HomeMy WebLinkAboutCorrespondence Page l of l
Carol Cotter - Comments for Pebbel Creek 9E and 9F
rte..
From: Carol Cotter
To: mikem @tca.net
Date: 10/14/2004 8:37 AM
Subject: Comments for Pebbel Creek 9E and 9F
Mike -
Attached are comments for the Preliminary Plat. Formal comments will be returned on Monday. Bridgette is out
the rest of the week, but I wanted to get these back to you before Monday.
Carol
file: / /C:\ Documents %20and %20Settings \ccotter \Local %20Settings \Temp \GW } 00001.HT... 10/14/2004
s McCLURE & BROWNE ENGINEERING /SURVEYING,
INC.
1008 Woodcreek Drive, Suite 103 • College Station, Texas 77845 10 , �
(979) 693 -3838 • Fax (979) 693 -2554 • Email: mcclure @tca.net , )
( !a/ 0I"
Vole
October 22, 2004
Bridgette George
Assistant Development Manager
Development Services, City of College Station
College Station, TX 77840
Re.: Pebble Creek Phase 9E & 9F Preliminary Plat
Dear Ms. George:
Below is the summary of the revisions made per the staff's comments.
ENGINEERING:
Comment #1: This plat must show compliance with the Bikeways Master Plan.
ACTION: Future Bikeways locations have been added to the plat.
Comment #2: Residential lots are shown fronting on a minor collector. The
Commission may restrict residential access on lots adjacent to St.
Andrews Drive per Section 8 -G.8.
ACTION: It is the Planning and Zoning Commission's discretion to allow access
to a collector. The owner would like to discuss this issue during the
Planning & Zoning meeting.
Comment #3: It is the Planning and Zoning Commission's discretion to require a
sidewalk down the northernmost unnamed cul -de -sac and common area
to Pebble Creek Parkway.
ACTION: A.sidewalk will be added at the Commission's request.
Comment #4: Upon investigation there does no appear to be an unnamed tributary of
Alum Creek crossing Animate Habitat property beginning at Lots 32 and
33, Block 46. If this is the case you will need an offsite drainage
easement. In addition it appears proposed flow will be in excess of
predevelopment flows at this discharge point. Keep in mind that you will
be required to show how the post development discharge complies with
the Drainage Policy and Design Standards.
ACTION: An offsite drainage easement has been added to the plat.
Comment #5: You will be required to show that there is flow capacity for the additional
stormwater discharge in the drainage way that runs behind the Tots in
Phase 7A.
ACTION: The flow capacity of the creek behind Phase 7A will be verified with the
drainage report for Phase 9E.
Comment #6: Where is the outfall for the stormwater lines along Lots 6 -9, Block 48?
ACTION: The storm drain line was inadvertently left out. It has been added to
the plat.
Comment #7: Show volume and page of filed easements on St. Andrews Drive at
Turnberry Drive.
ACTION: The volume and page number has been added to the plat.
Comment #8: There are a number of offsite easements proposed on the plat. These
will be required to be dedicated by separate instrument or on respective
plats.
ACTION: The offsite easement descriptions will be provided with the respective
final plats.
Comment #9: If the proposed sewer lines are in compliance with the target depth of 6',
then the required PUE width is 20'.
ACTION: The PUE widths have been adjusted.
Comment #10: St. Andrews will need to be designed in accordance with the Bikeways
Master Plan to include Bike Lanes.
ACTION: A label has been added to the plat. The typical section for St. Andrews
Drive in the construction plans will designate the appropriate Bikelane
size and location.
Comment #11: All utilities are required to meet BCS Design Guidelines. Line sizes will
be determined at Final Plat stage.
ACTION: Duly noted.
Comment #12: Per Subdivision Regulations 6- C.5.7, show line size of pipelines, design
pressure, and product transported.
ACTION: Exxon -Mobil is currently unwilling to release pressure information on
their pipeline. All other required information is shown on the
Preliminary Plat.
Comment #13: Adding an additional manhole in the floodplain is not recommended.
Staff recommends that flow be directed to the existing 6" sewer line on
St. Andrews.
ACTION: The sewerline on St. Andrews is not deep enough to provide service
for this cul -de -sac. If it is determined that the proposed manhole is
within the limits of the floodplain, a water -tight ring and cover will be
provided or the tie -in location will be changed.
Comment #14: Define PDE.
ACTION: The plat has been revised to show the definition (Public Drainage
Easement).
Comment #15: A number of streets are unnamed. Please provide names.
ACTION: The street names have been added to the plat.
Comment #16: Provide finish floor elevations for Lots 23, 24, 31, and 32, Block 46.
ACTION: It has been determined that the floodplain for Alum Creek was not
plotted correctly on the original submittal of this plat. The correct
floodplain location is shown on the revised plat. The floodplain is
located well away for the lots listed in the comment, therefore, we have
not added the Finished Floor elevations.
Comment #17: The design of St. Andrews to the future Pebble Creek Parkway will need
to consider the pipeline cover requirements and include the design of
the tie -in.
ACTION: Duly noted.
ELECTRICAL:
Comment #1: Developer installs conduit per city specs and design.
ACTION: Duly noted.
Comment #2: Developer provides 30' of rigid conduit for riser poles. Developer
installs first 10'. City installs remainder.
ACTION: Duly noted.
Comment #3: Developer pours switchgear pad per city specs. (Will be located back
side of Lot 1, Blk 46, Phase 9F near future road extension. A 15'x15'
easement outside of property will be necessary.
ACTION: The easement has been added to the plat.
Comment #4: Developer installs pull boxes as per city specs and design. (Pull boxes
provided by City)
ACTION: Duly noted.
Comment #5: Developer provides digital AutoCAD 2000 version of plat, email to
tmichalsky @cstx.gov
ACTION: Duly noted.
Comment #6: Once we received the site plan we will do an electric design and provide
it back to the developer for conduit install and necessary easement
T
locations.
ACTION: Duly noted.
Comment #7: Developer provides easements for electric infrastructure as installed for
electric lines (including street lights).
ACTION: Duly noted.
Comment #8: Will need 20' easement along rear of lots 1, 2, 3, 4, 5, 6, 13, 14, 15, 22,
23, 24, 31, and 32. (10' easement on either side of lot lines will work
too.)
ACTION: The easement has been shown on the plat.
Comment #9: Will need 15' easements between Lots 12 & 13 and Lots 18 & 19 Blk
47, Lots 7 & 8 Blk 48.
ACTION: The easements have been shown on the plat.
Comment #10: Street light easement to be determined with design.
ACTION: Duly noted.
Sincerely,
Robe on, E.I.T.
Graduate ngineer
McCLURE & BROWNE ENGINEERING /SURVEYING, INC.