Loading...
HomeMy WebLinkAbout20 Texas A&M Foundation 04-53vr CITY OF C OLLEGE STATION Planning & Development Servicts SITE LEGAL DESCRIPTION: University Industrial Center Lot 88 DATE OF ISSUE: 10/12/04 OWNER: Texas A&M Research Foundation 727 Graham Road College Station, Texas 77840 TYPE OF DEVELOPMENT: SPECIAL CONDITIONS: DEVELOPMENT PERMIT PERMIT NO . 04-53 Project: TAMU RESEARCH FOUNDATION FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA RE : CHAPTER 13 OF THE COLLEGE STATION CITY CODE SITE ADDRESS: 727 Graham Road DRAINAGE BASIN: Lick Creek VALID FOR 6 MONTHS CONTRACTOR: Full Development Permit All construction must be in compliance with the approved construction plans All trees required to be protected as part of the landscape plan must be completely barricaded in accordance with Section 7.5.E., Landscape/Streetscape Plan Requirements of the City's Unified Development Ordinance, prior to any operations of this permit. The cleaning of equipment or materials within the drip line of any tree or group of trees that are protected and required to remain is strictly prohibited. The disposal of any waste material such as , but not limited to, paint , oil, solvents, asphalt, concrete, mortar, or other harmful liquids or materials within the drip line of any tree required to remain is also prohibited . TCEQ PHASE II RULES IN EFECT . The Contractor shall take all necessary precautions to prevent silt and debris from leaving the immediate construction site in accordance with the approved erosion control plan as well as the City of College Station Drainage Policy and Design Criteria . If it is determined the prescribed erosion control measures are ineffective to retain all sediment onsite , it is the contractors responsibility to implement measures that will meet City, State and Federal requirements . The Owner and/or Contractor shall assure that all disturbed areas are sodden and establishment of vegetation occurs prior to removal of any silt fencing or hay bales used for temporary erosion control. The Owner and/or Contractor shall also insure that any disturbed vegetation be returned to its original condition, placement and state. The Owner and/or Contractor shall be responsible for any damage to adjacent properties , city streets or infrastructure due to heavy machinery and/or equipment as well as erosion , siltation or sedimentation resulting from the permitted work. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that debris from construction , erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities. I hereby grant this permit for development of an area outside the special flood hazard area. All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer in the development permit application for the above named project and all of the codes and ordinances of the City of College Station that apply. /0-12-o f Date Owner/ AgenUContractor Date • • CITY OF COLLEGE S TATION DEVELOPMENT SERVICES 1101 Texas Avenue South , PO Box 9960 College Station, Texas 77842 Phone (979) 764-3570 / Fax (979) 764-3496 MEMORANDUM September 27, 2004 TO : Stewart Kling , Kling Engineering & Surveying, Via fax 846 .8252 / FROM : Bridgette George, Assistant Development Manager SUBJECT: DP-TEXAS A&M RESEARCH FOUNDATION -Development Permit Staff reviewed the above-mentioned construction documents as requested . The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the follow ing information for further staff review, approval and issuance of the development permit: __ Three (3) copies of the revised construction plans . If there are comments that you are not addressing with the revised construction documents, please attach a letter explaining the details . If you have any questions or need additional information , please call Carol Cotter or myself at 764 .3570 . Attachments: Staff review comments cc : Texas A&M Research Foundation , 727 Graham Road, College Station, TX, 77840 / Case file# ( 04-00100053) • STAFF REVIEW COMMENTS NO. 1 Project: TEXAS A&M RESEARCH FOUNDATION-DEVELOPMENT PERMIT (04-00100053) ENGINEERING 1. Please refer to B/CS Unified Design Guidelines and Standard Specifications and Details for water line construction requirements. 2 . Add a note that all construction to be in accordance with B/CS Unified Design Guidelines and Standard Specifications and Details. 3. The 6 " PVC public water main shall be C-909 . 4. Refer to BCS Unified Specifications and Details for Standard Fire Hydrant Assembly . 5 . Private service lines are allowed to cross ROW, but not run within . Please relocate private service line outside ROW. 6. It is my understanding that the double check backflow preventer is private and should also be located outside of the ROW. 7 . Per Fire Marshall: signage and protection required on FDC . Reviewed by : Carol Cotter Date : September 23 , 2004 NOTE : Any changes made to the plans , that have not been requested by th e City of Co ll ege Station , must be explained in you r ne xt transmittal letter and "bubb led " on your plans . Any add itional changes on these plans that have not been po inted out to the Ci ty , will constitute a completely new rev iew . Staff Re view Comments Page 2 of 4 DEVELOPMENT PERMIT FOR OFFICE USE ONLY Case No. DL\-S ?J Date Submitted q-J '7 -0L{ 1)21 $ ~.oo P"'"\>\;L 'In5f.Ct-e. MINIMUM SUBMITTAL REQUIREMENTS ~ $200.00 development permit fee . [E fr Drainage and erosion control plan, with supporting Drainage Report two (2) copies each f!5lJ /#'\ Notice of Intent (N .0.1.) if disturbed area is greater than 5 acres Date of *Required Preapplication Conference:_N;...;;...;;;.o..;..;n"""e ________________ _ *(Required for areas of special flood hazard) LEGAL DESCRIPTION 2.6 Acres. Volume 2203, Page 256 APPLICANT'S INFORMATION (Primary Contact for the Project): Name Kling Engineering & Surveying E-Mail stewart@klingeng .com Street Address 4101 S. Texas Ave Suite A -------------------'-'--"--'---='-'--'--=-'-==-'-'-'-~=-=-=--='-'-------- City ----~B"'-rv'"""a~n'-------State ____ T'-"X-'-----Zip Code ____ 7_7_80~2~--- Phone Number 979-846-6212 Fax Number 979-846-8252 -------~~---- PROPERTY OWNER'S INFORMATION: Name __ ___;T~e~x=a~s"'-A=&=M~R=e=s=ea=r~c~h~F~o~u~n=d=at~io~n-'----E-Mail -------------~ Street Address 727 Graham Road ----------------~--------------- City ___ C~o~l~le~g~e_S~t~a~tio~n~---State ____ T~X~---Zip Code ----'-7-'--7~84-'-'0"----- Phone Number ------------~ Fax Number ____________ ~ ARCHITECT OR ENGINEER'S INFORMATION : Name ___ ~K~l~in~g~E=n~g=in~e~e~r~in=g~&=-=S~u~rv~e~y~in=g...._ __ ~ E-Mail ___ s_te_w_a_rt_@_kl_in~g~e_n~g_.c_o_m __ _ Street Address 4101 S . Texas Ave. Suite A ----------------~----~~--------- City ----~B~rv'"""a~n'-------State ____ T~X~---Zip Code ----'-7-'--78-"-0"""2~--- Phone Number 979-846-6212 FaxNumber ___ ___,;;9-'-7=9-~8~4=6-~8=2=52=---- Application is hereby made for the following development specific site/waterway alterations : To install a double check valve assembly (vault) in the right-of-way of Graham Road to which a private fire line will connect and run to the building . ACKNOWLEDGMENTS : I, B. J . Kling, design engineer/ewneF , hereby acknowledge or affirm that: The information and conclusions contained in the above plans and supporting documents comply with the current requirements of the City of College Station , Texas City Code, Chapter 13 and its associated Drainage Policy and Design Standards . ~ 6/1 3/03 1 of 2 As a condition of approval of this permit application , I agree to construct the improvements proposed in this application according to these documents and the requirements of Chapter 13 of the College Station City Code Contractor CERTIFICATIONS: A. I, , certify that any nonresidential structure on or proposed to be on this site as part of this application is designated to prevent damage to the structure or its contents as a result of flooding from the 100-year storm . Eng ineer Date B. I, , certify that the fin ished floor elevation of the lowest floor, including any basement, of any residentiql structure , proposed as part of this application is at or above the base flood elevation established in the latest Federal Insurance Admin istration Flood Hazard Study and maps, as amended . Engineer Date C . I, , certify that the alterations or development covered by th is permit shall not diminish the flood- carryi l)g capacity of the waterway adjoining or crossing this permitted site and that such alterations or development are consistent with requirements of the City of College Station City Code, Chapter 13 concerning encroachments of floodways and of floodways fringes . Engineer Date D. I, , do certify that the proposed alterations do not raise the level of the 100 year flood above ele '-'.,ation establ ished in the latest Federal Insurance Administrat ion Flood Hazard Study . Engineer Date Conditions or comments as part of approval : ----------------------- In accordance with Chapter 13 of the Code of Ord inances of the City of College Station , measures shall be taken to insure that debris from construction, eros ion , and sed imentation shall not be deposited in c ity streets , or existing drainage facilities . All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer for the above named project. All of the applicable codes and ord inances of the City of College Station shall apply . 6/13/03 2 of 2 KLING ENGINEERING & SURVEYING 4101 Texas Avenue , Suite A Bryan, Texas 77802 TO: City of College Station ATTENTION: WE TRANSMIT: D Under Separate Cover .f Enclosed VIA: DMail .f Messenger D Federal Express D Lone Star Overnight DUPS D Special Courier D Picked Up By Your Office NO . Consulting Engineers • Land Surveyors Email : stewart@klingeng .com P.O. Box 4234 Bryan, Texas 77805 Tel. 979/846-6212 Fax 979/846-8252 DATE: September 17 , 2004 PROJECT NO.: PROJECT NAME: Texas A&M Research Foundation REFERENCE: THE FOLLOWING: D Prints .f Copies D Originals D Plat D Field Notes D Plans D Report D Estimate D Cut Sheets D Computer Printout D File D Contract D Other DESCRIPTION Development Permit FOR : .f Your Review & Approval D Your Review & Comment D Your Review & Distribution D Your Review , Revision & Return D Your Signature & Return D Your File and/or Use D As Requested By: D Please Acknowledge Receipt of Enclosures D Please Return Enclosures To D Copies Of This Letter Of Transmittal Sent To : 1 application and filing fee 1 check -public infrastructure inspection fee 3 blueline If Enclosures Are Not As Noted Please Notify Us At Once. Signed : S. M. Kling