HomeMy WebLinkAboutEngineers cost estimate ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COSTS LOT 10, BLOCK 2, NORTH FOREST SUBDIVISION PUBLIC SANITARY SEWER RE -ROUTE May 25, 2012 ITEM EST. UNIT PRICE TOTAL PRICE IN ITEM DESCRIPTION & PRICE IN WORDS NO. QTY. UNIT IN FIGURES FIGURES SANITARY SEWER LINE: 1 210 LF Disconnect, Grout Fill & Abandon in place Existing 15" Sanitary Sewer Line (7' -9' $15.00 $3,150.00 depth) complete for Dollars and Cents per linear foot. 2 1 EA Plug Disconnected 15" Exit of Existing Sanitary Sewer Manhole at Station 0 +00 $300.00 $300.00 with water tight plug complete and in place for Dollars and Cents each. 3 1 EA Remove Cone, Ring & Cover of Existing Sanitary Sewer Manhole on Lot 10, Grout $1,000.00 $1,000.00 fill SSMH & Backfill to existing ground with density control (98% Std.) complete and in place for Dollars and Cents each. 4 40 LF Disconnect, Grout Fill & Abandon in place Existing 6" Sanitary Sewer Line (5' -6' $10.00 $400.00 depth) complete for Dollars and Cents per linear foot. 5 1 EA Connect to Existing Sanitary Sewer Manhole at Station 0 +00 with Fernco flexible $500.00 $500.00 coupling, Modify invert bench & channel as necessary complete and in place for Dollars and Cents each. 6 170 LF Furnish and Install 15" PVC Sanitary Sewer Main (SDR 26, ASTM D3034, CLASS $60.00 $10,200.00 160) —Extra Depth 8' -10' —, complete and in place for Dollars and Cents per linear foot. (Standard Bedding & Backfill) 7 55 LF Furnish and Install 15" PVC Sanitary Sewer Main (SDR 26, ASTM D3034, CLASS $65.00 $3,575.00 160) —Extra Depth 8' -10' —, complete and in place for Dollars and Cents per linear foot. (Structural Bedding & Backfill) 8 1 EA Furnish and Install Standard City of College Station Sanitary Sewer Manhole (8'- $4,200.00 $4,200.00 10' depth) in pavement area - reconnect existing lines with 1 joint pvc pipe, Fernco flexible couplings, concrete collar, etc. complete and in place for Dollars and Cents each. 9 1 EA Furnish and Install Standard City of College Station Inside Drop Sanitary Sewer $5,000.00 $5,000.00 Manhole (8' -10' depth) in sidewalk area complete and in place for Dollars and Cents each. SANITARY SEWER TOTAL - SUBTOTAL 1: $28,325.00 (ITEMS 1 -9) ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COSTS LOT 10, BLOCK 2, NORTH FOREST SUBDIVISION PUBLIC SANITARY SEWER RE -ROUTE May 25, 2012 ITEM EST. UNIT PRICE TOTAL PRICE IN ITEM DESCRIPTION & PRICE IN WORDS NO. QTY. UNIT IN FIGURES FIGURES INCIDENTALS: 10 225 LF Furnish and Install all necessary Trench Safety for Sanitary Sewer Line, complete $1.50 $337.50 and in place for Dollars and Cents per linear foot. 11 1 LS Provide bypass pumping for Sanitary Sewer line $3,000.00 $3,000.00 for Dollars and Cents. 12 1 LS Remove & Repair Existing Residential Wood Fencing to Equal or Better Condition $500.00 $500.00 complete and in place for Dollars and Cents. 13 55 SF Saw cut, Demo, Remove & Dispose of off -site Existing Reinforced Concrete $5.00 $275.00 Sidewalk complete for Dollars and Cents per square foot. 14 55 SF Furnish & Install Reinforced Concrete Sidewalk complete and in place $4.25 $233.75 for Dollars and Cents per square foot. 15 1 LS Saw cut, demo and remove & repair existing HMAC Pavement, complete $1,600.00 $1,600.00 for Dollars and Cents. 16 1 LS Furnish and Install Temporary Sidewalk Construction Signage /Barricades as $100.00 $100.00 necessary complete and in place for Dollars and Cents. 17 400 SY Furnish & Install Hydromulch for Revegetation in all disturbed areas with $1.00 $400.00 guarantee of growth & coverage complete and in place for Dollars and Cents per square yard. 18 1 LS Furnish and Install Erosion control, include all necessary silt fence, construction $1,000.00 $1,000.00 entrances, etc., complete and in place for Dollars and Cents. INCIDENTALS TOTAL - SUBTOTAL 2 $7,446.25 (ITEMS 10 -18) SUMMARY SUBTOTAL 1: $28,325.00 . _.1\ \ \` SUBTOTAL 2: $7,446.25 S S T� t`�, / rE ye. OF . l 1 * • '' •• • • /� • * i TOTAL ESTIMATE: $35,771.25 A ALFRED A. PAINE / 10% CONTINGENCY $3,577.13 , 1 � 97221 QQ •' ; �C EN g � / FINAL ESTIMATE: $39,348.38 p KLING ENGINEERING & SURVEYING Consulting Engineers • Land Surveyors � �� TBPE FIRM 4 F -776 ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COSTS LOT 10, BLOCK 2, NORTH FOREST SUBDIVISION PUBLIC SANITARY SEWER RE -ROUTE March 9, 2012 ITEM EST. UNIT PRICE TOTAL PRICE IN ITEM DESCRIPTION & PRICE IN WORDS NO. QTY. UNIT IN FIGURES FIGURES SANITARY SEWER LINE: 1 210 LF Disconnect, Grout Fill & Abandon in place Existing 15" Sanitary Sewer Line (7' -9' $15.00 $3,150.00 depth) complete for Dollars and Cents per linear foot. 2 1 EA Plug Disconnected 15" Exit of Existing Sanitary Sewer Manhole at Station 0 +00 $300.00 $300.00 with water tight plug complete and in place for Dollars and Cents each. 3 1 EA Remove Cone, Ring & Cover of Existing Sanitary Sewer Manhole on Lot 10, Grout $1,000.00 $1,000.00 fill SSMH & Backfill to existing ground with density control (98% Std.) complete and in place for Dollars and Cents each. 4 1 EA Demolish, Remove & Dispose of off -site Existing Sanitary Sewer Manhole at $1,200.00 $1,200.00 Station 2 +28 complete for Dollars and Cents each. 5 40 LF Demo, Remove, and Dispose of off -site existing 6" Sanitary Sewer line, complete $15.00 $600.00 for Dollars and Cents per linear foot. 6 1 EA Connect to Existing Sanitary Sewer Manhole at Station 0 +00 with Fernco flexible $500.00 $500.00 coupling, Modify invert bench & channel as necessary complete and in place for Dollars and Cents each. 7 188 LF Furnish and Install 15" PVC Sanitary Sewer Main (SDR 26, ASTM D3034, CLASS $60.00 $11,280.00 160) —Extra Depth 8' -10' —, complete and in place for Dollars and Cents per linear foot. (Standard Bedding & Backfill) 8 40 LF Furnish and Install 15" PVC Sanitary Sewer Main (SDR 26, ASTM D3034, CLASS $65.00 $2,600.00 160) —Extra Depth 8' -10' —, complete and in place for Dollars and Cents per linear foot. (Structural Bedding & Backfill) 9 2 EA Furnish and Install Standard City of College Station Sanitary Sewer Manhole (8'- $4,500.00 $9,000.00 10' depth) in sidewalk area - reconnect existing lines with 1 joint pvc pipe & Fernco flexible couplings, complete and in place for Dollars and Cents each. SANITARY SEWER TOTAL - SUBTOTAL 1: $29,630.00 (ITEMS 1 -9) r ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COSTS LOT 10, BLOCK 2, NORTH FOREST SUBDIVISION PUBLIC SANITARY SEWER RE -ROUTE March 9, 2012 ITEM EST. UNIT PRICE TOTAL PRICE IN NO. QTY. UNIT ITEM DESCRIPTION & PRICE IN WORDS IN FIGURES FIGURES INCIDENTALS: 10 228 LF Furnish and Install all necessary Trench Safety for Sanitary Sewer Line, complete $1.50 $342.00 and in place for Dollars and Cents per linear foot. 11 1 LS Provide bypass pumping for Sanitary Sewer line $3,000.00 $3,000.00 for Dollars and Cents. 12 1 LS Remove & Repair Existing Residential Wood Fencing to Equal or Better Condition $500.00 $500.00 complete and in place for Dollars and Cents. 13 195 SF Saw cut, Demo, Remove & Dispose of off -site Existing Reinforced Concrete $2.00 $390.00 Sidewalk complete for Dollars and Cents per square foot. 14 195 SF Furnish & Install Reinforced Concrete Sidewalk complete and in place $4.25 $828.75 for Dollars and Cents per square foot. 15 1 LS Furnish and Install Temporary Sidewalk Construction Signage /Barricades as $100.00 $100.00 necessary complete and in place for Dollars and Cents. 16 400 SY Furnish & Install Hydromulch for Revegetation in all disturbed areas with $1.00 $400.00 guarantee of growth & coverage complete and in place for Dollars and Cents per square yard. 17 1 LS Furnish and Install Erosion control, include all necessary silt fence, construction $1,000.00 $1,000.00 entrances, etc., complete and in place for Dollars and Cents. INCIDENTALS TOTAL - SUBTOTAL 2 $6,560.75 (ITEMS 10 -17) SUMMARY SUBTOTAL 1: $29,630.00 SUBTOTAL 2: $6,560.75 0 .• •.S TOTAL ESTIMATE: $36,190.75 r *•• * i 9 , 010 ALFRED A. PAINE 10% CONTINGENCY $3,619.08 4 o. 97221 sec FINAL ESTIMATE: $39,809.83 / i i , ` KLING ENGINEERING & SURVEYING o-7ZO/Z Consulting Engineers • Land Surveyors TBPE FIRM # F -776