HomeMy WebLinkAbout30 DP Indian Lakes 04-09Drainage Report
FOR
INDIAN LAKES, PHASES ff & V
Location Map
NTS
FEBRUARY, 2004
Prepared By:
McClure Engineering, Inc.
1008 Woodcreek Drive, Suite 103
College Station, Texas 77845
(979) 693-3838
Drainage Report
FOR
INIJIAN LAKES, PHASES II & V
Location Map
NTS
FEBRUARY, 2004
Prepared By :
McClure Engineering, Inc.
1008 Woodcreek Drive, Suite 103
College Station, Texas 77845
(979) 693-3838
CERTIFICATION
I, Kent M. Laza, Registered Professional Engineer No. 65923, State of Texas, certify that
the drainage report, for the INDIAN LAKES, PHASES II & V, were prepared by me in accordance
with the provisions of the City of College Station Drainage Policy and Design Standards for the
owners thereof.
DRA!NAGE REPORT
TABLE OF CONTENTS
INDIAN LAKES SUBDIVISION, PHASES IT & V
INTRODUCTION 1
GENERAL LOCATION AND DESCRIPTION 1
FLOOD HAZARD INFORMATION 1
PRIMARY DRAINAGE SYSTEM DESCRIPTION 1
DRAINAGE DESIGN CRITERIA 1
DETENTION DESIGN 3
CONCLUSION 4
EXHIBITS
FEMA FLOOD INSURANCE RATE MAP EXCERPT A
DRAINAGE AREA MAP -PROPOSED CONDITIONS B
RATIONAL FORMULAS DRAINAGE AREA CALCULATIONS C-1
CUL VERT FLOW CALCULATIONS C-2
CUL VERT ANALYSIS: CUL VERT 1 D-1
CUL VERT ANALYSIS: CUL VERT 2 D-2
CUL VERT ANALYSIS: CUL VERT 5 D-3
CUL VERT ANALYSIS: CUL VERT 6 D-4
CUL VERT ANALYSIS: CUL VERT 7 D-5
CUL VERT ANALYSIS: CUL VERT 8 D-6
CUL VERT ANALYSIS: CUL VERT 9 D-7
CUL VERT ANALYSIS: CUL VERT 10 D-8
DRAINAGE REPORT II
INDIAN LAKES SUBDIVISION, PHASES II & V
STORM DRAINAGE REPORT
INDIAN LAKES SUBDIVISION, PHASES II & V
INTRODUCTION:
This storm drainage report is intended to analyze the drainage infrastructure proposed for the
development of the Indian Lakes Subdivision, Phase 2. The existing and proposed conditions are included
to show how the design will achieve the desired drainage objectives of Brazos County and the City of
College Station.
GENERAL LOCATION AND DESCRIPTION:
Indian Lakes Subdivision is located in the southern portion of the extra territorial jurisdiction of
College Station in Brazos County. The site is bounded by property owned by Bewley Trust to the North
and Indian Lakes Subdivision, Phase 1, to the South and West. Property to the East is owned by Smiling
Mallard Development, LTD. and is planned as future phases of the Indian Lakes Subdivision.
FLOOD HAZARD INFORMATION:
No portion of the site is shown to be within the 100-year floodplain on the FEMA Flood Insurance
Rate Maps (FIRM) for Brazos County, Texas and Incorporated Areas, Map Number 48041C0215C,
effective July 2, 1992. As such, this site is not currently regulated under the National Flood Insurance
Program. An excerpt from the FIRM panel is shown in Exhibit A.
PRIMARY DRAINAGE SYSTEM DESCRIPTION:
Exhibit B is a drainage area map that shows contours and proposed drainage areas for the site. The
proposed street will have a 24' wide paved surface with ditches. Storm water from the site will be captured
in the ditches along the roads and conveyed to the natural streams on the site. Corrugated metal pipe
culverts will be used at the street crossings.
DRAINAGE DESIGN CRITERIA:
Since this project falls within the ETJ of College Station, the drainage system for Indian Lakes was
designed using the criteria in College Station's Drainage Policy and Design Standards. The design storm is
a 10-year rainfall event for ditch line culverts and a 25-year rainfall event for all stream crossing drainage
STORM DRAINAGE REPORT PAGEl
INDIAN LAKES SUBDIVISION, PHAS E II & V
structures. Flow calculations for the structures are based on the Rational Method (Exhibit C-1). Pipe sizes
were determined by analyzing culvert capacity under inlet and outlet control. All proposed culverts meet
requirements for freeboard and road overtopping.
Exhibit C-2 describes the peak runoff calculations for the post-development conditions of the
culverts shown in Exhibit B. A summary of these results is shown below:
Flowrates (cfs) from Culverts
In Indian Lakes Subdivision, Phase Two
Culvert 5 year 10 year 25 year 50 year 100 year
20.8 23.5 26.9 30.5 34.3
2 19.7 22.1 25.3 28.5 32.1
5 6 .4 7.2 8 .2 9.3 10 .5
6 121.4 138.1 158.5 I 180.1 203 .8 I
7 30.1 33.9 38 .7
f
43 .8 49.3
8 2.5 2 .8 3.2 3.6 4.1
9 13.3 14.9 17 .0 19.3 21.7
10 8 .6 9 .6 11.0 12 .4 13 .9
These runoff rates were used to design the roadway crossings shown in Exhibits D-1 through D-8.
The resulting culvert sizes are as follows:
Culvert Sizes
Culvert Culvert Size
2-24" Corrugated Metal Pipes
2 2-24" Corrugated Metal Pipes
5 18 " Corrugated Metal Pipe
6 3-48" Corrugated Metal Pipes
7 2-27" Corrugated Metal Pipes
8 18 " Corrugated Metal Pipe
9 27" Corrugated Metal Pipe
10 24" Corrugated Metal Pipe
STORM DRAINAGE REPORT PAGE 2
INDIAN LAKES SUBDIVISION, PHASE II & V
DETENTION DESIGN:
Detention for Phase 2 of Indian Lakes Subdivision is provided by Lake Arapaho, which was
constructed with Phase 1 of the subdivision. The lake and its accompanying outlet works were designed to
capture and store runoff from the 390-acre drainage basin above the dam. The table that follows is an
excerpt from the Engineering Report for Lake Arapaho prepared by East Texas Engineers, Inc. in
September 2002 . The Peak Inflow figures are based on post-development runoff rates. It shows that all
rainfall events have been analyzed during the design of the lake and provisions made to store and release
water at a significantly reduced rate.
Flood Event I Peak Inflow p eak Outflow I Max. Lake Level
(cfs) (cfs) (feet msl)
PMF 7794 3113 I 264.9
i
48.1% PMF 3750 958 I 262.2
100-yr 1536 201 I 260 .0
50-yr 1305 153 I 259 .7
i
25-yr 1100 114 I 259.4
10-yr 877 113 I 259.0
i
5-yr 660 94 258 .6
2-yr 429 57 258.3
Note that for the standard design storms (2-yr through 100-yr) the peak outflows are approximately
10-15% of the peak inflow. No pre-development runoff rates were computed with the analysis of the lake ,
but the report indicates that a SCS Curve number of 82 was assumed for these post-development
computations. The large, rural estate lots that are planned with this development have a very small
percentage of impervious cover associated with them, so the SCS Curve number for the pre-development
condition would have been only slightly less than the post-development number. This implies that only
small increases in runoff rates would be expected between the pre-and post-development scenarios. The
high capacity for storage that the lake offers will easily offset any small increases in runoff rates due to the
development surrounding it.
STORM DRAINAGE REPORT PAGE 3
INDIAN LAKES SUBDIVISION, PHASE II & V
::
CONCLUSION:
Indian Lakes Subdivision, Phase 2 is a rural subdivision for single family residences on lots that are
approximately 1 acre in size or larger. The small change in impervious area from the development ofthis
subdivision is small and has minimal effects on the existing drainage system.
Proposed improvements at the street crossings are designed using guidelines in the City of College
Station's Drainage Policy and Design Standards. Exhibits D-1 through D-8 shows that all drainage
structures in the Indian Lakes Subdivision, Phase 2 are capable of passing the design rainfall event with one
foot of free board.
STORM DRAINAGE REPORT PAGE4
INDIAN LAKES SUBDIVISION, PHASE II & V
\.· ~
r------
-·
Flood I EXHIBIT A
nsurance Rate t.1
Brazos Count op Excerpt
and I y, Te xas
ncorporated Ar eas
Map Numbers: 48041 C0215C
N.T.S. Effective Dot . e . July 2, 1992
<C 3': w 0 0 Di: w ..J ..J <C <C Q. :$ IL. w w 0 ... 0 (.!) Di: ..J ... z <C z <C w z w 0 :3 !!= <C > w ::E z ..J 0 ..J ~ ~ w <C c;; w <C Di: (.!) cw > ... Wz 0 z Di: w <C 0 >w 0 ... :::> <C Di: Q. ... 0 ..J NO. AC. 0.4 0.55 0.9 ft. 1.0 7.58 7.18 0.00 0.40 3.23 620.0 2.0 5.59 4.94 0.00 0.65 2.56 350.0 3.0 2.14 1.90 0.00 0.24 0.98 160.0 4.0 0.44 0.20 0.00 0.24 0.30 8.0 5.0 1.64 1.28 0.00 0.36 0.84 8.0 6.0 41.67 40.97 0.00 0.70 17.02 1100.0 7.0 9.89 9.31 0.00 0.58 4.25 400.0 8.0 0.63 0.48 0.00 0.15 0.33 8.0 9.0 3.25 2.94 0.00 0.31 1.46 8.0 10.0 2.42 2.13 0.00 0.29 1.11 250.0 11.0 1.75 1.63 0.00 0.12 0.76 500.0 12.0 0.57 0.37 0.00 0.20 0.33 1200.0 13.0 1.57 1.25 0.00 0.32 0.79 500.0 14.0 0.62 0.46 0.00 0.16 0.33 500.0 EXHIBIT C-1 Rational Formula Drainage Area Calculations Indian Lakes Phase II & V ~ 3': 3': ..J IL. 0 0 0 ..J ..J z IL. IL. ~ :3 Di: J: Di: 0 u u w ... w ... ... Di: ..J ~ (.!) ~ ..J 0 .!:i w ..J :::> z :::> ..J ..J w > <C ~ I'll en N It) 0 IL. (.!) ~ (.!) ~ 0 :::> N a It) a ft. ft. ft. ft/s min min In/Hr cfs In/Hr cfs 10.0 500.0 9.0 1.3 14.7 14.7 5.26 17.0 6.5 20.8 6.0 300.0 8.0 1.4 7.9 10.0 6.33 16.2 7.7 19.7 2.0 600.0 9.0 1.7 7.5 10.0 6.33 6.2 7.7 7.5 2.0 600.0 9.0 2.4 4.2 10.0 6.33 1.9 7.7 2.3 2.0 750.0 15.0 2.8 4.5 10.0 6.33 5.3 7.7 6.4 25.0 1000.0 13.0 1.4 24.6 24.6 3.92 66.7 4.9 82.9 5.0 700.0 19.0 1.5 12.0 12.0 5.81 24.7 7.1 30.1 2.0 200.0 1.2 1.6 2.2 10.0 6.33 2.1 7.7 2.5 2.0 600.0 4.0 1.6 6.2 10.0 6.33 9.2 7.7 11.2 5.0 150.0 0.9 1.1 5.8 10.0 6.33 7.0 7.7 8.6 15.0 600.0 10.0 1.7 10.7 10.7 6.13 4.7 7.5 5.7 25.0 150.0 5.0 1.1 20.3 20.3 4.39 1.4 5.4 1.8 15.0 600.0 10.0 1.7 10.7 10.7 6.13 4.8 7.5 5.9 15.0 600.0 10.0 1.7 10.7 10.7 6.13 2.0 7.5 2.4 0 It) 0 .... It) N .... a N a In/Hr cfs In/Hr cfs 7.3 23.5 8.3 26.9 8.6 22.1 9.9 25.3 8.6 8.4 9.9 9.6 8.6 2.6 9.9 2.9 8.6 7.2 9.9 8.2 5.5 94.3 6.4 108.3 8.0 33.9 9.1 38.7 8.6 2.8 9.9 3.2 8.6 12.6 9.9 14.3 8.6 9.6 9.9 11.0 8.4 6.4 9.6 7.3 6.2 2.0 7.1 2.3 8.4 6.6 9.6 7.6 8.4 2.8 9.6 3.1 0 !!? In/Hr 9.4 11.1 11.1 11.1 11.1 7.2 10.3 11.1 11.1 11.1 10.8 8.0 10.8 10.8 0 0 0 0 It) 0 .... a !: a cfs In/Hr cfs 30.5 10.6 34.3 28.5 12.5 32.1 10.9 12.5 12.2 3.3 12.5 3.7 9.3 12.5 10.5 123.0 8.2 139.2 43.8 11.6 49.3 3.6 12.5 4.1 16.2 12.5 18.2 12.4 12.5 13.9 8.2 12.2 9.3 2.6 9.1 3.0 8.5 12.2 9.6 3.6 12.2 4.0 2/18/2004 0406-dra.xls Exhibit C-1
t t Q.I .c ~ e = = uz # 1 2 5 6 7 8 9 10 ~ ~ < ~ ~ = .... ~ . ""' Q ~z # 1 2 5 6 7 8 9 10 ~ ~ = ·; ""' ~ ~ Q.I Q ""' E-<< # 6 6 6 HW6 HW7 9 HW9 11 < u ~ 0 E-< Ac. 3.2 2.6 0.8 24.9 4.2 0.3 1.8 1.1 E ~ . ~ "' (j I Q.I E-< ~ min I yr 14.71 10 10.0I 10 10.0I 10 24.61 25 12.0I 10 10.0I 10 10.81 10 10.0I 10 E .g VJ ""' ~ ~ I in cfs 20.8 19.7 6.4 121.4 30.1 2.5 13.3 8.6 E Q -VJ ""' ~ Q.I ~ = ..... cfs 23.5 22.1 7.2 138.1 33.9 2.8 14.9 9.6 EXHIBIT C-2 Culvert Flow Calculations Indian Lakes Phase II & V E Q ri5 ""' ~ Q.I > I in N cfs 26.9 25.3 8.2 158.5 38.7 3.2 17.0 11.0 E Q ri5 ""' ~ Q.I ~ = in cfs 30.5 28.5 9.3 180.1 43.8 3.6 19.3 12.4 ""' ~ Q.I > e g~ ..... VJ cfs 34.3 32.1 10.5 203.8 49.3 4.1 21.7 13.9 ~ fi:: .~ "' Q.I ~ "' Q.I Q, ~ .... Q 0 z cfs I # 23.51 2 22.11 2 7.21 1 158.51 3 33.91 2 2.81 1 14.91 1 9.61 1 Q.I Q, ~ ""' Q.I ~ ~ Q fi:: cfs 11.8 11.1 7.2 52.8 16.9 2.8 14.9 9.6 = ... Q ... '£ 8. .... Q ""' -~ VJ O/o 0.92 0.81 1.60 0.46 1.01 0.24 0.78 0.61 ~ -VJ " 24 24 18 48 27 18 27 24 ~ ~ fps 3.7 3.5 4.1 4.2 4.3 1.6 3.7 3.1 ~ z ~ ....:i 74 62 58 50 84 75 75 75 Q.I e E= Q:j ~ ""' E-< min 0.33 0.29 0.23 0.20 0.33 0.78 0.33 0.41 "O = ~ @ (j E---min 14.98 10.29 10.23 24.79 12.34 10.78 11.12 10.41 =~ E-< {.!) ~-~~ I I I 2/18/2004 0406-dra.xls Exhibit C-2
EXHIBIT 0-1
CULVERT ANALYSIS
INDIAN LAKES PHASES II & V
-X-: Top of Road Elho Elhi~ --~
tHWi ~.;---------~ H J--~----M
Eli Proposed Culvert~ - - - --'---_
CULVERT #1 Ela
C I rt 0 I Crlt rt u ve es1an e a
Culvert Descript ion Circula r
Pipe No.
Dual 24" CMP Dia . (ft .l Pipes
2 .00 2
Culvert Analvala Calculations
Total Flow pe r Cr itica l
Design Flow Pipe Depth(ft .)
Storm (cfs l (cfsl de
5 20 .80 10 .40 1.15
10 23 .50 11 .75 1.25
25 26 .90 13 .45 1.30
50 30 .50 15 .25 1.40
100 34 .30 17 .15 1.50
Elhi = Hwi + Eli
ho = TW or (de+ 0 )12 (W hichever is Greater)
n
0.024
Normal
Depth
(ft.)
1.26
1.38
1.54
2 .00
2 .00
Invert Outlet Culvert
Elev. (Eli) Elev. (Elo) Length
(ft.) (ft .) (ft.)
294.43 293.42 74.07
INLET CONTROL
HW i/D HWi Elhi
0.87 1.75 296 .18
0.95 1.89 296 .32
1.04 2.07 296 .50
1.13 2 .26 296 .69
1.23 2 .45 296 .88
H = (1+ke+((29 "(n'2)"L)/R'1 .33)]'((v"2)/2 g)
Elho = Elo + H + ho
Outfall Channel Deslan Criteria
Top Lt. Side Rt. Side Bottom
Slope of Slope Slope Slope Width
(ft/ft) Road ke I (ft/ft) (?:1) (?:1) {ft,)
0 .0136 297 .50 0.50 I 0.0100 4 .00 4 .00 0.00
HEADWATER CALCULATIONS Control
OUTLET CONTROL HW
TW de (de+ Dl/2 ho H EL ho Elev.
0 .86 1.15 1.58 1.58 0.79 295.78 296 .18
0 .90 1.25 1.63 1.63 1.00 296.05 296 .32
0 .94 1.30 1.65 1.65 1.31 296 .38 296 .50
0 .99 1.40 1.70 1.70 1.69 296 .8 1 296 .81
1.04 1.50 1.75 1.75 2 .14 297 .31 297 .31
n
0 .024
Type
of
Control
Inlet
Inlet
Inlet
Outlet
Outlet
Outlet
Ve loc ity Free board
(fps ) (ft.)
4 .97 1.32
5 .09 1.18
5.18 1.00
6.49 0 .69
6 .79 0 .19
2/18 /2004
0406-cul-p-0 1.xls
Exh ibit D-1
CULVERT #2
Culvert Deslan Criteria
Culvert Description Circular
Pipe No .
Dua l 24 " CMP Dia . (f!.l Pioes n
2.00 2 0 .024
C I rtA I I C I I ti u ve na1vs s a cu a ons
Total Flow per Critical Normal
Design Flow Pipe Depth(ft.) Depth
Storm (cfsl (cfsl de (ft .)
5 19.70 9.85 1.15 1.37
10 22 .10 11 .05 1.20 1.51
25 25 .30 12 .65 1.30 1.75
50 28 .50 14 .25 1.35 2.00
100 32 .10 16 .05 1.45 2.00
Elhi = Hwi + Eli
ho= TW or (de+ D)/2 (Whiche..er is Grea te r)
EXHIBIT 0-2
CULVERT ANALYSIS
INDIAN LAKES PHASES II & V
ELhl~ t HW; 2:-+ D---= =p~~~/ EL!' H
-J--t. - -TW
Eli Proposed Culv:-rt :_;:::.r - - ---'-
Invert Outlet Culvert
Elev. (Eli) Elev. (ELo) Length
(ft.) (ft .) (ft.)
281 .48 280 .88 62 .00
INLET CONTROL
HWi/D HWi ELhi
0 .85 1.69 283 .17
0 .91 1.82 283 .30
1.00 1.99 283 .47
1.08 2.18 283 .64
1.17 2.34 283.82
H = [1 +ke+((29.(n'2)'L)IR'1 .33)j•((v"2)/2g)
Elho = Elo + H + ho
Outfall Channel Deslan Criteria
Top Lt. Side Rt. Side Bottom
Slope of Slope Slope Slope Width
(ft/ft) Road ke I (ft/ft) (?:1) (?:1l (ft .)
0.0097 284.72 0 .50 I 0.0060 4 .00 4.00 0.00
HEADWATER CALCULATIONS Control
OUTLET CONTROL HW
TW de (de+ Dl/2 ho H ELho Elev.
0 .93 1.15 1.58 1.58 0.63 283 .08 283 .17
0.97 1.20 1.60 1.60 0 .79 283 .27 283.30
1.02 1.30 1.65 1.65 1.03 283 .56 283 .56
1.06 1.35 1.68 1.68 1.31 283 .87 283 .87
1.1 2 1.45 1.73 1.7 3 1.66 284.27 284.27
n
0 .024
Type
of
Control
Inlet
In let
Outlet
Outlet
Outlet
ELo
Outlet
Velocity Freeboard
(fps) (ft .)
4 .28 1.55
4 .35 1.42
5.85 1.16
6.32 0.85
6 .58 0 .45
2/18/2004
0406-cul-p-02 .xls
Exhibit D-2
CULVERT #5
C I D I Cit r1 u vert es1an r e a
Culvert Descripti on Circu lar
Pipe No .
18" CMP Dia. (ft.) Pioes n
2.00 1 0 .024
Cl AllClll u vert na1vs s a cu at ons
Total Flow per Critica l Normal
Des ign Flow Pipe Depth (ft .) Depth
Storm (cf s) (cfs ) de (ft.)
5 6.40 6.40 0.80 0.93
10 7.20 7.20 0.90 1.00
25 8 .20 8 .20 1.00 1.08
50 9 .30 9 .30 1.05 1.17
100 10.50 10 .50 1.20 1.26
Elhi = Hw i +Eli
ho= TW or (de+ 0 )12 (Whichewr is Greater)
EXHIBIT D-3
CULVERT ANALYSIS
INDIAN LAKES PHASES II & V
ELhi ~ _..;:: Top of Road ~ELho t HW i -:;::::= 'f: ;-- - - - - - --~ H ~-----~--TW
Eli _Jf Proposed ~lv:i ~ - - - --'-_
in vert Outlet Culvert
Elev. (Eli) Elev . (ELo ) Length
(ft,) (ft .) (ft,)
283 .99 282 .97 73 .50
INLET CONTROL
HWi/D HWi EL hi
0 .66 1.32 285 .31
0 .70 1.39 285.38
0 .75 1.50 285 .49
0 .8 1 1.63 285 .62
0.88 1.76 285 .75
H = [1 +ke+((29"(n'2)"L)/R'1 .33)]"((v"2)12g)
Elho = Elo + H + ho
Outfall Channel Desian Criteria
Top Lt. Side Rt. Side Bo tt om
Slope of Slope Slope Slope W idth
(fl/ft) Road ke I (fl/ft) (?:1) (?:1) (ft .)
0 .0139 286.49 0.50 I 0 .0300 4 .00 4.00 0 .00
HEADWATER CALCULATIONS Con tro l
OUTLET CONTROL HW
TW de (de+ D)/2 ho H ELho Elev.
0 .58 0 .80 1.40 1.40 0.30 284 .67 285 .31
0.60 0 .90 1.45 1.45 0 .37 284 .79 285 .38
0 .63 1.00 1.50 1.50 0 .49 284 .9 6 285 .49
0.67 1.05 1.53 1.53 0 .62 285 .12 285 .62
0.71 1.20 1.60 1.60 0.80 285.37 285 .75
n
0 .024
Type
of
Control
Inlet
Inlet
In let
inl et
inlet
ELo
Ou tl et
Ve loc ity Freeboard
(fos l (ft.)
4.4 7 1.18
4 .60 1.11
4 .75 1.00
4 .89 0 .87
5.02 0.74
2/18/2004
0406-c ul-p-05.xis
Exhi bit D-3
CULVERT #6
Culvert Design Criteria
Culvert Des c ri pti on Circu lar
Pipe No .
Tri ple 48 " CMP Dia. (ft.) Pipes n
4.00 3 0.024
Cl u vert A I CI I I nalvs s a cu at ons
Total Flow per Critical No rmal
Des ign Flow Pipe Depth (ft .) Depth
Storm lcfs\ lcfsl de (ft.\
5 121 .50 40 .50 1.93 2.55
10 138 .20 46.07 2.03 2 .80
25 158 .60 52 .87 2 .20 3 .15
50 180 .20 60 .07 2.35 4 .00
100 203 .90 67 .97 2.51 4 .00
Elhi = Hwi + Eli
ho= lW or (de + 0 )/2 (Whichever is Greater)
EXHIBIT D-4
CULVERT ANALYSIS
INDIAN LAKES PHASES II & V
ELhi ~ .¥:: Top of Road EL ho
t HW i 2C ~ (; - - - - - - -_""":'::,. ~
Invert Out let Cu lvert
Elev. (Eli) Elev . (Elo) Length
(ft.) (ft .) (ft .)
276 .25 275 .77 96 .50
INLET CONTROL
HWi/D HWi EL hi
0.70 2.79 279 .04
0 .75 3 .0 1 279.26
0 .82 3 .28 279 .53
0 .89 3 .56 279 .81
0 .96 3 .86 280 .11
H = [1 +ke+((29'(n'2)"l)IR'1 .33)]•((v"2)/2g)
Elho = Elo + H + ho
J--L------~~
Eli Proposed Cu lvert :_;::;:.-- - - --'---_
ELo
0 f I Ch I D I C I rl ut a I anne es1an rte a
Top Lt . Side Rt. Side Bottom
Slope of Slope Slop e Slope W idth n
(ft/ft) Road ke I {ft/ft} 1?:1} (?:1} (ft .)
0 .0050 281.0 1 0.50 I 0 .0 100 4.00 4.00 0 .00 0 .024
HEADWATER CALCULATIONS Contro l Type Outlet
OUTLET CONTROL
TW de I de+ D\/2 ho H
1.43 1.93 2.97 2.97 0 .50
1.50 2.03 3.02 3 .02 0 .65
1.59 2 .20 3.10 3 .10 0 .86
1.66 2.35 3 .18 3 .18 1.11
1.74 2 .51 3.26 3 .26 1.42
HW of
ELho Elev . Contro l
279 .24 279.24 Outlet
279.44 279.44 Out let
279 .73 279 .73 Outlet
280 .05 280 ,05 Ou t let
280 .44 280 .44 O utlet
Veloc ity Free board
(fos l (ft .}
6 .75 1.77
7.20 1.57
7.4 7 1.28
7.83 0.96
8 .19 0.57
2/1 8/2004
0406-cul-p-06 .xls
Exh ibit D-4
CULVERT #7
Culvert Deslan Criteria
Cu lvert Descript ion Circula r
Pipe No .
Dua l 27" CMP Dia. (fl .l Pioes n
2 .25 2 0.024
C I A I I C I I ti u vert na1vs s a cu a ons
Total Flow per Critica l Normal
Des ign Flow Pipe Depth (fl.) Depth
Storm lcfsl lcfsl de lfl.l
5 30 .10 15.05 1.33 2 .25
10 33 .90 16 .95 1.40 2.25
25 38 .70 19 .35 1.50 2.25
50 43 .80 21 .90 1.63 2.25
100 49 .30 24 .65 1.73 2 .25
Elhi = Hwi + Eli
ho = TW o r (de+ DY2 (Whichever is Greater)
EXHIBIT D-5
CULVERT ANALYSIS
INDIAN LAKES PHASES II & V
Elhl ~ -='*':= Top of Road Elho
!NW ' :::=:f'o--------~~
Invert Out let Cu lvert
Elev. (ELI ) Elev. (Elo) length
(fl .) (fl .) lfl.l
282.57 282.09 73 .50
INLET CONTROL
HW i/D HW i Elhi
0.92 2.07 284 .64
1.00 2 .24 284.81
1.09 2.45 285 .02
1.19 2.67 285 .24
1.54 3.46 286 .03
H = [1+ke+((29'(n'2)"l )/R'1 .33 )]'((v"2Y2 g)
Elho = Elo + H + ho
~--~---~~
ELI Proposed Culv:i ~ - - - --'--
Ela
Outfall Channel Des l an Criteria
Top Lt. Side Rt. Side Bottom
Slope of Slope Slope Slope W idth n
lfl/ftl Road ke I lft/fll 1?:1) 1?:1) (fl.)
0 .0065 286 .49 0.50 I 0 .0300 4 .00 4 .00 0.00 0 .024
HEADWATER CALCULATIONS Control Type Out let
OUTLET CONTROL
TW de I de+ Dl/2 ho H Elho
0 .80 1.33 1.79 1.79 0.92 284 .80
0 .84 1.40 1.83 1.83 1.17 285.08
0 .89 1.50 1.88 1.88 1.52 285 .49
0 .92 1.63 1.94 1.94 1.95 285 .98
0 .96 1.73 1.99 1.99 2 .47 286 .55
HW of
Elev. Control
284 .80 Outlet
285 .08 Outlet
285.49 Outlet
285 .98 Outlet
286 .55 Outlet
Velocity Freeboard
l fos l (fl.)
6 .15 1.69
6.52 1.4 1
6 .87 1.00
7.10 0.51
7.51 -0 .06
2/1 8/2004
0406-c ul-p-07.xls
Exh ibit D-5
CULVERT #8
Culvert Design Criteria
Culvert Descript ion Circular
Pipe No.
18 "CMP Dia. (ft .) Pipes n
1.50 1 0.024
Culvert Analysis Calculations
Total Flow per Critica l Normal
Design Flow Pipe Depth(ft .) Depth
Storm (cfs) (cfs) de (ft .)
5 2.50 2 .50 0.65 0.84
10 2 .80 2.80 0.65 0 .90
25 3 .20 3.20 0.65 0 .99
50 3 .60 3.60 0 .80 1.08
100 4 .10 4 .10 0.80 1.21
Elhi = Hw i + Eli
ho= TW or (de+ 0 )12 (Whichewr is Grea ter)
EXHIBIT D-6
CULVERT ANALYSIS
INDIAN LAKES PHASES II & V
Elh i ~ .....-::= TopofRoad ~Elho
! HW i 7-' 'f: ;-- - - - - - --~ H ~--~-----m Eli Proposed Culvert =-.;::;xr-- - - --'--_
Invert Outlet Culvert
Elev. (Eli) Elev. (Elo) Length
(ft .) (ft .) (ft .)
303.30 302 .95 65 .50
INLET CONTROL
HWi/D HW i Elhi
0.58 0 .86 304 .16
0.61 0 .92 304 .22
0.66 0.99 304 .29
0 .72 1.08 304.38
0 .77 1.15 304 .45
H = 11+ke +((29*(n•2)'L)IR'1.33 )]*((v"2)12g)
Elho = Elo + H + ho
Outfall Channel Design Criteria
Top Lt. Side Rt. Side Bottom
Slope of Slope Slope Slope W idth
(ft/ft) Road ke I (ft/ft) (?:1) (?:1) (ft.)
0 .0053 305 .97 0.50 I 0.0100 4 .00 4.00 0 .00
HEADWATER CALCULATIONS Contro l
OUTLET CONTROL HW
TW de (de+ Dl/2 ho H Elho Elev.
0 .50 0 .65 1.08 1.08 0 .17 304 .20 304 .20
0 .52 0 .65 1.08 1.08 0.22 304 .24 304 .24
0 .55 0.65 1.08 1.08 0 .28 304 .31 304 .31
0 .58 0 .80 1.15 1.15 0 .36 304 .46 304 .46
0 .61 0 .80 1.15 1.15 0.46 304.56 304 .56
n
0 .024
Type
of
Control
Outlet
Outlet
Outlet
Outlet
Outlet
Elo
Ou tl et
Veloc ity Freeboard
(fps) (ft .)
3.41 1.77
3 .82 1.73
4 .36 1.66
3 .76 1.51
4 .28 1.41
2/18 /2004
0406-cul-p-OB .xls
Exh ibit D-6
CULVERT #9
Culvert Design Criteria
Culvert Descript ion Circu lar
Pipe No .
27 " CMP D ia. (ft .) Pipes n
2.25 1 0.022
Culvert Analysis Calculations
Total Flow per Cri t ical Normal
Design Flow Pipe Depth(ft .) Depth
Storm lcfsl lcfsl de lft.l
5 13 .30 13 .30 1.25 1.55
10 14.90 14 .90 1.33 1.69
25 17.00 17.00 1.40 1.95
50 19 .30 19.30 1.50 2 .25
100 21 .70 21.70 1.63 2.25
El hi = Hwi + Eli
ho = TW or (de+ 0 )12 (W hichever is Grea ter)
EXHIBIT 0-7
CULVERT ANALYSIS
INDIAN LAKES PHASES II & V
ELh i ~ _.;;= Top of Road ELho
tHW i Y.:-~;;--------~~
Invert Outlet Culvert
Elev. (Eli) Elev . (ELo ) Length
(ft.) (ft .) (ft .)
296 .36 297 .88 63 .25
INLET CONTROL
HWi /D HWi ELhi
0.85 1.91 300 .29
0.91 2.06 300.44
1.00 2 .25 300 .63
1.09 2 .45 300 .83
1.16 2.65 30 1.03
H = [1 +ke+((29"(n'2)"L)/R'1 .33))"((v"2)/2g )
Elho = Elo + H + ho
~-----t.__ ~~
Eli J Proposed ~lv;rt :_.::::..-- - - --'--_
ELo
0 tf II Ch ID I C It rl u a anne &SIQn r e a
Top Lt. Side Rt. Side Bottom
Slope of Slope Slope Slope W idth n
(ft/ft) Road ke I (ft/ft) 1?:1l (?:1) (ft .)
0 .0079 301 .67 0.50 I 0 .0100 4 .00 4.00 0.00 0 .024
HEADWATER CALCULATIONS Contro l Type Ou tl et
OUTLET CONTROL
TW de Ide+ Dl/2 ho H ELho
0.95 1.25 1.75 1.75 0.59 300 .22
0 .96 1.33 1.79 1.79 0.74 300 .41
1.03 1.40 1.83 1.83 0.97 300 .67
1.06 1.50 1.86 1.66 1.25 301 .00
1.14 1.63 1.94 1.94 1.58 301.40
HW of
Elev. Contro l
300 .29 In let
300.44 Inlet
300 .67 Out let
301.00 Ou tl et
301 .40 Outlet
Ve loc ity Freeboard
(fps) (ft .)
4 .57 1.38
4 .64 1.23
6 .54 1.00
6 .85 0 .67
7.03 0 .27
2/18/2004
0406-cu l-p-09 .xls
Exh ibit D-7
CULVERT #10
Cu lvert Descript ion
24 " CMP
Culvert Desi n Criteria
Circular
Pipe
Dia. ft .
2 00
No .
Pi es
Culvert Analysis Calculations
Total Flow per Crit ical
Design Flow Pipe Depth (ft .)
Storm (cfsl (cfsl de
5 8.60 8.60 1.05
10 9.60 9.60 1.15
25 1 1.00 11 .00 1.20
50 12 .40 12 .40 1.25
100 13.90 13 .90 1.35
Elhi = Hwi + Eli
ho = TW or (de + D)/2 (W hichever is Greater)
n
0 024
Normal
Depth
(ft.)
1.61
2 .00
2.00
2.00
2 .00
EXHIBIT D-8
CULVERT ANALYSIS
INDIAN LAKES PHASES II & V
~ TopofRoad ELho Elh i ~ ---~ t HW i -;;::-f: ;-- - - - - - --~ H J--~---~
Eli Proposed Culv:-rt -:_;:::.r - - - --'-_
invert
Elev. (Eli)
ft .
298 27
Outlet
Elev. (ELo )
ft.
297 96
Culvert
Length
ft .
6110
INLET CONTROL
HWi/D HW i ELh i
0 .78 1.56 299 .83
0 .84 1.67 299 .94
0 .91 1.82 300 .09
0.98 1.97 300 .24
1.06 2 .13 300.40
H = [1+ke+((29.(n'2)"l)/R'1 .33)].((v"2)/2g)
Elho = Elo + H + ho
Slope
ft/ft
0 0051
Top
of
Road
301 65
ke
0 50 I
HEADWATER CALCULATIONS
Outfall Channel Deal n Criteria
Slope
ft/ft
0 0100
Lt. Side Rt. Side Bottom
Slope Slope W idth
?:1 ?:1 ft .
400 400 000
Control
OUTLET CONTROL HW
TW de (de+ Dl/2 ho H ELho Elev.
0.80 1.05 1.53 1.53 0.47 299 .96 299 .96
0 .83 1.1 5 1.58 1.58 0 .59 300 .13 300 .13
0.88 1.20 1.60 1.60 0 .77 300 .33 300.33
0 .92 1.25 1.63 1.63 0 .98 300 .57 300 .57
0.96 1.35 1.68 1.68 1.24 300 .87 300.87
ELo
n
0 024
Type Outlet
of Veloc ity Free board
Contro l lfosl (ft.)
Outlet 5 .15 1.69
Outlet 5.14 1.52
Outlet 5 .59 1.32
Outlet 6 .00 1.08
Outlet 6 .16 0.78
2/18/2004
0406-cul-p-1 O.xls
Exh ibit D-8
l
Drainage Report
FOB
/NO/AN~ PHASES D & V
Location Map
NTS
FEBRUARY, 2004
Prepared By:
McClure Engineering. Inc.
1 008 Woodcreek Drive, Suite 103
College Station, Texas 77845
(979) 693-3838
Drainage Report
FOB
/NO/AN LAKES, PHASES II & V
Location Map
N1S
FEBRUARY, 2004
Prepared By :
McClure Engineering, Inc.
1008 Woodcreek Drive, Suite 103
College Station, Texas 77845
(979) 693-3838
CERTIFICATION
I, Kent M . Laza, Registered Professional Engineer No. 65923, State of Texas, certify that
the drainage report, for the INDIAN LAKES, PHASES II & V, were prepared by me in accordance
owners thereof.
DRA!NAGE REPORT
TABLE OF CONTENTS
INDIAN LAKES SUBDIVISION, PHASES II & V
INTRODUCTION 1
GENERAL LOCATION AND DESCRIPTION 1
FLOOD HAZARD INFORMATION 1
PRIMARY DRAINAGE SYSTEM DESCRIPTION 1
DRAINAGE DESIGN CRITERIA 1
DETENTION DESIGN 3
CONCLUSION 4
EXHIBITS
FEMA FLOOD INSURANCE RATE MAP EXCERPT A
DRAINAGE AREA MAP -PROPOSED CONDITIONS B
RATIONAL FORMULAS DRAINAGE AREA CALCULATIONS C-1
CUL VERT FLOW CALCULATIONS C-2
CUL VERT ANALYSIS: CUL VERT 1 D-1
CUL VERT ANALYSIS: CUL VERT 2 D-2
CUL VERT ANALYSIS: CUL VERT 5 D-3
CUL VERT ANALYSIS: CUL VERT 6 D-4
CUL VERT ANALYSIS: CUL VERT 7 D-5
CULVERT ANALYSIS: CULVERT 8 D-6
CULVERT ANALYSIS: CULVERT9 D-7
CUL VERT ANALYSIS: CUL VERT 10 D-8
DRAINAGE REPORT ii
INDIAN LAKES SUBDIVISION, PHASES II & V
STORM DRAINAGE REPORT
INDIAN LAKES SUBDIVISION, PHASES II & V
INTRODUCTION:
This storm drainage report is intended to analyze the drainage infrastructure proposed for the
development of the Indian Lakes Subdivision, Phase 2. The existing and proposed conditions are included
to show how the design will achieve the desired drainage objectives of Brazos County and the City of
College Station.
GENERAL LOCATION AND DESCRIPTION:
Indian Lakes Subdivision is located in the southern portion of the extra territorial jurisdiction of
College Station in Brazos County. The site is bounded by property owned by Bewley Trust to t he North
and Indian Lakes Subdivision, Phase 1, to the South and West. Property to the East is owned by Smiling
Mallard Development, LTD. and is planned as future phases of the Indian Lakes Subdivision.
FLOOD HAZARD INFORMATION:
No portion of the site is shown to be within the 100-year floodplain on the FEMA Flood Insurance
Rate Maps (FIRM) for Brazos County, Texas and Incorporated Areas, Map Number 48041C0215C,
effective July 2, 1992 . As such, this site is not currently regulated under the National Flood Insurance
Program. An excerpt from the FIRM panel is shown in Exhibit A.
PRIMARY DRAINAGE SYSTEM DESCRIPTION:
Exhibit B is a drainage area map that shows contours and proposed drainage areas for the site. The
proposed street will have a 24' wide paved surface with ditches. Storm water from the site will be captured
in the ditches along the roads and conveyed to the natural streams on the site. Corrugated metal pipe
culverts will be used at the street crossings .
DRAINAGE DESIGN CRITERIA:
Since this project falls within the ETJ of College Station, the drainage system for Indian Lakes was
designed using the criteria in College Station's Drainage Policy and Design Standards. The design storm is
a 10-year rainfall event for ditch line culverts and a 25-year rainfall event for all stream crossing drainage
STORM DRAINAGE REPORT . PAGEl
INDIAN LAKES SUBDIVISION, PHASE II & V
structures. Flow calculations for the structures are based on the Rational Method (Exhibit C-1 ). Pipe sizes
were determined by analyzing culvert capacity under inlet and outlet control. All proposed culverts meet
requirements for freeboard and road overtopping.
Exhibit C-2 describes the peak runoff calculations for the post-development conditions of the
culverts shown in Exhibit B. A summary of these results is shown below:
Flowrates (cfs) from Culverts
In Indian Lakes Subdivision, Phase Two
Culvert 5 year 10 year 25 year 50 year 100 year I
1 I 20.8 23 .5 26 .9 ! 30.5 34.3
2 19 .7 22.l 25 .3 28.5 32.l
,.......___.
5 6.4 7.2 8 .2 9.3 10.5
!
6 121.4 138.l 158 .5 i 180.l 203.8 I
I
7 30.l 33.9 38.7 I 43.8 49.3
8 2 .5 2 .8 3 .2 I 3 .6 4 .1 I I
9 13.3 14.9 17.0 19.3 21.7 !
10 8.6 9.6 11.0 12.4 13 .9
These runoff rates were used to design the roadway crossings shown in Exhibits D-1 through D-8.
The resulting culvert sizes are as follows:
Culvert Sizes
Culvert Culvert Size I
1 2-24" Corrugated Metal Pipes I
2 2-24" Corrugated Metal Pipes i
5 18" Corrugated Metal Pipe
6 3-48" Corrugated Metal Pipes
7 2-27" Corrugated Metal Pipes I
8 18" Corrugated Metal Pipe i
i
9 27" Corrugated Metal Pipe I
IO 24" Corrugated Metal Pipe
STORM DRAINAGE REPORT PAGE2
INDIAN LAKES SUBDIVISION, PHASE II & V
DETENTION DESIGN:
Detention for Phase 2 of Indian Lakes Subdivision is provided by Lake Arapaho , which was
constructed with Phase 1 of the subdivision. The lake and its accompanying outlet works were designed to
capture and store runoff from the 390-acre drainage basin above the dam. The table that follows is an
excerpt from the Engine ering Report for Lake Arapaho prepared by East Texas Engineers, Inc. in
September 2002. The Peak Inflow figures are based on post-development runoff rates. It shows that all
rainfall events have been analyzed during the design of the lake and provisions made to store and release
water at a significantly reduced rate.
\ Flood Event I Peak Inflow Peak Outflow I Max. Lake Level
I (cfs) (cfs) i {feet msl) I
PMF I 7794 3113 I 264 .9 I
i 48 .1% PMF 3750 I 958 I 262 .2 I
! I
I 100-yr 1536 201 I 260 .0
50-yr 1305 I 153 259 .7
I 25 -yr 1100 114 259.4
10-yr 877 i 113 259 .0 I I I I I 5-yr 660 94 258.6
2-yr 429 57 258.3
Note that for the standard design storms (2-yr through 100-yr) the peak outflows are approximately
10-15% of the peak inflow. No pre-development runoff rates were computed with the analysis of the lake ,
but the report indicates that a SCS Curve number of 82 was assumed for these post-development
computations. The large, rural estate lots that are planned with this development have a very small
percentage of impervious cover associated with them, so the SCS Curve number for the pre-development
condition would have been only slightly less than the post-development number. This implies that only
small increases in runoff rates would be expected between the pre-and post-development scenarios. The
high capacity for storage that the lake offers will easily offset any small increases in runoff rates due to the
development surrounding it.
STORM DRAINAGE REPORT PAGE3
INDIAN LAKES SUBDIVISION, PHASE II & V
CONCLUSION:
Indian Lakes Subdivision, Phase 2 is a rural subdivision for single family residences on lots that are
approximately 1 acre in size or larger. The small change in impervious area from the development ofthis
subdivision is small and has minimal effects on the existing drainage system.
Proposed improvements at the street crossings are designed using guidelines in the City of College
Station's Drainage Policy and Design Standards. Exhibits D-1 through D-8 shows that all drainage
structures in the Indian Lakes Subdivision, Phase 2 are capable of passing the design rainfall event with one
foot of freeboard.
STORM DRAINAGE REPORT PAGE4
INDIAN LAKES SUBDIVISION, PHASE II & V
Flood I EXHIBIT A -•
nsuronce Rote M
Brazos Count op Excerpt
and
1
y, Texas
ncorporoted Ar eos
Mop Numbers: 48041 C0215C
N.T.S. Effective Dot . e . July 2 , 1992
< 3:: w 0 0 a: w .J .J < < Q. < LL w w 0 i= I-0 (!) a: .J z < z < w z w (.) ~~ < w .J > :IE .J z j5 We( 0 w j5 a: (!) ~ Ci) ow > wz 0 ~~ w < 0 >w 0 I-a: Q. I-0 .J NO. AC. 0.4 0.55 0.9 ft. 1.0 7.58 7.18 0.00 0.40 3.23 620.0 2.0 5.59 4.94 0.00 0.65 2.56 350.0 3.0 2.14 1.90 0.00 0.24 0.98 160.0 4.0 0.44 0.20 0.00 0.24 0.30 8.0 5.0 1.64 1.28 0.00 0.36 0.84 8.0 6.0 41.67 40.97 0.00 0.70 17.02 1100.0 7.0 9.89 9.31 0.00 0.58 4.25 400.0 8.0 0.63 0.48 0.00 0.15 0.33 8.0 9.0 3.25 2.94 0.00 0.31 1.46 8.0 10.0 2.42 2.13 0.00 0.29 1.11 250.0 11.0 1.75 1.63 0.00 0.12 0.76 500.0 12.0 0.57 0.37 0.00 0.20 0.33 1200.0 13.0 1.57 1.25 0.00 0.32 0.79 500.0 14.0 0.62 0.46 0.00 0.16 0.33 500.0 EXHIBIT C-1 Rational Formula Drainage Area Calculations Indian Lakes Phase II & V 3:: 0 3:: 3:: .J LL 0 0 0 .J .J z LL LL ~ ~ . a: :I: a: 0 u w I-w I-u a: .J ~ (!) ~ .J 0 I-u w .J :::> z :::> .J .J IV w >< ~ I/) N .,, 0 LL (!) ~ (!) ~ (.) :::> N a .,, a ft. ft. ft. ft/s min min In/Hr cfs In/Hr cfs 10.0 500.0 9.0 1.3 14.7 14.7 5.26 17.0 6.5 20.8 6.0 300.0 8.0 1.4 7.9 10.0 6.33 16.2 7.7 19.7 2.0 600.0 9.0 1.7 7.5 10.0 6.33 6.2 7.7 7.5 2.0 600.0 9.0 2.4 4.2 10.0 6.33 1.9 7.7 2.3 2.0 750.0 15.0 2.8 4.5 10.0 6.33 5.3 7.7 6.4 25.0 1000.0 13.0 1.4 24.6 24.6 3.92 66.7 4.9 82.9 5.0 700.0 19.0 1.5 12.0 12.0 5.81 24.7 7.1 30.1 2.0 200.0 1.2 1.6 2.2 10.0 6.33 2.1 7.7 2.5 2.0 600.0 4.0 1.6 6.2 10.0 6.33 9.2 7.7 11.2 5.0 150.0 0.9 1.1 5.8 10.0 6.33 7.0 7.7 8.6 15.0 600.0 10.0 1.7 10.7 10.7 6.13 4.7 7.5 5.7 25.0 150.0 5.0 1.1 20.3 20.3 4.39 1.4 5.4 1.8 15.0 600.0 10.0 1.7 10.7 10.7 6.13 4.8 7.5 5.9 15.0 600.0 10.0 1.7 10.7 10.7 6.13 2.0 7.5 2.4 0 .,, 0 .... .,, N .... a N a In/Hr cfs In/Hr cfs 7.3 23.5 8.3 26.9 8.6 22.1 9.9 25.3 8.6 8.4 9.9 9.6 8.6 2.6 9.9 2.9 8.6 7.2 9.9 8.2 5.5 94.3 6.4 108.3 8.0 33.9 9.1 38.7 8.6 2.8 9.9 3.2 8.6 12.6 9.9 14.3 8.6 9.6 9.9 11.0 8.4 6.4 9.6 7.3 6.2 2.0 7.1 2.3 8.4 6.6 9.6 7.6 8.4 2.8 9.6 3.1 0 .,, In/Hr 9.4 11.1 11.1 11.1 11.1 7.2 10.3 11.1 11.1 11.1 10.8 8.0 10.8 10.8 0 0 0 0 .,, 0 .... a ::: a cfs In/Hr cfs 30.5 10.6 34.3 28.5 12.5 32.1 10.9 12.5 12.2 3.3 12.5 3.7 9.3 12.5 10.5 123.0 8.2 139.2 43.8 11.6 49.3 3.6 12.5 4.1 16.2 12.5 18.2 12.4 12.5 13.9 8.2 12.2 9.3 2.6 9.1 3.0 8.5 12.2 9.6 3.6 12.2 4.0 2/18/2004 0406-dra.xls Exhibit C-1
t: t ~ .c ~ e = = uz # 1 2 5 6 7 8 9 10 ell ~ < ~ en ell = .... ell • -0 ~z # 2 5 6 7 8 9 10 ~ ell = ·; -~ell 0 ~ Emo < # 6 6 6 HW6 HW7 9 HW9 11 < u ~ ~ 0 Emo Ac. 3.2 2.6 0.8 24.9 4.2 0.3 1.8 1.1 e 0 .... 00 = .~ .,, Cj I ~ Emo ~ min I yr 14.71 10 10.0I 10 10.0I 10 24.61 25 12.0I 10 10.0I 10 10.81 10 10.0I 10 e 0 ~ -ell ~ >i I I() cfs 20.8 19.7 6.4 121.4 30.1 2.5 13.3 8.6 e 0 .... 00 -ell > 0 ..-4 cfs 23.5 22.1 7.2 138.1 33.9 2.8 14.9 9.6 EXHIBIT C-2 Culvert Flow Calculations Indian Lakes Phase II & V e 0 ~ -ell > .;. M cfs 26.9 25.3 8.2 158.5 38.7 3.2 17.0 11.0 e 0 ~ ; ~ >i 0 I() cfs 30.5 28.5 9.3 180.1 43.8 3.6 19.3 12.4 -ell ~ > e 8 .s ..-4 00 cfs 34.3 32.1 10.5 203.8 49.3 4.1 21.7 13.9 ~ fi:: Qi -~ ~ .,, ~ Q. l:C ... 0 c z cfs I # 23.51 2 22.11 2 7.21 1 158.51 3 33.91 2 2.81 1 14.91 1 9.61 1 ~ Q. l:C -~ ~ ~ 0 ~ cfs 11.8 11.1 7.2 52.8 16.9 2.8 14.9 9.6 = ... 0 ... ·~ & .... 0 --~00 % 0.92 0.81 1.60 0.46 1.01 0.24 0.78 0.61 ~ 00 ~ ~ " fps 24 3.7 24 3.5 18 4.1 48 4.2 27 4.3 18 1.6 27 3.7 24 3.1 = t; z ~ ~ 74 62 58 50 84 75 75 75 ~ e E= ~ -Emo min 0.33 0.29 0.23 0.20 0.33 0.78 0.33 0.41 "O = ~ @) Cj E--min 14.98 10.29 10.23 24.79 12.34 10.78 11.12 10.41 =~ Emo ~ ~-~ b3 ' I' 2/18/2004 0406-dra.xls Exhibit C-2
CULVERT #1
Culvert Design Criteria
Cu lvert Descripti on Circu lar
Pipe No .
Dual 24 " CMP Dia. (ft .) Pipes n
2.00 2 0.024
Culvert Analysis Calculations
Tota l Flow per Criti cal Normal
Des ign Flow Pipe Depth (ft .) Depth
Sto rm (cfs ) (cfs) de (ft .)
5 20.80 10.40 1.1 5 1.26
10 23 .50 11.75 1.25 1.38
25 26 .90 13.45 1.30 1.54
50 30 .50 15.25 1.40 2.00
100 34 .30 17 .15 1.50 2 .00
Elhi = Hwi + Eli
ho = TW or (de + 0)12 (Whichever is Grea ter)
EXHIBIT D-1
CULVERT ANALYSIS
INDIAN LAKES PHASES II & V
ELh l ~ ~ Top of Road ELho
t HW ; ?.:"J" 0 - - - - - - --~ ~ J--~---~~
Eli Proposed Culv;rt :_;::.r - - - --'-_
ELo
Outfall Channel Desi n Criteri a
Invert Outlet Culvert Top Lt. Side Rt. Side Bottom
Elev. (Eli) Elev. (ELo ) Length Slope of Slope Slope Slope W idth n
(ft .) (ft .) (ft .) (ft/ft ) Road ke I ft/ft ?:1 ?:1 ft .
294.43 293 .42 74 .07 0 .0136 297 .50 0 .50 I 0.0100 4 .00 4.00 0.00 0 .024
HEADWATER CALCULATIONS Cont rol Type Out let
INLET CONTROL
HW i/D HWi ELh i
0.87 1.75 296 .18
0.95 1.89 296 .32
1.04 2.07 296.50
1.13 2.26 296 .69
1.23 2 .45 296.88
H = [1+ke+((29•(n'2)"L)IR'1 .33)]'((v"2)12g)
Elho = Elo + H + ho
TW
0 .86
0 .90
0.94
0 .99
1.04
OUTLET CONTROL
de <de+ Dl/2 ho H
1.15 1.58 1.58 0 .79
1.25 1.63 1.63 1.00
1.30 1.65 1.65 1.31
1.40 1.70 1.70 1.69
1.50 1.75 1.75 2.14
HW of
ELho Elev. Control
295 .78 296 .18 Inlet
296 .05 296 .32 Inlet
296 .38 296 .50 Inlet
296 .8 1 296 .8 1 Outlet
297 .3 1 297 .3 1 Outlet
Ve loc ity Freeboard
(fos l (ft.)
4.9 7 1.32
5.09 1.18
5 .18 1.00
6 .49 0 .69
6 .7 9 0.19
2/18/2004
0406-cu l-p-01.xl s
Exh ibit D-1
CULVERT #2
Culvert Design Criteria
Culvert Description Circular
Pipe No .
Dual 24 " CMP Dia . (ft.) Pi pes n
2.00 2 0 .024
Culvert Analysis Calculations
Total Flow per Critical Normal
Design Flow Pipe Depth(ft .) Depth
Storm (cfs) (cfs) de (ft .)
5 19.70 9.85 1.15 1.37
10 22 .10 11 .05 1.20 1.51
25 25 .30 12 .65 1.30 1.75
50 28 .50 14 .25 1.35 2.00
100 32.10 16 .05 1.45 2.00
ELh i = Hwi + Eli
ho= TW or (de+ 0 )/2 (Whichewr is Grea ter)
EXHIBIT D-2
CULVERT ANALYSIS
INDIAN LAKES PHASES II & V
ELhi ~ ......--:= Top of Road ELho
lHWi L.:"~;---------~~
Invert Outlet Culvert
Elev. (Eli) Elev. (Elo) Length
(ft.) (ft .) (ft.)
281 .48 280.88 62 .00
INLET CONTROL
HWi/D HWi ELhi
0.85 1.69 283 .17
0 .91 1.82 283 .30
1.00 1.99 283.47
1.08 2 .16 283.64
1.17 2.34 283 .82
H = [1 +ke+((29*(n'2 )*L )/R'1 .33)]"((v"2)/2g)
ELho = ELo + H + ho
~--~------~~ Eli Proposed Culvert ~ - - - --'--_
ELo
Outfall Channel Deslan Criteria
Top Lt. Side Rt. Side Bottom
Slope of Slope Slope Slope Width n
(ft/ft) Road ke I (ft/ft) (?:1) (?:1) (ft .)
0.0097 284 .72 0 .50 I 0 .0060 4.00 4.00 0.00 0.024
HEADWATER CALCULATIONS Control Type Outlet
OUTLET CONTROL
TW de (de+ Dl/2 ho H EL ho
0 .93 1.15 1.58 1.58 0.63 283 .08
0.97 1.20 1.60 1.60 0 .79 283 .27
1.02 1.30 1.65 1.65 1.03 283.56
1.06 1.35 1.68 1.68 1.31 283.87
1.12 1.45 1.73 1.73 1.66 284.27
HW of
Elev. Control
283 .17 Inlet
283 .30 Inlet
283 .56 Outlet
283.87 Outlet
284 .27 Outlet
Velocity Freeboard
(fps\ (ft .)
4 .28 1.55
4 .35 1.42
5.85 1.16
6 .32 0 .85
6.58 0.45
2/18/2004
0406-cul-p-02 .xis
Exhibit D-2
CULVERT #5
Culvert Deslan Criteria
Cu lvert Descri pti on Circular
Pipe No.
18 "CMP I Dia. (ft.) Pioes n
2.00 1 0 .024
C I rt A I I C I I ti u ve na1vs s a cu a ons
Total Flow per Critical Normal
Design Flow Pipe Depth(ft .) Depth
Storm lcfsl lefsl de {ft,)
5 6 .40 6 .40 0.80 0.93
10 7.20 7.20 0.90 1.00
25 8 .20 8 .20 1.00 1.08
50 9 .30 9.30 1.05 1.17
100 10 .50 10.50 1.20 1.26
Elhi = Hw i + Eli
ho = TW or (de + D)/2 (W hichever is Greater)
EXHIBIT 0-3
CULVERT ANALYSIS
INDIAN LAKES PHASES II & V
ELhi ~ _.-:= Top of Road ELho
l HWI :<CJ",;" - - - - - - --~ ~
Invert Outlet Culvert
Elev. (Eli) Elev. (ELo ) Length
{ft,) (fl.) (ft.)
283 .99 282.97 73 .50
INLET CONTROL
HW i/D HW i ELh i
0 .66 1.32 285 .31
0.70 1.39 285 .38
0.75 1.50 285 .49
0 .81 1.63 285 .62
0 .88 1.76 285 .75
H = [1 +ke+((29.(n"2).L)IR'1 .33)].((v"2)/2g)
Elho = Elo + H + ho
~--~---~~
Eli Proposed Cu lv: :.;:::....-- - - --'--_
ELo
0 f II Ch I D I C I I ut a anne es1an r ter a
Top Lt. Side Rt. Side Bottom
Slope of Slope Slope Slope Width n
(ft/ft) Road ke I (ft/ft) 1?:1l 1?:1) (ft.)
0 .0139 286 .49 0.50 I 0.0300 4 .00 4 .00 0.00 0 .024
HEADWATER CALCULATIONS Control Type Outlet
OUTLET CONTROL
TW de (de+ D)/2 ho H ELho
0 .58 0 .80 1.-40 1.40 0 .30 284.67
0.60 0.90 1.45 1.45 0.37 284.79
0.63 1.00 1.50 1.50 0 .49 284.96
0.67 1.05 1.53 1.53 0 .62 285 .12
0.71 1.20 1.60 1.60 0 .80 285 .37
HW of
Elev. Control
285 .3 1 Inlet
285 .38 Inlet
285 .49 In let
285.62 Inlet
285 .75 In let
Velocity Free board
(fps) (ft.)
4.47 1.18
4 .60 1.1 1
4.75 1.00
4 .89 0 .87
5 .02 0 .74
2/18/2004
0406-cul-p-05 .xls
Exhibit D-3
CULVERT #6
Culvert Design Criteria
Culvert Des cri pt ion Circu lar
Pipe No .
Tri ple 48 " CMP Dia . (ft .) Pipes n
4 .00 3 0 .024
Cl u vert A I CI I I nalvs s a cu at ons
Total Flow pe r Critica l Normal
Des ign Flow Pipe Depth(ft.) Depth
Storm l cfsl lefsl de (ft .)
5 121 .50 40 .50 1.93 2.55
10 138 .20 46.07 2.03 2.80
25 158 .60 52 .87 2.20 3.15
50 180 .20 60 .07 2.35 4.00
100 203.90 67.97 2.51 4 .00
Elhi = Hwi + Eli
ho= TW or (de+ 0)/2 (Whichever is Greater)
EXHIBIT D-4
CULVERT ANALYSIS
INDIAN LAKES PHASES II & V
_r---TopofRoad ELho ELh i ~ -~ ! HW 1 ~I>;---------~ H
__!'------~-TW
Eli Proposed Culvert - - --'---_
0 tf II Ch u a
Invert Outlet Cu lvert Top
Elev. (ELI) Elev. (ELo ) Length Slope of Slope
(ft .) (ft .) (ft.) (ft/ft) Road ke I (ft/ft)
276.25 275 .77 96.50 0 .0050 281.01 0.50 I 0 .0100
HEADWATER CALCULATIONS
INLET CONTROL
HWi/D HWi ELh i
0 .70 2 .79 279.04
0 .75 3.01 279 .26
0.82 3.28 279 .53
0 .89 3.56 279 .81
0 .96 3.86 280 .11
H = (1 +ke+((2s•(n•2)•L)IR•1 .33)].((v"2)12g)
Elho = Elo + H + ho
TW
1.43
1.50
1.59
1.66
1.74
OUTLET CONTROL
de (de+ Dl/2 ho
1.93 2.97 2.97
2.03 3.02 3.02
2 .20 3.10 3.10
2 .35 3.18 3.18
2 .5 1 3.26 3.26
anne ID I C It rt es1an r e a
Lt. Side Rt. Side Bottom
Slope Slope W idth
(?:1) 1?:1) (ft .)
4 .00 4 .00 0.00
Contro l
HW
H ELho Elev.
0 .50 279 .24 279 .24
0 .65 279 .44 279.44
0 .86 279 .73 279 .73
1.11 280.05 280 .05
1.42 280.44 280 .44
n
0 .024
Type
of
Control
Ou tl et
Outlet
Ou tl et
Outlet
Outlet
Elo
Outlet
Veloc ity Free board
(fps ) (ft .)
6.75 1.77
7.20 1.57
7.4 7 1.28
7.83 0.96
8 .1 9 0 .57
2/1 8/2 004
0406-cul-p-06.xls
Exhibit D-4
CULVERT #7
Culvert Des i gn Criteria
Cu lvert Descript ion Circ ula r
Pipe No .
Dual 27" CMP I Dia. (ft .) Pioes n
2.25 2 0 .024
C I rtA I I C I I ti u ve narvs s a cu a ons
Tot al Flow per Critical Normal
Des ign Flow Pipe Depth(ft .) Depth
Storm (efs) (efsl de (ft .)
5 30 .10 15.05 1.33 2.25
10 33 .90 16 .95 1.40 2.25
25 38 .70 19 .35 1.50 2 .25
50 43 .80 21 .90 1.63 2.25
100 49 .30 24.65 1.73 2 .25
Elhi = Hwi + Eli
ho= TW or (de+ DY2 (W hichewr is Greater)
EXHIBIT D-5
CULVERT ANALYSIS
INDIAN LAKES PHASES II & V
Elh l ~!HWI ~.~---~=p~~E'i' H
~-----'!. - -TW
Eli _Jf Proposed ~lv:-rt ~ - - - --'-_
Invert Outlet Culvert
Elev. (Eli) Elev. (ELo) Length
(ft,) (ft.) (ft,)
282 .57 282 .09 73 .50
INLET CONTROL
HWi/D HW i ELh i
0 .92 2 .07 284 .84
1.00 2 .24 284.81
1.09 2.45 285 .02
1.19 2 .67 285 .24
1.54 3 .46 286 .03
H = (1 +ke+((29.(n•2)•L)IR•1 .33)].((v'2Y2g)
Elho = Elo + H + ho
Outfall Channel Design Criteria
Top Lt. Side Rt. Side Bo ttom
Slope of Slope Slope Slope W idth
(ft/ft) Road ke I (ft/ft) (?:1) (?:1) (ft.)
0 .0065 288.49 0.50 I 0.0300 4 .00 4.00 0 .00
HEADWATER CALCULATIONS Contro l
OUTLET CONTROL HW
TW de Ide+ Dl/2 ho H ELho Elev .
0.80 1.33 1.79 1.79 0 .92 284 .80 284 .80
0.84 1.40 1.83 1.83 1.17 285 .08 285 .08
0 .89 1.50 1.88 1.88 1.52 285.49 285 .49
0.92 1.63 1.94 1.94 1.95 285 .98 285.98
0.96 1.73 1.99 1.99 2.4 7 286 .55 286 .55
n
0.024
Type
of
Contro l
Outlet
Outlet
Outlet
Outlet
Outlet
ELo
Ou tl et
Velocity Freeboard
(fps ) (ft .)
6.15 1.69
6 .52 1.41
6 .87 1.00
7.1 0 0 .5 1
7.51 -0.06
2/18 /200 4
0406-eu l-p-07.xl s
Exh ibit D-5
CULVERT #8
Culvert Des i gn Criteria
Cu lvert Descript ion Circular
Pi pe No .
18" CMP Dia. (ft.) Pipes n
1.50 1 0 .024
Culvert Analysis Calculations
Total Flow per Cri t ica l Normal
Des ign Flow Pipe Depth (ft.) Depth
Storm (cfs ) (cfs) de (ft .)
5 2 .50 2.50 0.65 0 .84
10 2 .80 2.80 0 .65 0 .90
25 3 .20 3 .20 0.65 0.99
50 3.60 3 .60 0.80 1.08
100 4.10 4 .10 0.80 1.21
El hi = Hw i + Eli
ho = TW or (de+ DY2 (Whichever is Greater )
EXHIBIT D-6
CULVERT ANALYSIS
INDIAN LAKES PHASES II & V
~ TopofRoad ELho Elh i ~ ---~ ! HW i :2C" i' ;-- - --- - --~ H J--~---M
Eli Proposed Culv:-rt ~ - - - --'---_
Outfall Channel Desi n Criteria
Invert Outlet Culvert Top Lt. Side Rt. Side Bottom
Elev. (EU) Elev . (Elo) Lengt h Slope of Slope Slope Slope W idth n
(ft .) (ft .) (ft .) (ftlft) Road ke I ftJft ?:1 ?:1 ft .
303 .30 302 .95 65.50 0 .0053 305 .97 0.50 I 0.0100 4 .00 4 .00 0.00 0 .024
HEADWATER CALCULATIONS Con tro l Type
INLET CONTROL
HW i/D HW i Elhi
0.58 0.86 304.16
0 .61 0 .92 304.22
0.66 0 .99 304 .29
0 .72 1.08 304 .38
0.77 1.15 304 .45
H = [1 +ke+((29.(n'2).L)/R'1 .33)].((V'2Y2g)
Elho = El o + H + ho
TW de
0 .50 0 .65
0.52 0 .65
0 .55 0 .65
0 .58 0.80
0 .61 0 .80
OUTLET CONTROL HW of
(de+ D)/2 ho H Elho Elev . Control
1.08 1.08 0 .17 304 .20 304 .20 Outlet
1.08 1.08 0 .22 304 .24 304 .24 Out let
1.08 1.08 0 .28 304 .3 1 304 .3 1 Outlet
1.15 1.15 0 .36 304 .46 304.4 6 Ou tl et
1.15 1.15 0 .46 304 .56 304 .56 Outlet
Ela
Ou tl et
Ve loc ity Freeboard
(fos l (ft .)
3 .41 1.77
3 .82 1.73
4 .3 6 1.66
3 .76 1.51
4 .28 1.41
2/18 /2004
0406-cul-p-08 .xl s
Exh ibit D-6
CULVERT #9
Culvert Design Criteria
Cu lvert Description Circular
Pip e No .
27 " CMP Dia . (ft .) Pi pes n
2 .25 1 0 .022
Culvert Analysis Calculations
Tota l Flow per Critical Normal
Des ign Flow Pipe Depth(ft .) Depth
Storm (cfs) (cfs) de (ft.)
5 13.30 13 .30 1.25 1.55
10 14.90 14 .90 1.33 1.69
25 17.00 17.00 1.40 1.95
50 19.30 19 .30 1.50 2.25
100 21 .70 21 .70 1.63 2.25
Elhi = Hw i + Eli
ho = TW or (de + D )12 (Whichewr is Greater)
EXHIBIT D-7
CULVERT ANALYSIS
INDIAN LAKES PHASES II & V
Elhi ~ ,_.;:: Top of Road ELho
lHWi :<CJ".;---------~~
Invert Outlet Culvert
Elev. (Eli) Elev. (ELo) Length
(ft.) (ft .) (ft .)
298 .38 297 .88 63 .25
INLET CONTROL
HW i/D HWi Elhi
0.85 1.91 300.29
0.91 2.06 300.44
1.00 2.25 300.63
1.09 2.45 300.83
1.18 2 .65 301 .03
H = (1 +ke+((29*(n'2)"L)/R'1 .33)]'((v"2)/2g)
Elho = Elo + H +ho
J--~---~~
Eli Proposed Culv: :__;:.-- - - --'---_
ELo
Outfall Channel Design Criteria
Top Lt. Sid e Rt. Side Bottom
Slope of Slope Slope Slope Width n
(ft/ft) Road ke I (ft/ft) (?:1) (?:1) (ft .)
0 .0079 301 .67 0 .50 I 0.0100 4 .00 4 .00 0 .00 0 .024
HEADWATER CALCULATIONS Control Type Outlet
OUTLET CONTROL
TW de (de+ Dl/2 ho H ELho
0 .95 1.25 1.75 1.75 0.59 300 .22
0.98 1.33 1.79 1.79 0.74 300 .41
1.03 1.40 1.83 1.83 0.97 300 .67
1.08 1.50 1.88 1.88 1.25 301 .00
1.14 1.63 1.94 1.94 1.58 301.40
HW of
Elev. Control
300 .29 Inlet
300 .44 Inlet
300 .67 Outlet
301.00 Outlet
301 .40 Outlet
Velocity Freeboard
(fps) (ft .)
4 .57 1.38
4.64 1.23
6 .54 1.00
6 .85 0 .67
7.03 0 .27
2/18/2004
0406-cul-p-09.xls
Exhibit D-7
CULVERT#10
Culvert Des l an Criteria
Cul vert Descripti on Circula r
Pipe No .
24 " CMP Dia . (ft .) Pipes n
2.00 1 0 .024
Culvert Analysis Calculations
Total Flow per Crit ica l Normal
Des ign Flow Pipe Depth (ft.) Depth
Storm (Cfs ) (cfs l de (ft .)
5 8 .60 8 .60 1.05 1.61
10 9 .60 9.60 1.15 2 .00
25 11 .00 11 .00 1.20 2 .00
50 12.40 12.40 1.25 2 .00
100 13 .90 13 .90 1.35 2 .00
Elhi = Hw i + Eli
ho= TW or (de+ D)/2 (Whichewr is Greater)
EXHIBIT D·8
CULVERT ANALYSIS
INDIAN LAKES PHASES II & V
~ Top of Road ELho ELh i ~ ---~ t HW i ~. ;-- - -- - --~ H
---"---- -'t. -.. TW
Eli J Proposed ~lv:-rt ~ - - - --'-----
Invert Outlet Culvert
Elev. (Eli) Elev. (ELo ) Length
(ft .) (ft .) (ft.)
298 .27 29 7.96 6 1.10
INLET CONTROL
HW i/D HW i ELh i
0 .78 1.56 299 .83
0 .84 1.67 299 .94
0 .91 1.82 300 .09
0.98 1.97 300 .24
1.06 2.13 300 .40
H = [1 +k e+((29"(n'2).l)/R'1 .33)]'((v'2)/2g)
Elho = Elo + H + ho
Outfall Channel Desi n Criteria
Top Lt. Side Rt. Side Bottom
Slope of Slope Slope Slope W idth n
(ftlft) Road ke I ftlft ?:1 ?:1 ft .
0 .005 1 301 .65 0.50 I 0 .0100 4 .00 4.00 0 .00 0 .024
HEADWATER CA LCULATIONS Control Type
OUTLET CONTROL HW of
TW de (de + Dl/2 ho H EL ho Elev. Con trol
0.80 1.05 1.53 1.53 0 .47 299 .96 299 .96 Outlet
0 .83 1.15 1.58 1.58 0.59 300 .13 300 .13 Outlet
0.88 1.20 1.60 1.60 0.77 300 .33 300 .33 Outlet
0 .92 1.25 1.63 1.63 0 .98 300 .57 300 .57 Outlet
0 .96 1.35 1.68 1.68 1.24 300 .8 7 30 0 .87 Outl et
ELo
Outlet
Veloc ity Freeboard
(fps ) (ft .)
5 .15 1.69
5 .14 1.52
5.59 1.32
6 .00 1.08
6 .16 0 .78
2/1 8/2004
040 6-cu l-p-1 0 .xls
Exh ibit D-8
FOR OFFICE USE ONLY
P&Z Case No.: ""'Of,,__,__=5l)__,.~""-----
Date Submitted: D;-Ql3 -04:
FINAL PLAT APPLICATION
(Check one) D Amending
($300.00)
~Final
($400 .00 )
D Vacating
($400 .00 )
D Replat
($600 .00 )*
*Includes public heari ng fee
The following items must be submitted by an established filing deadline date for P&Z Commission
consideration.
MINIMUM SUBMITTAL REQUIREMENTS:
[gJ Final plat review and filing fee (see above) NOTE: Multiple Sheets -$55.00 per additional sheet
NIA Variance Request to Subdivision Regulations -$100 (if applicable)
[gJ Development permit fee of $200.00 (if applicable).
N/A Infrastructure inspection fee of $600.00 (applicable if any public infrastructure is being constructed)
C2J Thirteen (13) folded copies of plat. (A signed mylar original must be submitted after staff review.)
C2J One (1) copy of the approved Preliminary Plat and/or one (1) Master Plan (if applicable).
~ Paid tax certificates from City of College Station, Brazos County and College Station l.S.D.
C2J A copy of the attached checklist with all items checked off or a brief explanation as to why they are not.
N/A Two (2) copies of public infrastructure plans associated with this plat (if applicable).
N/A Parkland Dedication requirement approved by the Parks & Recreation Board, please provide proof of
approval (if applicable).
NAME OF SUBDIVISION INDIAN LAKES SUBDIVISION . PHASE TWO
SPECIFIED LOCATION OF PROPOSED SUBDIVISION (Lot & Block) J .M . Barrera Survey , A-69, Brazos
County, Texas ;
APPLICANT/PROJECT MANAGER'S INFORMATION (Primary Contact for the Project):
Name Paul J . Clarke. Manager of Smiling Mallard Management, LLC . & General Partner of Smiling Mallard
Development, Ltd. Street Address 3606 East 291
h Street
City Bryan State TX Zip Code 77802
Phone Number 979.846.4384 Fax Number 979.846.1461
CURRENT PROPERTY OWNER'S INFORMATION : (Al! owners must be identified. Please attach an
additional sheet, if necessary)
Name _____ _l.(S~am~e~a~s~a~b~o~v~e~)-----~
Street Address ---------------
City ___________ _ State ----Zip Code ________ _
Phone Number Fax Number
------------~ -------------
ARCHITECT OR ENGINEER'S INFORMATION :
Name McClure Engineering, Inc. E-Mail mikem@tca.net
Street Address _______________ 1008 Woodcreek Drive -'--"--=-=-~=-=-==.:...:=-=.!..!....!:::.!.!..!.::::__ ________ _
City College Station State TX -------'-' Zip Code 77845
Phone Number 979.846.4384 -----"---'-"-'-~=-=-==--=---~ Fax Number 979 .846 .1461 ----=...:.....::::..=.....:...:..:....!.....!..::~----