Loading...
HomeMy WebLinkAbout40 Boomfit SPAM 14-186 14-186 3200 LongmireFOR OFFICE USE ONLY CASE NO .: \Y-1~v DATE SUBMI TTE D : Q Q / f Lj CITY OF Cou .EGE STATION Home ofTexflS A &M University • SITE PLAN APPLICATION GENERAL d-? r:::..,..-".J\A , ,, L MINJMUM SUBMITTAL REQUIR.ftJl.ENTS: ...-/ 'f'O~ •·"' vtO'f" ~l-r~p la.M. D..~"t'l ~ per :J::> LYJ ~Site Plan Application Fee . TIME: ~: 2-b STAFF:tJ D $350 Non-Res idential Arch itectural Standards I Northgate Building Review Application Fee (if applicable). [M ir $600 (minimum ) Development Permit Application I Public Infrastructure Review and Inspection Fee . Fee is 1 % of acceptable Engineer's Estimate for public infrastructure , $600 minimum (if fee is > $600 , the balance is due prior to the issuance of any plans or development permit). ~ Application completed in ful l. This application form provided by the City of College Station must be used ..:;.../ and may not be adjusted or altered . LJ Six (6) folded copies of site plan . (f;l/f.rr One (1) folded copy of the landscape plan .. D One (1) copy of the follow ing for Non-Residential Architectural Standards building review or Northgate Bu il ding Review (if applicable). !:s' Building elevations to scale for all buildings . -OV\.. ~ -\-'k DSC.. ~ ~ Cj/ A list of building materials for all facade and screening . D . Color samples for all bwldmgs or hst colors to be used from the approved color palette. tJ Electronic copy of Site Plan e-mailed to csuelectdesign@cstx.gov. D Two (2) copies of the grading , drainage , and eros ion control plans with supporting drainage report . !HJ~ Two (2) copies of the Publ ic infrastructure plans and supporting documents (if appl icable). tJlA Traffic Impact Analysis or calculations of projected vehicle trips showing that a TIA is not necessary for the proposed request (if applicable). ~ The attached S ite Plan Non-Residential Architectural Standards Building Review and r;tortt19:;t; a• illdlaQ' Ra. iew cnesR:llSitS (as applicable) with all items checked off or a brief explanation as to why they are not check off. Date of Optional Preapplication or Stormwater Management Conference ________________ _ NAME OF PROJECT dQ\4 -1010 ~();)"<\~ \: ADDREss ~o Lo"'~~,r [. Co\\cip}" S\ ~.t,~ , 'I'( '7~ ~l\-S LEGAL DESCRIPTION (Lot , Block , Subdivision) L.ots \ s~ I &\oc\<. c:J\ Pof\duoSQ P\oc.e APPLICANT/PROJECT MANAGER'S INFORMATION (Primary contact for the project): Name ~<',\\-}"~c; E-mail bj .oggie.\o"'d Q 3m~1\. <bl'\"'\ Street Address Po &o"'i. ~S \ City &~of\ State ~ Zip Code _7_"?_~~0~5~--- Phone Number q-,q ... ~G~v~~O~ Fax Number 93G-'§fl\ -5~1/ PROPERTY OWNER'S INFORMATION : Name Chorlit L1~C? ... Street Address ~00 Lor-gf~''r (, city Colleae.. s+ati~ State _TX~-----Zip Code '1')~'\S Phone Number <J3~ -Y3l.\ -:n~ C. Fax Number Revised 4/14 Pa ge 1 of 11 ARCHITECT OR ENGINEER'S INFORMATION : Name Street Address City State _________ Zip Code Phone Number Fax Number OTHER CONTACTS (Please specify type of contact): Name __________________ E-mail ------------------~ Street Address City ------------------State ________ Zip Code Phone Number Fax Number Current zoning -------------------------------------- Present use of property Proposed use of prope rt y Number of parking spaces required Number of parking spaces proposed _______ _ Is there Special Flood Hazard Area (Zone A or Zone AE on FEMA FIRM panels) on the property? I" Yes I No This information is necessary to help staff identify the appropriate standards to review the application and will be used to help determine if the application qualifies fo r vesting to a previous ordinance . Notwithstanding any assertion made , vesting is limited to that which is provided in Chapter 245 of the Texas Local Government Code or other applicable law . Is this application a continuation of a project that has received prior City platting approval(s) and you are requesting the application be reviewed under previous ordinance as applicable? I Yes r No If yes , provide in formation regarding the first approved application and any related subsequent applicat ions (provide additional sheets if necessary): Project Name : City Project Number (in known): Date I Timeframe whe n submitted : Revis ed 4/14 Pag e 2 of 11 MUL Tl-FAMILY RESIDENTIAL Tota l Acreage Floodplain Acreage ____ _ Housing Units ___ # of 1 Bedroom Units #of 2 Bedroom Units --- #of 3 Bedroom Units --- ___ # of 4 Bedroom Units FOR 2 BEDROOM UNITS ONLY # Bedrooms = 132 sq . ft . --- #Bedrooms< 132 sq . ft . --- PARKLAND DEDICATION (Fees due prior to the issuance of a Building Permit) #of Multi-Family Dwelling Units X$1636=$ # of acres in floodplain # of acres in detention # of acres in greenways Date dedication approved by Parks & ____ Recreation Advisory Board COMMERCIAL Total Acreage Build ing Square Feet ___ _ Floodplain Acreage ____ _ * Proj ects that were vested prior to January 1, 2008 , per Chapter 245 of the Texas Local Government Code may be assessed a different amount. Please contact city staff for additional information . The applicant has prepared this application and certifies that the facts stated herein and exhibits attached hereto are true and correct. S~e Date Revised 4/14 Page 3 of 11 CERTIFICATIONS REQUIRED FOR ALL DEVELOPMENT Owner Certification: 1. No work of any kind may start until a permit is issued . 2 . The permit may be revoked if any false statements are made herein . 3. If revoked, all work must cease until permit is re-issued. 4. Development shall not be used or occupied until a Certificate of Occupancy is issued . 5. The permit will expire if no significant work is progressing within 24 months of issuance . 6. Other permits may be required to fulfill local , state , and federal requirements . Owner will obtain or show compliance with all necessary State and Federal Permits prior to construction including NOi and SWPPP. 7 . If required , Elevation Certificates will be provided with elevations certified during construction (forms at slab pre- pour) and post construction. 8. Owner hereby gives consent to City representatives to make reasonable inspections required to verify compliance. 9. If, stormwater mitigation is requi red , including detention ponds proposed as part of this project , it shall be designed and constructed first in the construction sequence of the project. 10 . In accordance with Chapter 13 of the Code of Ordinances of the City of College Station , measu res shall be taken to insure that all debris from construction , erosion , and sedimentation shall not be deposited in city streets , or existing drainage facilities . All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer for the above named project. All of the applicable codes and ordinances of the City of College Station shall apply . 11 . The information and conclusions contained in the attached plans and supporting documents w ill comply with the current requirements of the City of College Station , Texas City Code , Chapter 13 and associated BCS Unified Design Guidelines Technical Specifications , and Standard Details . All development has been designed in accordance with all applicable codes and ordinances of the City of College Station and State and Federal Regulations. 12 . Release of plans to (name or firm) is authorized for bidding purposes only. I understand that final approval and release of plans and development for construction is contingent on contractor signature on approved Development Permit. 13 . I, THE OWNER , AGREE TO AND CERTIFY THAT ALL STATEMENTS HEREIN , AND IN ATTACHMENTS FOR THE DEVELOPMENT PERMIT APPLICATION , ARE , TO THE BEST OF MY KNOWLEDGE , TRUE , AND ACCURATE. Property Owner(s) Date Engineer Certification: 1. The project has been designed to ensure that stormwater mitigation, including detention ponds , proposed as part of the project will be constructed first in the construction sequence . 2. I will obta in or can show compliance with all necessary Local, State and Federal Permits prior to construction including NOi and SWPPP . Des ign will not preclude compliance with TPDES : i.e ., projects over 1 O acres may require a sedimentation basin . 3. The information and conclusions contained in the attached plans and supporting documents comply with the current requirements of the City of College Station , Texas City Code , Chapter 13 and associated BCS Unified Design Guidelines. All development has been designed in accordance with all app licable codes and ordinances of the City of College Station and State and Federal Regulations . 4 . I, THE ENGINEER , AGREE TO AND CERTIFY THAT ALL STATEMENTS HEREIN , AND IN ATTACHMENTS FOR THE DEVELOPMENT PERMIT APPLICATION , ARE , TO THE BEST OF MY KNOWLEDGE , TRUE , AND ACCURATE . Engineer Date Revised 4 /14 Page 4 of 11 The following CERTIFICATIONS apply to development in Special Flood Hazard Areas. Required for Site Plans, Final Plats, Construction Plans, Fill/ Grading Permits, and Clearing Only Permits:* certify , as demonstrated in the attached drainage study , that the alterations or development covered by this permit , shall not: (i) increase the Base Flood elevation ; (ii) create additional areas of Special Flood Hazard Area ; (iii) decrease the conveyance capacity to that part of the Special Flood Hazard Area that is not in the floodway and where the velocity of flow in the Base Flood event is greater than one foot per second . This area can also be approximated to be either areas within 100 feet of the boundary of the regulatory floodway or areas where the depth of from the BFE to natural ground is 18 inches or greater; (iv) reduce the Base Flood water storage volume to the part of the Special Flood Hazard Area that is beyond the floodway and conveyance area where the velocity of flow in the Base Flood is equal to and less than one foot per second without acceptable compensation as set forth in the City of College Station Code of Ordinances , Chapter 13 concerning encroachment into the Special Flood Hazard Area ; nor (v) i ncrease Base Flood velocities . beyond those areas exempted by ordinance in Section 5.11.3a of Chapter 13 Code of Ordinances . Engin eer Date Initial D * If a platting-status exemption to this requ i rement is asserted , provide written justification under separate letter in l ieu of certification . Required for Site Plans, Final Plats, Construction Plans, and Fill/ Grading Permits: B. I, , certify to the following : (i) that any nonresidential or multi-family structure on or proposed to be on this site as part of this application is designed to prevent damage to the structure or its contents as a result of flooding from the 100-year storm. Engineer Date Additional certification for Floodway Encroachments: C . I , , cert ify that the construction , improvement, or fill covered by th is ~~~~~~~~~~~~~~~~ permit shall not increase the base flood elevation . I will apply for a variance to the Zoning Board of Adjustments . Engineer Date Revised 4/14 Page 5 of 1 1 Required for all projects proposing structures in Special Flood Hazard Area (Elevation Certificate required). Residential Structures: D. I, , certify that all new constructi on or any substantial improvement of any residential structure shall have the lowest floor , including all utilities , ductwork and any basement , at an elevation at least one foot above the Base Flood Elevation . Required Elevation Certificates will be provided with elevations certified during construction (forms at slab pre-pour) and post construction . Engineer I Surveyor Date Commercial Structures: E. I, _________________ , certify that all new construction or any substantial improvement of any commercial , industrial , or other non-residential structure are designed to have the lowest floor , including all utilities , ductwork and basements , elevated at least one foot above the Base Flood Elevation Engineer I Surveyor Date OR I, , certify that the structure with its attendant utility , ductwork , basement and sanitary facilities is designed to be flood-proofed so that the structure and utilities , ductwork , basement and sanitary facilities are designed to be watertight and impermeable to the intrusion of water in all areas below the Base Flood Elevation , and shall resist the structural loads and buoyancy effects from the hydrostatic and hydrodynamic condit ion s. Required Elevation Certificates wi ll be provided with elevations cert ified durin g construction (forms at slab pre- pour) and post construction . Engineer I Surveyor Date Conditions or comments as part of approval : Revised 4/14 Page 6 of 11 CITY oF C oUEGE STATTON Home of Texas A&M University" SITE PLAN MINIMUM REQUIREMENTS (ALL CITY ORDINANCES MUST BE MET) INCLUDING BUT NOT LIMITED TO THE FOLLOWING: Sheet size -24" x 36" (minimum). [!(A key map (not necessarily to scale). d Title block to include : [1' Name , address , location , and legal description ~Name , address , and telephone number of applicant ~ame , address , and telephone number of developer/owner (if differs from applicant) ~Name , address , and telephone number of architecUengineer (if differs from applicant) ~Date of submittal crTotal site area c:rNorth arrow . ~Scale should be largest standard engineering scale possible on sheet. ~Ownership and current zoning of parcel and all abutting parcels . ~he tota l number of multi-family buildings and units to be constructed on the proposed project site . ~The density of dwelling units per acre of the proposed project. [31'he gross square footage of all buildings and structures and the proposed use of each . If different uses are to be located in a single building , show the location and size of the uses within the building . Build ing separation is a minimum of 15 feet w/o additional fire protect ion . Locations of the following on or adjacent to the subject site: Designate between existing and proposed m The density of dwelling units per acre of the proposed project. f;ll Phasing . Each phase must be able to stand alone to meet ordinance requirements . ~uildings (Existing and Proposed ). [}"Setbacks according to UDO , Article 5. Geography [j-Water courses . Q-1'00 yr. floodplain and floodway (if applicable) on or adjacent to the proposed project site. Please note if there is none on the site with confirming FEMA/FIRM map number. [J"Existing topography (2' max or spot elevations) and other pert inent drainage information . (If plan has too much information , show drainage on separate sheet.) Q'.J Proposed grading (1' max for proposed or spot elevations) and other pertinent drainage information . (If plan has too much information , show drainage on separate sheet.) Revised 4/14 Page 7 of 11 Str,ts, Parking, and Sidewalks [!'.f Existing streets and sidewalks (R.O .W.). [g'fxisting Driveways , both opposite and adjacent to the site according to UDO , Article 7. flA Proposed drives . Minimum drive aisle width according to UDO , Article 7 fJt\lndicate proposed driveway throat length according to UDO , Article 7 ~ Proposed curb cuts . D For each proposed curb cut (including driveways , streets , alleys , etc .) locate existing curb cuts on the same and opposite side of the street to determine separation distances between existing and proposed curb cuts . ~Proposed curb and pavement detail. D A 6" raised curb is required around all edges of all parts of all paved areas without exception . (To include island , planting areas , access ways , dumpster locations, utility pads, etc .) No exception will be made for areas designated as "reserved for future parking". IJJrProposed medians . ¥JA-Proposed sidewal ks (both public and private). Jrn-Proposed pedestr ian/bike circulation and facilities for non-residential buildings (UDO , Article 7). ,ij9<0ff-Street parking areas with parking spaces drawn, tabulated, and dimensioned . D Designate number of parking spaces required by ordinance and provided by proposal. ([J)andicap parking spaces. ~Parking Islands drawn and dimensioned with square footage calculated according to UDO , Section 7.2 or 7.9 fornon- residential buildings . 19Pc-Parking setback from R.O.W. to curb of parking lot as required . ~Wheelstops may be required when cars overhang onto property not owned by the applicant or where there may be conflict with pedestrian or bike facilities , handicap accessible routes or above ground utilities , signs or other conflicts . drsecurity gates, showing swing path and design specs with colors . ~Guardrails . Include design and colors . f;J>,-Tra~ Impact Analysis for non-residential development (UDO , Article 7). IB Please note if none is required . / ~Will there be access from a TxDOT R.O .W.? D Yes ~ No If yes , then TxDOT permit must be submitted with this application . Easements and Utilities ~asements -clearly designate as existing or proposed and type (utility , access , etc.) ~Utilities (noting size and designate as existing or proposed) within or adjacent to the proposed site , including building transformer locations , above ground and underground service connections to buildings , and drainage inlets . f,A. Sewer Design Report (if applicable). ~Water Design Report and/or Fire Flow Report (if applicable). ti-Drainage Report with a Technical Design Summary. ~eter locations , existing and proposed (must be located in public R.O.W. or public utility easement). ~Provide a water and sanitary sewer legend to include D Minimum water demands D Maximum water demands D Average water demands in gallons per minute , and JJ Maximum sewer loadings in gallons per day [if Will there be access from a TxDOT R.O .W.? D Yes ~ No If yes , then TxDOT permit must be submitted with this application . Rev ised 4/1 4 Page 8 of 11 , . Fire Protecti_on GIC_>how fire lanes . Fire lanes with a minimum of 20 feet in width with a minimum height clearance of 14 feet must be established if any portion of the proposed structure is more than 150 feet from the curb line or pavement edge of a 1 p ublic street or highwa D Show poposed an existin fire hydrants . Fire hydrants must be located on the same side of a major street as a projec~ aiid shall be in cation approved by the City Engineer. Any structure in any zoning district other than R-1 , R-1A, or R-2 must be within 300 feet of a fire hydrant as measured along a public street, highway or designated fire lane . NOTE: Fire hydrants must be operable and accepted by the City , and drives must have an all weather surface before a building permit can be issued . [;zJ Will building be sprinkled? D Yes rd No If the decision to sprinkle is made after the site plan has bee~proved , then the plan must be resubmitted . If Yes , D Show fire department connections . FDC's should be within 100' of the fire hydrant. They shall be accessible from the parking lot without being blocked by parked cars or a structure . Landscaping ~Landscape plans as required in Article 7 of the Unified Development Ordinance . The landscaping plan can be shown on a separate sheet if too much information is on the original site plan . If requesting protected tree points , then those trees need to be shown appropriately barricaded on the landscape plan . Attempt to reduce or eliminate plantings in easements . Include information on the plans such as : D required point calculations D additional streetscape points required . Streetscape compliance is required on all streets . D calculations for # of street trees required and proposed (proposed street tree points will accrue toward total landscaping points .) D proposed new plantings with points earned D proposed locations of new plantings D screening of parking lots , 50% of all shrubs used for screening shall be evergreen . D screen i ng of dumpsters , concrete retaining walls , off street loading areas , utility connection points , or other areas potentially visually offensive . D existing landscaping to remain D show existing trees to be barricaded and barricade plan . Protected points will only be awarded if barricades are up before the first development permit is issued . D Buffer as required in Article 7 of the Unified Development Ordinance . D Show irrigation system plan . (or provide note on how irrigation system requirement will be met prior to issuance of C. 0 .) All plans must include irrigation systems for landscaping . Irrigation meters are separate from the regular water systems for buildings and will be sized by city according to irrigation demand submitted by applicant and must include backflow prevention protection . [3 Is there any landscaping in TxDOT R.O .W.? D Yes ~No If yes , then TxDOT permit must be submitted at the time of application . Other , D Common open spaces sites D Loading docks D Detention ponds D Retaining walls D Sites for solid waste containe~s with screening._ Locations ~f dumpste:s are a_ccessible but not visible _from streets or residential areas. Gates are discouraged and visual screening 1s required . (Minimum 12 x 12 pad required .) D Are there impact fees associated with this development? D Yes D No NOTE: Signs are to be permitted separately . Revised 4/14 Pag e 9 of 11 C nv OF C o rLEGE STATION Home of Texas A&M Univmiry• NRA BUILDING REVIEW MINIMUM REQUIREMENTS (ALL CITY ORDINANCES MUST BE MET) INCLUDING BUT NOT LIMITED TO THE FOLLOWING: Refer to UDO Section 7 .9 Non-Residential Architectural Standards, as appropriate. D Sheet size -24 " x 36" (minimum). O Title block to include: O Name , address , location , and legal description O Name , address , and telephone number of applicant O Name , address , and telephone number of developer/owner (if differs from applicant) O Name , address , and telephone number of architect/engineer (if differs from applicant) D Date of submittal O Scale should be largest standard scale possible on sheet. O List of colors from the City of College Station color palette to be utilized or proposed equivalent s. 0 Color samples . D List of materials to be utilized . . ' O Elevations of each non-residential building and screen ing structure . Show placement of materials and colors on the facades according to UDO Section 5.6 .B or 7.9. 0 Include t he follow ing dimensions: D Total vert ical square footage minus openings (for each fa9ade separately) O Total vert ical square footage of transparency (for each fa9ade separately in Northgate) O Total vertical square footage of each building material (for each fa9ade separately) O Total vertical square footage of each color (for each fa9ade separately) ~Graphic representation and/or description of existing buildings in building plot to show material , color , and architectural harmony. Revised 4/14 Page 1 o of 11 '""'""""'°.,....,..., __________ ~c rTY oF C ouEcE ST ATION' _________ ,..,.._,..,..,....,. ... Home of Texas A&M University " -= MEMORANDUM DATE : 08/18/14 TO : Britt Jones; via: bj.aggieland@gmail.com FROM : Mark Bombek SUBJECT : BOOMFIT (SP-MINOR) Staff reviewed the above-mentioned site plan as requested . The following page is a list of staff review comments detailing items that need to be addressed . Please address the comments and submit the following information for further staff review : City of College Station Transmittal Letter; Memo providing written responses to all of staff's comments (identify the specific page that each comment was addressed on or the reason for not addressing the comment); Eight (8) 24 "x36 " revised site plans (one set will be returned to you , please submit additional copies if you want more than one approved set); Please note that this application will expire in 90 days from the date of this memo , if the applicant has not provided written response comments and revised documents to the Administrator that seek to address the staff review comments contained herein . If there are comments that you are not addressing with the revised site plan, please attach a letter explaining the details . If you have any questions or need additional information , please contact Mark Bombek at 979 .764 .3570 . Attachments : Staff Review Comments PC : Charlie Lima ; via: charlie@myboomfit.com P&DS Project No . 14-00900186 Planning & Development Services P.O. BOX 9960 • I IOI TEXAS AVENUE · COLLEGE STATI ON · TEXAS · 77842 TEL. 979.764.3570 ·FAX. 979.764.3496 cstx.gov/devs ervic es PLANNING STAFF REVIEW COMMENTS NO. 1 Project: Boomfit (SP-Minor) 14-00900186 1. The title block on the site plan should include the name , address, location , and legal description . Make changes to the name of either the applicant or property owner to reflect required information . 2. Please indicate current ownership and zoning of the Property on the Site Plan . The current zoning is Cl Commercial Industrial. 3. Please identify where the fire lanes are placed on the property. 4. Please identify the location of the required bicycle rack with a minimum of four (4) spaces . 5. Side note : the structure is being built out past the forty foot building property line as identified from the original property plat. 6. Prov ide a general note on the site plan that states the following : Exterior building and site lighting will meet the standards of Section 7 .11 of the Unified Development Ordinance . The light source shall not project below an opaque housing and no fixture shall directly project light horizontally . Fixtures will be mounted in such a manner that the projected cone of light does not cross any property line . 7. Please note that any changes made to the plans that have not been requested by the City of College Station must be explained in your next transmittal letter and "bubbled " on your plans . Reviewed by : Mark Bombek Date : 08/18/2014 ENGINEERING 1. No Comments . Reviewed by : Erika Bridges Date : 08/06/2014 FIRE 1) Not big enough for sprinkler or alarm so no comment at this time Reviewed by : Steve Smith Date : 08/07/14 ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION 1. SITE PLAN/PLAT: Developer will provide CSU with a digital , AutoCAD dwg format, version of plat and I or site plan as soon as it is available. Email to: ehorton@cstx .gov 2 . LOAD DATA: The developer will provide load data to CSU as soon as it is available. This information is critical for CSU to accurately determine the size and number of transformers , and other equipment, required to provide service to the project. Failure to provide load data will result in construction delays and , due to clearance requirements , could affect the final building footprint. Delivery time for transformers and other equipment not in stock is approximate 26 weeks . 3. EASEMENTS: All easements on site are existing. Electric facilities will be designed within existing easements. 4. EASEMENTS: Developer provides descriptive easements for electric infrastructure as designed by CSU , as shown on plat or site plan. 5. If easements are existing, the developer will be responsible for locating easements on site to insure that electrical infrastructure is installed within easement boundaries . GENERAL ELECTRICAL COMMENTS 1. Developer installs conduit per CSU specs and design. 2 . CSU will provide drawings for electrical installation. 3. Developer provides 30 ' of rigid or IMC conduit for each riser conduit. CSU installs riser . 4. Developer w i ll intercept existing conduit at designated transformers or other existing devices and extend as required. 5 . If conduit does not exist at designated transformer or other existing devices , developer will furnish and install conduit as shown on CSU electrical layout. 6 . Developer pours electric device pads or footings, i.e. transformers , pull boxes, or other device , per CSU specs and design. 7. Developer installs pull boxes and secondary pedestals per CSU specs and design , Pull boxes and secondary pedestals provided by CSU . 8. Final site plan must show all proposed electr ical facilities necessary to provide electrical service , i.e. transformers , pull boxes , or switchgears, all meter locations , and conduit routing as designed by CSU . 9. To discuss any of the above electrical comments please contact Gilbert Martinez at 979 .764.6255 , Sam Weida at 979.764 .6314 , Er ic Horton at 979.764 .6280 , or Weldon Dav is at 979.764 .5027 . Reviewed by: Eric Horton Date: 8/05/14 SANITATION 1. Sanitation is ok with this project. Reviewed by : Wally Urrutia Date : August 5, 2014 CrrY or COLLEGE STATION Ho me of Texas A&M University • MEMORANDUM August 4 , 2014 TO : Britt Jones ; via : bj.aggieland@gmail.com FROM : Mark Bombek, Staff Planner SUBJECT: BOOMFIT (SP-MINOR) Thank you for the submittal of your Site Plan -Minor application . Erika Bridges , Graduate Civil Engineer, and I have been assigned to review this project. It is anticipated that the review will be completed and any staff comments returned to you on or before Monday, August 18, 2014 . If you have questions in the meantime, please feel free to contact us . PC : Charlie Lima ; via : charlie@myboomfit.com / P&DS Project No. 14-00900186 Planning 6· D evelopment Ser vices l'.l l. BOX 9%0 • l 101 T EXN:> AVENUE • < 'OLLH;f :,TATH >N ·TEX:\'.-> • 778'-12 TE L. ')7')7 (,4.Yi70 ·FAX. 97').7t;'t.j't% cst11 .gov/d evservices DEVELOPMENT PERMIT PERMIT NO . 14-186 C rTY OF Cm.LEGE ST,\T ION Jll.imti11f tf TlnTIJJp mrnt 5.-nua FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE SITE LEGAL DESCRIPTION: Boomfit Ponderosa Place, 81.21, Lots 1-2 DATE OF ISSUE: 9/8/14 OWNER: Charlie Lima 3200 Longmire College Station , TX 77845 TYPE OF DEVELOPMENT: CONDITIONS: SITE ADDRESS: 3200 Longmire Dr. DRAINAGE BASIN: Bee Creek Trib. "A" VALID FOR 24 MONTHS CONTRACTOR: Full Development Permit 1. No work beyond limits covered in permit is authorized . 2. The permit may be revoked if any false statements are made herein. If revoked , all work must cease until permit is re- issued . 3. The permit will expire if no significant work is progressing within 24 months of issuance . 4 . Other permits may have been required to fulfill local, state and federal requirements . Construction will be in compliance with all necessary State and Federal Permits . 5. Stormwater mitigation, including detention ponds will be constructed first in the construction sequence of the project. 6. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that all debris from construction, erosion, and sedimentation shall not be deposited in city streets , or existing drainage facilities . Construction Site Notice or Notice of Intent (NOi) along with Stormwater Pollution Prevention Plan (SWP3) will be kept and maintained on-site during construction as per TPDES permitting requirements . If it is determined that the prescribed erosion control measures are ineffective to retain all sediment on-site , it is the Contractor's responsibility to implement measures that will meet City , State, and Federal requirements . 7. All disturbed areas will be re-vegetated prior to Letter of Completion or Certificate of Occupancy. 8. All trees required to be protected as part of the landscape plan must be completely barricaded in accordance with the Landscaping and Tree Protection Section of the City 's Unified Development Ordinance, prior to any operations of this permit. The cleaning of equipment or materials within the drip line of any tree or group of trees that are protected and required to remain is strictly prohibited . The disposal of any waste material such as, but not limited to , paint, oil , solvents , asphalt , concrete , mortar, or other harmful liquids or materials within the drip line of any tree required to remain is also prohibited . 9. All construction shall be in accordance with the stamped approved plans and specifications for the above-named project and all of the codes and ordinances of the City of College Station , as well as State and Federal Regulations that apply . Only those deviations from BCS Unified Design Guidelines , Specifications and Details specifically requested and approved will be allowed . 10 . Special Conditions : l ,__,~=..:.r_;\-f-'---'-:s-;"'--"'-0-'-0-"e_<,. _________ , the Contractor, hereby agree to comply with all conditions herein . ~a___ c;-10-1L\ ~ature -D-a-te ____________ _ q"t~ ~ ~q s , %~ ~ bj .0531e, \~~. \Q\'V'. Phone number E-mail I hereby grant this permit for development. Contact f?n I 1 {t(t!l!,{1{!/}{ { 5Vl3 -'b'SD0J , the Public Works Inspector assigned to this project 24 hours prior to b~ingcb'hstructlOh for scheduling required Inspections . UiJM ~ 1/8/14 Date CrrY OF C on.EG E STAT ION Home o/Ttxn.s A &M Un iversity• FOR OFFICE USE ONLY CASE NO .: \ 4 -113 LR DATE SUBMITIEo-0826 / l L-\ TIME: \2 :CX J STAFF : _A~G~------ PLANNING & DEVELOPMENT SERVICES TRANSMITTAL LETTER Please check one of the options below to clearly define the purpose of your submittal. 0 New Project Submittal D Incomplete Project Submittal -documents needed to complete an application . Case No .: ~ Existing Project Submittal. Case No .: \Lj -Cj(/(2 \ rei\O Project Name 6 02ro-D-\- ____, Contact Name ______________ _ We are transmitting the following for Planning & Development Services to review and comment (check all that apply ): D Comprehensive Plan Amendment 0 Rezoning Application D Conditional Use Permit D Preliminary Plan D Final Plat 0 Development Plat D Site Plan 0 Special District Site Plan D Special District Building I Sign 0 Landscape Plan INFRASTRUCTURE AND ENGINEERING DOCUMENTS D Non-Residential Architectural Standards 0 Irrigation Plan 0 Variance Request 0 Development Permit 0 Development Exaction Appeal D FEMA CLOMA/CLOMR/LOMA/LOMR 0 Grading Plan D Other -Please specify below All infrastructure documents must be submitted as a complete set. The following are included in the complete set: D Comprehensive Plan Amendment D Waterline Construction Documents D TxDOT Driveway Permit D Sewerline Construction Documents D TxDOT Utility Perm it D Street Construction Documents D Drainage Letter or Report D Easement Application D Fire Flow Analys is D Other -Please specify Special Instructions : 10/10