Loading...
HomeMy WebLinkAbout8 Southwest Bus Center 03-80 12875 12905 Fm 2154•. 4:4-0 pnt Berry Engineering Company 1-9.3-0tf yyl(L January 23 , 2004 Ms . Carol Cotter L.A. Berry, P.E. 1811 Rose Street Bryan, Texas 77802 Telephone: (210) 884-0065 City Of College Station Development Services Department I I 0 I Texas Avenue South College Station , Texas 77842 RE: Southwest Business Center, Lots 7-8, Block Two, Edelweiss Business Center, College Station , Texas. Dear Ms. Cotter, f)3-]/ 5 ~ Attached herewith please find "blow-up" of the existing pill-box inlet and the area 1mmed1ately adjacent to same inlet box. The existing reinforced pilot channel as staked and ending on the ground at present will need to be extended approximately I 0 feet to a point at which the proposed G" curb with the 2 " leave -outs will be constructed. The proposed "curved " apron as depicted on Sheet "CI" of the Grading Plan will tie to same G" curb with flowline of proposed "curved " apron matching the flowline of the proposed upstream apron at elevation 325.00 . The "curved " apron will tie to the existing edges of the existing pill -box aprons. This connection to the existing pill-box apron 1s at elevation 325.00. There 1s a drop across the existing pill-box apron of I .00' and said pill-box inlet apron ties to same pill -box at inlet elevation of 324 .00. There 1s a natural ridge line near the south property line of Lot 8 which directs stormwater run-off from that same ridge line in a northerly and southerly d1rect1on respectively. This same ridge line currently rises to an elevation of 325.50 which left alone would allow a depth of flow near the pill -box inlet of six inches. This six inch depth should allow adequate capacity as to keep the discharge from "running past " the existing pill-box inlet. r' ' . - ,·, .... No attempt was made to validate the previously designed pill-box inlet or associated outlet discharge pipe. I hope you will find this letter and data contained within suitable for your review , consideration and subsequent approval , however, 1f you should require additional clarif1cat1on please advise me or "earl" Havel at your earliest convenience. Respectfully Submitted , ~-~ (l__f2 -L.A . ":lr'ry" Berry, P.E. Berry Engineering Co pany Cc: "earl " J .Woods M .Sm1th \ \ \ \ \ \ EX ISTING CONCRETE PILOT CHANNEL FL EXISTING PILOT CHANNEL=325.80 \ \ \ \ UI "J. \ \ \ \ \ -t 6" CURB WITH 2" LEAVE-OUTS \ 0 2'-2" o.c. \ PROPOSED CONCRETE APRON \ \ \ TIE PROPOSED APRON TO EXISTING INLET BOX APRON AS SHOWN / / / TOP APROM ELEV.=325.00 I EXISTING CONCRETE APRON I TIE EXISTING APRON TO EXISTING INLET BOX APRON AS SHOWN // / \ LIMITS OF EXISTIN,G 20' __LDAANAGE E>S?°1'NT FL EXISTING CONCRETE I APRON-325 .00 I -1 ~ I I I I I I EXISTING MASONRY WALL TOP PROPOSED APRON=325.00 N.G.325 .50~ FLow) I I I I <FLOW I FLow) NATURAL RIDGE LINE~/ TOP APROM ELEV.=325.0f-- TOP OF EXISTING "PILL-BOX" TYPE INLET BOX ELEV.=325.00 FL APRON IN=324.00 N.G.325.50 \Ftow FLow) N.G.325.50~ TOP APROM ELEV.-325.00 / / / \ TOP APROM / /~ ~ "\._EXISTING ', 8" ID CORRUGATED METAL DRAINAGE OUTLET PIPE I I I I I I L----l!--- ~--\+------------4.\_/_' ___ --.L. __ BA~CK OF EXISTING CURB DETAIL OF EXISTING INLET BOX SCALE: 1" = 5'-0" November 6, 2003 To Whom it Concerns: I have spoken with Mr. Woods and I am willing to work with him to resolve the issues pertaining to the common driveway access to Wellborn Rd. in conjunction with the City of College Station's approval. Sincerely, \ ~ John Fedora ~ 1 . d v1ss-svs-sl.s I 38l:l CITY OF COLLEGE STATION DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 College Station, Texas 77842 Phone 979 .764 .3570 I Fax 979.764 .3496 MEMORANDUM Octobe r 27 , 2003 TO : James H. Woods & Jeffrey McDowell , Via fax 846 .9133 V' FROM : Br idgette George , Assistant Development Manager SUBJECT: DP-SOUTHWEST BUSINESS CENTER -Development Permit Staff reviewed the above-mentioned construction documents as requested. The following page is a list of staff review comments detailing items that need to be addressed . Please address the comments and submit the following information for further staff review , approval and issuance of the development permit: __ One (1) copy of the revised construction plans . If there are comments that you are not addressing with the revised construction documents, please attach a letter explaining the details. If you have any questions or need additional information , please call Carol Cotter at 764.3570 . Attachments : Staff review comments cc: C. Barbu Architect , Via fax 775 .5642 J Case file# ( 03-00100080) H om e of Texas A&M Un i versi ty • STAFF REVIEW COMMENTS NO. 1 Project: DP-SOUTHWEST BUSINESS CENTER-DEVELOPMENT PERMIT( 03- 00100080) This review is for requirements for a Clearing and Grading Permit and does not constitute a complete review. ENGINEERING 1. There is an approved Site Plan for City Limits Restaurant on the southern adjacent property. The elevations of the approved drive do not match your proposed grade. Please adjust grading plan to accommodate . 2. Proposed grade along southern boundary does not match existing grade by as much as 4 feet in some places. Options for grade changes are a retaining wall or slope to grade at 3 to 1 maximum. Slope easement may be required if cannot fit entire slope on own property. 3. Add erosion control measures across TxDOT drainage ditch, downstream of the proposed driveway to prevent sediment transport from your property . Reviewed by: Carol Cotter Date : October 27, 2003 NOTE: Any changes made to the plans , that have not been requested by the City of College Station , must be expla ined in your next transmittal letter and "bubbled " on your plans . Any additional changes on these plans that have not been pointed out to the City , will constitute a completely new review . Staff Review Comments Page 2 of 4 u~ l .'DO ht FOR OFFICE USE ONLY P&Z CASE NO .: 03-c90. l DATE SUBMITTED :! 0-/6 -03 SITE PLAN APPLICATION (){) t\03-\(X)08D MINIMUM SUBMITTAL REQUIREMENTS __iL. Site plan application completed in full. v $200 .00 Application Fee. V $200 .00 Development Permit Application Fee. __ $600 .00 Public Infrastructure Inspection Fee if applicable . (This fee is payable if construction of a public waterline , sewerline , sidewalk , street or drainage facilities is in volved .) --1L:::_ Ten (10) folded copies of site plan and landscape plan . __ One (1) copy of building elevation required for buildings with a footprint of 20 ,000 sq . ft. or greater __ A list of building materials for all facades that are visible from the public right-of-way . __ A copy of the attached site plan checklist with all items checked off or a brief explanation as to why they are not checked off. __ Parkland Dedication requirement approved by the Parks & Recreation Board, please provide proof of approval (if applicable). Date of Preapplication Conference: _______________________ _ NAME OF PROJECT Southwest Business Center I.ors 7 & 8 Wellborn Rd. -------------------------------~ ADDRESS __ l_2_8_7_5_FH_2_1_5_4 __ 1_2_90_5_F._H_2_1_54 _____________________ ~ LEGAL DESCRIPTION I.ot 7 and I.ot 8, Block 2, Edelweiss Business Center APPLICANT/PROJECT MANAGER'S INFORMATION (Primary Contact for the Project): Name Souhtwood West Street Address __ 4_l_O_l_Te_x._a_s_A_v_e_. _Su_i_t_e_B ______ _ City Bryan State TX Zip Code _7_7_80_2 ___ _ E-Mail Address ------------- Phone Number _9_7_9_-_69_3_-_1_6_1_7 _____ _ Fax Number 979-846-9133 PROPERTY OWNER 'S INFORMATION : Name James H. Woods and Jeffrey McDowell Street Address __ 2_1_1_4_S_o_uh_t_woo __ d_D_r_. ________ _ City College Station State _T_x ____ Zip Code __ 7_7_84_0 __ _ E-Mail Address jhwgc@cox-internet.com Phone Number 979-693-1617 Fax Number 979-846-9133 ARCHITECT OR ENGINEER 'S INFORMATION : Name C. Barbu Architect Street Address __ 2_1_0_B_N_._H._a_in ___________ _ City Bryan State --'T=X~--Zip Code -~7~78~0~3 __ _ Phone Number ___ 9_7_9-_7_7_5_-_5_5_4_0 ___ _ 6/13 /03 E-Mail Address ------------- Fax Number 979-775-5642 I o f 6 OTHER CONTACTS (Please specify type of contact, i.e . project manager, potential buyer, local contact , etc .) Name ---------------------------------- Street Address ------------------C ity ----------- State _____ Zip Code _____ _ E-Mail Address ------------~ Phone Numbe r __________ _ Fax Number -------------- PRESENTUSEOFPROPERTY __ Em--=-~-~Y;:__ ____________________ ~ PROPOSED USE OF PROPERTY Buildings -------------------------- VARIANCE(S) REQUESTED AND REASON(S) ------------------- # OF PARKING SPACES REQUIRED __ 1_0_4 _ #OF PARKING SPACES PROVIDED 1 04 MUL Tl-FAMILY RESIDENTIAL PARKLAND DEDICATION Total Acreage ____ _ # of Multi-Family Dwelling Units Floodplain Acreage __ _ ---x $452 = $ -------- Housing Units ____ _ ___ # of acres in floodplain # of 1 Bedroom Units # of acres in detention ------ #of 2 Bedroom Un its ---___ # of acres in greenways # of 3 Bedroom Units ---___ date dedication approved by Parks Board # of 4 Bedroom Units COMMERCIAL --- FOR 2 BEDROOM UNITS ONLY Total Acreage _2_·_42_7 ____ _ 2400 ___ # Bedrooms = 132 sq . ft. Building Square Feet 11,300 and 7 ,500 ___ #Bedrooms < 132 sq . ft. Floodplain Acreage _____ _ NOTE: Parkland Dedication fee is due prior to the issuance of a Building Permit. The applicant has prepared this application and certifies that the facts stated herein and exhibits attached ~ 1_e___,_/_g_(i,__o_~--------~ Date 6/13/03 2 of 6 el' 1 . ff" 2 . 3 . 0 0 0 0 0 5. ;;6 7 . 0 0 0 0 0 0 0 0 0 j 8 . 0 0 0 0 0 6/13/03 SUBMIT APPLICATION AND THIS LIST CHECKED OFF WITH 10 FOLDED COPIES OF SITE PLAN FOR REVIEW SITE PLAN MINIMUM REQUIREMENTS (ALL CITY ORDINANCES MUST BE MET) INCLUDING BUT NOT LIMITED TO THE FOLLOWING: Sheet size -24 " x 36 " (minimum). A key map (not necessarily to scale). T itle block to include : Name, address, location, and legal description Name , address , and telephone number of applicant Name, address , and telephone number of developer/owner (if differs from applicant) Name, address , and telephone number of architect/engineer (if differs from applicant) Date of submittal Total site area North arrow. Scale shou ld be largest standard engineering scale possible on sheet. Ownersh ip and current zoning of parcel and all abutting parcels . Existing locations of the followi ng on or adjacent t o the subj ect site : Streets and sidewalks (R.O .W .). Driveways (opposite and adjacent per Section 7 .3 of the Un ifi ed Development Ordinance). Buildings . Water courses. Show all easements clearly designating as existing and type (utility, access , etc.). 100 yr. floodplain and floodway (if applicable) on or adjacent to the proposed proj ect s ite , note if there is none on the site. Utilities (noting size and designate as existing) within or adjacent to the proposed site , including building transformer locations , above ground and underground service connections to buildings , and drainage inlets . Meter locations . Topography (2' max or spot elevations) and other pertinent drainage information. (If plan has t oo much in formation , show drainage on separate sheet.) Proposed location, type and dimensions of the following .: Phasing . Each phase must be able to stand alone to meet ordinance requirements. The gross square footage of all buildings and structures and the proposed use of each . If different uses are to be located in a s ingle build in g , show the location and size of the uses within the building . Building separation is a minimum of 15 feet w/o additional fire protect ion . Setbacks . Show build ing setbacks as outlined in the Unified Development Ord in ance , Article 5 . Off-Street parking areas w ith parking spaces drawn , tabulated, and d i mensioned . Min imum parking space is 9 ' x 20 ', or on a perimeter row 9 ' x 18' with a 2' overhang . Designate number of parking spaces requ ired by ordinance and provided by proposal. Handicap parking spaces . 4 of 6 NOTE: ' 6 /13/03 0 Parking Islands . Raised landscape islands, (6" raised curb) a minimum of 180 sq . ft. are required at both ends of every parking row (greenspace area contiguous to the end island maybe applied toward the required 180 sq . ft.). Additionally, 180 sq. ft. of landscaping for every 15 interior parking spaces must be provided. All required islands must be landscaped or set with decorative pavers , or stamped dyed concrete or other decorative materials as approved . D Drives. Min imum drive aisle width . 0 Curb cuts . For each proposed curb cut (including driveways, streets, alleys , etc .) locate existing curb cuts on the same opposite side of the street to determine separation distances between existing and proposed curb cuts . Indicate driveway throat length as measured in the Unified Development Ordinance , Section 7 .3 Access Management and Circulation . 0 Security gates (show swing path and design specs with colors). D Sidewalks (both publ ic and private). Sidewalks are required at time of development if property has frontage on a street shown on the Sidewalk Master Plan or if the review staff determ ines the necess ity . 0 Medians. Show any and all traffic medians to be constructed on site . 0 A fifteen foot parking setback from R.O .W . to curb of parking lot is required . Pavement may encroach into this 15' setback by up to 7 contiguous parking spaces . A double parking island (360 square feet) must be provided between each group of seven spaces. In no case may the pavement be less than 6 ' from the property line . O Common open spaces sites 0 Loading docks D Detention ponds 0 Guardrails 0 Retaining walls 0 Sites for solid waste containers with screening. Locations of dumpsters are accessible but not visible from streets or residential areas . Gates are discouraged and visual screening is required . (Minimum 12 x 12 pad required.) 0 Show all easements clearly designating as proposed and type (utility , access, etc .). If dedicated by separate instrument list by volume and page . O Utilities (noting size and designate as proposed) within or adjacent to the proposed site , including building transformer locations, above ground and underground service connections to buildings . O Meter locations (must be located in public R.O .W. or public utility easement.). 0 Proposed grading (1' max for proposed or spot elevations) and other pertinent drainage information . (If plan has too much information, show drainage on separate sheet.) 0 Show proposed and existing fire hydrants . Fire hydrants must be located on the same side of a major street as a project , and shall be in a location approved by the City Engineer. Any structure in any zoning district other than R-1, R-1A , or R-2 must be within 300 feet of a fire hydrant as measured along a public street, highway or designated fire lane . 0 Show fire department connections. FDC 's should be within 150' of the fire hydrant. In no case shall they be any further than 300 ' apart , and they shall be accessible from the parking lot without being blocked by parked cars or a structure . 0 Show fire lanes. Fire lanes a minimum of 20 feet in width with a minimum height clearance of 14 feet must be established if any portion of the proposed structure is more than 150 feet from the curb line or pavement edge of a public street or highway. 9 . 10. Fire hydrants must be operable and accepted by the City, and drives must have an all weather surface as defined in the Zoning Ordinance Section 9 before a building permit can be issued . Will building be sprinkled? Yes 0 No~ If the decision to sprinkle is made after the site plan has been approved , then the plan must be resubmitted . Wheelstops may be required when cars overhang onto property not owned by the applicant or where there may be conflict with handicap accessible routes or above ground utilities , signs or other conflicts . 5 of 6 ~ I l. 12 . 0 0 0 0 0 0 0 0 0 14 . ~ 15 . 0 16 . 0 17 . 0 18 . ~· 19 . 0 20 . NOTE: 6/13/03 ::>t1 ow c u rb a nd pave m ent deta il. A ti " ra ised c u rb 1s requi red a ro und a ll ed g es of al l parts of al l paved areas without exception . (To include island , planting areas, access ways , dumpster locations , utility pads , etc.) No exception will be made for areas designated as "reserved for future parking ". Landscape plans as required in Section 7 .5 of the Unified Development Ordinance . The landscap ing plan can be shown on a separate sheet if too much information is on the o ri g i na l s it e plan . If requesting protected tree po ints, then those trees need to be shown appropri ately barricaded on the landscape plan . Attempt to reduce or el i minate plantings in easements . Include information on the plans such as : required po i nt calculations add itional streetscape points required. Streetscape compliance is requ i red on all streets . calculations for# of street trees required and proposed (proposed street t ree po ints will accrue toward tota l landscapi ng points .) proposed new plantings with points earned proposed locations of new plantings screening of parking lots , 50 % of all shrubs used for screen ing shall be evergreen . screening of dumpsters , concrete retaining walls , off street loading areas , util ity connection points , or other areas potentially visually offensive . existing landscaping to remain show existing trees to be barricaded and barricade plan. Protected points will only be awarded if barricades are up before the first development permit is issued . Buffer as required in Section 7 .6 of the Unified Development Ordinance . Show i rrigat ion system plan . (or provide note on how irrigation system requirement will be met prior to issuance of C O ) All plans must include irrigation systems for landscaping . Irr igation m eters are separate from the regular water systems for buildings and w ill be sized by city according t o irrigation demand submitted by applicant and must include backflow prevention protection . Is there any landscapi ng in TxDOT R.O .W .? If yes, then TxDOT permit must be submitted . Will there be any util it ies i n TxDOT R.O .W .? Yes 0 Yes 0 If yes , then TxDOT permit must be submitted . / Will there be access from a TxDOT R.O .W .? Yes ;(" If yes, then TxDOT permit must be submitted . to i--K.f J OH thl 5 No 'i 1 No ' No 0 The total number of multi-family buildings and units to be constructed on the proposed project site . fl/A- T he dens ity of dwell ing units per acre of the proposed project. /114 Provide a water and san itary sewer legend to include water demands (m inimum , max imum and average demands in gallons per m i nute ) and sewer loadings (maximum demands i n ga ll ons pe r day). Are there impact fees associated with th is development? Yes 0 No 0 S igns are to be permitted separately . 6 of 6 SUPPLEMENTAL DEVELOPMENT PERMIT INFORMATION Application is hereby made for the following development specific site/waterway alterations : ACKNOWLEDGMENTS: I, ----------------' design engineer/owner, hereby acknowledge or affirm that: The information and conclus ions conta ined in the above plans and supporting documents comply with the current requirements of the City of College Station , Texas City Code, Chapter 13 and its associated Drainage Policy and Design Standards . As a condition of approval of this permit application, I agree to construct the improvements proposed in th is application according to these documents and the requirements of Chapter 13 of the College Station City Code . Property Owner(s) Contractor CERTIFICATIONS: (for proposed alterations with in designated flood hazard areas .) A.I, certify that any nonresidential structure on or proposed to be on this site as part of this application is designated to prevent damage to the structure or its contents as a result of flooding from the 100 year storm . Engineer Date 8 . I, certify that the finished floor elevation of the lowest floor, including any basement, of any residential structure, proposed as part of this application is at or above the base flood elevation established in the latest Federal Insurance Administration Flood Hazard Study and maps, as amended . Eng ineer Date C. I, , certify that the alterations or development covered by this permit shall not diminish the flood-carrying capacity of the waterway adjoining or crossing this permitted site and that such alterations or development are consistent with requirements of the City of College Station City Code, Chapter 13 concerning encroachments of floodways and of floodway fringes. Engineer Date D. I, , do certify that the proposed alterations do not raise the level of the 100 year flood above elevation established in the latest Federal Insurance Administration Flood Hazard Study . Engineer Date Cond itions or comments as part of approval : -------------------------- In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities . All development shall be in accordance with the plans and specificat ions submitted to and approved by the City Eng inee r for the above named project. All of the applicable codes and ordinances of the C ity of College Station shall apply . 6/13/03 3 of 6 .... ~-~ DEVELOPMENT PERMIT PERMIT NO . 03-80A Project: Southwest Business Center 11 COLLlGl STATION FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE SITE LEGAL DESCRIPTION: Edelweiss Business Center Block 2 Lots 7 and 8 DATE OF ISSUE: 11/06/03 OWNER: Southwood West Group P.O. Box 10220 College Station, TX 77842 TYPE OF DEVELOPMENT: SPECIAL CONDITIONS: SITE ADDRESS: 12875 and 12905 FM 2154 DRAINAGE BASIN: Lick Creek VALID FOR 6 MONTHS CONTRACTOR: Clearing and Grading Permit All construction must be in compliance with the approved construction plans All trees required to be protected as part of the landscape plan must be completely barricaded in accordance with Section 7 .5.E., Landscape/Streetscape Plan Requirements of the City's Unified Development Ordinance, prior to any operations of this permit. The cleaning of equipment or materials within the drip line of any tree or group of trees that are protected and required to remain is strictly prohibited . The disposal of any waste material such as , but not limited to , paint, oil , solvents, asphalt, concrete , mortar, or other harmful liquids or materials within the drip line of any tree required to remain is also prohibited . Eros ion crontrol per approved plans must be in place for duration of the project. The Contractor shall take all necessary precautions to prevent silt and debris from leaving the immediate construction site in accordance with the approved erosion control plan as well as the City of College Station Drainage Policy and Design Cr iteria. If it is determined the prescribed erosion control measures are ineffective to retain all sediment onsite , it is the contractors responsibility to implement measures that will meet City, State and Federal requirements . The Owner and/or Contractor shall assure that all disturbed areas are sodden and establishment of vegetation occurs prior to removal of any silt fencing or hay bales used for temporary erosion control. The Owner and/or Contractor shall also insure that any disturbed vegetation be returned to its original condition , placement and state . The Owner and/or Contractor shall be responsible for any damage to adjacent properties, city streets or infrastructure due to heavy machinery and/or equipment as well as erosion , siltation or sedimentation resulting from the permitted work . In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that debris from construct ion , erosion , and sedimentat ion shall not be deposited in city streets , or existing drainage facilit ies . I hereby grant this permit for development of an area outside the special flood hazard area. All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer in the development permit appl ication for the above named project and all of the codes and ordinances of the City of College Station that apply. \\-v~-03_ Date I I I O\o I 0 3 Owner/Agent/Contractor Date DEVELOPMENT PERMIT PERMIT NO. 03-80B ~-~ Project: SOUTHWEST BUSINESS CENTER 11 COLLlC.l STATION FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA RE : CHAPTER 13 OF THE COLLEGE STATION CITY CODE SITE LEGAL DESCRIPTION: Edelweiss Business Center Block 2 Lots 7 and 8 DATE OF ISSUE: 02/23/04 OWNER: Southwood West Group P.O. Box 10220 College Station , TX 77842 TYPE OF DEVELOPMENT: SPECIAL CONDITIONS: SITE ADDRESS: 12875 and 12905 FM 2154 DRAINAGE BASIN: Lick Creek VALID FOR 9 MONTHS CONTRACTOR: Full Development Permit All construction must be in compliance with the approved construction plans Al l trees required to be protected as part of the landscape plan must be completely barricaded in accordance with Section 7.5 .E., Landscape/Streetscape Plan Requirements of the City's Unified Development Ordinance , prior to any operations of this permit. The cleaning of equipment or materials within the drip line of any tree or group of trees that are protected and required to remain is strictly prohibited . The disposal of any waste material such as , but not limited to , paint , oil , solvents , asphalt , concrete , mortar, or other harmful liquids or materials within the drip line of any tree required to remain is also prohibited . TCEQ PHASE II RULES IN EFFECT. The Contractor shall take all necessary precautions to prevent silt and debris from leaving the immediate construction site in accordance with the approved erosion control plan as well as the City of College Station Drainage Pol icy and Design Criteria . If it is determined the prescribed erosion control measures are ineffective to retain all sediment onsite , it is the contractors responsibility to implement measures that will meet City , State and Federal requirements . The Owner and/or Contractor shall assure that all disturbed areas are sodden and establishment of vegetation occurs prior to removal of any silt fencing or hay bales used for temporary erosion control. The Owner and/or Contractor shall also insure that any disturbed vegetation be returned to its original condition , placement and state . The Owner and/or Contractor shall be responsible for any damage to adjacent properties , city streets or infrastructure due to heavy machinery and/or equipment as well as erosion , siltation or sedimentation resulting from the permitted work . In accordance w ith Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that debris from construction , erosion , and sedimentation shall not be deposited in city streets , or exist ing drainage facilities . I hereby grant this permit for development of an area outside the special flood hazard area . All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer in the development permit application for the above named project and all of the codes and ordinances of the City of College Station that apply . Date