HomeMy WebLinkAbout88 Development Permit 438 A&M Easterwood 3 Oil Well09 /23 /96 14:39 '5'409 846 8252 KLING ENGR ~~~ COCS VOLK /M ORG AN
KLING ENGINEERING & SURVEYi NG
4103 Texas Avenue, Suite 212
Bryan , TcXD 77802
BJ. Kling, P .E., R.P .L.S.
S.M. Kling , R.P .L.S.
September 23, 1996
MEMO:
Consulting Engineers • Land Surveyors
Telephone 409/846-6212
Fax 409/846-8252
TO: Kent Laza, P.E.
City Engineer -City of College Station
FROM: Fred Paine
Post Olfice Box 4234
Bryan, Texas 77805
RE: Oil Well Permit -Drainage Report/Drainage Development Permit
We are preparing a permit for Union Pacific Resources Company to re-enter an
existing well within the city limits. The well was previously permitted in 1991 under
the name "Gig'Em # 1 ". This permit was extended through November 1, 1993. The
well pad and access road from this project are still in place. The new well, named
"A&M Easterwood #3" will util!ze these existing fe~tures with no increase in size or
change in orientation expected. We were under the opinion that because the pad and
access road were previously permitted and their usage is consistent with the original
permit, that no drainage report or D.D.P. will be required. I have tried to contact
engineering staff multiple times since Friday Sept 20, to get direction in this matter
to no avail. We have a deadline for our submittal of Thursday Sept 26th. Your
recommendations concerning the drainage portion of this permit would be greatly
appreciated. Please respond by phone or fax as soon as possible.
Thank you.
l(!JUUl