HomeMy WebLinkAboutResponse to staff comments STAFF REVIEW COMMENTS NO. 1
Project: TOWER POINT PH 13A L1 B1 & ROW DED 1.98 - 12- 00500242
PLANNING
1. Submit Easement Dedication Sheet and required documents for the water line that will be
looped through Phase 13B.
Provided.
2. Revise the two labels on the plat that state the Current Zoning is C -1 (Commercial) as the
name has been changed to GC General Commercial. Also, revise Note 7.
Current zoning nomenclature has been provided.
3. Provide labels for the easement lengths for the 15 -foot wide PUEs on the north and east
sides of the lot.
Easement lengths have been added.
4. Revise the name of the Commission's certificate to be "Certificate of Planning and Zoning
Commission." Also, remove the Secretary's attest from this certificate.
Certifications have been modified as requested.
5. Revise Note 6 to remove the "b.)" in front of Block 1. With the designation of Building Plot
a.), this additional notation makes the note somewhat confusing. Complete the last sentence
of the note to state for building plots "over 50,000 square feet."
Note 6 has been revised as requested.
6. Revise the Vicinity Map to relabel Greens Prairie Road as William D Fitch Parkway,
Vicinity map has been re- labeled.
7. Please note that you may be required to submit paid tax certificates if they are not current
prior to the filing of your plat.
Acknowledged.
8. Please note that any changes made to the plans that have not been requested by the City of
College Station must be explained in your next transmittal letter.
Not applicable.
Reviewed by: Jason Schubert Date: November 28, 2012
ENGINEERING COMMENTS NO. 1 — Final Plat
1. FYI...Please be aware that the private infrastructure including irrigation, light poles, signage
will be limited within PUEs. Dedicating the hatched area as PUE may be difficult.
This will require further discussion.
2. FYI...Additional Development Permit Fee in the amount of 1% of the total public
infrastructure cost will be required.
Acknowledged.
3. The construction documents are still under review and may affect the plat.
Acknowledged.
Reviewed by: Erika Bridges Date: November 28, 2012
ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION
1. SITE PLAN /PLAT: Developer will provide CSU with a digital, AutoCAD dwg format, version
of plat and / or site plan as soon as it is available. Email to: gmartinez(a)cstx.gov.
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be
explained in your next transmittal letter. 2 of 3
2. LOAD DATA: The developer will provide load data to CSU as soon as it is available. This
information is critical for CSU to accurately determine the size and number of transformers,
and other equipment, required to provide service to the project. Failure to provide load data
will result in construction delays and, due to clearance requirements, could affect the final
building footprint. Delivery time for transformers and other equipment not in stock is
approximate 26 weeks.
3. EASEMENTS: Developer provides temporary blanket easement for construction purposes
and upon completion of project must provide descriptive easements for electric infrastructure
as designed by CSU.
4. If easements shown on plat are used for electric infrastructure, the developer will be
responsible for locating easements on site as needed to insure that electrical infrastructure
is installed within easement boundaries.
GENERAL ELECTRICAL COMMENTS
1. Developer installs conduit per CSU specs and design.
2. CSU will provide drawings for electrical installation.
3. Developer provides 30' of rigid or IMC conduit for each riser conduit. CSU installs riser.
4. Developer will intercept existing conduit at designated transformers or other existing devices
and extend as required.
5. If conduit does not exist at designated transformer or other existing devices, developer will
furnish and install conduit as shown on CSU electrical layout.
6. Developer pours electric device pads or footings, i.e. transformers, pull boxes, or other
device, per CSU specs and design.
7. Developer installs pull boxes per CSU specs and design, Pull boxes provided by CSU.
8. Final site plan must show all proposed electrical facilities necessary to provide electrical
service, i.e. transformers, pull boxes, or switchgears, all meter locations, and conduit routing
as designed by CSU.
9. To discuss any of the above electrical comments please contact Gilbert Martinez at
979.764.6255.
Reviewed by: Gilbert Martinez Date: November 20, 2012
SANITATION
1. Sanitation is ok with this project.
Reviewed by: Wally Urrutia Date: November 21, 2012
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be
explained in your next transmittal letter. 3 of 3