HomeMy WebLinkAboutCost Estimate ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COSTS TOWER POINT PHASE 13A WATERLINE, SANITARY SEWER, & STORM SEWER IMPROVEMENTS 11/13/2012 - Revised 12/05/12 ITEM NO. QTY. UNIT 1 -_ ITEM DESCRIPTION & PRICE IN WORDS I UNF G R ES IN ( TOTAL FIGUR S E IN DEMOLITION: 1 35 SY Saw cut, demolish & remove existing concrete sidewalk $9.00 $315.00 for Dollars and Cents per square yard. 2 94 LF Saw cut, demolish & remove existing curb and gutter $5.00 $470.00 complete for Dollars and Cents per linear foot. 3 1 LS Salvage & relocate light pole as directed by City of College Station $750.00 $750.00 Utilities- Electric Department complete and in place for Dollars and Cents. DEMOLITION - SUBTOTAL 1: $1,535.00 (ITEMS 1 -3) PUBLIC STORM SEWER: 4 12 LF Furnish and Install 30" Rubber Gasket RCP Storm Sewer, complete and $100.00 $1,200.00 in place for Dollars and Cents per linear foot. 5 431 LF Furnish and Install 48" Rubber Gasket RCP Storm Sewer, complete and $200.00 $86,200.00 in place for Dollars and Cents per linear foot. 6 1 EA Furnish and Install 7.5'x6' (I.D.) Curb Inlet w/ 2 -5' Extensions complete $4,500.00 $4,500.00 and in place for Dollars and Cents each. 7 1 EA Furnish and Install 6'x6' (I.D.) Curb Inlet w/ 2 -5' Extensions complete and $4,500.00 $4,500.00 in place for Dollars and Cents each. 8 1 EA Furnish and Install 6'x6' (I.D.) Reinforced Concrete Junction Box $3,000.00 $3,000.00 complete and in place for Dollars and Cents each. 9 1 LS Demo portion of existing wing wall, Cut Chamfer on 48" RCP, Furnish $2,000.00 $2,000.00 and Install 4" thick reinforced concrete slope paving (80 ft complete and in place for Dollars and Cents ton. STORM SEWER - SUBTOTAL 2: $101,400.00 (ITEMS 4 -9) ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COSTS TOWER POINT PHASE 13A WATERLINE, SANITARY SEWER, & STORM SEWER IMPROVEMENTS 11/13/2012 - Revised 12/05/12 EST. UNIT PRICE IN TOTAL PRICE IN ITEM NO. QTY. UNIT ITEM DESCRIPTION & PRICE IN WORDS FIGURES FIGURES PUBLIC WATER LINE: 10 788 LF Furnish and Install 12" PVC Water Main (AWWA C -900, Pressure Class $60.00 $47,280.00 200) - Standard Depth- 4' -6' Bury complete and in place for Dollars and Cents per linear foot. (Structural Bedding and Backfill) 11 4 EA Furnish and Install 12" Gate Valve and Box, complete and in place $2,400.00 $9,600.00 for Dollars and Cents each. 12 10 EA Furnish and Install 12" Ductile Iron, M.J. 45° Bend, to include all $580.00 $5,800.00 necessary thrust blocking, complete and in place for Dollars and Cents each. 13 1 EA Furnish and Install 12 "x8" Ductile Iron, M.J. Reducer, to include all $325.00 $325.00 necessary thrust blocking, complete and in place for Dollars and Cents each. 14 1 EA Furnish and Install 12 "x12" Ductile Iron, M.J. Tee, to include all necessary $950.00 $950.00 thrust blocking, complete and in place for Dollars and Cents each. 15 1 EA Furnish and Install wet connection to existing 24" D.I. waterline - $10,000.00 $10,000.00 contractor to coordinate with City of College Station Utilities Dept. to include 12" tapping sleeve and valve, complete and in place for Dollars and Cents each. 16 1 EA Furnish and Install Standard City of College Station Fire Hydrant, with all $2,950.00 $2,950.00 necessary appurtances, complete and in place for Dollars and Cents each. 17 1 EA Furnish and Install Wet Connection to existing 8" PVC Waterline, $1,000.00 $1,000.00 contractor to coordinate with City of College Station Utilities Department for Dollars and Cents each. WATERLINE TOTAL - SUBTOTAL 3: $77,905.00 (ITEMS 10 -17) s. ENGINEER'S OPINION OF PROBABLE CONSTRUCTION COSTS TOWER POINT PHASE 13A WATERLINE, SANITARY SEWER, & STORM SEWER IMPROVEMENTS 11/13/2012 - Revised 12/05/12 EST. UNIT PRICE IN TOTAL PRICE IN ITEM NO. QTY. UNIT ITEM, DESCRIPTION & PRICE IN WORDS FIGURES FIGURES PUBLIC SANITARY SEWER LINE: 18 249 LF Furnish and Install 8" PVC Sanitary Sewer Main (SDR 26, ASTM D3034, $30.00 $7,470.00 SDR 26) —Extra Depth— 8' -12' complete and in place for Dollars and Cents per linear foot. (Structural Bedding and Backfill) 19 1 LS Adjust top of sanitary sewer manhole elevation to finished grade $500.00 $500.00 elevation complete and in place for Dollars and Cents. 20 2 EA Furnish and Install Standard City of College Station Sanitary Sewer $2,500.00 $5,000.00 Manhole (Depth— 10' -15'), complete and in place for Dollars and Cents each. 21 1 EA Furnish and Install Outside Drop Manhole Connection (8' to 20' depth) $1,500.00 $1,500.00 into Existing Manhole, complete and in place for Dollars and Cents each. SANITARY SEWER TOTAL - SUBTOTAL 4: $14,470.00 (ITEMS 18 -21) = ' ® yy �l l ESTIMATE SUMMARY os. '�••••••••::` Il SUBTOTAL 1: $1,535.00 • • *: • N * j, SUBTO 2: $101,400.00 SUBTOTAL 3: $77,905.00 ALFRED A. PAINE A SUBTOTAL 4: $14,470.00 0 • • 97221 0 �Q 7 9 ; TOTAL: $195,310.00 ( 1 0... :N ��• 10% CONTINGENCY: $19,531.00 r I // '0.� . TOTAL ESTIMATE: $214,841.00 , r (57Zc!Z