Loading...
HomeMy WebLinkAboutResponse to staff comments MITCHELL MA MORGAN November 27, 2012 Morgan Hester City of College Station Planning & Development Services PO Box 9960 College Station, TX 77842 RE: COPPER FALLS — Minor Plat Dear Morgan, Attached are the following items for the Copper Falls Executive Suites Final Plat: • One (1) 24 "x36" copy of the revised final plat; • One (1) Mylar original of the revised final plat (required after Staff approval); and • One (1) copy of the digital file of the final plat on diskette or e-mail to: pdsdigitalsubmittal @cstx.gov. • Haney Highway Six Plat STAFF REVIEW COMMENTS NO. 1 Project: COPPER FALLS (FP - MINOR) - 12- 00500243 PLANNING iin Please remove "Minor Replat," from the title block so that the plat reads that it is a al Plat of Copper Falls Commons Lots 1 R, 2, &3 Block 1 1.610 acres Being a Replat of Copper Falls Commons, Lot 1, Block 1. Response: The `Minor Plat' label has been removed from the title block. The Metro Mini Storage is shown as one parcel called "Haney Highway 6, Block A, o f & Block B Lot 1 & 2" Please revise on the Original Plat and Replat. Response: Brazos CAD is incorrect with this designation. Attached is the plat which properly depicts Lot 1 and 2 Block B, and where that lot line is located. We have reflected the correct lot designation on our final plat. 1 511 UNIVERSITY DRIVE EAST, SUITE 204 • COLLEGE STATION, TX 77840 • T 979.260.6963 • F 979.260.3564 CIVIL ENGINEERING • HYDRAULICS • HYDROLOGY • UTILITIES • STREETS • SITE PLANS • SUBDIVISIONS info@mitchellandmorgan.com • www.mitchellandmorgan.com X Please do not forget to include Lot 1R Block 1 0.536 acres label on the Replat in the ne submittal. Response: This label has been added ENGINEERING COMMENTS NO. 1 1. No Comments Response: Thanks ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION 1. SITE PLAN /PLAT: Developer will provide CSU with a digital, AutoCAD dwg format, version of plat and / or site plan as soon as it is available. Email to: gmartinez @cstx.gov. Response: A digital copy of this plat has been emailed to Gilbert. 2. LOAD DATA: The developer will provide load data to CSU as soon as it is available. This information is critical for CSU to accurately determine the size and number of transformers, and other equipment, required to provide service to the project. Failure to provide load data will result in construction delays and, due to clearance requirements, could affect the final building footprint. Delivery time for transformers and other equipment not in stock is approximate 26 weeks. Response: Understood. 3. EASEMENTS: All easements on site are shown as existing. Electric facilities will be designed within existing easements. Response: Understood. 4. If easements are existing, the developer will be responsible for locating easements on site as needed to insure that electrical infrastructure is installed within easement boundaries. Response: Understood. 2 GENERAL ELECTRICAL COMMENTS 1. Developer installs conduit per College Station Utilities specs and design. Response: Understood. 2. College Station Utilities will provide drawings for electrical installation. Response: Understood. 3. Developer provides 30' of rigid or IMC conduit for riser poles. College Station Utilities installs riser. Response: Understood. 4. Developer will intercept existing conduit at designated transformers or other existing devices and extend as required. Response: Understood. 5. If conduit does not exist at designated transformer or other existing devices, developer will furnish and install conduit as shown on College Station Utilities electrical layout. Electrical layout. Response: Understood. 6. Developer pours electric devise pads or footings (i.e. transformers, pull boxes etc) per College Station Utilities specs and design. Response: Understood. 7. Developer installs pull boxes and secondary pedestals per College Station Utilities specs and design (pull boxes and secondary pedestals provided by College Station Utlities). Response: Understood. 8. Final site plan must show all proposed electrical facilities necessary to provide electrical service, i.e. transformers, pull boxes, or switchgears, all meter locations, and conduit routing as designed by CSU. Response: Understood. 3 SANITATION 1. Sanitation is ok with this project. Response: Thanks. If you have any further comments or questions, please do not hesitate to call our office at 979) 260 -6963. Si i erely, i 04 1 Veronica J. :. or - , P.E., C.F.M Partner CC: File 4 1 0 MITCHELL City of College Station RAM November 14, 2012 Planning and Development Services MORGAN PO Box 9960 College Station, TX 77842 To Whom It May Concern: The enclosed Tax Certificate, as requested in the Title Report to be included within the Minor Plat Application, is a copy of the original certificate. This Tax Certificate is current and valid, and has been originally submitted to the City of College Station on May 29, 2012. The original should still be within the City's files should you need that copy for reference. Please let us know if you need any additional information regarding this report. e cerely, g Veronica Mir ' n, Managing Ptner 511 UNIVERSITY DRIVE EAST, SUITE 204 • COLLEGE STATION, TX 77840 • T 979.260.6963 . F 979.260.3564 CIVIL ENGINEERING • HYDRAULICS • HYDROLOGY • UTILITIES • STREETS • SITE PLANS • SUBDIVISIONS info@mitchellandmorgan.com • www.mitchellandmorgan.com