HomeMy WebLinkAboutApplication FOR OFFICE UE ONLY
CASE NO.:
11(1. 1
DATE SUBMITTED: III
_ L
TIME: l
CITY OF COI,LHGF: STATION
Home 1 t ✓�
of 'Texas Ad�M University STAFF:
DESIGN REVIEW BOARD APPLICATION
WOLF PEN CREEK DEVELOPMENT REVIEW
(Check all that apply. Note: All items checked must be presented to the Design Review Board at the
same time): ❑ Site Plan / Building ❑ Building X Sign
/ MINIMUM SUBMITTAL REQUIREMENTS:
$350 Design Review Board Application Fee.
Application completed in full. This application form provided by the City of College Station must be used
and may not be adjusted or altered. Please attach pages if additional information is provided.
For Site Plan / Building consideration:
❑ $932 Site Plan Application Fee.
❑ $600 (minimum) Development Permit Application / Public Infrastructure Review and Inspection Fee. Fee is
1% of acceptable Engineer's Estimate for public infrastructure, $600 minimum (if fee is > $600, the balance
is due prior to the issuance of any plans or development permit).
❑ $350 Non - Residential Architectural Standards Building Review Application Fee (if applicable).
❑ Fourteen (14) folded copies of site plan.
❑ One (1) folded copy of the landscape plan.
❑ One (1) copy of the following for building review (if applicable).
❑ Building elevations to scale for all buildings.
❑ A list of building materials for all facade and screening.
❑ Color samples for all buildings or list colors to be used from the approved color palette.
❑ Two (2) copies of the grading, drainage, and erosion control plans with supporting drainage report.
❑ Two (2) copies of the public infrastructure plans and supporting documents (if applicable).
❑ The attached Site Plan and Non - Residential Architectural Standards Building Review checklists (if
applicable) with all items checked off or a brief explanation as to why they are not check off.
For Building consideration:
❑ $250 Non - Residential Architectural Standards Building Review Application Fee (if applicable).
❑ One (1) copy of building elevations to scale for all buildings.
❑ A list of building materials for all facades and screening.
❑ Color samples for all buildings or list colors to be used from the approved color palette.
❑ The attached Non - Residential Architectural Standards Building Review checklist with all items checked off
or a brief explanation as to why they are not checked off (if applicable).
/Fo Sign consideration:
V /A Ten (10) copies of sign details with dimensions.
Ten (10) copies of the building elevation showing sign placement (if attached signage is proposed).
❑ Ten (10) copies of color samples.
❑ Material samples.
NOTE: Proposed development in Wolf Pen Creek must be reviewed by the Design Review Board. When staff has
completed their technical review of the proposal, it will be scheduled for consideration by the Design Review
Board. Ten (10) copies of all current design plans and color samples will be required for the Board.
1/11 Page 1 of 11
Date of Optional Preapplication o tormwater Management Conference
NAME OF PROJECT ? i fl -'e Erect
ADDRESS .I difILLAactin ir. E CC TY 7?fi'y
LEGAL DESCRIPTION (Lot, Block, Subdivision) fi M1/ GreAL
APPLICANT /PROJECT MANAGER'S INFORMATION (Primary contact for the project): /� / /
Name iwp f ) n - d • 7 i -ff &r E -mail WOt f� n �11 h S iYCe7R.
Cotikt
Street Address /6/ 417 i( 3o
City 61112- \ State Zip Code 771
Phone Number - 77 6 -rgoo Fax Number 776,
PROPERTY OWNER'S INFORMATION:
Name E -mail
Street Address
City State Zip Code
Phone Number Fax Number
OTHER CONTACTS lease specify type of contact, i.e. project manager, potential buyer, local contact, etc.):
Name aubriL ' Ss' , (M r E -mail ? ol'IOlS 'oh )
Street Address goo tin ` X Or. 1 srirrl-Iceahttla . CO►zl
City (' , State Zip Code T�'y D
Phone Number 673 - 3,60 Fax Number
This information is necessary to help staff identify the appropriate standards to review the application and will be used to
help determine if the application qualifies for vesting to a previous ordinance. Notwithstanding any assertion made,
vesting is limited to that which is provided in Chapter 245 of the Texas Local Government Code or other applicable law.
Is this application a continuation of a project that has received prior City platting approval(s) and you are requesting the
application be reviewed under previous ordinance as applicable?
fl Yes
KNo
If yes, provide information regarding the first approved application and any related subsequent applications (provide
additional sheets if necessary):
Project Name:
City Project Number (in known).
Date / Timeframe when submitted
1/11 Page 2 of 11
✓l,
Proposed use of property c.��� 4
Is there Special Flood Hazard Area (Zone A or Zone AE on FEMA FIRM panels) on the property? r Yes )No
Square footage of attached sign _ (6 S
Square footage of freestanding sign 1
For Site Plan consideration, describe how the following proposed elements meet the goals of the special district plan and
related regulations:
Site hting:
Solid Waste
Relationship of building(s) to site:
Relationship of building(s) and site to adjoining ar -•s:
Building footprint design:
Miscellaneous structures and street hardware:
Landscaping:
Site Maintenance:
•
1 /11 Page 3 of 11
For Biding consideration, describe how the following proposed elements meet the goals of the special district plan and
related regulations:
Building Ligi g:
Solid Waste Screening:
Relationship of building(s) to site:
Relationship of building(s) and site to adjoining areas:
Building design:
Maintenance (as related to Building design):
For Sign consideration, describe how the following proposed elements meet the goals of the special district plan and
related regulations:
Signs:
Maintenance:
(/‘) seraces ct i'( po-1ed S i dOrryS Du r
The applicant has prepared this application and certifies that the facts stated herein and exhibits attached hereto are true,
correct, and • • ' ete.
A p
` kur c Its //ft / 3
Signs e a ■. title Date
1/11 Page 4 of 11
CERTIFILNTIONS REQUIRED FOR ALL DEVtLOPMENT
Owner Certification:
1. No work of any kind may start until a permit is issued.
2. The permit may be revoked if any false statements are made herein.
3. If revoked, all work must cease until permit is re- issued.
4. Development shall not be used or occupied until a Certificate of Occupancy is issued.
5. The permit will expire if no significant work is progressing within 24 months of issuance.
6. Other permits may be required to fulfill local, state, and federal requirements. Owner will obtain or show
compliance with all necessary State and Federal Permits prior to construction including NOI and SWPPP.
7. If required, Elevation Certificates will be provided with elevations certified during construction (forms at slab
pre -pour) and post construction.
8. Owner hereby gives consent to City representatives to make reasonable inspections required to verify
compliance.
9. If, stormwater mitigation is required, including detention ponds proposed as part of this project, it shall be
designed and constructed first in the construction sequence of the project.
10. In accordance with Chapter 13 of the Code of Ordinances of the City of College Station, measures shall be taken
to insure that all debris from construction, erosion, and sedimentation shall not be deposited in city streets, or
existing drainage facilities. All development shall be in accordance with the plans and specifications submitted to
and approved by the City Engineer for the above named project. All of the applicable codes and ordinances of the
City of College Station shall apply.
11. The information and conclusions contained in the attached plans and supporting documents will comply with the
current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified
Design Guidelines Technical Specifications, and Standard Details. All development has been designed in
accordance with all applicable codes and ordinances of the City of College Station and State and Federal
Regulations.
12. Release of plans to (name or firm) is authorized for bidding purposes
only. I understand that final approval and release of plans and development for construction is contingent on
contractor signature on approved Development Permit.
13. I, THE OWNER, AGREE TO AND CERTIFY THAT ALL STATEMENTS HEREIN, AND IN ATTACHMENTS FOR
THE DEVELOPMENT PERMIT APPLICATION, ARE, TO THE BEST OF MY KNOWLEDGE, TRUE, AND
ACCURATE.
Property Owner(s) Date
Engineer Certification:
1. The project has been designed to ensure that stormwater mitigation, including detention ponds, proposed as part
of the project will be constructed first in the construction sequence.
2. I will obtain or can show compliance with all necessary Local, State and Federal Permits prior to construction
including NOI and SWPPP. Design will not preclude compliance with TPDES: i.e., projects over 10 acres may
require sedimentation basin.
3. The information and conclusions contained in the attached plans and supporting documents comply with the
current requirements of the City of College Station, Texas City Code, Chapter 13 and associated BCS Unified
Design Guidelines. All development has been designed in accordance with all applicable codes and ordinances
of the City of College Station and State and Federal Regulations.
4. I, THE ENGINEER, AGREE TO AND CERTIFY THAT ALL STATEMENTS HEREIN, AND IN ATTACHMENTS
FOR THE DEVELOPMENT PERMIT APPLICATION, ARE, TO THE BEST OF MY KNOWLEDGE, TRUE, AND
ACCURATE.
Engineer Date
1/11 Page 5 of 11