Loading...
HomeMy WebLinkAboutEngineers Cost Estimate • 09/07/2012 11:38 7136608550 GORSE ARCHITECTS INC PAGE 02/02 ENGINE£ SI NG. L.C. September 7, 2012 Erika Bridges City of College Station Engineering 1101 Texas Avenue P.G. Box 9960 College Station, TX 77842 Re: Varsity Ford Quick Lane Addition— Public Water Facilities Estimate 1351 Earl Rudder Freeway LE 12036 Ms. Bridges, This estimate is in. response to your request for the value of the fire hydrant and appurtenant items to be removed and the fire hydrant and appurtenant itemsto be added at the Varsity Ford site in support of the Quick Lane addition. Existing Line: Value of Fire Hydrant,GV&B, and 6" FE lead $6,000.00 Proposed Fire Hydrant; Fire Hydrant, 8 "x6" Tee, 8" GV &B, 6" GV &B, 6" PVC Lead $8,820.00 Proposed Isolation Valve: 6" Isolation Valve with Lockable Lid $3,648.00 Since .�..�r • • We ey effer, P.E. %WESLEY D. SHEFFERI Project Engineer 0 . Y Lentz Engineering, L.C. i l l � 110287 lit-0 t,`•. c Nso .4 4710 T3ellmircr }31\%.1. • SIiii ' 1 fl • 13ell irc_ Tovis 77 -1.01 • Moue: (71:4)S:494000 . Fax (71 i i • -9020 ��'w u'.ICi11 'Ic r'I�r,ilY�c`rirl,r,.nc l I'lif'1.: IiC'zitil.a.iiul No. f -1.378