December 13, 2012
BY HAND DELIVERY
Mr. Alan Gibbs
City Engineer
City of College Station
Planning & Development Services
1101 Texas Avenue
College Station, Texas 77840
Re: Final Plat of Tower Point Ph. 13A, Lot 1, Block 1 and Right of Way Dedication
Dear Alan:
This letter will confirm the following: (1) Financial surety for the captioned plat may be provided
after the Planning and Zoning Commission action. (2) Plat approval and filing will be
conditioned upon the City's receipt of financial surety in the amount of $214,841 (which includes
a contingency amount of $19,531) representing the amount shown in the Engineer's Opinion of
Probable Costs dated December 5, 2012 for the public infrastructure shown in the plans
submitted with the captioned plat ( "Public Infrastructure "). We further acknowledge that the site
plan for Lot 1, Phase 13A will require the entire water line design contained in the Public
Infrastructure plans to be completed and that the certificate of occupancy for Lot 1, Phase 13A
will be conditioned upon completion of such water line loop.
Very truly yours,
Amy L. lough
ALC /pc
cc: Andy Weiner
Tim Crowley
Brad Schlosser
Stewart Kling
(00182807)
I -
Jason Schubert
From: Jason Schubert
Sent: Wednesday, November 28, 2012 5:52 PM
To: 'chuck @ellisonlaw.com'
Cc: ' andyweiner @weinerdevelopment.com'; 'skling @cectexas.com'; Erika Bridges
Subject: Tower Point plat comments
Attachments: Tower Point Preliminary Plat comments.docx; Tower Point Final Plat Ph 13A comments.docx
Chuck,
I have attached comments for the preliminary and final plats. Let me know if you have any questions.
Andy, I apologize for not being able to return your call from this afternoon asking about the status of the project. I hope
this email will suffice as a response.
The construction documents for the final plat are still under review by Erika and she hopes to have that review
completed on Thursday. I will mention that with the water line going outside the boundary of Phase 13A plat, it
necessitates an off -site easement (at least a temporary blanket) for it through the unplatted Phase 13B. Beside the
design of this water line and responding to Erika's comments that are forthcoming, getting those easement documents
submitted to the City is probably your critical path.
Thanks,
Jason
Jason Schubert, AICP
Principal Planner
Planning & Development Services
City of College Station
office: (979) 764 -3570
fax: (979) 764 -3496
www.cstx.gov
City of College Station
Home of Texas A &M University
1