November 27, 2012
Morgan Hester
City of College Station
Planning & Development Services
PO Box 9960
College Station, TX 77842
RE: COPPER FALLS — Minor Plat
Dear Morgan,
Attached are the following items for the Copper Falls Executive Suites Final Plat:
• One (1) 24 "x36" copy of the revised final plat;
• One (1) Mylar original of the revised final plat (required after Staff approval); and
• One (1) copy of the digital file of the final plat on diskette or e-mail to:
pdsdigitalsubmittal @cstx.gov.
• Haney Highway Six Plat
STAFF REVIEW COMMENTS NO. 1
Project: COPPER FALLS (FP - MINOR) - 12- 00500243
PLANNING
iin Please remove "Minor Replat," from the title block so that the plat reads that it is a
al Plat of Copper Falls Commons Lots 1 R, 2, &3 Block 1 1.610 acres Being a Replat
of Copper Falls Commons, Lot 1, Block 1.
Response: The `Minor Plat' label has been removed from the title block.
The Metro Mini Storage is shown as one parcel called "Haney Highway 6, Block A,
o f & Block B Lot 1 & 2" Please revise on the Original Plat and Replat.
Response: Brazos CAD is incorrect with this designation. Attached is the plat
which properly depicts Lot 1 and 2 Block B, and where that lot line is
located. We have reflected the correct lot designation on our final
plat.
1
511 UNIVERSITY DRIVE EAST, SUITE 204 • COLLEGE STATION, TX 77840 • T 979.260.6963 • F 979.260.3564
CIVIL ENGINEERING • HYDRAULICS • HYDROLOGY • UTILITIES • STREETS • SITE PLANS • SUBDIVISIONS
info@mitchellandmorgan.com • www.mitchellandmorgan.com
X Please do not forget to include Lot 1R Block 1 0.536 acres label on the Replat in the
ne submittal.
Response: This label has been added
ENGINEERING COMMENTS NO. 1
1. No Comments
Response: Thanks
ELECTRICAL COMMENTS REQUIRING IMMEDIATE ATTENTION
1. SITE PLAN /PLAT: Developer will provide CSU with a digital, AutoCAD dwg format,
version of plat and / or site plan as soon as it is available. Email to:
gmartinez @cstx.gov.
Response: A digital copy of this plat has been emailed to Gilbert.
2. LOAD DATA: The developer will provide load data to CSU as soon as it is available.
This information is critical for CSU to accurately determine the size and number of
transformers, and other equipment, required to provide service to the project. Failure
to provide load data will result in construction delays and, due to clearance
requirements, could affect the final building footprint. Delivery time for transformers
and other equipment not in stock is approximate 26 weeks.
Response: Understood.
3. EASEMENTS: All easements on site are shown as existing. Electric facilities will be
designed within existing easements.
Response: Understood.
4. If easements are existing, the developer will be responsible for locating easements
on site as needed to insure that electrical infrastructure is installed within easement
boundaries.
Response: Understood.
2
GENERAL ELECTRICAL COMMENTS
1. Developer installs conduit per College Station Utilities specs and design.
Response: Understood.
2. College Station Utilities will provide drawings for electrical installation.
Response: Understood.
3. Developer provides 30' of rigid or IMC conduit for riser poles. College Station Utilities
installs riser.
Response: Understood.
4. Developer will intercept existing conduit at designated transformers or other existing
devices and extend as required.
Response: Understood.
5. If conduit does not exist at designated transformer or other existing devices,
developer will furnish and install conduit as shown on College Station Utilities
electrical layout. Electrical layout.
Response: Understood.
6. Developer pours electric devise pads or footings (i.e. transformers, pull boxes etc)
per College Station Utilities specs and design.
Response: Understood.
7. Developer installs pull boxes and secondary pedestals per College Station Utilities
specs and design (pull boxes and secondary pedestals provided by College
Station Utlities).
Response: Understood.
8. Final site plan must show all proposed electrical facilities necessary to provide
electrical service, i.e. transformers, pull boxes, or switchgears, all meter locations,
and conduit routing as designed by CSU.
Response: Understood.
3
SANITATION
1. Sanitation is ok with this project.
Response: Thanks.
If you have any further comments or questions, please do not hesitate to call our office
at 979) 260 -6963.
Si i erely,
i 04
1
Veronica J. :. or - , P.E., C.F.M
Partner
CC: File
4
1 0
MITCHELL
City of College Station RAM November 14, 2012
Planning and Development Services MORGAN
PO Box 9960
College Station, TX 77842
To Whom It May Concern:
The enclosed Tax Certificate, as requested in the Title Report to be included within the Minor Plat
Application, is a copy of the original certificate. This Tax Certificate is current and valid, and has been
originally submitted to the City of College Station on May 29, 2012. The original should still be within
the City's files should you need that copy for reference.
Please let us know if you need any additional information regarding this report.
e cerely,
g
Veronica Mir ' n,
Managing Ptner
511 UNIVERSITY DRIVE EAST, SUITE 204 • COLLEGE STATION, TX 77840 • T 979.260.6963 . F 979.260.3564
CIVIL ENGINEERING • HYDRAULICS • HYDROLOGY • UTILITIES • STREETS • SITE PLANS • SUBDIVISIONS
info@mitchellandmorgan.com • www.mitchellandmorgan.com