Loading...
HomeMy WebLinkAboutMinutesMINUTES Planning and Zoning Commission CITY OF COLLEGE STATION, TEXAS August 19, 2004 S. Public hearing, discussion, and possible action on a Replat for Gateway Phase iR and a Final Plat for the Gateway Phase 3 Lot iR consisting of 4 lots on 22.7 acres generally located at University Drive East at Forest Drive. (04 -155) Graduate Civil Engineer Thompson presented the Staff Report. Mr. Thompson stated that Lot 1R is being further divided into Lot 1AR, Lot 8 and Lot 12. Lot 8 is currently Gateway Station whereas the other lots are undeveloped at this time. He added that all the properties are accessed from University Drive at the signalized intersection. Mr. Thompson reported that there were several requirements placed on the Gateway during the rezoning. One was that Phase 3 is required to provide access to the adjacent lot to the West. A note to this effect is included on the plat. He added that Phase 2, 3, and 4 also include floodplain and floodway, as shown on the plat. Chairman Shafer opened the public hearing. Terry Barr, Mitchell and Morgan agreed with Staff, adding two modifications: (1) Note #10 added to plat that states all utilities to be located underground in order to promote the aesthetics of the property; (2) No requirement to add a 20' easement. Chairman Shafer closed the public hearing. Some discussion regarding utilities and the easement ensued. Commissioner Davis motioned to approve the replat with Staff comments. Commissioner White seconded the motion. The motion carried 7 -0. FOR: Shafer, Davis, Fedora, Hooton, Nichols, Reynolds, and White. AGAINST: None. ABSENT: None. Commissioner White motioned to approve the final plat. Commissioner Davis seconded the motion. The motion carried 7 -0. FOR: Shafer, Davis, Fedora, Hooton, Nichols, Reynolds, and White. AGAINST: None. ABSENT: None.