HomeMy WebLinkAbout20 Texas A&M Foundation 04-53vr
CITY OF C OLLEGE STATION
Planning & Development Servicts
SITE LEGAL DESCRIPTION:
University Industrial Center
Lot 88
DATE OF ISSUE: 10/12/04
OWNER:
Texas A&M Research Foundation
727 Graham Road
College Station, Texas 77840
TYPE OF DEVELOPMENT:
SPECIAL CONDITIONS:
DEVELOPMENT PERMIT
PERMIT NO . 04-53
Project: TAMU RESEARCH FOUNDATION
FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA
RE : CHAPTER 13 OF THE COLLEGE STATION CITY CODE
SITE ADDRESS:
727 Graham Road
DRAINAGE BASIN:
Lick Creek
VALID FOR 6 MONTHS
CONTRACTOR:
Full Development Permit
All construction must be in compliance with the approved construction plans
All trees required to be protected as part of the landscape plan must be completely barricaded in accordance with Section
7.5.E., Landscape/Streetscape Plan Requirements of the City's Unified Development Ordinance, prior to any operations of
this permit. The cleaning of equipment or materials within the drip line of any tree or group of trees that are protected and
required to remain is strictly prohibited. The disposal of any waste material such as , but not limited to, paint , oil, solvents,
asphalt, concrete, mortar, or other harmful liquids or materials within the drip line of any tree required to remain is also
prohibited .
TCEQ PHASE II RULES IN EFECT .
The Contractor shall take all necessary precautions to prevent silt and debris from leaving the immediate construction site
in accordance with the approved erosion control plan as well as the City of College Station Drainage Policy and Design
Criteria . If it is determined the prescribed erosion control measures are ineffective to retain all sediment onsite , it is the
contractors responsibility to implement measures that will meet City, State and Federal requirements . The Owner and/or
Contractor shall assure that all disturbed areas are sodden and establishment of vegetation occurs prior to removal of any
silt fencing or hay bales used for temporary erosion control. The Owner and/or Contractor shall also insure that any
disturbed vegetation be returned to its original condition, placement and state. The Owner and/or Contractor shall be
responsible for any damage to adjacent properties , city streets or infrastructure due to heavy machinery and/or equipment
as well as erosion , siltation or sedimentation resulting from the permitted work.
In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure
that debris from construction , erosion, and sedimentation shall not be deposited in city streets, or existing drainage
facilities.
I hereby grant this permit for development of an area outside the special flood hazard area. All development shall be in
accordance with the plans and specifications submitted to and approved by the City Engineer in the development permit
application for the above named project and all of the codes and ordinances of the City of College Station that apply.
/0-12-o f
Date
Owner/ AgenUContractor Date
•
•
CITY OF COLLEGE S TATION
DEVELOPMENT SERVICES
1101 Texas Avenue South , PO Box 9960
College Station, Texas 77842
Phone (979) 764-3570 / Fax (979) 764-3496
MEMORANDUM
September 27, 2004
TO : Stewart Kling , Kling Engineering & Surveying, Via fax 846 .8252 /
FROM : Bridgette George, Assistant Development Manager
SUBJECT: DP-TEXAS A&M RESEARCH FOUNDATION -Development Permit
Staff reviewed the above-mentioned construction documents as requested . The
following page is a list of staff review comments detailing items that need to be
addressed. Please address the comments and submit the follow ing information for
further staff review, approval and issuance of the development permit:
__ Three (3) copies of the revised construction plans .
If there are comments that you are not addressing with the revised construction
documents, please attach a letter explaining the details . If you have any questions or
need additional information , please call Carol Cotter or myself at 764 .3570 .
Attachments: Staff review comments
cc : Texas A&M Research Foundation , 727 Graham Road, College Station, TX, 77840 /
Case file# ( 04-00100053)
•
STAFF REVIEW COMMENTS NO. 1
Project: TEXAS A&M RESEARCH FOUNDATION-DEVELOPMENT PERMIT
(04-00100053)
ENGINEERING
1. Please refer to B/CS Unified Design Guidelines and Standard Specifications and
Details for water line construction requirements.
2 . Add a note that all construction to be in accordance with B/CS Unified Design
Guidelines and Standard Specifications and Details.
3. The 6 " PVC public water main shall be C-909 .
4. Refer to BCS Unified Specifications and Details for Standard Fire Hydrant Assembly .
5 . Private service lines are allowed to cross ROW, but not run within . Please relocate
private service line outside ROW.
6. It is my understanding that the double check backflow preventer is private and
should also be located outside of the ROW.
7 . Per Fire Marshall: signage and protection required on FDC .
Reviewed by : Carol Cotter Date : September 23 , 2004
NOTE : Any changes made to the plans , that have not been requested by th e City of Co ll ege Station , must be explained in you r
ne xt transmittal letter and "bubb led " on your plans . Any add itional changes on these plans that have not been po inted out
to the Ci ty , will constitute a completely new rev iew .
Staff Re view Comments Page 2 of 4
DEVELOPMENT PERMIT
FOR OFFICE USE ONLY
Case No. DL\-S ?J
Date Submitted q-J '7 -0L{
1)21 $ ~.oo P"'"\>\;L 'In5f.Ct-e. MINIMUM SUBMITTAL REQUIREMENTS
~ $200.00 development permit fee .
[E fr Drainage and erosion control plan, with supporting Drainage Report two (2) copies each
f!5lJ /#'\ Notice of Intent (N .0.1.) if disturbed area is greater than 5 acres
Date of *Required Preapplication Conference:_N;...;;...;;;.o..;..;n"""e ________________ _
*(Required for areas of special flood hazard)
LEGAL DESCRIPTION 2.6 Acres. Volume 2203, Page 256
APPLICANT'S INFORMATION (Primary Contact for the Project):
Name Kling Engineering & Surveying E-Mail stewart@klingeng .com
Street Address 4101 S. Texas Ave Suite A -------------------'-'--"--'---='-'--'--=-'-==-'-'-'-~=-=-=--='-'--------
City ----~B"'-rv'"""a~n'-------State ____ T'-"X-'-----Zip Code ____ 7_7_80~2~---
Phone Number 979-846-6212 Fax Number 979-846-8252 -------~~----
PROPERTY OWNER'S INFORMATION:
Name __ ___;T~e~x=a~s"'-A=&=M~R=e=s=ea=r~c~h~F~o~u~n=d=at~io~n-'----E-Mail
-------------~
Street Address 727 Graham Road ----------------~---------------
City ___ C~o~l~le~g~e_S~t~a~tio~n~---State ____ T~X~---Zip Code ----'-7-'--7~84-'-'0"-----
Phone Number
------------~
Fax Number ____________ ~
ARCHITECT OR ENGINEER'S INFORMATION :
Name ___ ~K~l~in~g~E=n~g=in~e~e~r~in=g~&=-=S~u~rv~e~y~in=g...._ __ ~ E-Mail ___ s_te_w_a_rt_@_kl_in~g~e_n~g_.c_o_m __ _
Street Address 4101 S . Texas Ave. Suite A ----------------~----~~---------
City ----~B~rv'"""a~n'-------State ____ T~X~---Zip Code ----'-7-'--78-"-0"""2~---
Phone Number 979-846-6212 FaxNumber ___ ___,;;9-'-7=9-~8~4=6-~8=2=52=----
Application is hereby made for the following development specific site/waterway alterations :
To install a double check valve assembly (vault) in the right-of-way of Graham Road to which a private fire
line will connect and run to the building .
ACKNOWLEDGMENTS :
I, B. J . Kling, design engineer/ewneF , hereby acknowledge or affirm that:
The information and conclusions contained in the above plans and supporting documents comply with the
current requirements of the City of College Station , Texas City Code, Chapter 13 and its associated Drainage
Policy and Design Standards .
~
6/1 3/03 1 of 2
As a condition of approval of this permit application , I agree to construct the improvements proposed in this
application according to these documents and the requirements of Chapter 13 of the College Station City
Code
Contractor
CERTIFICATIONS:
A. I, , certify that any nonresidential structure on or proposed to be on this site as part of this
application is designated to prevent damage to the structure or its contents as a result of flooding from
the 100-year storm .
Eng ineer Date
B. I, , certify that the fin ished floor elevation of the lowest floor, including any basement, of any
residentiql structure , proposed as part of this application is at or above the base flood elevation
established in the latest Federal Insurance Admin istration Flood Hazard Study and maps, as
amended .
Engineer Date
C . I, , certify that the alterations or development covered by th is permit shall not diminish the flood-
carryi l)g capacity of the waterway adjoining or crossing this permitted site and that such alterations or
development are consistent with requirements of the City of College Station City Code, Chapter 13
concerning encroachments of floodways and of floodways fringes .
Engineer Date
D. I, , do certify that the proposed alterations do not raise the level of the 100 year flood above
ele '-'.,ation establ ished in the latest Federal Insurance Administrat ion Flood Hazard Study .
Engineer Date
Conditions or comments as part of approval : -----------------------
In accordance with Chapter 13 of the Code of Ord inances of the City of College Station , measures shall be
taken to insure that debris from construction, eros ion , and sed imentation shall not be deposited in c ity streets ,
or existing drainage facilities . All development shall be in accordance with the plans and specifications
submitted to and approved by the City Engineer for the above named project. All of the applicable codes and
ord inances of the City of College Station shall apply .
6/13/03 2 of 2
KLING ENGINEERING & SURVEYING
4101 Texas Avenue , Suite A
Bryan, Texas 77802
TO: City of College Station
ATTENTION:
WE TRANSMIT:
D Under Separate Cover
.f Enclosed
VIA:
DMail
.f Messenger
D Federal Express
D Lone Star Overnight
DUPS
D Special Courier
D Picked Up By Your Office
NO .
Consulting Engineers • Land Surveyors
Email : stewart@klingeng .com P.O. Box 4234
Bryan, Texas 77805 Tel. 979/846-6212
Fax 979/846-8252
DATE: September 17 , 2004
PROJECT NO.:
PROJECT NAME: Texas A&M Research Foundation
REFERENCE:
THE FOLLOWING:
D Prints
.f Copies
D Originals
D Plat
D Field Notes
D Plans
D Report
D Estimate
D Cut Sheets
D Computer Printout
D File
D Contract
D Other
DESCRIPTION
Development Permit
FOR :
.f Your Review & Approval
D Your Review & Comment
D Your Review & Distribution
D Your Review , Revision & Return
D Your Signature & Return
D Your File and/or Use
D As Requested By:
D Please Acknowledge Receipt of
Enclosures
D Please Return Enclosures To
D Copies Of This Letter Of Transmittal
Sent To :
1 application and filing fee
1 check -public infrastructure inspection fee
3 blueline
If Enclosures Are Not As Noted
Please Notify Us At Once.
Signed : S. M. Kling