Loading...
HomeMy WebLinkAboutStaff CommentsCITY OF COLLEGE STATION DEVELOPMENT SERVICES 1101 Texas Avenue South, PO Box 9960 College Station, Texas 77842 Phone (979) 764-3570 / Fax (979) 764-3496 MEMORANDUM October 25, 2004 TO: Greg Taggart, MDG, via fax: 979.693.4243 ✓ FROM: Jennifer Prochazka, Staff Planner SUBJECT: HORSE HAVEN ESTATES PH.2 & 3 (PP) - Preliminary Plat Staff reviewed the above-mentioned preliminary plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following at your earliest convenience to be scheduled for the next available Planning and Zoning Commission meeting. Ten (10) copies of the revised preliminary plat; and, One (1) Mylar original of the revised preliminary plat. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff review comments cc: Alton Ofczarzak, Oakwood Custom Homes, via fax: 979.690.2504 ✓ Case file #04-00500234 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. 1 of 3 STAFF REVIEW COMMENTS NO. 2 Project: HORSE HAVEN ESTATES PH.2 & 3 (PP) - 04-00500234 ENGINEERING 1. The Preliminary Plat must show and provide for the construction of Appomattox per the Thoroughfare Plan and the approved Master Plan. It can not be shown as a Reserve tract on this property. 2. Due to the number of easements that need to be abandoned by City Council approval, staff may recommend for approval of the Preliminary Plat contingent on easements being abandoned prior to Final Plat approval. The critical easements are the ones that diminish the buildable area of the encumbered lot to less than minimum. For a corner lot this may be 1512.5 sqft and 1925 sqft for non-corner lots. 3. You have two "Block 2, Phase 3" areas labeled on the plat. (some of the following comments may be confusing due to this...) 4. A portion of the existing right-of-way that is Horse Haven Lane will need to be abandoned before Lots 13, 14, 15, 16, Block 2, Phase 3 and Lots 2, 3, 4, Block 2, Phase 3 can be platted. 5. Lot 9, Block 1, Phase 2 may need to be included in a later phase since the electrical easement traversing the property cannot be abandoned until service to the Kolbe property is re-routed. The existing location of the easement on the property may not provide sufficient buildable area. Please verify. 6. Lot 10, Block 1, Phase 2 is not to be platted without access. You can either include the lot in Phase 3 or include Horse Shoe Drive (with a temporary turn-around) in Phase 2. 7. If any portion of Horseshoe Drive is constructed, a temporary turn-around may be required. 8. It looks as if you are not including Lot 17, Block 2, Phase 3 (lot with the existing home on it) in this plat. There is a dark line surrounding this property. This lot must be platted with the rest of the subdivision. 9. Please show the buildable area of Lot 13, Block 3, Phase 3 to confirm that it will be sufficient. 10. The "elbow" shown on the southeastern portion of the property (at lots 20 & 21) must meet fire access standards and design speed. 11. FYI: the previous plat was approved with the condition that access was provided through the greenway area to the future bikeway system. 12. FYI: the utilities are not approved as shown. All utilities to be confirmed with the required engineering reports. NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. 2of3 13. Please add a note to the plat that all existing structures on the property are to be removed (except the "Existing House to Remain"). 14. Sanitary sewer in Phase 2 appears to need additional easement. 15. No dead-end water lines are allowed, except as per Design Guidelines. 16. The proposed "Common Area" is not in compliance with the approved Master Plan. The Master Plan showed these areas to be "Greenway." Please show limits of development per approved Master Plan. 17. Please label the triangular piece of property shown at the bottom of the page. The only verbiage currently on this property is "Phase Three." This area was also shown as "Greenway" on the approved Master Plan. Please show limits of development per approved Master Plan. 18. Please show all floodplain on the plat. Reviewed by: Spencer Thompson & Jennifer Prochazka Date:October 25, 2004 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. 3 of 3 CITY OF COLLEGE STATION Planning & Development Services 1101 Texas Avenue South, PO Box 9960 College Station, Texas 77842 Phone (979) 764-3570 / Fax (979) 764-3496 in, W101:1-11 L Bill December 20, 2004 TO: Greg Taggart, Municipal Development Group, Via fax 693.4243 FROM: Jennifer Prochazka, Staff Planner SUBJECT: HORSE HAVEN ESTATES PH.2 & 3 (PP) -Preliminary Plat Staff reviewed the above-mentioned preliminary plat as requested. The following page is a list of staff review comments detailing items that need to be addressed. One (1) copy of the revised preliminary plat; and, One (1) Mylar original of the revised preliminary plat. If you have any questions or need additional information, please call me at 979.764.3570. Attachments: Staff review comments cc: Alton Ofczarzak, Via fax 690.2504 V Burt & Virginia Hermann Case file #04-00500234 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. I of 2 /12,/2004 16 04 CVFAX 979 693 4243 CITY OF COLLEGE STATION Pkinning 6- Devel )pnzent Services 1101 Texas AventtC Sot_it.ii, PO Box 9960 College Station, Texas 77342 Phone (979) 764-3570 / Fax (979) 764-3496 MEMORANDUM October 12, 2004 Page 1 of 2 10 Al) '0j TO: Greg Taggart, Municipal Development Group, Via fax 693.4243 FROM: Bridgette George, Assistant Development Manager SUBJECT: HORSE HAVEN ESTATES PH.2 & 3 (PP) - Preliminary Plat Staff reviewed the above-mentioned preliminary plat as requested but was unable to complete the review. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information to be scheduled for a future Planning & Zoning Commission meeting: One (1) copy of the revised preliminary plat. If you have any questions or need additional information, please call Spencer Thompson at 979.764.3570. Attachments: Staff review comments cc: Alton Ofczarzak, Via fax 690.2504 Case file #04-00500234 Home of Texas A&M L.niversity /12/2004 lE 04 CVFAX 979 693 4243 Page 2 of 2 STAFF REVIEW COMMENTS NO. 1 Project: HORSE HAVEN ESTATES PH.2 & 3 (PP) - 04-00500234 ENGINEERING 1. The Preliminary Plat submitted is too busy and confusing to review. Please resubmit in a scale that is more appropriate for the amount of information show, on the plat. Please refer to previously approved preliminary plats for this project. Reviewed by Spencer Thompson Date: October 12, 2004 ELECTRICAL 1. Developer installs conduit per city specs and design. 2. Developer provides 30' of rigid conduit for riser poles. Developer installs 2. first 10'. City installs remainder. 3. Developer installs pull boxes as per city specs and design.(pull boxes 4. provided by the city). 5. Developer provides easements for electric infrastructure as installed for electric lines (including street lights). 6. 'tA/e are current working on electric layout for this projects. Will email it back to you for comments and easement locations per design. To discuss any of the above electrical comments, please contact Tony Michalsky at 979.764.3438. Reviewed by: Tony Michalsky Date: 10-07-04 NOTE: Any changes made to the plans, that have not teen requested by the City of College Stator, must be explained in your nerd transmittal letter and "bubbled' on your plans, Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. STAFF REPORT Project Manager: Jennifer Prochazka, Staff Planner Date: November 8, 2004 Email: jrochazka@cstx.gov Item: Consideration, discussion, and possible action on a revised Preliminary Plat for Horse Haven Estates Phase II, consisting of 63 lots on 14.58 acres, generally located at Earl Rudder Freeway and Horse Haven Lane. Applicant: Greg Taggart, Municipal Development Group, agent for owner Staff Recommendations: Staff recommends approval of the Preliminary Plat with the condition that all Staff Review Comments No.3 are addressed, the Preliminary Plat revised accordingly. Item Summary: This item is for consideration of a revised Preliminary Plat in preparation for residential development. The applicant is proposing 63 R-1 Single Family Residential lots and several reserve tracts. Approval of this item will replace the Preliminary Plat, showing 58 lots, approved for the property on September 2, 2004. The previous Plat was approved with the condition that public connection be made to the adjoining greenway. The applicant has shown access to the greenway to the south and to the east. The access easements provided on the plan should be Public Access Easements. Staff is concerned about the potential fencing of these access points as currently shown on the Plat. The Preliminary plat is in compliance with the approved Master Plan and the Subdivision Regulations. Comprehensive Plan Considerations: The Land Use Plan designates the majority of this property as Single-Family Residential Medium Density and Floodplain / Streams. The 100-year floodplain is shown as proposed greenway on the Preliminary Plat. Appomattox is shown as a minor collector on the Thoroughfare Plan. The applicant has provided sufficient right-of-way for the extension of Appomattox to the northern property. While discussions of whether Appomattox should stay on the plan as a minor collector are on-going, this plat is meeting the current Thoroughfare Plan. Item Background: The property was annexed in 1977 and zoned A-O at that time. The property was rezoned to R-1 Single Family Residential earlier this year. A Master Plan of this property and the surrounding area was also approved earlier this year. In addition, numerous illegal subdivisions of land have occurred over the years. Budgetary & Financial Summary: N/A Related Advisory Board Recommendations: The Parks Board recommended fee in lieu of land dedication with the condition that a pedestrian access way is provided for the residents of Horse Haven Estates to access Windwood Park. This will either be accomplished by way of pedestrian walk way at the end of Horse Shoe Drive in Phase III of the development or with the extension of Appomattox. Commission Action Options: The Commission has final authority over the Preliminary Plat. The options are: ■ Approval ■ Denial Supporting Materials: 1. Location Map 2. Aerial 3. Application 4. Staff Review Comments No. 3 5. Infrastructure and Facilities 6. Copy of Preliminary Plat (*t/q" CITY OF COLLEGE STATION Planning 6- Development Services 1101 Texas Avenue South, PO Box 9960 College Station, Texas 77842 Phone (979) 764-3570 / Fax (979) 764-3496 MEMORANDUM October 12, 2004 TO: Greg Taggart, Municipal Development Group, Via fax 693.4243 FROM: Bridgette George, Assistant Development Manager SUBJECT: HORSE HAVEN ESTATES PH.2 & 3 (PP) -Preliminary Plat Staff reviewed the above-mentioned preliminary plat as requested but was unable to complete the review. The following page is a list of staff review comments detailing items that need to be addressed. Please address the comments and submit the following information to be scheduled for a future Planning & Zoning Commission meeting: One (1) copy of the revised preliminary plat. If you have any questions or need additional information, please call Spencer Thompson at 979.764.3570. Attachments: Staff review comments cc: Alton Ofczarzak, Via fax 690.2504-' Case file #04-00500234 Home of Texas A&M University Ilk STAFF REVIEW COMMENTS NO. 1 Project: HORSE HAVEN ESTATES PH.2 & 3 (PP) - 04-00500234 ENGINEERING The Preliminary Plat submitted is too busy and confusing to review. Please resubmit in a scale that is more appropriate for the amount of information shown on the plat. Please refer to previously approved preliminary plats for this project. Reviewed by: Spencer Thompson Date: October 12, 2004 ELECTRICAL 1. Developer installs conduit per city specs and design. 2. Developer provides 30' of rigid conduit for riser poles. Developer installs 2. first 10'. City installs remainder. 3. Developer installs pull boxes as per city specs and design.(pull boxes 4. provided by the city). 5. Developer provides easements for electric infrastructure as installed for electric lines (including street lights). 6. We are current working on electric layout for this projects. Will email it back to you for comments and easement locations per design. 7. To discuss any of the above electrical comments, please contact Tony Michalsky at 979.764.3438. Reviewed by: Tony Michalsky Date: 10-07-04 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. 2 of 2 or"" oq-~3~, CITY OF COLLEGE STATION MEMORANDUM TO: Bridgette George, Development Services FROM: Brenda Godfrey, Legal Assistant SUBJECT: Public Utility Easement and Temporary Access Easement OAKWOOD CUSTOM HOMES GROUP, LTD. DATE: March 16, 2005 Attached are the following documents: 1. Original Temporary Access Easement - 0.21 acre tract of land in the Morgan Rector League, A#46, College Station, Brazos County, Texas. 2. Original Public Utility Easement - 0.13 acre tract of land in the Morgan Rector League, A#46, College Station, Brazos County, Texas. Please forward the above documents to the Owner so that they may be properly executed by the Owner and Lienholder (Compass Bank) before a Notary Public. Additionally, please advise the Owner that we will need a Resolution of the Directors of Oakwood Custom Homes Group, Ltd. authorizing Alton Ofczarzak to execute the Public Utility Easement and the Temporary Access Easement on behalf of Oakwood Custom Homes Group, Ltd. The Resolution previously provided only allowed Mr. Ofczarzak to sign the Temporary Blanket Utility Easement. Upon receipt of the fully executed Public Utility Easement and Temporary Access Easement, the documents will be executed by Legal and filed for record in the Brazos County Clerk's Office. If you need any additional information, please let me know. &w-P-6- Bg Attachments Legal Department P.O. BOX 9960 • 1101 TEXAS AVENUE COLLEGE STATION • TEXAS • 77842 TEL. 979.764.3507 . FAX. 979.764-3481 www.cstx.gov STAFF REVIEW COMMENTS NO. 3 Project: HORSE HAVEN ESTATES PH.2 & 3 (PP) - 04-00500234 ENGINEERING 1. Repeat Comment: Lot 13, Block 3, Phase 3 is required to have a minimum buildable area due to its irregular shape. As shown, the buildable area of is less than the minimum required when the 15' drainage easement is provided for the proposed storm sewer. The storm sewer would need to be rerouted in order to make this lot buildable. 2. Repeat Comment: The access easements provided on the plan should be Public Access Easements. There was a concern about the potential fencing of these easements, as shown. You may also wish to consider designating this space as "Common Area" and relocating lot lines (again, ensuring that they are accessible to the public). Reviewed by: Jennifer Prochazka Date: December 20, 2004 NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out to the City, will constitute a completely new review. 2of2 r STAFF REVIEW COMMENTS NO. 3 Project: HORSE HAVEN ESTATES PH 2 (PP) - 04-00500193 ENGINEERING J,~Public Utility Easements are to be provided on the Preliminary Plat to meet the requirements of 8-1.2 of the Subdivision Regulations. It is understood that they are not being shown here for clarity. 2 Lot 13, Block 3, Phase 3 is required to have a minimum buildable area due to its irregular shape. As shown, the buildable area of is less than the minimum required when the 15' drainage easement is provided for the proposed storm sewer. The storm sewer would need to be rerouted in order to make this lot uildable. The subject property has numerous existing structures that are required to be removed in order to plat the property. These structures will be required to be removed in order to file the Final Plat of the phase in which the structure is located. 4/The utility plan as shown is not approved with approval of the Preliminary Plat. All utilities must be designed to meet the Unified Design Guidelines. The required reports must show compliance. The Guidelines prohibit dead- end waterlines. The previous Preliminary Plat was approved with these same conditions. n`b 5 The Commission requested an access easement to the future Bikeway and Parkland. In light of this, the access easements provided on the plan should be Public Access Easements. There is a concern about the potential fencing of these easements, as shown. You may wish to consider designating this space as "Common Area" and relocating lot lines. 6. Please note, all phases of the project must "stand alone" in regard to utilities i and access. Reviewed by: Spencer Thompson & Jennifer Prochazka Date:11-8-04