HomeMy WebLinkAbout44 Jack Dorthy Miller Park 05-10CI TY OF C OLLEGE STAT ION
Planning c7 Developmtnt &rvius
SITE LEGAL DESCRIPTION:
Jack and Dorothy Miller Park
DATE OF ISSUE: 3/24/5
OWNER:
City of College Station
1000 Krenek Tap Road
College Station , Tx 77840
TYPE OF DEVELOPMENT:
SPECIAL CONDITIONS:
DEVELOPMENT PERMIT
PERMIT NO. 5-10
FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA
RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE
SITE ADDRESS:
1600 Rock Prairie Drive
DRAINAGE BASIN:
Lick Creek
VALID FOR 18 MONTHS
CONTRACTOR:
Full Development Permit
All construction must be in compliance with the approved construction plans
All trees required to be protected as part of the landscape plan must be completely barricaded in accordance with Section
7.5.E ., Landscape/Streetscape Plan Requirements of the City's Unified Development Ordinance, prior to any operations of
this permit. The cleaning of equipment or materials within the drip line of any tree or group of trees that are protected and
required to remain is strictly prohibited . The disposal of any waste material such as , but not limited to , paint, oil , solvents ,
asphalt , concrete , mortar, or other harmful liquids or materials within the drip line of any tree required to remain is also
prohibited .
All construction should be in compliance with TPDES stormwater regulations .
The Contractor shall take all necessary precautions to prevent silt and debris from leaving the immediate construction site
in accordance with the approved erosion control plan as well as the City of College Station Drainage Policy and Design
Criteria. If it is determined the prescribed erosion control measures are ineffective to retain all sediment onsite, it is the
contractors responsibility to implement measures that will meet City , State and Federal requirements . The Owner and/or
Contractor shall assure that all disturbed areas are sodden and establishment of vegetation occurs prior to removal of any
silt fencing or hay bales used for temporary erosion control. The Owner and/or Contractor shall also insure that any
disturbed vegetation be returned to its original condition , placement and state. The Owner and/or Contractor shall be
responsible for any damage to adjacent properties, city streets or infrastructure due to heavy machinery and/or equipment
as well as erosion , siltation or sedimentation resulting from the permitted work .
In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure
that debris from construction, erosion , and sedimentation shall not be deposited in city streets , or existing drainage
facilities .
I hereby grant this permit for development of an area outside the special flood hazard area . All development shall be in
accordance with the plans and specifications submitted to and approved by the City Engineer in the development permit
application for the above named project and all of the codes and ordinances of the City of College Station that apply .
Date I
~S:/CJ S::
Date
CITY OF C OLLEG E STATION
P'4nn ing & DroekJpmmt Services
SITE LEGAL DESCRIPTION:
Jack and Dorothy Miller Park
DATE OF ISSUE: 3/24/5
OWNER:
City of College Station
1000 Krenek Tap Road
College Station , Tx 77840
TYPE OF DEVELOPMENT:
SPECIAL CONDITIONS:
DEVELOPMENT PERMIT
PERMIT NO. 5-10
FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA
RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE
SITE ADDRESS:
1600 Rock Prairie Drive
DRAINAGE BASIN:
Lick Creek
VALID FOR 18 MONTHS
CONTRACTOR:
Full Development Permit
All construction must be in compliance w ith the approved construction plans
All trees required to be protected as part of the landscape plan must be completely barricaded in accordance with Section
7.5.E., Landscape/Streetscape Plan Requirements of the City 's Unified Development Ordinance , prior to any operations of
this permit. The clean ing of equipment or materials within the drip line of any tree or group of trees that are protected and
required to remain is strictly prohibited . The disposal of any waste material such as , but not limited to , paint, oil , solvents ,
asphalt, concrete , mortar, or other harmful liquids or materials within the drip line of any tree required to remain is also
prohib ited .
All construction should be in compliance with TPDES stormwater regulations .
The Contractor shall take all necessary precautions to prevent silt and debris from leav ing the immediate construction site
in accordance w ith the approved erosion control plan as well as the C ity of College Station Drainage Policy and Design
Criteria. If it is determined the prescribed erosion control measures are ineffective to retain all sediment onsite, it is the
contractors responsibility to implement measures that will meet City , State and Federal requ irements . The Owner and/or
Contractor shall assure that all disturbed areas are sodden and establ ishment of vegetation occurs prior to removal of any
silt fencing or hay bales used for temporary erosion control. The Owner and/or Contractor shall also insure that any
disturbed vegetat ion be returned to its original condition , placement and state . The Owner and/or Contractor shall be
responsible for any damage to adjacent properties , city streets or infrastructure due to heavy machinery and/or equ ipment
as well as erosion , siltation or sedimentation result ing from the permitted work.
In accordance w ith Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure
that debris from construction , erosion , and sedimentation shall not be deposited in city streets , or exist ing drainage
facilities.
I hereby grant th is permit for development of an area outside the special flood hazard area . All development shall be in
acco rdance with the plans and specifications submitted to and approved by the C ity Engineer in the development permit
application for the above named project and all of the codes and ordinances of the City of College Station that apply .
Owner/Agent/Contractor Date
?
Date 3ulm1IUecJ 3 ·
CITY OF COLLEGE STATION
Plmwirljt & f.),;w(o~1>r~)1t Smiit:n
D
0
0
DEVELOPMENT PERMIT
MINIMUM SUBMITTAL REQUl~EMENTS
$200.00 development permit fee.
Drainage and eras ion control pl3n, with supporting Drainage Report two (2) copies each
Notice of Intent (N.0.1.) if disturbed area is greater than 5 acres
Date of *Required Preapplicatlon Conference: __________________ _
"'(Requlred for areas of special flood hazard)
LEGAL DESCRIPTION ----1.,,,_...........,..._-=~ ........ .....,."--'-'---+-J!..
APPLICANT'S INFORM
ACKNOWLEDGMENTS: ----1. __ ,design engin r/owner ereby acknowledge or affirm that:
The information and conclusione contained In the ;;ibove plans and surporting documents comply w it h the
current requirements of the City of College Station, Texas City Code, Chapter 13 and its associated Drainage
Policy an Design Standards.
6/13/03 1of2
7.0 /10 39'iiid ~35 1N3Wd013A3G 5808 %t>Et>9L5L5
As a condition of approval of this permit application, I agree to construct the improvements proposed in this
application ;;iccording to these documents ::ind the requirements of Chapter 13 of the College Station City Code
Contractor
CERTIFICATIONS:
A. I , __ , certify that any nonresidential structure on or proposed to be on this site as part of this
applicat ion IS designated lu µrevent damage to the struoture or its cont~nts as a result of flooding from
the 100-year storm .
Engine~r Date
B. I, __ , certify that the finished tloor elevation ot the lowe::;t nuo r , including any basem~nt, of 3ny
residential structure, proposed as part of this application is at or above the base flood elevatlon
established In the latA~t Federal Insurance Administration Flood Hazard Study and maps, as amended .
Engineer Date
~ 1, __ , certify that the alterations or development covered by this permit shall not diminish the flood-
carrying capacity of the waterway adjoining or crossing this permill1;:t.J site and that such alterations or
development are consistent with requirements of the City of College Station City Code, Chapter 13
concerning encroachm ts of fl oodways ~nd of floodw ays fringes .
Date
D. I. do certify that the proposed alterations do not raise the level of the 100 year flood above
elevation established in the latest Federal Insurance Administration Flood Hazard Study.
Engineer Date
Conditions or comments as part of approval: ------
In accorrl::ince with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be
taken to insure that debris from construction, erosion , and sedimentation shall not be deposited in city streets,
or existing drainage facilities. All development shall be in accordance with the plans and specifications
submitted to and i2ppruved by the City Cngineer for the obove named project. All of the applir.:::ible codes and
ordinances of the City of College Station shal I apply.
6/13/03 2 of2
~3 S 1 N3Wd013A3G 5808 95 t>Et>'.3L6 L6 66 :s0 S006/16/E0