HomeMy WebLinkAbout1 DP Edelweiss Gardens Ph 3 4 02-50DEVELOPMENT PERMIT
PERMIT NO. 02-50
Project: EDELWEISS GARTENS PH 3 & 4
FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA
RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE
SITE LEGAL DESCRIPTION:
EDELWEISS GARTENS PH 3 & 4
DATE OF ISSUE: 11/19/02
OWNER:
TYPE OF DEVELOPMENT:
SPECIAL CONDITIONS:
SITE ADDRESS:
OLDENBURG AT BRANDENBURG
DRAINAGE BASIN:
Lick Creek
VALID FOR 12 MONTHS
CONTRACTOR:
Full Development Permit
All construction must be in compliance with the approved construction plans
All trees must be barricaded, as shown on plans, prior to any construction. Any trees not barricaded will not
count towards landscaping points . Barricades must be 1' per caliper inch of the tree diameter.
EROSION CONTROL TO BE INSTALLED, INSPECTED AND TO REMAIN THROUGHOUT DEVELOPMENT
The Contractor shall take all necessary precautions to prevent silt and debris from leaving the immediate
construction site in accordance with the approved erosion control plan as well as the City of College Station
Drainage Policy and Design Criteria. If it is determined the prescribed erosion control measures are ineffective
to retain all sediment onsite, it is the contractors responsibility to implement measures that will meet City , State
and Federal requirements. The Owner and/or Contractor shall assure that all disturbed areas are sodden and
establishment of vegetation occurs prior to removal of any silt fencing or hay bales used for temporary erosion
control. The Owner and/or Contractor shall also insure that any disturbed vegetation be returned to its original
condition, placement and state. The Owner and/or Contractor shall be responsible for any damage to
adjacent properties , city streets or infrastructure due to heavy machinery and/or equipment as well as erosion ,
siltation or sedimentation resulting from the permitted work.
Any trees required to be protected by ordinance or as part of the landscape plan must be completely fenced
before any operations of this permit can begin.
In accordance with Chapter 13 of the Code of Ordinances of the City of College Station , measures shall be
taken to insure that debris from construction , erosion , and sedimentation shall not be deposited in city streets ,
or existing dra i nage facilities .
I hereby grant this permit for development of an area outside the special flood hazard area . All development
shall be in accordance with the plans and specifications submitted to and approved by the City Engineer in the
development permit application for the above named project and all of the codes and ordinances of the City of
College Station that apply.
Owner/Agent/Contractor Date
--~c
(;f> ' .1.
:• KENT I ..
'
Item
No .
I
2
3
4
5
6
7
8
9
10
II
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
E DELWEISS GARTENS, PHASE 3 & 4
Engineer's Estim ate
O ct ober 10, 200 2
Description Unit Quantity Estimated
Unit Price
Pavement Construction
Prepare Work Area Lump Sum I 5,000 .00
Roadway Excavation C.Y. 6,131 3.50
1.5" HMAC Surface Course S.Y. 8,896 4 .50
6" Lime Stabiliz.ed Subgrade S.Y. 11 ,065 3 .25
Extra Lime Ton 90 85 .00
6" Crushed Limestone Base S.Y. 8,896 6 .00
Curb and Gutter (all types ) L.F . 4,582 7 .30
Concrete Pavement (aprons) S.Y. 233 34 .00
4" Sidewalk S.F 8,708 2 .75
Paving Subtotal
Dra inage System Construction
18" Rein( Co ncrete Pipe, Str. Backfill L.F . 74 32 .00
18" Rein( Co ncrete Pipe, Non-Str . Backfill L.F . 137 30.00
21" Rein( Co ncrete Pipe, Str. Backfill L.F . 608 36 .00
21" Rein( Concrete Pipe, Non-Str . Backfill L.F . 263 33 .00
24" Rein( Concrete Pioe, Str. Backfill L.F. 36 38 .00
24" Rein( Concrete Pipe, Non-Str. Backfill L.F . 192 35 .00
27" Rein( Concrete Pipe, Str. Backfill L.F . 548 40.00
Standard IO' Inlet EAC H 2 3,100.00
Standard 5' Inlet EACH 12 2,300.00
Grate Inlet EAC H I 2,000.00
Standard Junction Box EAC H 2 2,000 .00
Sloped Headwall for 21" RCP EACH I 500.00
30 degree bend for 21" Rein( Concrete Pipe EAC H 1 500.00
Inlet Protection EAC H 15 30 .00
Silt Fence L.F . 1,945 2.00
Trench Safety (storm drain) L.F. 1,858 1.00
Drainage System Subtotal
Water System C onstruction
6" PVC, C900 Water Line, Str. Backfill L.F . 84 23 .00
6" PVC, C900 Water Line, Non-Str. Backfill L.F. 259 17 .00
8" PVC, C900 Water Line, Str. Backfill L.F . 113 26 .00
8" PVC, C900 Water Line, Non-Str. Backfill L.F 2,171 21.00
Fire Hydrant Assembly EACH 4 2,200.00
8" Gate Valve EACH 4 700.00
8"x 13" Anchor Coupling EACH 6 150 .00
8"x 8" Tee EACH I 275 .00
8"x 1.5" Tapped Tee EACH I 200.00
8"x I" Tapped Tee EACH I 200.00
8"x 22.5 degree Bend EACH 2 200 .00
8 "x 11 .2 5 degree Bend EACH 2 200.00
8" Cap EACH I 50.00
2" Blow-Off Assembly EACH 2 550.00
I" Type K Coooer Water Ser. (47 ft . avg . len!!th) EACH 5 900 .00
1.5" Type K Copper Water Ser . (52 ft. avg . length) EACH 17 1,000 .00
Trench Safetv (water) L.F . 2,62 7 1.00
Water System Subtotal
Sewer System Constru ction
6" PVC, D-3034, Str. Backfill L.F . 1,979 28 .00
6" PVC, D-3034 , Non-Str. Backfill L.F . 269 21.00
1 ~~~VC , D-2241, Non-Str . Backfill L.F . 20 23 .00
ard Manhole, 0-8' ft . deep EACH 7 1,600.00
,fj..,ro~ • Service> I 0 ft. ( 62 ft . avg . len!!th) EACH 5 1,000.00
~8 6_"\~:V. Service> 10 ft . ( 58 ft . avg . length) EACH 17 1,100 .00
• •n •~ _fetv (sewer) L.F . 2 248 1.00
. u~.-t Sewer System Subtotal
~ . \. 65~23 _ /Si! Total Con struction C ost
~ '}.~;,·~~
Total
5,000.00
21,458 .50
40,032.00
35,961.25
7,65 0 .00
53,376.00
33 ,448 .60
7,922.00
23,947.00
228 795 .35
2,368.00
4,110.00
21,888.00
8,679.00
1,368 .00
6,720.00
21,920.00
6 ,200 .00
27,600.00
2,000.00
4,000 .00
500.00
500.00
450 .00
3,890 .00
I 858 .00
114,051.00
1,932 .00
4,403 .00
2,938.00
45,591.00
8,800.00
2,800.00
900.00
275 .00
200.00
200.00
400 .00
400.00
50.00
1,100.00
4,500 .00
17 ,000 .00
2,627 .00
94 116 .00
55,412 .00
5,649.00
460 .00
11,200 .00
5,000.00
18,700 .00
2,248.00
98 669.00
SSJS,631.35
..
•
STAFF REVIEW COMMENTS NO. 1
Project: DP-EDELWEISS GARTENS , PH 3 & 4 (DP)-DEVELOPMENT PERMIT( 02-
00100050)
Engineering comments for construction associated with Edelweiss Gartens Subd ivision
Phase 3 and 4 F inal Plats.
ENGINEERING
1. Please remove Sheet 11 from plan set to be approved by the City or subm it TxDOT
Dr iveway Permit and legal instrument allowing access to adjoining property.
Rev iewed by: Spencer Thompson * Date: 10/18/02
NOTE : An y c hanges made to t he plans , t hat have not bee n re que sted by t he City of College St ation , mu st be expl ai ned in your
next tran smittal letter and "bubbl ed" on your plan s . Any addi tion al cha nges on these pl ans th at have not bee n poi nted ou t
to the City , will con stitute a co mple tely ne w review.
Staff Review Comments Pa ge 2 of 4
..
October 22, 2002
CITY ~c~CE~T;~<;?
DEVELOPMENT SERVICES
1101 Texas Avenue South, PO Box 9960
College Station, Texas 77842
Phone (979) 764-3570 I Fax (979) 764-3496
MEMORANDUM
TO : J. Stephen Arden, Edelweiss Gartens Venture , Via fax 846-0652
FROM : Bridgette George , Assistant Development Manager
SUBJECT: DP-EDELWEISS GARTENS, PH 3 & 4 (DP) -Development Permit
Staff reviewed the above-mentioned construction documents as requested. The
following page is a list of staff review comments detailing items that need to be
addressed. Please address the comments and submit the following information for
further staff review, approval and issuance of the development permit:
__ Three (3) copies of the revised construction plans .
If there are comments that you are not addressing with the revised construction
documents, please attach a letter explaining the details. If you have any questions or
need additional information, please call Spencer Thompson at 764-3570 .
Attachments: Staff review comments
cc: Michael McClure , McClure Engineering Inc ., Via fax 693-2554
Case file# ( 02-00100050)
Home ofTexasA&M University