Loading...
HomeMy WebLinkAbout88 Development Permit 438 A&M Easterwood 3 Oil Well09 /23 /96 14:39 '5'409 846 8252 KLING ENGR ~~~ COCS VOLK /M ORG AN KLING ENGINEERING & SURVEYi NG 4103 Texas Avenue, Suite 212 Bryan , TcXD 77802 BJ. Kling, P .E., R.P .L.S. S.M. Kling , R.P .L.S. September 23, 1996 MEMO: Consulting Engineers • Land Surveyors Telephone 409/846-6212 Fax 409/846-8252 TO: Kent Laza, P.E. City Engineer -City of College Station FROM: Fred Paine Post Olfice Box 4234 Bryan, Texas 77805 RE: Oil Well Permit -Drainage Report/Drainage Development Permit We are preparing a permit for Union Pacific Resources Company to re-enter an existing well within the city limits. The well was previously permitted in 1991 under the name "Gig'Em # 1 ". This permit was extended through November 1, 1993. The well pad and access road from this project are still in place. The new well, named "A&M Easterwood #3" will util!ze these existing fe~tures with no increase in size or change in orientation expected. We were under the opinion that because the pad and access road were previously permitted and their usage is consistent with the original permit, that no drainage report or D.D.P. will be required. I have tried to contact engineering staff multiple times since Friday Sept 20, to get direction in this matter to no avail. We have a deadline for our submittal of Thursday Sept 26th. Your recommendations concerning the drainage portion of this permit would be greatly appreciated. Please respond by phone or fax as soon as possible. Thank you. l(!JUUl