HomeMy WebLinkAbout68 Development Permit 410 Lone Star PavillionW .. CITY OF COLLEGE STATION
~ hat om-a. 9110 1101 T~• AVWtue
CoJl .. c ltacton, Tau ??Ml-IHO .
CoDece StltimJAB.JLimitld Pmtnenhlp
A Delawsre Lum.d Pmnerthip
Attn: Mt. Chui• W. Shean
1325 La Cindw
Houstm, T ... '77054
·(Mt) 76'-HOO
It is mdemcod and nnmlll]y lo-i that CcUJe11 S~A.B./Limiied Parmenhip, •
Delaware Limited Pannersbip, will particip& in the consuuction of & stonn drain !om ibe
curb inlet b:aed ar 1be in1e1SC1ian af'Uncola Awnue aacl Posw A~ 1a 1be STorm drain
system loc:aied wilhin 1he Teas Avenue riabt-af'-way . The Limited Pannenhip qrais 1D
financially partigpate in m amount the equall lt\y pttc:em (SO%) of the total CCDIU'\l=lcin cost
up 10 I mmamum af'ten thousand dollUJ (Sl0,000).
kL KmrM.Lua~
City Enamecr j A
Date of' Sipiature: / 4 / f ,, r i
College Station/ AB./Limrtcd Partnership~
a Delaware linDted pannenhip.
By: A.B . Open.tions, Inc .~ a Delaware
Corporation .
::JZ~
Name : }<-.~.l lJ1V\'f Z?
Its: 5r . V. f
Date of SipatUre: P--21/ -9 6
Home of T••• A'M Unlvet1lty
i'.'0 0 ~ SJAS .L N3:JM 013A3G +-+-+-MD ~N iddOHS S:V TSO T 6 96 !IOi'.'D, 6i'.': GT 96 /ti'.'/i'.'t
-----------
Basic Outlet Structures
E
Orifices
• Opening perpendicular
to water surface
• Opening parallel
to water surface
H
H
Orifice Area\ Submerged Outfall ~
Flow., 1---------;;;~;·c;~;~l-'¥-Z... :c ~\_Centroid of Orifice
E
Orifice
Rating Curve
11hele:
10-3
Equation
Flow, Q
H /Orifice Area
I _l_ I
o.s c • Conlnidion l Engergy Loss Coe!f. a= CA(2gH) A·ElediveOriceAnla
rr7:~"7TTTTTT7"TTY"T7'..,..,..,.,..,...,...,...,.~ ~~~~~
Free Outfall
(Reprinted from Pond-2 Manual)
Haestad Methods , Inc. 10 -3
g. kalleration clle kl~
H • Orifice Head
1-800-727-6555
t
c •
LONE STAR PAVILION
FINAL DRAINAGE ENGINEERING REPORT
COLLEGE STATION, TEXAS
WILSON\ZETTY/ASSOCIATES
3100 WILCREST DR.
SUITE 325
HOUSTON, TEXAS 77042
(713) 952-8600
APPROV D FOR
:r
' .
-•
I
"
...
PURPOSE:
FINAL DRAINAGE ENGINEERING REPORT
LONE STAR PAVILION SHOPPING CENTER
COLLEGE STATION, TEXAS
01/20/96
The purpose of this engineering report is to outline and
discuss the development and drainage proposed for the Lone Star
Pavilion, College Station.
GENERAL LOCATION:
1. The Lone Star Pavilion will be located at the Northerly corner
of the intersection of Lincoln Ave. and Texas Ave., wrapping around
the existing Red Lobster Restaurant located on the corner proper.
2. According to FIGURE II-1 in the City of College Station's
Drainage Policy and Design Standard Manual, the drainage from this
property is in Basin 2 with primary drainage way being Wolfpin
Creek and the secondary drainage way being Wolfpin Creek Tributary
C. The route of the secondary drainage way was received from the
Texas Highway Department,
3 . The Existing 707 Center facing on Texas Ave. adjoins the
proposed development on it's northwesterly property line. The
property adjacent to the subject project on the northeasterly
property line is undeveloped at the present time. Across Lincoln
Ave. is an apartment project.
PROPERTY DESCRIPTION:
1. The Lone Star Pavilion Shopping Center will consist of the
construction of a retail shopping center and parking lot on a 9.270
acre tract of land.
2. 1.0812 acres are covered by existing pavement northeast of the
Red Lobster Inn, which will remain and be incorporated into the
proposed parking lot. Two e x isting buildings with parking
facilities on 0.7719 acres of land that fronts Tex as Ave. will be
removed and rebuilt as part of the proposed parking lot. The
remaining 7.4169 acres of undeveloped raw land will be used for
parking lot, retail shopping center building, and detention pond.
3. The owner is Charlie Shears, Shears Interests, 13 2 5 La Concha,
Houston, Texas 77054 .
4. The subject property is properly zoned for the commercial use
for which this project is proposed.
1
. r
·,
.'
·.
PRIMARY DRAINAGE BASIN DESCRIPTION:
1. Basin 2 is gently sloping to Wolfpin Creek, which flows
easterly, with a variety of land uses.
2. No related previous drainage studies exist,
drainage maps for Texas Ave. prepared by the
Department.
except for the
Texas Highway
3. The proposed development is located on Flood Insurance Map No.
48041C0144 c, effective date July 2, 1992, and is shown to be in
zone X, which is outside the 500-year flood plain.
SECONDARY DRAINAGE BASIN DESCRIPTION:
The general off-site drainage crosses the subject property
from the 707 Center on the northwest and the undeveloped land on
the northeast. This runoff is presently being carried by an
existing swale running from the northwest property line to an
existing storm drainage inlet on Lincoln Avenue which appears to be
satisfactorily handling the existing runoff. There is an existing
24" diameter pipe leaving this inlet, which connects to an existing
inlet on the northeasterly side of Texas Avenue. According to the
survey by Municipal Development Group, the slope on this pipe is
0.62 %. The capacity of this pipe, using an n factor of 0.013,
without head, is 17.8 cfs., with 0.76 feet of head the flow is 20.6
cfs. At this elevation the water will flow into the street, which
it presently does. The flow l·ine of the pipe at the inlet on
Lincoln is 317.80 and the street elevation at the inlet is 320.56.
The runoff from the 707 Center (area A) will be piped across
the subject property using a 24" RCP@ 0.646 %, which is capable of
handling 18.18 cfs without head (approx. 5 year storm). To achieve
the 10 year storm run-off, the 24" will require 0.85 feet of head.
The restrictions of the out fall elevation and the pipe cover in
the north end of this pipe will not allow the slope to be
increased.
The flows using a minimum Tc of 10 min. are as follow;
FLOW FROM AREA A
CiA = Q
Flood c i A (ac) Q (cf s)
2 year 0.65 6.3 3.71 15.19
5 0.65 7.7 3.71 18.57
10 0.65 8.3 3.71 22.02
25 0.65 9.8 3.71 23.63
50 0.65 11.1 3.71 26.77
100 0.65 12.6 3.71 30.38
2
: .
._
..
The 10 year storm runoff from the undeveloped land on the
northeast (area E) will be intercepted by a back-slope trench and
delivered by an 12 11 pipe to the pond outfall .structure and a 24"
pipe to the existing inlet. The back-slope trench inlet is
designed to allow the runoff above the 10 year storm to enter
Lincoln Ave. and be carried down the pavement, as it normally does
at the present. The flows for this undeveloped area using a min.
of 10 min. Tc are as followi
FLOW FROM AREA E
Ci A = Q
Flood c i A (ac) Q (cf s)
2 year 0.35 6.3 2.95 6.51
5 0.35 7.7 2.95 7.95
10 0.35 8 .3 2.95 8.57
25 0.35 9.8 2.95 10.12
50 0.35 11.1 2.95 11.46
100 0 .35 12.6 2.95 13.01
Back-slope Trench
side slopes = 2:1, bottom 2', slope = 0.25%, n = 0.02
Q = 13 .98 cfs at depth of 1.15'
DEVELOPMENT CRITERIA REFERENCE AND CONSTRAINTS
1. Regulations -The drainage system for the proposed development
was simplified and standard criteria was met by diverting the
runoff from off-site property from consideration in the
development runoff calculations . Thus, the pre-development
and the post development runoff discharges remain unchanged.
2. Development Criteria Reference and Constraints
a. There were no previous drainage studies for the property
under consideration.
b . By achieving parity between the pre-development and post
development runoffs, the impact of this project on existing
street and drainage systems is held to a minimum.
3
••
3. Hydrological Criteria
4.
a. The Intensity-Duration-Frequency ( IDF) Curves were
prepared using the constants obtained from the Texas Highway
Department, based on Technical Paper No. 40, for Brazos
County, Texas. Design rainfall 100-year~ 24 hour.
b. Runoff calculation method used was the Soil Conservation
Service, TR-55, which coincides with the data contained in the
City of College Station Designs Standards.
c. The Triangular and Computed Flood Hydrographs were used
in conjunction with reservoir routing stage-storage-discharge
relationship as found in the scs routing coefficient method.
The computer software is manufactured by Eagle Point.
d. The design storm recurrence intervals are 2, 5, 10, 25,
SO and 100 years with 24 hour duration.
e. Standard calculations were used in this design.
Hydraulic Criteria:
a. The capacities of the piping in the front parking lot
were determined using graphs based on Manning's formulas
(n=0.013), for Reinforced Concrete Pipe.
Dia. Slope Q (full)
18 II 0.7% 8.79 cfs
24 11 0.31% 12.59 cf s
24" 0.646% 18.18 cf s
36 II 0.35% 39.58 cf s
3 0 II 1.50% 50.19 cf s
Capacities for piping at the rear of the buildings.
Dia. Slope Q (full)
30 II 0.95% 39.95 cf s
12" 4.72% 9.22 cfs
b. Detention Pond at the Rear of Buildings:
The detention at the rear of the buildings uses a grass
bottomed pond with side slopes of 3:1 and a lateral slope at
O. 5%. The entire pond will be reinforced with "Pee-Mat"
11 Greenstreak 11 as manufactured by American Excelsior Company.
This product has passed Tex DOT tests and is on their approved
materials list. At an elevation of 326.5, the maximum depth
at the southerly end of the pond, the capacity of the pond is
65209 cubic feet. The out-fall facility shall consist of a
1.00' high by 0.694' .wide opening flow line at elevation
321.2 i with a ~.45-2a-' wide Cipolletti weir crest elevation at
3 24 .4'4 . I c./{qf
4
:
RUNOFFS FOR AREAS c & D
EVENT Q CPRE Q DPRE TOTAL PRE Q C po sT Q Dpos T TOTAL POST
2 YEAR 8.12 9.47 17.59 14.07 17.58 31.65
5 9.93 11.57 21.50 17.20 19.83 37.03
10 10.70 12.47 23.17 18.54 21.38 39.92
25 12.64 14.72 27.36 21.89 25.24 47.13
50 14.31 16.58 30.89 24 :r9 28.59 53.38
100 16.25 18.93 35.18 28.14 32.45 60.59
PROPOSED DISCHARGES
EVENT PARKING LOT DETENTION POND TOTALS
2 YEAR 10.90 6.69 17.59
5 13.32 8.18 21.50
10 14.36 8.81 23.17
25 16.95 10.41 27.36
50 19.14 11.75 30.89
100 21.80 13.38 35.18
The Detention Pond was lengthen 18. 5', and re-sloped the
parking lot which increases the volumes that were used in the
December 26, 1996 report.
INCREMENTAL VOLUMES OF THE DETENTION POND
ELEVATION VOLUME
321.50 437.5 CF
322.00 2541.5
322.50 5401.6
323.00 9161.9
323.50 13797.8
324.00 19527.5
324.50 26484.6
325.00 34607.5
325.50 43820.5
326.00 54046.4
326.5 65209.0
5
. '
·.
VOL. =
EVENT
2
5
10
25
50
100
2 YEAR
REQUIRED DETENTION POND
1/2 x 2TP X 60 x ( QPOST -QDISCH.)
QPOST -DISCH. = DIFF. x TP X 60 REQUIRED VOL. ELEV.
17.58 6.69 10.89 37.20 24306 C.F. 324.34
19.83 8.18 11.65 48.52 33915 324.96
21.38 8.81 12.57 55.32 41722 325.39
25.24 10.41 14.83 57.15 50852 325.69
28.59 11.75 16.84 56.92 57512 326.16
32.45 13.38 19.07 56.98 65196 326.50
(ACTUAL 65209)
DETENTION POND OUT FALL CALCULATIONS
Q = 6.86; ELEV. = 324.36; FL ELEV. = 321.21
1.0' HIGH X 0.694' WIDE RESTRICTER OPENING
FL ELEV. = 321.21
TOP ELEV.= 322.21
h = 324.36 -322.21 = 2.15'
Q Ca (2gh)iiz = 0.82 X .694 X 11.76 6.69 OK
100 YEAR
Q = 13.66; ELEV. 326.50
h 1 = 326.50 -322 .21 = 4.29'
Q1 Ca (2gh)112 = 0.82 X .694 X 16.59 = 9.44
326.50 -324.64 = i.86'
Q2 3 . 3 6 7 X B ( h) 312 = 3 . 3 6 7 X . 4 61' X ( 1. 8 6) 312 = 3 . 94
QTOTP..L = 9.44 + 3.94 = 13.66 OK
6
FLOW OVER WEIR PLUS FLOW THROUGH RESTRICTER OPENING
EVENT ELEVATION QTOTAL QMAXIMUM
5 YEAR 324.95 7.91 < 8.18
10 325.38 9.21 > 8.81
25
50
VOL =
EVENT
2
5
10
25
50
10 0
325.83 10.25 < 10.41
326.14 12.06 > 11.75
If the water level goes higher than 326.5, the over-flow will
discharge back through the curb cuts into the back parking lot
and into Lincoln Ave.
c. Detention in Front Parking Lot:
The front parking lot is divided into nine areas plus 242.00
lf of 36" and 260.00 lf of 24" RCP connecting the inlets in
these areas. which will also be used as detention. The
volumes were calculated with 10'' of water standing over the
inlets tapering out to the base of the proposed curbs.
Therefore, automobiles will be parking in less than 3" of
standing water. The flow from the front parking lot will be
restricted in the junction box near the existing inlet on
Lincoln Avenue.
DETENTION OUT-FALL FACILITIES FOR PARKING LOT
The out-fall facilities shall consist of an 12" pipe set at
elevation 318.04 and a Cipolletti weir with its 5.97' crest at
elevation 323.36, in the junction box near the existing inlet
on Lincoln Ave. The ma x imum water level will be 324.00 .
REQUIRED PARKING LOT DETENTION
1/2 x 2 TP x 60 x ( QPO ST -QDISCH . )
QE'OST -DISCH. = DIFF. X TP X 60 = REQUIRED VOL. ELEV.
14.07 10.90 3.17 35.19 6693.1 C.F. 323.36
17 .2 0 13.32 3.88 41.44 9647.2 323.53
18.54 14.36 4.18 46.78 11732.4 323 .65
21.89 16.95 4 .94 47.86 14185 .7 323.79
24.79 19.14 5 .65 47. 41 16043 .5 323.90
28.14 21.80 6.34 47 .30 17992.9 324.00
(ACTUAL 18003.13)
7
-.
·.
2 YEAR
100 YEAR
WEIR
PARKING LOT OUT FALL CALCULATJONS
Q = 10.73; ELEV. = 323.36; FL ELEV. = 318.04
12" RESTRICTER PIPE -FL ELEV . = 318 .04
TOP ELEV. = 319.04
h = 323 .36 -319.04 = 4.32'
Q =Ca (2gh)1 12 = 0.82 X .785 X 16.67 = 10 .73 OK
Q = 21.52; ELEV. 324.00
h 1 324 . 00 -319 . 04 = 4. 96'
Ca ( 2 g h) 112 = 0 . 8 2 X . 7 8 5 X 1 7 . 8 6 = 11.50
h 2 = 324.00 -323.36 = 0.6 4 '
Q2 = 3 .367 X B (h)312 = 3.367 X 5.97' X (0 .5 1 2)312 = 10.29
Q ":'OT.".L = 11. 50 + 10 . 02 = 21. 79 OK
FLOW OVER WEIR PLUS FLOW THROUGH RESTRICTER PIPE
ELEVATION Q '!'OTP<.L
323 .5 11.95
323.6 13 .39
323 .7 15.13
323 .8 17.13
323 .9 19 .36
8
FLOW FROM AREAS THAT CONTINUE TO DRAIN AS THEY DO AT PRESENT
Year C i A (to Texas) A (to Lincoln) Q (Tex.) Q (Linc.)
2
5
10
25
50
100
0.75 6.3
7.7
8.3
9.8
11.1
12.6
0.8781 ac. 0.8861 ac. 4.15 cfs
5 .. 07
5.47
6.45
7.31
8 .30
FLOW FROM AREAS THAT WILL BE REROUTED TO PROJECT
4.19 cfs
5.12
5.52
6.51
7.38
8.37
Year C i A (from Linc.) Q (C 1 )
2 0.75 6.3 0.1710 ac
5 7.7
10 8 .3
25 9.8
50 11.1
100 12.6
0.81 cfs
0.99
1. 06
1. 26
1.42
1. 62
The proposed parking lot in front of the shopping center will
have nine separate detention ponds, all with the same low
point elevation at inlets and will be drained by pipes to the
existing inlet on Lincoln Avenue. All the runoff on the
proposed buildings and behind the buildings will be subject to
a detention pond to be constructed adjacent to the
northeasterly property line.
b. The off-site runoff from the undeveloped property to the
northeast, will remain the same. The total discharge from the
front parking lot and the discharge from the detention pond
will be equal to the runoff which occurs at the present time,
plus the drainage that has been rerouted from the existing
paved area being repaved. The runoff from the off-site
properties that flow across this project at the present time
have been rerouted through the subject property so as not to
affect the drainage system of the proposed development.
c. The development is broken into five areas . Pre-
development consists of Area A (the 707 Center) . Area B (the
property being developed) ,and E (the undeveloped land on the
northeast) . Area B is further divided into Area c and Area D.
Area C is the raw land in front of the proposed shopping
center buildings that does not have existing pavement on it.
Area D is the raw land that has the proposed buildings, the
rear parking lot and pond on it.
10
·.
The post development consists of Area c (same as above), Area
C1 (that portion of the pavement that is in the parking lot
behind Red Lobster which has been rerouted to the front
parking lot system, and C2 (0.0955 acres that has been
rerouted to drains to Red Lobster driveway) and Area D (the
same above) . These areas are marked on tne accompanying maps.
Unit Hydrographs and Flood Completed Hydrographs were
prepared for each analysis area and combined where
appropriate. The various storms were routed through the
detention ponds.
PRE-DEVELOPMENT RUNOFF -UNDEVELOPED AREA C
Year c i A Q
2 0.40 6.3 2.9024 ac 7.31 cfs
5 7.7 8.94
10 8.3 9.64
25 9.8 11.38
50 11.1 12.89
100 12.6 14.63
PRE-DEVELOPMENT RUNOFF -UNDEVELOPED AREA D
Year c i A Q
2 0.35 6.3 4.2927 ac 9.47 cf s
5 7.7 11.57
10 8.3 12.47
25 9.8 14.72
50 11.1 16.58
100 12.6 18.93
PRE-DEVELOPMENT -PRE-DEVELOPMENT RUNOFF -AREA C TOTAL
Year Area c AREA C1 AREA TOTAL AREA c
2 7.31 cfs 0.81 cf s 8.12 cf s
5 8.94 0.99 9.93
10 9.64 1. 06 10.70
25 11.38 1.26 12.64
50 12.89 1.42 14.31
100 14.63 1.62 16.25
11
Soil Conservation Service, Technical Release no. 55
Q (inches) = (P -0.2 S)2 I (P + 0.8 S)
s (1,000 I CN) -10
PRE-DEVELOPMENT VOLUME FOR AREA c
Year p CN Q (inches) Area 43560/12 Volume
2 4.5 75 2.05 x 2.9024 x 3630 = 21598 cf
5 6.2 3.46 36454
10 7.4 4.51 47516
25 8.8 5.77 60791
50 9.8 6.69 70484
100 11. 0 7.82 82389
PRE-DEVELOPMENT VOLUME FOR AREA D
Year p CN Q Area Volume
2 4.5 75 2.05 4.2927 31944 cf
5 6.2 3.46 53915
10 7.4 4.51 70277
25 8.8 5.77 89911
50 9.8 6.69 104246
100 11.0 7.82 121377
POST-DEVELOPMENT RUNOFF -DEVELOPED AREA c + C1 -C2
Year c i A Q (cfs)
2 0.75 6.3 2.9779 ac 14.07 cf s
5 7.7 17.20
10 8.3 18.54
25 9.8 21.89
50 11.1 24.79
100 12.6 28.14
Soil Conservation Service, Technical Release no. 55
Q (inches) = (P -0.2 S)2 I (P + 0.8 S)
s = ( 1, 0 0 0 I CN) 10
12
'
POST-DEVELOPMENT VOLUME FOR AREA c TOTAL
Year p CN Q (INCHES) Area 43560/12 Volume
2 4.5 94 3.82 x 2.9779 x 3630 = 41293 cf
5 6.2 5.50 59454
10 7.4 6.69 72317
25 8.8 8.08 87343
50 9.8 9.07 98045
100 il. 0 10.27 111016
POST-DEVELOPMENT TIME TO PEAK FOR AREA C TOTAL
Year Vol Q (cf s) Vol/(1.39 x Q x 6 0) = Tp (min)
2 41293 14.07 35.19
5 59454 17.20 41.44
10 72317 18.54 46.78
25 87343 21.89 47.86
50 98045 24.79 47.41
100 111016 28.14 47.30
POST-DEVELOPMENT RUNOFF -DEVELOPED AREA D
Year c i A (ac) Q (cf s)
2 0.65 6.3 4.2927 ac 17.58 cf s
5 7.7 19.83
10 8.3 21.38
25 9.8 25.24
50 11.1 28.59
100 12.6 32.45
Post-DEVELOPMENT VOLUME FOR AREA D
Year p CN Q Area Volume
2 4.5 91 3.50 4.2927 54538 cf
5 6.2 5.15 80249
10 7.4 6.33 98637
25 8.8 7.72 120296
50 9.8 8.71 135723
100 11.0 9.90 154266
13
POST-DEVELOPMENT TIME TO PEAK FOR AREA D
Year Vol Q (cfs) Vol/(1.39 x Q x 60) = Tp (min)
2 54538 17.58 37.20
5 80249 19.83 48.52
10 98637 21.38 55.32
25 120296 25.24 57 .. 15
50 135723 28.59 56.92
100 154266 32.45 56.98
d. The drainage patterns are as follows;
1) the off-site runoff has been rerouted to remove them
from the design consideration for this project,
2) portions of existing pavement runoff will be allowed
to flow to Tex as Ave. and Lincoln Ave . as it does at
present, which removes it from the design considerations
for this project, with the remainder being included in
the front parking lot system,
3) the 225' adjacent to Texas Ave. that is being
redeveloped as part of the parking for this project will
be allowed to sheet flow to Texas Ave. which is the
direction of its runoff at the present time .
4) the runoff from the front parking lot will be
detained in nine separate ponds on the pavement and
piped to a junction box in front of the existing
inlet on Lincoln Avenue,
5) the building and back parking lot runoffs will
be detained in a detention pond located adjacent to
the northeast property line, and
6) the off-site runoff from the adjoining undeveloped
property on the northeast side of the project will be
intercepted by a back-slope trench and taken into the
system by use of an open sided inlet which will allow a
portion of the flow to enter Lincoln Ave. without causing
a strain on the drainage capacity of the existing
pavement.
14
2. Specific Details:
a. The drainage problems encountered in the drainage design
of this project were:
1) incorporating the existing paving into the proposed
new front parking lot. The existing pavement determined
the elevations in the new parking lot and the elevations
of all the other items in the developments.
2) determining the best method of handling the runoff
from the off-site properties. To simplify the design
consideration, these runoffs were rerouted around the
internal drainage systems.
3) To prevent a system overload by including all of the
runoff that may occur during a 100 year storm, the inlet
at the end of the back-slope trench is designed to allow
a portion of the runoff to pass around the open sided
inlet and flow into the gutter of Lincoln Ave. which will
not adversely affect the street drainage characteristics.
b. Detention solution encountered the following problems;
1) The location and arrangement of the back-slope trench
caused a problem in the layout of the detention pond. To
allow enough room to place the back-slope trench on the
proposed project property, the width of the rear parking
lot was reduced.
2) The use of a detention area in the front parking lot
was used, because of the restrictions imposed on the rear
detention pond, mentioned above. The use of detention
ponds on the front parking lot required the removal of a
portion of the existing pavement to provide an adequate
amount of storage.
c. The arrangement of the inlets and junction boxe s in the
system will facilitate easy access for maintenance.
The only problem that may occur is the size of the pipe
that leaves the existing inlet on Lincoln.
CONCLUSIONS:
1. It is our opinion that all of the Standards of the City of
College Station Drainage Policy and Design Standards have been met.
2. The effectiveness of the proposed drainage design will not
allow any additional damage from storm water flows that do not
exist at the present time .
15
;
3. The proposed drainage system was designed using the 100-year
storm information furnished by the City of College Station.
Therefore, the development of this project will not change the
runoff in the secondary system from what is experienced at present.
REFERENCES:
All criteria and technical information followed the guide
lines of the City of College Station Drainage Policy and Design
Standards and prepared using the Eagle Point software.
APPENDICES:
1. Hydrologic Computations
a. Land use for the 707 Center was Business/Commercial and
the land use for the undeveloped property to the northeast of
the project was Natural Grasslands .
b. Storm water runoff (peak 100-year discharge) for;
1) the 707 Center was determined to be 30.38 cfs
2) the pre-development raw land portion runoff of the
project was determined to be 35.18 cfs
3) the undeveloped off-site property to the northeast was
determined to 13.01 cfs
4) post development run-off for the front parking lot was
determined to be 28.14 cfs
5) detention pond maximum discharge 13.38 cfs
6) detention in parking lot max. discharge 21.80 cfs .
c. The pre-developed 100 year runoff for Area c and D is
35.18 cfs and the post development discharge for Area c and
Area Dis 35.18 cfs. Therefore, the project does not increase
the total amount of runoff that presently occurs.
2. Hydraulic Computations:
a. There are no culverts in this project.
16
·-
b. Storm Sewer Capacities
1) Pipes in front parking lot
a) 18 II capacity 8.79 cfs
b) 24 11 capacity 12.59 cfs
c) 3 0 II capacity = 50.19 cfs
d) 36 II outfall = 39.58 cfs:
e) 24 11 from 707 Center; cap. = 18.18 cf s
2) Pipes from the detention pond and back-slope trench
a) 12 11 capacity = 9.22 cfs; will carry 9.0 cfs
the remaining 4.01 cfs (for 100-yr storm) will be
discharged to Lincoln Ave.
b) 30" capacity = 39.95 cfs
c. Street Capacity:
Lincoln Ave.; Yo= 7", Sp= 19', slope= 1.33%
Q (half section) = 20.0 cfs capacity
from City of College Station topo. map, the area
being drained by this reach of Lincoln Ave. is
3.75 Acres
Time of concentration= 300 ft. at 1 fps = 5 min
+ 900 ft. at 2 fps= 7.5 min
Total Tc= 13.5 min.
Intensity for (25-yr storm) = 8.3 in/hr
Runoff coefficient; Medium density residential
c = 0.55
Runoff for Lincoln Ave. = 0.55 x 8 .3 x 3.75 = 17.12 cfs
d. Storm Inlet Capacity:
1) Inlets in front parking lot are all 2 foot square
grate top inlet. Open Area is 75% of 4 s.f. = 3 s.f.
Ag= 2.4 -25% (3) 2.25 s.f.; aver. Q = 3.17 cfs
Q/Ag = 3 .1 7 I 2. 25 = 1. 41: from Fig. V-2 y = 10"
2) Inlet for back-slope trench is a box with three side
open and a 4" X 3' X 3' reinforced concrete lid.
Length of openings = 3 x 2' = 6'
Q (@ height = 8 11 ) = 6' x 1.5 cfs/ft. = 9 .0 cfs
The remaining 5.71 cfs (for 100-yr runoff) will be
discharged to Lincoln Ave. gutter.
17
e. Open Channel design: Back-slope trench
Q (100-yr runoff) = 13.01 cfs
Trapezoidal earthen trench with 2:1 . side slopes
Bottom= 2.0'
Height = 1.12'
p = 2 + 2(2.50') = 7.00'
A 2(1.12) + 2(2.24 X 1.12)/2 4.75 s.f .
R = A/P = 0. 6785; R 213 = 0. 771
n = 0.02
s = 0.25%: S 112 = 0.05
v = 1. 486/n X R 213 X s 1 1 2
v = 74.3 x 0.771 x 0.05 = 2.86 fps
Q = 4.75 x 2.86 = 13.59 cfs > 13.01 cfs
Therefore the height will be somewhat less than 1.15'
FINAL DRAINAGE REPORT DRAWING CONTENTS:
1 . Sheet #1 -General Location Map
2 . Sheet #2 -Floodplain Information
3. Sheet #3 -Drainage Plan Map
I hereby certify that this report for the drainage design of
the Lonestar Pavilion Shopping Center development was prepared by
me or under my supervision in accordance with the provisions of the
City of College Station Drainage Policy and Design Standards for
the owners thereof.
~ik:?fl li49z
Registered Professional Engineer
State of Texas No. 26383
' . -~ :, .. ; .
18
FAX : Date : 1/20/96
TO: Steve Homeyer
City of College Station, Texas
FROM: Tom Eikel , P.E.
Subject:
Tele. No . (713) 988-9889
Fax No . (713) 952-8610
Corrections to the Final Drainage Report for Lonestar Pavilion
All changes to the 1/10/97 Report are marked with an *
The area for Post-Development Runoff for C total was an area that was carried
over from a previous report that was not updated . The new calculations
have required the enlargement of the parking lot detention and the detention
pond at the rear . We have made changes to the construction drawings and
hard copies of this report will over-nighted to your office for final review.
Please look over this faxed copy of the report and give me call before we send
the corrected drawings and report .
Thank you for your help in this matter .
Yours trul/-), _ ~ ;J I
Tom Eikef' / ..,.__ ~
lo+1t I
PURPOSE :
FINAL DRAINAGE ENGINEERING REPORT
LONE STAR PAVILION SHOPPING CENTER
COLLEGE STATION, TEXAS
01/20/96
The purpose of this engineering report is to outline and
discuss the development and drainage proposed for the Lone Star
Pavilion, College Station.
GENERAL LOCATION:
1. The Lone Star Pavilion will be located at the Northerly corner
of the intersection of Lincoln Ave. and Texas Ave., wrapping around
the existing Red Lobster Restaurant located on the corner proper.
2. According to FIGURE II-1 in the City of College Station's
Drainage Policy and Design Standard Manual, the drainage from this
property is in Basin 2 with primary drainage way being Wolfpin
Creek and the secondary drainage way being Wolfpin Creek Tributary
C. The route of the secondary drainage way was received from the
Texas Highway Department,
3 . The Existing 707 Center facing on Texas Ave. adjoins the
proposed development on it's northwesterly property line . The
property adjacent to the subject project on the northeasterly
property line is undeveloped at the present time. Across Lincoln
Ave . is an apartment project.
PROPERTY DESCRIPTION:
1. The Lone Star Pavilion Shopping center will consist of the
construction of a retail shopping center and parking lot on a 9 .270
acre tract of land.
2 . 1.0812 acres are covered by existing pavement northeast of the
Red Lobster Inn, which will remain and be incorporated into the
proposed parking lot . Two existing buildings with parking
facilities on 0.7719 acres of land that fronts Texas Ave. will be
removed and rebuilt as part of the proposed parking lot. The
remaining 7 .4169 acres of undeveloped raw land will be used for
parking lot, retail shopping center building, and detention pond.
3. The owner is Charlie Shears, Shears Interests, 1325 La Concha,
Houston, Texas 77054.
4. The subject property is properly zoned for the commercial use
for which this project is proposed.
1
PRIMARY DRAINAGE BASIN DESCRIPTION:
1 . Basin 2 is gently sloping to Wolf pin Creek, which flows
easterly, with a variety of land uses .
2. No related previous drainage studies exist,
drainage maps for Texas Ave. prepared by the
Department.
except for the
Texas Highway
3. The proposed development is located on Flood Insurance Map No .
48041C0144 c, effective date July 2, 1992, and is shown to be in
zone X, which is outside the 500-year flood plain .
SECONDARY DRAINAGE BASIN DESCRIPTION:
The general off-site drainage crosses the subject property
from the 707 center on the northwest and the undeveloped land on
the northeast. This runoff is presently being carried by an
existing swale running from the northwest property line to an
existing storm drainage inlet on Lincoln Avenue which appears to be
satisfactorily handling the existing runoff. There is an existing
24" diameter pipe leaving this inlet, which connects to an existing
inlet on the northeasterly side of Texas Avenue. According to the
survey by Municipal Development Group, the slope on this pipe is
0.62 %. The capacity of this pipe, using an n factor of 0.013,
without head, is 17.8 cfs., with 0.76 feet of head the flow is 20 .6
cfs. At this elevation the water will flow into the street, which
it presently does. The flow line of the pipe at the inlet on
Lincoln is 317.80 and the street elevation at the inlet is 320.56.
The runoff from the 707 Center (area Al will be piped across
the subject property using a 24" RCP@ 0.646 %, which is capable of
handling 18.18 cfs without head (approx. s year storm). To achieve
the 10 year storm run-off, the 24" will require 0 .85 feet of head.
The restrictions of the out fall elevation and the pipe cover in
the north end of this pipe will not allow the slope to be
increased.
The flows using a minimum Tc of 10 min. are as follow;
FLOW FROM AREA A
Ci A = Q
Flood c i A (ac) Q (cf s )
2 year 0 .65 6.3 3.71 15.19
5 0.65 7 .7 3 .71 18.57
10 0.65 8 .3 3.71 22 .02
25 0.65 9 .8 3 .71 23.63
50 0.65 11.1 3.71 26.77
100 0 .65 12.6 3 ~71 30 .38
2
The 10 year storm runoff from the undeveloped land on the
northeast (area E) will be intercepted by a back-slope trench and
delivered by an 12" pipe to the pond outfall · structure and a 24 11
pipe t o the existing inlet . The back-slope trench inlet is
designed to allow the runoff above the 10 year storm to enter
Lincoln Ave. and be carried down the pavement, as it normally does
at the present. The flows for this undeveloped area using a min.
of 10 min. Tc are as follow;
FLOW FROM AREA E
Ci A = Q
Flood c i A (ac) Q (c fs)
2 year 0 .35 6 .3 2 .95 6.51
5 0.35 7,7 2.95 7.95
10 0.35 8.3 2.95 8.57
25 0.35 9.8 2 .95 10.12
50 0.35 11.1 2.95 11.46
100 0. 3 5 12.6 2.95 13.01
Back-slope Trench
side slopes= 2:1, bottom·2 1 , slope= 0 .25%, n = 0.02
Q = 13.98 cfs at depth of 1.15'
DEVELOPMENT CRITERIA REFERENCE AND CONSTRAINTS
1. Regulations -The drainage system f o r the proposed development
was simplified and standard criteria was met by diverting the
runoff from off-site property from consideration in the
development runoff calculations. Thus, the pre-development
and the post development runoff discharges remain unchanged.
2. Development Criteria Reference and Constraints
a. There were no previous drainage studies for the property
under consideration.
b. By achieving parity between the pre-development and post
d evelopment runoffs, the impact of this project on existing
street and drainage systems is held to a minimum.
3
3. Hydrological Criteria
a. The Intensity-Duration-Frequency (IDF) Curves were
prepared using the constants obtained from the Texas Highway
Department, based on Technical Paper No. 40, for Brazos
County, Texas. Design rainfall 100-yea~, 24 hour .
b. Runoff calculation method used was the soil Conservation
Service, TR-55, which coincides with the data contained in the
City of College Station Designs Standards.
c . The Triangular and Computed Flood Hydrographs were used
in conjunction with reservoir routing stage-storage -discharge
relationship as found in the scs routing coefficient method .
The computer software is manufactured by Eagle Point.
d. The design storm recurrence intervals are 2, 5, 10, 25,
50 and 100 years with 24 hour duration .
e. Standard calculations were used in this design .
4 . Hydraulic Criteria :
a. The capacities of the piping in the front parking lot
were determined using graphs based on Manning's formulas
(n=0 .013), for Reinforced Concrete Pipe .
Dia. Slope Q (full)
18 II 0.7% 8.79 cf s
24" 0.31% 12 .59 cf s ~ 24 11 0.646%-18.18 cf s
36 II 0.35% 39 .58 cf s
30" 1 .50% 50 .19 cf s
Capacities for piping at the rear of the buildings .
Dia. Slope Q (full)
3 0 II 0.95% 39 .95 cf s
12" 4 .72% 9 .22 cf s
b. Detention Pond at the Rear of Buildings:
The detention at the rear of the buildings uses a grass
bottomed pond with side slopes of 3:1 and a latera l slope at
0 .5%. The entire pond will be reinforced with "Pee-Mat"
11 Greenstreak 11 as manufactured by American Excelsior Company .
This product has passed Tex DOT tests and is on their approved
materials list. At an elevation of 326 .5, the maximum depth
at the southerly end of the pond, the capacity of the pond is
)f: --/65209 cubic feet. The out-fall facility shall consist of a
"1. O Sl\igh by O --9-.4'/.wide opening flow line at elevation r-~2 . ~.k ith a . 0 M w\e Cipolletti we i r crest elevation at
~ 4~ Ov"-~ ""-' ~i?
RUNOFFS FOR AREAS C & D
EVENT Q CPRE Q D PR E TOTAL PRE Q Cpo sr Q Dpo sr TOTAL posT
2 YEAR 8 .12 9.47 17 .59 ';f 14 .0 7 17 .58 '31. 65
5 9.93 11.57 21 .50 it 17 .20 19 .83 * 3 7 . 03
10 10.70 12.47 23.17 / ;t 18 . 54 v-21. 38 * 39. 92
25 12.64 14 .72 27.36 ~ 21. 89 2S .24 )f47 .13
so 14.31 16.58 30 .89 * 24 .1 9 28.59 t 53. 3 8
100 16.25 18 .93 35.18 ":4r 28 .1 4 32.45 )1;60.59
PROPOSED DISCHARGES
EVENT PARKING LOT DETENTION POND TOTALS
2 YEAR j 10 . 90 '*6.69 17 .59
5 )'13.32 ;f.8 .18 21.SO
/ 10 ';¥ 14.36 Xe-8 . 81 2 3 .17
25 1'16.95 1 10. 41 27.36
so .*19.14 111.7S 30.89
100 ~·21 .80 * 13. 38 3S.18
The Det e ntion Pond was lengthen ~ and ~ the
parking lot which increases the volu ~ we ~ the
December 26, 1996 report.
INCREMENTAL VOLUMES OF THE DETENTION POND
ELEVATION VOLUME
321.SO )t. 437.S CF
322 . 00' ): 2541.S
322.5 0 -* 54 0 1. 6
323.00 )f' 9161 .9
323 .50 )f 13797.8
324 .00 ... 19S27 .5 ~ 324.SO x 26484 .6
325.00 # 34607 . 5
325 .SO *43820 .S
326.0 0 # S4046 .4
326.5 't65209.0
5
REQUIRED DETENTION POND
VOL. = 1/2 X 2TP X 60 X (O eos r -Oor sCH.) ...::.>
~'°
EVENT Q?osr -DISCH . = DIFF . X TP X 6 0 = REQUIRED VOL. ELEV . ~ ~
. tr
2 17 .58 ~6. 69 *10 .89 37.20 ' 24306 C .F. 324.34 ¥~
5
10
25
50
100
2 YEAR
19 .83 * 8 .18 i 11. 65 48 .52 ~33915 * 324.96
21. 38 i< 8. 81 ~ 12. 57 55 .32 t 41 722 '* 325.39
25 .24 JFl0 .41 * 14. 83 57 .15 * 50852 # 325.69
28 .59 #11.75 'lf16 .84 56 .92 # 57512 ~· 326.16
32 .45 ~13.38 f 19.07 56.98 * 65196
(ACTUAL 6 Sj 0 9 )
DETENTION POND OUT FALL CALCULATIONS
Q = 6 .86;
1. 0' HIGH X
~
ELEV . = 324 .36;
,;.
FL ELEV. = 321.21
-* 0.694' WIDE RESTRICTER OPENING/
FL ELEV . = 3 2 1 . 2 1 /¥-I//
TOP ELEV. = 3 2 2 . 21 >r V
t * ,it .J'
324 .36 -322 .21 = 2.15'.../-.~ ..>LJ ~V t x *~
Q =Ca (2gh)'~~ .694 X 11 .76 = 6 .69 OK ~
h
100 YEAR
~¥ "':(.,/ ~().,,,~~
Q = 13 .66; ELEV . 326.50 * ~ 326 .so -322 .21 = 4.29 ' 4-.S
·~ i
Q ~ =Ca (2g j "12 = 0.82 X .694 -X 16 .59
WEIR h 2 = 326 .50 -324~64 /= 1 .8~,J
)
=
\I \\
·\ G3
~
Ill
N
W\
*~ \ ~ Q2 = 3 .367 X B (h )312 = 3 .3 6 7 X x (1 .86 )312 = 3 .9 4
* ,. .r
Orc r>: = 9.44 + 3 .94 = 13 .66 0
7 , ./$
6
'-
FLOW OVER WEIR PLUS F ~W THROUGH RESTRICTER OPENING
EVENT ELEVATION Q TOT AL Q MAXI MUM
5 YEAR 324. 95· j 7. 91'. '< 8. 18 * &
*_9_. _21_._> _s ~ * ~c,~ ~ 10
25
50
325.38 ·
10. 41 *
326 .14 . *12. 06 • > 11. 75¥ ffaJJ}l. ---------=---
'* 10 . 25 < 325.83 , o~
If the water level goes higher than 326 .5, the over-flow will
discharge back through the curb cuts into the back parking lot
and into Lincoln Ave.
c. Detention in Front Parking Lot:
The front parking lot is divided into nine areas plus 242 .00
lf of 36" and 260.00 lf of 24" RCP connecting the inlets in
these areas. which will also be used as detention. The
volumes were calculated with 10" of water standing over the
inlets tapering out to the base of the proposed curbs .
Therefore, automobiles will be parking in less than 3 11 of
standing water. The flow from the front parking lot will be .
restricted in the junction box near the existing inlet on
Lincoln Avenue.
DETENTION OUT-FALL FACILITIES FOR PARKING LOT ~
The out-fall facilities shall consist of an 12 11 pi~ set at
elevation 318 .04 and a Cipolletti weir with its 5.97' crest at
elevation 323.36, in the junction box near the existing inlet
on Lincoln Ave . The maximum water level will be 324 .00.
REQUIRED PARKING LOT DETENTION
VOL = 1/2 X 2 TP X 60 X (O rosr -Oorscn .)
EVENT O rosr -DISCH. = DIFF. X TP X 60 = REQUIRED VOL. ELEV.
2 *' 14. 07 ~10. 90 '* 3. 1 7
s * 17.20 *'13.32 t3.88
1.0 * 18. 54 *' 14. 3 6 * 4. 18
25 * 21..89 ~1.6.95 ~ 4.94
50 >r 24 .79 'fl9.1.4 * 5.65
lOO ~ 2s .14 f.21.so * 6 .34
35 .19 ~ 6693 .1 C .F . 323.36
41.44 * 9647.2 323.53
46.78 t 11732.4 323 .65
47.86 ~ 14185.7 323.79
47.41 ~ 1.6043 .5 3 2 3 .90
47.30 * 17992 .9 324 .00
(ACTUAL 18003.13)
7 )f
2 YEAR
100 YEAR
WEIR
PARKING LOT OUT FALL CALCULATIONS
Q = 10.73; ELEV . = 323 .36; FL ELEV. = 318 .04 ~
12 11 RESTRICTER PIPE -FL ELEV. = 318. 04 V/
TOP ELEV. = 319 .04 V
h = 323.36 -319.04 = 4.32' ·[!! J,~£~
Q =Ca (2gh)112 = 0.8 ~X .785 X 16., = 10.73 OK
Q = 21.52; ELEV. 324.00
h 1 = 324.00 -319 .04 = 4 .96'
Q1 =Ca (2gh)1 ;;: = 0.82 X .785 X 17.86 :;; 11. 50
h , = 324.00 -323.36 = 0 .64' t i " 0 2 = 3.367 x B (h) ,,. " = 3.367 x 5.97' x (~))/2 = ' . to<J-'
Ornv.L = 11.50 + 10. = 21.79 OK
i q ~
FLOW OVER WEIR PLUS FLOW THROUGH RE STRICTER PIPE ·
ELEVATION Q ~C':·.;:,
323.5 ; 11.95 ~ 323.6 ~ 13.39
323.7 j 15.13
323.8 " 17.13
323.9 * 19 .36
3ic1 t;L1t\
8
* o\:--10 .29
STAGE STORAGE FOR PARKING LOT
Elevation Storage (cf)
318. 04 O (min. elev .)
318.54 56.49
319.04 267 .72
319 .54 663.80
320 .04 1213 .39
320 .54 1897.45
321 .04 2066.91
321.54 2681.86
322 .04 2739.27 (max . storage in pipes)
323 .17 (rim of inlets) ~
323.67 + 3188 .77=12077 .39~1 ~~~
324 .00 3188 .77 ~ 18003.13 ... ) ~~
If the water level rises above 324.00, the flow will travel nA>~
down the section of existing pavement that will remain f"
undisturbed to Lincoln Ave. as it does at the present time.
d. The criteria and calculation methods used agree with the
City of College Station Standards.
DRAINAGE FACILITY DESIGN:
1 . General Concept
a. The portion of the existing pavement behind Red Lobster
that is .not to be removed, will sheet flow as it presently ~
does to Lincoln Avenue . The original pavement has an area of \/"
1. 0571 acres . The final design will allow o. 8861 acres to
flow as it does at the present time, while rerouting 0 .171
acres into the front parking lot drainage system, by removing
the existing pavement and repaving this area.
There is a o. 8781 acre tract that fronts on Tex as Avenue, /
which is presently paved and sheet flows to Tex as Avenue.
This area will be repaved. This tract has a depth of 225 feet
back from the Texa.s Avenue R . 0 . w. will be allowed to continue
to sheet flow to Texas Avenue.
9
Year
2
5
10
25
50
100
Year
2
5
10
25
50
100
FLOW FROM AREAS THAT CONTINUE TO DRAIN AS THEY DO AT PRESENT
c i A (to Texas) A (to Lincoln) Q (Tex.) Q (Linc.)
0 .75 6 .3 0.8781 ac. 0.8 861 ac. 4.15 cfs 4 .19 cf s
7.7 5 -. 07 5.12
8.3 5.47 5 .52 / 9 .8 6 .45 6.51
11.1 7 .31 7.38
12.6 8.30 8 .37
FLOW FROM AREAS THAT WILL BE REROUTED TO PROJECT
c i A (from Linc.) Q (Ci)
0.75 6.3 0.1710 ac 0.81 cf s
7.7 0.99
8.3 1 .06
9.8 1. 26
11.1 1.42
12.6 1 .62
The proposed parking lot in front o f the shopping center will
have nine separate detention ponds, all with the same low
point elevati o n at inlets and wi_ll b e drained by pipes to the
existing inlet on Lincoln Avenue. All the runoff on the
proposed buildings and behind the b uildings will be subject to
a detention p o nd to be constructed adjacent to the
northeasterly property line .
b. The off-site runoff from the undeveloped property to the
northeast , will remain the same. Th e total discharge from the
front parking lot and the discharg e from the detention pond
will be equal to the runoff which occurs at the present time,
plus the drainage that has been rerouted from the existing
paved area being repaved . The runoff from the off-site
properties that flow across this project at the present time
have been rerouted through the subject property so as not to
affect the drainage system of the proposed development .
c. The development is broken into five areas. Pre-
d eveloprnent con s ists of Area A (the 707 Center). Area B (the
property being developed),and E (the undeve l oped land on the
northeast) . Area B is further divided into Area C and Area D .
Area C is the raw land in front o f the proposed shopping
center buildings that does not have existing pavement on it .
Area D is the raw land that has the proposed buildings, the
rear parking lot and pond on it .
10
I n.lL. Qi, ~~ *~~-~~-;a 7
The post development consists of rea C (same as above), Area ~·
C1 (that portion of the pavemen that is in the parking lot '1
behind Red Lobster which has een rerouted to the front
parking lot system, and C2 (0.0955 acres that has been ~If~
rerouted to drains to Red Lobster driveway) and Area D (the o~
same above). These areas are marked on the accompanying maps . ~
Unit Hydrographs and Flood Completed Hydrographs were
prepared for each analysis area and combined where
appropriate. The various storms were routed through the
detention ponds.
~
PRE-DEVELOPMENT RUNOFF -UNDEVELOPED AREA C ~C,z_ Year c i A Q t~ .\u 2 0 .40 6.3 2 .9024 ac 7 . 31 cf s
5 7.7 8.94 ~ 10 8.3 9 .64
25 9.8 11. 38
50 11.1 12.89
100 12.6 14.63
PRE-DEVELOPMENT RUNOFF -UNDEVELOPED AREA D
Year c i A Q
2 0.35 6.3 4.2927 ac 9.47 cf s
5 7.7 11.57
10 8.3 12.47
25 9.8 14.72
50 11.1 16.58
100 12 .6 18.93
PRE-DEVELOPMENT -PRE-DEVELOPMENT RUNOFF -AREA C TOTAL
Year Area c AREA C1 AREA TOTAL AREA c
2 7.31 cf s 0 .81 cf s 8.12 cf s
5 8 .94 0.99 9 .93
10 9.64 1. 06 10.70
25 11.38 1.26 12.64
50 12.89 1.42 14.31
100 14 .63 1. 62 16.25
11
Soil Conservation Service, Technical Release no. 55
Q (inches) = (P -0.2 8)2 I (P + 0.8 S)
s = (1,000 I CN) -10
PRE-DEVELOPMENT VOLUME FOR AREA c
Year p CN Q(inches) Area 43560/12 Volume
2 4.5 75 2.05 x 2.9024 x 3630 = 21598 cf
5 6.2 3.46 36454
10 7.4 4.51 47516 /
25 8.8 S.77 60791
so 9.8 6.69 70484
100 11. 0 7 .82 82389
PRE-DEVELOPMENT VOLUME FOR AREA D
Year p CN Q Area Volume
2 4.5 75 2.05 4.2927 31944 cf
5 6.2 3.46 S3915
10 7.4 4.Sl 70277
25 8.8 5.77 89911
so 9.8 6 .69 1.04246
100 11. 0 7.82 l21377
POST-DEVELOPMENT RUNOFF -DEVELOPED AREA
Year i A Q (cf s) ~ 2.9 * ac 2 6 .3 * 14. 07 cf s
5 7 .7 ~. 01'?'-/-o-.c, it 17.20
10 8.3 --;f 18.54 11
2S 9 .8 #' 21.89
50 11.1 ;¥24.79
100 12 .6 Jt28.14
Soil Conservation Service, Technical Release no . SS
Q (inches) (P -0.2 8)2 I (P + 0.8 S)
s = (1,000 I CN) 10
12
POST-DEVELOPMENT VOLUME FOR AREA C TOTAL
Year P CN Q(INCHES) Area 4356D/12
3.82 x ~ 3630
5.50 ~ 2 4.5
5 6.2
94
10 7.4 6.69
25 8.8 8.08
50 9.8 9.07
100 11.0 10 .27
POST-DEVELOPMENT TIME
Year
2
5 ~ 59454
10 * 7231 7
25 .f 87343
50 '# 98045
10 / 111016
..;. 14. 0
'117.20
f 18. 54
A 21. 89
t 24 . 79
i 28 .1
47 .41
47.30
POST-DEVELOPMENT RUNOFF DEVELOPED AREA
A (ac) Q (cfs )
2 6.3 4.2927 ac 17.58 cf s
5 7 .7 19.83 -
10 8.3 21.38
25 9.8 25.24
50 11 .1 28.59
100 12.6 32.45
Post-DEVELOPMENT VOLUME FOR AREA D
Year p CN Q Area Volume
2 4.5 91 3 .50 4.2927 54538 cf
5 6.2 5.15 80249
10 7 .4 6 .33 98637
25 8.8 7.72 120296
so 9.8 8 .71 135723
100 11 .0 9 .90 154f2 6 6
13
\J \
D
':f. 41293
)I 59454
'JF 72317
I 87343
~ 98045 t 111016
/_r
~
)
J 11
~<J
/
POST-DEVELOPMENT TIME TO PEAK FOR AREA D
Year Vol Q (cfs) Vol/(1 .39 x Q x 6 0) = Tp (min)
2 54538 17.58 37.20
5 80249 19 .83 48.52
10 98637 21.38 55 .32
25 120296 25.24 57 .. 15
50 135723 28.59 56 .92
iOO 154266 32.45 56.98
d . The drainage patterns are as follows ;
1) the off-site runoff has been rerouted to remove them
from the design consideration for this project,
2) portions of existing pavement runoff will be allowed
to flow to Texas Ave . and Lincoln Ave . as it does at
present, which removes it from the design considerations
for this project, with the remainder being included in
the front parking lot system,
3) the 225' adjacent to Texas Ave. that is being
redeveloped as part of the parking for this project will
be allowed to sheet flow to Texas Ave. which is the
direction of its runoff at the present time .
4) the runoff from the front parking lo t will be
detained in nine separate ponds on the pavement and
piped to a junction box in front of the e x isting
inlet on Lincoln Avenue,
5) the building and back parking lot runoffs will
be detained in a detention pond located adjacent to
the northeast property line, and
6) the off-site runoff from the adjoining undeveloped
property on the northeast side of the project will be
intercepted by a back-slope trench and taken into the
system by use of an open sided inlet which will allow a
portion of the flow to enter Lincoln Ave. without causing
a strain on the drainage capacity of the existing
pavement.
14
2. Specific Details :
a. The drainage problems encountered in the drainage design
of this project were:
1) incorporating the existing paving into the proposed
new front parking lot. The existing pavement determined
the elevations in the new parking lot and the elevations
of all the other items in the developments .
2) determining the best method of handling the runoff
from the off-site prope_rties. To simplify the design
consideration, these runoffs were rerouted around the
internal drainage systems .
3) To prevent a system overload by including all of the
runoff that may occur during a 100 year storm, the inlet
at the end of the back-slope trench i s designed to allow
a portion of the runoff to pass around the open sided
inlet and flow into the gutter of Lincoln Ave. which will
not adversely affect the street drainage characteristics .
b . Detention solution encountered the following problems ;
1} The location and arrangement of the back -slope trench
caused a problem in the layout of the detention pond. To
allow enough room to place the back-slope trench on the
proposed project property, the width of the rear parking
lot was reduced.
2) The use of a detention area in the front parking lot
was used, because of the restrict i ons imposed on the rear
detention pond, mentioned above. The use of detention
ponds on the front parking lot required the removal of a
portion of the existing pavement to provide an adequate
amount of storage.
c. The arrangement of the inlets and junction box es in the
system will facilitate easy access for maintenance .
The only problem that may occur is the size of the pipe
that leaves the existing inlet on Lincoln .
CONCLUSIONS :
1 . It is our opinion that all of the Standards of the City of
College Station Drainage Policy and Design Standards have been me t.
2. The effectiveness of the proposed drainage design will not
allow any additional damage from storm water flows that do not
exist at the present time ..
15
3. The proposed drainage system was designed using the 100-year
storm information furnished by the City of College Station .
Therefore, the development of this project will not change the
runoff in the secondary system from what is experienced at present .
REFERENCES :
All criteria and technical information followed the guide
lines of the City of College Station Drainage Policy and Design
Standards and prepared using the Eagle Point software.
APPENDICES:
1. Hydrologic Computations
2.
a. Land use for the 707 Center was Business/Commercial and
the land use for the undeveloped property to the northeast of
the project was Natural Grasslands.
b. Storm water runoff (peak 100-year discharge) for;
1) the 707 Center was determined to be 30 .38 cfs
2) the pre-development raw land portion runoff of the
project was determined to be 35.18 cfs
3) the undeveloped off-site property to the northeast was
determined to 13.01 cfs
cf s
4) post developm .nt run-off for the front parking lot was
determined to b ~ 28.14 · fs
5) detention pon ~ m:x.crnum discharge
;f:'
6) detention in parking lot max. disch~e 21.80 cfs. -------
c. The ~-veloped 100 year runoff for Area c and D is
35.18 cfs and th post development discharge for Area C and
Area Dis 35.18 cf . Therefore, the project does not increase
the total runoff that presently occurs .
-1::1-l.ic
a. There are no culverts in this project.
16
b. Storm Sewer Capacities
1)
2)
Pipes in front parking lot
a) 18 11 capacity = 8.79 cf s
b) 24 11 capacity = 12.59 cfs
c) 30" capacity = 50.19 cf s
d) 36" outfall = 39 .58 cfs :
e) 24 II from 707 Center; cap . = 18.18 cf s
Pipes from the detention pond and back-slope trench
a) 12" capacity = 9 .22 cfs; will carry 9.0 cfs
the remaining 4 . 01 cfs (for 100-yr storm) wi ll be
discharged to Lincoln Ave .
b) 30" capacity= 39 .95 cfs
c. Street Capacity:
Lincoln Ave.; Yo= 7", Sp= 19', slope= 1.33%
Q (half section) = 20.0 cfs capacity
from City of College Station topo . map, the area
being drained by this reach of Lincoln Ave. is
3.75 Acres
Time of concentration = 300 ft. at 1 fps = 5 min
+ 900 ft . at 2 fps= 7.5 min
Total Tc = 13 .5 mi n .
Intensity for (25-yr storm) = 8.3 in/hr
Runoff coefficient; Medium density residential
c = 0.55
Runoff for Lincoln Ave .= 0.55 x 8.3 x 3.75 = 17.12 cfs
d . Storm Inlet Capacity:
1) Inlets in front parking lot are all 2 foot square
grate top inlet. Open Area is 75% of 4 s .f. = 3 s.f.
Ag= 2.4 -25i (3) 2 .25 s.£.; aver . Q = 3 .1 7 cfs
Q/Ag = 3.17 I 2.25 = 1.41: from Fig . V-2 y = 10"
2) Inlet for back-slope trench is a box with three side
open and a 4" X 3' X 3' reinforced concrete lid.
Length of openings = 3 x 2' = 6'
Q (@height = 8") = 6' x 1.5 cfs/ft. = 9 .0 cfs
The remaining 5.71 cfs (for 10 0 -yr runoff ) will be
discharged to Lincoln Ave. gutter.
17
e . Open Channel design : Back-slope trench
Q (100-yr runoff) = 13.01 cfs
Trapezoidal earthen trench with 2: 1 . side slopes
Bottom= 2 .0'
Height = 1 .12'
p = 2 + 2(2 .50') = 7 .00'
A= 2(1 .12) + 2(2 .24 X 1 .12)/2 = 4 .75 s.f .
R = A/ P = 0 . 6 7 8 5 ; R 213 = 0 . 7 71
n ::: o . 02
s = 0.25%: sU2 = 0.05
v = 1. 486/n X R213 X S 1 1 2
v = 74 .3 X 0.771 x 0.05 = 2.86 fps
Q = 4 .75 X 2 .86 = 13.59 cfs > 13.01 cfs
Therefore the height will be somewhat less than 1 .15 '
FINAL DRAINAGE REPORT DRAWING CONTENTS:
1. Sheet #1 -General Location Map
2. Sheet #2 -Floodplain Information
3 . Sheet #3 -Drainage Plan Map
I hereby certify that this report for the drainage design of
the Lonestar Pavilion Shopping Center development was prepared by
me or under my supervision in accordance with the provisions of the
City of Co l lege Station Drai n age Po l icy and Design Standards for
the owners thereof .
Q.r;ikW (kl9z
Registered Professional Engineer
State of Texas No. 26383
18
101 CENTER EXISTING
1R-Rl'P
/ ~,,.,,.r :: / -----·
1 .~·/
TCJ29..70
GJ28.20 -.... .. )./
WAI()< ELEV.
":i) ,...1C.J29 2l
CJ2&.7)
'"'-.... -. _,, ... ~y .. /
q ~~~ ~ __ ,.-..... --t-~--~ _ ~'·!E..• ~ ·~ ... w"' 120.02·•_1._02;...•_,. __ .. 1 _§ .l?lll.n l;L_
: 11: I ) I~ J2&•8 ( • '° N ' ~ ~(;'
- --~~~-g~...._ l/__ • ,...~ f ,J 2'22 j;J I ./ JOIO •' .. '•'"-----<'"-1J4.12"•2.l7• IM.ET-2 1 ""S.•o ·~--12'e UO:ll llll--.....i'°9-11'-5~
:...------------.,. ---: ~lo) :.. •·-~ J6 211"• i"4h1 :; I -.... 21 7• 328 JO n · ,:,;:;:.: I cJ2s.:io I 326 .l! i.o
;;; 326 60..._ -~. '-I/ .... \ , l.;;.O'.:.:.~ __ ..,,. ... ---------.---------"'_,tt------,------tll""' ~ t ,~
I~ · --· re 27 .81 TCJ2• JO'L ..... LJ ~3l~~.:-)1 J3l!'oo'O I .... ~m~ b1~;~~ o , l'"-----i---c 1 Ja 0 0321.83 .. . I .... • I ~ ~,,,... \ i-+ -~ TYPE B INLET (TYP) ~ I -... ~ I ' ~... •5.3.,9. • •.oo>; • .,,,.,, n )606' • 0_., · .. fl..,;!_____ ~[....__ _ -:-i J .l0.•1 ·• 2.09 .s ~1.11·• J.?o .. 1--4--~JJ2•.101 I ~ ~ -------r . 31719 ~--=-~~ IBJ'e rns J S~>9 ·ce1.•09< ~ ~~~ ,.....
00
::t :;u n. 320.IS I
o ::I ~cJJ2~• ..... , I ; c'c3J2'•'.oo-~ g lC.lH .~ TCJ2~~ ~ I .. /~ ~~~~~er ~ 11 G324 .oo cJ2~ ... o '°
~ 8 ~
'\
0 ..
If
!\
+-1!>3.19'. I.~ -----
198 00 -----. ····-·--·------·
I
:!J I
8
1CJ2&.70
CJ26.20
l27.2•
TC3:H .&J
CJ21.lJ
... ---·-,.------~--..
:....i ~3~!'oo~ 0
••so•~oos l N
----~ •,.!.l.02 "---' ..
1'Cl24.'0
(1)2 .. 00
I
40.lt'92.07~
---,it ~
0 •
... =·-9_ .• ,.2· .. ·-·-~-~_:_;_'°~(1~1
NET-I
R1w JZJ.17 n. 31 8.66 n
M
VT
C)
b Q. ~.s,. ..,_ ________________ ..,."-¢
RED L065TE~
PAVEMENT
PARKING ISLANDS
:D PAVED TO
iG PAVEMENT I
l?t.J Gt
I
r
= ~
l!o
J2~.79 s I "' 5
:g ~s
!i a~ ~ ,.3
11.~cr 11.DO' I).
n:zo•• ~.oox :g .-J2S..1t ~
"' TP J26,10
-12/20/1996 15:30 713-796-0623
~19,1"6
Collep Stdcm/A.B./Limited hrenmp
A Delaware Limited Pftm]Dp
Attn: Mr. Charles W. Shem
1325 La Ccncha
lbla1m, Taat 1705~
SHEARS COMPANIES PAGE 04
Jt is undarstcod and nnnually t.greed that Calles• Sfldorl!AB./Limited Pumenhip. a
DclaWlll I.mted Pannership, wW pwcipue in me conswcdon cf a. StDmi chin from me
aub inlet Jo;1ted ai 1be inte:section ctUneem Awnue aad Fosm Awnua 10 die storm drain
system 1«ued within me Texas Avenue riJiu-cf-way . The Limited Partnership agrees 10
Snaneially paftigpate ift an amount mt equals !ft>' percent (SO'/o) of the total ccmtnl~ eo&t
up 10 a maximum often tho~and dollus (Sl0,000).
~L KcuM.Lm~ Collogc Station/ A B./Limitcd Partnership,
a Delaware limited partnership .
By: A.B . Operations. Inc ., a Delaware
Corporation .
lts~e7 Br_)ft;}_~
Name : J<l~~ · W1 nq 0
Its: S'r . V. t/
Datt: ofSisziarure:y-2 1/-96
FAX TRANSMISSION
WILSON/ZETIY/ASSOCIATES
3100 W il crest , Suite 325
Houston , Texas 77042
713/952-8600
FAX 713/952-8610
/)
No . of Pages Inc l. This Page : Z
ProjectNo .: 9~9 ,
Project Name~~ , %u, ~
Com p any:
Attn :
Fax Number:
From :
Date :
t/12 9/11t tj_-~ t.f_V,
i)au<.s ff.; ~°'--/'/llu/zA-:a./
12-d-1/J-9 ~ I
-1'21)011,96 15 : 30 713-796-0623
CoDep Stdcm/A.B.II.Jmited Parcnership
A Delawan Limitld PntnlDp
Attn: Mr. CharlM W. Sbcml
132' I.& Ccncha
~T..u'7'10!.C
SHEARS COMPANIES PAGE 0 4
lt is undamaod md nnmW1y -.reed that Collea• S~AB./Limited Parm«lhip, a
DclaWll'I Limited Pannership, will pvticipue in !he cor.suuciion of a. smnn chin ~m me
~ inlct loc:ated ai 1he i:tteMCtion o!Lineom Awnue and Fosm Avemia 10 the storm dlain
s)'ltem kxued Vw'iihin me Texas Aw.ai.e riJbt~f-way. the Limitad Parmership agrees to
Snaneially parti;;ipate in an amount me equals My percent (SO%) of 1be total ~en COit
up to a maximwn of ten thouslZSd dollars ($10,000).
!J:L KmrM.Lua~
City &peer Ji A
Date ci Signature: / .4 I 'I '-' rr
College Station/ AB./Limitcd Partnership,
a Delaware limited partnership .
By : A.B. Operations. Inc., a Delaware
Corporation .
Its~7 Br~4o
Name: R~~~ · W1 V\'1 Q
Its:~. rf
Date of Siprure: fl -2 1l -9 6
-
February 28, 1997
Dear Operator:
Your Notice of Intent (NOI) for the facility noted below has been processed by the U.S. Environmental Protection Agency. This facility is
authorized to discharge storm water associated with construction activity under the terms and conditions imposed by EPA's NPDES storm water
baseline construction general permit issued for use in the state of Texas. Your facility's NPDES baseline construction storm water general permit
number is TXR10Y734.
EPA's storm water baseline construction general permit requires certain storm water pollution prevention arid control measures. Among the
conditions and requirements of this permit, you must prepare and implement a pollution prevention plan (PPP) that is tailored to your construction site .
Enclosed is an insert explaining how you may obtain a summary: guidance document designed to assist you in the development and implementation of
your PPP. The summary is organized according to the phases of the pollution prevention planning process and contains a set of worksheets and an
example of a pollution prevention plan .. As a facility authorized to discharge under this storm water baseline construction general permit, all terms and
co\lditions must be ~omplied with to maintain coverage and avoid possible penalties. ~".
~··
FACILITY:
Lo~e Star Pavilion
715 S Texas Ave
College Station, TX 77840-
OPERATOR:
Tribble & Stephens Co
10610 Haddington Dr
Houston
TX 77043-
·'
•
[ ] 1061 O Haddington
Houston, TX 77043
(713) 465-8550
[ J
[ ]
[ ]
m Tribble & Stephens Co .
• Transmittal Letter
Mail
4-Hour
ROUTING
------2-Hour _____ _
1-Hour ------
P ick-Up ------
Spec ial p J4-,,A/ Jd
To: c 1t=i1 ofl ea/111 <'/e :5t?tt10,,U DAT E: /p -6 -7 7
I I , --<o-----"---'-----------
1/ 0 I 'TZ:Xif-5' ft;J~A/t/-C JOB: ~ 5 ~/'~
Co//-ec1 < <~t?.,,u Y-J<
I
7 7/2 '/Z-
ATTENTION: f;T-<' vr: ,tfi:! fflt'J'C'eL-
We are sending you: Herewith(~ Under separate cover( )
Copies
These are:
Remarks:
I Description
'
=3 acJ 1=/f Cd//.e y -e ,::;r1tDaAJ
( ) for approval. Please return _copies/prints.
( ) returned approved.
( ) returned approved as noted .
( ) returned disapproved , resubmit.
( ) for files and use on job.
(~tation only. /.',
( ;/!-!'n<. yo v I( J I-< 5
L,x .
------------------------------
Copies to: :::t-V';-4e> A) S/I e_//
~ yYJ 6 /(_!) uJ ,,u
f; )L-
TRIBB L ~CO. .
By: ~
Slro'94
z: 4 09 776 6699 MCC LU RE E NGR INC p. 0 1
McCLURE ENGINEEF
October 3, 1996
+ t L ~ .' Lo-"1€ -S!"f're_
'""?A\.( IL I o A.f "'bc-V ~/Y\ /i
Mr. Thomas Eikel . P .E .
EIK.EL ENGINEERING
3100 Wilcrest, Suite 325
Houston, TX 77042
RE: PROPOSED SEWER LINES
LONE STAR PAVILION PROJECT
Dear Mr . Eike!:
I have reviewed the proposed sewer alignments for the Lone Star Pavilion with
respect to the planned lines for City of College Station Eastgate Sewer Rehabilitation
project and I submit the following for your information and design :
1. A 12-inch sewer line with a minimum 15 ' wide public utility easement placed
approximately parallel to and 72 .6' southwest oft he northeast property line of the
Lone Star Pavilion is satisfactory . The sewer line should be terminated with a
manhole placed IO' from your northwest property line and with a Flowline (out)
= 316 .25 . (Please see attached sketch and Benchmark reference .)
2. New 15' and 20' wide public utility easements along the northwest property line
are also needed to accommodate another future sewer line .
Should you have any questions or need additional information, please advise .
Very tru ly yours ,
JJM/mlm
attachment
1722 Broadmoor, Suite 210 • Bryan , Texas 77802 • (409) 776-6700 • FAX (409) 776-6699
-i
~ x
0
"'
~ c · e>o ~ o_, <'o
C>
10 /03/9 6 1 6 :2 0
Live Oak
~o. «+ ~· o_, <o .,.,
C>
z 409 77 6 6699
IL
I
I
J
------------------------------------=il o I
..
:, ... ·:
''''''f '''_,,,f ' .. , ' .····•
.· ..
~. ~ ..
Lincoln Dr.
\
ri o'? I
0 ·1:
~
Ch
~ ::> C =tO
.... 0 :J
• 3 [
zO VI. .... ~-?>· 0
~Co~
:J'"---~ Ash
~--.,
r
0 ::>
(b
(/) ~ ,... 0 o.,
""\ 0
-u (/)
0 (b
$.a.
0 ::>
MCC LU RE ENGR I NC P.02
TO:
Accounting Department
City of College Station
P.O . Box 9960
Colle e Station , Texas 77842
Statement
Joe Orr, Inc.
Surveyors & E ngineers
2167 Post Oak Circle
College Station, TX 77845 <
(409) 690-3378 ~
\;\J ~
JY
fjj \~
ATTN:
eronica Morgan
Engineering Departmemt
eti:!nlii::1ii¥!1t:P:r:12ng::m1:1i.xin2n.::1t91~m.::;;;::
::::::::me12,te.J1!2ni.!:;gnij!uigrl::::rn:~m::::::::::m::::::1::1:::::::::::=::::::i1i:rn::::;:::::
.~cour~T ING
Sales Tax
Total Due
7-Jan-97
WILSON/ZETTY /FOSTER/TIPPS
ARCIDTECTS/PLANNERS/INTERIOR DESIGNERS, L.L.C.
3100 WILCREST, SUITE 325 HOUSTON, TEXAS 77042 (713)952-8600
PROJECT:
Lol-4fi S 7A R.. Pl\ Vi );~
Ct:>\\ etJJ <1-S "lt::t -f 1 CM, T ;x
SHIP
TO: c;, T r;;Vf5 N 0 lM 112.'G=
c 1 /11 'f) i-Co t ( E'f1 ('° s -f .?t°h CW)
t Jot -re~S Me .
Cb u e'?P s+~ -4t l04r T )(. { 7 gq L
TELEPHONE:
WE HEREBY TRANSMIT THE FOLLOWING:
()DRAWINGS DATED: I /w {CJ ]
()BID SET(S) () w/ INSTRUCTIONS TO BIDDERS
()REVISED DWGS.
FOR YOUR:
ARCHITECT'S
PROJECT NO: q /:,-6 S"')
DA TE: 1// <j-
VIA: ()
* ()
()
REGULAR MAIL
OVERNIGHT DELIVERY
HAND DELIVERED
COURIER SERVICE
( ) RUSH ( ) REGULAR
HOLD FOR PICK UP
H enclosures are not as noted
please inform us immediately
()~~~~~~~~~~~
()~----------() __________ _
~APPROVAL () FOR SIGNATURE ()INFORMATION ()RECORD ()FORWARD AS NOTED
() REVIEW AND COMMENT
()OTHER ____________ ~
ME SSAGE/COMMENTS: --------------------
\::;\l\.C\&->$ e J a. vr :tl1 re t"" C'e>:ft<95 a-f ~~-f: ruc ftcth
Dva.w 1 vi121 s s 1cg_..e. f: ~ -1 • c -'-. c-3 c_ -r:, . c. -7 c -B I i I , 7 I
a.A so r wo Ce;>\'?' es o--J-~ V-ev1 s~d_ F 1ttu1< (
D va 1t11 t1 i?( e f2.e__ f O t:f
COPIES TO : (WITH ENCLOSURES)
()
()
()
()
ORD E RED BY :
() OWNER/CLIENT () -----------
() CONTRACTOR () __________ _
PACKAGE PREPARED BY: --Z-:£ ·
NU MBER OF PRINTS: () BILLABLE TO CLIENT () INVOICE E NCLOSED
() OFFICE EXP EN SE () -------
T RAN S2.SA.M
WILSON/ZETTY/ASSOCIATES, INC.
ARCHITECTS • ----• PLANNERS
December 30, 1996
City of College Station
Engineering Division
1101 Texas Ave.
College Station, Texas 77842-0960
ATTENTION: Mr . Steve Homeyer
RE : Lonestar Pavilion
De ar Mr. Ho me y ~~;
Included here wi t h , are the copies of the revised
construction pl ans .and two copie s of t h e Fina l Drainage
Engineering Repo r t . We chang ed the size of the deten t ion pond
and the detention area in the front parking lot. We added cross-
sections for the front parking lot and a storm water pol lution
prevention plan for the ·Lonestar Pavilion project .
Yours truly,
/CH~P.E.
3100 WILCREST, SUITE 325 • HOUSTON, TEXAS 77042 (713) 952-8600
FAX TRANSMISSION
WILSON/ZETTY/ASSOCIATES ,1, ~~~VJ;
3100 W1lcrest , Suite 325 ~~ "~tr -~ ,
Houston, Texas 77042 ~ ~ 1
7131952-8600 \~:lo v '
FAX 713/952-8610 ~ -Gv ,
-~
Project No .: q 665q
Project Name: LoH<E 51~~ ~'-'lL-16~ SC.
0 f?~GA?c o.eec:r 1"3 w~de\/t::re ,~ J<e\ue~\('{Ct. IJZE.'lt~t:')
C1'-'tL, ~cs. o .. HitLG ~'H:. +\. \~ 6d\ ....
Company :
Attn :
Fax Number:
From :
Date :
CrrLt df ~LW:1e 5-rAT\ON
SH\~ \l~t..'t<
LONE STAR PAVILION, COLLEGE STAION -DRAINAGE CALCULATION
RUNOFFS FOR AREAS C & D
EVENT Q CPR £ Q DPRE TOTAL PRE Q CPOS'!' Q Dposr TOTAL POS T
2 YEAR 8 .12 9.47 17.59 13 .62 17 .58 31.20
5 9 .93 11 .57 21.50 16.65 19.83 36.48
10 10.70 12.47 23.17 17 .94 21 .38 39.32
25 12.64 14 .72 27.36 21.18 25.24 46 .42
50 14.31 16.58 30 .89 24.00 28 .59 52.59
100 16.25 18.93 35.18 27.24 32.45 59.69
PROPOSED DISCHARGES
EVENT PARKING LOT DETENTION POND TOTALS
2 YEAR 10.73 6.86 17.59
5 13.11 8.39 21.50
10 14.13 9 .04 23.17
25 16.69 10.67 27.36
50 18.84 12 .05 30.89
100 21.52 13.66 35 .18
REQUIRED PARKING LOT DETENTION
VOL = 1/2 X 2 TP X 60 X (Q posr -OorsCH.)
EVENT Owsr -DISCH . = DIFF. X TP X 60 = REQUIRED VOL. ELEV.
2 13 .62 10 .73 2.89 35.19 6101 .9 C .F. 323.36
5 16 .65 13.11 3.54 41.44 8801 .8 323.53
10 17 .94 14 .13 3.81 46.78 10693 .9 323.65
25 21 .1 8 16.69 4.49 47.86 12893.5 323 .79
50 24 .00 18.84 5 .16 47.41 14678.1 323.90
100 37.24 21 .52 5.72 47.30 16233 .3 32 4.00
(ACTUAL 16251.22)
( 1)
2 YEAR
100 YEAR
PARKING LOT OUT FALL CALCULATIONS
Q = 10.73; ELEV . = 323.36; FL ELEV . = 318 .04
12 11 RESTRICTER PIPE -FL ELEV. = 318 .04
TOP ELEV. = 319.04
h = 323.36 -319.04 = 4 .32'
0 = Ca (2gh) 1 12 = 0. 82 X . 785 X 16. 67
Q = 21.52; ELEV. 324 .00
h 1 = 324 .00 -319.04 = 4.96'
0 1 =Ca (2gh)112 = 0.82 X .785 X 17 .86
10 .73 OK
11 .50
WEIR h 2 = 324.00 -323.36 = 0.64'
0 2 = 3.367 X B (h)312 = 3.367 X 5.81' X (0 .64)312 10.02
OToT AL = 11 . 5 0 + 10 . 0 2 = 21 . 5 2 0 K
FLOW OVER WEIR PLUS FLOW THROUGH RESTRICTER PIPE
ELEVATION O roTAL
t ·-~c~r 324,lJO
323.5 11.94 W'ElR.. ----···v ~ i3, 3G
• ~ s.&\• ->I 323.6 13.33
323.7 15 .02
323.8 16.97 e :~ __ : .... l!~.~4
323.9 19.14 ____ plJ~o~
( 2)
'.
The Detention Pond was lengthen 14' which increases the
volumes that were used in the December 26, 1996 report .
INCREMENTAL VOLUMES OF THE DETENTION PO ND
ELEVATION VOLUME
32 1. 50
322 .00
322.50
323.00
323 .50
324.00
324 .50
325 .00
325.50
326 .00
326 .5
425 CF
2479
5284
8983
13552
19208
26084
34119
43236
53358
64407
REQUIRED DETENTION POND
VOL . = 1/2 X 2TP X 60 X (Q p0 sr -Oor scH.)
EVENT Qf.'osr -DISCH . = DIFF . X TP X 6 0 = REQUIRED VOL . ELEV.
2
5
10
25
50
100
2 YEAR
17 .58 6 .86 10 .72 37 .20 23927 C .F . 324 .34
19 .83 8 .39 11.44 48.52 3330 4 324 .95
21. 38 9.04 12 .34 55.32 40958 325 .38
25 .24 10 .67 14.57 57 .15 49960 325 .83
28.59 12.05 16 .~4 56.92 56487 326.14
32 .45 13.66 18.79 56.98 64239 32 6.50
(ACTUAL 6 4 40)
DETENTION POND OUT FALL CALCULATIONS
Q = 6 .86 ; ELEV . = 325.34; FL ELEV . = 321 .23
1 .0' HIGH X 0 .716' WIDE RESTRICTER OPENING
FL ELEV . = 321.23
TOP ELEV .= 322 .23
h = 325.34 -322.23 2 .11'
Q = Ca ( 2 g h) 1 1 2 = 0 . 8 2 X . 716 X 11 . 6 5 = 6 . 8 4 0 K
(3)
' . ..
100 YEAR
Q = 13.66; ELEV. 326.50
h 1 = 326.50 -322 .23 = 4.27'
0 1 = Ca ( 2gh) 1 /2 = 0.82 x .716 x 16 .57 = 9 .73
WEIR h ; = 326 .50 -324.85 = 1.65'
3.367 X B (h)31 2 3.367 x .581' x (1.65)3 1 2 = 3.93
O r oTAL = 9 . 73 + 3. 93 = 13. 66 OK
FLOW OVER WEIR PLUS FLOW THROUGH RESTRICTER OPENING
EVENT ELEVATION
5 YEAR 324.95 7 .88 < 8.39 OK
10 325.38 9.07 > 9.04 OK
25 325.83 10.70 > 10.67 OK
50 326 .14 12.03 < 12.05 OK
,,,-.. W~ll'i. ~"2.C,, So
Jtf . ·-., . .. . .
'2,2.~·tS
158•
£0 -l J, 'l / 'Z. 1.
;-i\1"1.]
, ,, "
( 4)
DEVELOPMENT PERMIT
PERMIT NO . 410
LONE STAR PAVILION
FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA
RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE
SITE LEGAL DESCRIPTION:
Tracts 1, 2, 3, 4, C, D and E, D .A. Smith Subdivision
SITE ADDRESS:
Not Addressed
OWNER:
Shears Interests
Attn: Charles Shears
1325 La Concha
Houston, Texas 77054
(713)796-1005
DRAINAGE BASIN:
Wolf Pen Creek Tributary "C"
TYPE OF DEVELOPMENT:
This permit is valid for site construction as shown on the approved plans. The
Contractor SHALL NOT begin construction within the existing channel that bisects the
subject property until all drainage issues are resolved as identified in the Letter of
Agreement dated December 5, 1996. Contractor shall prevent silt and debris from leaving
the site in accordance with the City of College Station Drainage Policy and Design Criteria
Owner and/or contractor shall be responsible for any damage to existing city streets or
infrastructure due to heavy machinery and/or equipment.
In accordance with Chapter 13 of the Code of Ordinances of the City of College Station,
measures shall be taken to insure that debris from construction, erosion, and sedimentation
shall not be deposited in city streets, or existing drainage facilities.
I hereby grant this permit for development of an area outside the special flood hazard area All
development shall be in accordance with the plans and specifications submitted to and
approved by the City Engineer in the development permit application for the above named
project and all f the codes and ordinances of the City of College Station that apply .
IZ-l,-4<,
Date
M-6 -&jb
Date
Contractor Date
I , __ _..
Figure XII
Development Permit
City of College Station, Texas
Site Legal Description : Tracts 1, 2, 3 , 4 C, D, E
Site Owner : Shears Interest
Architect/
Engineer : Thomas Ei kel
Contractor : Tri bb 1 e & Stevens
Date Application Filed : November 7, 1996.
DA.Smith Subdivision Vol .49 Pg. 106
of Brazos County
Address : 1325 La Concha Houston, Texas 77054
Jclephone: 713/ 796-1005
Address: 3100 Wi 1 crest #325 Houston, TX 77042
Telephone No : 713/ 952-8600
Address10610 Haddington Dr. Houston,Tx 77043
Telephone No :713 / 465, 8550
Application is hereby made for the following development specific waterway alterations :
Site Drainage -Lone ~tar Pavillion 9 ,2705 Acre ~.
81 Application Fee
&l Signed Certifications
~ Drainage and erosion control plan, with supporting Draina ge Report two (2) copies each .
ii Site and Construction Plans, with supporting Drainage Report two (2) copies each .
~ Other : Architectural Shell Plans
ACK N OWLEDGMENTS :
I, _C_ha_r_l_e_s_S_h_ea_r_s ______ __, design engineer/owner, hereby acknowledge or affirm that :
The information and conclu si ons contained in the above plans and supporting documents comply
with the current requirements of the City of College Station, Texas City Code, Chapter 13 and its
associated Drainage Policy and Design Standards .
As a condition of approval of this permit application , I agree to construct the improvements
proposed in this application according to these documents and the requirements of Chapter 13 of
the College · 1 y C
Charles Shears
Shears Interest
~:::;-----,
Contractor
Jeff Roberts
.. •
Figure XII Continued
CERTIFICATIONS : (for proposed alterations within designated flood hazard areas .)
A. I, Thomas E i k el certify that any nonresidential structure on or proposed
to be on this site as part of this application is designated to prevent damage to the structure or its
contents as a result of floodi fro the 100 year storm.
November 7,1996.
E Date
B . I, Thomas Eikel certify that the finished floor elevation ofthe lowest
floor, includ.ing any basement, of any residential structme, proposed as part of this application is
at or above ·the base flood elevation established in the .latest Federal Insurance Administration
Flood Hazard ~~aj, as amended.
!"\~A A ~ _N_o_v_e_m_b_er~7~'~1_99_6_·~~~~~~~~ t~ Date
C. i I, Thomas Eike l certify that the alterations or development covered by
this p J nnit shall not diminish the flood-carrying capacity of the waterway adjoining or crossing
this pennitted site and that such alterations or development are consistent with requirements of
the City .of College Station City Code, Chapter 13 concerning encroachments of flood ways and of
~---.---~~~~~~
November 7, 1996.
floodway fringes . !141
Engineer Date
I , Thomas Eike l do certify that the proposed alterations do not raise the level
of the 100 year flood above elevation established in the latest Federal Insurance Administration
Flood
1
HAaz:rd S~
,/")/l/l-L-~ November 7,1996. ~ Enki11eef" -D-a-te~~~~~~~~~~~~~~~
Conditions or comments as part of approval:
~~~~~~~~~~~~~~~~~~~-
In accordance with Chapter 13 of the Code of Ordinances of the City of College Station,
measures shall be taken to insure that debris from construction, erosion, and sedimentation shall
not be deposited in city streets, or existing drainage facilities .
I hereby grant this permit for development. All development shall be in accordance with the plans
and specifications submitted to and approved by the City Engineer for the above named project.
All of the applicable codes and ordinances of the City of College Station shall apply .
381 145
(,' ---~-~-+---,-1--. 19 1 rye
THANKYOU n
6870
ZETTY-WILSON DEVELOPMENT CORPORATION
PAY TO THE
3100 WILCREST , SUITE 325 952 -8600
HOUSTON, TEXAS 77042 ~l=l~/7~/~9~6 ___ 19_
88 -1295 / 1130
ORDER OF ____ _.c_,...,· ty'-l'-...._o ..... f___._.Co .......... l ....,] eg....._..P__._S ...... t ..... a ..... t .... i ....... o .... n _________________ $ 400. 00
00 2 7 7. 511•
·,i!~CITY OF COLLEGE STATION
~ ~ ENGil'EERING DIVISION
Post O ffice Box 9960 1101 Texas Avenue
C ollege Station, Texas 77842-0960
(409 ) 764-35 70
September 13 , 1996
To: Thomas Eikel , P .E .
RE: Lone Star Pavilion Drainage Report
Upon review of the submitted drainage report, we found the document to be lacking some critical
information . The submitted report consisted only of numbers and did not indicate where the
drainage area was or how it was being modified . The report must contain information outlined in
the City's Drainage Policy and Design Standards Manual . This section is located toward the
back of the manual in Section XI, Drainage Plan Submittal Requirements . We also require that the
report be bound . This binding can consist of a staple or anything that will ensure that pages do not
get separated from the document. I am returning the drainage report dated August 28, 1996
without a review . We encourage a Preliminary Drainage Conference if the design engineer is
unfamiliar with our design criteria . If you choose to take advantage of this conference , call
(409)764-3570 to schedule an appointment. You can also contact me at this number if you have
any questions or comments .
Steve Homeye r
Graduate Engin ee r
----
------
'
I
•
~ 0/
\--.
From:
To:
Date:
Subject:
Deborah Grace
KLAZA, VMORGAN
1/20/97 4:15pm
Lone Star Pavilion Project -Reply -Reply
Veronica FYI to you!!
>>>Kent Laza 01/20/97 04:12pm >>>
No. As part of an agreement with the deveolper to resolve some of the
drainage issues, we agreed to hire Mayo to do this. Pay for it out of
professional services in our Engineering Budget.
>>> Deborah Grace 01/20/97 03:50pm >>>
I have a statement from Joe Orr for $520.00 for Drainage Review. Veronica
said this might be something that we want to bill back to the Developer.
Please let me know.