HomeMy WebLinkAbout2 Development Permit 364 Sweetwater SubdBRAZOS COUNIY
ROAD AND BRIDGE DEPARTMENT
Commissioner Gary Norton
Precinct 1
Commissioner Randy Sims
Precinct 3
Fain McDougal
McDougal & Company
7607 Eastmark
Richard F. Vance. P.E.. County Engineer •
RJ. Holmgrccn, County Judge
December 20, 1993
College Station, TX 77860
RE: Acceptance Of Road Construction Procedures
Dear Mr. McDougal:
Commissioocr Waller Wilcox
Pn:cinct 2
Commissioocr Milton Turner
Pn:cinct 4
This letter is to notify any parties involved that Brazos County will accept the construction
of the roads in Sweetwater Subdivision without a hard surface, provided there is a report
from a Registered Civil Engineer certifying that all other construction requirements by
Brazos County are met.
There is a two (2) year developer's maintenance period immediately following Brazos
County's acceptance of construction provided there is a maintenance bond on file in the
County Engineer's office. Prior to the end of the developer's two (2) year maintenance
period the developer will be required to hard surface all roads in this subdivision.
If there are any questions concerning this matter please contact the Brazos County
Engineer's office at 409-822-2127.
Sincerely,
tfl ~/07V~ ~~ V~nce, P.E.
County Engineer
SWTWATER
cc : . Commissioner Gary Norton, Pct 1
Shirley Volke, Development Services CCS
Office Files-Subds /Sweetwater
2617 Highway 21 West Bryan, Texas 77803 (409) 822-2127