Loading...
HomeMy WebLinkAboutEngineers Cost Estimate EMERALD RIDGE EMERGENCY ACCESS COST ESTIMATE Item I Qty I Unit I Description I Unit Cost I Total Base Bid General Construction Items 1 1 LS Mobilization and project overhead (not to exceed 5% $1,500.00 $1,500.00 of work items) 2 275 LF Silt fence installation, maintenance, and removal $2.00 $550.00 General Construction Items Subtotal $2,050.00 3 2934 SY Base prime coat and one course surface treatment $ 6.00 $17,604.00 4 2934 SY 6" crushed limestone base $ 8.00 $23,472.00 5 44 LF 24" corrugated steel pipe $ 30.00 $1,320.00 6 1 AC Clearing and grubbing $ 2,000.00 $2,000.00 Subtotal General Construction Items $44,396.00 Total $46,446.00 ....E o. r �Itt . SAM J. VERNON 6 i .... .. 99353 •' � 1%, /ONA= V $Niq (0))\ 1 ,1% 1