Loading...
HomeMy WebLinkAboutStaff ReportINFRASTRUCTURE AND FACILITIES Water required for development: There is an existing 8-in water line along Horse Haven Lane. This line is to be extended to provide fire coverage and domestic uses. Water Service: Water service to be provided to each lot and proposed structure. Sewer required for development: There are two existing sewer mains within the property boundaries. Sanitary sewer system is to be extended as shown on plat. Sewer Service: Sewer service to be extended to each lot. Street/Access required for development: Access is to be provided to each lot. Appomattox is required per the T-fare Plan. Off-site Easements required for development: None known to be needed at this time. Numerous abandonments to occur for Final Plat. Drainage: Drainage is generally to Wolf Pen Creek. Some to Carters Creek. Flood Plain: Wolf Pen Creek and Carters Creek floodplains are on the subject site, as shown. No lots are proposed in the floodplain. Oversize request: None requested at this time. Impact Fees: None Parkland Dedication Fees: The Parks Board recommended fee in lieu of land dedication with the condition that a pedestrian access way be provided for the residents of Horse Haven Estates to access Windwood Park. This will either be accomplished by way of pedestrian walk way at the end of Horse Shoe Drive in Phase III of the development or with the extension of Appomattox.