HomeMy WebLinkAboutStaff CommentsE
CITY OF COLLEGE STATION
DEVELOPMENT SERVICES
1101 Texas Avenue South, PO Box 9960
College Station, Texas 77842
Phone 979.764.3570 / Fax 979.764.3496
MEMORANDUM
July 6, 2004
TO: Veronica J. B. Morgan, Mitchell & Morgan, LLP, via fax 979.260.3564
FROM: Bridgette George, Assistant Development Manager
SUBJECT: GATEWAY STATION PH I & III (FP -VAC) - Final Plat
Staff reviewed the above - mentioned final plat as requested but had to stop review due
to incomplete information. The following page is a preliminary list of staff review
comments detailing items that need to be addressed. Please address the comments
and submit the following information for your plat to be scheduled for a future Planning
& Zoning Commission meeting:
Two (2) copies of the revised final plat;
One (1) copy of the revised preliminary plat;
One (1) Mylar original of the revised final plat; and
One (1) copy of the digital file of the final plat on diskette or e-mail to
nmanhart @cstx.gov
If you have any questions or need additional information, please call Spencer
Thompson at 979.764.3570.
Attachments: Staff review comments
cc: DELMAR Baronhead, Ltd., via fax 972.233.1501
Case file #04- 00500155
Home of Texas A&M University
STAFF REVIEW COMMENTS NO. 1
Project: GATEWAY STATION PH I & III (FP -VAC) - 04- 00500155
STOP PLAT REVIEW PROCESS
ENGINEERING
1. In order to vacate a plat or any portion of a plat, the vacating plat must be signed by
all owners of the original plat according to § 212.013 of the Local Government Code.
2. The proposed plat does not comply with the approved Preliminary Plat. Please
submit a revised Preliminary Plat. Please see City SubRegs for items required on
the plat.
3. This being a Vacating Plat and Final Plat on separate sheets, please have separate
signatures as they relate to each items.
4. Comments concerning the plat will be addressed with the submittal of the
Preliminary Plat.
Reviewed by: Spencer Thompson
Date: July 6, 2004
ELECTRICAL
1. Lot 8, Blk 1, Ph 1, need to provide easements for the existing electric infrastructure
as installed. (Call Tony Michalsky at 979 - 764 -3438 to have existing electric lines
located so easements can be dedicated on plat.)
5. Lot 1R, Blk 1, Ph 3, need 20 ft. Public Utility Easement along north property line for
future extension of electric lines.
Reviewed by: Tony Michalsky
Date: 6 -23 -04
NOTE: Any changes made to the plans, that have not been requested by the City of College Station, must be explained in your
next transmittal letter and "bubbled" on your plans. Any additional changes on these plans that have not been pointed out
to the City, will constitute a completely new review.
Page 2 of 2