HomeMy WebLinkAbout11 Development Permit 362 St Mary's Student CenterDEVELOPMENT PERMIT PERMIT NO . 362 ST. MARY'S STUDENT CENTER FOR AREAS OUTSIDE THE SPECIAL FLOOD HAZARD AREA RE: CHAPTER 13 OF THE COLLEGE STATION CITY CODE SITE LEGAL DESCRIPTION: Lots 1-14, Block 3 and Lots 2-5, Block 6, Tauber Addition SITE ADDRESS: 103 Nagle Street College Station, Texas 77840 OWNER: St. Mary's Catholic Center 103 Nagle Street College Station, Texas 77840 (409)846-5717 DRAINAGE BASIN: Wolf Pen Creek Tributary "C" and Burton Creek TYPE OF DEVELOPMENT: This permit is valid for the site construction as shown on the approved plans. The contractor shall prevent silt and debris from leaving the site in accordance with the City of College Station Drainage Policy and Design Standards. The owner and/or contractor shall be responsible for any damage to existing city streets or infrastructure due to heavy machinery and/or equipment. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken to insure that debris from construction, erosion, and sedimentation shall not be deposited in city streets, or existing drainage facilities. I hereby grant this permit for development of an area outside the special flood hazard area. All development shall be in accordance with the plans and specifications submitted to and approved by the City Engineer in the development permit application for the above named project and all 9 the codes and ordinances of the City of College Station that apply . Dat7/ y -:?-y? Date Contractor Date Figure XII Development Permit City of College Station, Texas Site Legal Description : 0o 3 ~Avrdc s+ree-f-,1 C:O/~e s:fqY../tJ/j/ Site Owner: :;;_ • ;1/ut&-i a/c ~Address : /OJ /t/ag/e s;_c Cr<;;;; 77rf1J Telephone: cr&9 -t?7~6'~>?/7 Architect/ /J , I/ J/r // I , Address: ;;;;_?6_) 4r-e ffe/.;ff.":20J? ;(MPrJ"'j"?;a:Js- Engineer : Mg;=r<:. /'f~fl;A{ji(Jr/' /'tf frl'Jrtrr/5 Telephone No: 7/I ~:;-:;;tf ~ 0 / :S ( Contractor: C,6. lfet?J Cblf/.!l-fV{(ffJ,vUJ,Address : //{Y)/ 5, M'/c1~.>¢-{;"'(-{' /3f!?,k~/ Telephone No : ?f.5-c:t'..iY -/flJOQ 77.?.J.t;- Date Application Filed : t..l(Y,/7 7 Approved: __________ _ Application is hereby made for the following development specific waterway alterations: Application Fee 0 Signed Certifications 0 Drainage and erosion control plan , with supporting Drainage Report two (2) copies each . 0 Site and Construction Plans, with supporting Drainage Report two (2) copies each. 0 Other: ----------------------------- ACKNOWLEDGMENTS : I, Pekr d/:.fe@_{?J= , design engineer/owner, hereby acknowledge or affirm that: The information and conclusions contained in the above plans and supporting documents comply with the current requirements of the City of College Station, Texas City Code, Chapter 13 and its associated Drainage Policy and Design Standards . As a condition of approval of this permit application, I agree to construct the improvements proposed in this application according to these documents and the requirements of Chapter 13 of the C ge Station City Code . Contractor tP96 7 'A Y TO THE RECEIVEDOF~-----~:::::::~~-L_L_-t-~~~~.L...~~,ll.d~6J.::~'::!f_~::_ __ _ FOR~~~~~.&.--t____;\--Jt---}--:;::::ib{::=r""Z~~~-=¥---~------2::'.._---- Pa id by _ Chec{)..W {, ash __ _ ST. MARYS BUILDING FUND 103 NAGLE STREET PH . 409-846-5717 COLLEGE STATION , TEXAS 77840 THANK YOU FIRST AMERICAN BANK BRYAN, TEXAS 77805 88-232 -1131 413/97 J RDER OF City College Station $ .. 100.00 One Hundred and 00 /IOO•••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••• City College Station 20~ al 'O DOLLARS -t .!: ~ 15 ~ ~ ii .. <J) Building Permit for new Student Center 0 "~ p (;J ,!LJ_J u ·-.. --· ---~ -·----------·--·---------l JI EM O 29June1994 Ms . Veronica J.B. Morgan, P .E. City of College Station 1101 Texas Avenue College Station, Texas 77842 Re: St. Mary's Parish & Student Center Dear Ms . Morgan: I appreciate your meeting with me last week to review the City's policy regarding storm drainage and site developement. As our plans for St. Mary 's Parish & Student Center tak e more definitive form, I will contact you again for more detailed review of the concept. Si ncer e1y , Richard P. Hollington II, AIA Vice President RPH/db Ray & Holling ton A rchitects , In c. · 23 6 5 Rice Boulev ard Suite 202 · Houst on , Texas 77005 · 7131524-6 13 1 Drainage Report FOR Saint Mary's Catholic Church 103 Nagle Street College Station, TX 77840 VICINITY MAP NTS January, 1997 Prepared By: McClure Engineering, Inc. 1722 Broadmoor Drive, Suite 210 Bryan, Texas 77802 ( 409) 776-6700 APPROVEDFO Dra1nage Report FOR Saint Mary's Catholic Church 103 Nagle Street College Station, TX 77840 VICINITY MAP NTS January, 1997 Prepared By: McClure Engineering, Inc. 1722 Broadmoor Drive, Suite 210 Bryan, Texas 77802 ( 409) 776-6700 CERTIFICATION I, Michael R McClure, Registered Professional Engineer No. 32740, State of Texas, certify that this report for the drainage design of SAINT MARY'S CAIBOLIC CHURCH, was prepared by me in accordance with the provisions of the City of College Station Drainage Policy and Design Standards for the owners thereof STORM DRAINAGE REPORT SAINT MARY'S CATHOLIC CIIDRCH TABLE OF CONTENTS SAINT MARY'S CATHOLIC CHURCH INTRODUCTION GENERAL LOCATION AND DESCRIPTION 1 PRIMARY DRAINAGE BASIN DESCRIPTION 2 DRAINAGE FACILITY DESIGN 2 DRAINAGE DESIGN CRITERIA 3 CONCLUSION 5 EXHIBITS FEMA FLOOD INSURANCE RA TE MAP EXCERPT "A" DRAINAGE AREA MAP-EXISTING CONDITIONS "B-1" DRAINAGE AREA MAP -PROPOSED CONDITIONS "B-2" RATIONAL FORMULAS DRAINAGE AREA CALCULATIONS "C-1" INLET COMPUTATIONS "C-2" PIPE SIZE CALCULATIONS "C-3" PROPOSED DETENTION POND ROUTING "D-1" INTRODUCTION: STORM DRAINAGE REPORT SAINT MARY'S CATHOLIC CHURCH 1bis storm drainage report is intended to cover the necessary drainage infrastructure for the Saint Mary's Catholic Church site improvements. The parameters used for design and the existing conditions of the on-site area are incorporated to show how the final drainage design will accomplish the desired drainage objectives per the City of College Station Drainage Policy and Design Standards (DPDS.) GENERAL LOCATION AND DESCRIPTION: The Saint Mary's Catholic Church is located in the northern portion of College Station. The existing church occupies land on both sides of Church Street and extends to Cross Street to the north, Stasney Street to the West, and Nagel Street to the east. The church property is platted as Lots 1-14 of Block 3 and Lots 2-5 of Block 6, Tauber Addition. The site is partially developed and is gently rolling with an average of3% slopes. Most of the existing parking for this site is within the public right of way . The proposed improvements are a new activity center, ministry center, parking areas, and the demolition of the existing student center and parking areas. The phasing of the project requires the proposed structures be in use before the existing structures be removed. 1bis poses problems for the detention area which will be built in the location of the existing student center. In order to gain a certificate of occupancy before the construction of STORM DRAINAGE REPORT PAGE 1 SAINT MARY'S CATIIOLIC CHURCH the detention facility, the owner will sign an agreement with the City to construct the detention facility within a specified period of time. PRIMARY DRAINAGE BASIN DESCRIPTION: Most of the site drains to the south, into the storm drain system along Church Street This system conveys the flows to Tributary "C" of Wolf Pen Creek. A minor portion of the site drains into the southwest curb line of Nagel Street and is conveyed northwest along the street to Tributary "A" of Burton Creek. This Burton Creek outfall has been studied in detail with the College Main Rehabilitation Project. No portion of the site is within the 100 year flood plain per the Federal Emergency Management Agency Flood Insurance Rate Map (see Exhibit "A"). DRAINAGE FACILITY DESIGN: The proposed drainage patterns will not significantly alter the existing conditions. Storm water falling on the building and courtyard area north of Church Street are captured in the storm drain system and routed to the storm water detention area. The proposed storm water detention facility will be located at the south comer of Church Street and Nagel Street. The facility will be heavily landscaped and additionally will serve as an outdoor meeting area. The storm water detention facility is scheduled to be constructed with the improvements south of Church Street. The proposed detention pond will outfall into the existing inlet located at the comer of Church Street and Nagel Street Exhibits "C-1 ", "C-2", and "C-3" indicate the peak runoff calculations and inlet/pipe sizing computations for the drainage areas shown in Exhibit "B-1" and "B-2". STORM DRAINAGE REPORT PAGE2 SAINT MARY'S CA moue CHURCH DRAINAGE DESIGN CRITERIA: All drainage design is in accordance with the City DPDS. The design rainstorm is the 10 year event. Flow calculations for all drainage areas are based on the Rational Method. Pipe sizing is in accordance with Manning's Equation with an "n" of .014 per the DPDS. The storage volume required for the detention facility is based on a triangular hydrograph (base= 3* Tc) and peak flows computed using the rational method. The required volwne consists of the difference in volume of the ''pre" and ''post" development hydrographs for the 10 year design storm. The outlet for the detention pond is located at the upstream end of an undersized storm drain system. At the study point (the intersection of Church and Nagel Streets) the storm drain pipe system has a capacity of appro:Ximately 32 cfs and a calculated ten-year flow of 79 cfs., The inlets at this point have even less capacity. Due to this restriction, the majority of the storm drain flow will overflow the inlets and traverse along the Church Street gutter line in a easterly direction. The proposed detention pond routings shown in Exhibit D-1 demonstrate how the pond will function. The calculations are conducted at a 15 second interval, but printed at a 30 second interval to minimize unnecessary data. Exhibit D-2 shows a stage storage curve for the pond. No stage discharge curve is submitted as the discharge is limited by outfall conditions and the depth of water in the pond. These variables are impossible to plot in two dimensions. Note that drainage areas 1 through 3 are routed through the pond. Drainage areas 6 and 7 are combined near the comer of Nagel and Church Streets, but the flow is limited by the existing inlet capacity. The inlet capacity (computed as sump conditions, 2 cfs/lf) and pipe flow (based on manning) are shown on Exhibit D-1. The pipe downstream of inlet #7 is the most restricted and therefore the one studied. Note that the STORM DRAINAGE REPORT PAGE3 SAINf MARY'S CATIIOLIC CHURCH pipe flow is shown as the inlet flow plus the routed flow or the existing pipe capacity, whichever is less. Flows from drainage areas 1, 2, & 3 in excess of the pipe capacity are detained in the pond. Flows in excess of the Pipe capacity from drainage areas 6 & 7 bypass the inlets and are conveyed easterly along Church Street in the gutter line. In order to show the effect of the detention on the flows from the site, the "Total Proposed" flow is the combination of drainage areas 8, 10 , & 11 and the routed flows from drainage areas 1,2,3,6,& 7. Note that this does not account for any routing effects of the grate inlet number 8 or the pipe capacity of the subsequent downstream pipes . Existing drainage areas 16, 17, 18 , & 20 are combined to show the "Total Existing" flow. Note that drainage areas 10, 11, and 20 drain to Burton Creek, and are shown only to demonstrate the net result of the routing on the runoff of the entire site. The peak discharge for the Post-development does not exceed the Pre-development condition for the 5, 10, 25, and 50 year storm events. The following summary table shows the Pre-development and Post-development flows. Design Event Pre-Development Post-Development Qs= 88.71 85.04 Q10= 99.32 95.00 Qzs= 113.32 108.15 Qso= 127.97 121.92 Q100= 143.60 136.59 STORM DRAINAGE REPORT PAGE4 SAINT MARY'S CA 1HOLIC CHURCH CONCLUSION: The storm water detention facility is placed in a highly visible comer of the site. Because of its location, the area will be landscaped and will double as an outdoor meeting area. Despite undersized existing drainage facilities the detention pond can function during all storm events as demonstrated in the table. In all cases storm water is released into public rights of ways and conveyed to the natural outfall. The drainage design for this site meets the requirements as stated in the City of College Station Drainage Policy and Design Stan~. STORM DRAINAGE REPORT PAGES SAINT MARY'S CATHOLIC CHURCH ZONEX 1· = 500' E»lllT •A• Fl.000 INSURANCE RA TE MAP BRAZOS COUNTY, TEXAS ( INCORPORATED AREAS MAP NUMBERS: 48041C0143C 48041C0144C Effectlw Date: July 2. 1992 EXHIBIT C-1 Rational Formula Drainage Area Calculations Saint Mary's Catholic Center ~ @ i!= ~ ~ c( U5 ~ @ U5 ct!>c...19 g ~ 0:: ...I (!) Q. 0:: z ffi z ci LL. LL. ~ c( c( ~ z 0 c( :3 ...I :3 LL. 0:: i!= 0:: -~ ~ w~t;rd ~ ;i o::~o::~~(!)~_, 8 ~ ~ CQ:-(ij c) ~ ~O~O::>Z::>-'-' C ~ ~c(~C ~ ~0~0~(!)~(!)~ ~ u t-: ~ I I I I I I I I I I I I 0 .2W o It) o o o CU UJ · N It) 0 ..-It) N 0 It) 0 ..... o => ~ a ~ a ~ a ~ a ~ a ~ a NO. I.AC. I0.40!0.80I0.95ICA lft. lft. lft. !ft. lftls min min ln/Hn cfs I ln/Hn cfs I ln/Hn cfs I ln/Hn cfs I ln/Hn cfs I ln/Hn cfs Existing Drainage Areas 16 I 5.711 o.oo I 5.71 0.0014.57 1.0 17 I 5.091 0.001 5.09 0.0014.07 1.0 18 I 1.88 I 0.001 1.88 0.001 l.50 1.0 19 I 0.001 0.001 o.oo 0.0010.00 1.0 20 I 2.05 I 0.00 I 2.05 0.0011.64 144.0 !Proposed Drainage Areas 1 I 0.171 0.001 0.00 0.1710.16 1.0 2 I 0.201 0.001 o.oo 0.2010.19 1.0 3 I 0.21 I 0.001 0.00 0.21I0.20 1.0 4 I 0.001 0.001 0.00 0.0010.00 1.0 5 I 0.001 0.001 0.00 0.0010.00 1.0 6 I 5.30 I 0.00 I 5.30 0.0014.24 1.0 7 I 4.241 0.00 I 4.24 0.0013.39 1.0 8 I 2.281 0.001 2.28 0.0011.82 1.0 9 I 0.001 0.001 o.oo 0.0010.00 1.0 1 o I 1.53 I o.oo I 1.53 0.0011.22 144.0 11 I 0.791 0.001 0.79 0.0010.63 1.0 12 I 0.001 0.001 0.00 0.0010.00 1.0 1.011140.0I 12.0 2.01 9.4 9.41 6.52129.8 1.01 960.0I 11.0 2.11 7.6 7.61 7.12129.0 1.01 500.0I 10.0 2.81 3.0 5.01 8.22112.4 1.0 I 1.0 I 1.0 10.41 0.0 5.01 8.221 0.0 1.51 720.0I 10.0 1.71 8.5 8.51 6.80111.l 1.01 50.0 1.01 2.81 0.31 5.01 8.221 1.3 1.01 50.0 1.0 I 2.81 0.3 I 5.0 I 8.221 1.6 1.01 50.0 1.01 2.81 0.31 5.01 8.221 1.6 1.0 I 1.0 1.01 10.41 0.01 5.01 8.221 0.0 1.01 1.0 1.01 10.41 0.01 5.01 8.221 0.0 1.011140.0 12.0I 2.01 9.41 9.41 6.52127.6 1.01 %0.0 11.0I 2.11 7.61 7.61 7.12124.1 1.01 500.0 10.0I 2.81 3.01 5.01 8.22115.0 1.01 1.0 1.01 10.41 0.01 5.01 8.221 0.0 1.51 720.0 10.0 I 1.71 8.5 I 8.51 6.80 I 8.3 1.01 290.0 1.71 1.51 3.21 5.01 8.221 5.2 1.01 1.0 1.01 10.41 0.01 5.01 8.221 0.0 7.9136.1 8.9140.51 10.1146.31 11.4152.31 12.9158.7 8.6135.0 9.6139.21 11.0144.71 12.4150.51 13.9156.6 9.9114.8 11.0116.51 12.5118.81 14.1121.21 15.8123.7 9.91 0.0 11.0I 0.01 12.51 0.01 14.ll 0.01 15.81 0.0 8.2113.5 9.2115.ll 10.5117.31 11.9119.51 13.3121.9 9.91 1.61 11.0I 1.81 12.51 2.0 9 .91 1.9 I 11.0 I 2.11 12.5 I 2.4 9.91 2.01 11.0I 2.21 12.51 2.5 9.91 0.01 11.0I 0.01 12.51 o.o 9.91 0.01 11.0I 0.01 12.51 o.o 7.9133.51 8.9137.61 10.1142.9 8.6129.2 9.6132.6 I 11.0 I 37.2 9.9118.0 11.0120.0 I 12.5122.8 9.91 0.0 11.0 I o.o I 12.5 I o.o 8.2110.l 9.2111.31 10.5112.9 9.91 6.2 11.0I 6.91 12.51 7.9 9.91 0.0 11.0I 0.01 12.51 o.o 14.ll 2.31 15.81 2.6 14.ll 2.71 15.81 3.0 14.1 I 2.81 15.8 I 3.2 14.11 0.01 15.81 0.0 14.ll 0.01 15.81 0.0 11.4148.51 12.9154.5 12.4142.0I 13.9147.2 14.1125.71 15.8128.8 14.ll 0.01 15.81 0.0 11.9114.61 13.3116.3 14.1 I 8.91 15.8110.0 14.ll 0.01 15.81 0.0 1n/91 9630adra.xls ExhibitC-1 .c: ~ . -Q,) "O =-<o ~ "O 0 ~~ G.> -a.. 00 -.... -G.> = Q,) Q Q,) c:r Q,) -~ a.. Q,) a.. ~ ~< 01 -=: -0 00 00 -cfs 1 1.8 NIA 2 2.1 NIA 3 2.2 NIA Node4 0.0 NIA Node5 0.0 NIA EXHIBIT C-2 INLET COMPUTATIONS Saint Mary's Catholic Center ~ ~ a.. 0 G.> z ~ -~ G.> Q = ~ 01 DESCRIPTION u ~ "O G.> "O -c -;; c:r 0 Q,) a.. =: ~ ~ ~ Curb Inlet cfs ft ft 1 1.8 Prooosed Grate Inlet 2 2.1 Prooosed Grate Inlet 3 2.2 Prooosed Junction Box 4 0.0 Prooosed Junction Box 5 5.0 Prooosed Grate Inlet ·.: "" "'f Q 100 Flow from proposed storm I I drain svs1em. I ~ "O "O G.> G.> a.. 00 .... "O = ·;; a.. c:r 0 G.> G.> a.. ~ =: ~ ~ OS OS G.> G.> ... a.. u < < Grate Inlet cfs ft ft 2 0.87 1.7 2 1.02 1.7 2 2.45 2.5 lnt97 9630adra.xls Exhibit C-2 < 0 ~ u z ~ ~ ~ ~ as < ~ ~ ~ 0 0 as c.J ~ ~ ~ # # Ac. min Existing Drainage Areas 16 17 4.6 9.4 17 19 8.6 9.4 18 19 1.5 5.0 19 Creek 10.l 9.4 Proposed Drainage Areas 1 2 0 .2 5.0 2 3 0.4 5.8 3 4 0 .6 6 .0 4 5 0 .6 6 .5 5 6 0 .6 6 .9 6 7 4.8 9.4 7 9 8.2 9.4 8 9 l.8 5.0 9 Creek 10.0 9.4 *Incl udes 25% Flow Increase for pipe sizes <27" di a. EXHIBITC-3 PIPE SIZE CALCULATIONS Saint Mary's Catholic Center = -~ = fl) -~ ~ fl) ~ ~ s ~ ~ c. c. ~ .. "O fl) ~ 0 0 ~ "O ~ 00 ..... ..... 00 fl) ~ ·-.. = ..... ~ ~ = fl) ~ = .... = c,... _g -~ "O ~ .... ~ 0 ~ ..... ~ fl) 0: 0 "O 0 c.J ~ 0 0 ·c ~ = -<--~ ;;;i ~ iC ~ z ~ ~ 00 yr cfs cfs # cfs % " 10 40 .5 50.7 1 50.7 5.78 24 10 76.5 76.5 1 76 .5 7.04 27 10 16.5 16.5 1 16 .5 0.33 27 10 89.7 89 .7 1 89 .7 9 .67 27 10 1.8 2.2 1 2.2 0 .14 15 10 3.7 4.6 1 4.6 0 .22 18 10 5.7 7 .2 1 7 .2 0 .54 18 10 5.6 7 .0 1 7.0 0.51 18 10 5.5 6 .9 1 6 .9 4.28 12 10 42.5 53 .l 1 53 .l 6 .36 24 1.0 72.5 72.5 1 72.5 6.32 27 10 20.0 25 .0 1 25 .0 6.55 18 10 88.5 88.5 1 88 .5 9.41 27 ~ C!l ~ z ~ ~ ~ f p s I 16.1 31 19 .2 50 4.2 150 22.5 200 l.8 84 2.6 31 4.1 118 4.0 97 8.7 48 16 .9 3 1 18 .2 50 14.2 150 22.2 200 ~ s "O E:: = ~ G:3 ... @ 0: .. c.J ~ ~ min min 0 .03 9.3 9 0.04 9 .43 0 .6 0 5.60 0.15 9.5 8 0 .78 5.78 0.20 5.97 0.48 6.46 0.41 6.87 0 .09 6.96 O.o3 9.39 0 .05 9.43 0 .18 5.18 0 .15 9 .58 .c: ..... "O ~ I ~ = I 12/3 0/9 6 9 630adra.xls Exhibit C-3 = u ..!!. 16000.000 14000.000 12000 .000 10000.000 " 8000 .000 Cl l!! .s Cl) 6000.000 4000.000 2000.000 0 .000 340 .5 341 Saint Mary's Catholic Center Stage-Storage Curve 341.5 342 Elevation (msl) 342 .5 343 Exhibit D-2 ~~------------------------------------------ Post-It"' brand fax transm ittal memo 7671 ! rofP89ff • l 1'D V, F,.... ~~O~I,~ ~l"(")f'"1 Co. I;(). Dept. '"'--' Fu# Fu# ,,,,,,,, Sbwt M' fl()W ~ .sr ~ IYwf. ----------------~-1.N 9'-··-··-·· -··-··-·· .. _,::.,.;:-_-.. ---.. --.:-:...::-_-.. ---' .......... ~ ) !'-..e·-.. ·~ -·-·-·-·-·-£:..--·~7_.L ____ -· ~-~t. --""----...JC.8"'--' ,,..., ~ ... ... ... m .., '.3' 0 0 .- c ;u "' "' :z: "' ;u -:z: 0 .,, m DY ?Jod- c1T v O F COi .I .EGE STATION February 17, 1997 St. Mary's-Catholic Center Attn : Rev. Michael J. Sis 103 Nagle Street College Station, Texas 77840 P ost Office Box 9960 l tO l Te.xa'i Avenue Coll e g e Station, Te.xa'> 77P. '2 ·9960 (409) 764-3500 RE: Proposed Construction of St. Mary's Catholic Center Dear Rev. Sis : This letter is to state that the City of College Station Engineering Department finds your February 4 , 1997 correspondence satisfactory with regard to the guarantee of the detention facility on the south side of Church Street. The only thing that we would like to recommend is that upon completing the demolition of the south parcel, that the detention facility be constructed prior to the parking area. The pond does not have to be to finish grade, but should be rough graded such that it will function properly. There have been some organizational changes made within the Engineering Department in the last few weeks . As part of those changes , Veronica Morgan is now in charge of our Capital Improvements Division and I am now in charge of the Development Review Division. If you have any questions or comments, I am the new contact person for development related items . Should you need to contact me , my phone number is 764-3570 and my fax is 764-3496 . xc: ~~Volk, Development Coordinator v-iJevetopment Permit File Home of Texas AfrfY~ (fnlversltv nEU ~"""'I FtLE ST. MARY'S CATHOLIC CENTER ~(o?- Ms. Veronica Morgan City of College Station P.O. Box 9960 103 NAGLE STREET COLLEGE STATION, TEXAS 77840 (409) 846-5717 • FAX: (409) 846-4493 CATHOLIC CAMPUS MINISTRY AT TEXAS A&M UNIVERSITY February 4, 1997 College Station, TX 77840 Dear Ms. Morgan, This letter is to request that St. Mary's Catholic Center be allowed to occupy phase one of our upcoming building project prior to the completion of the storm water detention area in phase two of the project. Phase one of the project will consist of the construction of 30,000 square feet of new space on our north parcel of land, 603 Church Street in College Station. Anticipated commencement is in early April and construction of phase one is scheduled for completion by January 1, 1998 . At the conclusion of phase one, we would move our entire ministry into the new Catholic Center. We need to occupy the ministry center, activity center and chapel in order for our ministry to continue. Once we have moved into the new buildings on the north parcel, we will immediately initiate the demolition of the existing student center at 103 Nagle Street. Once demolition is achieved, phase two will be completed with the construction of the required storm water detention area, landscaping , and the south parcel parking lot. St. Mary's Catholic Center guarantees that the south parcel storm water detention area and parking lot will be completed within six months of the final conditional CO from the city of College Station. If St. Mary's Catholic Center fails to finish the south parcel storm water detention area and parki ng withir. the six month p1::riod, St. M a;:y 's CaLhol ic Center a gre es tu give the city of College Station access to our property to complete detention and parking at the expense of St. Mary's Catholic Center. One thing that should be pointed out is that our contract with the General Contractor covers not only the construction on the north parcel, but also the construction on the south parcel. Attached you will find a copy of the contract we intend to sign with our General Contractor. Sincerely, ~-/fl#~; Rev. Michael J. Sis Director of Campus Ministry ~·~·· . . . . . . \ Construction Form Parish/A-! (Rev. '95) AGREEMENT FOR CONSTRUCTION CONTRACT This Agreement, dated for reference this the day of , 19 , is between The Most Reverend John _M_c_C_a_r_t_h_y_,~B-i~·s-h:--o-p of the Roman Catholic Diocese of Austin and his Successors in Off ice ("Owner") (for the Parish) and the following named and described Contractor: Name: Address: Type of Organization: W I T N E S S E T H : Article 1. Statement of Work. Contractor shall furnish all materials, supplies, labor, service and equipment required for the following-described Work of construction, alteration or repair: Such Work is described more in particular in the other Contract Documents incorporated in this Contract. Article 2. Time for Completion. The Work will be completed following execution of this Agreement by Owner, ~uch time for completion being subject to adjustment as provided in the Contract Documents. Time is of the essence in the performance of this Contract. Article 3. List of Drawings and Specifications. 1. Architectural Drawings and Specifications: Architect Name of Document 2. Civil Engineer: 3. Landscaping: 4. Structural: Date Construction Form Parish/A-1 (Rev. '95) 5. Mechanical, Electrical and Plumbing: Article 4. Contract Documents. This Contract includes the following Contract Documents, all of which are incorporated in the Contract as parts hereof: 1. This Agreement. 2. The General Conditions, Construction Form (Rev. '94). 3. The Drawings and Specifications, all as identified in this Agreement, together with all addenda thereto. 4. Contractor's Proposal . In case of conflict between two or more of the Contract Documents, each shall prevail over others in the order of precedence above listed. Article 5. Price . For performance of the Work, the Owner will pay to Contractor a Contract Price computed as shown below, but subject to payment and adjustment as provided in the Contract Documents. Check Applicable Provision A . Fixed Price . The cost of the project shall be a fixed price of $ , computed by adding the Contract Price for Material incorporated into the Work and the Contract Price for Labor as shown in the following Pricing Schedule, but subject to adjustment as provided in the Contract Documents: Pricing Schedule: Contract Price for Material incorporated into Work: Contract Price for Labor: Total: B. Cost Plus a Fee. The Contractor guarantees that the maximum price to the Owner for the Cost of the Project and the Contractor's fee as set forth in paragraph B.5 will not exceed $ , which sum shall be called the Guaranteed Maximum Price. 1. The Guaranteed Maximum Price laws, codes and regulations in existence its establishment and upon criteria, Specifications set forth in the Contract -2- is based upon at the date of Drawings and Documents . Construction Form Parish/A-1 (Rev. '95) 2. The Guaranteed Maximum Price will be modified for changes in the Project, all pursuant to the Contract Documents. 3. Allowances included in the Guaranteed Maximum Price are as set forth below: 4. Whenever the cost is more or less than the Allowance, the Guaranteed Maximum Price shall be adjusted by Change Order. 5. In consideration of the performance of the Agreement, the Owner agrees to pay to the Contractor in current funds as compensation for his services a fee as follows: The cost of the work plus a fee of %. 6. Adjustment in fee shall be made as follows: for changes in the Project as provided in the Contract Documents, the Contractor's fee shall be adjusted as follow: The cost ·of the additional work plus a fee of % • 7. In the event the cost of the Project plus the Contractor's fee shall be less than the Guaranteed Maximum Price as adjusted by Change Orders, the resulting savings will be shared by the Owner and the Contractor as follows: Seventy-five percent ( 75%) to the Owner and twenty-five percent (25%) to the Contractor. 8. The Contractor shall be paid monthly that part of his fee proportionate to the percentage work completed and accepted by the Owner, the balance, if any, to be paid at the time of final payment; subject to the retainage provided in the Contract Documents. 9. Included in the Contractor's fee are the following, and such sums shall not be included in the Cost of Project: (a) Salaries or other compensation of the Contractor's employees except employees listed in paragraph B.lO(b) below. -3- Construction Form Parish/A-1 (Rev. '95) (b) General operating expenses of the Contractor's offices including the field office. (c ) Any part of the Contractor's capital expenses, including interest on the Contractor's capital employed for the Project . (d) Overhead or general expenses of any kind, except as may be expressly included in paragraph B.10 below . (e) Costs in excess of the Guaranteed Maximum Price. ( f ) Any cost, including transportation and maintenance, of materials, supplies, equipment, temporary facilities and hand tools not owned by the Contractor or any workmen, which are not consumed in the performance of the Work. (g) Losses, expenses or damages to the extent not compensated by insurance or otherwise, and the cost of corrective work. 10. The term "Cost of the Project" shall mean costs necessarily incurred in the design and construction of the Project and shall include the items set forth below in this paragraph. The Owner agrees to pay the Contractor for the Cost of the Project as itemized below, which payment shall be in addition to the Contractor's fee stipulated in paragraph B.5 above . (a) .All engineering and related fees and expenses incurred in designing and constructing the Project. (b) Wag e s paid for labor in the direct employ of the Contractor in the performance of the Work or under a salary or wage schedule agreed upon by the Owner and the Contractor. (c) Salaries of Contractor's employees when stationed at the field office, for purposes of furthering the Project, employees engaged on the road expediting the production or transportation of material and equipment. (d) Cost of all employee benefits and taxes for such i terns as unemployment compensation and social security, insofar as such cost i s based on wages, salaries or other remuneration paid to employees of the Contractor and included in the Cost of the Project hereunder. -4- ... Construction Form Parish/A-! (Rev. '95) (e) Cost of all materials, supplies and equipment incorporated in the Project, including costs of transportation. (f) Payments made by the Contractor to subcontractors for Work performed pursuant to contract under this Agreement. (g) Rental charges incurred by Contractor for necessary machinery and equipment, exclusive of hand tools, used at the site of the Work, including installations, repairs and replacements, dismantling, removal, costs of lubrication, transportation and delivery costs thereof, at rental charges consistent with those prevailing in the area. (h) Cost of the premiums for all insurance which the Contractor is required to procure by this Contract or is deemed necessary by the Contractor and approved by the Owner. (i) Sales, use, gross receipts or similar taxes (but not income, franchise or similar taxes) related to the Project, imposed by any governmental authority, and for which the Contractor is liable. (j) Permit fees, and licenses, for which the Contractor is responsible under the Contract Documents. (k) Cost of removal of all debris. -5- Construction Form Parish/A-1 (Rev. '95) Executed to be effective as of the date this Agreement is signed by Owner. OWNER: The Most Reverend John McCarthy, Bishop of the Roman Catholic Diocese of Austin, and His Successors in Off ice Date of Execution: ------- G:\D\DIOCESE\FORMS\AGRCONS.ClA 5-1-95 CONTRACTOR: Date of Execut i on: ------- .. Drainage Report FOR Saint Mary's Catholic Church 103 Nagle Street College Station, TX 77840 VICINITY MAP NTS January, 1997 Prepared By: McClure Engineering. Inc. 1722 Broad moor Drive, Suite 2 10 APPROV Bryan, Texas 77802 .__.-....;;;..;,.,.,;..;::;...:..::...:.;::.=...:~1-1!1-_J ( 409) 776 -6700 Drainage Report FOR Saint Mary's Catholic Church 103 Nagle Street College Station, TX 77840 VICINITY MAP NTS January, 1997 Prepared By. McClure Engineering. Inc. 1722 Broadmoor Drive, Suite 210 Bryan, Texas 77802 ( 409) 776-6700 CERTIFICATION I, Michael R. McClure, Registered Professional Engineer No. 32740, State of Texas, certify that this report for the drainage design of SAINT MARY'S CATIIOLIC CHURCH, was prepared by me in accordance with the provisions of the City of College Station Drainage Policy and Design Standards for the owners thereof STORM DRAINAGE REPORT SAINT MARY'S CATHOLIC CHURCH TABLE OF CONTENTS SAINT MARY'S CATHOLIC CHURCH INTRODUCTION GENERAL LOCATION AND DESCRIPTION 1 PRIMARY DRAINAGE BASIN DESCRIPTION 2 DRAINAGE FACILITY DESIGN 2 DRAINAGE DESIGN CRITERIA 3 CONCLUSION 5 EXIDBITS FEMA FLOOD INSURANCE RA TE MAP EXCERPT "A " DRAINAGE AREA MAP -EXISTING CONDITIONS -"B-1 " DRAINAGE AREA MAP -PROPOSED CONDITIONS "B-2" RA TI ON AL FORMULAS DRAINAGE AREA CALCULATIONS "C-1 " INLET COMPUTATIONS "C-2" PIPE SIZE CALCULATIONS "C-3 " PROPOSED DETENTION POND ROUTING "D-1 " INTRODUCTION: STORM DRAINAGE REPORT SAINT MARY'S CATHOLIC CHURCH This storm drainage report is intended to cover the necessary drainage infrastructure for the Saint Mary's Catholic Church site improvements. The parameters used for design and the existing conditions of the on-site area are incorporated to show how the final drainage design will accomplish the desired drainage objectives per the City of College Station Drainage Policy and Design Standards (DPDS.) GENERAL LOCATION AND DESCRIPTION: The Saint Mary's Catholic Church is located in the northern portion of College Station. The existing church occupies land on both sides of Church Street and extends to Cross Street to the north, Stasney Street to the West, and Nagel Street to the east. The church property is platted as Lots 1-14 of Block 3 and Lots 2-5 of Block 6, Tauber Addition. The site is partially developed and is gently rolling with an average of3% slopes. Most of the existing parking for this site is within the public right of way. The proposed improvements are a new activity center, ministry center, parking areas, and the demolition of the existing student center and parking areas. The phasing of the project requires the proposed structures be in use before the existing structures be removed. This poses problems for the detention area which will be built in the location of the existing student center. In order to gain a certificate of occupancy before the construction of STORM DRAINAGE REPORT PAGE 1 SAINT MARY'S CATIIOLIC CHURCH the detention facility, the owner will sign an agreement with the City to construct the detention facility within a specified period of time. PRIMARY DRAINAGE BASIN DESCRIPTION: Most of the site drains to the south, into the storm drain system along Church Street This system conveys the flows to Tributary "C" of Wolf Pen Creek. A minor portion of the site drains into the southwest curb line of Nagel Street and is conveyed northwest along the street to Tributary "A" of Burton Creek. This Burton Creek outfall has been studied in detail with the College Main Rehabilitation Project. No portion of the site is within the 100 year flood plain per the Federal Emergency Management Agency Flood Insurance Rate Map (see Exhibit "A"). DRAINAGE FACILITY DESIGN: The proposed drainage patterns will not significantly alter the existing conditions. Storm water falling on the building and courtyard area north of Church Street are captured in the storm drain system and routed to the storm water detention area. The proposed storm water detention facility will be located at the south comer of Church Street and Nagel Street. The facility will be heavily landscaped and additionally will serve as an outdoor meeting area. The storm water detention facility is scheduled to be constructed with the improvements south of Church Street. The proposed detention pond will outfall into the existing inlet located at the comer of Church Street and Nagel Street. Exhibits "C-1 ", "C-2", and "C-3" indicate the peak runoff calculations and inlet/pipe sizing computations for the drainage areas shown in Exhibit "B-1" and "B-2,,. STORM DRAINAGE REPORT PAGE2 SAINT MARY'S CATIIOLIC CiillRCH DRAINAGE DESIGN CRITERIA: All drainage design is in accordance with the City DPDS. The design rainstorm is the 10 year event. Flow calculations for all drainage areas are based on the Rational Method. Pipe sizing is in accordance with Manning's Equation with an "n" of .014 per the DPDS. The storage volume required for the detention facility is based on a triangular hydrograph (base= 3* Tc) and peak flows computed using the rational method. The required volume consists of the difference in volume of the "pre" and ''post" development hydrographs for the 10 year design storm. The outlet for the detention pond is located at the upstream end of an Wldersized storm drain system. At the study point (the intersection of Church and Nagel Streets) the storm drain pipe system has a capacity of approximately 32 cfs and a calculated ten-year flow of 79 cfs. The inlets at this point have even less capacity. Due to this restriction, the majority of the storm drain flow will overflow the inlets and traverse along the Church Street gutter line in a easterly direction. The proposed detention pond routings shown in Exhibit D-1 demonstrate how the pond will function. The calculations are conducted at a 15 second interval, but printed at a 30 second interval to minimize unnecessary data. Exhibit D-2 shows a stage storage curve for the pond. No stage discharge curve is submitted as the discharge is limited by outfall conditions and the depth of water in the pond. These variables are impossible to plot in two dimensions. Note that drainage areas 1 through 3 are routed through the pond. Drainage areas 6 and 7 are combined near the comer of Nagel and Church Streets, but the flow is limited by the existing inlet capacity. The inlet capacity (computed as sump conditions, 2 cfs/lf) and pipe flow (based on manning) are shown on Exhibit D-1. The pipe downstream of inlet #7 is the most restricted and therefore the one studied. Note that the STORM DRAINAGE REPORT PAGE3 SAINT MARY'S CATIIOLIC CHURCH pipe flow is shown as the inlet flow plus the routed flow or the existing pipe capacity, whichever is less. Flows from drainage areas 1, 2, & 3 in excess of the pipe capacity are detained in the pond. Flows in excess of the Pipe capacity from drainage areas 6 & 7 bypass the inlets and are conveyed easterly along Church Street in the gutter line. In order to show the effect of the detention on the flows from the site, the "Total Proposed" flow is the combination of drainage areas 8, 10, & 11 and the routed flows from drainage areas 1,2,3,6,& 7. Note that this does not account for any routing effects of the grate inlet number 8 or the pipe capacity of the subsequent downstream pipes. Existing drainage areas 16, 17, 18, & 20 are combined to show the "Total Existing" flow. Note that drainage areas 10, 11, and 20 drain to Burton Creek, and are shown only to demonstrate the net result of the routing on the runoff of the entire site. The peak discharge for the Post-development does not exceed the Pre-development condition for the 5, 10, 25, and 50 year storm events. The following summary table shows the Pre-development and Post-development flows. Design Event Pre-Development Post-Development Qs= 88.71 85.04 Q10= 99.32 95.00 Qis= 113.32 108.15 Qso= 127.97 121.92 Ql()()= 143.60 136.59 STORM DRAINAGE REPORT PAGE4 SAINT MARY'S CA IBOLIC CHURCH CONCLUSION: The storm water detention facility is placed in a highly visible corner of the site. Because of its location, the area will be landscaped and will double as an outdoor meeting area. Despite undersized existing drainage facilities the detention pond can function during all storm events as demonstrated in the table. In all cases storm water is released ·into public rights of ways and conveyed to the natural outfall. The drainage design for this site meets the requirements as stated in the City of College Station Drainage Policy and Design Stan~s. STORM DRAINAGE REPORT PAGES SAINT MARY'S CATIIOLIC CHURCH ZONEX 1" = 500' E>CHlllJ •A• FLOOD INSURANCE RA 1E MAP BRAZOS COUNTY, TEXAS t IN CORPORA lEO AREAS MAP NUMBERS:. 48041C0143C 48041C0144C Effectlve Date: July 2, 1992 = u ~ 16000.000 14000.000 12000.000 10000.000 41 8000 .000 Cl ~ 0 v; 6000.000 4000.000 2000 .000 0.000 340 .5 341 Saint Mary's Catholic Center Stage-Storage Curve 341 .5 342 Elevation (msl) 342.5 343 Exhibit D-2