infrastructure due to heavy machinery and/or equipment as well as erosion , siltation or sedimentation resulting from the permitted work . In accordance with Chapter 13 of the Code of Ordinances of the City of College Station , measures shall be taken to insure that debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities . I hereby grant th is permit for development of an area outside the special flood hazard area . All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer in the development permit application for the above named project and all of the codes and ordinances of the City of College Station that apply . {r A.6,t0 mistrator epresentative Date ~ Owner/ Agent/Contractor Date SUPPLEMENTAL DEVELOPMENT PERMIT INFORMATION Application is hereby made for the following development specific waterway alterations : 4,,.dC"h• "°"' ~-b:t,-/q4 J'l,e. -·JI.I ACKNOWLEDGMENTS: I, 4,.,...., ... 2 /~. ~ ._, s . J'. E . , design engineer/owner, hereby acknowledge or affirm tha t: 7 The information and conclus ions conta ined in the above plans and supporting documents comply with the current requirements of the City of College Stat ion , Texas City Code , Chapter 13 and its associated Dra inage Policy and Des ign Standards . Contractor CERTIFICATIONS: (for proposed alterations within designated flood hazard areas .) A. I, , certify that any nonresidential structure on or proposed to be on th is site as part of this application is designated to prevent damage to the st ructure or its contents as a result of flood ing from the 100 year storm . Engineer Date 8 . I, , certify that the finished floor elevation of the lowest floor , includ ing any basement, of any residential structure , proposed as part of this applicat ion is at or above the base flood elevation established in the latest Federal Insurance Admin istration Flood Hazard Study and maps, as amended . Engineer Date c . I, , certify that the alterations or development covered by th is perm it shall not d iminish the flood-carrying capacity of the waterway adjoining or crossing th is permitted site and that such alterations or development are consistent with requirements of the City of College Stat ion City Code, Chapter 13 concerning encroachments of floodways and of floodway fringes . Engineer Date D. I, , do cert ify that the proposed alterations do not ra ise the level of the 100 year flood above elevation established in the latest Federal Insurance Administrat ion Flood Hazard Study. Eng ineer Date Conditions or comments as part of approval : --------------------------- In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that debris from construction , erosion , and sedimentation shall not be deposited in city streets, or existing drainage facilities. I hereby grant this perm it for development. All development shall be in a~cordance with the plans and specificati~ns submitted to and approved by the City Engineer for the above named proiect. All of the applicable codes and ordinances of the City of College Station shall apply. \ '·- -( TCEQ Office Use Only Notice of Intent (NOi) for Storm Water Discharges Associated with Construction Activity under the TPDES Construction General .Permit (TXR150000) TPDES Permit Number: TXR15•:_•:_•:_•:_•'-NO For help completing this application, read the TXR 150000 NOi In stru ctions (TCEQ-20022 -lnstructlons). ·A. Construction Site Operator El New !:]No Change Customer Reference Number: CN Name: Qg Kw ooal C •.1. f#G rt'! ilQttta h w' /Joi-s 1 1 LL C. ' --------- Mailing Address: 4 c2 Go 0 _ Ji u.J V' ' So \:1. -l b City: G II--. e j-f",L,W£tate ::t:2'.::.Zip Code: Z?'M S" r --... Country Mailing Information Jif outside USA) Territory : Country Code : Postal Code: __ _ Phone Number: Cf 7 'f / 69 0 -IS"C> 4 Extension : a -Z E-ma il Address: • 0 Type of Operator: D Individual 0 Sole Proprietorship -D .BA D Partnership ti Corporation [] Federal Government D State Government D County Government [j City Government [J Other: -------------------- 1 n dependent Operator? 0 Yes D No Number of Employees: D 0-20 [2 21-100 0 101-250 0 251-500 D 501 or higher Federal Tax ID : 64-3G,35"'-'S4=State Franchise Tax ID Number: OD/5"3-?LZ-tu DUNS Number: 8. Bllllng Address I Name : Ooi. Kwooo/TC v~fovt/1 /.fcm11e b1&,"/rlev-s .~ Mailing Address: ~O 6'0 j.../VJ v Uz Ge>cdj<1 City: Go@.:.n~+;,,,. State :IT_Zip Code : 7~4 > ., -+-~ Country Mailing Information (if oulsido USA) Territory : Co untry Code : Postal Code : C. Project I Site Information ~New 0No Change Regulated Entity Reference Number: RN ________ _ Name : #0 r'~c.or:: #A 11 c:ro. ?ba.~t11t ZZ--r 7lT '$,,./,d,· w·~ loY'I MailingAddress: f/Or"S'e/-1c;. vvn Le:.oll.-. City : Ce>/l~:i.,,..t.~tate :_1:1'.:ZipCode: 77~ Physical Address: City: t:ounty: -Zip Code: ___ _ Location Access Description: 0££ /Ee.. :S .f: &e'4:. Re/ llw a( k By:pe-1 S IJ>pfy !ea-a Hw_,v~flo Latitude :~·-'_" N Longitude : __ ._._" w· / Degrees(°), Minutes('), and Seconds(") Latitude : 3 0 • C-Zl'L3 5 Longitude : -'i'. Z'f<f 99 Decima l Form Standard Industrial Classification (SIC) code: __ · _Also, describe the construction activity at this site (do not repeat the SIC code): Re":tlol•a-h•0t I $ "1, 6«'1'11U i 0 n IA../.i l,'.),'4 'S +d'YA l11?R 'S +rw Q ./w ,..':f Has a storm water pollution prevention plan been prepared as specified in the general permit (TXR150000)? 1'5l!Yes CJ No Estimated area of land disturbed (to the nearest acre): / tf.· S-Is the project/ site located on Indian Country Lands? D Yes IJ?No Does this project I site discharge storm water into a municipal separate storm sewer system (MS4)? D Yes oa No If yes, provide the name of the MS4 operator: _______________________________ _ Provide the name or segment number of the water body that re ceives storm water from this project I site : W" ft fit:,,,, C~ D. Contact-If the TCEQ needs additional information regarding this appli cation, who shou ld be contacted ? Name : ./enu>aoq"G 4d4m.:$/ P. C Titl e:J..L,..._..1'-=!J'-'--"C-/=-·4'pc..::A..___,/._ __________ _ Ph one Number: 9 7CJ -~9"3, 5'3S:41' Extension: __ Fax Number: 9 79 -G.9' 3 -42.4-3 E-mail Address: m OG= C.jTX (f) Yc\1-aoo. c Of"YI E. Payment Information -Check I Money Order Number: Name on Check I Money Order: I'. Certification I certify undor penalty of law that this document was prepared under my direction or supervis ion in acc ordance with a systemdosigned to assure that qualified personnel properly gather and evaluate tho In formation submitted . Based on my inquiry of the persC'~ or .persons who manage the system, or those persons d!re clly responsibl 9 for gathering the information , th e information submitte d is, to the bost of my kn owledge and belief , tru e, accurate, and complete . I am av.-aro there a1e significant penalties for subm itting false information , including the possibility or lino and imprisonment for knowing violations. Construction Site Operator: Prefix : {Y1 V. First: __ ,#./fL-A/~:../-a-'--=--'Yl'-'--------Middl e: _____________ _ La st: 0 -f c ~a. v ~""""-'-""--<'-'----Suffix: _____ TiUe: __;G=-:e.-=-=..01~~:.J,,."-'-"'4<-L./__.m,'-!.L_,,_.,::us~y.,.~.c:a-'V--o::_ _____ _ Signature : _.+-A,..44(:;.-IJ--'-4~-'-"-~"'<l'--r---,-------------Date : --'-~~J;;,d-~ ..... -=~:.,J<-l;;::....f;._· -------- 11 you have qu~stions on how is form or about the storm water program, please contact u~ at (512) 239-4671 . Indiv iduals are entitled to request and review their personal information that the agency gathers on its forms. They may also have any errors in their information corrected . To review such Information , contact us at (512) 239-3282 . TCEQ -2 0022 (0 5/03) The completed NOi must be mailed to the following address . Use the attac 0 hed document to submit the $100 application fee . Please note that .the NOi and application fee are submitted . separately to different addresses. Texas Commission on Environmental Quality Storm Water & General Permits Team ; MC -228 P.O. Box 13087 Austin, Texas 78711-3087 Page 1 of 2 SUPPLEMENTAL DEVELOPMENT PERMIT INFORMATION Application is hereby made for the following development specific waterway alterations : ./lof'Se; fu ,~,_, Phav<Je zr ACKNOWLEDGMENTS: I, /.el'twCVP,,_/6 • ~MS, />. e. , design engineer/owner, hereby acknowledge or affirm that: , The information and conclus ions contained in the above plans and supporting documents comply with the current requirements of the City of College Station , Texas City Code , Chapter 13 and its associated Dra inage Policy and Des ign Standards . As a condition of approval of this permit application , I agree to construct the improvements proposed in this applica ti on accord ing to these ments and the requirements of Chapter 13 of the College Station City Code . ~=====----~--------------~ Property Owner (s ) o..a q'e,,,..-/ Contractor CERTIFICATIONS: (for proposed alterations within designated flood hazard areas.) A. I, , certify that any nonresidential structure on or proposed to be on this site as part of th is application is designated to prevent damage to the structure or its contents as a result of flooding from the 100 year storm . Engineer Date B. I, , certify that the finished floor elevation of the lowest floor , including any basement, of any resident ial structure , proposed as part of this application is at or above the base flood elevation establ ished in the latest Federal Insurance Administration Flood Hazard Study and maps, as amended . Engineer Date C . I, , certify that the alterations or development covered by this permi t shall not diminish the flood-carrying capacity of the waterway adjoining or crossing this permitted site and that such alterat ions or development are consistent with requirements of the City of College Station City Code, Chapter 13 concerning encroachments of floodways and of floodway fringes . Engineer Date D. I, , do certify that the proposed alterations do not raise the level of the 100 year flood above elevation established in the latest Federal Insurance Administration Flood Hazard Study. Engineer Date Conditions or comments as part of approval : --------------------------- In accordance with Chapter 13 of the Code of Ordinances of the City of College Station , measures shall be taken to insure that debris from construction , erosion , and sedimentation shall not be deposited in city streets , or existing drainage facilities. I hereby grant this permit for development. All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer for the above named project. All of the applicable codes and ordinances of the City of College Station shall apply. Horse Haven Estates Phase Ill Preliminary Engineering Estimate of Costs at 99% Design Dated February 8, 2005 Proposed Water Utility Service Item No. Item ~ Unit 1 3" PVC Water Line (DR14 Class 200 , AWWA C909) 137 LF 2 6" PVC Water Line (DR14 Class 200 , AWWA C909) 1104 LF 3 8" PVC Water Line (DR14 Class 200 , AWWA C909) 130 LF 4 90 deg , MJ Bend and Gate Valve 3 EA 5 45 deg , MJ Bend 3 EA 6 22 .5 deg MJ Bend EA 7 11 .25 deg MJ Bend 3 EA 8 1" Long Side Single Service 2 EA 9 1.5" Long Side Double Service 13 EA 10 1" Short Side Double Service 12 EA 11 1' Short Side Single Service 1 EA 12 Fire Hydrants 3 EA 13 18" Steel Casing and Street Bore 39 LF 14 Trench Safety 1453 LF Proposed Sanitary Sewer Utility Service Item No. Item ~ Unit 1 Standard Sanitary Sewer Manholes 5 EA 2 Long Side Sanitary Double Service 16 EA 3 Short Side Double Service 10 EA 4 Short Side Single Service EA 5 6" Sanitary Sewer Line (SOR 26 Class 160 ASTM 03034) 586 LF 6 8" Sanitary Sewer Line (SOR 26 Class 160 ASTM 03034) 629 LF 7 Trench Safety Proposed Drainage Item No. Item 1 Curb Inlet 2 Junction Boxes 3 Outlet Headwall 4 18" RCP 5 24" RCP 6 30" RCP 7 36 " RCP 8 42'' RCP 9 48" RCP 10 Trench Safety Proposed Grading and Pavement Item No. Item 1 Mobil ization 2 Remove Cul-de-Sac 3 Subgrade Preparation w/ 6" Lime Treated Subgrade 4 8" Limestone Base 5 2"HMAC 6 Curb and Gutter 7 Erosion Control 8 4' Sidewalk Adjacent to Curb 9 ADA Sidewalk Ramps 10 Site Grading 1215 LF ~ Unit 6 EA 5 EA EA 40 LF 299 LF 57 LF 547 LF 279 LF 200 LF 1382 LF ~ Unit 1 LS LS 6614 SY 5842 SY 736.7 TONS 3964 LF LS 1650 LF 4 EA LS Total Construction Cost Phase Ill: Construction Contingencies 20% Subtotal: Engineering 10% Unit Price $16.00 $18 .00 $21 .00 $800.00 $500.00 $450.00 $400.00 $1,000.00 $1,200.00 $550.00 $400.00 $2 ,400.00 $40.00 $1 .00 Total Unit Price $2 ,500 .00 $1 ,400 .00 $600 .00 $450 .00 $30 .00 $32.00 $1.00 Total Unit Price $2 ,800.00 $2,800 .00 $1 ,000 .00 $24.00 $32 .00 $35 .00 $40 .00 $50.00 $60.00 $1 .00 Total Unit Price $8 ,000.00 $1 ,000 .00 $3.50 $8.50 $55 .00 $7.50 $5 ,000 .00 $6.00 $800 .00 $40 ,000.00 Total Grand Total: $595,160 .28 Total $2,192 .00 $19 ,872 .00 $2 ,730.00 $2,400 .00 $1 ,500 .00 $450 .00 $1 ,200.00 $2 ,000 .00 $15,600 .00 $6,600 .00 $400 .00 $7,200 .00 $1,560.00 i1 453 .00 $65,157.00 Total $12 ,500 .00 $22 ,400.00 $6 ,000 .00 $450 .00 $17 ,580.00 $20 ,1 28.00 i1,215.00 $80,273.00 Total $16 ,800 .00 $14 ,000 .00 $1 ,000 .00 $960.00 $9 ,568.00 $1 ,995 .00 $2 1,880.00 $13,950 .00 $12,000.00 i1 382 .00 $93,535 .00 Total $8 ,000.00 $1 ,000.00 $23 ,149.00 $49,657.00 $40,518 .50 $29 ,730 .00 $5 ,000 .00 $9 ,900 .00 $3 ,200.00 ~0 .000 .00 $210, 154.50 $450,879.00 $90 .175.80 $541,054.80 $54 ,105.48 $595,160.28 Horse Haven Estates Phase Ill Preliminary Engineering Estimate of Costs at 99 % Design Dated March 29, 2006 Proposed Water Utility Service Item No. Item 1 3" PVC Water Line (OR14 Class 200, AWWA C909) 2 6" PVC Water Line (DR14 Class 200, AWWA C909) 3 8" PVC Water Line (OR14 Class 200, AWWA C909) 4 90 deg , MJ Bend and Gate Valve 5 45 deg , MJ Bend 6 22 .5 deg MJ Bend 7 11 .25 deg MJ Bend 8 1" Long Side Single Service 9 1. 5" Long Side Double Service 10 1" Short Side Double Service 11 1' Short Side Sin gle Service 12 3" Gate Valve 13 6" Gate Valve 14 8" Gate Valve 15 Fire Hydrants 16 18'' Steel Casing and street Bore 17 Trench Safety Proposed Sanitary Sewer Utility Serv i ce Item No. Item 1 Standard Sanitary Sewer Man holes 2 Long Side Sanitary Double Service 3 Short Side Double Service 4 Short Side Single Service 5 6" Sanitary Sewer Line (SOR 26 Class 160 ASTM 03034) 6 8" Sanitary Sewer Line (SOR 26 Class 160 ASTM 03034) 7 Trench Safety Proposed Drainage Item No. Item 1 Curb Inlet 2 Junction Boxes 3 Outlet Headwall 4 18'' RCP 5 24" RCP 6 30' RCP 7 3S'RCP 8 42" RCP 9 48" RCP 10 Trench Safety Proposed Grading and Pavement Item No. Item 1 Mobilization 2 Remove Cu l-de-Sac 3 Subgrade P reparation w/ 6' Lime Treated Subgrade 4 8" Limestone Base 5 2"HMAC 6 Curb and Gutter 7 Erosion Control 8 6 Sidewalk Adjacent to Curb 9 ADA Sidewalk Ramps 10 Site Grading quanity Un it 137 LF 1104 LF 130 LF 3 EA 3 EA EA 3 EA 2 EA 13 EA 12 EA 1 EA EA 2 EA 2 EA 3 EA 39 LF 1453 LF quanity Unit 5 EA 16 EA 10 EA 1 EA 586 LF 629 LF 1215 LF quanity Unit 6 EA 5 EA EA 40 LF 299 LF 57 LF 547 LF 279 LF 200 LF 1382 LF quanity Unit 1 LS LS 6614 SY 5842 SY 736 .7 TONS 3964 LF 1 LS 1650 LF 4 EA LS Total Construction Cost Phase Ill : Construction Contingencies 20% Subtotal : Engineering 10% Unit Price $16 .00 $18.00 $21 .00 $800.00 $500.00 $450.00 $400.00 $1 ,000.00 $1 ,200.00 $550.00 $400.00 $400.00 $500.00 $550.00 $2 ,400.00 $40.00 $1.00 Total Unit Pri ce $2 ,500.00 $1 ,400.00 $600.00 $450.00 $30.00 $32 .00 $1 .00 Total Unit Price $2,800.00 $2 ,800.00 $1 ,000.00 $24.00 $32 .00 $35.00 $40.00 $50.00 $60.00 $1.00 Total Unit Price $8,000.00 $1 ,000.00 $3.50 $8.50 $55 .00 $7 .50 $5,000.00 $6.00 $800.00 $40,000.00 Total Grand Total : Total Construction Cost for Phase II and Phase Ill: $698,460 .28 Total $2 , 192 .00 $19,872 .00 $2 ,730.00 $2 ,400.00 $1,500.00 $450.00 $1 ,200.00 $2,000.00 $15,600.00 $6,600.00 $400.00 $400.00 $1 ,000.00 $1 , 100.00 $7 ,200.00 $1 ,560.00 ~1 453 .00 $67 ,667.00 Total $12 ,500.00 $22 ,400.00 $6,000.00 $450.00 $17 ,580.00 $20, 128.00 $1 215 .00 $80 ,273.00 Total $16,Bbo.oo $14,000.00 $1 ,000.00 $960.00 $9,568 .00 $1,995.00 $2 1,880.00 $13,950.00 $12 ,000.00 $1 382 .00 $93 ,636 .00 Total $8,000.00 $1 ,000.00 $23 , 149.00 $49,657 .00 $40,518.50 $29,730.00 $5,000.00 $9,900.00 $3,200.00 ~40 ODO.DO $210, 164 .60 $463 ,379 .00 $90 675.80 $644,064 .80 $54 405.48 $698,460.28 SANITARY SEWER CAPACITY STUDY FOR HORSE HAVEN ESTATES PHASES 2 & 3 MDG JOB NO. 000751-3775 COLLEGE STATION, BRAZOS COUNTY, TEXAS DECEMBER 2004 2551 Texas Ave. South, Ste. A, College Station , TX 77840 Ofc: 979 .693 .5359 Fax: 979.693.4243 Email : mdgcstx @ yahoo.com i r Project Scope and Description: The project site is located just east of James Earl Rudder Freeway (SH 6) on Horse Haven Lane , between SH 30 and Southwest Parkway. The proposed tie to the existing system is at an existing junction box south of the southeast corner of the subdivision. Horse Haven Estates, Phases 2 & 3 contains 63 single-family residential lots. On July 24 , 2003 plans for sanitary sewer at Horse Haven Estates were submitted on behalf of client Bert Herman and appro ved for compliance by Brett McCully on August 4, 2003. The sewer service line was for servic e of 53 proposed lots at the time. Construction did not advance on the subdivision at that time and the ne w plans are for a 63 lot single-family subdivision known as Horse Haven Estates for Alton Ofczarzak. The tie-in point is the same as was depicted in the previous report. Analysis of Proposed Sewer\Flow A conservative approach to determine the expected sewer flow from the proposed Horse Haven subdivision is to assume that total water demand equals that of sewage output. Using this assumption, a peak flow of 0.026 cfs would be generated by the proposed subdivision. This value was computed asswning that there are 2.67 people/lot and that each person uses 100 gal/day of water. This value in the previous sewer report for 53 lots is 0 .022 cfs. Thus, the new 8" sewer line will only have a peak flow of 0.004 more than the previously approved sewer line. Results: Using a nomograph , it was found that the maximum flow in the 6"pipe and 8" pipe are respectively 0 .55 cfs and 0.80 cfs . The 8" line servin g Horse Haven Subdi vision must be able to withstand a peak flow of 0.026 cfs (~16820 gal /day). This requirement is easily met and will have additional capacity in the 8" line of 0.774 cfs . Page 1 of2· •t METES AND BOUNDS DESCRIPTION OFA 0.144 ACRE TRACT HORSE HA VEN LANE BULB 20'PUE/DE (P-) MORGAN RECTOR LEAGUE, ABSTRACT NO. 46 COLLEGE STATION, BRAZOS COUNTY, TEXAS Metes and bounds description of all that certain 0.144 acre tract or parcel ofland, lying and being situated in the Morgan R,ector League, Abstract No . 46, College Station, Brazos County, Texas and being a portion of the 20 foot public utility easement/drainage easement along the bulb right-of-way of Horse Haven Lane as depicted on plat of Lot 1 Horse Haven Estates recorded in VOLUME 4285 PAGE 35 of the Official Records of Brazos County, Texas, and also being a portion of that same called 40.38 acre remainder sai.d 0.144 ac re tract being more particularly described as follows: BEGINNING at a chiseled "X" in concrete found for point of reverse curvature to the left (Radius= 25.00 feet) in the northwestern right-of-way of Horse Haven Lane (50.00 feet), from which a capped W' iron rod found in the southeastern said right-of-way and bears S 33° 38' 35" E-51.45 feet, for the north corner of the 0.682 acre remainder of a 2.05 acre Burton R. Hermann tract as described in deed recorded in VOLUME 5011 PAGE 93 of the Official Records of Brazos County, Texas; THENCE N 36° 01' 33" W -20.00 feet across the said 40.38 acre tract and said public utility easement to the beginning of a curve to the left (Radius= 5.00 feet) and being on the said easement line; THENCE the following calls across the said 40.38 acre tract and along said easement line: 3.70 feet along said curve whose chord bears N 32 ° 46' 50 " E-3.62 feet (Delta= 42° 24' 04", Tangent= 1.94 feet) to a point for the beginning of a reverse curve to the right (Radius= 70.00 feet); Page 1of3 000751-f.10(3775) I 12 /2/2 004 4 :06 PM ' , 336. 77 feet along said curve, whose chord bears S 3 0° 3 3' 13 " E -94. 01 feet (Delta= 275° 38' 07'', Tangent= 63.43 feet), for the end of said curve and the beginning of a reverse curve to the left (Radius= 5.00 feet); 4.93 feet along said curve, whose chord bears S 79 ° 03 ' 03" W -4.73 feet (Delta = 56° 25' 57'', Tangent= 2.68 feet), for the end of said curve and corner; THENCE N 39° 10' 16 " W -20.00 feet across the said 40.38 acre tract to a capped Yi" iron rod found in the right-of-way of said Horse Haven Lane and being the point of compound curvature of a curve to the right (Radius = 25.00); THENCE the following calls along said right-of-way line: 24.62 feet along said curve , whose chord bears N 79 ° 02' 43" E -23.64 feet (Delta= 56° 25' 57" ,Tangent= 13.41 feet), to a capped Yi" iron rod found for the end of said curve and being the beginning of a reverse curve to the left (Radius = 50.00 feet); 240.54 feet along said curve, whose chord bears N 30° 33 ' 16" W -67.15 feet (Delta= 275° 38' 07'' ,Tangent = 45.31 feet), to a capped Yi'' iron rod found for the end of said curve and being the beginning of a reverse curve to the right (Radius= 25.00 feet); Page 2of3 000751-f. l 0(3775) 12/2/2004 4:06 PM ' 1 ... ,, 18.48 feet along said curve, whose chord bears s 32 ° 48 ' 01" w -18.06 feet (Delta= 42° 20' 52 ", Tangent = 9 .68 feet), to the PLACE OF BEGINNING, and containing 0.144 acres of land. Refer to drawing issued simultaneously this date. BASIS OF BEARING: Plat of Lot 1 of Horse Haven Estates , as recorded in VOLUME 4285 PAGE 35 of the Official Records of Brazos County, Texas. Page 3of3 December, 2004 Municipal Development Group College Station, Texas 000751-f. l 0(3 775) 12 /2 /2004 4:06 PM Date Received: Park zone: Current Zone Balance: Project Location: Name of Development: Applicant: Address: City/State/Zip: Phone Number/Fax: E-mail: Engineer/Planner: Address: City/StateZip: Park Land Dedication Ordinance Project Review Checklist 4/6/2004 4 $21 ,740 Horse Haven Drive -East of Hwy 6 Horse Haven Estates Burt Hermann 2701 Horse Haven College Station, TX 77845 979-693-9513 Hester Engineering Co . 7607 Eastmark Drive Suite 253-8 College Stat ion , TX 77840 Phone Number/Fax: 693-1100 Fax Number: E-Mail: mhes ter@hester-engr.com REQUIRED COMPLIANCE Section 10-B-1: Land Dedication Single Fam ily Dwelling Un its : 22 Multi-Fam il y Dwelling Units : Total Land Requiremen t: 0.218 Ac~s -------- Proposed Dedication : 0 Section 10-8-2: Fee in Lieu of Land Has the Planning and Zoning Comm iss ion 's approval been obta ined? Land Fee : Sing le Fam ily Fee ($198/dwelling un it ): Multi -Fam il y Fee ($160 /dwelling unit): Total Acquis ition Fee : Section 10-B-3: Park Development Fee Single Fam il y Fee ($358/dwelling unit): Multi -fam ily Fee ($292 /dwelling un it): Total Fee Amounts: Total Single Family Fee ($556/dwelling Un it ): Multi-Fam il y Fee ($452/dwelling Unit): Parl< Land Dedication Checklist O!Boa rd!Parl< Land Dedication/checklist/Origin als/Long Version Revised.xis Page 1 $198 x 22 = $4,356 $358 x 22 = $7 ,876 $556 x 22 = $12 ,232 No Section 10-8-4: Park Development in Lieu of Fee Required development cost: Staff review date and comment: Parks Board review and decision : Section 10-8-5: Minimum Park Size Is the proposed park less than five (5) acres? If yes, staff recommends : Section 10-8-7: Prior Park Acquisition Is there an existing park that can serve the proposed development? If yes, staff recommends : Acceptance of fees Section 10-E: Comprehensive Plan Is the proposed park dedication in compliance with the City's Comprehensive Plan and the Recreation, Park , and Open Space Master Plan? Comments: Section 10-F: Additional Information 1. Is land in the 100-year floodplain? ____ N_o ____ Percentage: a. Detention/Retention? ___ _;N_;_o::,__ ___ Size: Raintree? If accessible Meets Board Policy? ______ _ Acreage in floodplain : ________ Percentage: Acreage in detention : --------Percentage : Acreage in greenways : ________ Percentage: Comments : Parl< Land Dedication Checklist O/Board!Parl< Land DedicationlchecklisVOriginals/Long Version Revised .xis Page 2 Section 10-F (of the Park Land Dedication Ordinance) 10-F. 1 Any land dedication to the City under this section must be suitable for park and recreation uses. Consideration will be given to land that is in the floodpla in or may be considered "floodable" even though not in a federally regulated floodplain as long as , due to its elevation , it is suitable for park improvements . (a) Neighbo rhood park s ites shou ld be adjacent to res ide nt ial areas in a manner t hat serves the greatest number of use rs . Comments : (b) Neighbo rhood park sites should be located so that users are not required to cross arte ri a l roadways to access them . Comments : (c) Sites shou ld not be severely sloped or have unusual topography which wou ld render the land unusable for o rganized rec reationa l activit ies. Comments : (d) S ites should have existing trees or other scenic elements. Comments : (e) Detent ion /retent ion areas will not be accepted as part of the required ded ication , but may be accepted in addition to the required dedication . If accepted as part of the park , the detent ion/retent ion area design must be approved by the City staff and must meet specific parks specifications . Comments : 10-F. 2 Parks should be easy to access and open to public view so as to benefit area development, enhance the visual character of the city, protect public safety, and minimize conflict with adjacent land uses . The following guidelines should be used in designing parks and adjacent development: (a) Where physically feas ible , park sites should be located adjacent to greenways and/o r schools in order to encourage both shared f acilities and the potential co -development of new sites . Commen ts: Parl< Lan d Dedication Checklist O/Bo ard!Parl< Land Dedica tionlchecklist!Originafs/Long Version Revised.xis Page3 (b) A proposed subdivision adjacent to a park may not be designed to restrict reasonable access to the park from other area subdiv isions . Street and greenway connections to existing or future adjoining subdivisions may be required to provide reasonable access to parks. Comments : (c) Where a non-residential use must directly abut a park , the use must be separated by a screening wall or fence and landscaping . Access points to the park may be allowed by the Planning and Zoning Commiss ion if a public benefit is established. Comments : (d) It is desirable that a minimum of fifty percent (50%) of the perimeter of a park should abut a publ ic street. In all cases , the City shall approve the proposed street alignment fronting on city parks . Comments : (e) Streets abutting a park shall be bu ilt in accordance with the thoroughfare plan and the standards of this ordinance ; however, the City may require any residential street built adjacent to a park to be constructed to collector width to ensure access and prevent traffic congestion . The developer may request oversize participation in such an instance . Comments : Staff Recommendations: Section 10-G: Approval: Parks and Recreation Advisory Board: Planning and Zoning Commission : City Council : Park Land De dic ation Ch ecklist Acceptance of park dedication fees . At the April 20 , 2004 meeti ng the Board accepted the fee in lieu of land subject to the develope r putti ng in a ded icated easement on Horseshoe Drive , towa rds Switch Station Road , in order to provide access to W indwood Park. (Street na me on developer's site plan shown as Horseshoe Drive , although th is has not been approved by 911 and could change .) O/Board/Pa rk La nd Dedication/checklist/Originals/Lon g Version Revised.xis Page 4 METES AND BOUNDS DESCRIPTION OFA 0.191 ACRE TRACT HORSE HA VEN LANE ROW (BULB) (R-1) MORGAN RECTOR LEAGUE, ABSTRACT NO. 46 COLLEGE STATION, BRAZOS COUNTY, TEXAS Metes and bounds description of all that certain 0.191 acre tract or parcel of land , lying and being situated in the Morgan Rector League, Abstract No. 46, Co lle ge Station, Brazos County, Texas and being a portion out of right-of-way of Horse Haven Lane as depicted on plat of Lot 1 Horse Haven Estates recorded in VOLUME 4285 PAGE 35 of the Official Records of Brazos County, Texas, said 0.191 acre tract being more patticularly described as follows: BEGINNING at a chiseled "X" in concrete found for point of reverse curvature to the left (Radius = 25.00 feet) in the northwestern right-of-way of Horse Haven Lane (50 .00 feet), from which a capped Yi" iron rod found in the southeastern said right-of-way at1d bears S 33° 38' 35" E -51.45 feet, for the north corner of the 0.682 acre remainder of a 2.05 acre Burton R. Hermann tract as described in deed recorded in VOLUME 5011 PAGE 93 of the Official Records of Brazos County, Texas; THENCE the following calls along said right-of-way: -Along said curve for a distance of~ 8.48 feet to a capped Yi" iron rod found, whose chord bears 32° 48' OT' E-18 .06 feet (Delta= 42 ° 20' 52" ,Tat1gent = -9.68 feet) for the end of said curve at1d the beginning of a curve to the right (Radius= 50.00 feet); Along said curve for a distance of 240.54 feet to a capped Y:z" iron rod fo d, whosechordbearsS30°33' 16 'E ~67.15 eet(Delta=275°38' ll")for heend of said curve and the beginning of a reverse curve to the left (Radius = 25.00 feet ); Along said curve for a distance of 24.62 feet to a capped Yi" iron rod found, whose chord bears S 79 ° 02 ' 43 " W -23 .64 feet (Delta= 56 ° 25 ' 57'', Tangent= 13 .41 feet) for the end of said curve and corner ; Page 1 of 2 000751-f.09(3775) 12/912004 2:57 PM .. , . .., . THENCE N 23° 43' 07" W-51.49 feet to the PLACE OF BEGINNING, and containing 0 .191 acres of land. Refer to drawing issued simultaneously this date . BASIS OF BEARING: Plat of Lot 1 of Horse Haven Estates, as recorded in VOLUME 4285 PAGE 3 5 .of the Official Records of Brazos County, Texas. I Page 2 of2 December, 2004 Municipal Development Group College Station, Texas 0007 51-f. 09(3 77 5) 12/9/2004 2:57 PM ... • n... ... .J~.~: .. ',:_~ . . JUN-02-2005 THU 09:30 AM RM DUDLEY CO NSTR UCTION FAX NO. 979 776 2235 P. 02 -/p-J;--o ~ . ·~o q~ r..... . -.. 0 c -J-8 3 ~\,;) 2551 Texiu Ave. South, Ste:. A,.Colleee Station, TX 77840 -..) ~11_6_te_: 97-9-.6-93_.5_3-59-Fax-: 9-7-9.-69-3-.4-24_3_B_mail_' -: m_d_g_c:~-· .-d-'~-"-..o-o:_co_rn_. ------ .J une 1, 2005 .Mr. Clint Willis Dudley Construction College Station·, Texas 77845 RE: Sewer Line Slope Adjustment DueTo Oas Line Uear Mr . Willis , I am a.ware that .the existing gas line as indicated on the plans was not in the location that we relied on during the design and it is in conflict with the sanitary sewer line leadins ·from · . manhole (MH 11) to the junction box tenninus .of the proposed line. I am also aware that w:e must maintain. at least 18" separation between the gas line and the sanitary sewer line. 1n order to achieve this separation we must flatten the grade of the line starting at manhole CT-IB 6) to a grade of about 0.6% as opposed to the grades in .the 0.8% range. This change in . grade is well within the City of College Station's and TCEQ acceptable slope for a 8" sanitary sewer line and I recommend that the grades be change to the flatter 0.6% range in order to achieve the line separation. There is the option to lower or raise the gas line to achieve the required separation b.ut I understand that the cost factors and time f actois may prohibit using this option. . Sincerely, Mlluicipal Development Group --==?7~ =- Le nwood S. Adams, P.E. Managing Principal dno~ lN 3Wd013n3a 1b'dIJINnw: \.Q:l.:I JUN-02-2005 THU 09:30 AM RM DUDLEY CONSTRUCTION FAX NO. 979 776 2235 - 1 DUDLEY "'CONSTRUCTION FACSIMILE TRANSMITTAL SHEET PROM: G..,...rr b} ..... '-l~ TOTAL NO . OF PAGES INCL.t.rDING COVER ; L PHONE NUMBER; SENDER'S REFERENCE NUMBER: YOUR REFERENCE NUMBER; ~RGENT ~OR REVIEW 0 PLEASE COMMENT "/<.zLEASE REPLY 0 PER YOUR REQUEST . NOTES/COMMENTS; 11370 STATE HWY 30 ; COLLEGE STATION, TX 77845 OFFlClL 9 7 9-77 6 -21 35 FAX : 9 79-776 -2.235 P. 01 . ~~2-55_I_T_e_x_as_A~ve_._s_ou_t_h,_S_te_._A_,_c_o_lle_g_e_S_ta_ti_o_n,_T_X~77_8_4_0~~~~~~~~~~~ "'~---..<\ Ofc : 979 .693 .5359 Fax : 979 .693.4243 Email : mdgcstxd @yahoo .com ·o~' ~~~a"~"' ~v~o ~~ G June 1, 2005 Mr. Clint Willis Dudley Construction College Station, Texas 77845 RE : Sewer Line Slope Adjustment Due To Gas Line Dear Mr. Willis , I am aware that the existing gas line as indicated on the plans was not in the location that we relied on during the design and it is in conflict with the sanitary sewer line leading from manhole (MH 11) to the junction box terminus of the proposed line . I am also aware that we must maintain at least 18" separation between the gas line and the sanitary sewer line. In order to achieve this separation we must flatten the grade of the line starting at manhole (MH 6) to a grade of about 0.6% as opposed to the grades in the 0.8% range. This change in grade is well within the City of College Station's and TCEQ acceptable slope for a 8" sanitary sewer line and I recommend that the grades be change to the flatter 0.6% range in order to achieve the line separation. There is the option to lower or raise the gas line to achieve the required separation but I understand that the cost factors and time factors may prohibit using this option. Sincerely, Municipal Development Group Lenwood S . Adams, P.E. Managing Principal DATE, TIME FA X NO. /NAME DURATION PAG E(S) RESULT MODE TRANSMI SS ION VERIFICATION REPORT 09/15 08 :1 5 95902504 00 :00:31 02 OK STANDARD ECM CITY OF COLLEGE STATION DEVELOPMENT SERVICES TIME : 09/15/2005 08 :15 NAM E : COCS DEVELOPMENT SER FA X : 979754 3495 TEL : 9797543570 SER.# : BROE2J341073 . 1101 Texas Avenue South, PO Box 9960 College Station, Texas 77842 Phone 970.704.3670 I Fax 979.764.3496 FACSllvULE COVER SHEET Date: CJ j;J k #of pages including cover: 2- 11 yau did not .rocefr'c ll complc:tc Ax, please call our office immediately for a new transmittal. ro:Al+o~ Of-c~~rcG.lc:_ FAX:(i7q) {90-2so'-/ COMPANY: Chk~ L<-A~Tu~ !toed Rt! UC¥= L -t~ f kd~ 1 ) ll-tu · L.N_ rnol\ir:)ajL ~rb CO!VU'ANV• . ' . CITY OF COLLEGE STATION DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 College Station, Texas 77842 Phone 979.764.3570 I Fax 979.764.3496 FACSIMILE COVER SHEET Date: CJ j;S' /oJ # of pages including cover: Z- if you did not receive a complete fax, please call our office immediately for a new transmittal. TO: AHv.I'\ Ot-c :Ccr r~I<.. FAX: (c;rt) ('10-2~'-/ COMPANY: ~l~ C~~1u~ lb:( RE: u/JL t~ -~~ r u~ ·) \l.k L.iX FROM: )c:JL Abreh CO MP ANY : __ C-'--'i~ty,__o""""f'--Co~ll~e& ..... e'--S"'--'"ta ___ ti'--. o ...... n ...... , -=-D---ev ___ e""""lo"'"'p_..m'--e'--n ___ t_Se_rvi ______ · c---es"----- REMARKS : 0 Urgent · 0 For your review D Replay ASAP ~FYI DATE, TIME FAX NO ./NAME DURATION PAGE (S) RESULT MODE TRANSMISSION VERIFICA TI ON REPOR T 09 /15 08 :1 7 %934243 00 :01 :05 02 OK STANDARD CITY OF COLLEGE STATION DEVELOPMENT SERVICES TIME : 09/15/2005 08 :1 8 NAM E : COCS DEV ELOPME NT SER FAX : 9797543495 TEL : 9797543570 SER .# : BRO E2J341073 . 1101 Texas Avenue :south, PO Box 9960 College Station, Texas 77842 I'hone 979 .. 764.3570 I Fax 979.764.3496 FACSIMILE COVER SHEET Date: 9 /; ,s-,XJ # of pages including covti.r : L If you did 11ot rccelvc a complete fax, pleue call OW' office immedititcly for a new transmitf8f.. TO! Uc.. &k~s COMPANY: /1 De; ·~~-'--~~~~~~~~~~~~~~~~~~~- M:._._._~~~---'"~~· _-_K_~~/~~-&,_.J~W~-~~L~~e~~~ rno~~~L COI\1PANY: City of College Station.. uevelovment SenrirP..~ . . . CITY OF COLLEGE STATION DEVELOPMENT SERVICES . 1101 Texas Avenue South, PO Box 9960 College Station, Texas 77842 Phone 979.764.3570 I Fax 979.764.3496 FACSIMILE COVER SHEET Date: 9 /; _) ~J # of pages including cover: L If you did not receive 11 complete fax, please call our office immediately for a new transmittal. TO: Uc. &k~J FAX: (q7qj {13 '/l'-/3 COMPANY: /\Db -~-----------------~ RE: }fetJe-~ -}(er/ kJkj \J.,trfv lr~e rnoM:~L /J.:>r~ COMP ANY : __ C"-"i~ty__.o..._f_..Co---=lle-'-<.g"'-'-e-'-S_._ta ____ ti~o----n,,__D __ e ___ v""'""el~op.._.m~en__.t_S__.ervi~· c'""""e"""-s ___ _ REMARKS: 0 Urgent · D For your review D Replay ASAP ~ FY1 DATE, TIME FA X NO . /NAME DURATION PAGE (S) RESULT MODE TRANSMISSION VERIFICAT I ON REPORT 09/15 08 :1 9 97752235 00 :00 :31 02 OK STANDARD ECM CtTY OF COLLEGE STATION DEVELOPMENT SERVICES TIME : 09/15/2005 08 :20 NA ME : COCS DEVE LOP ME NT SER FA X : 9797543495 TEL : 9797543570 SER.# : BRO E2J341073 . 1101 Teus Avenue South, PO Box 9960 College Station, Texas 77842. Phone 979~764.3570 I Fax 979.704.3496 FACSIMILE COVER SHEET Date: Lj /!< k ... # of pages including cover: L Jt'you did not receive a complete fax, please call cur office immcdilltely for a new tnu'lsmittsJ. TO: l/nf ~//rj FAX: 971 -776 -llJJ COMP ANY: DJ l.,7 { ""-J'lM<-Tu.._ RE: 1-k&=: 1-L~ -kw-I tJk~ l.hw [,~ · fROM0cD( A.hr~ , ,~,,__-_r,.., _,, --------- CITY OF COLLEGE STATION DEVELOPMENT SERVICES . 1101 Texas Avenue South, PO Box 9960 College Station, Texas 77842 Phone 979.764.3570 I Fax 979.764.3496 FACSIMILE COVER SHEET Date: 9 /! S-k # of pages including cover: L If you did not receive a complete fax, please CIJ.11 our office immediately for a new transmittal. TO: {/,.,.,f l,.).//,j FAX: 977 -776 -llJJ COMPANY: \J.Jle / (,._J-fi.,,<..-h,_ RE: 1-k~ fl.~ -kw-I j(Jk~ ~kr [,~ FROM0~l Ahr~ COMPANY: City of College Station, Development Services REMARKS: 0 Urgent · 0 For your review 0 Replay ASAP DATE, TIME FA X NO . /NAME DURATION PAGE (S) RESULT MODE TRANSMISSION VERIFICATION REPOR T 09/15 08 :21 3489 00 :00 :31 02 OK STANDARD ECM CITY OF COLT .EGE STATION DEVELOPMENT SERVICES TIME : 09/15/2005 08 :21 NAME : COCS DEVELOPMENT SER FA X : 9797543495 TEL : 9797543570 SER .# : BROE2J341073 . 1101 Texas Avenue South, PO Box 9960 College Station, Texas 77842 Phone O?S .. 764.5570 I Fax 979.764.8496 FACSIMILE COVER SHEET Date: 9 /r /os # of pages includi11z c.over: L Tl ycu did not rt:cdvc a. c.:umpletc fax, plee..se call our offl'oe immediately for a new trfl11$mittal. COMPANV· (';.k .. ,,._.c ~~ 11 .-.---.,. ... _,' -.. ---------~~~~~~~-- CITY OF COLLEGE STATION DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 College Station, Texas 77842 Phone 979.764.3570 I Fax 979.764.3496 FACSIMILE COVER SHEET Date: C/ Jr /o.J # of pages including cover: L_ 11 you did not receive a complete fax, please call our office immediately for a new transmittal. TO:-Ser'd ~CJ FAX ,(qn) 7{,t{-JYi'? COMPANY: lo_L~ --'---"'"------------------- RE: ~ ~ -)W tJ~s ~ l,lAL FROM: --S:Jl /'1At-.. COMP ANY : __ C-'-'i"-'-oty,__o~f'--Co---=11--e~ge ___ S-'--'ta_ti ___ . o.._..n.....,.., ....... D_.._ev~e ___ lo-'-"p,...._m_e_n_t_Se_rn--'-'--"· c ___ es _______ _ REMARKS : 0 Urgent · 0 For your review 0 Replay ASAP J:'R.FYI September 15 , 2005 Mr. Alton Ofczarzak 4816 Close Quarters College Station, Texas 77845 (979) 690-1504 Dear Mr. Ofczarzak: It has been brought to our attention that there is some discrepancy to what is required for providing water to Mr. Karl Kolbe's property. The extension of a 3" water main to CoCS standards is required as to prevent the future boring of Horseback Drive . Replacement of Mr. Kolbe's .75" meter and reconnecting Mr. Kolbe's private water system to the .75" meter is also required. We understand you may be submitting a final plat or replat of the subject property illustrating the movement of some property lines. To correctly locate and place Mr. Kolbe's water meter, it may be helpful for you and/or your engineer to provide the contractor the information required to locate the future location of Mr. Kolbe 's driveway off Horseback Lane. Please let me know if you have any further questions. Sincerely, y~ Josh Norton City of College Station Planning and Development Services (979) 764-3570 cc: Lee Adams (MDG) Clint Willis (Dudley Construction) Jerry Jones (CoCS) Alan Gibbs (CoCS) ,.........-; \i ai. 1,..\.--<. "0 J ) .. ~r,ti-i ) ~ Terry Boriskie -Fwd: Horse Haven Ph3 Bk4 Lts10, 11, and 12 From: Alan Gibbs To: Boriskie, Terry; Haver, Chris Date: 4/10/2008 3:31 PM Subject: Fwd : Horse Haven Ph3 Bk4 LtslO, 11, and 12 fyi Alan Gibbs, P.E. City Engineer City of College Station, Public Works >>>Alan Gibbs 4/10/2008 3:25 PM >>> Alton, Page 1 of 1 The Herman 's have made us aware that there is a drainage swale that w ill be altered with the development of these lots which has the potential to block drainage flows if not properly addressed. You are likely aware of the existing concrete flume discharging from the Herman property into the middle of Lot 17 . This specific drainage as well the general drainage must be accommodated by keeping the downstream lot lines low to enable the drainage to discharge to Horseback Drive . The raised slabs are appropriate, but again the lot lines must remain "low" and ensure drainage is not blocked. We 'll check this ultimately at the issuance of COs . This notice is an effort to inform you sooner rather than later so this can be best addressed. Alan Gibbs, P.E. City Engineer City of College Station, Public Works fi le://C :\Do cum ents and Settings \tbo riskie .CSTX\Lo cal Settings\Temp\X PGrpW ise\47 FE32E6City of Co ll... 5/1/2008