HomeMy WebLinkAboutMinutesMINUTES
Planning and Zoning Commission
CITY OF COLLEGE STATION, TEXAS
August 19, 2004
S. Public hearing, discussion, and possible action on a Replat
for Gateway Phase iR and a Final Plat for the Gateway
Phase 3 Lot iR consisting of 4 lots on 22.7 acres generally
located at University Drive East at Forest Drive. (04 -155)
Graduate Civil Engineer Thompson presented the Staff Report.
Mr. Thompson stated that Lot 1R is being further divided into Lot
1AR, Lot 8 and Lot 12. Lot 8 is currently Gateway Station
whereas the other lots are undeveloped at this time. He added
that all the properties are accessed from University Drive at the
signalized intersection. Mr. Thompson reported that there were
several requirements placed on the Gateway during the
rezoning. One was that Phase 3 is required to provide access to
the adjacent lot to the West. A note to this effect is included on
the plat. He added that Phase 2, 3, and 4 also include floodplain
and floodway, as shown on the plat.
Chairman Shafer opened the public hearing.
Terry Barr, Mitchell and Morgan agreed with Staff, adding two
modifications: (1) Note #10 added to plat that states all
utilities to be located underground in order to promote the
aesthetics of the property; (2) No requirement to add a 20'
easement.
Chairman Shafer closed the public hearing.
Some discussion regarding utilities and the easement ensued.
Commissioner Davis motioned to approve the replat with Staff
comments. Commissioner White seconded the motion. The
motion carried 7 -0.
FOR: Shafer, Davis, Fedora, Hooton, Nichols, Reynolds,
and White.
AGAINST: None.
ABSENT: None.
Commissioner White motioned to approve the final plat.
Commissioner Davis seconded the motion. The motion carried
7 -0.
FOR: Shafer, Davis, Fedora, Hooton, Nichols, Reynolds,
and White.
AGAINST: None.
ABSENT: None.