HomeMy WebLinkAboutEngineers Cost Estimate CHIMY'S
PUBLIC INFRASTRUCTURE - PRELIMINARY COST ESTIMATE
25- Mar -12
Water Line Items
6" PVC Waterline (AWWA C900 CL 200)
in structural embedment 24 LF $50.00 $1,200.00
6" MJ Gate Valve W/ Lock Lid 1 EA $1,250.00 $1,250.00
6"x45 Degree M.J. Bend 2 EA $400.00 $800.00
8 "X6" MJ Tee 1 EA $750.00 $750.00
6'x11.25 Degree M.J. Bend 1 EA $400.00 $400.00
Mobilization 1 LS $1,600.00 $1,600.00
Pavement Repair 1 LS $1,500.00 $1,500.00
Connection to existing system 1 EA $2,250.00 $2,250.00
Trench Safety 24 LF $1.00 $24.00
Total $9,774.00
City Inspection Fee (1% of construction cost) Total Insp Fee $97.74 rr-� �f�
F - K443
OF
Jr �* `'i'.
i *: °� *li
( VERONICA J.B. MORGAN i
'� ` 77689 : ' 0;
g 9FG /
/
1t ' S ` r7 O NAL�.
alW