HomeMy WebLinkAboutEngineers Cost Estimate • 09/07/2012 11:38 7136608550 GORSE ARCHITECTS INC PAGE 02/02
ENGINE£ SI NG. L.C.
September 7, 2012
Erika Bridges
City of College Station Engineering
1101 Texas Avenue
P.G. Box 9960
College Station, TX 77842
Re: Varsity Ford Quick Lane Addition— Public Water Facilities Estimate
1351 Earl Rudder Freeway
LE 12036
Ms. Bridges,
This estimate is in. response to your request for the value of the fire hydrant and appurtenant items to be
removed and the fire hydrant and appurtenant itemsto be added at the Varsity Ford site in support of the Quick
Lane addition.
Existing Line:
Value of Fire Hydrant,GV&B, and 6" FE lead $6,000.00
Proposed Fire Hydrant;
Fire Hydrant, 8 "x6" Tee, 8" GV &B, 6" GV &B, 6" PVC Lead $8,820.00
Proposed Isolation Valve:
6" Isolation Valve with Lockable Lid $3,648.00
Since .�..�r
•
•
We ey effer, P.E. %WESLEY D. SHEFFERI
Project Engineer 0 . Y
Lentz Engineering, L.C. i l l � 110287 lit-0
t,`•. c Nso .4
4710 T3ellmircr }31\%.1. • SIiii ' 1 fl • 13ell irc_ Tovis 77 -1.01 • Moue: (71:4)S:494000 . Fax (71 i i • -9020 ��'w u'.ICi11 'Ic r'I�r,ilY�c`rirl,r,.nc l
I'lif'1.: IiC'zitil.a.iiul No. f -1.378