HomeMy WebLinkAbout20 Shenandoah Ph 8B 03-99 DecaturShenandoah Subdivision
Phase 8A
Addendum #1
to the
Original Drainage Report
submitted in conjunction with the
Phase SB Construction Drawings
December, 2003
Shenandoah Subdivision
Phase 8A
Addendum #1
to the
Original Drainage Report
submitted in conjunction with the
Phase SB Construction Drawings
December, 2003
' I
'
CERTIFICATION
I, Kent M. Laza, Registered Professional Engineer No. 65923, State of Texas, certify that
the revisions contained in this Addendum #1 to the Original Drainage Report for the
SHENANDOAH SUBDIVISION, PHASE 8A, were prepared by me in accordance with the
provisions of the City of College Station Drainage Policy and Design Standards for the owners
thereof.
12 26 03
DRAINAGE REPORT
ADDENDUM#lOFTHEDRAINAGEREPORTFOR
SHENANDOAHPHASE8A
Addendum #I to the Drainage Report for Shenandoah Phase 8A is intended to
analyze the drainage impacts of constructing Shenandoah Phase 8B. As stated in the
original drainage report, the area that comprises Phase 8B was included in the detention
calculations for Phase 8A, so no additional computations are necessary. The only
additions to the original report involve the stormwater capacity analysis of the alley
proposed with Phase 8B. As with the original system, the system for Phase 8B is
designed for a 10-yr storm event as required by the City of College Station. The
following exhibits are provided to show the revisions to the drainage system.
Exln"bit A -Excerpt from FEMA map
Exhibit B -Drainage Area Map
Exhibit C-1 -Drainage Area Calculations
Exhibit C-2 -Alley Capacity Analysis
N.T.S .
EXHIBIT A
Flood Insurance Rote M Brazos C ap Excerpt
ounty, Te xas
and Incorporated Ar eas
Mop Numbers : 48041 C0 2 05D
Effective D ate : FEBRUARY 9 , 2000
< ~ w c 0::: w ...J ...J
< < fl. < u..
w w 0 j::: ... c
(!) 0::: ...J z < z < w z w 0 :s :c < w z ...J > c :::::e ...J 0::: ... < W< w < ~ Ci) w (!) ... cw > ... >z 0 z 0::: w < 0 c ... :::> < 0::: Q. ... o~
NO. AC. 0.4 0.55 0.9 ft.
1 0.66 0 .00 0.66 0 .00 0 .36 1.0
2 1.42 0.00 1.42 0 .00 0.78 1.0
EXHIBIT C-1
Rational Formula Drainage Area Calculations
Shenandoah Phase 88
~ ~ ~ ...J u.. 0 0 c ...J ...J z u.. u.. ~ :s 0::: :c 0::: CJ w ... w 0 ... CJ
0::: ...J I: (!) ... ...J 0 ...
t,) w ...J :::> z ... ...J ...J w >< :::> < w ia "' N It)
0 u.. (!) ~ (!) u.. > 0 :::> ~ a It) a
ft. ft. ft. ft/s min min In/Hr cfs In/Hr cfs
1.0 1.0 1.0 10 .4 0 .0 5.0 8 .22 3.0 9 .9 3 .6
1.0 800 .0 4 .0 1.4 9 .5 9.5 6.46 5.0 7 .9 6 .1
0
0 .... It)
It)
N .... a ~ a
In/Hr cfs In/Hr cfs
11 .0 4 ~0 12 .5 4 .5
8 .8 6 .. 9 10 .1 7 .9
0
0 0 0
0 It) 0 ....
It) a !: a
In/Hr cfs In/Hr cfs
14 .1 5.1 15 .8 5 .7
11 .4 8 .9 12 .8 10 .0
12/22/2003
0204-88-dra .xls
Exh ibit C-1
0 0
lj) "<t
ci 0
0 0
~ ~
II II
w w
EXHIBIT "C-2"
lYPICAL ALLEY SECTION CAPACllY
Ma x imum Flowrates (See Exhibit "C-1 ")
1 Opost 0=6 .9 cfs 1 OOpost Q= 1 0 .0 cfs
0
0
0
0
~
II
w
0 0
"<t lj)
0 ci
0 0
~ ~
II II
w w
Note : Elev. Shown
is Assumed
Calculation Alley Cross Section
Area = 4.00 sf n = 0 .014
Pw = 20.0 ft s = 0.006
From Mannings Equation
Q= 1 .49 A Rh~ S ~ n
Q= 1.49 (4.00)(4 .00)~3 (0.006)~ 0.014 20 .0
Q= 11.28 cfs
The capacity of the Alley Section is greater than the
100 year flow anticipated in the Right-o f-Way.
Therefore, the 100 year event will be conveyed
within the Right-of-Way.
0204-Sb-dm.dwg
Exh ibit ·c-2·
Shenandoah Subdivision
Phase 8A
Addendum #1
to the
Original Drainage Report
submitted in conjunction with the
Phase SB Construction Drawings
December, 2003
:
.
Shenandoah Subdivision
Phase 8A
Addendum #1
to the
Original Drainage Report
submitted in conjunction with the
Phase SB Construction Drawings
December, 2003
:
CERTIFICATION
I, Kent M. Laza, Registered Professional Engineer No. 65923, State of Texas, certify that
the revisions contained in this Addendum #1 to the Original Drainage Report for the
SHENANDOAH SUBDIVISION, PHASE 8A, were prepared by me in accordance with the
provisions of the City of College Station Drainage Policy and Design Standards for the owners
thereof.
DRAINAGE REPORT
ADDENDUM #1 OF THE DRAINAGE REPORT FOR
SHENANDOAH PHASE SA
Addendum #I to the Drainage Report for Shenandoah Phase 8A is intended to
analyze the drainage impacts of constructing Shenandoah Phase 8B. As stated in the
original drainage report, the area that comprises Phase 8B was included in the detention
calculations for Phase 8A, so no additional computations are necessary. The only
additions to the original report involve the stormwater capacity analysis of the alley
proposed with Phase 8B. As with the original system, the system for Phase 8B is
designed for a I 0-yr storm event as required by the City of College Station. The
following exhibits are provided to show the revisions to the drainage system.
Exhibit A -Excerpt from FEMA map
Exhibit B -Drainage Area Map
Exhibit C-1 -Drainage Area Calculations
Exhibit C-2 -Alley Capacity Analysis
I
N.T.S.
Flood
EXHIBIT A
Insurance Rate M Brazos C op Excerpt
ounty, Texas
and Incorporated Ar eos
Map Numbers: 48041 C0205D
Effective D ate : FEBRUARY 9 , 2000
< ~ w c ex: w ...J ...J
< ~ 0.. < u..
w 0 j:: .... c
(!) ex: ...J z < z < w z w u ~ :i:: < w ...J > :::&: ...J z c ex: ....
~ < We( u; w < w (!) .... cw > I->z 0 z ex: w < 0 c .... ::::> < ex: 0.. I-o~
NO. AC. 0.4 0.55 0.9 ft.
1 0.66 0 .00 0 .66 0 .00 0 .36 1.0
2 1.42 0.00 1.42 0.00 0.78 1.0
EXHIBIT C-1
Rational Formula Drainage Area Calculations
Shenandoah Phase 88
~ 3: 3: ...J u.. 0 0 c ...J ...J z u.. u.. ~ ~ ex: :i:: ex: 0 0 w .... w .... 0 .... ex: ...J ~ (!) .... ...J 0 ~ w ...J ::::> z .... ...J ...J w >< ::::> < w ca en N ..,,
0 u.. (!) ~ (!) u.. > u ::::> ~ a !!? a
ft. ft. ft . ft/s min min In/Hr cfs In/Hr cfs
1.0 1.0 1.0 10 .4 0 .0 5 .0 8 .22 3.0 9 .9 3.6
1.0 800 .0 4 .0 1.4 9 .5 9 .5 6.46 5 .0 7 .9 6 .1
0 ..,,
0 .... ..,, N .... a ~ a -In/Hr cfs In/Hr cfs
11 .0 4:0 12 .5 4 .5
8 .8 6 ,9 10 .1 7 .9
0
0 0 0
0 ..,, 0 ....
!!? a !: a
In/Hr cfs In/Hr cfs
14 .1 5 .1 15 .8 5.7
11.4 8 .9 12 .8 10 .0
12/22/2003
0204-88-dra .xls
Ex hibit C-1
0 0
O! ~
0 0
0 0
~ ~
II II
w w
EXHIBIT "C-2"
TYPICAL ALLEY SECTION CAPACITY
Ma x imum Flowrates (See Ex hibit "C-1 ")
1 Opost 0=6.9 cfs 1 OOpost Q= 10.0 cfs
0
0
0
0
~
II
w
0 0
~ O>
0 0
0 0
~ ~
II II
w w
4 r o.4o ' --z_ ,_ ----1c::=:::~~=-==::.....:==--==--==~4~%~--==-=====~==::rJ
Note: Elev. Shown
is Assumed
Calculation Alley Cross Section
Area = 4.00 sf n = 0.014
Pw = 20 .0 ft s = 0 .006
From Mannings Equation
Q= 1 .49 A Rh53 sYz n
Q= 1.49 (4.00)(4 .00)~3 (0 .006)Yz 0 .014 20 .0
Q= 11.28 cfs
The capacity of the Alley Secti on is greater than the
100 year flow anticipated in th e Right-of -Way .
Therefore , the 100 year event will be c onveyed
within the Right-of -Way .
0204-Sb-dm.dwg
Exh ibit ·c-2 ·
Item
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
Shenandoah Subdivision, Phase SB
Engineer's Estimate
December 23, 2003
Description Unit Quantity Estimated
Unit Price
Pavint! Construction
Prepare ROW Lump Sum 1 3000.00
Excavation C.Y. 438 5.00
1.5" HMAC Surface Course S.Y. 317 5.00
6" Lime Stabilized Subgrade S .Y. 3,429 5.50
Extra Lime Ton 25 96.00
6" Concrete Pavement w/ curb S.Y. 2,797 25.00
6" Crushed Limestone Base S.Y. 317 7.25
All Types Curb and Gutter L.F. 185 7.50
4" Sidewalk S.F. 469 2.75
Side\ValkRanlps S.F. 105 2.75
End of Road Markers EACH 4 200.00
Paving Subtotal
Drairuu!e System Construction
Concrete Flume (4' wide) L.F. 157 20.00
Dry Rip Rap S.F. 742 3.00
Silt Fence L.F. 1,265 2.00
Construction Exit S.Y. 134 35.00
Drainage System Subtotal
Water System Construction
6" PVC, C900 Water Line, Str. Backfill L.F. 115 19.00
2" Blow-Off Assembly EACH 1 440.00
Trench Safety (water) L.F. 115 LOO
Water System Construction
Sewer System Construction
8" PVC, D-3034, Str. Backfill L.F. 135 32.00
Standard Manhole, 14-16 ft. deep EACH l 2175.00
Remove Existing Sewet: Line (all sizes) L.F. 20 10.00
Connection to Existing Manhole EACH 1 400.00
Trench Safety (sewer) L.F. 135 2 .00
Sewer System Subtotal
Estimated Construction Cost
Page 1 of 1
Total
3,000
2,190
1,585
18,860
2,400
69,925
2,298
1,388
1,290
289
800
$104,024
3,140
2,226
2,530
4,690
$12,586
2,185
440
115
$2,740
4,320
2,175
200
400
270
$7.365
$126,715
Item
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
Shenandoah Subdivision, Phase SB
Engineer's Estimate
December 23, 2003
Description Unit Quantity Estimated
Unit Price
Paviot! Construction
Prepare ROW Lump Sum 1 3000.00
Excavation C.Y. 438 5.00
1.5" HMAC Surface Course S.Y. 317 5.00
6" Lime Stabilized Subgrade S.Y. 3,429 5.50
Extra Lime Ton 25 96.00
6" Concrete Pavement w/ curb S.Y. 2,797 25 .00
6" Crushed Limestone Base S.Y. 317 7.25
All Types Curb and Gutter L.F. 185 7.50
4" Sidewalk S.F. 469 2.75
Sidewalk Ramps S.F. 105 2.75
End of Road Markers EACH 4 200.00
Paving Subtotal
Drairuu?e System Construction
Concrete Flume (4' wide) L.F. 157 20.00
DryRipRap S.F. 742 3.00
Silt Fence L.F. 1,265 2.00
Construction Exit S.Y. 134 35.00
Drainage System Subtotal
Water System Construction
6" PVC, C900 Water Line, Str. Backfill L.F. 115 19.00
2" Blow-Off Assembly EACH 1 440.00
Trench Safety (water) L.F. 115 LOO
Water System COD.5truction
Sewer System Construction
8" PVC, D-3034, Str. Backfill L.F. 135 32.00
Standard Manhole, 14-16 ft. deep EACH 1 2175.00
Remove Existing Sewer Line (all sires) L.F. 20 10.00
Connection to Existing Manhole EACH 1 400.00
Trench Safetv (sewer) L.F. 135 2.00
Sewer System Subtotal
Estimated Construction Cost
Page 1 of l
Total
3,000
2,190
1,585
18,860
2,400
69,925
2,298
1,388
1,290
289
800
$104,024
3,140
2,226
2,530
4,690
$12,586
2,185
440
115
$2,740
4,320
2,175
200
400
270
$7.365
$126,715
Item
l
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
Shenandoah Subdivision, Phase SB
Engineer's Estimate
December 23, 2003
Description Unit Quantity Estimated
Unit Price
Paving Construction
Prepare ROW Lump Sum l 3000.00
Excavation C.Y. 438 5.00
1.5" HMAC Surface Course S .Y. 317 5.00
6" Lime Stabilized Subgrade S.Y. 3,429 5.50
Extra Lime Ton 25 96.00
6" Concrete Pavement w/ curb S.Y. 2,797 25.00
6" Crushed Limestone Base S.Y. 317 7.25
All Types Curb and Gutter L.F. 185 7.50
4" Sidewalk S.F . 469 2.75
Sidewalk Ramos S.F. 105 2.75
End of Road Markers EACH 4 200.00
Paving Subtotal
D~e System Construction
Concrete Flume (4' wide) L.F. 157 20.00
DryRipRap S.F. 742 3 .00
Silt Fence L.F . 1,265 2.00
Construction Exit S.Y. 134 35.00
Drainage System Subtotal
Water System Construction
6" PVC, C900 Water Line, Str. Backfill L.F. 115 19.00
2" Blow-Off Assembly EACH I 440.00
Trench Safety (water) L.F. 115 1.00
Water System Con.5truction
Sewer System Construction
8" PVC, D-3034, Str. Backfill L.F. 135 32.00
Standard Manhole, 14-16 ft. deep EACH 1 2175.00
Remove Existing Sewer Line (all sizes) L.F . 20 10.00
Connection to Existing Manhole EACH I 400.00
Trench Safety (sewer) L.F. 135 2.00
Sewer System Subtotal
Estimated Construction Cost
Page I of I
Total
3,000
2 ,190
1,585
18 ,860
2,400
69,925
2,298
1,388
1,290
289
800
$104,024
3,140
2,226
2,530
4,690
$12,586
2,185
440
115
$2,740
4,320
2,175
200
400
270
$7.365
$126,715
~-~ DEVELOPMENT PERMIT
PERMIT NO . 03-99
Project: SHENANDOAH PHASE 88
COlllGl STATION FOR AREAS INSIDE THE SPECIAL FLOOD HAZARD AREA
RE : CHAPTER 13 OF THE COLLEGE STATION CITY CODE
SITE LEGAL DESCRIPTION:
Shenandoah Phase 88
All Lots
DATE OF ISSUE: 02/26/04
OWNER:
Edward Froehling
3887 High Lonesome
College Station , Texas 77845
TYPE OF DEVELOPMENT:
SPECIAL CONDITIONS:
SITE ADDRESS:
Alexandria Ave at Decatur Drive
DRAINAGE BASIN:
Alum Creek
VALID FOR 9 MONTHS
CONTRACTOR:
Full Development Permit
All construction must be in compliance with the approved construction plans
All trees required to be protected as part of the landscape plan must be completely barricaded in accordance with Section
7.5.E., Landscape/Streetscape Plan Requirements of the City's Unified Development Ordinance , prior to any operations of
this permit. The cleaning of equipment or materials within the drip line of any tree or group of trees that are protected and
required to remain is strictly prohibited . The disposal of any waste material such as , but not limited to, paint, oil , solvents,
asphalt , concrete , mortar, or other harmful liquids or materials within the drip line of any tree required to remain is also
prohibited.
TCEQ PHASE II RULES IN EFFECT.
The Contractor shall take all necessary precautions to prevent silt and debris from leaving the immediate construction site
in accordance with the approved erosion control plan as well as the City of College Station Drainage Policy and Design
Criteria . If it is determined the prescribed erosion control measures are ineffective to retain all sediment onsite , it is the
contractors responsibility to implement measures that will meet City , State and Federal requirements . The Owner and/or
Contractor shall assure that all disturbed areas are sodden and establishment of vegetation occurs prior to removal of any
silt fencing or hay bales used for temporary erosion control. The Owner and/or Contractor shall also insure that any
disturbed vegetation be returned to its original condition , placement and state. The Owner and/or Contractor shall be
responsible for any damage to adjacent properties, city streets or infrastructure due to heavy machinery and/or equipment
as well as erosion , siltation or sedimentation resulting from the permitted work .
In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure
that debris from construction , erosion , and sedimentation shall not be deposited in city streets , or existing drainage
facilities .
I hereby grant this permit for development of an area inside the special flood hazard area . All development shall be in
accordance with the plans and specifications submitted to and approved by the City Engineer in the development permit
application for the above named project and all of the codes and ordinances of the City of College Station that apply .
oar ,
~~ CITY INFRASTRUCTURE
INSPECTION NOTICE
COLLEGE STATION
Date: 02/26/04
To : ~ Bob Mosley ( 2 )
D Diane Broadhurst ( 0)
From : Deborah Grace
RE : Shenandoah Phase BB
Location : Alexandria Avenue at Decatur Drive
~ Public Water Lines/Fire Hydrants
~ Public Sanitary Sewer
D Public Storm Sewer
~ Public Streets
D Public Detention Facility
D Driveway Connection to Public Street
D Private Construction within easement
D No Inspection Required
Comments :
Engineer's Estimate to follow .
r:\htltr\pz ltr\prod\pz2003 \p00092 l 8.doc
~ Engineer 's Estimates Attached
~ Construction Plans Attached
D Site Plan Attached
o ____ _
~-'1 CITY INFRASTRUCTURE
INSPECTION NOTICE
COLLlGl STATION
Date : 02/26/04
To : D Bob Mosley ( 0)
~ Diane Broadhurst ( 1 )
From : Deborah Grace
RE : Shenandoah Phase BB
Location : Alexandria Avenue at Decatur Drive
~ Public Water Lines/Fire Hydrants
~ Public San itary Sewer
D Public Storm Sewer
~ Public Streets
D Public Detention Facility
D Driveway Connection to Public Street
D Private Construction with i n easement
D No Inspection Required
Comments :
r:\h tltr\pzltr\prod\pz2003 \p00092 l 8 .doc
D Engineer's Estimates Attached
~ Construct i on Plans Attached
D Site Plan Attached
o ____ _
January 12 , 2004
CITY OF COLLEGE STATION
DEVELOPMENT SERVICES
1101 Texas Avenue South , PO Box 9960
College Station , Texas 77842
Phone 979.764.3570 I Fax 979.764.3496
MEMORANDUM
TO : Edward Freehling , Via fax 774 .0565 .V
FROM : Bridgette George , Assistant Development Manager
SUBJECT: SHENANDOAH PH 8-B (FP) -Construction Documents
Staff reviewed the above-mentioned engineering documents as requested. The
following page is a list of staff review comments detailing items that need to be
addressed . Please address the comments and submit the following information for
further staff review and approval of the plans :
__ One (1) set of revised construction documents.
If you have any questions or need additional information , please call Spencer
Thompson at 764 .3570 .
Attachments : Staff Review Comments
Cc: Michael McClure , McClure Engineering Inc., Via fax 693 .2554 v
Case file no . 03-00500321
Home of Texas A&M University
ENGINEERING REVIEW
COMMENTS No. 1
1. Change riprap section from Public Alley in City Park to concrete flume and riprap
flare .
2 . Sheet 3 on plan view of S-1 states "Ex. 8" PVC (to be removed)". Points to new
sewer installation . ?
Reviewed by : Spencer Thompson Date: January 12 , 2004
NOTE: Any changes made to the plans , that have not been requested by the City of College Station , mus t be
explained in your next transmittal letter and "bubbled " on your plans . Any additional changes on these plans
that have not been po inted out to the City of Co ll ege Stat ion will consti tute a completely new review .
Page 2 of 2
P&Z Case No.:
Date Submitted:
FINAL PLAT APPLICATION
(Check one) D Amending
($300.00)
*Includes public hearing fee
~Final
($400.00)
D Vacating
($400.00)
D Replat
($600 .00)*
The following items must be
consideration.
submitted by an established filing deadline date for P&Z Commission
MINIMUM SUBMITTAL REQUIREMENTS:
~ Final plat review and filing fee (see above) NOTE: Multiple Sheets -$55.00 per additional sheet
N/A Variance Request to Subdivision Regulations -$100 (if applicable)
~ Development permit fee of $200.00 (if applicable).
~ Infrastructure inspection fee of $600.00 (applicable if any public infrastructure is being constructed)
NIA All replats must be accompanied with a copy of the deed restrictions/covenants for this plat.
~ Thirteen (13) folded copies of plat. (A signed mylar original must be submitted after staff review.)
~ One (1) copy of the approved Preliminary Plat and/or one (1) Master Plan (if applicable).
~ Paid tax certificates from City of College Station, Brazos County and College Station l.S.D.
~ A copy of the attached checklist with all items checked off or a brief explanation as to why they are not.
~ Two (2) copies of public infrastructure plans associated with this plat (if applicable).
D Parkland Dedication requirement approved by the Parks & Recreation Board, please provide proof of
approval (if applicable).·
NAME OF SUBDIVISION ----------'S=h=e:..:....:n=a.:...:..nd=o=-=a=h'-L....:-P.:...:..ha=s=-=e'-'8=--=B------------
SPECIFIED LOCATION OF PROPOSED SUBDIVISION (Lot & Block) to the east of the intersection of
Southern Plantation and Decatur
APPLICANT/PROJECT MANAGER'S INFORMATION (Primary Contact for the Project):
Name Edward Froehling & Ed Froehling Builder. Inc. E-Mail -------------
Street Address 3887 High Lonesome Road
City College Station State ___ .....:T..:_X!----Zip Code 77845
PhoneNumber ____ ~9~7=9.:...:...7~7=6=.8=2=6=6 ___ _ Fax Number ____ 9=7'-'9"--'-. 7.:....7,_4.:...:..0=5=..:6~5:...__ __ _
CURRENT PROPERTY OWNER'S INFORMATION : (Af! owners must be identified. Please attach an
additional sheet, if necessary)
Name ------=E=dw;:.:_a=r'-=d'-'F...:.r=oe=h=l.:..:..in,....g______ E-Mail -------------
Street Address ______________ _....(s=a=m~e:;....=.as:;....=.ab=o::...:vo...=e"'-) _________ _
City ____________ State________ Zip Code _______ _
Phone Number -------------Fax Number ___________ _
ARCHITECT OR ENGINEER'S INFORMATION:
Name ____ ~M~c~C~lu~re~E~n~g~in~e~en~·n~9~·~1n~c~·----E-Mail ___ ___:.:.m.:..:..:ik=e=m'-'-'@;:::;...:..:tca=.n-=-=e=t __ _
Street Address 1008 Woodcreek Drive Suite 103 ----------------=-=-==..:...:...;=-=:=-::::..=..:'-=-!..:..:...:::.a...=.==~::=....----
C it y College Station State ___ _:.T..:....;X=------Zip Code 77845
Phone Number 979.693.3838 ----~~~~~----Fax Number 979.693.2554 ___ ___:::....:.....=:..:..:..-::..:::..:..:=.:::.:=-:......---
Acreage Total Property 3.543 acres Total# Of Lots 14 lots R-0-W Acreage 0 .805 ac.
Existing Use: Vacant Proposed Use: _____ ......;...;R=e=si=d=e:....:.nt=ia=I ____ _
Number Of Lots By Zoning District R-1 / 14 __ /__ __/ __
Average Acreage Of Each Residential Lot By Zoning District:
R-1 / 0 .165 ac. / __ --'--__ / __
Floodplain Acreage __ -0=---'a=c::..:...re=s=------------------------------
A Statement Addressing Any Differences Between The Final Plat And Approved Master Development Plan
And/Or Preliminary Plat (If Applicable):
None
Requested Variances To Subdivision Regulations & Reason For Same: __ N_o~n~e ___________ _
Requested Oversize Participation : _..:...N=o;.;..:n=e ______________________ _
Total Linear Footage of
Proposed Public:
1043
-0-
135
Streets (Alley)
Sidewalks
Sanitary Sewer Lines
115 Water Lines
156
-0-
Channels
Storm Sewers
-0-Bike Lanes I Paths
Parkland Dedication due prior to filing the Final Plat:
ACREAGE:
OR
# of acres to be dedicated
+ 60 x $358 = $ _____ development fee
# of acres in floodplain
# of acres in detention
# of acres in greenways
FEE IN LIEU OF LAND :
___ #of Single-Family Dwelling Units X $556 = $ __
# of Multi-Family Dwelling Units X $452 = $ __ _
__ (date) Approved by Parks & Recreation Board
NOTE: DIGITAL COPY OF PLAT MUST BE SUBMITTED PRIOR TO FILING.
The applicant has prepared this application and certifies that the facts stated herein and exhibits attached
hereto are true, correct and complete . The undersigned hereby requests approval by the City of College
Station of the above-identified final plat and attests that this request does not amend any covenants or
restrictions associated with this plat.
Date1
1 1+. •• ,.. n">
SUPPLEMENTAL DEVELOPMENT PERMIT INFORMATION
Application is hereby made for the foUowing development specific waterway alterations : --=Su=bd=ivls~· =io~n~co=n=s~tru=c=tio~n~in~th~e ~S""pn~·n,.,._g ~C'"'"'ree='-'-k _,_T_,_,,,rib=ut=a,_,_rv_·=-c·
drainage basin
ACKNOWLEDGMENTS:
I, Michael R. McClure. P.E. , design engineer/owner, hereby acknowledge or affirm that:
The information and conclusions contained in the above plans and supporting documents comply with the
current requirements of the City of College Station, Texas City Code, Chapter 13 and its associated Drainage
Policy and Design Standards .
Design Engineer
As a condition of approval of this permit application, I agree to construct the improvements proposed in this
application according to these documents and the requirements of Chapter 13 of the College Station City
Code.
Contractor
CERTIFICATIONS:
A . I, , certify that any nonresidential structure on or proposed to be on this
site as part of this application is designated to prevent damage to the structure or its contents as a
result of flooding from the 100-year storm .
Engineer Date
B. I, certify that the finished floor elevation of the lowest floor, including any
basement, of any residential structure, proposed as part of this application is at or above the base
flood elevation established in the latest Federal Insurance Administration Flood Hazard Study and
maps, as amended .
Engineer Date
C. I, Michael R. McClure. P.E. , certify that the alterations or development co:vered ~~it shall
not diminish the flood-carrying capacity of the waterway adjoining or crossing ~'~~ and
that such alterations or development are consistent with requirements of the ;'/f.-"l• ~l!~~on
City Code, Chapt 13 concerning encroachments of floodways and of floodwy.!!i.~.Q215:.~ ..... ::.1~
I~ 12 ~" 03 l~~t9.~.~.~.R.M~9hV.~~·I
-..:......!...---jJ.,.::..:=-=-..::+~+--F!....l....o~~l.,..L..----~
Date lto_;.~~G <:-.()··~ §
D.
•,~;·• • .f STE~···r~ ~ ' ... .s, •••••• ~\J-
I, , do certify that the proposed alterations do not raise ~~e 100
year flood above elevation established in the latest Federal Insurance Administration Flood Hazard
Study.
Engineer Date
Conditions or comments as part of approval: -----------------------
In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that debris
from construction , erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities . All development
shall be in accordance w ith the plans and specifications submitted to and approved by the City Engineer for the above named project.
All of the applicable codes and ordinances of the City of College Station shall apply.