Loading...
HomeMy WebLinkAbout2 Development Permit 364 Sweetwater SubdBRAZOS COUNIY ROAD AND BRIDGE DEPARTMENT Commissioner Gary Norton Precinct 1 Commissioner Randy Sims Precinct 3 Fain McDougal McDougal & Company 7607 Eastmark Richard F. Vance. P.E.. County Engineer • RJ. Holmgrccn, County Judge December 20, 1993 College Station, TX 77860 RE: Acceptance Of Road Construction Procedures Dear Mr. McDougal: Commissioocr Waller Wilcox Pn:cinct 2 Commissioocr Milton Turner Pn:cinct 4 This letter is to notify any parties involved that Brazos County will accept the construction of the roads in Sweetwater Subdivision without a hard surface, provided there is a report from a Registered Civil Engineer certifying that all other construction requirements by Brazos County are met. There is a two (2) year developer's maintenance period immediately following Brazos County's acceptance of construction provided there is a maintenance bond on file in the County Engineer's office. Prior to the end of the developer's two (2) year maintenance period the developer will be required to hard surface all roads in this subdivision. If there are any questions concerning this matter please contact the Brazos County Engineer's office at 409-822-2127. Sincerely, tfl ~/07V~ ~~ V~nce, P.E. County Engineer SWTWATER cc : . Commissioner Gary Norton, Pct 1 Shirley Volke, Development Services CCS Office Files-Subds /Sweetwater 2617 Highway 21 West Bryan, Texas 77803 (409) 822-2127