HomeMy WebLinkAboutStaff ReportINFRASTRUCTURE AND FACILITIES
Water required for development: There is an existing 8-in water line
along Horse Haven Lane. This line is to be extended to provide fire
coverage and domestic uses.
Water Service: Water service to be provided to each lot and proposed
structure.
Sewer required for development: There are two existing sewer mains
within the property boundaries. Sanitary sewer system is to be extended
as shown on plat.
Sewer Service: Sewer service to be extended to each lot.
Street/Access required for development: Access is to be provided to
each lot. Appomattox is required per the T-fare Plan.
Off-site Easements required for development: None known to be
needed at this time. Numerous abandonments to occur for Final Plat.
Drainage: Drainage is generally to Wolf Pen Creek. Some to Carters
Creek.
Flood Plain: Wolf Pen Creek and Carters Creek floodplains are on the
subject site, as shown. No lots are proposed in the floodplain.
Oversize request: None requested at this time.
Impact Fees: None
Parkland Dedication Fees: The Parks Board recommended fee in lieu
of land dedication with the condition that a pedestrian access way be
provided for the residents of Horse Haven Estates to access Windwood
Park. This will either be accomplished by way of pedestrian walk way at
the end of Horse Shoe Drive in Phase III of the development or with the
extension of Appomattox.