HomeMy WebLinkAboutEngineers Cost Estimate (2) SCHULTZ ENGINEERING, LLC. 2730 LONGMIRE DRIVE, SUITE A COLLEGE STATION, TEXAS 77845 Firm No. 12327 CAPROCK CROSSING WATER & SANITARY SEWER CONSTRUCTION ENGINEER'S ESTIMATE OF CONSTRUCTION Item Description Unit Estimated Unit Price Total Quantity General Items 1 Mobilization, Overhead and Construction Staking LS 1 $ 1,500.00 $ 1,500.00 2 Traffic Control - complete in place LS l $ 500.00 $ 500.00 3 Easement Site Preparation, Fine Grading, complete in place LS 1.0 $ 1,500.00 $ 1,500.00 4 Erosion & Sediment Control - SWPPP Implementation & Maintenance, Silt LS 1 $ 1,000.00 $ 1 000.00 Fence, Construction Exit, Rock Filter Dam, etc., complete in place 5 Hydroseed and Hydromulch, complete in place SY 1,200 $ 0.60 $ 720.00 General Items Subtotal $ 5,220.00 Water Construction Items 6 12" C900 Water Pipe - Non - Structural Backfill, complete in place LF 70 $ 32.00 $ 2,240.00 7 12" C900 Water Pipe - Structural Backfill, complete in place LF 160 $ 38.00 $ 6,080.00 8 12" M.J. Gate Valve, complete in place EA 1 $ 2,250.00 $ 2,250.00 9 Fire Hydrant (w /vert. extension), complete in place EA 1 $ 3,000.00 $ 3,000.00 10 12" x 6" M.J. Reducer, complete in place EA 2 $ 500.00 $ 1,000.00 11 12" x 45 M.J. Bend, complete in place EA 3 $ 500.00 $ 1,500.00 12 12" x 11.25 M.J. Bend, complete in place EA 1 $ 500.00 $ 500.00 13 Connect to Existing Water Line, complete in place EA I $ 1,000.00 $ 1,000.00 14 Waterline Testing LS 1 $ 500.00 $ 500.00 Water Construction Items Subtotal $ 18,070.00 Sanitary Sewer Construction Items 15 6" PVC Sewer Line -133034 - Structural Backfill, complete in place LF 60 $ 28.00 $ 1,680.00 16 6" PVC Sewer Line - D3034 - Non - Structural Backfill, complete in place LF 140 $ 24.00 $ 3,360.00 17 8" PVC Sewer Line -133034 - Non - Structural Backfill, complete in place LF 140 $ 28.00 $ 3,920.00 18 Tie -In to Existing Manhole, complete in place EA 1 $ 1,000.00 $ 1,000.00 19 Concrete Manhole - 4' Dia. - complete in place EA 2 $ 3,250.00 $ 6,500.00 20 TV Testing and Inspection, complete in place LF 340 $ 3.50 $ 1,190.00 Sanitary Sewer Construction Items Subtotal $ 17,650.00 General Items Subtotal $ 5,220.00 Water Construction Items Subtotal $ 18,070.00 Sanitary Sewer Construction Items Subtotal $ 17,650.00 TOTAL ESTIMATED CONSTRUCTION' 8 40,940.00 4 14"F 74 : :C . ,...A . 1 1 iiii i i 4 / Aft, i I / F -12327 SCHULTZ ENGINEERING, LLC. Page 1 of 1