HomeMy WebLinkAbout15 Quality Suites Hotel 04-47Date: 09/23/04 Q UALITY S UITES HOTEL A N D QUALITY OFFICE SUITES Job : 12-04
4.5769 ACRES
COLLEGE STATION, BRAZOS COUNTY, TX
PUBLIC INFRASTRUCTURE
ENGINE E RS OPINION OF COST ~ w
CD w t°""I llTEM SPEC DESCRIPTION UNIT QUANT PRICE CITY DEVELOPR TOTAL I w
en ~ 0 c -tj SIDEWALKS ::r
---------------------------------------------------------------------------------mt 0 x
Mobilization l.s . 1 ,000 .00 1 ,000 1,000 Ill ~ en
2 4 '-Wide Sidewalk s.f. 3 ,240 3 .50 11 ,340 11 ,340 )> < ~ 3 Handicap Ramps ea . 6 200 .00 1,200 1,200 C)
4 Contingency % 4 542 542
CJ) ~ c ;:;:
5 Construction Layout & As-built Drawings % 4 542 542 CD ~ I\)
Subtotal $ 14 ,082 14 ,082 .......
w !:zj
OJ V)
WATER ~ ~ ---------------------------------------------------------------------------------Ill
-~ ~ 6 8" PVC C909 , CL200 (4' bury) l.f. 510 24 .00 12 ,240 12,240 mt
7 8" PVC C909 , CL200 (4' bury) l.f. 300 24 .00 7 ,200 7 ,200 x
Ill ~ 8 Bore and 15" Steel Casing , 3/8" wall l.f. 65 200 .00 13,000 13,000 en
........
9 6" X8" Reducer 400 .00 400 400 ........ ea. CD ~ 0
10 8"X8"X6" Tee ea . 2 700 .00 1,400 1,400 I\) ~ 11 8"X8 "X6 " Tee with plug ea . 800 .00 800 800 <O 12 Fire Hydrant Assembly ea . 1,800 .00 1,800 1,800 ........ ~ 13 8" Water Valve 2 700 .00 1,400 1,400 ~ ea. CD
14 8" Water Valve 700 .00 700 700 .;:.. V)
ea . O> ~
I ~ 15 6" PVC C909 , CL200 (4' bury) l.f. 369 22 .00 8 ,118 8,118 CD
CD
16 6"X6"X6" Tee 200.00 200 200 m ea . CD
17 90 Degree Bend ea . 3 150.00 450 450 (] •
18 6" Water Valve ea . 3 500.00 1,500 1,500
19 F ire Hydrant Assembly ea . 1,800.00 1,800 1,800
20 2" Water Meter ea. 500 .00 500 500
21 3/4" Water Meter ea. 12 150.00 1,800 1,800
22 Contingency % 4 1, 114 1,019 2,132
23 Construction Layout & As-built Drawings % 4 1, 114 1,019 2,132
Subtotal $ 30 ,067 27,505 57 ,573
24
25
26
27
28
29
30
31
32
33
34
DRAINAGE
---------------------------------------------------------------------------------
12" RCP CL Ill l.f.
30" RCP CL Ill l.f.
4'-wide Rectangular Flume c .y .
Junction Box (6' deep) ea .
Junction Box (4' deep) ea .
Grate Inlet Junction Box (2' deep) ea .
Concrete dissipator section s.f.
Cement stabilized rubble rip rap section s.f.
Silt fencing l.f ..
Contingency %
Construction Layout & As-built Drawings %
Subtotal $
TOTAL ESTIMATED CONSTRUCTION COST $
Christian A. Galindo , P.E. # 53425, R.P.L .S . # 4473
23-Sep-04
38
264
58
1
75
320
900
4
4
22 .00 836
60.00 15,840
210 .00 12 , 180
1 ,600 .00 1 ,600
1 ,400.00 1,400
1 ,000.00 1,000
4 .00 300
2 .50 800
2 .00 1,800
1,430
1 ,430
38 ,616
30 ,067 80 ,204
,..,. ..... ,,,,,,\\\\\
__ .... ~ 0 F r £: '''t .:F"t.... '\ .............. ,r_..., ., ..
-'.. .. -1.r. fll ::' C::> •• •• •• •• v' 'i ~ * .·· ··.1c ~ "'-*: ·~* ~ ~ ...... ~ ................................ ~
~CHRISTIAN A. GALINDO~ ~•••••••M•c••• .... •oeeeo••o••oooe•n-•:o••••••~
~...()\ 53425 .:Q:-;; 1,, .p_ ... If> <v <:) ... /,,'.,/ t?
11 °;(' ·· .. to 1srt.?-.,./ .;e.'<i §' ,,A ~15'C\ '••.,, ,,.,•' ~~'\ .:
'~ • u/ONAL t. ...::--11\ ~ ..... \\\ w , .. ,,.. .....
836
15,840
12,180
1,600
1,400
1,000
300
800
1,800
1,430
1,430
38 ,616
110,271
AU G-2 4 -0 4 T UE 1 1 :05 GA LIND O ENGIN E ER S 979 8 46 8868
GALINDO ENGINEERS AND PLANNERS, INC.
3833 South Texas Ave., Suite 213 Bryan, Texas n602 (979) 846~8868
GEP Proj ect : / 2--04
10:
FROM :
SUBJECT :
NUMBER OF PAGES :
COMMENTS :
SPe:t-le.e~J
FAX.MEMO
RETURN FAX# 979 ·846 -8868
Cc;v5R.:-+ !i
A-'f'OU.H Eb 15 A/\J Ab J::)ITtONAL.. C-fJP'I tJF lf/E° FtRE
FLoW WA-TE/;!. 4/'./AL'(StS ALREADY saeM 111eD -ro
You Arll> ---r/--/RbE. ~HE£.-r>s) AloT P~t~-v/Od.SL..Y
5UBM1Trc=1>/ Doc. aMcNT/N{) 111£ .i?ESL!t:...TS ~ -rH£
r!R:~ HYDRANT CALCU LATtO/\/$,
P.0 1
~~Ht
____ _,)
Date : 09/15104
JITEM SPEC#
2
3
4
5
6
7
8
9
10
QUALITY SUffES HOTEL AND QUALITY OFFICE SU ITES
4.5769 ACRES
COLLEGE STATION, BRAZOS COUNTY, TX
8" WATER LINE
ENGINEERS OPIN10N OF COST
DESCRIPTION UNIT
WATER
--------------------------------------------------
8" PVC C9rnl, Cl200 (4 ' bury) t.f.
8" PVC C909 , CL200 (4 ' bury) [. f.
Bore and 15" Steel Casfng, 318" wall Lf.
8"X8"X6" Tee with plug ea.
8" X 6• Reducer ea.
8"X8"X6" Tee ea.
Ffre Hydrant ea.
s· Water Valve ea.
a· Water Valve ea .
Contingency %
Construction Layout & As-built Drawings %
Subtotal $
TOTAL ESTIMATED CONSTRUCTION COST $
' i
J
<..tll~~H"i':l:1a~incfo, P.E. # 53425, R .. 5 . # 4473
15-Sep-04
QUANT PRICE CITY
510 24 .DO 12,240
300 24 .00
65 200.0D 13,000
800.00 800
400.00 400
3 700.00
1 1,800.00
2 700 .00 1,400
1 700.00
4 1, 114
4 1,114
30,067
30,067
Job: /2-04
w
CD
c.:i w
DEVELOPR jTOTAL
(/)
0 c: s-
"a}
x
g.)
Cl)
12,240 > < (II
7 ,200 7,200 en
13 ,000
800
c
~
l'I)
~ 4()0 (,;>
2 ,100 2,100
CD
1 ,800 1,800 ~
$l)
1,400 ?
700 700 ;I x
472 1,586 DJ
t/l
472 1,586 ...... ...... co
12,744 42,811 0
N
12,744 42,811 ca
-..J
~
CD ....
(])
°' co
O"J co
~
~ ~ tj
0
~
Q
~ ~
V:i
~
@
~ ~
~ ~
~
~ () .
~
(/)
rn
"O
I .....
U1
I
Ill
-!>
E rn
tJ
.....
(ll
N
N
C1
D
r ....
z
tJ
0
rn z
C1 ....
z rn rn
;u
(/)
~
-J
~
co
-!>
a'> co co
a'> co
"O
Ill
N
SEP-15 -04 WED 13:21 GALINDO ENGINEERS 979 8468868 P.01
GALINDO ENGINEERS AND PLANNERS, INC.
3833 South Texas Ave .• Suite 213 Bryan, Texas 77802 (979) 846-8868
FAX MEMO
GEP Project: /.2-04 Date: StEP-r, !S1 z.oo 4
TO:
SUBJECT:
RETURN FAX# 979·846·8868
NUMBER OF PAGES :
COMMENTS:
At.AN;
As ~,~.-:;ussG""'P 11'1 11-1~ Mt:tT1f'tt7 tJA/ MON.bA'l,.1
"fLeFl,S.G' r1NI> rl--IE ATIJ4..ct-/Eb {OSI ESTINl..AT&
A/\/1':::> A nCrl.IR.€ OF {J-/£ P>J2~Pl>.5Eb Lt/\/~.
Ul rn
~e : 09123/04 QUALITY SUITES HOTEL A.ND QUALITYOFFlCE SUITES Job: 12-04 "'O
I
4 .-5769 ACRES t\)
(>j
COLLEGE STATION, BRAZOS COU.NiY,-TX I
(S)
PUBLIC INFRASTRUCTURE ~ ~
ENGINEERS OPINION OF COST -i (,) :r co
~lEM (,) ~ c
SPEC DESCRIPTION UNI T QUANT PRlCE C JTY DEVELOPR TOTAL! (,)
Cf} ~ ....
0 t\) c:
S IDEWALKS S' tj (S)
~ 0 (]\ -------------------------------·--·-----·------------x
1 Mobil iz.a tion ts. 1 1,000.00 1,000 1,000 O> ~ G1 "' D
2 4'-Wide Sidewalk s .f . 3,240 3.50 11,340 11,340 )> r < ~ .....
3 Handicap Ramps ea . 6 200.00 1,200 1,200 Q z
(J) t:I
4 Contfngency % 4 542 542 c: ~ 0
5 Construction Layout & As-bui[t Drawings % 4 542 542 $' rn I\)
Subtotal $ 14 ,082 14,082 ...... ~ z
(,.) G1
.....
OJ V) z
WATER rn ~ ~ rn g) ----------------------·-----------------------~ < ;u
Ul 6 8" PV C C909, CL200 (4' bury) l.f. 510 24 .00 12,240 12,240 ~ tj
7 8" PVC C909, CL200 (4' bury) Lf. 300 24 .00 7 ,200 7,200 x
fl) ~ 8 Bore and 15" Stee l Casing, 3/8" wall Lt. 65 200 .00 13 ,000 13 ,000 <I>
--..J
9 6~ X8" Reducer 400 .00 400 400 --..J ea . co ~ 0
10 a~X 8 "X6" Tee ea . 2 700 .00 1,400 1,400 I\) ~ 11 8"X8 "X6~ Tee w ith plug ea . 800 .00 800 800 ~
(0 ..J
12 Fire Hydrant Assembly ea . 1,800 .00 1,800 1,800 -....! ~ ~
13 8" Water Va[ve 2 700.00 1,400 1,400 ~ 00 ea . co '-V) ~
14 8" Water Valve ea . 1 700.00 700 700 ~ (]\ °' 15 6 " PVC C909, C L200 ( 4' bury} l.f. 369 22.00 8,118 8,118 Co ~ 00
CD 00
16 6"X6''X6'' Tee ea. 1 200.00 200 200 ~ (]\
() 00
-17 90 Degree Bend ea. 3 150.00 450 450 .
-19 6" Water Valve ea . 3 500.0<J 1,500 1,500
-19 F ire Hydrant Assembly ea . 1 1,800.00 1,800 1,800
::20 2 " Water Meter ea. 1 500.00 500 500
::21 314" Water Meter ea. 12 150 .00 1,800 1,800
<:;:22 Contingency % 4 1, 114 1,019 2,132 "'O ~23 Construction Layout & As-built Drawings % 4 1,114 1 ,019 2,132
Subtotal $ 30,0 67 27,505 57 ,5 73 (S)
t\)
24
25
26
27
28
29
30
31
32
33
34
DRAINAGE
12• RCP CL ll l
30· RCP CL lll
4'-wide Rectangular Flume
Junction Box (6' deep)
Junction Box (4' deep)
Grate Inlet Junction Box (2' deep)
Concrete dissipator sectLon
Cement stabilized rubble rip rap section
Siltfencing
Contingency
Construction Layout & As-built Drawings
TOTAL EST(MATED CONSTRUCTION COST
Subtotal $
$
l.f.
l.f.
c .y .
ea .
ea.
ea.
s .t
s .f .
l .f ..
%
%
Christian A. Galindo, P.E. # 53425 , R.P.L .S. # 4473
23-Sep-04
38
264
58
1
75
320
900
4
4
22.00
60.00
210.00
1,600.00
1,400.00
1,000.00
4.00
2.50
2 .00
30,067
836 836
15,840 15 ,840
12 ,180 12,180
1 ,600 1,600
1,400 1,400
1 ,000 1,000
300 300
800 800
1,800 1,800
1,430 1,430
1,430 1,430
38,616 38,616
80,204 .. i .10,271
'
(/)
rn
"U
I
I\)
w
I
(SJ ..
-i
I c
.....
I\)
(SJ
(JI
C'l
D
r
.....
z
t:j
0
rn z
C'l
.....
z rn rn
ilJ
(/)
<!)
-J
<!)
co ..
(JI
co co
(JI
co
GALINDO ENGINEERS AND PLANNERS, INC.
3833 South Texas Ave ., Suite 213 Bryan , Texas 778 02 (979) 846 -8868
08 /12 /04
l tTE~ ~PEC # DESCRIPTION
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
S I DEWALKS
Mobi liz at ion
4'-Wide Sidewalk
5'-Wide S idewalk
6'-Wide S idewalk
Handicap Ramps
Con ting ency
WATER
6" PVC C909 , CL200 (4' bury)
6"X6"X6" Tee
90 De gree Bend
6" Water Va lve
Fire Hyd rant Assembly
2" Water Meter
3/4" Water Meter
Contingency
DRAINAGE
12" RCP CL Il l
30" RCP CL Il l
4'-wide Rectangular Flume
Junction Box (6 ' de ep)
Junction Box (4' deep)
Grate Inlet Junctio n Box (2' deep)
S ilt fenc ing
Contingency
Subtotal $
Subtotal $
Subtotal $
q oTAL ESTIMATED CONSTRUCTION COST
UNIT QUANT.
l.s .
s.f.
s.f.
s .f .
ea .
%
Lf.
ea .
ea .
ea .
ea .
ea .
ea .
%
l.f.
l.f.
c .y .
ea .
ea .
ea.
l.f.
%
3 ,684
1,030
1,082
8
3
345
4
1
4
2
1
12
3
38
264
57
1
900
3
Job :
1,000 .00
3.50
3.50
3.50
200.00
22.00
200 .00
150.00
500 .00
1,100.00
500 .00
100.00
22.00
60 .00
210 .00
1,60 0 .00
1,400 .00
1,000.00
2.00
12-04
1,000
12 ,894
3,605
3,787
1,600
387
22 ,273
7 ,59 0
800
150
2 ,000
2,200
500
1,200
433
14 ,873
836
15 ,840
11 ,97 0
1,600
1,400
1,000
1,800
1,033
35 ,479
SEP-15-04 WED 13:22 GALINDO ENGINEERS
~· ~~~~" <o~
'.'\..
QUALITY
OF FICE
SUI TES
~
~ 4~
QUALITY
SUITES
HOTEL
979 8468868
N
s
SCALE :
1" ~ 90'
P.03
S EP -23 -04 THU 12 :05 GA LINDO ENGINEE RS 9 7 9 8 4 68868 P.01
GALINDO ENGINEERS AND PLANNERS, [NC. 0\
3833 South Tons Ave., Suite 213 B')'11n , Texas 77802 (979) 846-8868 ""\..\ ~
FAX MEMO 'lJ"'i~ . )
GEP Pmj ect : 12--04 Date: .Gt;"P, 23, :'!L)04 ~ ~ )}Q {jf
TO :
FRO M:
SUBJECT :
RETURN FAX# 979·846-8868
NUM BE R OF PAGES :
COMMEN TS:
~te£0
a;ti{ ~~ aui-~"u~~
. ec-k-r-e, ~~kv I
r ~~r=~r
aL~~~
~---
cc.: ~~~~~
/-74-X. 25.f.-77/-87::39
)'
Attachment 2 TPDES General Pennit TXR.150000
------- ------..
~ ill
CONSTRUCTION SITE NOTICE
FOR THE
Texas Commission on Environmental Quality (TCEQ)
Storm Water Program
TPDES GENERAL PERMIT TXRlSOOOO
T he following information is posted in compliance with Part Il.D.2. of the TCEQ General Permit Number
TXRI 50000 for discharges of storm water runoff from construction sites. Additional information regarding the
TC EQ storm water permit program may be found on the internet at:
I ··; rm/ rm/d www.tnrcc.state.tx.usroenruttme: waterne wwne 1tn1 estorm
Contact Name and Phone Number: kEfiPAL/.. C-7/LL. U/vf
'254 -f-9 .3 -8'/Cf 7
Project Description: 4,58-AC 7.X?AcT
CU/AL/TY SL.II TES llOTFL 4N.D
{Physical address or description of the site's Q.t./ALITY t:?FFICE SL/1T£.5 ocation, estimated start date and projected end
date, or date that disturbed soils will be TGXA.S A VE . .50L.ITl-l I POA/OEROSA RP,
stabilized) COLLEGE STATIOA/t.. TX.
.G.:3TIMA TCP PATFS
srA!<:T.'
£NDt
Location of Storm Water Pollution J~ S/;"E Prevention Plan :
For Construction Sites Authorized Under Part 11.0.2 . (Obtaining Authorization to Discharge) the following
certification must be completed:
l K. EN PAtL G It t UM (Typed or Printed Name Person Completing This Certification) certify under penalty of
la w that I have read and understand the eligibility requirements for claiming an authorization under Part ll.D.2. of
TPDES General Permit TXR150000 and agree to comply with the terms of this permit. A storm water pollution
prevention plan has been developed and implemented according to permit requirements. A copy of this signed
notice is supplied to the operator of the MS4 if discharges enter an MS4 system. I am aware there are significant
penalties for providing false information or for conducting unauthorized discharges, including the possibility of fine
and imprisonment r knowing violations.
Date
Page 33
\.' 10 ...
' v ,
.~
(' •
GALINDO ENGINEERS AND PLANNERS, INC.
3833 South Texas Ave ., Suite 213 Bryan , Texas 77802 (979) 846-8868
QUALITY SUITES HOTEL AND
QUALITY OFFICE SUITES
STORMWATER POLLUTION PREVENTION PLAN
1. SITE AND PROJECT DESCRIPTION
The proposed Quality Suites Hotel and Quality Office Suites is a 4 .58-acre tract of land
located on the northwest corner of Texas Ave . South (S .H. 6) and Ponderosa Rd .,
COLLEGE station , TX . The site is traversed along its .northwest by a drainage channel in
the Bee Creek water shed.
The project will consist of the installation of a 3-story hotel , a 1-story office complex ,
driveway and parking lots, 345 l.f. of water line and 510 l.f. of a combination of pipe and
open box culverts . The project will require grading of 80% of the tract area .
It is expected that construction of this infrastructure will disturb approximately 3 .5 acres and
will be completed in eight months as follows :
a) Site preparation
First two months .
b) Building development.
Next six months .
Attached is a copy of the Grading and Drainage Plan in a 24"x36 " format. Also attached is
the CONSTRUCTION SITE NOTICE, prepared under the provisions of TPDES General
Permit No . TXR150000 .
2 . EROSION AND SEDIMENT CONTROL
Best Management Practices shall be followed to prevent erosion and sedimentation from
disturbed soil. To this effect the following devices shall be installed :
a) a silting barrier along the lower ends of the land being disturbed . This barrier will remain
in place until stabilization or revegetation occurs ,
b) a construction entrance a minimum of 12 ' in width consisting of rock-rubble with pieces 1-
1 /2" to 3-1/2" in diameter,
c) all storm drainage inlets will be protected during construction, until revegetation or
stabilization is complete, from runoff sedimentation by a 6"-high barrier made up of 20 lb
straw filled burlap bags (or equivalent barrier). These traps shall be cleaned as soon as
their capacity has been reduced by 50%,
Page 1
. '
.. "
d) a location within the project area and near its entrance shall be identified as a truck
washing area,
e) a location within the project shall be identified as on-site storage of construction waste
materials such broken concrete, concrete washout and waste asphalt.
3 . STABILIZATION PRACTICES
a) where called for in the design rubble riprap shall be installed consisting of 20-lb pieces
placed on plastic liner or cement stabilized ,
b) all disturbed ground, including the detention pond, shall be hydromulched at the
conclusion of construction .
4. SCHEDULED MAINTENANCE
The attached schedule lists the maintenance operations for the activities described in this
plan.
CHRISTIAN A. GALINDO, P.E., R.P.L.5 .
August10 , 2004
Page 2
8/10/2004 UALITY SUITES HOTEL & QUALITY OFFICE SUITI 12-04
O PERAT OR:
I
'.,,,:~~:SWP.3 MAINTENANCE SCHEDULE ·~ .. ;i'.::r"
I I
Activity Date Date Mainten . Special Week Week Week Week Week Week Week Week Week Week
Installed Completed Frequency Conditions 1 2 3 4 5 6 7 8 9 10
Clearing & Grubbing O nce l
Silt Fencing Weekly Until compl.
Construction Entrance Weekly Temporary
Site Grading Weekly Until compl. I
Utilities I Weekly Until c ompl.
Concrete structures Weekly 1Until compl. ;
Riprap structures Weekly Until compl. 1 -
Hydromulching Weekly Until compl. ,
Truck washout are a I Weekly Until compl. ,
I i I
I I I I I I I I I I I I I I I
Activity /Date Date Mainten . Speci a l : Week W eek Week Week I Week Week Week Week Week I Week
Installed Completed Frequency Conditions 11 12 13 14 15 16 17 I 18 19 20
I
Clearing & Grubbing Once
Silt Fencing I Weekly Until co mpl.
Constru cti on Ent ra nce I Weekly Tem po rary
Site Grading I Weekly Until compl.
Utilities I Weekly Until compl.
Concrete structure s Weekly Until co mpl.
Riprap structures Weekly Until compl.
Hydromulching Weekly Until compl.
Truck washout area Weekly Until compl.
CITY OF C OLLEGE S TATION
Planning & Development Services
SITE LEGAL DESCRIPTION:
LOTS 5-10
SOUTHWOOD VALLEY
PH 4B
DATE OF ISSUE: 10/27/04
OWNER:
GILLUM , KENDALL
6329 GUN CLUB RD
TEMPLE , TX 76501-6716
TYPE OF DEVELOPMENT:
SPECIAL CONDITIONS:
DEVELOPMENT PERMIT
PERMIT NO . 04-47
Project: QUALITY SUITES HOTEL AND OFFICES
FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA
RE : CHAPTER 13 OF THE COLLEGE STATION CITY CODE
SITE ADDRESS:
3600 SH 6 S
DRAINAGE BASIN:
Bee Creek Trib . "A"
VALID FOR 9 MONTHS
CONTRACTOR:
Clearing and Grading Permit
All construction must be in compliance with the approved construction plans
All trees required to be protected as part of the landscape plan must be completely barricaded in accordance with Section
7.5.E., Landscape/Streetscape Plan Requirements of the City's Unified Development Ordinance , prior to any operat ions of
this permit. The cleaning of equipment or materials within the drip line of any tree or group of trees that are protected and
required to remain is strictly prohibited . The disposal of any waste material such as , but not limited to , paint , oil , solvents,
asphalt , concrete , mortar, or other harmful liquids or materials within the drip line of any tree required to remain is also
prohibited .
EROSION CONTROL REQUIRED AS PER PLANS . HAYBALE CHECK DAM REQUIRED AT END OF PUBLIC
CHANNEL. PERMIT SUBJECT TO REVOCATION IF IN VIOLATION. SILT FENCE REQUIRED FOR WATERLINE
PROJECT AT ALL TIMES . SWPPP REQUIRED TO MEET TCEQ REQUIREMENTS .
The Contractor shall take all necessary precautions to prevent silt and debris from leaving the immediate construction site
in accordance with the approved erosion control plan as well as the City of College Station Drainage Policy and Design
Criteria . If it is determined the prescribed erosion control measures are ineffective to retain all sediment onsite , it is the
contractors responsibility to implement measures that will meet City, State and Federal requirements . The Owner and/or
Contractor shall assure that all disturbed areas are sodden and establishment of vegetation occurs prior to removal of any
silt fencing or hay bales used for temporary erosion control. The Owner and/or Contractor shall also insure that any
disturbed vegetation be returned to its original condition , placement and state . The Owner and/or Contractor shall be
responsible for any damage to adjacent properties, city streets or infrastructure due to heavy machinery and/or equipment
as well as erosion , siltation or sedimentation resulting from the permitted work .
In accordance w ith Chapter 13 of the Code of Ordinances of the City of College Station , measures shall be taken to insure
that debris from construction , erosion , and sedimentation shall not be deposited in city streets, or existing drainage
facilities .
I hereby grant this permit for development of an area outside the special flood hazard area . All development shall be in
accordance with the plans and specifications submitted to and approved by the City Engineer in the development permit
application for the above named project and all of the codes and ordinances of the City of College Station that apply .
Date
...
---~-
\
"--
I
H.t.Y BAI.ES NIO SILT FENCE TO
BE USED IH AREAS OF CONCENTRATED
DRAINAGE fl...OWS .
SILT ~ FABRIC
SILT FENCE W/
HAY BALES
NTS
STAl<ES-8' SPACING OR
"T" POSTS-10' SPACING
BURY BOlTOM Fl.AP
SILT FENCE
NTS
OR PROPOSED EXISTING
PU8UC ROAD OR STREET
CONSTRUCTION NOTES:
PAVEMENT Nf£A
0
PEA GRAVE.. OR SAND F1U£O N'l'LON
MOS (OR APPRO\IED EQUIVALENT) e• HEJCHT (MIN.), lAIO DID TO
ENO.
EDGE OF OUTTE
TOP OF CURB
CURS/GRATE INLET OR JUNC'TlOH BOX
,...
.....
INLET PROTECTION
NTS
HAY BALE
CHECK DAM
NTS
1 e• MIN . DEPTH
BELOW EXISTNG GROUND
3• OIA. CRUSHm STONE. MIN 1HICl<N£SS -e·
/ MIN. ROCK EXIT lENC1ll -30•, SIZE, LOCATION
AS SHOWN ON lHIS SHEET.
lHE EXIT SHAU... BE MAINTNHEO ANO KEPT IN A CON OITlON
THAT PRE\IENTS MUO FROM LEAVING lHE SITE. A00m0NN..
CRUSHED STONE SHAU.. BE AOOED AS NECESSARY.
CONSTRUCTION EXIT
NTS
FOR OFFICE us~ ONL y
P&Z CASE NO .: 0~ .....-}Cf Cf
DATE SUBMITTED:----
SITE PLAN APPLICATION
MINIMUM SUBMITTAL REQUIREMENTS
/Site plan application completed in full.
/ $200 .00 Application Fee. ~ $200 .00 Development Permit Application Fee . ~ $600 .00 Public Infrastructure Inspection Fee if applicable . (This fee is payable if construction of a public
waterline, sewerline , sidewalk, street or drainage facilities is involved.)
~en (10) folded copies of site plan.
_717_ A A copy of the attached site plan checklist with all items checked off or a brief explanation as to why they
are not checked off .
.tJ..Ai_ Parkland Dedication requirement approved by the Parks & Recreation Board, please provide proof of
approval (if applicable).
NAME OF PROJECT QUALITY 5Ut/F;$ Hore.L AND QUA.LITV OrE/CE. SUITES
ADDRESS 3512 TEXA.:5 AVENVE !Sour# 3Co00 5 H (p S.
LEGAL DESCRIPTION Lozcs S-/O, BL~Ck 18. Sour//~op vALlEY -5EC77CN' 1-B > >
APPLICANT/PROJECT MANAGER'S INFORMATION (Primary Contact for the Project):
Name KENDAL.~ Gt.Lh. UM
Street Address &32 CJ GuN CL tJ B ROAD City ~~~'£~M~P_L~£...~----
State rx Zip Code 7 ft:;S-tJ I
Phone Number ~S4 -413-f/'17
PROPERTY OWNER'S INFORMATION :
Name .SAME.
E-Mail Address ------------
Fax Number ::Z..S-4-77 / -373 9
Street Address -----------------City ----------
State _____ Zip Code _____ _
Phone Number-----------
ARCHITECT OR ENGINEER'S INFORMATION :
Name CHRISTIAN A. GALINDO
Street Address 3 g,33 s. r£.k AS AVE.
State TX Zip Code 77$~7-
Phone Number $46-$8" fS
E-Ma il Address ------------
Fax Number _____________ _
~£, "2-13 City -=8'-'--K~Y. ...... 'A_,_N,__.__ _____ _
E-Mail Address chrisga.l~lllyriac/. f)ef
Fax Number U&-S«(,8
OTHER CONTACTS (Please specify type of contact, i.e . project manager, potential buyer, local contact, etc.)
Name ---------------------------'--------
Street Address -----------------City ----------
State _____ Zip Code _____ _ E-Mail Address ------------
Phone Number -----------
Fax Number _____________ _
Site Plan Appl.doc 8/11/2004 1 of 3
CURRENTZONING._~-L-------------------------
PRESENTUSEOFPROPERTY__.V~A_C.._A.i\/"-'-'r-'--------------------~
PROPOSED USE OF PROPERTY
VARIANCE(S) REQUESTED AND REASON (S) ----'N"-"O=-A/-'-=£'------------------
#OF PARKING SPACES REQUIRED ---'9'--f_s-__ #OF PARKING SPACES PROVIDED <J9 -~--
MULTI-FAMILY RESIDENTIAL
Total Acreage _. _.
Floodplain Acreage .
Housing Units ____ _
___ # of 1 Bedroom Units
___ # of 2 Bedroom Units
___ # of 3 Bedroom Units
# of 4 Bedroom Units ---
FOR 2 BEDROOM UNITS ONLY
--~#Bedrooms= 132 sq . ft.
___ # Bedrooms < 132 sq . ft.
PARKLAND DEDICATION
#of Multi-Family Dwelling Units
---x $457 = $ ______ _
_ __ # of acres in floodplain
___ # of acres in detention
___ # of acres in greenways
COMMERCIAL
Total Acreage 4 . ..S-7 & 9
HorEL = 1~9g/ s.r,
Building Square Feet OFr/c,e = 24/ 7otJs.r.
Floodplain Acreage NoA/£
NOTE: Parkland Dedication fee is due prior to the issuance of a Certificate of Occupancy.
The applicant has prepared this application and certifies that the facts stated herein and exhibits attached
hereto are true and correct.
Date ' 7
Site Plan Appl.doc 8 /11/2004 2 of 3
SUPPLEMENTAL DEVELOPMENT PERMIT INFORMATION
Application is hereby made for the following development specific site/waterway alterations:
CO/I/VERT/NG E?<f.ST/NG OPS-/\/ C:!fANNGL 7V ~¢PEN~ co~ V5'l'f:r
ACKNOWLEDGMENTS:
The information and conclusions contained in the a ove pans and supporting documents comply with the current
requirements of the City of College Station, Texas City Code, Chapter 13 and its associated Drainage Policy and Design
Standards. As a condition of approval of this permit application, I agree to construct the improvements proposed in this
application acco ing t these d um nts and t e requirements of Chapter 13 of the College Station City Code .
Contractor
CERTIFICATIONS: (for proposed alterations within designated flood hazard areas .)
A.I, certify that any nonresidential structure on or proposed to be on this site
as part of this application is designated to prevent damage to the structure or its contents as a result of flooding from the
100 year storm .
Engineer Date
B. I, certify that the finished floor elevation of the lowest floor, including any
basement, of any residential structure, proposed as part of this application is at or above the base flood elevation
established in the latest Federal Insurance Administration Flood Hazard Study and maps, as amended.
Engineer Date
C. I, , certify that the alterations or development covered by this permit shall
not diminish the flood-carrying capacity of the waterway adjoining or crossing this permitted site and that such alterations
or development are consistent with requirements of the City of College Station City Code , Chapter 13 concerning
encroachments of floodways and of floodway fringes .
Engineer Date
D. I, , do certify that the proposed alterations do not raise the level of the 100
year flood above elevation established in the latest Federal Insurance Administration Flood Hazard Study .
Engineer Date
Conditions or comments as part of approval: --------------------------
In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be
taken to insure that debris from construction, erosion, and sedimentation shall not be deposited in city streets,
or existing drainage facilities.
All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer
for the above named project. All of the applicable codes and ordinances of the City of College Station shall apply
Site Plan Appl.doc 8/11/2004 3 of 3
GALINDO ENGINEERS AND PLANNERS, !NC.
3833 South Texas Ave ., Suite 213 Bryan , Texas 77802 (979) 846 -8868
September 23 , 2004
Mr. Alan Gibbs, P. E .
. Engineering Department
City of College Station
College Station , TX
Subject :
Dear Alan :
Revised Drainage Report
Quality Suites Hotel and
Quality Office Suites
College Station , TX
12-04
Please find enclosed the referenced report for your review. This document replaces
the original report dated August 10 , 2004 (amended August 12, 2004). The purpose
of this revision is to adjust the detention design to a 25-year storm.
The combined 4 .58-acre tract of land to be occupied by the two projects listed
above is included in this report.
Sincerely ,
GALINDO ENGINEERS AND PLANNERS, /NC.
Christ1an A. Galindo, P.E., R.P.L.S.
President
cc: Kendall Gillum
BCS Hospitality Developing , L. P.
-
~.... :\.'\\\\\\k' ,... F "\a.. ~ "~ o r £'. .,, ; ,,(. ~ ................. .,.,......., ., .. -r._' • '• -7.C\ r1. ~ --' .. ·· : • .. v~ --~ s *... . ···* ~ ~*:' ;.•~ if1!••••••••••••••••••.,••c•••••••••••••••••1
i c HRIST.AN A. GALIN DOI
~··••••~eeoe•oeeeeeee9oeee~oeeeHeeeeeeee •eee .. -if!!. ~-o\ 53425 /Q:-#
r1, ~ ··.~ ~ •• • 4.1 S 1e: 0-<' • ••• ttQ1s1t~~.· ~4.1 .: i;:! ~Sn ........ ···JJ ···:,<;.' :
"!h u/ONAL t.'" -~-~\ ~ .... \\\:'!{;.~,,'ii
GALINDO ENGINEERS AND PLANNERS, !NC.
3833 South Texas Ave., Suite 213 Bryan, Texas 77802 (979) 846-8868
1. TRACT DESCRIPTION
QUALITY SUITES HOTEL AND
QUALITY OFFICE SUITES
REVISED DRAINAGE REPORT
12-04
This project covers approximately 4. 58 acres of land and it includes Lots 5 through 10 , Block 18 ,
Southwood Valley Section 4-B , College Station , TX. The tract is zoned C-1, it is currently vacant and
it is located at the northwest corner of the intersection of the southwest service road of S.H. 6 (Texas
Avenue South) and Ponderosa Road . To the west the tract is bound by vacant land and by a storage
facility. To the north it is bound by two residential and one educational structure.
The present report is to be used in conjunction with the construction design drawings issued
separately in 24"X36" format and herein referred to as Exhibit 1. In particular Sheet 2 (Grading and
Drainage Plan) is of importance.
The northwest half of the tract will be developed as a one-story office complex referred to as Quality
Office Suites. The southeast half will be developed as a three -story hotel called Quality Hotel Suites.
The adopted Flood Insurance Study does not identify the existence of a 100-flood plain affecting this
tract (Map # 48041 C 0205 C, July 2, 1992).
2. STORMWATER RUNOFF
Two drainage areas have been defined , each one corresponding to one of the two Quality projects. A
third area (off-site pass-through) has been identified adjacent to the west of the referenced Lots 8, 9
and 10. This adjoining area is vacant but is currently being developed. The drainage report for this
adjoining project was prepared by Michael McClure, P. E. No. 32740, on February 18, 2003 and it
indicated that its post-development run -off (at pre -development levels) would drain into the same
drainage system being used by the subject project. See further discussion below.
Exhibit 2 (in two pages) shows the runoff calculations (pre and post development conditions) for 2,
5, 10 , 25 , 50 and 100-year storms for each of the two previously defined drainage areas . Two
detention facilities , one for each drainage area , are being provided in each of the two parking lots .
Additionally the subject project will provide adequate pass -through for run -off that originates from
Ponderosa Rd. and that enters this tract through a restricting 20"x26 " CMP pipe as shown in Exhibit
.J.. This pipe restricts the pass-through flow to a maximum 15.43 cfs.
The McClure report estimated runoff from the adjoining western tract, after development and with
two detention areas, for the 100 -yr storm to be 8.75 cfs (3.23 cfs from the upper pond and 5.10 cfs
-1 -
from the lower pond). Therefore the drainage system designed herein provides pass-through capacity
for the estimated 8. 75 cfs .
Run-off coefficients used in this exhibit, and the approx i mate velocities used to compute Tc, were
obtained from TX DOT Hydraulic Manual (Bridge Division).
3. INFLOW HYDROGRAPHS
Calculations for this section were made using Haestad Methods Quick Tr -55 V. 5.47.
3.1. QUALITY SUITES HOTEL
Inflow hydrographs for the multiple storms given in Exhibit 2, page 1, are shown in Exhibit 4 (7
pages). The estimated required storage from these hydrographs for the 100-yr frequency is 0.163 ac-
ft.
3.2. QUALITY OFFICE SUITES
Inflow hydrographs for the multiple storms given in Exhibit 2, page 2, are shown in Exhibit 5 (7
pages). The estimated required storage from these hydrographs for the 100-yr frequency is 0.151 ac-
ft .
4. DETENTION FACILITIES
All calculations in this section were made using Haestad Methods Pond -2, V. 5.21. The detention
volumes were calculated for Q25.
4. 1. QUALITY SUITES HOTEL
A detention area, as shown in Exhibit 1, is located in the rear parking lot. Exhibit 6 calculates the
available storage capacity of the designated pond area to be 0.14 ac-ft. Exhibit 7 (two pages)
estimates the ponding requirements at 0.2 ac-ft when the inflow hydrographs and the actual
topography of the pond are input.
The detention pond will drain through a grate inlet located in the center of the parking lot into a 38' -
long 12" RCP at 1.00% grade . This pipe constitutes the restricting weir for the pond. Exhibit 8 (Z:
pages) shows the characteristics of this weir. The grate inlet will consist of a 3'x3' box with a 2'x2'
heavy duty steel grate and is designed to allow a greater flow capacity than the 12" RCP and
therefore will not act as a restrictor, Exhibit 9. All construction details for this system are given in
Exhibit 1.
Exhibit 10 (4 pages) shows the routing computations for 2, 5, 10 and 25-yr storms. The results are as
-2 -
follows:
Storm
2-year
5-year
10 -yea r
25-yea r
Max . Outflow Allowed
6.00
7.30
8.19
9.36
Peak Outflow Attained
6.15
6.98
7.22
7.47
Max. Elevation
288 .87
289 .05
289.15
289.25
Runoff from through the 12" RCP restrictor will flow into a 30" RCP to be built at the downstream of
the 24"x36" CMP that brings Ponderosa Rd . runoff into this tract. Therefore this new 30" RCP will
carry at least 15.43+3.23 = 18 .66 cfs . Exhibit 11 shows the design characteristics of this pi pe that
can carry 31.20cfs at maximum flow . This pipe will transition into an open concrete rectangular box
culvert before it enters the west side of the Quality Office Suites project.
A pond spillway designed for the excess Q100 post development will be located at the northwest of
the hotel parking lot consisting of a 4 '-wide cu r b cut. See Exhibit 11-A. This spill way will convey up
to 15.20 cfs which is slightly greater than Q100 less the amount conveyed by the pond restrictor at
Q25 , that is 22.09 -7.47 = 14 .62. The overflow will go into the downstream concrete open culvert that
carri es all the flown to the north end of the property (see below).
4.2. QUALITY OFFICE SUITES
A detention area , as shown in Exhibit 1, is located in the rear parking lot. Exhibit 12 calculates the
available storage capacity of the designated pond area to be 0.14 ac -ft . Exhibit 13 (two pages)
estimates the ponding requirements at 0.1 ac-ft when the inflow hydrographs and the actual
topography of the pond are input.
The detention pond will drain through a curb cut weir located in the west curb of the rear parking lot.
Exhibit 14 (2 pages) shows the characteristics of this wei r . The 3. 75' curb cut will drain directly into
t~e open box culvert referred to above. All construction details for this system are given in Exhibit 1.
A spillway for flows exceeding Q25 is provided by the top of curb along the western edge of the
proposed driveway. This curb slopes to the open concrete culvert along almost its total length.
Exhibit 15 (4 pages) shows the routing computations for 2, 5, 10 and 25-yr storms . The results are as
follows:
Storm
2-year
5-year
10-yea r
25 -year
Max. Outflow Allowed
5.58
6.78
7.62
8.70
Peak Outflow Attained
5.66
6.55
7.12
7.85
Max . Elevation
285.14
285.20
285 .24
285.30
Runoff from through the 3.75' curb cut restrictor will flow into a 4.0 'x2 .0' rectangular concrete open
- 3 -
box culvert that is designed to carry all preceding upstream flows, including 8. 75' cfs from the
referenced adjoiner currently under development. Exhibit 16 shows the design characteristics of this
open culvert that can carry 66.80 cfs (15 .43+20 .53+22 .09+8.75 = 66 .80) reaching a water depth of
2.01 ', which is equal to the concreted edges of the culvert .
At the northwest end of the project this rectangular open culvert will transition into an 8' long, 12'
wide baffled section followed by a 20'x20' cement rubble riprap section to mitigate the impact of the
water flow. These sections will discharge into the existing offsite concrete triangular pilot channel.
shown in Exhibit 17.
7. CERTIFICATION
This report and design conform to the City of College Station Drainage Policy and Design Standards.
CHRISTIAN A. GALINDO , P.E. # 53425, R.P.L.S. # 4473
September 23, 2004
- 4 -
Job: 12-04
Date : 06-Jul-04
RUNOFF CALCULATIONS -RATIONAL METHOD
QUALITY SUITES HOTEL
COLLEGE STATION, TEXAS
(County: Brazos) Tc= 10.0 when the calculated value is less than 10.0
===== =========== ===== ===== ===== ====== ====== ====== ====== ====== ====== ====== ======= ====== ====== ====== ======
Sectior Soil
Type
A
Acres
c Veloc . Length
fps ft
Tc in min.
Cale . Used 2 yrs 5 yrs 10 yrs 25 yrs 50yrs 100yrs
Q
2 yrs
Q
5yrs
Q
10 yrs
Q Q
25 yrs 50yrs
Q
100yrs
==::;== =========== ===== ====== ====== ====== ====== ====== ====== ====== ======= ====== ====== ====== ======
Pre-development
Grass 2 .372 0.400 1 .30 550 7 .1 10.0 6 .327 7.693 8 .635 9.861 11 .148 11 .639 6 .00 7 .30 8 .19 9.36 10.58 11 .04
Total 6 .00 7 .30 8 .19 9 .36 10 .58 11 .04
Post-development
2 Commercial 2 .372 0 .800 3 .00 600 3.3 10.0 6.722 7.693 8 .635 9.861 11 .148 11 .639 12 .76 14 .60 16.38 18.71 21.15 22.09
Total 12 .76 14.60 16.38 18 .71 21 .15 22 .09
County : Constants for use in formula : l=b/(t+d)•e
Brazos 2-yr 5-yr 10-yr 25-yr 50-yr 100-yr
b 65 .000 76.000 80 .000 89 .000 98.000 96 .000
e 0 .806 0 .785 0 .763 0 .754 0 .745 0 .730
d 8 .000 8 .500 8 .500 8 .500 8 .500 8 .000
Job: 12-04
Date : 20-Jul-04
===== =========== =====
RUNOFF CALCULATIONS -RATIONAL METHOD
QUALITY OFFICE SUITES
COLLEGE STATION, TEXAS
(County: Brazos) Tc= 10.0 when the calculated value is less than 10.0
====== ====== ====== ====== ====== ====== ====== ======= ====== ====== ====== ======
Sectior Soil
Type
A
Acres
c Veloc . Length Tc in min . Q
2 yrs
Q
5yrs
Q Q Q Q
fps ft Cale . Used 2 yrs 5 yrs 10 yrs 25 yrs 50yrs 100yrs 10 yrs 25 yrs 50yrs 1 OOyrs
===·== =========== =====
Pre-development
Grass 2.205 0.400 1.00 490 8.2 10.0 6 .327 7.693 8 .635 9 .861 11 .148 11.639 5 .58 6 .78 7 .62 8.70 9 .83 10.27
Total 5 .58 6 .78 7.62 8 .70 9.83 10.27
Post-development
2 Commercial 2 .205 0 .800 3.00 580 3 .2 10.0 6 .722 7.693 8 .635 9 .861 11 .148 11 .639 11 .86 13.57 15 .23 17.39 19.66 20 .53
Total 11.86 13 .57 15.23 17.39 19 .66 20.53
County : Constants for use in formula: l=b/(t+d )•e
Brazos 2-yr 5-yr 10-yr 25-yr 50-yr 100-yr
b 65 .000 76.000 80 .000 89 .000 98 .000 96 .000
e 0 .806 0.785 0.763 0 .754 0 .745 0 .730
d 8 .000 8.500 8 .500 8 .500 8 .500 8 .000
Circular Channe l Analysis & Design
Solved with Manning 's Equ ati o n
Open Channel -Uniform flow
Worksheet Name: QUALITY SUITES HOTEL
Comment: CAPACITY OF EXISTING 26"X20 " CMP
Solve For Full Flow Capacity
Given Input Data:
Diameter ......... .
Slope ............ .
Manning's n ...... .
Discharge ........ .
Computed Results:
Full Flow Capacity .... .
Full Flow Depth ....... .
Velocity ......... .
Flow Area ........ .
Critical Depth ... .
Critical Slope ... .
Percent Full ..... .
Ful l Capacity .... .
QMAX @.94D ....... .
Froude Number .... .
2.00 ft
0.0137 ft /ft
0.024
14.34 cfs
14.34 cfs
2 .00 ft
4.5 7 fps
3.14 sf
1.36 ft
0 .0209 ft /ft
100.00 %
14.34 cfs
15.43 cfs
FULL
Open Channel Flow Module, Version 3.21 (c ) 1990
EXHIBIT 3
Haestad Methods, Inc. * 37 Brooks ide Rd * Waterbury, Ct 06708
EXHIBIT 4
Quick TR -55 Ver.5.47 S /N:
Executed: 13:06 :51 08-06-2004
F
L
0
w
c
f
MODIFIED RATIONAL METHOD
----Graphical Summary for Maximum Required Storage ----
First peak outflow point assumed to occur at Tc h ydrograph recession leg .
I
QUALITY SUITES HOTEL
**********************************************************************
* RETURN FREQUENCY: 2 yr
* 'C' Adjustment: 1.000
Allowable Outflow:
Re qui red Sto r age :
6.00 cfs *
0.087 ac-ft *
*--------------------------------------------------------------------*
* Peak Inflow: 10.71 cfs Inflow .HYD stored: 2IN .HYD *
**********************************************************************
Td = 13 minutes I Return Freq: 2 yr
/-------Approx. Duration for Max. Storage ------/ C adj.factor: 1.00
x
. I.
Tc =
I
Q
10.00
6.327
12.01
I
x x x x x x x ix
I
minutes
in /hr
cf s
I
I
I
I
I
I
I
Required Storage I
0.087 ac-ft J
I
x x x x x x x x x x
Are a (ac):
We ighted C:
Adjusted C:
2.37
0.80
0.80
Td= 13 minutes
I 5.646 in/hr
Q 10.71 cfs
x
s o o o o o o o o o o o o o o o o Q= 6.00 cfs
x o I. Ix (All ow .Outflow)
o I I
x 0 I NO T TO SCALE I x
I o I ============ I
I o I I x
'-----------------------1-----------------------------1------------
15 .00 minut es 17.40 minutes
Quick TR -55 Ver.5.47
Executed: 12:20:45
S /N:
08-06 -2 004
F
L
0
w
c
f
MODIFIED RATIONAL METHOD
----Graphical Summary for Maximum Required Storage ----
First peak outflow point assumed to occur at Tc hydrograph recession leg.
I
QUALITY SUI TES HOTEL
**********************************************************************
*
*
RETURN FREQUENCY: 5 yr
'C' Adjustment : 1.000
All owable Outflow:
Required Storage:
7.30 cfs
0.107 ac-ft
*
* *--------------------------------------------------------------------*
* Peak Inflow : 13.10 cfs Inflow .HYD stored: SIN .HYD *
**********************************************************************
Td = 13 minut es I Return Freq: 5 yr
!-------Approx . Duration for Max. Storage ------/ C adj.factor : 1.00
x
. I.
Tc=
I
Q
10.00
7 .693
14 .60
I
x x x x x x x ix
I
minutes
in /hr
cf s
I
I
I
I
I
I
I
Required Storage I
0.107 ac-ft I
I
x x x x x x x x x x
Area (ac):
Weighted C:
Adjusted C:
2.37
0.80
0 .80
Td= 13 minutes
I 6 .903 in/hr
Q 13.10 cfs
x
s o o o o o o o o o o o o o o o o Q= 7.30 cfs
x o I. Ix (Allow.Outflow)
o I I
x 0 I NO T TO SCALE I x
o I ============ I
I o I I x
'-----------------------1-----------------------------1 ------------
15 .00 minut es 17.43 minutes
Quick TR-55 Ver.5.47 S/N :
Executed: 12:20:45 08-06-2004
F
L
0
w
c
f
MODIFIED RATIONAL METHOD
----Graphical Summary for Maximum Required Storage ----
First peak outflow point assumed to occur at Tc hydrograph recession leg.
QUALITY SUITES HOTEL
**********************************************************************
*
*
RETURN FREQUENCY: 10 yr
'C' Adjustment: 1.000
. I
I
Allowable Outflow:
Required Storage:
8 .19 cfs
0 .121 ac-ft
*
*
*--------------------------------------------------------------------*
* Peak Inflow: 14.75 cfs Inflow .HYD stored: lOIN .HYD *
**********************************************************************
I
/-------
Td = 13 minutes I
Approx. Duration for Max. Storage ------/
Return Freq: 10 yr
C adj.factor: 1.00
1
I
I
I
I
x
. I.
Tc=
I
Q
10.00
8.635
16.39
I
x x x x x x xJx
I
minutes
in/hr
cf s
I
I
I
I
I
I
I
Required Storage J
0.121 ac-ft J
I
x x x x x x x x x x
Area (ac) :
Weighted C:
Adjusted C:
2.37
0.80
0.80
Td= 13 minutes
I 7.770 in/hr
Q 14.75 cfs
x
s o o o o o o o o o o o o o o o o Q= 8.19 cfs
x o J. Ix (Allow.Outflow)
o I I
x 0 I NOT TO SCALE I x
o I ============ I
I o I I x
'-----------------------1-----------------------------1------------
15.00 minutes 17.45 minutes
Quick TR-55 Ver.5.47 S/N:
Executed: 12:20:45 08-06-2004
MODIFIED RATIONAL METHOD
----Graphical Summary for Maximum Required Storage ----
First peak outflow point assumed to occur at Tc hydrograph recession leg.
QUALITY SUITES HOTEL
**********************************************************************
* RETURN FREQUENCY: 25 yr
* 'C' Adjustment: 1.000
Allowable Outflow: 9.36 cfs *
Required Storage : 0.138 ac-ft *
*--------------------------------------------------------------------*
* Peak Inflow: 16.86 cfs Inflow .HYD stored: 25IN .HYD *
**********************************************************************
I Td = 13 minutes I Return Freq: 25 yr
/-------Approx. Duration for Max. Storage------/ C adj.factor: 1.00
I I
I I
I Tc= 10.00 minutes I
I I 9.861 in/hr I Area (ac): 2.37
I Q 18.71 cfs I Weighted C: 0.80
I -1· I Adjusted C: 0.80
F I I
L I I Required Storage I
0 I 0.138 ac-ft I Td= 13 minutes
W I I I I 8.885 in/hr
I xx xx xx xix xx xx x x xx xx Q 16.86 cfs
c I I
f J x x
s I o o o o o o o o o o o o o o o o Q= 9.36 cfs
I x o I. Ix (Allow.Outflow)
I o I I
I x 0 I NOT TO SCALE I x
I o I ============ I
I o I I x
~-----------------------1-----------------------------1------------
15.00 minutes 17 .45 minutes
Quick TR-55 Ver.5 .47 S /N:
Executed : 12:20:45 08-06-2004
F
L
0
w
c
f
MODIFIED RATIONAL METHOD
----Graphical Summary for Maximum Requi red Storage ----
First peak outflow point assumed to occur at Tc hydrograph recession leg.
QUALITY SUITES HOTEL
**********************************************************************
* RETURN FREQUENCY: 50 yr
* 'C' Adjustment : 1.000
Allowable Outflow:
Required Storage:
10.58 cfs *
0.156 ac-ft *
*--------------------------------------------------------------------*
* Peak Inflow: 19.08 cfs Inflow .HYD stored: 50IN .HYD *
**********************************************************************
I
/-------
Td = 13 minutes I
Approx . Duration for Max. Storage ------/
x
. I.
Tc=
I
Q
10.00
11 .148
21.15
I
x x x x x x xix
I
minut es
in /hr
cfs
I
I
I
I
I
I
I
Require d Storage I
0 .15 6 ac-ft I
I
x x x x x x x x x x
Return Freq: 50 yr
c adj.factor: 1.00
Area (ac):
Weighted C:
Adjusted C:
2.37
0.80
0.80
Td= 13 minutes
I 10.056 in/hr
Q 19.08 cfs
x
s o o o o o o o o o o o o o o o o Q= 10.58 cfs
x o I . Ix (Allow.Outflow)
o I I
x 0 I NO T TO SCALE I x
o I ============ I
o I I x
-----------------------1-----------------------------1------------
15.00 minutes 17.46 minutes
Quick TR-55 Ver.5.47 S/N:
Executed: 12:20:45 08-06-2004
F
L
0
w
c
f
MODIFIED RATIONAL METHOD
----Graphical Summary for Maximum Required Storage ----
First peak outflow point assumed to occur at Tc hydrograph recession leg.
I
QUALITY SUITES HOTEL
**********************************************************************
*
*
RETURN FREQUENCY: 100 yr
'C' Adjustment: 1 .000
Allowable Outflow:
Required Storage :
11.04 cfs
0.163 ac-ft
*
*
*--------------------------------------------------------------------*
* Peak Inflow: 19.91 cfs Inflow .HYD stored: lOOIN .HYD *
**********************************************************************
Td = 13 minutes I
/-------Approx. Duration for Max . Storage ------/
Return Freq: 100 yr
C adj .factor: 1.00
1
I
x
. /.
TC=
I
Q
10 .00
11. 639
22.09
I
x x x x x x x/x
I
minutes
in /hr
cfs
I
I
I
I
I
I
I
Required Storage /
0.163 ac-ft I
I
x x x x x x x x x x
Area (ac):
Weighted C:
Adjusted C:
2.37
0.80
0.80
Td= 13 minutes
I 10.495 in/hr
Q 19. 91 cfs
x
s o o o o o o o o o o o o o o o o Q= 11.04 cfs
x o I. /x (Allow.Outflow)
o I I
x 0 I NOT TO SCALE I x
o I ============ I
I o I I x
'-----------------------!-----------------------------/------------
15.00 minutes 17.46 minutes
Quick TR-55 Ver.5.47 S /N:
Executed: 12:20:45 08-06-2004
************************************************************************
************************************************************************
* *
* *
* MODIFIED RATIONAL METH OD *
* ----Grand Summary For All Sto rm Frequencies *
* *
* *
************************************************************************
************************************************************************
First peak outflow point assumed to occur at Tc hydrograph recession leg.
Area =
. . . . . . . . . ..... . . . . . . . . . . . . . . . .
QUALITY SUITES HOTEL
2.37 acres Tc = 10.00 minutes
. . . . . . . . ................................ . ...... . . . . . . . . . . . . . ................. .
VOLUMES
Frequency Adjusted Duration Intens . Qpeak Allowable I Inflow Storage
(years) 'C' minutes in/hr cfs cfs I lac-ft) (ac-ft)
------------------------------------------------------1---------------------
2
5
10
25
50
100
0.800 13
0 .800 13
0.800 13
0.800 13
0.800 13
0.800 13
5.646
6.903
7.770
8.885
10.056
10.495
10. 71
13 .10
14.75
16.86
19.08
19.91
6 .00
7.30
8.19
9.36
1 0 .58
11. 04
1
I
I
I
I
I
0.192
0.235
0.264
0.302
0.342
0.357
0.087
0.107
0.121
0.138
0.156
0.163
EXHIBIT 5
Quick TR-55 Ver.5.47 S /N :
Executed: 16:44:03 08-09 -2004
F
L
0
w
c
f
MODIFIED RATIONAL METHOD
----Graphical Summary for Maximum Required Storage ----
First peak outflow point assumed to occur a t Tc hydrograph recession .leg.
I
QUALITY OFFICE SUITES
**********************************************************************
*
*
RETURN FREQUENCY: 2 yr
'C' Adjustment : 1.000
Allowable Outflow:
Required Storage:
5.58 cfs
0.081 ac-ft
*
*
*--------------------------------------------------------------------*
* Peak Inflow: 9.96 cfs Inflow .HYD stored: 2IN .HYD *
**********************************************************************
Td = 13 minutes I Return Freq: 2 yr
/-------Approx. Duration for Max. Storage ------/ C adj .factor : 1 .00
1
x
. I .
Tc=
I
Q
10.00
6 .327
11.16
I
x x x x x x xJx
I
minutes
in /h r
cf s
I
I
I
I
I
I
I
Required Storage I
0.081 ac-ft I
I
x x x x x x x x x x
Area (ac):
Weighted C:
Adjusted C:
2.20
0 .80
0.80
Td= 13 minutes
I 5.646 in/hr
Q 9.96 cfs
x
s o o o o o o o o o o o o o o o o Q= 5.58 cfs
x o I . Ix (Allow.Outflow)
o I I
x 0 I NOT TO SCALE I x
o I ============ I
o I I x
-----------------------1-----------------------------1------------
15 .00 minutes 17.40 minutes
Quick TR-55 Ver.5.47
Executed: 16:10:27
S/N:
08-09-2004
MODIFIED RATIONAL METHOD
----Graphical Summary for Maximum Requ ired Storage ----
First peak outflow point assumed to occur at Tc hydrograph recession leg.
QUALITY OFFICE SUITES
**********************************************************************
* RETURN FREQUENCY: 5 yr
* 'C' Adjustment: 1.000
Allowable Outflow: 6.78 cfs *
Required Storage: 0 .099 ac-ft *
*--------------------------------------------------------------------*
* Peak Inflow: 12.18 cfs Inflow .HYD stored: SIN .HYD *
**********************************************************************
I Td = 13 minutes I Return Freq: 5 yr
/-------Approx. Duration for Max. Storage------/ C adj.factor: 1.00
I I
I I
I Tc= 10.00 minutes I
I I 7. 693 in/hr I Area (ac) : 2. 20
I Q 13.57 cfs I Weighted C: 0.80
I .1. I Adjusted C: 0.80
F I I
L I I Required Storage I
0 I 0.099 ac-ft I Td= 13 minutes
W I I I I 6.903 in/hr
I xx xx xx xix xx xx xx xx xx Q 12.18 cfs
c I I
f I x x
s I o o o o o o o o o o o o o o o o Q= 6.78 cfs
I x o I. Ix (Allow .Outflow)
I o I I
I x 0 I NOT TO SCALE I x
I o I ============ I
I o I I x
'-----------------------1-----------------------------1------------
15.00 minutes 17.43 minutes
Quick TR-55 Ver.5.47 S/N:
Executed: 16:10:27 08-09-2004
F
L
0
w
c
f
MODIFIED RATIONAL METHOD
----Graphical Summary for Maximum Required Storage ----
First peak outflow point assumed to occur at Tc hydrograph recession leg.
I
QUALITY OFFICE SUITES
**********************************************************************
*
*
RETURN FREQUENCY: 10 yr
'C' Adjustment: 1.000
Allowable Outflow:
Required Storage:
7.62 cfs
0.112 ac-ft
*
*
*--------------------------------------------------------------------*
* Peak Inflow: 13.71 cfs Inflow .HYD stored: lOIN .HYD *
**********************************************************************
Td = 13 minutes I Return Freq: 10 yr
/-------Approx. Duration for Max. Storage ------/ C adj.factor: 1.00
x
. I.
Tc=
I
Q
10 .00
8.635
15.23
I
x x x x x x xix
I
minutes
in/hr
cfs
I
I
I
I
I
I
I
Required Storage I
0.112 ac-ft I
I
x x x x x x x x x x
Area (ac):
Weighted C:
Adjusted C:
2.20
0.80
0.80
Td= 13 minutes
I 7.770 in/hr
Q 13.71 cfs
x
s o o o o o o o o o o o o o o o o Q= 7.62 cfs
x o I. Ix (Allow.Outflow)
o I I
x 0 I NOT TO SCALE I x
o I ============ I
I o I I x
'-----------------------1-----------------------------1------------
15.00 minutes 17.44 minutes
Quick TR-55 Ver.5.47 S/N:
Executed: 16:10:27 08-09-2004
F
L
0
w
c
f
MODIFIED RATIONAL METHOD
----Graphical Summary for Maximum Required Storage ----
First peak outflow point assumed to occur at Tc hydrograph recession leg.
I
QUALITY OFFICE SUITES
**********************************************************************
*
*
RETURN FREQUENCY: 25 yr
'C' Adjustment: 1.000
Allowable Outflow:
Required Storage:
8.70 cfs
0.128 ac-ft
*
*
*--------------------------------------------------------------------*
* Peak Inflow: 15.67 cfs Inflow .HYD stored: 25IN .HYD *
**********************************************************************
Td = 13 minutes I Return Freq: 25 yr
/-------Approx. Duration for Max. Storage ------/ C adj.factor: 1.00
Tc= 10 .00
I 9.861
Q 17.39
. I
I
x x x x x x xjx
I
x
minutes
in/hr
cfs
I
I
I
I
I
I
I
Required Storage I
0.128 ac-ft I
I
x x x x x x x x x x
Area (ac) :
Weighted C:
Adjusted C:
2.20
0.80
0.80
Td= 13 minutes
I 8.885 in/hr
Q 15.67 cfs
x
s o o o o o o o o o o o o o o o o Q= 8.70 cfs
x o jx (Allow.Outflow)
o I
x 0 NOT TO SCALE I x
I 0 I ============ I
I 0 I I x
------------------------!-----------------------------!------------
15.00 minutes 17.45 minutes
Quick TR-SS Ver.S.47 S /N:
Executed : 16:10 :27 08-09-2004
MODIFIED RATIONAL METHOD
----Graphical Summary for Maximum Required Storage ----
First peak outflow point assumed to occur at Tc h ydrograph recession leg .
QUALITY OFFICE SUITES
**********************************************************************
* RETURN FREQUENCY: SO yr
* 'C' Adjustment: 1.000
Allowable Ou tflow : 9.83 cfs *
Required Storage: 0.14S ac-ft *
*--------------------------------------------------------------------*
* Peak Inflow: 17.74 cfs Inflow .HYD stored : SOIN .HYD *
**********************************************************************
I Td = 13 minutes I Return Freq : SO yr
/-------Approx. Duration for Max. Storage------/ C adj.factor : 1.00
I I
I I
I Tc= 10 .00 minut es I
J I 11.148 in /hr I Area (ac) : 2. 20
J Q 19.67 cfs I Weighted C: 0.80
I .1. I Adjusted C: 0.80
F I I
L I J Required Storage I
0 J 0.14S ac-ft I Td= 13 minutes
W I I I I 10.0S6 in/hr
J xx xx xx xix xx x x xx xx xx Q 17.74 cfs
c I I
f I x x
s I o o o o o o o o o o o o o o o o Q= 9.83 cfs
I x o I. Ix (Allow.Outflow)
I o I I
I x 0 I NOT TO SCALE I x
I 0 I ============ I
I o I I x
'-----------------------1-----------------------------1------------
lS .00 minutes 17.46 minutes
Quick TR-55 Ver.5.47 S/N:
Executed: 16:10:27 08-09-2004
MODIFIED RATIONAL METHOD
----Graphical Summary for Maximum Required Storage ----
First peak outflow point assumed to occur at Tc hydrograph recession leg.
QUALITY OFFICE SUITES
**********************************************************************
* RETURN FREQUENCY: 100 yr
* 'C' Adjustment: 1.000
Allowable Outflow:
Required Storage:
10.27 cfs *
0.151 ac-ft *
*--------------------------------------------------------------------*
* Peak Inflow: 18.51 cfs Inflow .HYD stored: lOOIN .HYD *
**********************************************************************
I Td = 13 minutes I Return Freq: 100 yr
/-------Approx. Duration for Max. Storage------/ C adj.factor: 1.00
I I
I I I Tc= 10.00 minutes I
I I 11.639 in/hr I Area (ac): 2.20
I Q 20.53 cfs I Weighted C: 0.80
I -1· I Adjusted C: 0.80
F I I
L I Required Storage I
0 I 0.151 ac-ft I Td= 13 minutes
W I I I I 10.495 in/hr
I xx xx xx xix xx xx xx xx xx Q 18.51 cfs
c I I
f I x x
s I o o o o o o o o o o o o o o o o Q= 10.27 cfs
I x o I. Ix (Allow.Outflow)
I o I I
I x 0 I NOT TO SCALE I x
I 0 I ============ I
I o I I x
'-----------------------1-----------------------------1------------
15.00 minutes 17.45 minutes
Quick TR-55 Ver.5.47 S /N:
Executed: 16 :10:27 08-09-2004
************************************************************************
************************************************************************
* *
* *
* MODIFIED RATIONAL MET HOD *
*
*
----Grand Summary For All Storm Frequencies *
*
* *
************************************************************************
************************************************************************
First peak outflow point assumed to occur at Tc hydrograph recession leg .
Area = . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
QUALITY OFFICE SUITES
2.20 acres
. . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Tc = 10.00 minutes
................ . ................... .
VOLUMES
Frequency Adjusted Duration Intens . Qpeak Allowable I Inflow Storage
(years) 'C' minutes in/hr cfs cfs I (ac-ft) (ac-ft)
------------------------------------------------------1---------------------
2
5
10
25
50
100
0.800
0.800
0.800
0.800
0 .800
0.800
13
13
13
13
13
13
5.646
6.903
7.770
8.885
10.056
10.495
9 .96
12.18
13.71
15.67
17.74
18 .51
5.58
6.78
7.6 2
8.70
9.83
10.27
1
I
I
I
I
I
0.178
0.218
0.245
0.281
0 .318
0.331
0 .079
0 .099
0.112
0.128
0.145
0 .151
POND-2 Version : 5.21
S/N:
QUALITY SUITES HOTEL
CALCULATED 09-23-2004 11:13:03
DIS K FILE: c:\l data \data2004\12-04\pond-h\12-04 .VOL
Planimeter scale: 1 inch 1 ft.
*
EXHIBIT 6
Elevation
(ft)
Planimeter
(sq. in.)
Area
(acres)
Al+A2+sqr(Al*A2)
(a cres )
Volume
(acre-ft)
Volume Sum
(acre-ft)
286.40 9.00 0.00 0.00 0.00 0.00
288.50 9.00 0.00 0.00 0.00 0.00
288.70 3,000.00 0.07 0.07 0.00 0.01
288.90 10,000.00 0.23 0.42 0.03 0.03
289.30 13,500.00 0.31 0 .81 0 .11 0.14
* Incremental volume computed by the Conic Method for Reservoir Volumes.
Volume= (1/3) * (EL2-EL1) * (Areal+ Area2 +sq.rt. (Areal*Area2))
where: ELl, EL2
Areal,Area2
Volume
Lower and upper elevations of the increment
Areas computed for ELl, EL2, respectively
Incremental vo lume between ELl and EL2
POND-2 Versi o n : 5.21 S/N:
>>>>> OUTFLOW HYDROGRAPH ESTIMATOR <<<<<
Inflow Hydrograph: c:\ldata \data2004 \12-04\pond-h\25IN .HYD
Qpeak = 16.9 cfs
Estimated Outflow: c:\ldata \data2004 \12-04 \pond-h\ESTIMATE.E ST
Qpeak = 9.4 cfs
Approximate Storage Volume
(computed from t= 0.00 to 0.29 hrs)
0.2 acre-ft
EXHIBIT 7
POND-2 Version: 5.21 S/N:
Plotted: 09-23 -2004
.02
.03
.O S
.07
.08
.1
.12
.13
.15
.17
.18
.2
.22
.23
.25
.27
.28
.3
.32
.33
.35
.37
Flow (cfs)
0.0 2.0 4.0 6.0 8 .0 10 .0 12.0 14.0 16 .0 18 .0 20.0 22 .0
.------1-----1-----1-----1-----1-----1-----1-----1-----1-----1-----1 -
1
-I x *
I x
-I
I
-I
I
-I
I
-I
I
-I
I
-I
I
-I
I
-I
I
-I
TIME
(hrs)
x
x
x
*
*
*
x
x
x
x
*
*
*
*
x
x
x
x
x
x
x
x
x
x
x
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
x *
x *
x *
x *
x *
x *
x *
x *
x *
x *
x *
x *
x *
*
*
*
*
*
* File: c :\ldata\data2004\12-04\pond-h\2 5IN .HYD
x File: c:\ldata\data2004 \12-04\pond-h\ESTIMATE.EST
Qmax
Qmax
16.9 cfs
9 .4 cfs
Ou t l et Structure File: 12-04 .STR
POND-2 Version: 5.21
Da te Execu t ed:
S/N:
Time Executed:
********************
QUALITY SUITES HOTEL
********************
>>>>>> Structure No. 1 <<<<<<
(Input Data)
CULVERT-CR
Circular Culvert (With Inlet Control)
El elev. (ft)?
E2 elev . (ft) ?
Diam. (ft)?
Inv. el. (ft)?
Slope (ft/ft)?
Tl ratio?
T2 ra t io?
K Coeff.?
M Coeff.?
c Coeff.?
Y Coeff.?
Form 1 or 2?
Slope factor?
286.4
289.301
1. 00
286.4
.01
.534
.555
.0 1 96
.89
2
-0 .5
Out let Stru cture File: 12-04 .STR
Out flow Rat i ng Table for Structure #1
CUL VERT-CR Circular Culvert (With Inlet Control)
***** INLET CONTROL ASSUMED *****
E l e vation (f t ) Q (cfs) Computation Messages
---------------------------------------------
286.4 0 0.0 No headwater
287.1 0 0 .7 Equ.2: HW =.5
2 87 .6 0 2.4 Equ.2: HW =l. 0
288.10 4.4 Submerged: HW =1.5
288 .6 0 5.9 Submerged: HW =2.0
289.1 0 7.1 Submerged : HW =2.5
289.30 7.6 Submerged: HW =2.7
EXHIBIT 8
Used Uns ubmerged Equ. Form (2) for elev. less tha n 28 7 .6 7 ft
Used Subme r ge d Equ a t ion for elevations greater than 2 87 .8 ft
HW =Head wa t er (ft)
Transition flows interpolated from the following value s:
E l=28 7 .67 f t ; Ql=2 .75 cfs; E2=287.8 ft; Q2=3 .14 cf s
Outlet Structure File: 12-04
POND-2 Version: 5.21
Date Executed:
.STR
S/N:
Time Executed:
********************
QUALITY SUITES HOTEL
********************
***** COMPOSITE OUTFLOW SUMMARY ****
Elevation (ft) Q (cfs) Contributing Structures
--------------
286.40
287.10
287.60
288.10
288.60
289.10
289.30
-------
0.0
0.7
2.4
4.4
5.9
7.1
7.6
1
1
1
1
1
1
1
Outlet Structure File: 12-04 .STR
POND-2 Version: 5.21
Date Executed:
S/N :
Time Executed:
********************
QUALITY SUITES HOTEL
********************
Min. Elev. (ft) = 286.4 Max. Elev. (ft ) = 289.3 Iner. (ft)
Additional elevations (ft) to be incl uded in table:
* * * * * * * * * * * * * * * * * * * * * * * * * *
**********************************************
SYSTEM CONNECTIVITY
**********************************************
Structure No. Q Table Q Table
CULVERT-CR 1 -> 1
. 5
EXHIBIT 9
08/10/04 QUALITY SUITES HOTEL
GRATE INLET
Use Weir Equation : Q=An *C*(2*g*h)"1 /2
Q = discharge , cfs
L = grate length , ft
W = grate width , ft
At= gross grate inlet area , s.f.
An = grate net area , s.f . 50 .00% of gross
H = maximum possible height of water above grate at 0100, ft
c = 0 .7
L w At An H (2*g*h)"1/2 Q
INLET ft ft sq . ft . sq . ft. ft cf s
2.00 2.00 4.00 2.00 1.30 9.15 12.81 I
--------------------
EX HIBI T 10
POND-2 Version: 5 .21 S /N :
EXECUTED: 09-23-2004 12 :31:2 8 S TORM # 1
Page 1
Re turn Freq: 2 years
**************************
* * * QUALITY SUITES HOTEL *
* *
* *
* *
**************************
****************** SUMMARY OF ROUTING COMPUTATIONS ******************
Pond File:
Inflow Hydrograph:
Outflow Hydrograph :
c:\ldata\data2004 \12-04 \pond2-hr \12-04
c:\ldata\data 2 004 \12-04 \pond2-hr \2IN
c:\ldata \data20 0 4 \12-04 \p o nd2-hr \2 OUT
Starting Pond W.S . Elevation 28 6 .6 0 ft
.PND
.HYD
.HYD
***** Summary of Peak Outflow and Peak Elevation *****
Pond File:
Peak Inflow
Peak Outflow
Peak Elevation
1 0.71 cfs
6 .15 cfs
288 .8 7 ft
***** Summary of Approximate Peak Storage *****
Initial Storage
Peak Storage From Storm
Total Storage in Pond
0.00 ac-ft
0.05 ac-ft
0.05 ac-ft
STORM # 1 Return Freq:
Inflow Hydrograph:
c:\ldata \data2004 \12-04 \pond2-hr \12-04
c:\ldata\data2004 \12-04 \pond2-hr \2IN
c:\ldata\data2004 \12-04 \pond2-hr \2 OUT Outflow Hydrograph:
2 years
.PND
.HYD
.HYD
EXECUTED: 09-23-2004
Peak Inf l ow
Peak Outflow
Peak Elevation
10.71 cfs
6.15 cfs
288.87 ft
12:31:28
POND-2 Version: 5.21 S /N: Page 2
Return Freq: 5 years EXECUTED: 09-23-2004 11:0 9:34 STORM # 2
**************************
* *
* QUALITY SUITES HOTEL *
* *
* *
* *
* *
**************************
****************** SUMMARY OF ROUTING COMPUTATIONS ******************
Pond File:
Inflow Hydrograph:
Outflow Hydrograph:
c:\l data\data 2004\12-04 \pond-h\12-04
c:\ldata \data2004 \12-04 \pond-h\SIN
c:\ldata\data2004 \12 -04 \pond-h\5 OUT
.PND
.HYD
.HYD
Starting Pond W.S. Elevation 286.60 ft
***** Summary of Peak Outflow and Peak Elevation *****
Peak Inflow
Peak Outflow
Peak Elevati on
13.10 cfs
6.98 cfs
289.05 ft
***** Summary of Approximate Peak Storage *****
Pond File:
Initial Storage
Peak Storage From Storm
Total Storage in Pond
0.00 ac-ft
0.07 ac-ft
0.07 ac-ft
STORM # 2 Return Freq: 5 years
Inflow Hydrograph:
c:\ldata\data2004\12-04\pond-h\12-04 .PND
c:\ldata\data2004\12-04\pond-h\5IN .HYD
c:\ldata\data2004\12-04 \pond-h\5 OUT .HYD Outflow Hydrograph:
Peak Inflow
Peak Outflow
Peak Elevation
13.10 cfs
6.98 cfs
289.05 ft
EXECUTED: 09-23-2004
POND-2 Version : 5.21 S /N: Page 3
Return Freq: 10 years EXECUTED: 09-23-2004 11:09:34 STORM # 3
**************************
* *
* QUALITY SUITES HOTEL *
* *
* *
* *
* *
**************************
****************** SUMMARY OF ROUTING COMPUTATIONS ******************
Pond File:
Inflow Hydrograph:
Outflow Hydrograph:
c:\ldata \data2 004\12-04 \pond-h \12 -04
c:\ldata \data2004 \12-04 \pond-h\10IN
c :\ldata \data2004\12-04 \pond-h \10 OUT
.PND
.HYD
.HYD
Starting Pond W.S. Elevation 286.60 ft
***** Summary of Peak Outflow and Peak Elevation *****
Peak Inflow
Peak Outflow
Peak Elevation
14.75 cfs
7 .22 cfs
289 .15 ft
***** Summary of Approximate Peak Storage *****
Pond File:
Initial Storage
Peak Storage From Storm
Total Storage in Pond
0.00 ac-ft
0.10 ac-ft
0.10 ac-ft
STORM # 3 Return Freq : 10 years
Inflow Hydrograph:
c:\ldata \data2004\12-04 \pond-h\12-04 .PND
c:\ldata\data2004\12-04 \pond-h\10IN .HYD
c:\ldata\data2004\12-04 \pond-h\10 OUT .HYD Outflow Hydrograph:
Peak Inflow
Peak Outflow
Peak Elevation
14.75 cfs
7.22 cfs
289.15 ft
EXECUTED: 09-23-2004
POND-2 Version: 5.21 S/N : Page 4
Return Freq: 25 years EXECUTED: 09-23-2004 11 :09:34 STORM # 4
**************************
* *
* QUALITY SUITES HOTEL *
* *
* *
* *
* *
**************************
****************** SUMMARY OF ROUTING COMPUTATIONS ******************
Pond File:
Inflow Hydrograph:
Outflow Hydrograph:
c:\ldata\data2004 \12-04\pond-h\12-04
c:\ldata\data2004\12-04\pond-h\25IN
c:\ldata\data2 004 \12-04 \pond-h \25 OUT
.PND
.HYD
.HYD
Starting Pond W.S. Elevation 286.60 ft
***** Summary of Peak Outflow and Peak Ele v ation *****
Peak Inflow
Peak Outflow
Peak Elevation
16 .86 cfs
7 .47 cfs
289.25 ft
***** Summary of Approximate Peak Storage *****
Pond Fi l e:
Initial Storage
Peak Storage From Storm
Total Storage in Pond
0 .00 ac-ft
0.13 ac-ft
0.13 ac-ft
STORM # 4 Return Freq: 25 years
Inflow Hydrograph:
c:\ldata\data2004\12-04\pond-h\12-04 .PND
c:\ldata\data2004\12-04 \pond-h\25IN .HYD
c:\ldata\data2004\12-04 \pond-h\25 OUT .HYD Outfl o w Hydrograph :
Peak Inflow
Peak Outflow
Peak Elevation
16.86 cfs
7.47 cfs
289.25 ft
EXECUTED: 09-23-2004
Circular Channel Analysis & Design
Solved with Manning's Equation
Open Channel -Uniform flow
Worksheet Name: QUALITY SUITES HOTEL
Comment: FLOW IN 30" RCP
Solve For Actual Depth
Given Input Data:
Diameter ......... .
Slope ............ .
Manning's n ...... .
Discharge ........ .
Co mputed Results:
Depth ............ .
Velocity ......... .
Flow Area ........ .
Critical Depth ... .
Critical Slope ... .
Percent Full ..... .
Full Capacity .... .
QMAX @.94D ....... .
2 .50 ft
0.0050 ft /ft
0 .013
23.15 cfs
1.69 ft
6.56 fps
3 .53 sf
1.64 ft
0.0054 ft/ft
67.55 %
29.00 cfs
31.20 cfs
EXHIBIT 11
Froude Number .... . 0.94 (flow i s Subcritical)
Open Channel Flow Modul e , Version 3 .21 (c ) 1 99 0
Haestad Methods, Inc. * 37 Brookside Rd * Waterbury, Ct 06708
Rectangul ar Cha nnel Analysis & Design
Open Channel -Uniform flow
Worksheet Nam e: QUALITY SUITES HOTEL
Co mment: CURB CUT SPILLWAY
So lve For Discharge
Given Input Data:
Bottom Width .... .
Manning's n ..... .
Channel Slope ... .
Depth ........... .
Com pute d Results:
Discharge ....... .
Velocity ........ .
Flow Area ....... .
Flow Top Width .. .
Wetted Perimeter.
Critical Depth .. .
Critical Slope .. .
4.00 ft
0 .013
0 .0150 ft /ft
0 .50 ft
15.20 cfs
7.60 fps
2.00 sf
4 .00 ft
5 .00 ft
0 .7 7 ft
0.0042 ft/ft
EXHIBIT 11• A
Froude Number ... . 1.89 (flow is Supercritical)
Open Channel Flow Module, Version 3.21 (c) 1 990
Haestad Methods, Inc. * 37 Brooksi d e Rd * Waterbury, Ct 06708
EXHIBIT 12
POND-2 Version : 5 .21
S /N :
QUALITY OFFI CE SUITE S
CALCULATED 09-2 3-2 004 14 :04 :50
DISK FILE: C :\1DATA \DATA 2 0 04 \1 2 -0 4 \POND-OR \12 -04 .VOL
Planimeter scale : 1 i n ch 1 ft.
*
Elevation
(ft)
Planimeter
(sq . in .)
Area
(acres)
Al+A2+sqr(Al*A2)
(acr e s)
Volume
(acre-ft)
Volume Sum
(acre-ft)
284.50 0.00
284.90 5,400.00
2 85.30 23,300 .00
0 .00
0.1 2
0 .53
0.00
0 .1 2
0 .9 2
0.00
0.02
0.12
0.00
0.02
0.14
* Incremen tal vol um e computed by the Conic Me thod for Reservoir Volumes.
Volume = (1/3) * (EL2-EL1) * (Are al+ Area 2 +sq .rt. (Areal *Area2))
where: ELl, EL2
Areal,Area2
Volume
Lower and upper elevations of the increment
Areas computed for ELl, EL2, respective l y
Incremental volume between ELl and EL2
POND-2 Version: 5.21 S /N:
>>>>> OUTFLOW HYDROGRAPH ESTIMATOR <<<<<
Inflow Hydrograph: C:\1DATA \DATA2004\12-04 \POND-OR \25IN .HYD
Qpeak = 15.7 cfs
Estimated Outflow: C:\1DATA \DATA2004 \12-04 \POND-OR\ESTIMATE.EST
Qpeak = 8 .7 cfs
Approximate Storage Volume
(computed from t= 0.00 to 0.29 hrs)
0 .1 acre-ft
EXHIBIT 13
POND-2 Version : 5.21 S /N:
Plotted: 09-23-2004
Flow (cfs)
0.0 2.0 4.0 6 .0 8.0 10.0 12.0 14.0 16.0 18.0 20 .0 22.0
.------1-----1-----1-----1-----1-----1 -----1-----1-----1-----1-----1-
1
.02 -I x *
I x *
. 03 -I x *
I x *
. 05 -I x *
I x *
.01 -I x *
I x *
. 08 -I x *
I x *
.1 -I x *
I x *
.12 -I x *
I x *
.13 -I x *
.15
.17
.18
.2
.22
.23
.25
.27
.28
.3
.32
.33
.35
.37
TIME
(hrs)
*
*
*
*
x
x
x
x
x
x
x
x
*
*
*
x
x
x
x
x
x *
x *
x *
x *
x *
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
* File: C:\1DATA\DATA2004\12-04\POND-OR\25IN .HYD
x File: C:\1DATA\DATA2004\12-04\POND-OR\ESTIMATE.EST
Qmax
Qmax
15.7 cfs
8.7 cfs
Outlet Structure File: 12 -04 .STR
S /N: POND-2 Version: 5.21
Date Executed: Time Executed:
*********************
QUALITY OFFICE SUITES
*********************
>>>>>> Structure No. 1 <<<<<<
(Input Data)
WEIR-VR
Weir -Vertical Rectangular
El elev. (ft)?
E2 elev. (ft)?
Weir coefficient?
Weir elev. (ft)?
Length (ft)?
Contracted/Suppressed
Outlet Structure File: 12-04 .STR
284.5
285.301
3.087
284.5
3.75
(C/S)? C
POND-2 Version : 5.21
Date Executed:
S/N:
Time Executed:
*********************
QUALITY OFFICE SUITES
*********************
Outflow Rating Table for Structure #1
WEIR-VR Weir -Vertical Rectangular
***** INLET CONTROL ASSUMED *****
Elevation (ft) Q (cfs) Comp ut ation Messages
---------------------------------------------
284 .50 0.0 H =0.0
284.70 1.0 H =.2
284.90 2.9 H =.4
285.10 5.2 H =.6
285.30 7.9 H =.8
C = 3 .087 L (ft) = 3.75
H (ft) Table elev. -Invert elev . ( 284. 5 ft )
Q (cfs) = C * (L-.2 H) * (H**l.5) --Contracted Weir
EXHIBIT 14
Outlet Structure File : 12-04 .STR
POND-2 Version: 5 .21
Date Executed:
S /N :
Time Ex e c uted:
*********************
QUALITY OFFICE SUITE S
*********************
***** COMPOSITE OUTFL OW SUMMAR Y ****
Elevation (ft)
284 .50
284.70
284.90
285.10
285.30
Q (cfs)
0.0
1.0
2.9
5.2
7.9
Contributing Structures
1
1
1
1
1
Outlet Structure File: 12-04 .STR
POND-2 Version : 5.21
Date Executed:
S /N:
Time Ex ecuted:
Outlet Structure File :
Planimeter Input File :
·Rating Table Output File:
*********************
QUALITY OFFICE SUITES
*********************
C:\1DATA \DATA2004\12-04\POND-OR\12-04
C:\1DATA \DATA2004 \12-04 \POND-OR\12-04
C:\1DATA \DATA2004 \12-0 4 \POND-OR\12-04
.STR
.VOL
.PND
Min. Elev. (ft) = 284.5 Max. Elev. (ft) = 285.3 Iner. (ft)
Additional elevations (ft) to be included in table:
* * * * * * * * * * * * * * * * * * * * * * * * * *
**********************************************
SYSTEM CONNECTIVITY
**********************************************
Structure No . Q Table Q Table
WEIR-VR 1 -> 1
Outflow rating table summary was stored in file:
C:\1DATA\DATA2004 \12-04\POND-OR\12 -04 .PND
. 2
EXHIBIT 1 5
POND-2 Version: 5.21 S/N:
EXECUTED: 09-23-2004 14:11:31 STORM # 1
Page 1
Return Freq: 2 years
***************************
* *
* QUALITY OFFICE SUITES *
* *
* *
* *
* *
***************************
****************** SUMMARY OF ROUTING COMPUTATIONS ******************
Pond Fil e:
Inflow Hydrograph:
Outflow Hydrograph:
C:\1DATA\DATA2004\12-04\POND2-0R\12-04
C:\1DATA\DATA2004\12-04\POND2-0R\2IN
C:\1DATA\DATA2004\12-04 \POND2-0R\2 OUT
.PND
.HYD
.HYD
Starting Pond W.S. Elevation 284.50 ft
***** Summary of Peak Outflow and Peak Elevation *****
Peak Inflow
Peak Outflow
Peak Elevation
9 .96 cfs
5.66 cfs
285 .14 ft
***** Summary of Approximate Peak Storage *****
Pond F ile:
Initial Storage
P eak Storage From Storm
Total Storage in Pond
0.00 ac-ft
0.07 ac-ft
0 .07 ac-ft
STORM # 1 Return Freq: 2 years
Infl ow Hydrograph:
C :\1DATA\DATA2004\12-04\POND2-0R\1 2-0 4 .PND
C:\1DATA\DATA2004\12-04\POND2-0R\2IN .HYD
C:\1DATA\DATA2004 \12-04\POND2 -0R\2 OUT .HYD Outf low Hydrograph:
Peak Inflow
Peak Outflow
Peak Elevat i on
9.96 cfs
5.66 cfs
285.14 ft
EXECUTED: 09-23-2 0 04
14:11:31
POND-2 Version: 5.21 S/N: Page 2
Return Freq: 5 years EXECUTED: 09-23 -2004 14:03:41 STORM # 2
***************************
* *
* QUALITY OFFICE SUITES *
* *
* *
* *
* *
***************************
****************** SUMMARY OF ROUTING COMPUTATIONS ******************
Pond File:
Inflow Hydrograph:
Outflow Hydrograph:
C:\1DATA\DATA2004\12-04\POND-OR\12-04
C:\1DATA\DATA2004\12-04\POND-OR\5IN
C:\1DATA\DATA2004 \12-04 \POND -OR \5 OUT
.PND
.HYD
.HYD
Starting Pond W.S . Elevation 284.50 ft
***** Summary of Peak Outflow and Peak Elevation *****
Peak Inflow
Peak Outflow
Peak Elevation
12.18 cfs
6.55 cfs
285.20 ft
***** Summary of Appr~ximate Peak Storage *****
Pond File:
Initial Storage
Peak Storage From Storm
Total Storage in Pond
0.00 ac-ft
0.10 ac-ft
0 .10 ac-ft
STORM # 2 Return Freq: 5 years
Inflow Hydrograph :
C:\1DATA\DATA2004\12-04\POND-OR\12-04 .PND
C:\1DATA\DATA2004\12 -04\POND-OR\5IN .HYD
C :\1DATA \DATA 2004\12-04 \POND-OR \5 OUT .HYD Outflow Hydrograph:
Peak Inflow
Peak Outflow
Peak Elevation
12.18 cfs
6.55 cfs
285.20 ft
EXECUTED: 09-23-2004
14:03:41
POND-2 Version: 5.21 S /N: Page 3
Return Freq: 10 ye ars EXECUTED: 09-23-2004 14:03:41 STORM # 3
***************************
* * * QUALITY OFFICE SUITES *
* *
* *
* *
* *
***************************
****************** SUMMARY OF ROUTING COMPUTATIONS ******************
Pond File :
Inflow Hydrograph:
Outflow Hydrograph:
C:\1DATA \DATA2004\12-04 \POND-OR\12-04
C :\1DATA\DATA2004\12-04 \POND-OR\10IN
C:\1DATA\DATA2004\12-04 \POND-OR\10 OUT
.PND
.HYD
.HYD
Starting Pond W.S. Eleva tion 284 .50 ft
***** Summary of Peak Outflow and Peak Elevation *****
Peak Inflow
Peak Outflow
Peak Elevation
13.71 cfs
7.12 cfs
285.24 ft
***** Summary of Approximate Peak Storage *****
Pond File:
Initial Storage
Peak Storage From Storm
Total Storage in Pond
0.00 ac-ft
0.12 ac-ft
0.12 ac-ft
STORM # 3 Return Freq: 10 years
Inflow Hydrograph:
C:\1DATA\DATA2004\12-04\POND-OR\12-04 .PND
C:\1DATA\DATA2004\12-04\POND-OR\10IN .HYD
C:\1DATA\DATA2004\12-04 \POND-OR\10 OUT .HYD Outflow Hydrograph:
Peak Inflow
Peak Outflow
Peak Elevation
13 .71 cfs
7.12 cfs
285.24 ft
EXECUTED: 09-23-2004
14 :03:41
POND-2 Version: 5 .21 S/N: Page 4
Return Freq: 25 years EXECUTED: 09-23-2004 14:03:41 STORM # 4
***************************
* *
* QUALITY OFFICE SUITES *
* *
* *
* *
* *
***************************
****************** SUMMARY OF ROUTING COMPUTATIONS ******************
Pond File:
Inflow Hydrograph:
Outflow Hydrograph:
C:\1DATA\DATA2004\12-04 \POND-OR\12-04
C:\1DATA\DATA2004\12-04\POND-OR\25IN
C:\1DATA\DATA2004 \12-04 \POND-OR \25 OUT
.PND
.HYD
.HYD
Starting Pond W.S. Elevation 284.50 ft
***** Summary of Peak Outflow and Peak Elevation *****
Peak Inflow
Peak Outflow
Peak Elevation
15.67 cfs
7.85 cfs
285.30 ft
***** Summary of Approximate Peak Storage *****
Pond File:
Initial Storage
Peak Storage From Storm
Total Storage in Pond
0 .00 ac-ft
0.14 ac-ft
0 .14 ac-ft
STORM # 4 Return Freq: 25 years
C:\1DATA\DATA2004\12-04\POND-OR\12-04 .PND
Inflow Hydrograph: C:\1DATA\DATA2004\12-04\POND-OR\25IN .HYD
Outflow Hydrograph:
Peak Inflow
Peak Outflow
Peak Elevation
C:\1DATA\DATA2004\12-04\POND-OR\25 OUT .HYD
15.67 cfs
7.85 cfs
285.30 ft
EXECUTED: 09-23-2004
14:03:41
Rectangular Channel Analysis & Design
Ope n Channel -Uniform flow
Worksheet Name: QUALITY OFFICE SUITE
Comment: FLOW IN OPEN CONCRETE CULVERT
Solve For Depth
Given Input Data:
Bottom Width .... .
Manning's n ..... .
Channel Slope ... .
Discharge ....... .
Computed Results:
Depth ........... .
Velocity ........ .
Flow Area ....... .
Flow Top Width .. .
Wetted Perimeter.
Critical Depth .. .
Critical Slope .. .
Froude Number ... .
4.00 ft
0.013
0 .0053 ft/ft
66.80 c f s
2.01 ft
8.33 fps
8.02 sf
4 .00 ft
8 .01 ft
2 .05 ft
0.0050 ft/ft
1.04 (flow is Supercritical)
Open Channel Flow Module, Version 3 .21 (c) 1990
EXHIBIT 16
Haestad Methods, Inc . * 37 Brookside Rd * Waterbury, Ct 06708
,
Trapezoidal Channel Analysis & Design
Open Channel -Uniform flow
Worksheet Name: QUALITY OFFICE SUITE
Comment: FLOW IN OPEN RIP RAP CHANNEL
Solve For Depth
Given Input Data:
Bottom Width .....
Left Side Slope ..
Right Side Slope.
Manning's n ..... .
Channel Slope ... .
Discharge ....... .
Computed Results:
Depth ........... .
Velocity ........ .
Flow Area ....... .
Flow Top Width .. .
Wetted Perimeter.
Critical Depth .. .
Critical Slope .. .
Froude Number ... .
4.00 ft
2.00 :1 (H :V)
2 .00 :1 (H:V )
0 .0 3 0
0.0050 ft /ft
6 6 .80 cfs
2.03 ft
4.07 fps
16.41 sf
1 2 .1 4 ft
13.10 ft
1.57 ft
0.0140 ft/ft
0.6 2 (flow is Subcritical)
Open Channel Flow Module, Version 3.21 (c) 1990
EXHIBIT 17
Haestad Methods, Inc. * 37 Brookside Rd * Waterbury, Ct 06708
AUG-2 4 -0 4 TUE 11:05 GALINDO ENGINEERS 979 8 46 8868
GALINDO ENGINEERS AND PLANNERS, [NC.
3833 South Texas Ave., Suite 213 Bryan. Texas 77802 (979) 846 -8868
QUALITY SUITES HOTEL AND QUALITY OFFICE SUITES
.FJRC£L0li___t{ME1~ .~.S.lS
P.0 2
Water demand for the hotel is calculated on the basis of 150 gpd per capita. This demand applied to 81
double rooms, and a peaking factor of 3.5 results in a total demand of 85,050 gpd or approximately 59 gpm .
Water demand for the office building is calculated on the basis of 60 gpd per capita. Thts demand applied
to ten offices, 5 occupants per office, and a peaking factor of 3.5 results in a total demand of 10,500 gpd or
approximately 8 gpm .
2. FIREFLOW ANALYSIS
The ftre flow analysts for this water line used an assumed pressure value of 60 psi in the existing 6" water
line along Texas Ave. South. The analysis was made using the Hazen·Wi\\iams equation with a coefficient of
140.
The fire flow requirements were obtained from the 2000 International Fire Codes, Table 6105 .1:
Floor area 111 18,250 s.f,
Total floor area "' 54,750 s.f. (3 floors)
Fire flow for Type V-6 and 1 B construction :
6,250 gpm
Credit currently envisioned by City of College Station due to sprinkling the building is 50 %. Therefore the
required fire flow is 3, 125 gpm .
And the total max1mum demand at the end of a possible fire line is calculated as
31 125 + 59 + 8 ,. 3, 192 gpm
This demand divided by three , for each of three fire hydrants, ls 1 ,064 gpm per hydrant.
The flow characteristics at the proposed S.H. 6 South fire hydrant (FH-1) are
Q Length Elev Diam p v
Location gQffi fi fi 1n fil! w
FH·1 0 100 60.00
At hose 1,064 5 100 6 159.8~ 12.04
The flow characteristics into the building from proposed fire hydrant (FH -2.) at rear N.W. corner of hotel are
Q Length Elev Diam p v
Location ~ fi it in ~ ~
fH -2 0 100 60.00
At hose 1,064 290 100 6 l5o.s~ 12.07
Page 1
. AUG -2 4 -0 4 TUE 11:06 GALINDO ENGINEE RS 979 8 4 6 8 868
The flow characteristics at the existing Ponderosa fire hydrant (FH ·3) are
Locati on
FH·3
At hose 1,064
Length
tl
0
5
Elev
ft
100
100
Diam
!O
6
p
~
60
\59.841
P .03
v
fQ§
12.04
Thus under the conditions of this analysis the minimum residual pressure at the end of either line will be not
be less than the minimum acceptable of 20 psi.
Page 2
AUG -24-0 4 TUE 11:0 7 GALINDO ENGINEERS
Pressure Pipe Analysis & Des i gn
Circular Pipe
worksheet Name: QUALITY SUITES HOTEL
Comment: FH-1
Solve For Pressure ® 2
Given Input Data:
Elevation® 1 .... .
Pressure@ 1 ..... .
Elevation@ 2 .... .
Discharge ........ .
Diameter ......... .
Length ........... .
Hazen-Williams C ..
Computed Results:
Pressure@ 2 ..... .
Velocity ......... .
Headloss ......... .
100.00 ft
60.00 psi
100.00 ft
1064.00 $Pm
6.00 in
5.00 ft
140.00
59.84 psi
12.01 fps
0.36 ft
240.69 ft
240.32 ft
979 8 4 68868
Energy Grade@ 1 ..
Energy Grade@ 2 ..
Friction Slope .... 72.547 ft/1000 ft
Open Channel Flow Module, Version 3.21 (c} 1990
Haestad Methods, Inc. * 37 Brookside Rd * Waterbury, Ct 06708
P.04
AUG -24-0 4 TUE 11:0 7 GALINDO ENGINEER S
Pressure Pipe Analysis & Peaign
Circular Pipe
Worksheet Name: QUALITY SUITES HOTEL
Comment: Fl!-2
Solve For Pressure @ 2
Given Input Data:
Elevation® 1 .... .
Pressure@ 1 ..... .
Elevation® 2 .... .
Discharge ........ .
Diameter ......... .
Length~ .......... ..
Hazen-Williams C ..
Computed Results:
Pressure® 2 ..... .
Velocity ......... .
Headless ......... .
100.00 ft
60.00 psi
100 .00 ft
1064.00 gpm
6.00 in
290.00 ft
140.00
50.88 psi
12.07 fps
21.04 ft
240.69 ft
219.65 ft
979 8 4 68868
Energy Grade® 1 ..
Energy Grade@ 2 ..
Friction Slope .... 72.547 ft/1000 ft
Open Channel Flow Module, Version 3.21 (c) 1990
Haestad Methods, Inc. * 37 Brookside Rd * Waterbury, Ct 06708
P.05
AUG-24-04 TUE 11:07 GALINDO ENGINEERS
Pressure Pipe Analysis & Design
Circular l?ipe
Worksheet Name: QUALITY SUITES HOTEL
comment: FH-3
Solve For Pressure @ 2
Given Input Data:
Elevation@ 1 .... .
Pressure@ 1 ..... .
Elevation@ 2 .... .
Discharge ........ .
Diameter ......... .
Length ........... .
Hazen-Williams C ..
Computed Results:
Pressure@ 2 ..... .
Velocity ......... .
Headloss ......... .
100.00 ft
60.00 psi
100.00 ft
1064.00 gpm
6.00 in
5.00 ft
140.00
59 .84 psi
12.07 fps
0.36 ft
240.69 ft
240.32 ft
979 8468868
Energy Grade@ 1 ..
Energy Grade@ 2 ..
Friction Slope .... 72.547 ft/1000 ft
Open Channel Flow Module, Version 3.21 (c) 1990
Haestad Methods, Inc. * 37 Brookside Rd * Waterbury, Ct 06708
P.06
GALINDO ENGINEERS AND PLANNERS, !NC.
3833 South Texas Ave., Su ite 213 Bryan , Texas 77802 (979) 846-8868
1. TOTAL WATER
QUALITY SUITES HOTEL AND QUALITY OFFICE SUITES
FI RE FLOW WA TER ANA LYS IS
12-04
Water demand for the hotel is calculated on the basis of 150 gpd per capita. This demand applied to 81
double rooms, and a peaking factor of 3.5 results in a total demand of 85 ,050 gpd or approximately 59 gpm .
Water demand for the office building is calculated on the basis of 60 gpd per capita . This demand applied
to ten offices, 5 occupants per office , and a peak i ng factor of 3.5 results in a total demand of 10 ,500 gpd or
approximately 8 gpm .
2. FIREFLOW ANALYSIS
The fire flow analys i s for this water line used an assumed pressure value of 60 psi in the existing 6" water
line along Texas Ave. South. The analysis was made using the Hazen-Williams equation with a coefficient of
140.
The fire flow requirements wer e obtained from the 2000 International Fire Codes, Table B105.1:
Floor area = 18 , 250 s. f.
Total floo r area = 54, 750 s. f . (3 floors)
Fire flow for Type V-B and 1 B construction :
6 ,250 gpm
Credit cu r rently en v isioned by City of College Station due to sp ri nkling the building is 50 %. Therefore the
required fire flow is 3 , 125 gpm.
And the total maximum demand at the end of a possible fire line is calculated as
3, 125 + 59 + 8 = 3, 192 gpm
This demand divided by three, for each of three fire hydrants , is 1,064 gpm per hydrant.
The flow characteristics at the proposed S.H. 6 South fire hydrant (FH-1) are
Location
FH-1
At hose 1,064
Length
ll
0
5
Elev
ll
100
100
Diam
in
6
p
Qii
60.00
1 59 .8 ~
v
ID
12.04
The flow characteri stics into the building from proposed fire hydrant (FH -2 ) at rear N.W . corner of hotel are
Q Length Elev Diam p v
Location gQ!!! ft ll in Qii ID
FH -2 0 100 60.00
At hose 1,064 290 100 6 l5o.8 ij 12.07
Page 1
The flow characteristics at the existing Ponderosa fire hydrant (FH-3) are
Location
FH-3
At hose 1,064
Length
.li
0
5
Elev
.li
100
100
Diam
in
6
p
~
60
ls9.a~
v
lli
12 .04
Thus unde r the conditions of this analysis the minimum residual pressure at the end of either line will be not
be less than the minimum acceptable of 20 psi.
,._.,,,,,,~\\\~-,..
-_.,,. t. 0 F I '~ ~l -"'" ~ ~ . • •••••• .• f:...i.. f e,, --,r " ··· I.A ti.A : c, .-··· ···.:1t.r VIA
;*/ ... *" :I-kl \*~ '1'/~•t1t_••••O•••••••••••••oeeoee•••••••••111~ ~CHRISTIAN A. GAUNDOi
~·······:··~·0•············2···s······ .. ··:······~ ~"'° ... 534 /r...i6 .. , "P. ··.1> ~ •• • Q'-~ 11A 0A'.l'-· ... f91sr£.~~:-:··· ~<,.;,: if~ ,.S,s .... ..... ,Q>\: .,.,..
~--==--===---=~~~~~~~~~~~~~~----.J·ea, 10NAL ~~ _..:--
Christian A. Galindo, P.E. # 53425, R.P.L.S. # 4473 ~~~:i. ~<t:.' ~\, ........ .._ ............. August 11, 2004 ~""'""'
Page 2
GALINDO ENGINEERS AND PLANNERS, INC.
3833 South Texas Ave., Suite 213 Bryan, Texas 77802 (979) 846-8868
1. TOTAL WATER
QUALITY SUITES HOTEL AND QUALITY OFFICE SUITES
EIRE FLOW WATER ANALYSIS
12-04
Water demand for the hotel is calculated on the basis of 150 gpd per capita. This demand applied to 81
double rooms, and a peaking factor of 3.5 results in a total demand of 85,050 gpd or approximately 59 gpm.
Water demand for the office building is calculated on the basis of 60 gpd per capita. This demand applied
to ten offices, 5 occupants per office, and a peaking factor of 3.5 results in a total demand of 10,500 gpd or
approximately 8 gpm.
2. FIREFLOW ANALYSIS
The fire flow analysis for this water line used an assumed pressure va l ue of 60 psi in the existing 6" water
line along Texas Ave. South. The analysis was made using the Hazen-Willia.ms eq uation with a coefficient of
140.
The fire flow requirements were obtained from the 2000 International Fire Codes, Table B105.1:
Floor area = 18,250 s. f.
Total floor area = 54 , 750 s. f. (3 floors)
Fire flow for Type V-B and 1 B construction :
6,250 gpm
Credit currently envisioned by City of College Station due to sprinkling the building is 50%. Therefore the
required fire flow is 3, 125 gpm.
And the total maximum demand at the end of a possible fire line is calculated as
3,125 + 59 + 8 = 3,192 gpm
This demand divided by three, for each of three fire hydrants, is 1,064 gpm per hydrant .
The flow characteristics at the proposed S.H. 6 South fire hydrant (FH-1) are
Location
FH-1
At hose 1,064
Length
.tt
0
5
Elev
ft
100
100
Diam
in
6
p
!lli
60.00
159.8~
v
w
12.04
The flow characteristics into the building from proposed fire hydrant (FH-2) at rear N.W . corner of hotel are
Q Length Elev Diam p v
Location gQffi ft .tt in !lli w
FH-2 0 100 60.00
At hose 1,064 290 100 6 l5o.8~ 12.07
Page 1
The flow characteristics at the existing Ponderosa fire hydrant (FH-3) are
Location
FH-3
At hose
Q
gQ.!]}
1,064
Length
ft
0
5
Elev
ft
100
100
Diam
in
6
p
JIB
60
159.8~ 12.04
Thus under the conditions of this analysis the minimum residual pressure at the end of either line will be not
be less than the minimum acceptable of 20 psi.
..._,,,,,~\\\\\~· . ___ .... ~ t 0 F I }i~l .= '\ 't-............... '..+· ,,,
: Cj •• ••• * "·.:?u-l11.
;:*/ "-* ~ ~*:' ... *I!! it!~··········"····················: ...... ~ /J jl j j A fl ~CHRISTIAN A. GALINDO~ y~l-C4_,tz:;_ ... · ... · ,1 .. .xv:x!!!~~ t,;i;:.:::;;s3-;;·2s::7~1 ,~ ___.. II ~~:···.f}IST'l~ ... ·" ~'<; _: It S,s ............ \~"\ :· --""--===---""""---------------"ti ~ 10NAL t.'' .... -
Christian A. Galindo, P.E. # 53425, R.P.L.S. # 4473 t~:. ... ~ ... -~\\\'\'\''-""'" August 11, 2004
Page 2